Unit Price Averages Reports

Size: px
Start display at page:

Download "Unit Price Averages Reports"

Transcription

1 Unit Price Averages Reports

2 12/7/2015 UNIT PRICE AVERAGES REPORT Disclaimer The information provided in the following Unit Price Averages Report is only for the use of Alberta Infrastructure & Transportation staff and its Consultants for the development of construction cost estimates on Department construction projects. The unit price averages presented in this report are based on the cumulative average of the unit prices from the three lowest bids received for the period from August 1, 2014, to September 30, 2015 for 2015 construction projects. As well, the unit price averages are weighted by bid quantity. These unit price averages are provided for information only and, while thought to be accurate, are provided without warranty of any kind, either expressed or implied. The Crown, its agents, employees or contractors will not be liable for any damages, direct or indirect, or lost profits arising out of the use of this information, and as such, any user of this information shall assume all associated risks.

3 10/23/2015 PROVINCIAL, Weighted Unit Price Averages Page 1 of 6 Based on 2015 Construction Prices tendered between August 01, 2014 and September 30, 2015 Item A051 Supply of Aggregate - No Option 1 $0 2,600 m3 $0.00 A805 Supply of Aggregate - No Option 10 $539, ,197 t $0.96 B100 Subgrade Excavation 19 $589,895 19,845 m3 $29.73 B152 Granular Fill (Pit-run) - Des $2,731,173 95,705 t $28.54 B153 Granular Fill - Des $410,654 10,955 t $37.49 B154 Granular Fill (Pit-Run) 2 $212,702 10,450 t $20.35 B155 Granular Fill, 6, $15, t $31.46 B175 Granular Fill, 6, $42, m3 $ B180 Preparing Subgrade Surface (First Layer) 20 $1,177, ,630 m2 $1.67 B181 Preparing Subgrade Surface (Second Layer) 3 $153, ,400 m2 $1.27 B282 Granular Base Course - Des. 2 Cl $24,615, ,804 t $31.37 C055 Topsoil and Subsoil Stripping 4 $834, ,500 m3 $5.10 C056 Topsoil and Subsoil Placement 4 $257,618 32,755 m3 $7.86 C060 Common Excavation - Civil Projects 3 $992, ,000 m3 $8.01 C062 Borrow Area Excavation 2 $3,532, ,000 m3 $5.52 C063 Wet Excavation - Type 1 1 $305,200 40,000 m3 $7.63 C064 Wet Excavation - Type 2 2 $175,056 12,800 m3 $13.68 C065 Impervious Fill Zone 1A 3 $1,445, ,500 m3 $5.68 C069 Random Fill Zone 2A 2 $525, ,000 m3 $1.48 C091 Pitrun Gravel Zone 4C 3 $569,865 28,400 t $20.07 C100 Riprap Bedding Gtavel Zone 5A 2 $589,390 17,000 m3 $34.67 C102 Coarse Rip-rap Bedding Zone 5B 2 $702,000 13,000 m3 $54.00 C105 Gravel Armour Zone 5C 1 $266,640 8,000 m3 $33.33 C106 Gravel Armour Zone 5C 2 $50,753 1,500 t $33.84 C110 Riprap Zone 6A 2 $720,275 9,700 m3 $74.26 C120 Riprap Zone 6B 2 $945,000 10,500 m3 $90.00 C140 Riprap Zone 6C 1 $3,240,000 24,000 m3 $ C143 Salvage and Reinstall Existing Riprap 1 $3, m3 $65.00 C145 Impervious Fill Zone 1A 1 $147,450 15,000 m3 $9.83 C150 Fine Filter Zone 3A 1 $1,300,550 19,000 m3 $68.45 C160 Coarse Filter Zone 3B 1 $129,990 3,000 m3 $43.33 C200 Geotextile 3 $15,217 3,960 m2 $3.84 C225 Erosion Control Blanket 1 $3, m2 $3.92 C230 Drill Seeding 3 $208, ,000 m2 $0.65 C232 Hydroseeding 3 $54,540 40,000 m2 $1.36 C248 Temporary Fencing 1 $38,340 2,000 m $19.17 C250 Barbed Wire Fence 1 $9,030 1,000 m $9.03 C254 Barbed Wire Fencing and Gates 2 $59,662 5,600 m $10.65 C265 Vehicle Access Control Gate 1 $20,800 4 Each $5, D100 Culverts - Remove and Dispose (C.S.P.) (up to 700 mm dia.) 22 $250,416 2,248 m $ D105 Culverts - Remove and Dispose (C.S.P.) (over 700 mm dia.) 19 $85, m $ D200 Granular Backfill - Culverts 3 $13, m3 $81.28 D235 Granular Backfill - Culverts 8 $55, t $55.90 D326 Culverts - Supply and Install (up to 700 mm dia. R.G.R.C.P.) 2 $8, m $ D405 Culverts - Supply and Install (500 mm dia. C.S.P.) 3 $67, m $313.36

