1 Delaware Department of Transportation Division of Transportation Solutions Design Guidance Memorandum Memorandum Number 1-20 Revised 1. Road Design Manual 2. Bridge Design Manual 3. Utilities Design Manual 4. Real Estate Manual 5. Standard Specifications 6. Standard Construction Details Title: Materials Effective date: December 3, 2012 Sections to Implement: X Project Development X Bridge X Team Support X Utilities I. Purpose X Planning X Quality X Maintenance & Operations X DTC X Traffic Other To provide guidance on DelDOT s policy for the selection of pipe materials. This guidance defines the locations where various pipe products are considered to be equally acceptable for all projects. This information shall be used to determine which pipe products will be bid for projects. The project manager and/or designer shall determine which pipe product shall be specified from the materials considered adequate for the installation. The decision shall be made based on economics, available cover and any other factors that may affect the performance of the pipe (e.g., soil ph, type of water exposure, susceptibility to abrasion, fire, etc.). II. Design Guidance For any type of pipe, many factors contribute to its successful performance, including: Hydraulic Characteristics and Capacity Structural Capacity o Cover o Loads Environmental Conditions o ph of the soil and water conveyed by the pipe o Soil resistivity o Abrasion due to sand and/or gravel o Standing water Regardless of the pipe material, all pipes require proper installation, including: material in good condition from delivery until final installation Compaction Backfill material Proper installation procedures Inspection during installation Post-installation inspection per DelDOT s Storm Sewer CCTV Manual for Storm Sewer Assessment and Acceptance and specifications The minimum cover for pipes shall conform to the values in Figure 1. See Figure 2 for a clarification of the limits of the cover measurement under rigid and flexible pavements. DGM 1-20 Revised Materials, Page 1 of 5
2 Figure 1 Minimum Cover Type Condition Minimum Cover Flexible Corrugated Metal Spiral Rib Metal Structural Plate Structures Thermoplastic (HDPE) Steel Conduit Aluminum Conduit where S < 48.0 in. Aluminum Conduit where S > 48.0 in. S < 48.0 in. S/8 > 12.0 in.* S/4 > 12.0 in.* S/2 > 12.0 in.* S/2.75 > 24.0 in.* S/8 > 12.0 in.* 12.0 in.* 48.0 in. < S < 60.0 in in.* Rigid Reinforced Concrete Under Unpaved Areas or Flexible Pavement Under Rigid Pavement S/8 > 12.0 in. (measured from top of flexible pavement or top of ground) 9.0 in. (measured from bottom of rigid pavement) * See Figure 2 for the orientation for minimum cover for rigid and flexible pipe. ** Class IV or V reinforced concrete pipe may be used in accordance with AASHTO design standards where the cover is shallower than the minimum cover for class III. Where: S = Largest interior pipe dimension (in.) DGM 1-20 Revised Materials, Page 2 of 5
3 Figure 2 * *Minimum 3 below rigid pavement For DelDOT projects, there are four service levels of pipe installations defined as follows. The pipe materials listed under each service level are considered equally acceptable for that level. Service Level I Installations require an expected service life of 75 years or more. All pipe which is to be installed under roadways with a classification of expressway, arterial or collector shall be service level I. This includes pipe running transversely across the road and longitudinally under the pavement and/or curb. Additionally, pipe outside of the roadway for expressways, arterials and collectors shall be a service level I installation unless future roadway widening over the pipe is not anticipated. o Reinforced Concrete (RCP) is considered to have a service life of 75 years or more. The class of RCP shall be specified in the plans. RCP shall be manufactured and installed in accordance with Section 612 of the Standard Specifications. o High Density Polyethylene (HDPE) HDPE pipe is considered to have an expected service life of 75 years. The maximum allowable diameter for use on DelDOT projects is 60 inches. HDPE pipes shall be manufactured and installed in accordance with AASHTO M294 and the Special Provisions for the item. Service Level II Installations require an expected service life of 50 years or more. All pipes that are to be installed under local roadways and high volume commercial entrances (such as shopping centers) shall be service level II or better. This includes pipe running transversely across the road and pipe running longitudinally under the pavement and/or curb. Additionally, pipe outside of the roadway for local roads shall be service level II installations. DGM 1-20 Revised Materials, Page 3 of 5
