Summary 7/11/2012. Michigan Water Environment Association 2012 Annual Conference Boyne Mountain Resort
|
|
- Stanley Goodman
- 8 years ago
- Views:
Transcription
1 Michigan Water Environment Association 2012 Annual Conference Boyne Mountain Resort June 25, 2012 Thomas Gossiaux, PE (AECOM) Matt Raysin, PE (GCDC-WWS) Dave Barnas, PE (AECOM) Ed Tharp, PE (AECOM) Summary Project Background Why Rehab? & Alternatives Bid Project Concerns What is CIPP Lining? Construction Setup, Lining/Curing, Demob Time Criteria Project Hiccups 1
2 Project Background 72-inch RCP sanitary sewer interceptor installed to collect several aging sanitary sewer pump station and service additional area. Installed interceptor had high infiltration and evidence of structural failure, which was not solved through grouting. Alternatives were bid to fix this issue. Why Rehab? 2
3 Why Rehab? Why Rehab? 3
4 Proposed Alternatives Alternative Low Bid High Bid CIPP (Composite) Lining $4,720,220 $5,561,870 CIPP (Fiber/Felt) Lining $4,055,140 $5,790,420 Slip lining $5,519,810 $9,605,350 Parallel Tunnel $6,578,700 (only bid) *CIPP Composite Liner was $665,080 more than CIPP (Fiber/Felt) Liner, but selected due to increased strength and reduced thickness. Benefits of CIPP Composite Bid was less expensive than slip-lining and parallel tunnel Lighter/thinner and stronger than traditional felt CIPP Liner Reduces infiltration and exfiltration (no pipe joints) Protect pipes from corrosion Minimal traffic disruption/social costs vs. open-cut Increase flow capacity 4
5 Pipe Comparison RCP CIPP (composite) CIPP (fiber/felt) Sliplining (Hobas) Design Flow 61 MGD 61 MGD 61 MGD 61 MGD Design Slope 0.05% 0.05% 0.05% 0.05% Manning's Roughness (n) Nominal ID Flow Capacity (Q) 61.2 MGD 71.6 MGD 67.6 MGD 55 MGD Project Specific Concerns Interceptor Size: 72-inch Interceptor (not a typical liner installation) Run Lengths: 1,200 to 1,400 feet per run Depth: 50-feet Water Table: 20+ feet of hydrostatic pressure Constructability Issues: Weight and stretching liner Over the hole wet-out 5
6 What is CIPP? Cured In Place Pipe Thermosetting resin is injected into a felt tube The tube is inserted into an existing host pipeline by water inversion The CIPP tube is cured using hot water Ends are cut and the final product is a fully-functional pipe-within-apipe Slide courtesy of: Water Inversion 6
7 Liner Technical Information Liner Thickness: ~1.4 (approx. 33 mills) Over the hole wetout Additional structural component Carbon Fiber Added strength with less thickness and weight Designed for Class 5 RCP equivalent strength Cured at ~180 F for about 12 hours Liner Layers Host Pipe Carbon Fiber Felt Layers Plastic Layer Sewage Flow 7
8 Liner Structural Member iplus Composite Slide courtesy of: 8
9 Preparation for Lining - Level Site Preparation for Lining - Mobilize Equipment Liner Brake Boilers Frac Tanks Inversion Structure 9
10 Preparation for Lining - Layout Liner Lining Operations - Begin Inversion 10
11 Lining Operation Begin Wet-out Lining Operation - Wet-out 11
12 Lining Operation - End of Wet-out Lining Operation - End of Wet-out 12
13 Lining Operation - End Inversion * Photo is not from Genesee County Project Lining Operation - Curing Liner 13
14 Lining Operations - Cut Ends Finished Product! 14
15 Time Criteria Prep For Lining: Level site around manhole: 4 hours per inversion MH Install water line: 4 hours Clean/TV: 2-4 hours (more if additional grouting is necessary) Grout major leaks (if necessary): 1-2 days End Seals: ~ 4 hours Equipment Set-up: 36 hours Total Prep Time: ~ 3-5 days (2-12 hour crews per day) Time Criteria (cont.) Lining: Wet-out/Inversion: 1-day (over the hole wetout ) Cure: 1-day Cut ends/clean edges: 1-day Total Lining Time: ~ 3 days Total Time Including Prep: ~ 6-7 days 15
16 Time Criteria (cont.) Demob/Cleanup: Tear down equipment: 1 day Total Demob Time: ~ 1 days Total Time Including Prep and demob: ~ 7 to 8 days Project Hiccups Curing issue in first liner length was due to water behind pipe. Some non-fully cured pipe bubbles required special resin to be injected to create a seal. Structural strength was not compromised. Finished pipe had some wrinkles If in flow path, ground down and sealed. 16