4 10/23/2015 PROVINCIAL, Weighted Unit Price Averages Page 2 of 6 Based on 2015 Construction Prices tendered between August 01, 2014 and September 30, 2015 Item D410 Culverts - Supply and Install (600 mm dia. C.S.P.) 21 $1,101,095 3,255 m $ D425 Culverts - Supply and Install (800 mm dia. C.S.P.) 13 $722,249 1,285 m $ D430 Culverts - Supply and Install (900 mm dia. C.S.P.) 9 $126, m $ D435 Culverts - Supply and Install (1200 mm dia. C.S.P.) 3 $37, m $ D460 Culverts - Supply and Install (450 mm dia. R.C.P.) 2 $8, m $ D500 Smoothwall Steel Pipe Culvert - Supply and Auger (750 mm dia 1 $49, m $1, D510 Smoothwall Steel Pipe Culvert - Supply and Auger (600 mm dia 4 $425, m $1, D520 Smoothwall Steel Pipe Culvert - Supply and Auger (800 mm dia 5 $736, m $1, D525 Smoothwall Steel Pipe Culvert - Supply and Auger (900 mm dia 2 $258, m $1, D540 Grouting of Abandoned Culverts 19 $678, m3 $ D555 Riprap - Random - Supply and Place 1 $11, m3 $ D607 Filter Material 1 $30, m3 $ D615 Perforated Pipe 2 $34, m $ D732 Adjust Manholes 2 $5,333 3 units $1, D733 Adjust Catch Basins 1 $1,083 1 units $1, D734 Ajust Water Valve 2 $20, units $1, D795 Leads - Supply and Install 1 $8, m $ D825 Culvert Liner - Supply and Install (375 mm Dia.) 1 $7, m $ D850 Culvert Liner - Supply and Install (S.W.S.P.) ( mm) 2 $62, m $ E003 Misc. Environmental Work 3 $57, plantings $ E110 Granular Fill for Drainage Layer 2 $91,545 5,100 m3 $17.95 E331 Gabion Mattress - Supply and Install 1 $83, m2 $ E420 Stone Barrier 1 $65, m3 $ E435 Geotextile Fence Barrier - Ditch 25 $180,449 11,770 m $15.33 E452 Geotextile - Nonwoven (Supply and Install) 7 $839, ,860 m2 $2.74 E453 Geogrid - Supply and Install 1 $1, m2 $2.67 E454 Geotextile for Materials Separation - Supply and Install 4 $15,334 2,805 m2 $5.47 E456 Geotextile for Stabilization - Supply and Install 8 $178,397 38,940 m2 $4.58 E500 Soil Covering (Low Flow) 1 $2,040 1,000 m2 $2.04 E505 Soil Covering (Medium Flow) 7 $192,251 67,135 m2 $2.86 E510 Soil Covering (High Flow) 13 $263,482 35,779 m2 $7.36 E515 Synthetic Permeable Ditch Barrier 5 $73,073 4,200 m $17.40 E607 Drill Seeding 7 $44, ha $2, E608 Broad-Cast Seeding 12 $140, ha $ E609 Hydro-Seeding 4 $58,306 6 ha $9, E610 Slope Texturing 3 $78, ,400 m2 $0.47 F169 Haul of Bridge Materials 1 $5,682 1 t.km $5, F189 Excavation - Channel 1 $6, m3 $13.51 F195 Backfill - Non-Granular 2 $36, m3 $73.95 F200 Backfill - Pit Run Granular - Des. 6 Cl $87, m3 $ F203 Backfill - Crushed Granular, 2, 25 3 $58, m3 $ F495 CSP with Couplers - Supply 1 $38, m $ F496 CSP - Assembly 2 $63, m $ F500 Heavy Rock RipRap (Class 1) 20 $947,465 3,996 m3 $ F505 Heavy Rock RipRap (Class 1M) 3 $127, m3 $282.50