4 installations on expressways, arterials and collectors that are outside of the roadway and in locations where future roadway widening over the pipe is not anticipated may also be service level II installations. The following products are considered to have a service life of 50 years or more and are equally acceptable. Service level I pipes may also be used for these installations. o Corrugated Aluminum and Spiral Rib Aluminum Aluminum pipe is considered to have a service life of 50 years. The type of aluminum pipe shall be specified in the plans. Aluminum pipes shall be manufactured and installed in accordance with Section 614 of the Standard Specifications. Metal pipe shall not be used where there may be standing water in the pipe for longer than 12 hours. o Polyvinyl Chloride Profile Wall (PVCPW) Drain - PVCPW pipe is considered to have an expected service life of 50 years. The maximum allowable diameter for use on DelDOT projects is 48 inches. PVCPW pipes shall be manufactured and installed in accordance with AASHTO M304 and the Special Provisions for the item. o Polypropylene (PP) - PP pipe is considered to have a service life of 50 years. The maximum allowable diameter for use on DelDOT projects is 60 inches. PP pipes shall be manufactured and installed in accordance with AASHTO MP Service Level III Installations require an expected service life of 25 years or more for commercial entrances and multi-family residential entrances. High volume entrances, such as those for large shopping malls, shall be a minimum of service level II. The following products are considered to have a service life of 25 years or more and are equally acceptable. Service level I and II pipes may also be used for these installations. o Polymer-Coated Corrugated Steel Polymer-coated corrugated steel pipe is considered to have a service life of 35 years. Polymer-coated corrugated steel pipes shall be manufactured in accordance with AASHTO M245 and installed in accordance with Section 614 of the Standard Specifications. Installation sites shall be limited to those where the soil and water have a ph from 3 to 12 and a soil resistivity above 200 ohm-cm. Metal pipe shall not be used where there may be standing water in the pipe for longer than 12 hours. o Aluminum-Coated (Type 2) Corrugated Steel Aluminum-coated (Type 2) corrugated steel pipe is considered to have a service life of 25 years. Aluminum-coated (Type 2) corrugated steel pipes shall be manufactured and installed in accordance with Section 614 of the Standard Specifications. Installation sites shall be limited to those where the soil and water have a ph from 5 to 9 and a soil resistivity above 1,500 ohmcm. Metal pipe shall not be used where there may be standing water in the pipe for longer than 12 hours. Service Level IV Installations require an expected service life of 15 years or more for residential driveway entrances. Service level I, II and III pipes may also be used for these installations. o Galvanized Corrugated Steel Galvanized corrugated steel pipe is considered to have a service life of 15 years. Galvanized corrugated steel pipes shall be manufactured and installed in accordance with Section 614 of the Standard Specifications. Installation sites shall be limited to those where the soil and water have a ph from 6 to 10 and a soil resistivity of 2,000 to 8,000 ohm-cm. Metal pipe shall not be used where there may be standing water in the pipe for longer than 12 hours. DGM 1-20 Revised Materials, Page 4 of 5
5 Other pipe materials may be considered for installation with approval from an assistant director. The choice of a pipe material for a particular project shall be documented in the project s drainage report or quantity calculations. III. Justification To select the appropriate pipe material for use in proposed work. Revised Date: November 14, 2012 Distribution: Transportation Solutions Assistant Directors Maintenance & Operations District Engineers Transportation Solutions Planning Consultants DelDOT Internet Site DGM 1-20 Revised Materials, Page 5 of 5
SECTION 724 PIPE CULVERTS
SECTION 724 PIPE CULVERTS 724.1 Description. This work shall consist of providing pipe or pipe arch of the diameter or shape designated, laid upon a firm bed and backfilled as specified. Where appropriate
CULVERT AND STORM SEWER PIPE MATERIAL POLICY ON FEDERALLY FUNDED LOCAL AGENCY PROJECTS UPDATED March 2013
CULVERT AND STORM SEWER PIPE MATERIAL POLICY ON FEDERALLY FUNDED LOCAL AGENCY PROJECTS UPDATED March 2013 Background Section 5514, a final rule for SAFETEA-LU was issued on November 15, 2006 and became
MEMORANDUM: RECOMMENDATIONS FOR PIPE MATERIAL SELECTION
MEMORANDUM: RECOMMENDATIONS FOR PIPE MATERIAL SELECTION Moser and Associates Engineering for CDOT Region 6 Date: 9/30/10 Memorandum to File: Recommendations for Pipe Material Selection for Construction
ITD Pipe Materials Selection & Specification Procedures. July 2011
ITD Pipe Materials Selection & Specification Procedures July 2011 INTRODUCTION: This technical memorandum is written as a guide to the selection of compliant pipe materials and the elimination of non-compliant
SUBDRAINS AND FOOTING DRAIN COLLECTORS. A. Construct subdrains, subdrain cleanouts and outlets, and footing drain collectors.
SUBDRAINS AND FOOTING DRAIN COLLECTORS PART 1 - GENERAL 1.01 SECTION INCLUDES A. Subdrains B. Subdrain Cleanouts and Outlets C. Footing Drain Collectors D. Storm Sewer Service and Connections 1.02 DESCRIPTION
DRAINAGE HANDBOOK OPTIONAL PIPE MATERIALS
STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION DRAINAGE HANDBOOK OPTIONAL PIPE MATERIALS OFFICE OF DESIGN, DRAINAGE SECTION AUGUST 2014 TALLAHASSEE, FLORIDA Table of Contents Chapter 1 - Purpose... 3 1.1
Nebraska Department of Roads Drainage and Erosion Control Manual December 2011 Appendix C: Pipe Material Policy Page C-1 PIPE MATERIAL POLICY
Appendix C: Pipe Material Policy Page C-1 PIPE MATERIAL POLICY Policy: This policy will replace all previous policies regarding the selection of pipe material for cross drains, drive pipe, drop pipe, storm
8-11 Structural Analysis and Fill Height Tables... 42 8-11.1 Pipe Cover... 43 8-11.2 Shallow Cover Installation... 43 8-11.3 Fill Height Tables...
