1 Sanitation District No. 1 of Northern Kentucky SD1's Sanitary and Storm Water Asset Management Program KSPE Annual Convention April 28, 2011
2 Background Outline CSAP Program Development CSAP Program Implementation SWAMP Development & Implementation Integration of CSAP & SWAMP Data Management & Automation Conclusions
3 Sanitation District No. 1 of Northern Kentucky Created in 1946 Serves Boone, Kenton, and Campbell Counties in Northern Kentucky Until 1995 SD1 responsible only for interceptors and one regional WWTP (about 67 miles of sewer) Serves approximately 300,000 people Background Greater Cincinnati / Northern Kentucky Airport
4 Sanitation District No. 1 of Northern Kentucky Today Total service area ~ 200 sq miles >1,600 miles of sanitary sewers >42,000 manholes 129 pump stations 15 Flood PSs 2 regional treatment facilities 400 miles of storm sewers Western Regional under construction
5 Background Continuous Sewer Assessment Program Needed SD1 identified the need to develop a more proactive collection system inspection, cleaning and rehabilitation/replacement program Coordinate sewer operation and maintenance efforts within the CMOM and NMC programs. CMOM self assessment and NMC compliance review resulted in the development of an aggressive and comprehensive Continuous Sewer Assessment Program (CSAP) CSAP currently being expanded to manage storm system
6 Continuous Sewer Assessment Program Program Goals Develop integrated, prioritized Continuous Sewer Assessment program to achieve both NMC and CMOM goals Go from a reactive maintenance mode to proactive mode Asset Management approach to try to balance maintenance costs and replacement costs Develop a prioritized maintenance program to reduce spills caused by debris, grease, roots and collapsing pipe Estimate rehabilitation costs to understand system repair needs and how these efforts coordinate with the Watershed Plans Develop an SSES program to remove public & private I/I sources to reduce /eliminate SSOs.
7 Continuous Sewer Assessment Program Program Approach Divide overall collection system maintenance into six key programs Trouble call program Preventative Maintenance O&M Program Interceptor (Sonar) program SSES Program LDSAP program Manhole inspection program Prioritize the assessment in the separate sewer system using a modified Basin Priority approach Develop program standards and tools to track progress, schedule re-inspections and cleaning, & calculate & prioritize rehab costs
8 CSAP Program Development Modified Priority Drainage Basin Approach Prioritize inspection by Drainage Basin rather than individual pipes Exceptions are individual pipes with the following characteristics: Pipes within 50 of a creek Pipes immediately downstream of an SSO Pipes in SSES Priority areas SD1 Drainage Basin Boundaries
9 CSAP Program Development Reasons for Drainage Basin Approach With the availability of system performance data, it made more sense to summarize priorities on a larger scale than individual pipes Increase efficiency - crews conduct continuous inspections in a specific area - not jumping from pipe to pipe Result of basin inspections could be rolled up into basin reports and summaries Subsequent inspection, cleaning, and rehabilitation could follow a similar basin approach Approach helped focus efforts, efficiency, and data collection
10 CSAP Program Development Drainage Basin Summary There are just over 250 basins in the SD1 service area, of which 182 are in the sanitary sewer system There is an average of 35,500 lf of pipe in each basin. This corresponds to approximately 30 days of inspection for a single crew assuming 1,200 feet per day Sanitary Basins in Blue LDSAP Basins in Yellow
11 CSAP Program Development Basin Scoring Process Summarized the available historical data for each basin for the following priority criteria: Service performance priority (measures risks of blockages) Structural performance priority (measures risks of collapse) Work Order history priority (used to estimate frequency of problem occurring) Applied priority scores of 1-5 for each criteria and sum for a total Raw Score Applied enhancement factor based on number and type of overflows in each basin for a Total Adjusted Score Basins were ranked based on Total Adjusted Score
12 CSAP Program Development Overall Scoring An overall raw score was calculated by summing the individual Service, Structural, and Work Order scores RAW SCORE = Service Score + Structural Score + Work Order Score Overall raw score was modified with factors based on the number of known or suspected SSOs, priority SSOs, and priority CSOs Enhancement Factors were summed and multiplied by the Raw Score to develop the total Enhancement Adder The Total Adjusted Score = Overall Raw Score + Enhancement Adder Number of SRPs and SSOs SRP/SSO Factor Number of Priority SSOs Priority SSO Factor Priority CSOs more 1.0 More 0.7 Priority CSO Factor
13 Overall Basin Scoring RAW SCORE Category Service Structural Work Order Raw Overall Score TOTAL ADJUSTED SCORE DA Basin Raw Overall Score SSO/SRP Priority SSO Priority CSO Total Enhancem ent Factor Enhance ment Adder Total Adjusted Score Overall Rank /182
14 Basin Prioritization Results $1 "/"/ "/ "/"/ "/ "/ "/ "/"/ "/"/ "/"/ "/ "/ "/ "/"/ "/ "/ "/ "/ "/ "/ "/ "/ "/ "/ "/ "/ "/ "/ "/ "/ "/ "/ "/ "/"/ "/ "/ "/ "/ "/ "/ "/ "/"/ "/"/ "/ "/ "/ "/ "/ "/ "/ "/"/"/ "/ "/ "/ "/ "/ "/ "/ "/ "/"/ "/ "/ "/ $1 "/ "/ "/ "/ "/"/ "/ "/ "/ "/ $1 "/ "/ "/ "/ "/"/ "/ "/ "/ "/"/ "/ "/"/ Legend "/ "/ sso_exhibita DS_SSO_pipes florence pipes_within_50'_of_creek PhaseII_SSES Phase1_SSES Phase2_basins Phase3_basins PhaseI_basins LDSAP_Basins
15 CSAP Program Implementation Once prioritization was completed, the next steps were: Develop a 10-year inspection schedule by Basin and by pipe Develop CSAP process diagram to act as a decision making framework for next actions Defines CCTV inspection and re-inspection frequencies based on structural and maintenance scores for pipes Defines program for cleaning and re-cleaning frequencies based on pipe maintenance score Defines and prioritizes need for sewer rehab or replacement integrated with Watershed Plans Ensures pipes that need inspection and cleaning are done first and most often until they are fixed