5 10/23/2015 PROVINCIAL, Weighted Unit Price Averages Page 3 of 6 Based on 2015 Construction Prices tendered between August 01, 2014 and September 30, 2015 Item F515 Heavy Rock RipRap (Class 2) 5 $191, m3 $ F525 Heavy Rock RipRap (Class 3) 3 $859,820 6,180 m3 $ F755 Surface Removal 5 $299,632 13,223 m2 $22.66 F760 Partial Depth Repair 8 $474, m2 $1, F765 Full Depth Repair 4 $43, m2 $1, F770 Sandblasting (Deck Surface) 3 $59,190 2,675 m2 $22.13 F775 Deck Overlay Concrete 3 $314, m3 $1, F776 Placement Deck Overlay Concrete 3 $268,526 2,665 m2 $ F812 Supply of Piling - H-Pile 4 $126, m $ F814 Supply of Piling - Pipe Pile 3 $101, m $ F816 Pile Set-up 7 $413, piles $2, F818 Pile Driving 7 $213,963 1,903 m $ F820 Loading Tests 3 $32,276 7 tests $4, F822 Pile Concrete 6 $1,294,645 3,465 m3 $ F824 Drill Rig Set-up 5 $344, piles $2, F826 Pile Installation 4 $727,783 3,132 m $ F834 Concrete - Class C 8 $1,116, m3 $1, F836 Concrete - Class D 1 $3,439,418 3,550 m3 $ F838 Concrete - Class S 1 $469, m3 $ F841 Concrete - Class HPC 5 $739, m3 $2, F850 Plain Reinforcing Steel - Supply 8 $665, ,398 kg $1.63 F854 Reinforcing Steel - Place 11 $2,110, ,936 kg $2.65 F974 Deck Waterproofing 4 $158,966 1,977 m2 $80.41 F980 Asphalt Concrete Pavement - Mix Type H2 ( A) 7 $768,875 2,535 t $ F982 Asphalt Concrete Pavement - Mix Type M1 ( A) 1 $52, t $ G100 Clearing 6 $25,004 2 ha $12, G220 Channel Excavation 13 $270,832 41,385 m3 $6.54 G225 Common Excavation 20 $14,523,242 2,493,247 m3 $5.83 G230 Borrow Topsoil Excavation 4 $1,342, ,497 m3 $3.57 G235 Borrow Excavation 2 $4,764, ,800 m3 $5.72 G236 Borrow Excavation - Contractor's Supply 12 $2,278, ,437 m3 $17.33 G239 Overhaul 1 $1,642,816 1,235,200 m3.km $1.33 G248 Common and/or Borrow Excavation Loaded to Trucks 4 $1,542, ,350 m3 $13.26 G270 Sideslope Improvement 13 $3,371, km $44, G300 Topsoil Placement 20 $1,452,712 1,928,253 m2 $0.75 G320 Topsoil (Supply and Place) 2 $17,133 1,775 m2 $9.65 G452 Remove and Dispose of Existing Fence 10 $76, km $4, G453 Remove and Salvage of Existing Fence 1 $2,505 0 km $17, G470 New Fence - Supply and Install - Class A 1 $0 0 km $0.00 G475 New Fence - Supply and Install - Class B 9 $169, km $11, G483 New Fence - Supply and Install - Class F 1 $2,087 0 km $20, M102 Crack Repair - Spray Patch 5 $764, ,255 m $5.87 M103 Transverse Crack Repair - Mill & Fill 1 $142,476 3,100 m $45.96 Q185 Gravel Surfacing - Des. 4 Cl $49,014 1,510 t $32.46 Q186 Gravel Surfacing - Des. 4 Cl $543,123 13,555 t $40.07

