1 Sewer Pipe Lining An Economic Solution for Pipe Rehabilitation By Tawana Albany Nicholas, Virgin Islands Waste Management Authority Abstract The United States Virgin Islands Waste Management Authority (VIWMA) oversees the maintenance and operation of the wastewater and solid waste infrastructure in the Territory. St. Croix is the largest of the four (4) islands of the United States Virgin Islands (USVI) with a population of approximately 50,600. The collection system on St. Croix is the largest system in the Territory, and consists of one (1) treatment plant, three (3) pump stations, twelve (12) lift stations, and approximately 102 miles of sewer piping ranging from four (4) inches to thirty (30) inches in diameter. Many of the major interceptors in the system were constructed in the 1970s with a design life of 25 to 30 years, and little maintenance has been performed since. With scarce funding, VIWMA is constantly looking for cost-effective long term solutions to maintaining the aging wastewater infrastructure and preventing system failures. There are many methods of sewer line rehabilitation available today. The typical dig and replace method has been increasingly avoided by many communities due to the serious challenges in excavation and restoration in some localities and the cost effectiveness of this rehabilitation solution. VIWMA has joined this trend and recently worked on its fourth sewer lining project for the island of St. Croix, with other lining projects schedule for next year. This report provides an overview of the solution for the sewer system rehabilitation of the LBJ Force Main, the Williams Delight Interceptor, the Krause Lagoon Interceptor, and the Anguilla Interceptor. The report will discuss the main steps of the sewer lining rehabilitation process. It will focus on the achievements as well as the challenges of each project; and, it will provide a unique perspective on the execution of a sewer lining project in a small community.
2 St. Croix Collection System Overview The United States Virgin Islands Waste Management Authority (VIWMA) oversees the maintenance and operation of the wastewater and solid waste infrastructure in the Territory. Overseeing the maintenance repairs, rehabilitation, and replacement of the infrastructure, as well as capital improvements, are part of that responsibility. St. Croix is one of four (4) islands of the United States Virgin Islands (USVI) with a total population 50,600 according to 2010 U.S. Census Bureau data; and its wastewater collection system serves approximately 51.5% of its population. The collection system on St. Croix consist of one (1) treatment plant, three (3) pump stations, twelve (12) lift stations, and approximately 102 miles of sewer piping ranging from four (4) inches to thirty (30) inches in diameter. Many of the major interceptors in the system were constructed in 1970s with a design life of 25 to 30 years; and little maintenance has been performed since. Physical deterioration and system component failures now require rehabilitation or replacement of many of the sewer lines and manholes to help bring the system into conformance with Environmental Protection Agency (EPA) standards. Trenchless Technology Overview With scarce funding available, VIWMA is constantly looking for cost-effective long term solutions to manage and maintain the aging wastewater infrastructure to prevent system failures. There are several methods of sewer line rehabilitation available today. The typical dig and replace method has been increasingly avoided by many communities up to 70 percent in the sewer sector and up to 31 percent in the water sector according to the EPA. The dig and replace method involves soil excavation, shoring (when applicable), pipe removal, pipe replacement, soil backfill, and site restoration. Trenchless technologies leave the existing pipe in place and use it as a host for a new pipe or a liner so that many of the steps for dig and replace can be eliminated. It is important to note that trenchless technologies are not applicable for all pipe rehabilitation. A pipe that is collapsed or has settlement of grade alignment may need to be dug up and replaced; or abandoned and replaced in a new route. Trenchless technologies are applicable to pipe with cracks, infiltration, joint offsets, and wall deterioration. They are also applicable when a project has limited above and below grade access, has safety concerns for deep excavations, a need to limit the environmental impact, has minimal impact on the public, and has time constraints. The trenchless technologies available today are Pipe Bursting or In-Line Expansion, Slip Lining, Cured-In-Place-Pipe, and Modified Cross Section Liner. Pipe Bursting is when new pipe (equal or larger diameter of host pipe) attached to a bursting or expansion head is pulled through the host pipe
3 Slip Lining is when new pipe of a smaller diameter than the host pipe is pulled through the host pipe and the space in between both pipes are filled with grout. Cured-In-Place is when a liner of the same diameter as the host pipe is pulled or inverted through the host pipe, inflated, and cured in place. Modified Cross Section Liner is when a new pipe of the same diameter as the host pipe is deformed, typically in a U shape, pulled through the host pipe, and expanded (by heating and pressurization or cool down) Project Summary Each pipe rehabilitation method should be chosen based on the pipe and field condition.. VIWMA has not and does not plan to standardize or limit rehabilitations to one type of trenchless technology or limit the material used for each type of trenchless technology. VIWMA s first trenchless technology pipe rehabilitation project was the Williams Delight Interceptor, consisting of 700ft of 30 diameter pipe. This was a Cured- In-Place-Pipe Liner installation using a felt liner material. The liner was inverted through the sewer line with water and heated with a boiler to cure. The second and third trenchless pipe rehabilitation projects were the Anguilla Interceptor consisting of 2,825ft of 24 and 30 diameter pipe, and the LBJ Force Main consisting of 4,500ft of 24 pressure pipe. This was also a Cured-In-Place-Pipe Liner installation; however the material used was a fibreglass (resin impregnated fibreglass material). The liner was pulled into the host pipe, inflated against the exiting walls, and cured with Ultra Violet Light. The Engineering Division of VIWMA recently completed its fourth sewer lining project in St. Croix; the Krause Lagoon Interceptor and Figtree Sewer Rehabilitation, Phase 3 & 4 Project. The project consisted of approximately 5,700ft of 24 diameter sewer lining and rehabilitation of fourteen (14) manholes. The sewer lining material for this project was manufactured by SAERTEX multicom. The material was composed of stitch-bonded glass-fibre fabrics and was cured in place with UV light. The sewer line depths below grade ranged from six feet (6ft) deep up to twenty feet (20ft) deep. The average manhole to manhole distance is 400 linear feet; the minimum distance is 155ft and the maximum distance is 600ft. Inspection of the sewer lines to determine the condition and help set spending priorities is critical. With limited resources, the project scope of work included closed circuit television (CCTV) inspection with recommendation and/or confirmation to proceed with sewer lining. If maintenance funding had been available, cleaning and CCTV work would have been completed prior to completing the request for proposal (RFP) project scope of work. The importance of this became evident when it was discovered that 225ft of sewer line had a larger pipe size and an incorrect slope; that required the dig