16 CSAP Work Flow Process System Assessment LDSAP SSES Sonar Preventative O&M System Correction Cleaning Rehab & Replacement Process Concepts by Hazen & Sawyer
17 CSAP Process Diagram Example Preventative O&M Program addresses all separate sewer basins in SD1 system SCREAM TM codes used provides scores 1-100
18 CSAP Process Diagram Example SCREAM TM codes used provides scores 1-100
19 CSAP Program Implementation Implemented program in Goal is to inspect entire collection system in ~ 10 years Software tools were developed to automate work flow process and reporting Final CSAP Database Fully Automated Automatically enters SCREAM structural & maintenance scores Automatically generate and schedule work orders for Next Action Helps determine staff needs for crews Calculates life cycle costs for rehab, repair or ongoing PM cleaning
20 ,000 LF 65,000 LF on PM ,000 LF 139,000 LF on PM ,456,000 LF 300,000 LF on PM ,410,599 LF 3,277 on PM ,095,082 LF 11,249 LF on PM CCTV Footage Stats
21 Cost Savings Example Realized with CSAP PM Footage as of ,000 LF PM Footage after CSAP Reinspect in 6 months 26,000 LF Reinspect/Clean in 1yr 64,500 LF Reinspect greater than 1yr 108,500 LF Rehab/Clean/Replace Immediately 65,500 LF Annual Cost Savings [300,000 * $1.50 * 2] = $900,000 [(26, ,500) * $1.50] = $135,750 Difference = $765,250
22 SD1 s Storm Water Asset Management Program Agenda SD1 took over approximately 400 miles of storm sewers and structures from the local cities & counties in 2010
23 SW Asset Transfer Nearly all cities and agencies have turned ownership over to SD1 Similar condition as sanitary assets when SD1 assumed ownership Many existing problems Partnership with each City and County Recognize the positive impact a regional agency can have in the community Need for proactive, prioritized approach to fixing and maintaining these assets
24 SD1 s SWAMP How do you integrate CSAP with the new storm assets? Developed criteria to rank each SW problem and assign a score to each problem for prioritization
25 SD1 s SWAMP Implementation Problem Rating Criteria Project Specific Criteria (60% of Total Score) Weighted Factor SD1 Responsibility 5 Public Health and Safety Concerns 5 Property Damage 4 Number of Properties Affected 4 Stream bank Degradation 4 Public Sensitivity 3 Operations & Maintenance Reduction 2 Impact on Sanitary Sewer System 2 Frequency of the Problem 1 Condition of the Storm Water System 1 Age of the Infrastructure 1 Regional Planning Criteria (40% of Total Score) Weighted Factor Wet Weather Adaptive Management Program Benefit 5 Green Infrastructure Opportunities 5 Other Factors to be Considered Regional Benefit Economic Development Benefit Available Outside Funding (Other than SD1 or City)
26 SD1 s SWAMP Implementation Criteria Scoring Degree of Impact Scoring None or NA 0 Minor 1 Moderate 2 Severe 3 Extreme 4
27 Example Project
28 CSAP & SWAMP Integration Implementation SW problem is reviewed against sanitary sewer and Watershed Plan priorities to develop integrated projects SW and sanitary asset fixes are coordinated with priority watershed areas and with Cities street reconstruction projects Encourages partnership with communities and stakeholders Manage the limited storm water capital budget Integration allows for saving ratepayer dollars - economies of scale
29 CSAP & SWAMP Integration Approximately 45% of the service area has excessive I/I
30 Continued Partnership Many Cities are building new storm assets Street reconstruction projects Road failures Culvert collapses Funding Scenarios City responsibility SD1 responsibility 50/50 cost-share
31 SD1 s Data Integration Plan Designed to Expedite Decisions by Automating Processes Data Storage & SCREAM TM Scoring Field Data CSAP Logic Applied & Decision-Making
32 Example Screens of SCREAM CCTV in gbams
33 Example Screens of SCREAM Scores in gbams
34 Example Display in GIS
35 Automation Provides Web Planning Reports of Next Actions
36 Automatically Generate & Schedule Work Orders for Next Action Create Work Order Add to Work Order Group Pipes by Location
37 Reporting Tools for Costs & Production Reporting Tools Per Crew and Total Cost reports $/LF for CCTV $/LF for Cleaning $/Str. For CB cleaning, MH/CB inspections Production reports CCTV Footage Reports by type of work, by crew(s) Cleaning MH inspections Staff Utilization reports Separating Vactors and CCTV Trucks Where Possible
38 Reporting Tools for Costs & Production
39 Calculates Life Cycle Costs for Rehab, Repair or Ongoing PM Cleaning
40 Example Display in GIS
41 Conclusions SD1 s Sanitary & Storm Water Asset Management Program: Provides coordinated and efficient maintenance management of sanitary and storm system infrastructure through: formation of integrated O&M related programs establishment of performance objectives & integrated data prioritized inspection and cleaning prioritized rehabilitation and replacement Defines projects for rehab/replacement by highest need and value Savings of over $765,000 the first year Went from 5 CCTV Crews to 7 Crews with same staff level Increased Inspection Production by 110% Reduced CCTV inspection costs by 25%
42 Conclusions Focuses on fixing existing sanitary & storm assets rather than building new ones: Renews existing assets to maximize useful life and reduce operational-related overflows Address s storm water quantity and quality Reduces I/I to eliminate SSOs Encourages partnership with communities and stakeholders Integration allows for saving customer dollars - economies of scale Results in maximizing WQ improvements for the dollar spent
43 KSPE Annual Convention April 28, 2011 SD1's Sanitary and Storm Water Asset Management Program Questions? Brandon Vatter, P.E. Barrett Groh
Using Frequent Sewer Inspection to Prioritize Asset Management. May 1, 2014. John Schroeder, P.E., BCEE Drew Richards, EI Tim Fallara, P.E.