6 10/23/2015 PROVINCIAL, Weighted Unit Price Averages Page 4 of 6 Based on 2015 Construction Prices tendered between August 01, 2014 and September 30, 2015 Item Q510 Asphalt Mix For Others 9 $560,561 9,025 t $62.11 Q560 Cold Milling Asphalt Pavement 3 $668,605 20,543 m3 $32.55 Q565 Cold Milling Asphalt Pavement 20 $3,539,343 1,246,192 m2 $2.84 Q567 Supply Rejuvenating Agent 1 $6,315 2,170 l $2.91 Q722 Supply and Place Fog Coat 5 $86, ,910 m2 $0.85 Q770 Graded Aggregate Seal Coat - Des. 3 Cl. 12.5C 3 $2,646, ,831 m2 $3.54 Q771 Graded Aggregate Seal Coat - Bridge Decks 3 $79,891 3,805 m2 $21.00 Q785 Chip Seal Coat - Des. 3 Cl. 12.5BW 3 $4,512,548 1,183,331 m2 $3.81 Q798 Chip Seal Coat - Bridge Decks 3 $115,671 4,262 m2 $27.14 Q987 Asphalt Concrete Pavement - EPS Mix Type H1 (PG58-34) 1 $4,761,792 50,400 t $94.48 Q990 Asphalt Concrete Pavement - EPS Mix Type H1 17 $88,064,606 1,103,323 t $79.82 Q991 Asphalt Concrete Pavement - EPS Mix Type H2 14 $37,828, ,267 t $83.46 Q992 Asphalt Concrete Pavement - EPS Mix Type M1 16 $71,492, ,615 t $78.68 Q993 Asphalt Concrete Pavement - EPS Mix Type L1 4 $7,098,713 85,135 t $83.38 Q994 Asphalt Concrete Pavement - EPS Mix Type S1 12 $14,494, ,740 t $91.31 Q996 Asphalt Concrete Pavement - EPS Mix Type S3 16 $42,125, ,850 t $71.91 S261 Concrete Base - Supply and Install 9 $226, units $1, S270 Supply of Signs, 3/4" Plywood 9 $35, m2 $ S271 Supply of Signs, Extruded Aluminum 9 $162, m2 $ S272 Supply of Signs, Aluminum 20 $39, m2 $ S273 Supply of Signs, Aluminum - 3M Diamond Grade (VIP) 19 $111, m2 $ S275 Removal and Reinstallation or Disposal of Existing Signs - One 25 $122, signs $ S277 Removal and Reinstallation or Disposal of Existing Signs - Two 18 $36, signs $ S283 Concrete Base - Remove and Reinstall 1 $1,867 2 units $ S288 Install Sign - Less than 1 m2 26 $69, signs $81.39 S289 Install Sign - 1 m2 to 3 m2 16 $35, signs $ S290 Install Sign - over 3 m2 8 $40, signs $ S291 Remove and Reinstall Breakaway Steel Posts 1 $1,350 2 posts $ S292 Remove and Dispose - Breakaway Steel Posts 5 $10, posts $ S309 Pavement Messages - Gore Area 10 $83, messages $1, S310 Pavement Messages - Turn Arrow (Single or Double) 11 $32, messages $ S315 Pavement Messages - Stop Bar 16 $17, messages $ S320 Pavement Messages - Stop Ahead 5 $3, messages $ S321 Pavement Messages - STOP 2 $612 3 messages $ S326 Pavement Messages - Railway Crossing 2 $2,400 4 messages $ S327 Pavement Messages - Pedestrian Crossing 2 $724 3 messages $ S341 Durable Pavement Messages - Turn or Straight Arrows (Single 17 $95, messages $ S342 Durable Pavement Messages - Stop Bar 18 $93, messages $ S343 Durable Pavement Messages - Railway Crossing 3 $7,572 8 messages $ S344 Durable Pavement Messages - Stop Ahead 6 $11, messages $ S345 Durable Pavement Messages - Aircraft Patrol Zone 3 $14, messages $1, S346 Durable Pavement Messages - Pedestrian Crossing 1 $9,900 6 messages $1, S347 Durable Pavement Messages - STOP 10 $22, messages $ S348 Durable Pavement Messages - SCHOOL ZONE 1 $1,755 2 messages $ S349 Removal of Existing Durable Pavement Messages 2 $1,527 5 messages $305.46