17 Bubbles and Wrinkles Summary Project Background Why Rehab? & Alternatives Bid Project Concerns What is CIPP Lining? Construction Setup, Lining/Curing, Demob Time Criteria Project Hiccups 17
18 Comments? Questions? 18
Rehabilitation or Replacement? That Is The Question
Rehabilitation or Replacement? That Is The Question Chris L. Windley PE Greg Anderson, PE 94th Annual Conference November 18, 2014 Overview Project Background Existing Sewer Condition Flow Projections
More informationSPECIFICATIONS FOR SEWER PIPE AND LINING INSERTION - TRENCHLESS; GENERAL GUIDELINES (As Provided by NASSCO)
SPECIFICATIONS FOR SEWER PIPE AND LINING INSERTION - TRENCHLESS; GENERAL GUIDELINES (As Provided by NASSCO) 1 Intent: The intent of trenchless sewer pipe Insertion is to rehabilitate the existing sewer
More informationMainline Pipe Rehabilitation Using Cured-in-Place Pipe (CIPP) & Folded Pipe Technology
2007 Pumper & Cleaner Environmental Expo International Wednesday February 7, 2007 Mainline Pipe Rehabilitation Using Cured-in-Place Pipe (CIPP) & Folded Pipe Technology What is Cured-In-Place Pipe (CIPP)
More informationREHABILITATION OR REPLACEMENT? THAT IS THE QUESTION
REHABILITATION OR REPLACEMENT? THAT IS THE QUESTION ABSTRACT Chris L. Windley PE, McKim & Creed, Inc. Ben R. Latino, Jr., PE, McKim & Creed, Inc. Greg Anderson, PE, McKim & Creed, Inc. When designing to
More informationStorm Sewer Trenchless Upgrade Alternatives and Recommendations
Storm Sewer Trenchless Upgrade Alternatives and Recommendations Background Approximately 1,930 feet of the 40-inch and 42-inch CMP storm sewer pipe from manhole M22 to manhole M12 will be evaluated for
More informationREVIEW OF TRENCHLESS TECHNIQUES FOR THE REHABILITATION OF SEWERS. Gerhard (Gerry) P. Muenchmeyer, P.E. Muenchmeyer Associates, LLC
REVIEW OF TRENCHLESS TECHNIQUES FOR THE REHABILITATION OF SEWERS Gerhard (Gerry) P. Muenchmeyer, P.E. Muenchmeyer Associates, LLC What is really out there? DO YOU DIG IT? INDUSTRY CONCERNS UNEXPECTED DEVELOPMENTS
More informationSan Antonio, TX July 28, 2011
Rehabilitation of a Deteriorated 60 RCP Wastewater Interceptor Using Competing Trenchless Technologies Bruce Cole, PE Corey Anderson, EIT TAWWA/WEAT Summer Seminar San Antonio, TX July 28, 2011 Wendy Martinez,
More informationGENERAL SPECIFICATIONS AND GUIDELINES FOR INSTALLATION MASTERLINER CURED-IN-PLACE PIPE SYSTEMS
GENERAL SPECIFICATIONS AND GUIDELINES FOR INSTALLATION OF MASTERLINER CURED-IN-PLACE PIPE SYSTEMS 34 TABLE OF CONTENTS 1.00 INTRODUCTION 2.00 SITE WORK PREPARATIONS 3.00 THE PRODUCT AND COMPONENT MATERIALS
More informationIntroduction to Pressure Pipe Rehabilitation with CIPP
Introduction to Pressure Pipe Rehabilitation with CIPP Founded in early 1990 s RS Technik is a global leader in the rehabilitation of underground pipes RS Technik uses Cured-in- Place (CIPP) technology
More informationLetty Arvide-Gomar, PE
Letty Arvide-Gomar, PE Outline DIP History and Applications Corrosion Issues Internal Cleaning Technologies Rehabilitation Options DIP History and Applications Corrosion Issues Internal Cleaning Technologies
More informationREHABILITATION OF UNDERGROUND SEWER LATERAL PIPES WITH CURED-IN-PLACE-PIPE LINER SECTION 02542
1.0 INTENT REHABILITATION OF UNDERGROUND SEWER LATERAL PIPES 1.01 It is the intent of this specification to provide for the reconstruction of pipelines and conduits by the installation of a resin-impregnated
More informationTrenchless Construction Technology and Issues
Trenchless Construction Technology and Issues Dr. Mohammad Najafi, P.E., F. ASCE Director, Center for Underground Infrastructure Research & Education (CUIRE) Professor and Director of Construction Engineering
More informationCIPP for Large Diameter Pressure Pipes. Water Research Foundation Large Diameter Pipe Rehabilitation Seminar 20 January 2016 George Bontus, P.Eng.