Using Frequent Sewer Inspection to Prioritize Asset Management May 1, 2014 John Schroeder, P.E., BCEE Drew Richards, EI Tim Fallara, P.E. Agenda Rationale and Goals for Sewer Re-inspection How and why
More informationSAWS SSO Reduction Program
SAWS SSO Reduction Program Jeff Haby, P.E. Director Sewer System Improvements February 20, 2014 TMDL Implementation Plan Technical Committee Overview Sanitary Sewer Overflows Consent Decree Overview Major
More informationCASE STUDY. City of Grand Rapids Stormwater Asset Management Program. City of Grand Rapids. By the Numbers
United States Environmental Protection Agency CASE STUDY City of Grand Rapids Stormwater Asset Management Program Overview With increasing pressure to meet water quality targets, address population growth,
More informationDRAFT Public Outreach Document for What s an SSMP?
DRAFT Public Outreach Document for What s an SSMP? This easy to read document is developed and provided to interested parties to assist in educating cities, agencies, their management, elected officials
More informationKansas City s Overflow Control Program
Kansas City s Overflow Control Program Kansas City Water Services Water Wastewater Stormwater 2 Water Services Department 1000 Positions 835 Employees 3 Utilities FY 13/14 Budget = $307 million Water Wastewater
More informationIntegrating Asset Management Principals to Watershed Management: A Risk-Based Approach to Managing Stormwater Assets
Integrating Asset Management Principals to Watershed Management: A Risk-Based Approach to Managing Stormwater Assets Presenters: Mark VanAuken, PE, CMS4S, ENV SP Stormwater/MS4 Discipline Leader Kevin
More informationCity of Dallas Wastewater Collection System: TCEQ Sanitary Sewer Outreach Agreement City Council Briefing January 17, 2007
City of Dallas Wastewater Collection System: TCEQ Sanitary Sewer Outreach Agreement City Council Briefing January 17, 2007 1/12/2007 1 Briefing Purpose Provide update on Wastewater Collection Activities
More informationREAD THIS FIRST. Check here if you believe that fats, oils and/or grease (FOG) caused or contributed to the SSO. Date: Time: Title:
READ THIS FIRST In the event of a Sanitary Sewer Overflow Check here if you believe that fats, oils and/or grease (FOG) caused or contributed to the SSO Address: Date: 1 st : Open this envelope. Instructions
More informationCelebrating Growth, Embracing Community. Fiscal Year 2015/16 Proposed Financial Plan for Community Services and Budget Memos
Celebrating Growth, Embracing Community Fiscal Year 2015/16 Proposed Financial Plan for Community Services and Budget Memos ~ Cityof dllllffi CHAMPAIGN REPORT TO CITY COUNCIL FROM: Dorothy Ann David,
More informationCity of Bakersfield Public Works Department Sewer System Management Plan December 2014
City of Bakersfield Public Works Department Sewer System Management Plan December 2014 C:\Users\hmayberry\Desktop\SEWER SYSTEM MANAGEMENT PLAN 2014.doc 1 Sewer System Management Plan Index: Section 1 Goals
More informationAsset Management Approaches to Maximize Effectiveness of Your Stormwater Program
Asset Management Approaches to Maximize Effectiveness of Your Stormwater Program Presenters: Mark VanAuken, PE, CMS4S, ENV SP Stormwater/MS4 Discipline Leader Celine Hyer, P.E. Conveyance Market Sector
More informationM E M O R A N D U M. Among the standard conditions contained in the NPDES permit is also a Duty to
M E M O R A N D U M DATE: August 7, 2015 TO: FROM: SUBJECT: Metropolitan Wastewater Management Commission (MWMC) Matt Stouder, MWMC General Manager Capacity Management, Operations, and Maintenance (CMOM)
More informationELIMINATE STORM WATER FROM ENTERING SANITARY SEWER SYSTEMS
(408) 761 5882 http://www.sewerlock.net ELIMINATE STORM WATER FROM ENTERING SANITARY SEWER SYSTEMS 1. `The United States and various State Environmental Protection Agency regulations require elimination
More informationCity and County of San Francisco 2030 Sewer System Master Plan TASK 400 TECHNICAL MEMORANDUM NO. 405
City and County of San Francisco 2030 Sewer System Master Plan TASK 400 TECHNICAL MEMORANDUM NO. 405 REGULATORY CONSIDERATIONS FOR WET WEATHER COLLECTION SYSTEM BACKUPS FINAL DRAFT August 2009 2700 YGNACIO
More informationSeattle Public Utilities Mainline Sewer Pipe Maintenance/Backup Strategy June, 2005
Seattle Public Utilities Mainline Sewer Pipe Maintenance/Backup Strategy June, 2005 1 of 30 Executive Summary Seattle Public Utilities (SPU) currently experiences an average of 80 mainline sanitary sewer
More informationSanitary Sewer Master Plan
, Illinois Sanitary Sewer Master Plan EXECUTIVE SUMMARY Prepared by September 9, 2010 1670 South Taylorville Road Decatur, Illinois 62521 www.bgmengineering.com Sanitary Sewer Master Plan A. SCOPE OF STUDY
More informationAffordable Asset Management Making Use of the Data You Have: An Owner s Perspective