7 10/23/2015 PROVINCIAL, Weighted Unit Price Averages Page 5 of 6 Based on 2015 Construction Prices tendered between August 01, 2014 and September 30, 2015 Item S350 Roadway Lines - Supplying Paint and Painting (Directional Divid 33 $481, km $ S351 Roadway Lines - Supplying Paint and Painting (Lane Dividing a 14 $350, km $ S352 Roadway Lines - Supplying Paint and Painting (Lane Dividing L 14 $19, km $ S355 Roadway Lines - Supplying Paint and Paiting (Directional Divid 2 $3,460 6 km $ S360 Intersection Lines - Supplying Paint and Painting 32 $51, intersection $ S370 Interchange Lines - Supplying Paint and Painting 4 $50, interchange $3, S375 Removal of Existing Painted Lines 2 $3, m $5.08 S376 Removal of Existing Roadway Lines 2 $72, km $2, S400 Underground Electrical Conduit - Supply and Install - Trench Ex 6 $275,830 6,487 m $42.52 S405 Underground Electrical Conduit - Supply and Install - Pushed C 8 $119, m $ S700 Milled Rumble Strips for Stop Conditions 10 $44, sets $2, S706 Milled Rumble Strips 25 $939,158 1,212 km $ S730 Supply and Install Breakaway Steel Posts - W150 X 14 8 $123, m $1, S740 Supply and Install Breakaway Steel Posts - W150 X 22 1 $19, m $1, S745 Supply and Install Breakaway Steel Posts - W200 X 27 1 $38, m $1, S765 Cluster Frames - Supply and Install 3 $3,477 7 frames $ S770 Supply and Install - Wooden Post 4 $21, posts $ S772 Supply and Install Post (100mm X 150mm) 26 $163, posts $ S775 Removal and Reinstallation or Disposal of Existing Signs 2 $1,826 4 signs $ S800 W-Beam Guardrail - Supply and Install 1 $14, m $ S805 Strong Post W-Beam Guardrail - Supply and Install 23 $1,952,034 14,029 m $ S815 Cable Barrier - Supply and Install 3 $1,113,500 10,231 m $ S820 Remove, Salvage and Reinstall Existing Guardrail 9 $182,312 1,407 m $ S822 Supply of Guardrail Posts 5 $29, posts $99.18 S825 Remove and Dispose of Existing Guardrail 30 $1,102,782 37,725 m $29.23 S830 Flexible Guide Post/Delineators - Round - Supply and Install 32 $452,571 5,349 posts $84.61 U100 Trenching and Backfilling 9 $315,379 16,972 m $18.58 U105 Secondary Cable - Supply and Install 10 $506,754 50,921 m $9.95 U110 Removal and Salvage of Existing Standards 2 $5,393 8 units $ U115 Removal and Disposal of Existing Light Fixures 4 $27, units $ U120 Cast In Place Concrete Base - Supply and Install 6 $420, units $2, U125 Street Light Standard - Supply and Install 8 $506, units $2, U130 Salvaged Street Light Standard - Install 2 $7,073 8 poles $ U135 Distribution Enclosure - Supply and Install 7 $163, units $12, X215 Removing Curb and Gutter 1 $75, m $ X220 Removing Concrete Surface 1 $1,333 5 m2 $ X225 Removing Manhole 1 $4,667 1 units $4, X230 Removing Catch Basin 1 $17,333 4 units $4, X235 Removing Curb 1 $1,800 9 m $ X320 Concrete Curb (all Types) 2 $98,912 1,260 m $78.50 X325 Curb and Gutter (all heights) 3 $442,434 3,218 m $ X346 Rock Rip-Rap - Hand Laid 2 $14, m2 $ X350 Solid Concrete Islands 2 $111, m2 $ X400 Solid Concrete Medians 1 $31, m2 $ X415 Granular Fill for Medians 2 $51,660 1,280 t $40.36