4 and replace method for a grade alignment repair. In addition, 700ft of sewer line had excessive debris that required additional work to get cleaned prior to lining. The main steps of the Krause Lagoon Interceptor and Figtree Sewer Rehabilitation, Phase 3 & 4 Project were: 1. Temporary bypass flow for the sewer line to be repaired. 2. Sewer line clean and inspect 3. Pull liner in Place 4. Secure liner ends to a can. (The cans seal and anchor the ends of the liner.) 5. Inflate and insert ultraviolet (UV) light train. The light train is the curing device 6. Cure (and monitor) the liner 7. Inspect liner 8. Demobilize and remove temporary bypass The sewer line was cleaned and inspected just a day or two before the liner was installed. A few spot repairs were required; however, the repairs were minor (removal of a section of the pipewall) and completed the same day the liner was installed. The liner arrived on St. Croix approximately eight (8) weeks after an order was placed (three (3) weeks shipping time). The liner was custom manufactured; its thickness is based on the sewer line depth. The contractor was required to verify the manhole to manhole distances during their inspection. Manhole rehabilitation was executed while the liners were being manufactured and shipped to the site. The liners were pulled manually into a manhole and pulled by winch through the sewer line to the manhole on the other end. The cans at each end are installed manually; and care must be taken to prevent the liner from getting over exposed and cured by the sun s UV light. The light train vehicle came equipped with an air compressor; however, a mobile compressor was required for the long distances to inflate the liner material. With the liner inflated, care was taken to insert the light train to begin the curing process. The curing time is determined by the number of UV light bulbs used and the thickness of the liner. The average cure time was three (3) hours. The liner curing is monitored via video to ensure the liner was completed inflated with no ripples. After the curing is complete and the cans and light train are removed, the liner is cut at the edge or just inside of the manhole wall depending on the existing manhole configuration. A video of the liner post installation is recorded to document the quality of work; and, it documents the new baseline condition of the pipe for comparison to its future pipe inspections.
5 Picture on Right: Cleaned Pipe Pre- Liner Installation Picture on Left: Video Monitoring During Liner Curing After the video recording confirmation, the line can be immediately placed in operation. However, depending on the project schedule, the bypass may be kept in service to clean and line an adjacent section of pipe. Project Lessons Learned As an Authority for a geologically separated territory, there are additional challenges that may not be present if the project were located in a major city. The challenges for the Krause Lagoon Interceptor and Figtree Sewer Rehabilitation, Phase 3 & 4 Project were related to the isolated location. To receive economical cost per linear foot pricing, the minimum size for future VIWMA lining projects will be 2000ft. The cost for mobilization and the operation of a bypass line (also known as a pump around) starts to level off with a scope of 2,000ft; therefore the project funding can be optimized when more piping is rehabilitated under the same project.
6 The operation and maintenance of a good bypass system is critical. It is important to protect the health and safety of the workers on the project, the public heath, and the environment. Failure of the plug for the bypass system can cause workers injuries and serious project delays. The bypass system must be leak free to avoid negatively impacting the public heath and environment. VIWMA best management practice dictates that at least one (1) and sometimes two (2) additional spare bypass pump on site at all Bypass Pump and System Suction times. Bypass System Discharge Due to the isolated location, another VIWMA best management practice is to keep additional spare parts for equipment on site. The project schedule and efficiency will be negatively impacted if equipment is down for an extended period of time for repairs. If spare equipment parts are not onsite, project workers may become idle because the delays due to the shipment of the required parts. In addition, material may be lost due to the down time; since some materials are time sensitive and the materials integrity are vulnerable to prolonged delays. It is important to also note that after the rehabilitation method is chosen, the VIWMA project specifications require that the contractor is responsible for all labor, materials, and equipment necessary to complete the contract. VIWMA was responsible for the inspection. Conclusion Sewer lining and other trenchless technologies continue to advance quickly. Constant research and networking are required to keep up to date in an effort to choose the most cost effective solution for the site specific situation. Despite the anticipated and unforeseen challenges, the Krause Lagoon Interceptor and Figtree Sewer Rehabilitation, Phase 3 & 4 Project proved economically successful. The dig and replace not only would have cost more, by more than 20%; but posed more safety concerns with 20ft deep trench excavations, and the project would have taken for time.
7 References 1. U.S. Census Bureau, Census 2000 for the U.S. Virgin Islands and the 2010 Census for the U.S. Virgin Islands Friesenhahn, P.E., Leonard. The University of Texas Sewr Rehab: Using Trenchless Technologies. Available from Accessed 24 June United States Environmental Protection Agency. Office of Water. Washington, D.C.: Collection Systems O&M Fact Sheet. Trenchless Sewer Rehabilitation. EPA 832-F September 1999.