Affordable Asset Management Making Use of the Data You Have: An Owner s Perspective An Owner Operator s Approach for Asset Management on a Budget Lane Longley, City of St. Petersburg Presented by the April
More informationA Systematic Approach to Reduce Infiltration and Inflow (I&I) and Sanitary Sewer Overflows (SSO) PETE GORHAM, P.E. MIKE LYNN FEBRUARY 19, 2015
A Systematic Approach to Reduce Infiltration and Inflow (I&I) and Sanitary Sewer Overflows (SSO) PETE GORHAM, P.E. MIKE LYNN FEBRUARY 19, 2015 Infiltration/Inflow (I/I) I & I Reduction: Three-Prong Attack
More informationCOMBINED SEWER OVERFLOW OPERATIONAL AND MAINTENANCE PLAN SUMMARY
COMBINED SEWER OVERFLOW OPERATIONAL AND MAINTENANCE PLAN SUMMARY Revised: April 2014 Village of Wilmette, Illinois NPDES CSO Permit No. ILM580012 Chapter 1 Introduction This Operational and Maintenance
More informationElement 4: FATS, OILS, AND GREASE (FOG) CONTROL PROGRAM
Element 4: FATS, OILS, AND GREASE (FOG) CONTROL PROGRAM This section of the SSMP discusses the City s FOG control measures, including identification of problem areas, focused cleaning, and source control.
More informationREVISED SHORT TERM AND LONG TERM SEWER PIPE INSPECTION AND CONDITION ASSESSMENT PROGRAM SOUTH COAST WATER DISTRICT. June 2005
REVISED SHORT TERM AND LONG TERM SEWER PIPE INSPECTION AND CONDITION ASSESSMENT PROGRAM SOUTH COAST WATER DISTRICT FOR SOUTH COAST WATER DISTRICT Prepared with the requirements identified in the United
More informationAlmonte Sanitary District Sewer System Management Plan Adopted by the ALMONTE Board of Directors on_08/28/06
Almonte Sanitary District Sewer System Management Plan Adopted by the ALMONTE Board of Directors on_08/28/06 1. Goals The goal of this SSMP is to provide a plan and schedule to properly manage, operate,
More informationecmar SECTION INSTRUCTIONS: Sanitary Sewer Collection Systems
ecmar SECTION INSTRUCTIONS: Sanitary Sewer Collection Systems Please see the DEFINITIONS of terms at the end of this section. If you have any questions about these definitions, do not understand a question,
More informationBACKUPS! Solving the Problem in a Seattle Neighborhood
BACKUPS! Solving the Problem in a Seattle Neighborhood MARTHA BURKE SEATTLE PUBLIC UTILITIES A ND A NDY BEHNKE HERRERA ENVIRONMENTAL CONSULTANTS PNCWA 2 009 BOISE, IDAHO Broadview Area Project Study Area
More informationOffice of Environment, Health and Safety (EH&S) - Sanitary Sewer Overflow Incident Form (rev. 12/2014)
STEP 1 Immediately call EH&S at (510) 642-3073 with the following details of the incident: Name of First Responder Phone Number of First Responder Location of Spill Is the spill potentially greater than
More informationSection 4 Pipe and Maintenance Hole Inspection and Condition Assessment Plan
and Condition Assessment Plan 4.1 Introduction 4.1.1 Purpose This addresses the requirements of Section IV.A. of the EPA Order. The plan documents the progress that each agency has made to date regarding
More information21 st Century Approaches to CSO & Water Quality Restoration. Paul L. Freedman, P.E., BCEE
21 st Century Approaches to CSO & Water Quality Restoration Paul L. Freedman, P.E., BCEE Wet Weather Partnership & NACWA April 26-27, 2007 Burning Cuyahoga Traditional CWA Approach to Water Quality Protection,
More informationRequest for Proposals PROFESSIONAL SERVICES FOR DRINKING WATER, WASTEWATER AND STORMWATER PROJECTS OPEN-END CONTRACTS 2016-18
Request for Proposals PROFESSIONAL SERVICES FOR DRINKING WATER, WASTEWATER AND STORMWATER PROJECTS OPEN-END CONTRACTS 2016-18 Page 2 of 8 1. INTRODUCTION Capital Region Water (CRW) is requesting proposals
More informationGravity Line Preventative Maintenance Program
Gravity Line Preventative Maintenance Program Lexington-Fayette Urban County Government Department of Environmental Quality Division of Water Quality December 2011 Gravity Line Preventative Maintenance
More information2.1 Development of Risk-Based Asset Management Framework
SECTION 2 Development of Asset Management Framework 2.1 Development of Risk-Based Asset Management Framework As part of the master planning effort, WES developed a risk-based asset management framework
More informationJeff Haby, P.E. Director Sewer System Improvements. September 15, 2015. Agenda
SAWS Sanitary Sewer Overflow Reduction Program Jeff Haby, P.E. Director Sewer System Improvements SA Military Engineers Meeting Agenda SAWS Overview Consent Decree CD Compliance Programs Program Transition
More informationCAPACITY, MANAGEMENT, OPERATIONS AND MAINTENANCE FY 2013
CAPACITY, MANAGEMENT, OPERATIONS AND MAINTENANCE FY 2013 September 1, 2013 City of Tuscaloosa Water and Sewer Department TABLE OF CONTENTS 1 SECTION 1. INTRODUCTION 1.1 Overview and Report Period 1.2 Collection
More informationSanitary Sewer Overflows Response to EPA Rule Making
