ENVIRONMENT MANAGEMENT PLAN



Similar documents
ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN

EnVirOnMEnT ManaGEMEnT PLan. FOr. M/S. LiME STOnE MinE OF. Dhirajlal Panchanbhai Vachhani. area. PrOPOSEd PrOdUCTiOn: TPa

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN

Ratdi Limestone (Building) Mine Location Near Village- Ratdi, Taluka & district Porbandar, (Gujarat) Latitude. 9.0m RL.

Proposed Terms of Reference for EIA studies

Environment Management Plan

TERMS OF REFERENCE FOR SCOPING OF EIA STUDY

PROPOSED TERMS OF REFERENCE

The Terms of reference (ToR) for conducting Rapid EIA study for the proposed project is described below:

Project Details-Minor Minerals (Other Than Sand)

Environment Management Plan

Project Details- Minor Minerals (Other Than Sand)

Environmental Management Plan

Project Details- Minor Minerals (Other Than Sand)

ENVIRONMENT MANAGEMENT PLAN

CHANDAM7AIL,P SAND DEPOSIT

Final Environmental Impact Assessment of Smt. Singam Bhavani Laterite Mining ADDITIONAL STUDIES

ENVIRONMENTAL MANAGEMENT PLAN :-

How To Conduct An Environmental Impact Assessment

ENVIRONMENT MANAGEMENT PLAN

Environment Management Plan

PROPOSED TERMS OF REFERENCE

TERMS OF REFERENCE FOR THE RAPID EIA STUDY

ENVIRONMENT MANAGEMENT PLAN

Environment Management Plan

PRE FEASIBILITY REPORT

ENVIRONMENT MANAGEMENT PLAN

PRE - FEASIBILITY REPORT

ENVIRONMENT MANAGEMENT PLAN

Environmental Management Plan

PROPOSED TOR FOR EIA STUDY

Proposed Terms of Reference for EIA studies

ENVIRONMENTAL MANAGEMENT PLAN. Nilaya Hills/ Heights Promoted by M/s RBS Developers (Group Housing & Commercial Building Project)

THE NATURAL RESOURCES AND ENVIRONMENT ORDINANCE (CAP LAWS OF SARAWAK, 1958 Ed.)

TERMS OF REFERENCE FOR THE RAPID EIA STUDY FOR SHIVKAR LIGNITE BLOCK, DIST. BARMER, RAJASTHAN

Project Details-Minor Minerals ( Rajula Building Stone)

Fauna- No particular type of fauna finds except snakes, hynus & Jackals, wild cat, wildhen etc. are found in and around the area.

Frequently Asked Questions (FAQs) on Hydropower

Project Details Minor Minerals

Climate Change and Sri Lanka. Ajith Silva Director/ Policy and Planning Ministry of Environment and Natural Resources Sri Lanka

Pre- FEASIBILITY REPORT

2x800 MW Thermal Power Project Near Village Paraspani, Tehsil Pathargama, Godda- District By Adani Power (Jharkhand) Limited

Birmingham City University / Students Union Aspects and Impacts Register. Waste. Impacts description

BHARAT PETROLEUM CORPORATION LIMITED

Pre- FEASIBILITY REPORT

TERMS OF REFERENCE. BEFORE CONSTRUCTION: Sl No TOR RESPONSE 1. Legalities of the land: Is the land The Project is clear from all angles.

2. PRE-FEASIBILITY REPORT

PRE FEASIBILITY REPORT

2. PRE-FEASIBILITY REPORT

RISK ASSESSMENT REPORT

COMPLIANCE STATUS OF CONDITIONS IMPOSED IN ENVIRONMENTAL CLEARANCE FOR 8.5 MTPA BAUXITE MINING VIDE LETTER NO J-11015/650/2007-IA.II(M),DTD

Environmental aspects of water fluoridation

RISK ASSESSMENT REPORT

Pre- FEASIBILITY REPORT

Appendix I. Form 1 BASIC INFORMATION GRANITE MINING PROJECT VILLAGE KHARDA KI DHANI, TEHSIL ROHAT, DISTRICT PALI, RAJASTHAN