San Antonio Water System Standard Specifications for Construction ITEM NO. 1103 POINT REPAIRS AND OBSTRUCTION REMOVALS
ITEM NO. 1103 POINT REPAIRS AND OBSTRUCTION REMOVALS 1103.1 DESCRIPTION: 1. Repair of sanitary sewer lines by replacing short lengths of failed pipe with new pipe. 2. Repair of service laterals located
More informationRehabilitation or Replacement? That Is The Question
Rehabilitation or Replacement? That Is The Question Chris L. Windley PE Greg Anderson, PE 94th Annual Conference November 18, 2014 Overview Project Background Existing Sewer Condition Flow Projections
More informationMainline Pipe Rehabilitation Using Cured-in-Place Pipe (CIPP) & Folded Pipe Technology
2007 Pumper & Cleaner Environmental Expo International Wednesday February 7, 2007 Mainline Pipe Rehabilitation Using Cured-in-Place Pipe (CIPP) & Folded Pipe Technology What is Cured-In-Place Pipe (CIPP)
More informationSECTION 21 REHABILITATION OF SANITARY SEWER MAINS BY THE PIPE BURSTING AND TRENCHLESS PIPE REPLACEMENT METHOD
SECTION 21 REHABILITATION OF SANITARY SEWER MAINS BY THE PIPE BURSTING AND TRENCHLESS PIPE REPLACEMENT METHOD 21.01 SCOPE: It is the intent of the Specification to define the approved methods and materials
More informationStorm Sewer Trenchless Upgrade Alternatives and Recommendations
Storm Sewer Trenchless Upgrade Alternatives and Recommendations Background Approximately 1,930 feet of the 40-inch and 42-inch CMP storm sewer pipe from manhole M22 to manhole M12 will be evaluated for
More informationby Leonard Friesenhahn, P.E.
by Leonard Friesenhahn, P.E. of sight, out of mind is an adage your top administrators may apply to your campus Out wastewater collection system but as a facilities professional, you know how serious a
More informationINSTALLATION OF INSITUFORM LINER
PART 1 GENERAL 1.1 SCOPE: A. This item shall include all work and materials to install, insert a flexible polyester felt liner saturated with a thermo-setting resin into the existing sewer line for rehabilitation
More informationSPECIFICATIONS FOR SEWER PIPE AND LINING INSERTION - TRENCHLESS; GENERAL GUIDELINES (As Provided by NASSCO)
SPECIFICATIONS FOR SEWER PIPE AND LINING INSERTION - TRENCHLESS; GENERAL GUIDELINES (As Provided by NASSCO) 1 Intent: The intent of trenchless sewer pipe Insertion is to rehabilitate the existing sewer
More informationWaste Management. Infrastructure Rehabilitation in the U.S. Virgin Islands
Waste Management Infrastructure Rehabilitation in the U.S. Virgin Islands The United States Virgin Islands is a group of islands in the Caribbean that are an insular area of the United States. The islands
More information1.3.2 Method of construction and restoration of existing water service connections. This shall include:
1.0 GENERAL 1.1 DESCRIPTION: This specification shall cover the rehabilitation of existing water lines using the GRUNDOCRACK PIPE BURSTING SYSTEM. Pipe bursting is a system by which the pneumatic bursting
More informationLetty Arvide-Gomar, PE
Letty Arvide-Gomar, PE Outline DIP History and Applications Corrosion Issues Internal Cleaning Technologies Rehabilitation Options DIP History and Applications Corrosion Issues Internal Cleaning Technologies
More informationSewer Line Rehabilitation
1.0 GENERAL 1.1 DESCRIPTION: This specification shall cover the rehabilitation of existing sanitary sewers using the GRUNDOCRACK PIPE BURSTING SYSTEM. Pipe bursting is a system by which the pneumatic bursting
More informationDefense Technical Information Center Compilation Part Notice
UNCLASSIFIED Defense Technical Information Center Compilation Part Notice ADP017712 TITLE: Rehabilitation of TCE-Contaminated Underground Storm Water System Using Trenchless Technology DISTRIBUTION: Approved
More informationPROVIDING THE SAFE CHOICE FOR UNDERGROUND PIPE RENEWAL, INTEGRITY MANAGEMENT AND ASSET RELIABILITY
PROVIDING THE SAFE CHOICE FOR UNDERGROUND PIPE RENEWAL, INTEGRITY MANAGEMENT AND ASSET RELIABILITY Cured-In-Place Pipe Pressure & Gravity Lines Pipe Splitting Trenchless Pipe Replacement EcoCast Advanced
More informationREHABILITATION OF UNDERGROUND SEWER LATERAL PIPES WITH CURED-IN-PLACE-PIPE LINER SECTION 02542
1.0 INTENT REHABILITATION OF UNDERGROUND SEWER LATERAL PIPES 1.01 It is the intent of this specification to provide for the reconstruction of pipelines and conduits by the installation of a resin-impregnated
More informationSECTION 02763 POINT REPAIRS TO SANITARY SEWERS. A. Repairs to existing sewer lines by replacing short lengths of failed pipe.