Massachusetts Water Resources Authority Sanitary Sewer Overflows Response to EPA Rule Making October 15, 2010 MASSACHUSETTS WATER RESOURCES AUTHORITY SUMMARY OF EPA RULE MAKING SUMMARY OF MWRA, ADVISORY
More informationSanitary Sewer Overflow Report Form
Preliminary report Final report Revised final report Sanitary Sewer Overflow Report Form Sanitary Sewer Overflow Sequential Tracking Number: Reported to: Sent Regional Board a fax Left Regional Board a
More informationWork Practice: Wastewater Collection System Maintenance Plan Potential Safety Hazards
Potential Safety Hazards Required items Potential PPE None Additional References - Collection System Related Work Practices & Forms Jet Truck Cleaning Work Practice (Do not drive on peoples driveway) CDL
More informationSEWER CLEANING, INSPECTION AND ASSESSMENT
3.1 OVERVIEW Chapter 3 SEWER CLEANING, INSPECTION AND ASSESSMENT Preventive maintenance protects the investment of the sanitary sewer collection system infrastructure. Higher frequency cleaning of gravity
More informationINTRODUCTION AND BACKGROUND
Chapter 1 INTRODUCTION AND BACKGROUND 1.1 INTRODUCTION The City of Lincoln s Sewer System Management Program (SSMP) generally describes the City s sanitary sewer system operation and maintenance procedures,
More informationSANITARY SEWER SYSTEM ASSESSMENT
SANITARY SEWER SYSTEM ASSESSMENT What is this tool? The Sanitary Sewer System Assessment is a form that helps your utility identify and document all of the components in your utility s sanitary sewer system.
More informationInfo What? Using InfoMaster to Develop a Rehabilitation and Replacement Plan
Info What? Using InfoMaster to Develop a Rehabilitation and Replacement Plan Amanda Lei - City of San Jose Alex Palmatier - HDR 2014 HDR, Inc., all rights reserved. Background Forecasting and Budget Data
More informationAddressing SSOs in Austin, Texas: Initial Call to Final Fix
Addressing SSOs in Austin, Texas: Initial Call to Final Fix Gopal K. Guthikonda, P.E., Barbara L. Wilde, Steven W. Schrader, P.E., and Rajendra P. Bhattarai, P.E. Austin Water Utility City of Austin 2600
More informationMIAMI-DADE LATERAL PILOT PROGRAM. James T. Cowgill, P.E. Rodney J. Lovett Franklin Torrealba, P.E.
MIAMI-DADE LATERAL PILOT PROGRAM James T. Cowgill, P.E. Rodney J. Lovett Franklin Torrealba, P.E. Hazen and Sawyer, P.C. 4000 Hollywood Boulevard Hollywood, FL 33021 ABSTRACT Since 1994 the Miami-Dade
More information1. Water Line Maintenance 2. Sanitary Sewer Maintenance 3. Spill/Leak/Overflow Control, Response, and Containment
WATER AND SEWER UTILITY OPERATION AND MAINTENANCE Although sewage systems the operation and maintenance of public utilities are not considered themselves are not a chronic sources of stormwater pollution,
More informationCLEANING, INSPECTION, AND TESTING OF SEWERS
CLEANING, INSPECTION, AND TESTING OF SEWERS PART 1 - GENERAL 1.01 SECTION INCLUDES A. Cleaning, Inspecting, and Testing Sanitary Sewers B. Cleaning, Inspecting, and Testing Storm Sewers C. Cleaning and
More informationREQUEST FOR PROPOSALS SANITARY SEWER MAINTENANCE SERVICES FOR THE TOWN CENTER SEWER ASSESSMENT DISTRICT WITHIN THE TOWN OF WOODSIDE
REQUEST FOR PROPOSALS SANITARY SEWER MAINTENANCE SERVICES FOR THE TOWN CENTER SEWER ASSESSMENT DISTRICT WITHIN THE TOWN OF WOODSIDE Submit Proposals to: Town of Woodside Public Works Department 2955 Woodside
More informationA Comprehensive Approach to Storm Water Asset Management Planning. City of Virginia Beach Public Works Operations
A Comprehensive Approach to Storm Water Asset Management Planning City of Virginia Beach Public Works Operations Steve McLaughlin, PE April 2016 Agenda City of Virginia Beach, VA Population: 450,000 250
More informationSanitary Sewer Overflow (SSO) Incident Report Form
Submit completed form to EHS. Date of SSO spill: Sanitary Sewer Overflow (SSO) Incident Report Form Identify the SSO category (check one): Category 1 SSO Spills of any volume that reach surface water Category
More informationIntroduction to Asset Management. Presented by: John J. Jackman, P.E. Associate - Asset Management Specialist
Introduction to Asset Management Presented by: John J. Jackman, P.E. Associate - Asset Management Specialist Agenda Infrastructure Management Inventory Condition Assessment Maintenance Life Cycle Costs
More informationStormwater Asset Management. Presented to SESWA By Ricardo Campos January 23, 2013
Stormwater Asset Management Presented to SESWA By Ricardo Campos January 23, 2013 Agenda I. What is Asset Management? II. Why Asset Management for Stormwater Systems? III. How to Implement a Stormwater
More informationTO BE DELIVERED AGENDA MATERIAL
Office of the City Manager TO BE DELIVERED AGENDA MATERIAL Meeting Date: Item Number: 23 Item Description: Presentation: Storm Water Improvements 2180 Milvia Street, Berkeley, CA 94704 Tel: (510) 981-7000
More informationThe Clean Water Project What Is The Stormwater Impact?