CIPP for Large Diameter Pressure Pipes Water Research Foundation Large Diameter Pipe Rehabilitation Seminar 20 January 2016 George Bontus, P.Eng. Pressure Pipe Lining What Does it Mean? What is It? No
More informationSan Antonio Water System Standard Specifications for Construction ITEM NO. 1100 SLIP-LINING SANITARY SEWERS
ITEM NO. 1100 SLIP-LINING SANITARY SEWERS 1100.1 DESCRIPTION: This item shall consist of slip-lining sanitary sewer pipe, which is accomplished by pulling or pushing liner pipe into existing sewers by
More informationPlatte River Interceptor Slipline Rehabilitation
Platte River Interceptor Slipline Rehabilitation Owner: Metro Wastewater Reclamation District Contractor: American West, Denver CO Slipline Pipe Manufacturer : Hobas Pipe USA Presented by: Tom Furie, Area
More informationSewer Pipe Lining An Economic Solution for Pipe Rehabilitation By Tawana Albany Nicholas, Virgin Islands Waste Management Authority
Sewer Pipe Lining An Economic Solution for Pipe Rehabilitation By Tawana Albany Nicholas, Virgin Islands Waste Management Authority Abstract The United States Virgin Islands Waste Management Authority
More informationWorking together to improve beach water quality. Fixing our. public and private. sewers
Working together to improve beach water quality Fixing our public and private sewers May 2004 FIND FIX DECIDE Narrow Neck Beach on a summer day As part of Project CARE, our long-term project to improve
More informationPresented by: Scott E. Belz Project Manager- URS Corporation Robert P. Kelly, P.E. Director of Engineering-City of Westlake James J. Smolik, P.E.
Presented by: Scott E. Belz Project Manager- URS Corporation Robert P. Kelly, P.E. Director of Engineering-City of Westlake James J. Smolik, P.E. Engineer-City of Westlake City of Westlake Facts Founded
More informationWater Main Lining A Sustainable Alternative to Open Cut Replacement
Water Main Lining A Sustainable Alternative to Open Cut Replacement Sean O Dell, PE Baxter & Woodman, Inc. B&W Client Seminar, Crystal Lake May 1, 2014 Agenda Why, What, When, Where, Who, How Reduction
More informationby Leonard Friesenhahn, P.E.
by Leonard Friesenhahn, P.E. of sight, out of mind is an adage your top administrators may apply to your campus Out wastewater collection system but as a facilities professional, you know how serious a
More informationSPR PE Steel Reinforced Liner
ENGINEERED SOLUTIONS SPR PE Steel Reinforced Liner Reline Done Right Contech is your single source for rehabilitation of sanitary & storm sewers, culverts and bridges. Contech Engineered Solutions has
More informationFRONT STREET & MUD ISLAND Interceptor Rehab
± 1!(!( 2!(!(!(!( 3!(!( 4!(!( 5!(!(!( 7!(!(!(!(!( 6!(!( 8!(!( 9!( Legend!( Manhole Rehab Mud IslandInterceptor (CIPP) Front St Interceptor (No Rehab) Gravity Main (No Rehab) Manhole (No Rehab) Sheet Boundary
More informationMIAMI-DADE LATERAL PILOT PROGRAM. James T. Cowgill, P.E. Rodney J. Lovett Franklin Torrealba, P.E.
MIAMI-DADE LATERAL PILOT PROGRAM James T. Cowgill, P.E. Rodney J. Lovett Franklin Torrealba, P.E. Hazen and Sawyer, P.C. 4000 Hollywood Boulevard Hollywood, FL 33021 ABSTRACT Since 1994 the Miami-Dade
More informationCURED-IN-PLACE PIPE MINIMIZING RISK BY DEFECT CODING
North American Society for Trenchless Technology 2007 No-Dig Conference & Exhibition San Diego, California April 16-19, 2007 CURED-IN-PLACE PIPE MINIMIZING RISK BY DEFECT CODING Robert K. Lee, P.E. 1 1
More informationINSTALLATION OF INSITUFORM LINER
PART 1 GENERAL 1.1 SCOPE: A. This item shall include all work and materials to install, insert a flexible polyester felt liner saturated with a thermo-setting resin into the existing sewer line for rehabilitation
More informationRehabilitation Alternatives. MWEA Collection System Seminar October 1, 2009
Rehabilitation Alternatives MWEA Collection System Seminar October 1, 2009 Overview Types of Rehabilitation Trenchless Categories On-Line Replacement In-Situ Options Selecting the Best Solution Types of
More informationTRB Webinar, Sponsored by AFS40 (Subsurface Soil-Structure Interaction), June 20 th 2008
TRB Webinar, Sponsored by AFS40 (Subsurface Soil-Structure Interaction), June 20 th 2008 Culvert Relining Installation, Design and Hydraulic Considerations Presented by: Tim Toliver, P.E. Advanced Pipe
More informationFlowtite Jacking Pipe