Pre- FEASIBILITY REPORT

Environment Situation in Timor-Leste

RISK ASSESSMENT. STONE QUARRY (2.40 Ha)

Pre- FEASIBILITY REPORT

APPENDIX I (See Paragraph -6) FORM I

PRE-FEASIBILITY CUM DETAIL PROJECT REPORT FOR SAND EXTRACTION PROJECT: 300 MT/DAY (FROM RIVER TAPI PAT)

ENVIRONMENTAL MANAGEMENT PLAN

Pre- FEASIBILITY REPORT

(IV) Proposed Terms of Reference for EIA Studies

PROPOSED BASALT QUARRY

ENVIRONMENT ACT PROPOSED TERMS OF REFERENCE FOR PUBLIC REVIEW AND COMMENT NOVA SCOTIA DEPARTMENT OF TRANSPORTATION AND PUBLIC WORKS

S/o Vishnudas Chakraborty, residence at R/o Narsinghgarh, District Rajgarh (M.P.).

To. State Level Expert Appraisal Committee, Paryavaran Bhavan, Sector-10/A, Gandhinagar.

PRE-FEASIBILITY CUM EMP REPORT FOR SAND EXTRACTION PROJECT (FROM RIVER PURNA PAT) FOR. KESHAVBHAI RATANJIBHAI PATEL 150 MT/day

APPENDIX I. (See Paragraph-6) FORM 1

PROJECT DETAILS. Smt. Rajeshwari M.Viraktamath of Lokapur, Mudhol Taluk, Bagalkot Dist has a

PRE FEASIBILITY REPORT

SCHEDULE 2 TO THE DEVELOPMENT PLAN OVERLAY Shown on the planning scheme map as DPO2 WAVERLEY GOLF COURSE, LYSTERFIELD VALLEY

NASA Stennis Space Center Environmental Resources Document

NON-TECHNICAL SUMMARY OF ENVIRONMENTAL AND SOCIAL IMPACT ASSESSMENT FOR THE BAHCE WINDFARM PROJECT (135 MW)

ABANDONMENT COST, FINANCIAL ASSURANCE AND PRESENTATION OF THE DOCUMENT. Abandonment cost :

APPENDIX 4. Risk Tables

ENVIRONMENTAL MANAGEMENT PLAN

PRE- FEASIBILITY STUDY REPORT. M/s. SAI MINERALS

TOR for Synthetic Organic Chemicals ToR for EIA studies in respect of the synthetic organic chemicals industry may include, but not limited to the

FORM - 1. Location/ Site alternatives under consideration : Block No. O : Contact Information :

NAPCS Product List for NAICS 54162: Environmental Consulting Services

PRE-FEASIBILITY REPORT

APPENDIX I (See Paragraph-6) FORM 1. S. No. Item Details

PROPOSAL FOR HOUSTON COUNTY BAN ON SILICA SAND MINING / PROCESSING ACTIVITY. Introduction and Assumptions

ENVIRONMENTAL AND SOCIAL RISK ASSESSMENT IN LENDING

Climate Change: A Local Focus on a Global Issue Newfoundland and Labrador Curriculum Links

We herewith apply (in From-1) for environmental clearance with and other supporting documents.

Form-1, Prefeasibility Report, Mining Plan for Rough Stone for S.F.Nos.: 332/1, 321/1 &

Building Stone Quarry

National Environment Awareness Campaign(NEAC) Theme

Amherst County Public Schools. AP Environmental Science Curriculum Pacing Guide. College Board AP Environmental Science Site

M/s Gokul Stone Industries

1311/P, Khata No-570. Mariwada Malkangiri Malkangiri. APPENDIX I (See Paragraph-6) FORM 1. Basic Information. S. No. Item Details

PRE- FEASIBILITY STUDY REPORT

ENVIRONMENTAL MANAGEMENT PLAN

Development proposals will require to demonstrate, according to scale, type and location, that they:-

The key points of the 2013 Annual Compliance Report are described fully in the following sections of this report:

Transcription:

ENVIRONMENT MANAGEMENT PLAN

ENVIrONMENT MaNaGEMENT plan 1. INTRODUCTION: Shri Ratilal Ravji Solanki have a Blacktrap mining lease project for an area of 1.00.00 Ha located on Survey no. 984 paiki, Village: Anjar, Taluka: Anjar, District: Kutch (Gujarat). Sanctioned vide Order No.GKK/QL/6424 dated 17.03.2008 of office of the Geologist, Jilla Seva Sadan, Bhuj-Kutch. Govt. Land is obtained on lease for mining of Blacktrap mineral. (Order is enclosed as annexure 1) Climate date From Secondary Sources The lease is situated in Kutch district. Kutch has semi-arid climate, with hot, dry summers from mid-march to mid- June and the wet monsoon season from mid-june to oct., when the city receives 750 mm of rain on average. The months from November to February are mild, the average temperature being around 24 C, with low humidity. During summer time, the temperature ranges between 34 C and 44 C. In the months of winter, Ravani temperature varies between 12 C and 22 C but on a whole winters are pleasant Flora & Fauna No forests land the area. It is entirely a Government Land. No endangered Species found in the core zone, so no adverse impact on the flora & Fauna. Since, there are no endangered spices of flora & fauna observed in core zone. The environmental Management plan has been developed with a view to bring down the levels of impacts as discussed in the last chapter within

limits. In each of the areas of impact, measures have to be taken to reduce potentially significant adverse impacts are to be enhanced/ augmented so that the overall adverse impacts are reduced to as low level as possible. The mining in the area has been proposed with time bound management plan so that impacts on different environmental parameters are minimized at every stage of mining. Measures to be taken for each of the impact areas are detailed in the following para: Land Environment Air Environment Water Environment Noise Environment Reclamation & Rehabilitation of lands Discharge of Effluents Afforestation & Green belt development programme Corporate Social Responsibilities Risk assessment & Disaster Management Plan 2.0. ENVIRONMENT IMPACT & MEASURES 2.1. AIR ENVIRONMENT 2.1.1 Anticipated impacts The opencast mining operations are generally prone to generation of high levels of PM and to a limited extent SO2, NOx due to fossil fuel based vehicles and machines etc. Air pollution due to SO2, NOx and PM may result in irritation and inflammation of eyes and congestion of throat and infection in lungs. 2.1.2 Mitigation Measures: In addition to the above the following measures will be adopted:- 1. Water spraying on the roads for suppression of dust.

2. Development of green belt. 3. Water sprinklers will be sprayed at all loading / transfer points. 4. Modern Hydraulic Driller is be adopted. 5. PPE will be provided to the workers. 6. To control the emissions regular preventative maintenance of equipment will be carried out. 2.2. WATER ENVIRONMENT 2.2.1 Anticipated impacts No impact on the surface water resources is envisaged. The rain water accumulates in the area, which will be used for dust suppression and plantation purpose. The ground water table in this region range from 35-40 m from the surface level. Due to mining, ground water will not intersect in this project. Since no chemicals or explosives are used for mining, there is no source of contaminants that can contaminate surface waters or the ground waters. 2.2.2 Mitigation Measures There is not the case with this lease, as mineral or soil does not contain any harmful ingredients that could leach to the water table. Thus the area working shall not affect the ground water quality. The impact of mining on ground water is not anticipated; therefore measures are not required. 2.3. LAND ENVIRONMENT 2.3.1 Anticipated impacts In open cast mining, the top crust of earth i.e. top soil/sub soil is completely removed below which are mineral deposits. The earth rock and other strata, called O/B are completely removed to provide access to the mineral deposit. In this manner land use pattern of an area always changes in the form of voids formed due to excavation of

mineral. Topography of the surrounding area will remain unchanged. The drainage pattern due to proposed mining will not be disturbed within core zone as well as buffer zone. The thickness of the top soil is 2 m, it shall be scrapped and stack at separate place and will be used for plantation.