Contents Chapter 8 Pipe Classifications and Materials...1 8-1 Classifications of Pipe... 1 8-1.1 Drain Pipe... 2 8-1.2 Underdrain Pipe... 2 8-1.3 Culvert Pipe... 3 8-1.4 Storm Sewer Pipe... 7 8-1.5 Sanitary
SECTION 02720 SANITARY SEWER AND STORM DRAIN SYSTEMS
SECTION 02720 SANITARY SEWER AND STORM DRAIN SYSTEMS PART 1 GENERAL 1.01 SECTION INCLUDES A. The requirements for pipe material and installation in sewer and drainage collection systems. All materials
State of Illinois Department Of Transportation CONSTRUCTION INSPECTOR S CHECKLIST FOR STORM SEWERS
State of Illinois Department Of Transportation CONSTRUCTION INSPECTOR S CHECKLIST FOR STORM SEWERS While its use is not required, this checklist has been prepared to provide the field inspector a summary
DIVISION 2 - SEWERAGE AND DRAINAGE SECTION 02720 - STORM DRAIN SYSTEMS PART 1 - GENERAL
DIVISION 2 - SEWERAGE AND DRAINAGE SECTION 02720 - STORM DRAIN SYSTEMS PART 1 - GENERAL 1.01 DESCRIPTION A. Furnish and install all storm drains, including manholes, inlets, service lines and other appurtenant
SECTION 55 PIPE FOR STORM DRAINS AND CULVERTS (FAA D-701)
SECTION 55 PIPE FOR STORM DRAINS AND CULVERTS (FAA D-701) 55-1 GENERAL The Contractor shall perform all work required by the plans for construction of pipe for storm drains, precast polymer trench drains
SD96-11-F. SD Department of Transportation Office of Research. Evaluation of High Density Polyethylene (HDPE) Pipe SD96-11 Final Report
SD96-11-F SD Department of Transportation Office of Research Evaluation of High Density Polyethylene (HDPE) Pipe SD96-11 Final Report Prepared by Office of Research South Dakota Department of Transportation
Chapter 9 Storm Sewers
Contents 1.0 Introduction... 1 2.0 Design Storms... 1 2.1 Minor Event... 1 2.2 Major Event... 1 3.0 Pipe Material and Size... 2 3.1 Pipe Material... 2 3.2 Minimum Pipe Size... 2 3.3 Service Life... 2 3.4
SPECIFICATIONS FOR CULVERT PIPE
SPECIFICATIONS FOR CULVERT PIPE USED IN SCDOT HIGHWAY APPLICATIONS SARAH L. GASSMAN, PH.D. SUBMITTED TO THE SOUTH CAROLINA DEPARTMENT OF TRANSPORTATION AND THE FEDERAL HIGHWAY ADMINISTRATION OCTOBER 2005
Section 402. STORM SEWERS
402.02 Section 402. STORM SEWERS 402.01. Description. This work consists of constructing storm sewers of the size and class required, including excavation, bedding, and backfill. 402.02. Materials. Provide
SECTION 02400 - STORM DRAIN SYSTEM
SECTION 02400 - STORM DRAIN SYSTEM CONTENTS: Part 1 - General... 1 1.01 Work Included... 1 1.02 Related Requirements... 1 1.03 Reference Standards... 1 1.04 Quality Assurance... 1 1.05 Measurement And
PIPE INSPECTION AND REPAIR. Larry Ritchie
PIPE INSPECTION AND REPAIR Larry Ritchie February 23, 2010 PIPE INSPECTION AND REPAIR The Florida Department of Transportation builds and maintains hundreds of miles of underground infrastructure as part
SECTION 701 CULVERT PIPE, ENTRANCE PIPE, STORM SEWER PIPE, AND EQUIVALENTS
SECTION 701 CULVERT PIPE, ENTRANCE PIPE, STORM SEWER PIPE, AND EQUIVALENTS 701.01 DESCRIPTION. Furnish and install culvert pipe, entrance pipe, and storm sewer pipe. Use units conforming to the dimensions,
SECTION 08000 STORM DRAINAGE TABLE OF CONTENTS
SECTION 08000 STORM DRAINAGE 08010 DESIGN A. Location B. Sizing TABLE OF CONTENTS 08020 MATERIALS A. Pipe Materials B. Structure Materials C. Installation D. Inlets and Outlets 08030 INSPECTIONS AND TESTING
TECHNICAL NOTE Culvert Sliplining and Lining of Casings with HPPipe
