STORM WATER PROJECT COST ESTIMATES & LOCATION MAPS. Appendix F



Similar documents
SANITARY SEWER PROJECT COST ESTIMATES & LOCATION MAPS. Appendix D

UNIT PRICE LIST January 2009

VILLAGE OF LOMBARD CONTRACT DOCUMENT NUMBER ST BID PROPOSAL

Demo Existing Curb Demo Existing Asphalt Roadway Demo Asphalt Saw Cutting Protection Fence - 4 Snow Fence with T posts

Storm Sewer Trenchless Upgrade Alternatives and Recommendations

Los Angeles County Department Of Public Works. Land Development Division. Bond Calculation Sheets

Figure 3 Pipe Cracking

FY08 SEWER POINT REPAIRS BID TABULATION

PUBLIC WORKS DESIGN, SPECIFICATIONS & PROCEDURES MANUAL LINEAR INFRASTRUCTURE

APPENDIX C INLETS. The application and types of storm drainage inlets are presented in detail in this Appendix.

Item No. Description Estimated Unit Total Unit Total Unit Total Unit Total Quantity Price Amount Price Amount Price Amount Price Amount

PROJECT COST ESTIMATE ASSUMPTIONS AND EXCLUSIONS

SECTION STORM DRAINAGE STRUCTURES. 1. Trench excavation, backfill, and compaction; Section

CITY OF ANN ARBOR PUBLIC SERVICES PLAN REVIEW CHECKLIST

CD i -STREETS- Detail #

SECTION STORM DRAINAGE TABLE OF CONTENTS

FY11 Sanitary Sewer Main Rehab and Point Repair Bid Tabulation

in Marina Del Rey Prepared by: County of Los Angeles Department of Public Works

CHAPTER 17: STORM SEWER STANDARDS Introduction Administration Standards 17.1

Legacy Trail Extension Feasibility Study. Preliminary Cost Estimate

Riverside County Transportation Department Summary of Bids

How to Do a Water & Sewer System Inventory - Capital Improvements Plan

SECTION 7- STORM SEWER

CITY OF COLTON PUBLIC WORKS/ENGINEERING DEPARTMENT STORM DRAIN PLAN REVIEW CHECKLIST (PROVIDE SEPARATE ON-SITE & OFF-SITE STORM DRAIN PLAN SETS)

CITY OF VISTA STANDARD DRAWINGS (PRELIMINARY, FOR REVIEW)

GOUVEIA ENGINEERING. Pre-Bid Conference Meeting Minutes. City of Los Banos. Henry Miller Area Storm Drain and L Street Waterline

WILDCAT CANYON ROAD SPECIFICATION NO SLIDE REPAIR BIDDER'S PROPOSAL (continued)

SECTION 6A STORM DRAIN DESIGN Mar S E C T I O N 6A STORM DRAIN - DESIGN

Storm Drainage Structures

Private storm drain inlet retrofitting requirements - Purpose. Sec Private storm drain inlet retrofitting requirements - Definitions.

SECTION III DRAINAGE

CID STREET INFRASTRUCTURE ASSESSMENT

City of La Quinta Public Works Department - Storm Drain Plan Review Checklist

SECTION STORM DRAIN SYSTEM

8.1.3 General Design Guidelines. The following guidelines shall be used when designing inlets along a street section:

STORM DRAINS CHAPTER 7

1.0 INDEX TO SHEETS URGENT STORM DAMAGE REPAIR AVON PARK AIR FORCE RANGE LOCATION MAP LEGEND LOCATION MAP

CHOOSING THE PROPER INLET GRATE

ADDENDUM NO. 1. Manchester Boston Regional Airport, City of Manchester, NH

Storm Drainage Systems

Special Specification 7021 Water Main and Sewer Line Replacements

SECTION REMOVAL OR ABANDONMENT OF EXISTING UTILITIES AND UNDERGROUND STRUCTURES. 1. Trench excavation, backfill, and compaction; Section

STANDARD SPECIFICATIONS & CONSTRUCTION DETAILS MANUAL SECTION 5 - STORM DRAINAGE Design

Nebraska Department of Roads Drainage and Erosion Control Manual December 2011 Appendix C: Pipe Material Policy Page C-1 PIPE MATERIAL POLICY

MONETARY GUARANTY PROCEDURE PACKAGE FREDERICK COUNTY, VIRGINIA

DESCRIPTION OF WORK:

Local Road Assessment and Improvement Drainage Manual

INDEX STORM DRAINAGE PRE-APPROVED NOTES, DESIGN CRITERIA, & PLANS

Engineering Specifications February, 2004 Schedule H to Bylaw 7452, Subdivision Bylaw Page 18

Premature Storm Drainage System Repairs and Replacement

CW GRAVITY SEWERS TABLE OF CONTENTS

San Antonio Water System Standard Specifications for Construction ITEM NO. 854 SANITARY SEWER LATERALS

DESIGN AND CONSTRUCTION GUIDELINES AND STANDARDS DIVISION 33 UTILITIES SITE UTILITIES

SECTION 5 DRAFTING STANDARDS

SUBDRAINS AND FOOTING DRAIN COLLECTORS. A. Construct subdrains, subdrain cleanouts and outlets, and footing drain collectors.

DIVISION 2 - SEWERAGE AND DRAINAGE SECTION STORM DRAIN SYSTEMS PART 1 - GENERAL

2014 Inlet Rehab Project II Various Locations

2014 Sewer Replacement Project

New Road 11.0m Asphalt 23m ROW

Unit Price Averages Reports

Precast Manhole Sections and Castings. These items shall conform to Section 31, "Storm Drain Installation," of these Standard Provisions.

Fabricated Drainage Products

VILLAS OF TRADITIONS AT GREY OAKS

ENGINEERING DESIGN GUIDELINES. for SUBDIVISIONS OR COMMERCIAL DEVELOPMENTS

X Planning X Quality X Maintenance & Operations

SECTION PUBLIC STORM UTILITY DRAINAGE PIPING

SUMP PUMP. City of Ann Arbor & C O L L E C T I O N S Y S T E M G L O S S A R Y

ITD Pipe Materials Selection & Specification Procedures. July 2011

3. Amend the following: Item 410 Traffic Compacted Surface, Type C to Item 446 Cold Patch.

SECTION INLETS INLET LOCATIONS

Chapter 22. Lump Sum Project Guidelines

STANDARD SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION CITY OF MANITOWOC, WISCONSIN SECTION 400 SEWER AND WATER CONSTRUCTION

SEWER LINE EXTENSION DESIGN CHECKLIST

February 4, Estimate

JULY 24, 2009 WEST-END FLOODING INVESTIGATION ACTION PLAN. Presentation to Insurance Companies 19 January 2012

Infrastructure assets are distinguished from other capital assets because they normally:

APPENDIX D INLET CAPACITY AND SPACING. The capacity and spacing design of storm drainage inlets are presented in detail in this Appendix.

City of West Linn Public Works Design Standards Table of Contents

CHAPTER 1181 Improvements

VDOT 2001 Road and Bridge Standards Section Drainage Items

FDOT DBE CERTIFICATION NAICS CODE GUIDE WITH CAP SIZES

MAIN STREET IMPROVEMENTS Water, Sewer, Stormwater and Streetscape Improvements

C. Section TESTING LABORATORY SERVICE.

LS 2540 SEWER LATERALS AND INSPECTION TEES

provided for improvements for each structure during these timeframes. Rehabilitation and Investment Strategies:

FDOT Specifications List

CITY COUNCIL AGENDA ITEM CITY OF SHORELINE, WASHINGTON

EXHIBIT A Accessible Truck Routes Map

Developer s/consultants Field Services Guidelines

VERTICAL SPEED CONTROL DEVICES

Tobique Employment & Training

DRAINAGE MANUAL CHAPTER VII STORM DRAINAGE SYSTEMS

Porous Pavement Alternatives Cost Analysis

2011 HYDRAULICS MANUAL

City of Shelbyville Site Inspection Checklist

How To Build A Road In A Townhouse

CITY OF COOS BAY CITY COUNCIL Agenda Staff Report

ARTICLE VI (ALTERNATE) STANDARD SPECIFICATIONS. for (PVC) SANITARY SEWER MAIN CONSTRUCTION

A. Structures Quantity Item Price $3,500 EA

Bidding and Contract Requirements:

Transcription:

STORM WATER PROJECT COST ESTIMATES & LOCATION MAPS Appendix F

RIVERDALE CITY CAPITAL FACILITIES PLAN STORM DRAINAGE Engineer's Cost Estimate January 2009 Project Name: 4400 South Street - Piping and Collection Improvements Project Location: 700 West Street to 1191 West on 4400 South Street Project Number: Project #1 Item Description Quantity Units Unit Price Amount 1. Mobilization 1 ls. $45,000.00 $45,000.00 2. Remove existing storm drainage piping (average cost) 3,690 lf. $16.00 $59,040.00 3. Remove surface materials - asphalt, curb and gutter 4,035 lf. $8.75 $35,306.25 4. Construct single grate inlet catch basin box 21 ea. $2,725.00 $57,225.00 5. Construct 15" diameter rcp storm drain pipe 345 lf. $39.25 $13,541.25 6. Construct 24" diameter rcp storm drain pipe 375 lf. $71.50 $26,812.50 7. Construct 27" diameter rcp storm drain pipe 1,030 lf. $81.00 $83,430.00 8. Construct 30" diameter rcp storm drain pipe 750 lf. $91.75 $68,812.50 9. Construct 33" diameter rcp storm drain pipe 345 lf. $115.00 $39,675.00 10. Construct 48" diameter rcp storm drain pipe 600 lf. $145.00 $87,000.00 11. Construct 60" diameter rcp storm drain pipe 590 lf. $176.00 $103,840.00 12. Construct 4' diameter storm drain manhole 4 ea. $2,550.00 $10,200.00 13. Construct 5' diameter storm drain manhole 23 ea. $2,950.00 $67,850.00 14. Construct 6' diameter storm drain manhole 5 ea. $3,340.00 $16,700.00 15. Furnish trench backfill materials 1,325 tons $4.50 $5,962.50

16. Furnish bedding materials 1,940 tons $10.50 $20,370.00 17. Roadway patching 3,280 sy. $19.50 $63,960.00 18. Traffic control and flagging 75 days $150.00 $11,250.00 19. Looping residential waterlines 22 ea. $450.00 $9,900.00 20. Looping main waterlines 5 ea. $4,500.00 $22,500.00 21. Landscaping & surface restoration 1 ls. $15,000.00 $15,000.00 Subtotal $863,375.00 Engineering and Construction Contingencies (20%) $172,700.00 Estimated Total for Improvements $1,036,100.00

RIVERDALE CITY CAPITAL FACILITIES PLAN STORM DRAINAGE Engineer's Cost Estimate January 2009 Project Name: 4400 South Street - Piping Upgrade Improvements Project Location: (700 West Street to Weber River) Project Number: Project #2 Item Description Quantity Units Unit Price Amount 1. Mobilization 1 ls. $9,300.00 $9,300.00 2. Remove existing storm drainage piping 935 lf. $11.00 $10,285.00 3. Remove surface materials - asphalt, curb and gutter 935 lf. $8.75 $8,181.25 4. Construct single grate inlet catch basin box 3 ea. $2,725.00 $8,175.00 5. Construct 48" diameter rcp storm drain pipe 935 lf. $67.25 $62,878.75 6. Construct 6' diameter storm drain manhole 2 ea. $3,240.00 $6,480.00 7. Install storm water outlet structure at Weber River connection with rip rap 1 ea. $8,300.00 $8,300.00 8. Construct 15" diameter rcp storm drain pipe 155 lf. $39.25 $6,083.75 9. Furnish trench backfill materials 350 ton $4.50 $1,575.00 10. Furnish bedding materials 1,050 ton $10.50 $11,025.00 11. Construct concrete curb and gutter 60 lf. $19.50 $1,170.00 12. Connection to existing system 1 ea. $4,800.00 $4,800.00 13. Roadway patching 920 sy. $19.50 $17,940.00 14. Traffic control and flagging 30 days $150.00 $4,500.00

15. Landscaping & surface restoration 1 ls. $3,000.00 $3,000.00 Subtotal $163,694.00 Engineering and Construction Contingencies (20%) $32,700.00 Estimated Total for Improvements $196,400.00

RIVERDALE CITY CAPITAL FACILITIES PLAN STORM DRAINAGE Engineer's Cost Estimate January 2009 Project Name: Cherry Drive - Piping Upgrade Improvements Project Location: (Highland Drive & Cherry Drive Intersection to the Northwest) Project Number: Project #3 Item Description Quantity Units Unit Price Amount 1. Mobilization 1 ls. $7,600.00 $7,600.00 2. Remove existing storm drainage piping 970 lf. $5.50 $5,335.00 3. Construct 15" diameter rcp storm drain pipe 970 lf. $39.25 $38,072.50 4. Construct 4' diameter manhole 8 ea. $2,550.00 $20,400.00 5. Construct single grate inlet catch basin box 7 ea. $2,725.00 $19,075.00 6. Construct double grate inlet catch basin box 1 ea. $3,175.00 $3,175.00 7. Construct concrete curb and gutter 160 lf. $19.50 $3,120.00 8. Remove surface materials - asphalt, curb and gutter 970 lf. $8.75 $8,487.50 9. Connection to existing system 2 ea. $2,800.00 $5,600.00 10. Furnish trench backfill materials 245 ton $4.50 $1,102.50 11. Furnish bedding materials 290 ton $10.50 $3,045.00 12. Roadway patching 650 sy. $23.50 $15,275.00 13. Traffic control and flagging 30 days $150.00 $4,500.00