8 10/23/2015 PROVINCIAL, Weighted Unit Price Averages Page 6 of 6 Based on 2015 Construction Prices tendered between August 01, 2014 and September 30, 2015 Item X435 Median Asphalt Concrete Surfacing 2 $194,402 1,185 t $ X440 Median Concrete Surfacing 3 $486,553 5,205 m2 $93.48 X510 Cutting of Pavement Edge 25 $360,167 45,609 m $7.90

9 10/23/2015 SOUTHERN REGION, Weighted Unit Price Averages Page 1 of 4 Based on 2015 Construction Prices tendered between August 01, 2014 and September 30, 2015 Item A805 Supply of Aggregate - No Option 2 $120, ,330 t $0.61 B100 Subgrade Excavation 6 $126,936 6,670 m3 $19.03 B152 Granular Fill (Pit-run) - Des. 6 7 $1,105,338 51,515 t $21.46 B153 Granular Fill - Des. 2 2 $10, t $39.48 B155 Granular Fill, 6, $15, t $31.46 B180 Preparing Subgrade Surface (First Layer) 1 $14,820 11,060 m2 $1.34 B282 Granular Base Course - Des. 2 Cl $1,028,420 39,840 t $25.81 C055 Topsoil and Subsoil Stripping 4 $834, ,500 m3 $5.10 C056 Topsoil and Subsoil Placement 4 $257,618 32,755 m3 $7.86 C060 Common Excavation - Civil Projects 3 $992, ,000 m3 $8.01 C062 Borrow Area Excavation 2 $3,532, ,000 m3 $5.52 C063 Wet Excavation - Type 1 1 $305,200 40,000 m3 $7.63 C064 Wet Excavation - Type 2 2 $175,056 12,800 m3 $13.68 C065 Impervious Fill Zone 1A 3 $1,445, ,500 m3 $5.68 C069 Random Fill Zone 2A 2 $525, ,000 m3 $1.48 C091 Pitrun Gravel Zone 4C 3 $569,865 28,400 t $20.07 C100 Riprap Bedding Gtavel Zone 5A 2 $589,390 17,000 m3 $34.67 C102 Coarse Rip-rap Bedding Zone 5B 2 $702,000 13,000 m3 $54.00 C105 Gravel Armour Zone 5C 1 $266,640 8,000 m3 $33.33 C106 Gravel Armour Zone 5C 2 $50,753 1,500 t $33.84 C110 Riprap Zone 6A 2 $720,275 9,700 m3 $74.26 C120 Riprap Zone 6B 2 $945,000 10,500 m3 $90.00 C140 Riprap Zone 6C 1 $3,240,000 24,000 m3 $ C143 Salvage and Reinstall Existing Riprap 1 $3, m3 $65.00 C145 Impervious Fill Zone 1A 1 $147,450 15,000 m3 $9.83 C150 Fine Filter Zone 3A 1 $1,300,550 19,000 m3 $68.45 C160 Coarse Filter Zone 3B 1 $129,990 3,000 m3 $43.33 C200 Geotextile 3 $15,217 3,960 m2 $3.84 C230 Drill Seeding 3 $208, ,000 m2 $0.65 C232 Hydroseeding 3 $54,540 40,000 m2 $1.36 C248 Temporary Fencing 1 $38,340 2,000 m $19.17 C250 Barbed Wire Fence 1 $9,030 1,000 m $9.03 C254 Barbed Wire Fencing and Gates 2 $59,662 5,600 m $10.65 C265 Vehicle Access Control Gate 1 $20,800 4 Each $5, D100 Culverts - Remove and Dispose (C.S.P.) (up to 700 mm dia.) 4 $20, m $ D105 Culverts - Remove and Dispose (C.S.P.) (over 700 mm dia.) 4 $15, m $ D200 Granular Backfill - Culverts 2 $12, m3 $86.56 D326 Culverts - Supply and Install (up to 700 mm dia. R.G.R.C.P.) 2 $8, m $ D405 Culverts - Supply and Install (500 mm dia. C.S.P.) 2 $57, m $ D410 Culverts - Supply and Install (600 mm dia. C.S.P.) 5 $75, m $ D425 Culverts - Supply and Install (800 mm dia. C.S.P.) 2 $41, m $ D430 Culverts - Supply and Install (900 mm dia. C.S.P.) 2 $26, m $ D460 Culverts - Supply and Install (450 mm dia. R.C.P.) 1 $2,386 4 m $ D520 Smoothwall Steel Pipe Culvert - Supply and Auger (800 mm dia 2 $134, m $1, D540 Grouting of Abandoned Culverts 5 $122, m3 $726.84