TECHNICAL NOTE Culvert Sliplining and Lining of Casings with HPPipe TN 5.14 February 2010 Introduction It may be at times necessary, in an aging infrastructure, to rehabilitate drainage and sanitary lines
SPR PE Steel Reinforced Liner
ENGINEERED SOLUTIONS SPR PE Steel Reinforced Liner Reline Done Right Contech is your single source for rehabilitation of sanitary & storm sewers, culverts and bridges. Contech Engineered Solutions has
SECTION 02630 STORM DRAINAGE SYSTEM
SECTION 02630 PART 1 - GENERAL 1.01 DESCRIPTION A. Section includes specifications for storm drainage systems including modifications and connections to existing storm drainage systems. 1.02 REFERENCE
CHAPTER 850 PHYSICAL STANDARDS
HIGHWAY DESIGN MANUAL 850-1 CHAPTER 850 PHYSICAL STANDARDS Topic 851 - General Index 851.1 - Introduction This chapter deals with the selection of drainage facility material type and sizes including pipes,
Fabricated Drainage Products
Fabricated Drainage Products Complete Drainage System Inline Drains are used At the beginning of a drain line Add a new water inlet to an existing drain line using a riser pipe and tee HARCO Surface Drainage
DIVISION 4300 STORM DRAINAGE
DIVISION 4300 STORM DRAINAGE SECTION 4305 STORM SEWER PART 1 - GENERAL 1.01 SCOPE This section covers the construction of storm sewers for the collection and transport of stormwater runoff. 1.02 REFERENCES
CD i -STREETS- Detail #
-STREETS- Detail # 3000 Vertical Curb, Gutter and Sidewalk 3010 Low-Profile Curb, Gutter and Sidewalk 3020 Rolled Curb, Gutter and Sidewalk 3030 Separated Sidewalk, Curb & Gutter 3040 Sidewalk Staged Construction
Section 2100-Trenching and Tunneling
SECTION 5200 - STORM SEWER PART 1 - GENERAL 1.01 SCOPE: This Section covers installation of storm sewer mains and culverts. Topics include permits and fees, trench widths, pipe laying, bedding, initial
Native InDesign 2890 SaniTite Brochure 1/8" 100 300 CMYK April 17, 07
Sanitary Sewer Pipe Tough pipe for a tough environment SaniTite Sanitary Sewer Pipe delivers the features that engineers, contractors and municipalities demand durability, performance, handling, toughness
550 PIPE CULVERTS, SEWERS AND DRAINS
551.01 550 PIPE CULVERTS, SEWERS AND DRAINS 551 GENERAL 551.01 Description 551.02 Materials 551.03 Excavation 551.04 Protection of Excavation 551.05(a) Bedding for Rigid Pipe 551.05(b) Bedding for Non-Rigid
WILDCAT CANYON ROAD SPECIFICATION NO. 16-11001 SLIDE REPAIR BIDDER'S PROPOSAL (continued)
BIDDER'S PROPOSAL (continued) Item Estimated No. Description Quantity Unit Unit Cost Total Cost BASE BID 1 Traffic Control 1 LS $ $ 2 Construction Area Signs 1 LS $ $ 3 Excavation Safety 1 LS $ $ 4 Reset
CHAPTER 17: STORM SEWER STANDARDS. 17.00 Introduction. 17.01 Administration. 17.02 Standards 17.1
CHAPTER 17: STORM SEWER STANDARDS 17.00 Introduction 17.01 Administration 17.02 Standards 17.1 17.00 INTRODUCTION The purpose of this chapter is to provide guidance for the design and construction of storm
SECTION 108 - INLETS 108.1 INLET LOCATIONS
Greene County Design Standards -Adopted April 5, 1999 SECTION 108 - INLETS SECTION 108 - INLETS 108.1 INLET LOCATIONS 108.2 INLET INTERCEPTION CAPACITIES 108.2.1 Clogging Factors 108.3 INTERCEPTION AND
Section 600 Incidental Construction
Table of Contents 1. Pipe Culverts... 600-1 A. Endwalls, Inlets, Manholes, and Spring Boxes... 600-5 2. Grade Adjustment of Existing Miscellaneous Structures... 600-8 3. Rebuilt Miscellaneous Structures...