The Clean Water Project What Is The Stormwater Impact? Presentation To: Seminar On Water Issues Bob Weimar, PE, BCEE Chief of Program Management The Metropolitan District Sewage Overflows Have Become More
More informationInteractive Decision Tree Automates Sewer Rehabilitation Planning
Interactive Decision Tree Automates Sewer Rehabilitation Planning IWPCA Annual Conference June 5, 2008 Rodney Moeller, P.E., John Schroeder, P.E. BCEE, C. Timothy Fallara, P.E. & Mel Meng, P.E. Agenda
More informationUpdate on the Metro Nashville Consent Decree Program. Scott Potter Ron Taylor
Update on the Metro Nashville Consent Decree Program Scott Potter Ron Taylor 1 Why We Are Here Planned actions to meet Clean Water Act The types of projects that will be constructed The impacts of these
More informationCity of Cambridge and IBM Build a Smarter City
City of Cambridge and IBM Build a Smarter City September 8, 2010 Presented by Mike Hausser, P.Eng Director of Asset Management and Support Services City of Cambridge Infrastructure Asset Life Cycle Install
More informationSetting Priorities for Stormwater Infrastructure to Achieve Best Results Using a Risk Analysis
Setting Priorities for Stormwater Infrastructure to Achieve Best Results Using a Risk Analysis Wayne Miles, PE Michael Sloop, PE Presented at 2014 APWA Water Resources Conference September 16, 2014Wayne
More informationM I D W E S T S O C I E T Y F O R T R E N C H L E S S T E C H N O L O G Y. Kansas City, Missouri s Trenchless Program
M I D W E S T S O C I E T Y F O R T R E N C H L E S S T E C H N O L O G Y Kansas City, Missouri s Trenchless Program Outline of Presentation Intro to Kansas City Water Services information Trenchless Program
More informationSan Antonio Water System Standard Specifications for Construction ITEM 866 SEWER MAIN TELEVISION INSPECTION
ITEM 866 SEWER MAIN TELEVISION INSPECTION 866.1 DESCRIPTION: The Contractor shall furnish all labor, materials, equipment, and incidentals to provide the televising and a NASSCO-(PACP) standard video,
More informationCITY OF KRUM Sanitary Sewer. Corrective Action Plan. February 5, 2009. Prepared by: Freese and Nichols, Inc.
Corrective Action Plan CITY OF KRUM Sanitary Sewer Corrective Action Plan February 5, 2009 Prepared by: Freese and Nichols, Inc. 4055 International Plaza Suite 200Fort Worth, TX 76109 817/735-7300 Corrective
More informationCMOM How to Develop Your Collection System Maintenance Program NWOWEA Pre-Conference Utility Workshop June 22, 2015 Kalahari Conference Center
CMOM How to Develop Your Collection System Maintenance Program NWOWEA Pre-Conference Utility Workshop June 22, 2015 Kalahari Conference Center Thomas A. Fishbaugh Ohio RCAP What is CMOM? CMOM: Capacity,
More informationSewer System Management Plan (SSMP) Development Guide
J U L Y 2 0 0 5 SAN FRANCISCO BAY REGIONAL WATER QUALITY CONTROL BOARD in cooperation with BAY AREA CLEAN WATER AGENCIES Sewer System Management Plan (SSMP) Development Guide San Francisco Bay Regional
More informationCondition Assessment of Underground Pipes April 2015 With excerpts from: Condition Assessment of Wastewater Collection Systems, EPA/600/R-09/049
Condition Assessment of Underground Pipes April 2015 With excerpts from: Condition Assessment of Wastewater Collection Systems, EPA/600/R-09/049 EPA New England Water Infrastructure Outreach provides tools,
More informationSewer System Management Plan University of California Kearney Agricultural Research & Extension Center 9240 S. Riverbend Ave.