SECTION 02763 PART 1 G E N E R A L 1.01 SECTION INCLUDES A. Repairs to existing sewer lines by replacing short lengths of failed pipe. 1.02 UNIT PRICES A. Measurement for point repairs is on a unit price
More informationTHE BIG FIX: Public works administration would be easy if infrastructure. San Diego s Sewer Renewal Program. By Steve Gibbs
THE BIG FIX: San Diego s Sewer Renewal Program By Steve Gibbs Public works administration would be easy if infrastructure lasted forever. It does not. Roads, bridges and sewers eventually wear out. Even
More informationFY11 Sanitary Sewer Main Rehab and Point Repair Bid Tabulation
644-10-569 Page 1 of 9 1 FOR CLEANING AND TELEVISING EXISTING SEWERS, AS SPECIFIED, ANY REQUIRED CLEANING, ANY LOCATION, ANY LENGTH OF SEWER, COMPLETE IN PLACE, FOR VARIOUS PIPE DIAMETERS. A. EXISTING
More informationSection 2100-Trenching and Tunneling
SECTION 5200 - STORM SEWER PART 1 - GENERAL 1.01 SCOPE: This Section covers installation of storm sewer mains and culverts. Topics include permits and fees, trench widths, pipe laying, bedding, initial
More informationSEWER CLEANING, INSPECTION AND ASSESSMENT
3.1 OVERVIEW Chapter 3 SEWER CLEANING, INSPECTION AND ASSESSMENT Preventive maintenance protects the investment of the sanitary sewer collection system infrastructure. Higher frequency cleaning of gravity
More information53.03 MATERIALS FOR SEWER LINER PIPE AND FITTINGS: The following materials are approved for installation in sanitary sewer lines:
Division 53: Slip-Lining of Existing Sewer Line 53.01 GENERAL: This section includes all labor, materials, transportation, equipment necessary to rehabilitate by means of Instituform deteriorated sections
More informationWorking together to improve beach water quality. Fixing our. public and private. sewers
Working together to improve beach water quality Fixing our public and private sewers May 2004 FIND FIX DECIDE Narrow Neck Beach on a summer day As part of Project CARE, our long-term project to improve
More informationSECTION 6 SANITARY SEWER MAIN 6.01 SCOPE
6.01 SCOPE The work covered by this section of the specifications consists of the furnishing of all plant, labor, materials, equipment and supervision and performing all operations involved in the construction
More informationMIAMI-DADE LATERAL PILOT PROGRAM. James T. Cowgill, P.E. Rodney J. Lovett Franklin Torrealba, P.E.
MIAMI-DADE LATERAL PILOT PROGRAM James T. Cowgill, P.E. Rodney J. Lovett Franklin Torrealba, P.E. Hazen and Sawyer, P.C. 4000 Hollywood Boulevard Hollywood, FL 33021 ABSTRACT Since 1994 the Miami-Dade
More informationREVIEW OF TRENCHLESS TECHNIQUES FOR THE REHABILITATION OF SEWERS. Gerhard (Gerry) P. Muenchmeyer, P.E. Muenchmeyer Associates, LLC
REVIEW OF TRENCHLESS TECHNIQUES FOR THE REHABILITATION OF SEWERS Gerhard (Gerry) P. Muenchmeyer, P.E. Muenchmeyer Associates, LLC What is really out there? DO YOU DIG IT? INDUSTRY CONCERNS UNEXPECTED DEVELOPMENTS
More informationSan Antonio Water System Standard Specifications for Construction ITEM NO. 1100 SLIP-LINING SANITARY SEWERS
ITEM NO. 1100 SLIP-LINING SANITARY SEWERS 1100.1 DESCRIPTION: This item shall consist of slip-lining sanitary sewer pipe, which is accomplished by pulling or pushing liner pipe into existing sewers by
More informationFY08 SEWER POINT REPAIRS BID TABULATION
6-07-831 Page 1 of 12 1 FOR CLEANING AND TELEVISING EXISTING SEWERS, AS SPECIFIED, ANY REQUIRED CLEANING, ANY LOCATION, ANY LENGTH OF SEWER, COMPLETE IN PLACE, FOR VARIOUS PIPE DIAMETERS. A. EXISTING "
More informationWater Main Lining A Sustainable Alternative to Open Cut Replacement
Water Main Lining A Sustainable Alternative to Open Cut Replacement Sean O Dell, PE Baxter & Woodman, Inc. B&W Client Seminar, Crystal Lake May 1, 2014 Agenda Why, What, When, Where, Who, How Reduction
More informationSewer Rehabilitation Design Requirements
Sanitary Sewer Overflow (SSO) Control and Wastewater Facilities Program Sewer Rehabilitation Design Requirements City of Baton Rouge/Parish of East Baton Rouge Department of Public Works Submitted by Prepared
More informationUltraviolet (UV) Light Cured Fiberglass Reinforced Cured-In-Place Pipe (CIPP) It is not just for sanitary sewer rehabilitation
Ultraviolet (UV) Light Cured Fiberglass Reinforced Cured-In-Place Pipe (CIPP) It is not just for sanitary sewer rehabilitation Dan Broderick Director of Pipeline Rehabilitation ACHEN-GARDNER ENGINEERING,
More informationEmerging Technologies in Wastewater Collection Systems
Keville Enterprises Emerging Technologies in Wastewater Collection Systems Douglas McCutchen, CCM Brian Karmasin, P.E., BCEE CMAA Annual Conference Oct 2008 San Francisco, California Today s s Presentation
More information32-02.05 Precast Manhole Sections and Castings. These items shall conform to Section 31, "Storm Drain Installation," of these Standard Provisions.