SECTION 33 41 13 PUBLIC STORM UTILITY DRAINAGE PIPING
SECTION 33 41 13 PUBLIC STORM PART 1 - GENERAL 1.01 SECTION INCLUDES A. Storm drainage piping, fittings, and accessories at proposed station areas and locations other than under and immediately adjacent
Premature Storm Drainage System Repairs and Replacement
Premature Storm Drainage System Repairs and Replacement Stewart Edwards Program Manager Design Management Team Charlotte-Mecklenburg Storm Water Services April 8, 2015 Date Agenda Storm Water Infrastructure
A Research Plan and Report on Factors Affecting Culvert Pipe Service Life in Minnesota
A Research Plan and Report on Factors Affecting Culvert Pipe Service Life in Minnesota Jeff Marr, Principal Investigator St. Anthony Falls Laboratory University of Minnesota September 2012 Research Project
SECTION 200: STORM SEWER CONSTRUCTION STANDARDS
SECTION 200: STORM SEWER CONSTRUCTION STANDARDS Page No. Description 200-2 201 GENERAL 200-2 201.1 SPECIFICATIONS 200-2 201.2 CONNECTION TO EXISTING FACILITIES 200-3 202 MATERIALS 200-3 202.1 PIPES 200-4
Chapter 22. Lump Sum Project Guidelines
Chapter 22 Lump Sum Project Guidelines 22.1 General...22-1 22.2 Project Selection...22-3 22.3 Plans Preparation...22-5 22.4 Preliminary Estimate...22-7 22.5 Specifications...22-9 22.6 Contracts Administration...22-11
EFFECTIVE FEBRUARY 2014. note: drainage permit required to call for a dampproof inspection
EFFECTIVE FEBRUARY 2014 note: drainage permit required to call for a dampproof inspection 1. ROOF DRAINS/DECK DRAINS (INTERIOR ) All roof and deck drains within the perimeter of the building shall be APPROVED
STORM DRAINS CHAPTER 7
CHAPTER 7 Chapter 7 - Storm Drains A storm drain is a drainage system that conveys water or stormwater, consisting of two or more pipes in a series connected by one or more structures. Storm drains collect
PUBLIC WORKS DESIGN, SPECIFICATIONS & PROCEDURES MANUAL LINEAR INFRASTRUCTURE
REGION OF PEEL PUBLIC WORKS DESIGN, SPECIFICATIONS & PROCEDURES MANUAL LINEAR INFRASTRUCTURE Storm Sewer Design Criteria REVISED July 2009 PUBLIC WORKS STORM SEWER DESIGN CRITERIA TABLE OF CONTENTS 1.0
Repair or Replacement - Band-Aids vs. Surgery
Repair or Replacement - Band-Aids vs. Surgery Using RCP for the Replacement of Failed or Undersized Culverts www.concrete-pipe.org Introduction and Background Our Nation s infrastructure owners are facing
DESIGN AND CONSTRUCTION GUIDELINES AND STANDARDS DIVISION 33 UTILITIES 33 00 00 SITE UTILITIES
SECTION INCLUDES Domestic Water Fire Water Service Water Well Sanitary Sewer Storm Drains Foundation Drainage RELATED SECTIONS 03 30 00 Concrete 21 00 00 Fire Suppression - Sprinklers 22 00 00 Plumbing
MTO GRAVITY PIPE DESIGN GUIDELINES
Ontario Ministry of Transportation MTO GRAVITY PIPE DESIGN GUIDELINES CIRCULAR CULVERTS AND STORM SEWERS May 2007 Prepared by Drainage and Hydrology Design and Contract Standards Office Ministry of Transportation
AGENDA. Pipe Materials / Trends The Reason for Change Design / Standards Pipe Selection Installation Examples Conclusion
AGENDA Pipe Materials / Trends The Reason for Change Design / Standards Pipe Selection Installation Examples Conclusion Water & Sewerage Pipe Materials Flexible Pipes Replacing Rigid Pipes Old Days Vitrified
DESIGN INFORMATION BULLETIN NO. 83-03 CALTRANS SUPPLEMENT TO FHWA CULVERT REPAIR PRACTICES MANUAL
DESIGN INFORMATION BULLETIN NO. 83-03 CALTRANS SUPPLEMENT TO FHWA CULVERT REPAIR PRACTICES MANUAL This document establishes uniform procedures to carry out the highway design functions of the California
SECTION 02530 STORM DRAINAGE STRUCTURES. 1. Trench excavation, backfill, and compaction; Section 02250.
02530-1 of 5 SECTION 02530 STORM DRAINAGE STRUCTURES 02530.01 GENERAL A. Description Storm drainage structure construction shall include, but not necessarily be limited to, furnishing and installing or
STORM DRAIN DESIGN AND CONSTRUCTION STANDARDS & SPECIFICATIONS 400 SERIES
CITY OF PETALUMA STORM DRAIN DESIGN AND CONSTRUCTION STANDARDS & SPECIFICATIONS 400 SERIES AUGUST 1999 Revised 10/98 City of Petaluma Petaluma, California STORM DRAIN INSTALLATION DETAIL
Memorandum. PROJECT: Postmark Emergency Storm Repair Alternative Analysis
Memorandum CRW Engineering Group, LLC 3940 Arctic Blvd. Suite 300 Anchorage, AK 99503 (907) 562-3252 FAX 561-2273 TO: Mike Lee, P.E., Chief Engineer, ADOT/ANC FROM: Shane Blanchard, P.E. THRU: Mike Rabe,
Culvert Repair, Materials, and Structural Design 4.4-1
Culvert Repair, Materials, and Structural Design 4.4-1 4.4 Culvert Materials 4.4.1 General Culverts are primarily made with reinforced concrete, corrugated metal, and more recently, solidwall, profile
The Most Advanced Name in Drainage Systems. Sanitary Sewer Pipe
The Most Advanced Name in Drainage Systems Sanitary Sewer Pipe SaniTite Sanitary Sewer Pipe delivers the features that engineers, contractors and municipalities demand durability, performance, handling,
SECTION 7- STORM SEWER
SECTION 7- STORM SEWER 7.1. STORM SEWERS.... 7-1 7.2. SUMP DRAINS... 7-3 7.3. CATCH BASINS... 7-3 7.4. MANHOLES... 7-4 7.5. STORM SEWER CALCULATIONS... 7-4 7.6. CULVERTS AND BRIDGES... 7-5 7.7. OPEN CHANNELS...