2.3.2 Mitigation measures The mining area will be affected to the land environment. The excavated area will be create artificial water reservoir which rain water harvesting. The top soil will be stack at separate earmarked site and use for the plantation. 2.4. NOISE ENVIRONMENT 2.4.1 Anticipated impacts As far as noise pollution is concerned, the mining does not contribute much to noise pollution, except the noise generated from cutter machine. Noise level in the working environment is compared with the standards prescribed by central pollution control board which will be adopted and enforced by the govt. of india through the noise pollution (Regulation and control) Rules, 2000 The exposures to excessive noise levels can lead to: Prevention of sleep, insomnia & fatigue. Decrease in speech reception, communication, disturbance and diminished concentration thus adversely affecting job performance efficiency. Irreparable psychological disturbance including impaired hearing 2.4.2 Mitigation measures Mitigate the noise level following control measures will be adopted:- 1. Periodical monitoring of noise will be done. 2. Regular and proper maintenance of noise generating machinery. 3. Proper PPE in form of earplugs and safety eye wear shall be provided to workers working with the hydraulic driller and those in immediate vicinity of it. 4. Plantation in applied area will also reduce propagation of noise outside the core zone. 5. Green belt shall provide at the lease periphery, within the applied area

2.5. BIOLOGICAL ENVIRONMENT No forests land is in the area. It is entirely a Government Land. No endangered species found in the applied area, so no adverse impact on the flora & fauna. Since, there are no endangered spices of flora & fauna observed in core zone as well as buffer zone. Therefore, measures are not required 2.5.1 GREENBELT DEVELOPMENT The implementation for development of green belt will be of paramount importance as it will not only add up as an aesthetic feature, but also act as a pollution sink. The species to be grown in the area should be dust tolerant and fast growing species so that permanent green belt is created. Apart from the green belt and aesthetic plantation for elimination fugivitive of emission and noise control, all other plantation efforts shall be decided and executed with the assistance and co-operation of the local community. 2.6. Socio-Economic The impact of mining on social demographic profile is positive because displacements of habitat are not involved in this project. The project will generate rural employment. The mining activities in the area will raise economic status of the mine workers in minor terms. 3.0. ENVIRONMENTAL MANAGEMENT PLAN IMPLEMENTATION Environmental Management plan serves no purpose if it is not implemented with true spirit. Thus, an implementation and monitoring programme has to be prepared. Implementation of proposed control measures and monitoring programmed has an implementation on the surrounding area as well as for the region. Therefore mining management should be strengthen the existing control measures implemented within the mining area relating to the following specific areas.

Collection of air and water samples at strategic location with frequency suggested and by analyzing thereof. If the parameters exceed the permissible tolerance limits, corrective regulation measure should be taken. Collection of soil samples at strategic locations once in a year and analysis thereof with regard to deleterious constituents, if any. Regular visual examination will be carried out to look for possibilities of erosion. Any abnormal condition, if observed should be taken care of. Measurement of noise levels at mine site, stationary and mobile sources, and adjacent villages will be done. Plantation will be done as per program i.e. along the boundary. 3.1. ENVIRONMENTAL OFFICER Environmental professional/ officer should be appointed/ hired to implement the environment management plan. The officer shall ensure the suitability, adequacy and effectiveness of the environment management program me:- Environmental officer will be responsible for proper maintenance and operation of the program me and it will oversee the following aspect: Conduct environmental awareness program to the workers, supervisory staff and contract laborers during the mining and operation period. Regularly monitor the environmental parameters and prepare reports as required by the GPCB. Recommend necessary measures to improve environmental conditions. Conduct safety program to create safety awareness among workers/staff. Train the staff and other workers on safety measures and conduct safety drills to educate them.

Environmental officer will be in regular touch with state pollution control board and state mining department and send them annual progress report. Any new regulations considered by state/central pollution control board for the mining would be taken care of. 3.2. PROPOSED SET UP The Environmental professional/ officer will be responsible for: Liaison with environment monitoring laboratory for collecting and analyzing water and air samples from surrounding area and work zone monitoring for pollutants. Implementing the control and protective measures. Co-coordinating the environment related activities within the project as well as with outside agencies. Collecting statistics of health of workers and population of surrounding villages. Monitoring the progress of implementation of environmental management program. Greenbelt development along the area.

AREAL VEIW A SETELITE IMAGE OF 1Km REDIUS OF STUDY AREA Name of Lease Holder Ratilal Ravji Solanki Location Address Survey no. 984, Village & Taluka: Anjar, District: Kachchh (Gujarat) Name of mineral to mine Blacktrap