14. Landscaping & surface restoration 8 ea. $200.00 $1,600.00 Subtotal $136,388.00 Engineering and Construction Contingencies (20%) $27,300.00 Estimated Total for Improvements $163,700.00

RIVERDALE CITY CAPITAL FACILITIES PLAN STORM DRAINAGE Engineer's Cost Estimate January 2009 Project Name: 1150 West - 5500 South Intersection - Piping and Collection Improvements Project Location: 1150 West - 5500 South Intersection and 1106 West 5475 South Street Project Number: Project #4 Item Description Quantity Units Unit Price Amount 1. Mobilization 1 ls. $2,500.00 $2,500.00 2. Remove existing storm drainage structures 6 ea. $450.00 $2,700.00 3. Remove surface materials - asphalt 90 lf. $8.75 $787.50 4. Construct single grate inlet catch basin box 4 ea. $2,725.00 $10,900.00 5. Construct 15" diameter rcp storm drain pipe 90 lf. $39.25 $3,532.50 6. Construct 4' diameter cleanout manhole 2 ea. $2,550.00 $5,100.00 7. Furnish trench backfill materials 50 tons $4.50 $225.00 8. Furnish bedding materials 30 tons $10.50 $315.00 9. Construct concrete curb and gutter 120 lf. $19.50 $2,340.00 10. Construct double hooded inlet catch basin box 2 ea. $3,700.00 $7,400.00 11. Roadway patching 100 sy. $19.50 $1,950.00 12. Traffic control and flagging 14 days $150.00 $2,100.00

13. Landscaping & surface restoration 6 ea. $200.00 $1,200.00 Subtotal $41,050.00 Engineering and Construction Contingencies (20%) $8,200.00 Estimated Total for Improvements $49,300.00

RIVERDALE CITY CAPITAL FACILITIES PLAN STORM DRAINAGE Engineer's Cost Estimate January 2009 Project Name: 5175 South 1200 West Intersection - Piping Collection Improvements Project Location: (5175 South - 1200 West Intersection to the West) Project Number: Project #5 Item Description Quantity Units Unit Price Amount 1. Mobilization 1 ls. $4,100.00 $4,100.00 2. Remove existing waterway 65 lf. $5.75 $373.75 3. Remove surface materials - asphalt 460 lf. $8.75 $4,025.00 4. Construct single grate inlet catch basin box 5 ea. $2,725.00 $13,625.00 5. Construct 15" diameter rcp storm drain pipe 460 lf. $39.25 $18,055.00 6. Construct 4' diameter cleanout manhole 3 ea. $2,550.00 $7,650.00 7. Furnish trench backfill materials 180 tons $4.50 $810.00 8. Furnish bedding materials 180 tons $10.50 $1,890.00 9. Connection to existing system 1 ea. $2,800.00 $2,800.00 10. Construct concrete curb and gutter 100 lf. $19.50 $1,950.00 11. Construct handicap ramp at old waterway location 2 ea. $2,700.00 $5,400.00 12. Roadway patching 345 sy. $19.50 $6,727.50 13. Traffic control and flagging 21 days $150.00 $3,150.00

14. Landscaping & surface restoration 7 ea. $200.00 $1,400.00 Subtotal $71,956.00 Engineering and Construction Contingencies (20%) $14,400.00 Estimated Total for Improvements $86,400.00

RIVERDALE CITY CAPITAL FACILITIES PLAN STORM DRAINAGE Engineer's Cost Estimate January 2009 Project Name: 4800 South - 1700 West Intersection - Piping and Collection Improvements Project Location: 4800 South - 1700 West Street Intersection Project Number: Project #6 Item Description Quantity Units Unit Price Amount 1. Mobilization 1 ls. $1,500.00 $1,500.00 2. Remove surface materials - asphalt 55 lf. $8.75 $481.25 3. Construct single grate inlet catch basin box 3 ea. $2,725.00 $8,175.00 4. Construct 15" diameter rcp storm drain pipe 55 lf. $39.25 $2,158.75 5. Construct 4' diameter cleanout manhole 1 ea. $2,550.00 $2,550.00 6. Furnish trench backfill materials 30 tons $4.50 $135.00 7. Furnish bedding materials 25 tons $10.50 $262.50 8. Roadway patching 65 sy. $19.50 $1,267.50 9. Traffic control and flagging 4 days $150.00 $600.00 10. Landscaping & surface restoration 1 ls. $500.00 $500.00 Subtotal $17,630.00 Engineering and Construction Contingencies (20%) $3,500.00 Estimated Total for Improvements $21,100.00