SECTION 32: SANITARY SEWER INSTALLATION 32-01 SCOPE. The Work shall consist of furnishing and installing sewer mains, manholes, laterals, cleanout fittings and appurtenances; and testing, flushing and
More informationSection 402. STORM SEWERS
402.02 Section 402. STORM SEWERS 402.01. Description. This work consists of constructing storm sewers of the size and class required, including excavation, bedding, and backfill. 402.02. Materials. Provide
More informationRepairs Made With Under Pressure Installations Can Offer Reduced Risks And Expenses
Repairs Made With Under Pressure Installations Can Offer Reduced Risks And Expenses They also give the community a built-in re-entry system for future monitoring and repair. BY BRETT HANES According to
More informationSan Antonio Water System Standard Specifications for Construction ITEM 866 SEWER MAIN TELEVISION INSPECTION
ITEM 866 SEWER MAIN TELEVISION INSPECTION 866.1 DESCRIPTION: The Contractor shall furnish all labor, materials, equipment, and incidentals to provide the televising and a NASSCO-(PACP) standard video,
More informationTABLE OF CONTENTS. Manhole, Frame, and Cover Installation (includes Drop Manhole) Additional Manhole Depth
TABLE OF CONTENTS NO. MP-1 MP-2 MP-3 MP-4 MP-4.01 MP-4.02 MP-4.03 MP-5 MP-5.01 MP-5.02 MP-5.03 MP-5.04 MP-5.05 MP-5.06 MP-5.07 MP-5.08 MP-5.11 MP-5.12 MP-5.13 MP-5.14 MP-5.15 MP-5.16 MP-5.18 MP-5.19 MP-5.20
More informationThe leader in trenchless rehabilitation
The leader in trenchless rehabilitation The trenchless rehabilitation of underground water and sewer pipes is a solution that s more ecological, more cost efficient, faster and less invasive for taxpayers
More informationWaste Collection Systems
Waste Collection Systems System Maintenance and Repair Maintenance and Repair Training Objectives To gain an understanding of: System Maintenance and Repair vocabulary System Maintenance and Repair techniques
More informationUVDB empowered by Achilles
UVDB empowered by Achilles DISAB Centurion: High Performance Wet/Dry Materials Handling Unit DISAB Centurion: High performance vacuum tanker that will vacuum dry or wet material The DISAB can vacuum material
More informationLS 2540 SEWER LATERALS AND INSPECTION TEES
LS 2540 SEWER LATERALS AND INSPECTION TEES A. Summary B. Submittals C. Site Information D. Sewer Pipe and Fittings E. Lateral Locations F. Lateral Installation G. Inspection Tee Installation H. Removal
More informationSECTION 02150 REMOVAL OR ABANDONMENT OF EXISTING UTILITIES AND UNDERGROUND STRUCTURES. 1. Trench excavation, backfill, and compaction; Section 02250.
02150-1 of 6 SECTION 02150 REMOVAL OR ABANDONMENT OF EXISTING 02150.01 GENERAL A. Description Removal or abandonment of existing utilities and underground structures shall include, but not necessarily
More informationSECTION 02732 CLEANING AND CLOSED CIRCUIT TELEVISION (CCTV) INSPECTION OF SEWER PIPE
SECTION 02732 CLEANING AND CLOSED CIRCUIT TELEVISION (CCTV) INSPECTION OF SEWER PIPE PART 1 - GENERAL 1.01 WORK INCLUDED A. This section covers the initial and final cleaning, and the initial and final
More informationFY15 Gravity Sewer and Manhole Rehabilitation
Contract Drawings For FY15 Gravity Sewer and Manhole Rehabilitation TRAVELERS REST TAYLORS Frazier Project No. -030 BASIN 850 Greenville, South Carolina April 2015 BASIN 700A GREENVILLE BASIN 700B FIVE
More informationSIDE SEWER CONDITION ASSESSMENT AND REPAIR RECOMMENDATIONS
SIDE SEWER CONDITION ASSESSMENT AND REPAIR RECOMMENDATIONS Introduction City of Tacoma property owners are responsible for the construction, maintenance and repair of private side sewers, which connect
More informationGlen Hills Area: Septic System and Public Sewer Q & A Information Sheet Page 1
Glen Hills Area: Septic System and Public Sewer Q & A Information Sheet Page 1 The Montgomery County Dept. of Environmental Protection, in cooperation with the Dept. of Permitting Services and the Washington
More informationSECTION 02400 - STORM DRAIN SYSTEM
SECTION 02400 - STORM DRAIN SYSTEM CONTENTS: Part 1 - General... 1 1.01 Work Included... 1 1.02 Related Requirements... 1 1.03 Reference Standards... 1 1.04 Quality Assurance... 1 1.05 Measurement And
More informationCURED-IN-PLACE PIPE MINIMIZING RISK BY DEFECT CODING
North American Society for Trenchless Technology 2007 No-Dig Conference & Exhibition San Diego, California April 16-19, 2007 CURED-IN-PLACE PIPE MINIMIZING RISK BY DEFECT CODING Robert K. Lee, P.E. 1 1
More informationSpecification for Pipe Bursting Gravity Sewer Mains with HDPE Pipe
Specification for Pipe Bursting Gravity Sewer Mains with HDPE Pipe 1. GENERAL The following supplemental sewer main specifications are intended to address the installation of high-density polyethylene
More informationTrouble Shooting for Trenchless Liner Installation During Sewer Line Rehabilitation
Trouble Shooting for Trenchless Liner Installation During Sewer Line Rehabilitation Salam Khan*, P.E. and Christoph Dobson, P.E. Sacramento County Sanitation District 1 (CSD-1) 10545 Armstrong Avenue,
More informationCity of Mill Valley Sewer Capital Improvement Plan 2012 2016
City of Mill Valley Sewer Capital Improvement Plan 2012 2016 I. BACKGROUND Between December 2004 and February 2008, the ed States Environmental Protection Agency (EPA) conducted inspections of the SASM
More informationCLEANING, INSPECTION, AND TESTING OF SEWERS
CLEANING, INSPECTION, AND TESTING OF SEWERS PART 1 - GENERAL 1.01 SECTION INCLUDES A. Cleaning, Inspecting, and Testing Sanitary Sewers B. Cleaning, Inspecting, and Testing Storm Sewers C. Cleaning and