Sewer System Management Plan University of California Kearney Agricultural Research & Extension Center 9240 S. Riverbend Ave. Parlier, CA 93648 Wastewater ID # 5SSO11453 1 Goals 1.1 Regulatory Requirements
More informationInnovative I/I Analysis Leads to Sustainably Program
Innovative I/I Analysis Leads to Sustainably Program Heart of the Valley Metropolitan Sewerage District Kaukauna, Wisconsin Mark Surwillo, HOVMSD District Manager Tammy Kuehlmann, PE, Donohue & Associates
More informationUtilizing Remaining Useful Life for Asset Management of Critical Wastewater Assets
*Jessica Brown, P.E., Freese and Nichols, Inc., (817) 312-6980; Jessica.Brown@freese.com Mazen Kawasmi, Freese and Nichols, Inc. ABSTRACT The City of Fort Worth s wastewater collection system includes
More informationATTACHMENT 3: SPECIFICATION FOR SEWER CLEANING
ATTACHMENT 3: SPECIFICATION FOR SEWER CLEANING 1.0 General 1.1 The work covered by this section consists of providing all labor, equipment, material and supplies, insurance, accessories, tools, transportation,
More informationFWEA Utility Council Sanitary Sewer Overflow (SSO) Enforcement Policy Recommendations
FWEA Utility Council Sanitary Sewer Overflow (SSO) Enforcement Policy Recommendations Purpose and Objective The FWEA Utility Council formed the SSO Sub-Workgroup to provide a venue to discuss the increase
More informationSanitary Sewer Overflow Annual Report
Sanitary Sewer Overflow Annual Report Division of Surface Water Date: 01/08/15 Facility name: Ohio NPDES permit no.: City of Fairborn 1PD0002*MD Period covered by report: 01/01/14 to 12/31/14 Contact person
More informationUniversity of California Santa Cruz
University of California Santa Cruz Sewer System Management Plan May 2009 Rev July 2013 Rev May 2014 UCSC SSMP 052014.doc 2 Table of Contents 1.0 Goals of the SSMP Page 4 2.0 Organization Page 4 3.0 Legal
More informationManaging & Assisting with State & Federal Enforcement Directives Related to Sanitary Sewer Overflows (SSOs)
Managing & Assisting with State & Federal Enforcement Directives Related to Sanitary Sewer Overflows (SSOs) ABSTRACT Brian L. Tripp, PE, BCEE, 1 Jeremy Brashears, PE, 1 & Mark Fisher, PE, 2 1 WK Dickson
More informationSanitary Sewer Overflow Annual Report
Sanitary Sewer Overflow Annual Report Division of Surface Water Date: 1/9/2016 Facility name: Ohio NPDES permit no.: Village of Coldwater WWTP 2PB00013*ID Period covered by report: November 1 2014 October
More informationINTRODUCTION. WASTEWATER MANAGEMENT PLAN MAY 2009 Metropolitan North Georgia Water Planning District 7-1
INTRODUCTION There are approximately 16,000 miles of sewers and more than 450,000 manholes within the Metro Water District. Sewers and manholes within the Metro Water District range in age from new to
More informationAffordable Asset Management Workshop Making Use of the Data You Have An Owners Perspective
Affordable Asset Management Workshop Making Use of the Data You Have An Owners Perspective Building the Foundation for an Effective Asset Management Program Scott D. Kelly, P.E. Assistant City Administrator
More informationVILLAGE OF SHOREWOOD CAPACITY, MANAGEMENT, OPERATIONS, MAINTENANCE (CMOM) PLAN
VILLAGE OF SHOREWOOD CAPACITY, MANAGEMENT, OPERATIONS, MAINTENANCE (CMOM) PLAN Prepared By: Superior Engineering, LLC S75W13139 Oxford Court Muskego, WI 53150 (414) 235 9726 Version 3 February 25th, 2010
More informationTim Schneller, P.E. GBA Engineers and Architects
Tim Schneller, P.E. GBA Engineers and Architects Portions of the presentation were taken from a presentation prepared by a member of the Water Environment Federation Collection Systems Committee CMOM Subcommittee.
More informationExecutive Summary Consent Decree
OVERFLOW ABATEMENT PROGRAM Executive Summary Consent Decree The sewer system in Nashville dates back to the late 1800s and originally consisted of a combined sewer system, later transitioning to separate
More informationAppendix J: Pipe Evaluation and Replacement Options and Costs
Appendix J: Pipe Evaluation and Replacement Options and Costs STORMWATER SYSTEM INVENTORY The City of Olympia has an extensive stormwater conveyance system. As a matter prudent management of the Stormwater
More informationUSING GIS TO IMPROVE SEWER LINE MAINTENANCE TO PREVENT SANITARY SEWER OVERFLOWS
USING GIS TO IMPROVE SEWER LINE MAINTENANCE TO PREVENT SANITARY SEWER OVERFLOWS Brian Hewes, Department of Earth Sciences, University of South Alabama, Mobile, Al 36688. Email: bjh401@jaguar1.usouthal.edu.
More informationCity of Springfield, Illinois Office of Public Works Sewer Division. 2012 Sewer Overflow Report
City of Springfield, Illinois Office of Public Works Sewer Division 2012 Sewer Overflow Report April 24, 2013 1 Table of Contents 1. PURPOSE... 3 APPENDIX A. City of Springfield 2012 SSO Report... 4 2
More informationContracting Opportunities Vendor Day May 17, 2011
Customer Care Team Contracting Opportunities Vendor Day May 17, 2011 Customer Care Team: What We Do Team Office customer advocacy and contracting Customer Relations Group call centers, claims, special
More informationTOWN OF GRIMSBY ASSET MANAGEMENT PLAN
TOWN OF GRIMSBY ASSET MANAGEMENT PLAN August 20, 2014 DFA Infrastructure International Inc. Executive Summary ES1 Background The Town of Grimsby (Town) with a population of approximately 25,325 is located
More informationRESPONSIBLE DEPARTMENT: ADDITIONAL DIRECTOR (S): ASSISTANT CITY MANAGER: JIM CALLAWAY
CITY COUNCIL AGENDA REQUEST AGENDA OF: 07-01-14 AGENDA REQUEST NO: IV-D INITIATED BY: GREG NICHOLS PROJECT MANAGER RESPONSIBLE DEPARTMENT: ENGINEERING PRESENTED BY: TIMOTHY JAHN, P.E. SENIOR ENGINEER DIRECTOR:
More informationDan Ott Managing Engineer Collection System Johnson County Wastewater, KS and Rick Nelson CH2M HILL