VIDEO INSPECTION AND LASER DEFLECTION TESTING FOR POST CONSTRUCTION QC/QA SPECIFICATIONS AND MAINTENANCE INSPECTIONS
VIDEO INSPECTION AND LASER DEFLECTION TESTING FOR POST CONSTRUCTION QC/QA SPECIFICATIONS AND MAINTENANCE INSPECTIONS BY JOHN FLECKENSTEIN PIPELINE AND DRAINAGE CONSULTANTS INTRODUCTION History Of Post
CCTV of Stormwater Systems. Cairns Regional Council. Commentary Guidelines #4037587
CCTV of Stormwater Systems Cairns Regional Council Commentary Guidelines Introduction Councils inherit assets through the donated asset process. In doing so, Councils immediately receive assets that are
Wastewater Capital Projects Management Standard Construction Specification
CITY AND COUNTY OF DENVER ENGINEERING DIVISION Wastewater Capital Projects Management Standard Construction Specification 10.1 Precast Concrete Pipe 10.1.1 General This section covers material requirements,
DISTRIBUTION PIPING MATERIALS: BUILDING HYDRONIC SYSTEM MANAGEMENT. Jim Riley, Texas A&M University February 10, 2015
DISTRIBUTION PIPING MATERIALS: BUILDING HYDRONIC SYSTEM MANAGEMENT Jim Riley, Texas A&M University February 10, 2015 Piping at Texas A&M 2 History of Distribution Piping at Texas A&M Concrete reinforced
HDPE PRODUCTS QUALITY, PERFORMANCE AND ECONOMY COMBINED
QUALITY, PERFORMANCE AND ECONOMY COMBINED LANE S HDPE DRAINAGE PIPE Scan for more information on Lane s HDPE product line. Lane provides the complete product line to meet all your HDPE drainage needs -
Storm Sewer Trenchless Upgrade Alternatives and Recommendations
Storm Sewer Trenchless Upgrade Alternatives and Recommendations Background Approximately 1,930 feet of the 40-inch and 42-inch CMP storm sewer pipe from manhole M22 to manhole M12 will be evaluated for
June 2007 CHAPTER 7 - CULVERTS 7.0 CHAPTER 7 - CULVERTS 7.1 GENERAL
7.0 7.1 GENERAL For the purpose of this manual, culverts are defined as structures that are completely surrounded by soil and located below the surface of the roadway parallel to the general direction
3. Contractor shall ensure that all permits are obtained prior to any construction. Contractor shall be responsible for all utility fees.
The following shall serve as the minimum requirements for contractors performing work in relation to the Authority s potable water and sanitary sewer system(s), appurtenances and service connections. General:
APPENDIX C INLETS. The application and types of storm drainage inlets are presented in detail in this Appendix.
Storm Drainage 13-C-1 APPENDIX C INLETS 1.0 Introduction The application and types of storm drainage inlets are presented in detail in this Appendix. 2.0 Inlet Locations Inlets are required at locations
Durability and Service Life
Chapter 7 Durability and Service Life Lester H. Gabriel, Ph.D., P.E. DURABILITY AND SERVICE LIFE Durability of Drainage Pipes Durability is the property to resist erosion, material degradation and subsequent
STORM WATER PROJECT COST ESTIMATES & LOCATION MAPS. Appendix F
STORM WATER PROJECT COST ESTIMATES & LOCATION MAPS Appendix F RIVERDALE CITY CAPITAL FACILITIES PLAN STORM DRAINAGE Engineer's Cost Estimate January 2009 Project Name: 4400 South Street - Piping and Collection
Electric Engineering Division FIBER CONDUIT RULES AND REGULATIONS
Electric Engineering Division FIBER CONDUIT RULES AND REGULATIONS TABLE OF CONTENTS I. RULES AND REGULATIONS A. TABLE OF CONTENTS... 2 B. TERMS AND DEFINITIONS... 3 C. DEVELOPER S/CONTRACTOR S RESPONSIBILITIES...