More informationPRODUCT CATALOGUE. for. SMARTPHONE / WEBSITE / DIGITAL EDITION / BOOK / ipad / GPS
PRODUCT CATALOGUE for This product catalogue has been downloaded from COSSD.com. Listed products/services and their descriptions are shown as supplied by the title company COSSD does not guarantee the
More informationBefore H 2 Town of South Windsor, CT Evaluates Large Diameter Concrete Pipe
Before H 2 Town of South Windsor, CT Evaluates Large Diameter Concrete Pipe September 11, 2012 NEWEA Collection Systems Conference Presented by: Laurie L. Perkins, PE Dennis A. Dievert, PE C. Frederick
More informationSection 02702 SEWER PIPE INSTALLATION AND TESTING
PART 1 - GENERAL Section 02702 SEWER PIPE INSTALLATION AND TESTING 1-1. SCOPE. This section covers the installation and testing of all sewer pipe furnished under the following specification sections: Concrete
More informationPlatte River Interceptor Slipline Rehabilitation
Platte River Interceptor Slipline Rehabilitation Owner: Metro Wastewater Reclamation District Contractor: American West, Denver CO Slipline Pipe Manufacturer : Hobas Pipe USA Presented by: Tom Furie, Area
More informationCollection Systems Technology Fact Sheet Sewers, Conventional Gravity
United States Environmental Protection Agency Collection Systems Technology Fact Sheet Sewers, Conventional Gravity DESCRIPTION Sewers are hydraulic conveyance structures that carry wastewater to a treatment
More informationCITY OF BEVERLY RULES AND REGULATIONS - SEWER SYSTEM TESTING. General
General All sanitary sewers, manholes and force mains shall be acceptance tested, as hereinafter specified in the presence of a City representative. Acceptance testing shall be performed after backfilling
More informationMarch 2006 DIVISION 3 - CW 2140-R3 TABLE OF CONTENTS
March 2006 CW 2140 - SEWER AND MANHOLE CLEANING TABLE OF CONTENTS 1. DESCRIPTION... 1 1.1 General... 1 1.2 Definitions... 1 1.3 Referenced Standard Constructions... 1 3. CONSTRUCTION METHODS... 1 3.1 High
More informationSECTION 33 31 00.11 GRAVITY SANITARY SEWERS
SECTION 33 31 00.11 GRAVITY SANITARY SEWERS PART 1: GENERAL 1.01 SCOPE A. Gravity sanitary sewers and appurtenances. 1.02 SUBMITTALS A. Conform to requirements of Section 01 33 00 Submittals. B. Submit
More informationSANITARY SEWER SPECIFICATIONS
SANITARY SEWER SPECIFICATIONS OCTOBER 2003 HARVEST-MONROVIA WATER, SEWER, AND FIRE PROTECTION AUTHORITY SECTION 1.00 1.10 Purpose The purpose of this document is to assemble the sewer specifications, policies,
More informationLOWER NORTH OUTFALL SEWER AND NORTH OUTFALL SEWER REHABILITATION USING AMERON S T HAB METHOD
www.norcalpug.com LOWER NORTH OUTFALL SEWER AND NORTH OUTFALL SEWER REHABILITATION USING AMERON S T HAB METHOD Bob Fisher and Lance Stracner Ameron Protective Lining J.R. Pipeline Co Inc. Abstract: The
More informationLARGE DIAMETER PIPELINE INNOVATIVE FAST TRACKED REPAIR
LARGE DIAMETER PIPELINE INNOVATIVE FAST TRACKED REPAIR ABSTRACT Phil Hubbard, P.E., HRSD Paul Wilson, P.E., Brown and Caldwell* Mark Harber, P.E., Brown and Caldwell *301 Bendix Road, Suite 400 Virginia
More information02780 LINER FOR SEWER REHABILITATION
Section 02780 Liner for Sewer Rehabilitation Page 02780-1 (Revised 11/06/09) 02780 LINER FOR SEWER REHABILITATION SELECTED LINKS TO SECTIONS WITHIN THIS SPECIFICATION Part 1 GENERAL Part 2 PRODUCTS Part
More informationSection 2651 Television Inspection
Section 2651 Television Inspection PART 1: General 1.1 Description Provide all labor, materials, tools, equipment and incidentals as shown, specified, and required to perform television (TV) inspection
More informationWastewater Collection Practice Test #3 Page 1 of 15
Wastewater Collection Practice Test #3 Page 1 of 15 1) A 54 in. storm sewer flowing half full, at a velocity of 1.35 Ft./sec., will discharge how much flow into a creek in MGD? 13.85 MGD 10.73 MGD 1.85
More informationState of Illinois Department Of Transportation CONSTRUCTION INSPECTOR S CHECKLIST FOR STORM SEWERS
State of Illinois Department Of Transportation CONSTRUCTION INSPECTOR S CHECKLIST FOR STORM SEWERS While its use is not required, this checklist has been prepared to provide the field inspector a summary
More informationSANITARY GRAVITY SEWER LINE TESTING. B. Section 02732 CCTV Inspection of Gravity Sewer Lines
PART 1 GENERAL 1.1 SECTION INCLUDES A. Low Pressure Air Test B. Deflection Test 1.2 RELATED SECTIONS A. Section 02730 Sanitary Gravity Sewer Lines B. Section 02732 CCTV Inspection of Gravity Sewer Lines
More informationRehabilitation Alternatives. MWEA Collection System Seminar October 1, 2009
Rehabilitation Alternatives MWEA Collection System Seminar October 1, 2009 Overview Types of Rehabilitation Trenchless Categories On-Line Replacement In-Situ Options Selecting the Best Solution Types of
More informationSpecifications for Residential Property Owners Connection to New Public Sewer
Specifications for Residential Property Owners Connection to New Public Sewer Spalding Tract property owners are required to connect to the community sewer system when construction is complete and the
More informationPART 6 - STANDARD DESIGN AND CALCULATION FORMS 6.1 SANITARY SEWER DATA SHEET
PART 6 - STANDARD DESIGN AND CALCULATION FORMS 6.1 SANITARY SEWER DATA SHEET Name of Municipality or Sewer District Name of Project Original Township and Lot Number Name of Engineer of Firm Preparing Plans
More informationPipe Bursting. Case Study at Zeeland, MI Collections Seminar September 6, 2012. Presentation Agenda. What is Pipe Bursting? What is Pipe Bursting?