RIVERDALE CITY CAPITAL FACILITIES PLAN STORM DRAINAGE Engineer's Cost Estimate January 2009 Project Name: Parker Drive - Piping and Collection Improvements Project Location: River Valley Drive to manhole near 3675 South on Parker Drive Project Number: Project #7 Item Description Quantity Units Unit Price Amount 1. Mobilization 1 ls. $2,200.00 $2,200.00 2. Remove surface materials - asphalt (1/2 width) 525 lf. $3.00 $1,575.00 3. Construct single grate inlet catch basin box 1 ea. $2,725.00 $2,725.00 4. Construct 15" diameter rcp storm drain pipe 525 lf. $39.25 $20,606.25 5. Construct 4' diameter cleanout manhole 1 ea. $2,550.00 $2,550.00 6. Furnish trench backfill materials 130 tons $4.50 $585.00 7. Furnish bedding materials 120 tons $10.50 $1,260.00 8. Roadway patching (1/2 width) 525 sy. $10.50 $5,512.50 9. Traffic control and flagging 5 days $150.00 $750.00 10. Landscaping & surface restoration 1 ls. $750.00 $750.00 Subtotal $38,514.00 Engineering and Construction Contingencies (20%) $7,700.00 Estimated Total for Improvements $46,200.00

RIVERDALE CITY CAPITAL FACILITIES PLAN STORM DRAINAGE Engineer's Cost Estimate January 2009 Project Name: 4300 South 700 West - Intersection - Piping and Collection Improvements Project Location: 4300 South 700 West Intersection Project Number: Project #8 Item Description Quantity Units Unit Price Amount 1. Mobilization 1 ls. $1,500.00 $1,500.00 2. Remove surface materials - asphalt 45 lf. $8.75 $393.75 3. Remove waterway materials - concrete 40 lf. $9.75 $390.00 4. Construct single grate inlet catch basin box 3 ea. $2,725.00 $8,175.00 5. Construct 15" diameter rcp storm drain pipe 45 lf. $39.25 $1,766.25 6. Construct 4' diameter cleanout manhole 1 ea. $2,550.00 $2,550.00 7. Furnish trench backfill materials 30 tons $4.50 $135.00 8. Furnish bedding materials 25 tons $10.50 $262.50 9. Roadway patching 40 sy. $19.50 $780.00 10. Traffic control and flagging 4 days $150.00 $600.00 11. Landscaping & surface restoration 1 ls. $2,000.00 $2,000.00 Subtotal $18,553.00 Engineering and Construction Contingencies (20%) $3,700.00 Estimated Total for Improvements $22,300.00

RIVERDALE CITY CAPITAL FACILITIES PLAN STORM DRAINAGE Engineer's Cost Estimate January 2009 Project Name: 4350 South Street - Piping and Collection Improvements Project Location: 800 West to 751 West on 4350 South Street Project Number: Project #9 Item Description Quantity Units Unit Price Amount 1. Mobilization 1 ls. $4,000.00 $4,000.00 2. Remove surface materials - asphalt 460 lf. $8.75 $4,025.00 3. Remove waterway materials - concrete 85 lf. $9.75 $828.75 4. Construct single grate inlet catch basin box 7 ea. $2,725.00 $19,075.00 5. Construct 15" diameter rcp storm drain pipe 460 lf. $39.25 $18,055.00 6. Construct 4' diameter cleanout manhole 3 ea. $2,550.00 $7,650.00 7. Furnish trench backfill materials 120 tons $4.50 $540.00 8. Furnish bedding materials 120 tons $10.50 $1,260.00 9. Roadway patching 410 sy. $19.50 $7,995.00 10. Traffic control and flagging 20 days $150.00 $3,000.00 11. Landscaping & surface restoration 1 ls. $4,000.00 $4,000.00 Subtotal $70,429.00 Engineering and Construction Contingencies (20%) $14,100.00 Estimated Total for Improvements $84,500.00