U.S. COMPOSITE PIPE SOUTH, LLC. MEMBER OF KTI PIPE GROUP OF COMPANIES Flowtite Jacking Pipe 18585 Samuels Rd. Zachary, La. 70791 PH. 225-658-6166 Fax 225-658-0947 www.flowtitepipe.com Flowtite GRP Pipe
More informationEI- MH06-204 TO MH06-209 LINER
EI- MH06-204 TO MH06-209 LINER TABLE OF CONTENTS PART ONE: PROJECT-SPECIFIC CONDITIONS 101 PROJECT DESCRIPTION 102 SCOPE OF WORK 103 ESTIMATED FLOWS 104 PROJECT SCHEDULE 105 HIGH WATER USERS PART TWO:
More informationPART 6 - STANDARD DESIGN AND CALCULATION FORMS 6.1 SANITARY SEWER DATA SHEET
PART 6 - STANDARD DESIGN AND CALCULATION FORMS 6.1 SANITARY SEWER DATA SHEET Name of Municipality or Sewer District Name of Project Original Township and Lot Number Name of Engineer of Firm Preparing Plans
More informationTrouble Shooting for Trenchless Liner Installation During Sewer Line Rehabilitation
Trouble Shooting for Trenchless Liner Installation During Sewer Line Rehabilitation Salam Khan*, P.E. and Christoph Dobson, P.E. Sacramento County Sanitation District 1 (CSD-1) 10545 Armstrong Avenue,
More informationBRANDYWINE HUNDRED SEWER REHABILITATION LYNNFIELD WEBSTER FARMS
BRANDYWINE HUNDRED SEWER REHABILITATION PROGRAM ND13 GREEN ACRES GREEN ACRES LYNNFIELD WEBSTER FARMS OBJECTIVES OF MEETING Review Why in Brandywine Hundred Explain County obligations regarding laterals
More informationRepair or Replacement - Band-Aids vs. Surgery
Repair or Replacement - Band-Aids vs. Surgery Using RCP for the Replacement of Failed or Undersized Culverts www.concrete-pipe.org Introduction and Background Our Nation s infrastructure owners are facing
More informationSoapstone Sewer Rehabilitation Alternative Concepts Design and Associated Impacts
Soapstone Sewer Rehabilitation Alternative Concepts Design and Associated Impacts Outline Update on Soapstone Emergency Response Provide project background Provide project purpose & need Present proposed
More informationRelining of Water Mains with. Flexible High Pressure Pipelines. Raedlinger Primus Line, Inc. Ivan Zubiaga Executive Vice President 2014
Relining of Water Mains with Flexible High Pressure Pipelines Raedlinger Primus Line, Inc. Ivan Zubiaga Executive Vice President 2014 Aging water main infrastructure The American Society of Civil Engineers
More informationExternal Wrapping of Steel Riser Pipe. Case Study HJ3 CS200902
External Wrapping of Steel Riser Pipe Case Study HJ3 CS200902 Introduction Refineries process a wide variety of petroleum products. As part of the process, they rely on cooling towers, which recycle water
More informationDefense Technical Information Center Compilation Part Notice
UNCLASSIFIED Defense Technical Information Center Compilation Part Notice ADP017712 TITLE: Rehabilitation of TCE-Contaminated Underground Storm Water System Using Trenchless Technology DISTRIBUTION: Approved
More informationStructural Lining for Water Mains. Presenters: Stephen Marcino, PE and Micah Blate, EIT (JMT)
Structural Lining for Water Mains Presenters: Stephen Marcino, PE and Micah Blate, EIT (JMT) 2015 PA-AWWA Annual Conference Thursday, April 23 rd, 2015 Agenda 1. Introduction 2. Purpose of Lining 3. Lining
More informationREHABILITATION METHOD FOR INCREASING FLOW VELOCITY AND REDUCING SEDIMENTATION
.asu/ North American Society for Trenchless Technology (NASTT) NO-DIG 2005 Orlando, Florida April 24-27, 2005 REHABILITATION METHOD FOR INCREASING FLOW VELOCITY AND REDUCING SEDIMENTATION Hwan-Kook Hwang
More informationSECTION 02150 REMOVAL OR ABANDONMENT OF EXISTING UTILITIES AND UNDERGROUND STRUCTURES. 1. Trench excavation, backfill, and compaction; Section 02250.
02150-1 of 6 SECTION 02150 REMOVAL OR ABANDONMENT OF EXISTING 02150.01 GENERAL A. Description Removal or abandonment of existing utilities and underground structures shall include, but not necessarily
More informationAnnular Space Grouting of Slipline Products
Annular Space Grouting of Slipline Products by David Gellings(, M.APWA & John Jurgens(, M.WWCPA Traditional methods of using neat cement slurries, (Portland cement and water, cement with fly ash or cement
More informationIndustrial Pipeline Integrity Management & Remote Polyurea Pipe Lining Systems.
Industrial Pipeline Integrity Management & Remote Polyurea Pipe Lining Systems. Aging pipeline infrastructure and industry s inability to evaluate and inspect has left many engineers and plant managers
More informationPORTLAND BES ADVANCES IN SEWER MAINTENANCE AND REPAIRS BY OPERATING MULTIPLE CIPP CREWS.