Dan Ott Managing Engineer Collection System Johnson County Wastewater, KS and Rick Nelson CH2M HILL What is JCW s strategy for meeting wet weather performance targets? SSO s Basement Back-ups Serving Johnson
More informationCOLLECTION SYSTEM SETTLEMENT AGREEMENT
COLLECTION SYSTEM SETTLEMENT AGREEMENT Wastewater Collection System Rehabilitation and Replacement Report and Plan A deliverable of the Settlement Agreement and Final Order between the city of Los Angeles
More informationBridges & Culverts Condition by Quantity
3.4.3 What condition is it in? Approximately 93% of the municipality s bridge structures are in good to excellent condition, with the remaining 7% in fair condition. As a result, the municipality received
More informationPurpose and Approach. Introduction
City of Ann Arbor Sanitary Sewer Wet Weather Evaluation Project Best Practices Sub- Group of the Citizens Advisory Committee Examples of Wet Weather Improvements from Other Communities December 5, 2013
More informationZIONSVILLE WASTEWATER DEPARTMENT 10-YEAR SEWER REHABILITATION REPORT 2013-2022
ZIONSVILLE WASTEWATER DEPARTMENT 10-YEAR SEWER REHABILITATION REPORT 2013-2022 Town of Zionsville, Indiana December 19, 2012 PREPARED BY BEAM, LONGEST & NEFF, LLC. 8126 Castleton Road Indianapolis, Indiana
More informationComprehensive Sewer Surveys in 9 Basins
Sanitary Sewer Overflow Consent Decree Presentation to Anacostia Watershed Management Committee Washington Suburban Sanitary Commission March 1, 2012 1 Three Phases of SSO Consent Decree 2 Comprehensive
More informationSource Water Protection Practices Bulletin Managing Sanitary Sewer Overflows and Combined Sewer Overflows to Prevent Contamination of Drinking Water
United States Office of Water EPA 916-F-01-032 Environmental Protection (4606) July 2001 Agency Source Water Protection Practices Bulletin Managing Sanitary Sewer Overflows and Combined Sewer Overflows
More information9/22/2011. Growing population Expanding number of businesses Aging infrastructure. Multiple databases (conflicting, redundant or hardto-find
Tips, Tools and Tales for Intelligent, Automated Infrastructure Maintenance Keith Alvis Maintenance Management Systems Coordinator City of Westminster, CO - PW/U Topics Westminster PW/U: overview, history,
More informationFY 2016 Proposed Capital Improvement Program
FY 2016 Proposed Capital Improvement Program Metropolitan St. Louis Sewer District FY 2016 Capital Improvement Program Proposed Engineering Services Rich Unverferth P.E. Director of Engineering January
More informationChapter 2 Asset Management and CMOM
Chapter 2 Asset Management and CMOM Chapter Outline This chapter is organized into the following sections: Introduction Asset Management Capacity, Management, Operation and Maintenance (CMOM) Introduction
More information5O. Consideration of adopting a Sanitary Sewer Maintenance Policy for the City of Monticello (MT)
City Council Agenda: 10/13/14 5O. Consideration of adopting a Sanitary Sewer Maintenance Policy for the City of Monticello (MT) A. REFERENCE AND BACKGROUND: City Council is asked to approve the City of
More informationQuantifying Inflow and Infiltration via Dyed Water Flooding
Quantifying Inflow and Infiltration via Dyed Water Flooding Prepared by Anna Kesler, E.I.T. Catherine Morley, P.E. Overview Historical background to City of Elmhurst I/I issues What Is Dye Flooding? What
More informationEvaluation of Rapid Acoustic Pipe Inspection for Prioritizing Cleaning and CCTV Resources
Evaluation of Rapid Acoustic Pipe Inspection for Prioritizing Cleaning and CCTV Resources George Selembo InfoSense, Inc. Stephen Orticello Directrik, Inc. Silvano Piluso Toronto Water Colbert Clifford
More informationREQUEST FOR PROPOSAL
REQUEST FOR PROPOSAL FOR DEVELOPMENT OF THE CITY OF CLAYTON SEWER SYSTEM MANAGEMENT PLAN (SSMP) PROPOSALS MUST BE RECEIVED BY: FRIDAY, 01/17/2014 AT 4:00 PM SSMP Request for Proposal Released 12/18/2013
More informationSANITARY SEWER OVERFLOW EVALUATION REPORT
SANITARY SEWER OVERFLOW EVALUATION REPORT MAY 2012 SEPT 2013 Draft for Review: November 13, 2013 Prepared by: James C. Hailey & Company City of Gallatin, Sumner County, TN Sanitary Sewer Collection Evaluation
More informationSECTION 812 SEWER LINE, MANHOLE AND WET WELL CLEANING
812-1 SCOPE OF WORK: SECTION 812 SEWER LINE, MANHOLE AND WET WELL CLEANING a. The Contractor shall provide all labor, materials, equipment, and incidentals necessary to perform the cleaning of sewer lines,
More informationUDG Spring Conference Birmingham 2016
Use of Monitoring Equipment to Proactively Manage the Waste Water Network Presenters James Mason (RPS), Joanna Kelsey (Severn Trent Water) Contributors Andrew Bailey (RPS), John Hateley (RPS) Ruth Clarke
More information812-3 LIMITATIONS: b. No fire hydrant shall be obstructed or used when there is a fire in the area.
812-1 SCOPE OF WORK: SECTION 812 SEWER LINE, MANHOLE AND WET WELL CLEANING a. The Contractor shall provide all labor, materials, equipment, and incidentals necessary to perform the cleaning of sewer lines,
More informationDRAINAGE :: DRAINAGE CONCERN FREQUENTLY ASKED QUESTIONS
DRAINAGE :: DRAINAGE CONCERN FREQUENTLY ASKED QUESTIONS The City of DeSoto s Department of Development Services is the point of contact for storm drainage related issues. The following are some frequently
More informationMEMORANDUM. Doug Monn, Public Works Director Jim App, City Manager. Matt Thompson, Wastewater Resources Manager. Date: January 24, 2011
MEMORANDUM To: From: Doug Monn, Public Works Director Jim App, City Manager Matt Thompson, Wastewater Resources Manager Date: January 24, 2011 Subject: Audit of 2010 Wastewater Collection Performance City
More information