SECTION 33 05 16.13 PRECAST CONCRETE UTILITY STRUCTURES
SECTION 33 05 16.13 PRECAST CONCRETE PART 1 - GENERAL 1.01 SECTION INCLUDES A. This item shall consist of the construction of both sanitary and storm sewer precast concrete manholes in accordance with
SEWERS FOR ADOPTION 6 PIPE MATERIALS TABLE AND CONDITIONS OF USE VERSION 4 March 09
SEWERS FOR ADOPTION 6 PIPE MATERIALS TABLE AND CONDITIONS OF USE VERSION 4 March 09 Foul and Storm Lateral Drains (100 & 150 mm Diameters) Pumped Storage General Exceptions General Exceptions General Exceptions
SPECIFICATIONS FOR THE INSTALLATION OF FIRE ALARM SYSTEMS, SPRINKLER SYSTEMS, AND MASTER BOXES IN THE POQUONNOCK BRIDGE FIRE DISTRICT
SPECIFICATIONS FOR THE INSTALLATION OF FIRE ALARM SYSTEMS, SPRINKLER SYSTEMS, AND MASTER BOXES IN THE POQUONNOCK BRIDGE FIRE DISTRICT The purpose of these specifications is to insure that there are minimum
FY11 Sanitary Sewer Main Rehab and Point Repair Bid Tabulation
644-10-569 Page 1 of 9 1 FOR CLEANING AND TELEVISING EXISTING SEWERS, AS SPECIFIED, ANY REQUIRED CLEANING, ANY LOCATION, ANY LENGTH OF SEWER, COMPLETE IN PLACE, FOR VARIOUS PIPE DIAMETERS. A. EXISTING
SPECIFICATION FOR PIPE SUBSOIL DRAIN CONSTRUCTION
SPECIFICATION FOR PIPE SUBSOIL DRAIN CONSTRUCTION 1. SCOPE Pipe subsoil drains shall be constructed in accordance with this specification and in conformity with the lines, grades and cross-sections shown
The Most Advanced Name in Drainage Systems. Geotextile Products
The Most Advanced Name in Drainage Systems Geotextile Products ADS MEETs YOUR Geotextile NEEDS Advanced Drainage Systems, Inc. (ADS) single wall and N12 dual wall pipe have become the industry standard
Local Road Assessment and Improvement Drainage Manual
Local Road Assessment and Improvement Drainage Manual Donald Walker, T.I.C. Director, author Lynn Entine, Entine & Associates, editor Susan Kummer, Artifax, design Transportation Information Center University
SECTION 33 31 00.11 GRAVITY SANITARY SEWERS
SECTION 33 31 00.11 GRAVITY SANITARY SEWERS PART 1: GENERAL 1.01 SCOPE A. Gravity sanitary sewers and appurtenances. 1.02 SUBMITTALS A. Conform to requirements of Section 01 33 00 Submittals. B. Submit
STANDARD SPECIFICATIONS & CONSTRUCTION DETAILS MANUAL SECTION 5 - STORM DRAINAGE. 5.01 Design
SECTION 5 - STORM DRAINAGE 5.01 Design Storm drainage facilities shall be designed in accordance with the goals and guidelines set forth in the Unified Development Ordinance. The goal shall be to collect
SECTION 33 41 03 POLYVINYL CHLORIDE (PVC) PIPE
SECTION 33 41 03 POLYVINYL CHLORIDE (PVC) PIPE PART 1 GENERAL 1.01 SECTION INCLUDES A. This section includes all labor, materials, equipment, and incidentals required and installation of Polyvinyl Chloride
volume of concrete occupied by the drain pipe in a cast-in-place structure or structure extension.
715.01 430 volume of concrete occupied by the drain pipe in a cast-in-place structure or structure extension. No additional payment will be made for the repair or replacement of existing concrete damaged
CITY OF VISTA STANDARD DRAWINGS (PRELIMINARY, FOR REVIEW)
CITY OF VISTA STANDARD DRAWINGS (PRELIMINARY, FOR REVIEW) January, 2013 THIS SHEET INTENTIONALLY LEFT BLANK TABLE OF CONTENTS DRAINAGE STRUCTURES DRN-01 Corrugated metal pipe drop inlet DNR-02 Storm Drain
GEOTECHNICAL DESIGN MANUAL
GEOTECHNICAL DESIGN MANUAL CHAPTER 21 GEOTECHNICAL ASPECTS OF PIPE DESIGN AND INSTALLATION NYSDOT Geotechnical Page 21-1 July 18, 2013 (Intentionally left blank) NYSDOT Geotechnical Page 21-2 July 18,
Duraslot Surface Drains
Duraslot Surface Drains Durable, economical, corrosion-resistant collection of surface runoff A sensible alternative to metal and concrete Since 1987, Duraslot surface drains have been providing reliable
CONCRETE SEGMENTAL RETAINING WALL SYSTEM
CONCRETE SEGMENTAL RETAINING WALL SYSTEM PART 1: GENERAL SPECIFICATIONS 1.01 Work Included A. Work shall consist of furnishing and constructing a Rockwood Vintage TM unit segmental retaining wall (SRW)
DESCRIPTION OF WORK:
DEPARTMENT OF PUBLIC WORKS COUNTY OF HENRICO P.O. BOX 27032 RICHMOND, VIRGINIA 23273 PERMIT NO. One (1) copy of application and four (4) copies of plans are hereby made to the Director of Public Works
City of Hilshire Village Pine Creek Ln Reconstruction
City of Hilshire Village Pine Creek Ln Reconstruction OVERVIEW The City will be soliciting bids for the Pine Creek Reconstruction Project with construction scheduled to begin in January 2015. This project
SECTION 9.02 BUILDING SUBSURFACE DRAINS (PERIMETER, ETC.)