North American Society for Trenchless Technology 2007 No-Dig Conference & Exhibition San Diego, California April 15-20, 2007 Paper # PORTLAND BES ADVANCES IN SEWER MAINTENANCE AND REPAIRS BY OPERATING
More informationSECTION 02720 SANITARY SEWER AND STORM DRAIN SYSTEMS
SECTION 02720 SANITARY SEWER AND STORM DRAIN SYSTEMS PART 1 GENERAL 1.01 SECTION INCLUDES A. The requirements for pipe material and installation in sewer and drainage collection systems. All materials
More informationAPPENDIX M-2 SANITARY SEWER TECHNICAL MEMORANDUM. Stadium Reconstruction EIR
APPENDIX M-2 SANITARY SEWER TECHNICAL MEMORANDUM Stadium Reconstruction EIR Appendices \ AECOM Technical Services, Inc 401 West A Street Suite 1200 San Diego, CA 92101 www.aecom.com 619-610-7600 tel 619-610-7601
More informationCoast Trunk Sewer Rehabilitation Project for the Orange County Sanitation District
Coast Trunk Sewer Rehabilitation Project for the Orange County Sanitation District Paul F. Wilson 1 and Robert J. Warren 2 1 1525 Faraday Ave, Suite 290, Carlsbad, California, USA 92008; e-mail: pwilson@pirnie.com.
More informationBefore H 2 Town of South Windsor, CT Evaluates Large Diameter Concrete Pipe
Before H 2 Town of South Windsor, CT Evaluates Large Diameter Concrete Pipe September 11, 2012 NEWEA Collection Systems Conference Presented by: Laurie L. Perkins, PE Dennis A. Dievert, PE C. Frederick
More informationSECTION 02612 NONREINFORCED CONCRETE SEWER PIPE
SECTION 02612 PART 1 GENERAL 1.1 SUMMARY A. Section Includes: Furnishing and installing nonreinforced concrete sewer pipe. Provide concrete sewer pipe less than 12 inches in diameter, and in other sizes
More informationTHAT FIT SOLUTIONS. profile COVER STORY INLAND WATERS POLLUTION CONTROL, INC., DETROIT, MICH.
COVER STORY SOLUTIONS THAT FIT profile W When aging sewer lines in Detroit and the surrounding area begin INLAND WATERS POLLUTION CONTROL, INC., DETROIT, MICH. SERVICE AREA: CIPP lining (water, sewer and
More information02780 LINER FOR SEWER REHABILITATION
Section 02780 Liner for Sewer Rehabilitation Page 02780-1 (Revised 11/06/09) 02780 LINER FOR SEWER REHABILITATION SELECTED LINKS TO SECTIONS WITHIN THIS SPECIFICATION Part 1 GENERAL Part 2 PRODUCTS Part
More informationPROVIDING THE SAFE CHOICE FOR UNDERGROUND PIPE RENEWAL, INTEGRITY MANAGEMENT AND ASSET RELIABILITY
PROVIDING THE SAFE CHOICE FOR UNDERGROUND PIPE RENEWAL, INTEGRITY MANAGEMENT AND ASSET RELIABILITY Cured-In-Place Pipe Pressure & Gravity Lines Pipe Splitting Trenchless Pipe Replacement EcoCast Advanced
More informationMemorandum. PROJECT: Postmark Emergency Storm Repair Alternative Analysis
Memorandum CRW Engineering Group, LLC 3940 Arctic Blvd. Suite 300 Anchorage, AK 99503 (907) 562-3252 FAX 561-2273 TO: Mike Lee, P.E., Chief Engineer, ADOT/ANC FROM: Shane Blanchard, P.E. THRU: Mike Rabe,
More informationUltraviolet (UV) Light Cured Fiberglass Reinforced Cured-In-Place Pipe (CIPP) It is not just for sanitary sewer rehabilitation
Ultraviolet (UV) Light Cured Fiberglass Reinforced Cured-In-Place Pipe (CIPP) It is not just for sanitary sewer rehabilitation Dan Broderick Director of Pipeline Rehabilitation ACHEN-GARDNER ENGINEERING,
More informationREHABILITATION OF THE LONG WHARF SEWER FORCE MAIN USING SLIPLINING METHODOLOGY IN NEWPORT, RHODE ISLAND
North American Society for Trenchless Technology (NASTT) No-Dig Show 2011 Washington, D.C. March 27-31, 2011 Paper A-5-04 REHABILITATION OF THE LONG WHARF SEWER FORCE MAIN USING SLIPLINING METHODOLOGY
More informationSewer Rehabilitation Design Requirements