Pipe Bursting Case Study at Zeeland, MI Collections Seminar September 6, 2012 By: Brian Hannon, PE and John Racek, PE Presentation Agenda What is Pipe Bursting? History of Pipe Bursting Types of Pipe Bursting
More informationSEWER BACKUPS & BASEMENT FLOODING PREVENTATIVE SOLUTIONS FOR THE BUILDING OWNER
Village of Shorewood, Wisconsin SEWER BACKUPS & BASEMENT FLOODING PREVENTATIVE SOLUTIONS FOR THE BUILDING OWNER Prepared By: Thomas A. Zoulek, P.E., LEED A.P. Vice President Mid City Plumbing & Heating
More informationMcGOEY, HAUSER and EDSALL CONSULTING ENGINEERS D.P.C.
McGOEY, HAUSER and EDSALL CONSULTING ENGINEERS D.P.C. 111 Wheatfield Drive, Suite 1 Milford, Pennsylvania 18337 (570) 296-2765 fax: (570) 296-2767 e-mail: mhepa@mhepc.com RICHARD D. McGOEY, P.E. (NY &
More informationWastewater Capital Projects Management Standard Construction Specification
CITY AND COUNTY OF DENVER ENGINEERING DIVISION Wastewater Capital Projects Management Standard Construction Specification 10.1 Precast Concrete Pipe 10.1.1 General This section covers material requirements,
More informationSECTION LS 2530 SANITARY SEWERS. A. General: Submit the following in accordance with The General Conditions.
SECTION LS 2530 SANITARY SEWERS PART 1 GENERAL 1.1 SUBMITTALS A. General: Submit the following in accordance with The General Conditions. 1. Product data for drainage piping specialties. 2. Shop drawings
More informationPORTLAND BES ADVANCES IN SEWER MAINTENANCE AND REPAIRS BY OPERATING MULTIPLE CIPP CREWS.
North American Society for Trenchless Technology 2007 No-Dig Conference & Exhibition San Diego, California April 15-20, 2007 Paper # PORTLAND BES ADVANCES IN SEWER MAINTENANCE AND REPAIRS BY OPERATING
More informationGENERAL SPECIFICATIONS AND GUIDELINES FOR INSTALLATION MASTERLINER CURED-IN-PLACE PIPE SYSTEMS
GENERAL SPECIFICATIONS AND GUIDELINES FOR INSTALLATION OF MASTERLINER CURED-IN-PLACE PIPE SYSTEMS 34 TABLE OF CONTENTS 1.00 INTRODUCTION 2.00 SITE WORK PREPARATIONS 3.00 THE PRODUCT AND COMPONENT MATERIALS
More informationSummary 7/11/2012. Michigan Water Environment Association 2012 Annual Conference Boyne Mountain Resort
Michigan Water Environment Association 2012 Annual Conference Boyne Mountain Resort June 25, 2012 Thomas Gossiaux, PE (AECOM) Matt Raysin, PE (GCDC-WWS) Dave Barnas, PE (AECOM) Ed Tharp, PE (AECOM) Summary
More informationINTRODUCTION. WASTEWATER MANAGEMENT PLAN MAY 2009 Metropolitan North Georgia Water Planning District 7-1
INTRODUCTION There are approximately 16,000 miles of sewers and more than 450,000 manholes within the Metro Water District. Sewers and manholes within the Metro Water District range in age from new to
More informationWastewater Collection System Supplemental Design Standards for Capital Improvement Program Projects
Wastewater Collection System Supplemental Design Standards for Capital Improvement Program Projects March 2013 i Metropolitan Sewer District of Greater Cincinnati Wastewater Collection System Supplemental
More informationBeacon Hill Sewer District Standard Specifications
Beacon Hill Sewer District Standard Specifications Residential Gravity Side Sewer Including Design Criteria and Standard Construction Drawings Residential Gravity Side Sewer Design Criteria 1. Provisions
More information4 Steps for Quality Sewer Performance in Perpetuity
4 Steps for Quality Sewer Performance in Perpetuity By Gerhard Gerry P. Muenchmeyer, P. E. Principal Muenchmeyer Associates, LLC E-mail gerry@muenchmeyerassoc.com INTRODUCTION A well maintained and functional
More informationCity of Regina Standard Construction Specification SECTION 1320 SEWERMAIN TESTING
1.0 GENERAL 1.1 Scope 2.0 PRODUCTS 1.1.1 The work shall consist of testing wastewater and/or storm mains to ensure construction conforms to the proper line, grade, cross section and performance. 2.1 The
More informationSEWER PIPELINE AND MANHOLE REHABILITATION FOR VARIOUS LOCATIONS WITHIN THE CITY OF BEVERLY HILLS, CALIFORNIA CITY OF BEVERLY HILLS
SEWER PIPELINE AND MANHOLE REHABILITATION FOR VARIOUS LOCATIONS WITHIN THE CITY OF BEVERLY HILLS, CALIFORNIA CITY OF BEVERLY HILLS RESPONSE TO BIDDER S QUESTIONS Question #1: Is the Contractor required
More informationCHAPTER 6 - SANITARY SEWER
CHAPTER 6 - SANITARY SEWER 6.1 GENERAL This section covers the requirements for PVC plastic sewer pipe materials and installation in sanitary sewer construction. 6.2 PIPE PVC gravity sewer pipe and fittings