CHAPTER 9 SEWER / STORM DRAIN / IRRIGATION LINES SECTION 9.01 GENERAL This section covers the requirements for piping materials and installation of Lehi City sewer, storm drainage and irrigation collection
ADA POST INSPECTION CHECKLIST. Job No. Route County Location
ADA POST INSPECTION CHECKLIST Job No. Route County Location SIDEWALKS All sidewalks constructed within the project limits are ADA compliant. Sidewalks are 5 or greater in width. Exception, existing sidewalks
SECTION 02150 REMOVAL OR ABANDONMENT OF EXISTING UTILITIES AND UNDERGROUND STRUCTURES. 1. Trench excavation, backfill, and compaction; Section 02250.
02150-1 of 6 SECTION 02150 REMOVAL OR ABANDONMENT OF EXISTING 02150.01 GENERAL A. Description Removal or abandonment of existing utilities and underground structures shall include, but not necessarily
APPLICATION FOR DEMOLITION & RIGHT-OF OF-WAY PERMIT
APPLICATION FOR DEMOLITION & RIGHT-OF OF-WAY PERMIT City of Swartz Creek 8083 Civic Drive Swartz Creek, MI 48473 810-635-4464 Fee Received: $ Date: / / Receipt No: Demolition Permit (including Right of
ENGINEERING DESIGN GUIDELINES. for SUBDIVISIONS OR COMMERCIAL DEVELOPMENTS
ENGINEERING DESIGN GUIDELINES for SUBDIVISIONS OR COMMERCIAL DEVELOPMENTS City of Birmingham Department of Planning, Engineering and Permits Engineering Division Office of the City Engineer 2008 TABLE
CONCRETE SEGMENTAL RETAINING WALL SYSTEM
CONCRETE SEGMENTAL RETAINING WALL SYSTEM PART 1: GENERAL SPECIFICATIONS 1.01 Work Included A. Work shall consist of furnishing and constructing a Rockwood Classic 8 with PCS unit segmental retaining wall
C. Section 014510 TESTING LABORATORY SERVICE.
SECTION 014500 QUALITY CONTROL PART 1 GENERAL 1.01 RELATED REQUIREMENTS A. Drawings and General Provisions of Contract, including General and Special Conditions and other Division 1 Specification Sections,
EXHIBIT "A. Technical Specifications for Water and Sewer Service Lines
EXHIBIT "A Technical Specifications for Water and Sewer Service Lines Water and Sewer Line Bedding and Backfill: Drawings show cross-section of trench, pipe laid on top of 6" min. bedding material, bedding
City of La Quinta Public Works Department - Storm Drain Plan Review Checklist
Tract or Parcel Project Name PCN Checked By Date City of La Quinta Public Works Department - Storm Drain Plan Review Checklist SUBMITTAL REQUIREMENTS Approved Tentative Tract Map Conditions of Approval
Pipe bursting provides viable alternative for rehab work By Greg Key, U.S. Pipe
Pipe bursting provides viable alternative for rehab work By Greg Key, U.S. Pipe As the Environmental Protection Agency tightens groundwater quality regulations, old leaking sewers lines made of pipe clay,
FDOT DBE CERTIFICATION NAICS CODE GUIDE WITH CAP SIZES
NAICS CODE Highway, Street, and Bridge Construction SIZE CAP ($ MIL) 237310 Asphalt Roadway (includes 300, 320, 327, 330, 334, 336, 337, 338) Application of prime and tack coats, leveling surfaces and
FY08 SEWER POINT REPAIRS BID TABULATION
6-07-831 Page 1 of 12 1 FOR CLEANING AND TELEVISING EXISTING SEWERS, AS SPECIFIED, ANY REQUIRED CLEANING, ANY LOCATION, ANY LENGTH OF SEWER, COMPLETE IN PLACE, FOR VARIOUS PIPE DIAMETERS. A. EXISTING "
Preliminary Design Report Clay County, Florida Carpet n Drapes Culvert Repair and Rehabilitation July 21, 2006
Clay County, Florida Carpet n Drapes Culvert Repair and Rehabilitation July 21, 2006 1.0 Background and Repair and Rehabilitation Recommendation Clay County has contracted Camp Dresser & McKee Inc. (CDM)
Porous Pavement Alternatives Cost Analysis
Porous Pavement Alternatives Cost Analysis Prepared by Century West Engineering for Metro This cost analysis compares the construction costs of six different types of pavement for three different scenarios.