Sanitary Sewer Overflow (SSO) Control and Wastewater Facilities Program Sewer Rehabilitation Design Requirements City of Baton Rouge/Parish of East Baton Rouge Department of Public Works Submitted by Prepared
More informationSewer Pipe & Manhole Rehab. Jack Keys Collection System & Inspection Services Supervisor Southern Clinton County Municipal Utilities Authority
Sewer Pipe & Manhole Rehab Jack Keys Collection System & Inspection Services Supervisor Southern Clinton County Municipal Utilities Authority Past & Present There Are Times It Feels Like This 10 DIP WITH
More informationWauwatosa Lateral Rehabilitation Pilot Project. CSWEA Annual Meeting Madison, WI May 15, 2013
Wauwatosa Lateral Rehabilitation Pilot Project CSWEA Annual Meeting Madison, WI May 15, 2013 Overview Background Objectives Work Completed Testing Evaluation Conclusions 2 Milwaukee Metropolitan Sewerage
More informationFY15 Gravity Sewer and Manhole Rehabilitation
Contract Drawings For FY15 Gravity Sewer and Manhole Rehabilitation TRAVELERS REST TAYLORS Frazier Project No. -030 BASIN 850 Greenville, South Carolina April 2015 BASIN 700A GREENVILLE BASIN 700B FIVE
More informationA CASE STUDY IN INFILTRATION REDUCTION THROUGH TRENCHLESS TECHNOLOGY
A CASE STUDY IN INFILTRATION REDUCTION THROUGH TRENCHLESS TECHNOLOGY SOUTH PALOS TOWNSHIP SANITARY DISTRICT COOK COUNTY, ILLINOIS March 1999 By: Aaron E. Fundich, P.E. Robinson Engineering, Ltd. and Larry
More informationTHE BIG FIX: Public works administration would be easy if infrastructure. San Diego s Sewer Renewal Program. By Steve Gibbs
THE BIG FIX: San Diego s Sewer Renewal Program By Steve Gibbs Public works administration would be easy if infrastructure lasted forever. It does not. Roads, bridges and sewers eventually wear out. Even
More informationNative InDesign 2890 SaniTite Brochure 1/8" 100 300 CMYK April 17, 07
Sanitary Sewer Pipe Tough pipe for a tough environment SaniTite Sanitary Sewer Pipe delivers the features that engineers, contractors and municipalities demand durability, performance, handling, toughness
More informationSECTION 3 SANITARY SEWER DESIGN
SECTION 3 SANITARY SEWER DESIGN 3.1 GENERAL DESIGN CRITERIA 3.1.1 Requirement for Sanitary Sewer 3.1.2 Design Approval 3.1.3 IEPA Permit Required 3.1.4 Differentiation Between Public and Private Sanitary
More informationLOWER NORTH OUTFALL SEWER AND NORTH OUTFALL SEWER REHABILITATION USING AMERON S T HAB METHOD
www.norcalpug.com LOWER NORTH OUTFALL SEWER AND NORTH OUTFALL SEWER REHABILITATION USING AMERON S T HAB METHOD Bob Fisher and Lance Stracner Ameron Protective Lining J.R. Pipeline Co Inc. Abstract: The
More informationInstallation of Large Diameter Buried Pipes
Installation of Large Diameter Buried Pipes Sullivan (Sully) Curran P. E., Executive Director I. Introduction and Scope There is an ongoing need to provide designers, specifiers, engineers, consultants
More informationAPPLICATION OF GLASS-REINFORCED PLASTIC TO SEWER REHABILITATION
North American Society for Trenchless Technology (NASTT) NO-DIG 2005 Orlando, Florida April 24-27, 2005 APPLICATION OF GLASS-REINFORCED PLASTIC TO SEWER REHABILITATION Lynn Osborn 1 1 ArmourGRiP Product
More informationSANITARY SEWER SPECIFICATIONS
SANITARY SEWER SPECIFICATIONS OCTOBER 2003 HARVEST-MONROVIA WATER, SEWER, AND FIRE PROTECTION AUTHORITY SECTION 1.00 1.10 Purpose The purpose of this document is to assemble the sewer specifications, policies,
More information12/8/2014. Brought To You By: This webcast is sponsored by NASSCO with the support of IPBA.