More informationAppendix J: Pipe Evaluation and Replacement Options and Costs
Appendix J: Pipe Evaluation and Replacement Options and Costs STORMWATER SYSTEM INVENTORY The City of Olympia has an extensive stormwater conveyance system. As a matter prudent management of the Stormwater
More informationSECTION 3 SANITARY SEWER DESIGN
SECTION 3 SANITARY SEWER DESIGN 3.1 GENERAL DESIGN CRITERIA 3.1.1 Requirement for Sanitary Sewer 3.1.2 Design Approval 3.1.3 IEPA Permit Required 3.1.4 Differentiation Between Public and Private Sanitary
More informationREHABILITATION OR REPLACEMENT? THAT IS THE QUESTION
REHABILITATION OR REPLACEMENT? THAT IS THE QUESTION ABSTRACT Chris L. Windley PE, McKim & Creed, Inc. Ben R. Latino, Jr., PE, McKim & Creed, Inc. Greg Anderson, PE, McKim & Creed, Inc. When designing to
More informationWater CIPP What to Do When You re Between a Fence and a Hard Place
What to Do When You re Between a Fence and a Hard Place 1, Marty S. Paris, P.E. 2, and Anthony Parker 3 1 Kimley Horn and Associates, Inc. 12750 Merit Drive, Suite 1000, Dallas, TX 75251 Tel (972) 776-1785;
More informationDrain & Tank Cleaning
Drain & Tank Cleaning Our ever growing fleet of drain cleaning vehicles ranging from small vans to Hi-spec Jet-Vac units enable us to provide you with the right equipment at the right time. Services include:
More informationSpecial Specification 7021 Water Main and Sewer Line Replacements
Special Specification 7021 Water Main and Sewer Line Replacements 1. DESCRIPTION Furnish, install, or replace water pipe, water valves, water meters and boxes, water service connections, fire hydrant assemblies,
More information12/8/2014. Brought To You By: This webcast is sponsored by NASSCO with the support of IPBA.
Brought To You By: This webcast is sponsored by NASSCO with the support of IPBA. 1 Pipe Bursting A Mature and Diverse Trenchless Technology December 10, 2014 1:00 3:00 pm Eastern How to Participate Today
More informationExhibit A. Rules and Regulations for House Connections and Sewer Extensions
The purpose of this application example is to provide assistance to small and medium sized rural communities in the drafting of documents necessary for the efficient operation of water, wastewater, and
More informationUNDERGROUND INFRASTRUCTURE SPECIALISTS TABLE OF CONTENTS
U UNDERGROUND INFRASTRUCTURE SPECIALISTS TABLE OF CONTENTS 3. COMPANY PROFILE A growing company excelling in the fields of infrastructure repair and maintenance. 6. MANDREL TESTING Individually approved
More informationDIVISION 4300 STORM DRAINAGE
DIVISION 4300 STORM DRAINAGE SECTION 4305 STORM SEWER PART 1 - GENERAL 1.01 SCOPE This section covers the construction of storm sewers for the collection and transport of stormwater runoff. 1.02 REFERENCES
More informationSoapstone Sewer Rehabilitation Alternative Concepts Design and Associated Impacts
Soapstone Sewer Rehabilitation Alternative Concepts Design and Associated Impacts Outline Update on Soapstone Emergency Response Provide project background Provide project purpose & need Present proposed
More informationSERVICE LINE EXTENSION AND SERVICE LINE CONNECTION CONDENSED SANITARY SEWER SYSTEM INSTALLATION SPECIFICATIONS
1001 SOUTH LEECHBURG HILL LEECHBURG, PA 15656 Phone: 724-845-9355 Fax: 724-845-1186 SERVICE LINE EXTENSION AND SERVICE LINE CONNECTION CONDENSED SANITARY SEWER SYSTEM INSTALLATION SPECIFICATIONS 1. General
More informationSANITARY SEWER BACKUP. Causes & Prevention
SANITARY SEWER BACKUP Causes & Prevention A. PURPOSE The purpose of this publication is twofold: 1. It provides homeowners with basic information on the causes of sanitary sewer backups. 2. It provides
More informationOakland Macomb Interceptor Drain Rehabilitation State Revolving Fund Project Plan Overview. Public Meeting June 10, 2009
State Revolving Fund Project Plan Overview Public Meeting June 10, 2009 What is the OMI? The OMI is the Oakland Macomb Interceptor Sewer. The OMI transports much of the sanitary sewage from Oakland and
More informationInnovative Methods to Assess Sewer Pipe Risk and Improve Replacement Planning Decisions
Innovative Methods to Assess Sewer Pipe Risk and Improve Replacement Planning Decisions Seth Anderson, GISP Management Consultant Celine Hyer, P.E. Associate Vice President Presentation Topics The Infrastructure
More information