Brought To You By: This webcast is sponsored by NASSCO with the support of IPBA. 1 Pipe Bursting A Mature and Diverse Trenchless Technology December 10, 2014 1:00 3:00 pm Eastern How to Participate Today
More informationOakland Macomb Interceptor Drain Rehabilitation State Revolving Fund Project Plan Overview. Public Meeting June 10, 2009
State Revolving Fund Project Plan Overview Public Meeting June 10, 2009 What is the OMI? The OMI is the Oakland Macomb Interceptor Sewer. The OMI transports much of the sanitary sewage from Oakland and
More informationSECTION 15076 CEMENT-MORTAR LINED AND COATED STEEL PIPE
SECTION 15076 CEMENT-MORTAR LINED AND COATED (CML&C) STEEL PIPE PART 1 GENERAL 1.01 DESCRIPTION This section designates the requirements for steel pipe fabrication, test in shop, installation of steel
More informationM I D W E S T S O C I E T Y F O R T R E N C H L E S S T E C H N O L O G Y. Kansas City, Missouri s Trenchless Program
M I D W E S T S O C I E T Y F O R T R E N C H L E S S T E C H N O L O G Y Kansas City, Missouri s Trenchless Program Outline of Presentation Intro to Kansas City Water Services information Trenchless Program
More informationCHALLENGES IN LINING A 100 YR OLD BRICK SEWER
North American Society for Trenchless Technology 2007 No-Dig Conference & Exhibition San Diego, California April 15-20, 2007 CHALLENGES IN LINING A 100 YR OLD BRICK SEWER Brad Jenson 1, Keith Hanks 2,
More informationEmerging Technologies in Wastewater Collection Systems
Keville Enterprises Emerging Technologies in Wastewater Collection Systems Douglas McCutchen, CCM Brian Karmasin, P.E., BCEE CMAA Annual Conference Oct 2008 San Francisco, California Today s s Presentation
More informationENGINEERING DESIGN GUIDE FOR REHABILITATION WITH CURED-IN-PLACE PIPE Second Edition
ENGINEERING DESIGN GUIDE FOR REHABILITATION WITH CURED-IN-PLACE PIPE Second Edition Lanzo Company History Lanzo has been a leading competitor in the construction industry for over 45 years. Lanzo was founded
More informationQuantifying Inflow and Infiltration via Dyed Water Flooding
Quantifying Inflow and Infiltration via Dyed Water Flooding Prepared by Anna Kesler, E.I.T. Catherine Morley, P.E. Overview Historical background to City of Elmhurst I/I issues What Is Dye Flooding? What
More informationSpecification for Pipe Bursting Gravity Sewer Mains with HDPE Pipe
Specification for Pipe Bursting Gravity Sewer Mains with HDPE Pipe 1. GENERAL The following supplemental sewer main specifications are intended to address the installation of high-density polyethylene
More informationPIPE REHABILITATION. Industrial Wastewater Municipal Wastewater Drinking Water Pressure Pipes
PIPE REHABILITATION Industrial Wastewater Municipal Wastewater Drinking Water Pressure Pipes About Us An HDPE after mechanical insertion into an egg-shaped brick work sewer sized 1400 x 2100 mm (or 56
More informationSewer network renovation using glass-fiber reinforced (GRP) pipe liners
Sewer network renovation using glass-fiber reinforced (GRP) pipe liners The BONEX method 1./ Antecedents Several hundred or thousand kilometers is the total length of the communal and industrial sewer
More informationCITY OF DAYTON DEPARTMENT OF WATER 42-INCH SANITARY SEWER REHABILITATION
CITY OF DAYTON DEPARTMENT OF WATER 42-INCH SANITARY SEWER REHABILITATION 42-INCH SANITARY SEWER REHABILITATION WHAT WE WILL DISCUSS TODAY: Project Justification & Evolution (high level/not a chemistry
More informationRESPONSIBLE DEPARTMENT: ADDITIONAL DIRECTOR (S): ASSISTANT CITY MANAGER: JIM CALLAWAY
CITY COUNCIL AGENDA REQUEST AGENDA OF: 07-01-14 AGENDA REQUEST NO: IV-D INITIATED BY: GREG NICHOLS PROJECT MANAGER RESPONSIBLE DEPARTMENT: ENGINEERING PRESENTED BY: TIMOTHY JAHN, P.E. SENIOR ENGINEER DIRECTOR:
More informationENGINEERED SOLUTIONS. A2 Liner Pipe for Trenchless Technology
ENGINEERED SOLUTIONS A2 Liner Pipe for Trenchless Technology A2 Liner Pipe Restores Deteriorated Sewers Cost-Effective Rehabilitation The increasing rate of sanitary and storm sewer deterioration requires
More informationCONSTRUCTION OF NON-CIRCULAR SEWER REHABILITATION PROJECTS IN LOS ANGELES
North American Society for Trenchless Technology (NASTT) No-Dig Show 2010 Chicago, Illinois May 2-7, 2010 Paper C-4-04 CONSTRUCTION OF NON-CIRCULAR SEWER REHABILITATION PROJECTS IN LOS ANGELES Brad Jenson
More informationWaste Management. Infrastructure Rehabilitation in the U.S. Virgin Islands
Waste Management Infrastructure Rehabilitation in the U.S. Virgin Islands The United States Virgin Islands is a group of islands in the Caribbean that are an insular area of the United States. The islands
More informationSession: HDPE Pipe Test Rafael Ortega, Vice President, Lockwood, Andrews & Newnam
Session: HDPE Pipe Test Rafael Ortega, Vice President, Lockwood, Andrews & Newnam Education Master of Business Administration University of Houston, 1985 Bachelor of Science, Civil Engineering University
More informationTECHNICAL NOTE Culvert Sliplining and Lining of Casings with HPPipe
TECHNICAL NOTE Culvert Sliplining and Lining of Casings with HPPipe TN 5.14 February 2010 Introduction It may be at times necessary, in an aging infrastructure, to rehabilitate drainage and sanitary lines
More informationSECTION 5: SANITARY SEWER SYSTEM DESIGN
SECTION 5: SANITARY SEWER SYSTEM DESIGN 5.01 GENERAL Sanitary sewer improvements shall be designed to serve the ultimate level of City development as defined in the General Plan and the Wastewater Facilities
More information4 Steps for Quality Sewer Performance in Perpetuity
4 Steps for Quality Sewer Performance in Perpetuity By Gerhard Gerry P. Muenchmeyer, P. E. Principal Muenchmeyer Associates, LLC E-mail gerry@muenchmeyerassoc.com INTRODUCTION A well maintained and functional
More informationThe AQUAFIN Approach to Concrete Repair
Concrete Repair Building Product Systems Waterproofing & Concrete Restoration Decorative Coatings Moisture Vapor Remediation & Flooring Injection Grouting The AQUAFIN Approach to Concrete Repair www.aquafin.net
More informationSEPTIC SYSTEM CONSTRUCTION REQUIREMENTS ST. MARY S COUNTY HEALTH DEPARTMENT
SEPTIC SYSTEM CONSTRUCTION REQUIREMENTS ST. MARY S COUNTY HEALTH DEPARTMENT The following are minimum requirements for installation of conventional trench sewage disposal systems in St. Mary s County,
More informationBROOKS BRIDGE WATERLINE REHABILITATION
The North American Society (NASTT) and the International Society for Trenchless Technology (ISTT) International No-Dig Show 2009 Toronto, Ontario Canada March 29 April 3, 2009 Paper C-3-02 BROOKS BRIDGE
More informationepros DrainLiner Program
epros DrainLiner Program All Liner Types At A Glance epros DrainLinerPP (mit PP-Beschichtung) 3 In trenchless rehabilitation methodology, a general distinction is made between sectional or part repairs
More informationTECHNICAL NOTE Lining of Casings with SaniTite HP Pipe
TECHNICAL NOTE Lining of Casings with SaniTite HP Pipe TN 5.18 October 2015 In sanitary sewer, it is often necessary to use trenchless technology methods to install a casing pipe under high volume roads,
More informationSection 02702 SEWER PIPE INSTALLATION AND TESTING
PART 1 - GENERAL Section 02702 SEWER PIPE INSTALLATION AND TESTING 1-1. SCOPE. This section covers the installation and testing of all sewer pipe furnished under the following specification sections: Concrete
More information53.03 MATERIALS FOR SEWER LINER PIPE AND FITTINGS: The following materials are approved for installation in sanitary sewer lines:
Division 53: Slip-Lining of Existing Sewer Line 53.01 GENERAL: This section includes all labor, materials, transportation, equipment necessary to rehabilitate by means of Instituform deteriorated sections
More informationWhite Paper I C G. How to Reduce I&I and Prevent Structural Damage with Intelligent Use of Chemical Grout. A Infiltration Control Grouting Association
I C G A Infiltration Control Grouting Association A Division of NASSCO, Inc. White Paper THE ROLE OF CHEMICAL GROUTING IN WASTEWATER SYSTEMS: How to Reduce I&I and Prevent Structural Damage with Intelligent
More informationSECTION 802 GRAVITY SEWER PIPE
SECTION 802 GRAVITY SEWER PIPE 802-1 DESCRIPTION: This Work shall consist of furnishing all labor, materials, equipment, and incidentals required to remove and dispose of existing gravity sewer pipe if
More informationHigh Density Polyethylene Liners for Rehabilitation of Corroded Pipelines
High Density Polyethylene Liners for Rehabilitation of Corroded Pipelines Jeff Schell General Manager United Pipeline Middle East, Inc. Introduction HDPE Liners A cost effective and environmentally beneficial
More informationThe Most Advanced Name in Drainage Systems. Sanitary Sewer Pipe
The Most Advanced Name in Drainage Systems Sanitary Sewer Pipe SaniTite Sanitary Sewer Pipe delivers the features that engineers, contractors and municipalities demand durability, performance, handling,
More informationIS THAT LINER THICK ENOUGH?
IS THAT LINER THICK ENOUGH? Philip McFarlane, Opus International Consultants Ltd ABSTRACT The amount of pipeline rehabilitation being undertaken in New Zealand is increasing each year. Larger diameter
More informationInfo What? Using InfoMaster to Develop a Rehabilitation and Replacement Plan
Info What? Using InfoMaster to Develop a Rehabilitation and Replacement Plan Amanda Lei - City of San Jose Alex Palmatier - HDR 2014 HDR, Inc., all rights reserved. Background Forecasting and Budget Data
More informationSEWER PIPELINE AND MANHOLE REHABILITATION FOR VARIOUS LOCATIONS WITHIN THE CITY OF BEVERLY HILLS, CALIFORNIA CITY OF BEVERLY HILLS
SEWER PIPELINE AND MANHOLE REHABILITATION FOR VARIOUS LOCATIONS WITHIN THE CITY OF BEVERLY HILLS, CALIFORNIA CITY OF BEVERLY HILLS RESPONSE TO BIDDER S QUESTIONS Question #1: Is the Contractor required
More information