10 10/23/2015 SOUTHERN REGION, Weighted Unit Price Averages Page 2 of 4 Based on 2015 Construction Prices tendered between August 01, 2014 and September 30, 2015 Item D555 Riprap - Random - Supply and Place 1 $11, m3 $ D734 Ajust Water Valve 1 $1,917 1 units $1, D825 Culvert Liner - Supply and Install (375 mm Dia.) 1 $7, m $ D850 Culvert Liner - Supply and Install (S.W.S.P.) ( mm) 1 $17, m $ E110 Granular Fill for Drainage Layer 2 $91,545 5,100 m3 $17.95 E435 Geotextile Fence Barrier - Ditch 8 $88,488 6,075 m $14.57 E454 Geotextile for Materials Separation - Supply and Install 2 $1, m2 $4.63 E456 Geotextile for Stabilization - Supply and Install 2 $29,268 5,350 m2 $5.47 E505 Soil Covering (Medium Flow) 1 $8, m2 $16.29 E510 Soil Covering (High Flow) 1 $64,416 9,600 m2 $6.71 E607 Drill Seeding 3 $21,089 6 ha $3, E609 Hydro-Seeding 2 $26,310 1 ha $23, F203 Backfill - Crushed Granular, 2, 25 1 $22, m3 $ F495 CSP with Couplers - Supply 1 $38, m $ F496 CSP - Assembly 2 $63, m $ F500 Heavy Rock RipRap (Class 1) 2 $19, m3 $ F505 Heavy Rock RipRap (Class 1M) 2 $69, m3 $ F515 Heavy Rock RipRap (Class 2) 2 $114, m3 $ F525 Heavy Rock RipRap (Class 3) 1 $99, m3 $ F755 Surface Removal 1 $14, m2 $64.72 F760 Partial Depth Repair 1 $172, m2 $1, F765 Full Depth Repair 1 $10,574 4 m2 $2, F812 Supply of Piling - H-Pile 2 $62, m $ F814 Supply of Piling - Pipe Pile 1 $12, m $ F816 Pile Set-up 2 $125, piles $2, F818 Pile Driving 2 $99, m $ F820 Loading Tests 2 $14,898 2 tests $7, F822 Pile Concrete 2 $20, m3 $ F824 Drill Rig Set-up 2 $134, piles $5, F826 Pile Installation 2 $96, m $ F834 Concrete - Class C 2 $49, m3 $1, F836 Concrete - Class D 1 $3,439,418 3,550 m3 $ F838 Concrete - Class S 1 $469, m3 $ F850 Plain Reinforcing Steel - Supply 2 $11,982 3,511 kg $3.41 F854 Reinforcing Steel - Place 3 $1,541, ,011 kg $4.76 F974 Deck Waterproofing 1 $30, m2 $83.33 F980 Asphalt Concrete Pavement - Mix Type H2 ( A) 2 $94, t $ G220 Channel Excavation 2 $18,897 1,530 m3 $12.35 G225 Common Excavation 4 $517,001 35,930 m3 $14.39 G230 Borrow Topsoil Excavation 1 $4, m3 $12.30 G235 Borrow Excavation 1 $46,000 2,000 m3 $23.00 G236 Borrow Excavation - Contractor's Supply 2 $83,558 3,550 m3 $23.54 G248 Common and/or Borrow Excavation Loaded to Trucks 1 $52,272 4,800 m3 $10.89 G270 Sideslope Improvement 5 $711, km $32, G300 Topsoil Placement 4 $93,893 62,100 m2 $1.51

11 10/23/2015 SOUTHERN REGION, Weighted Unit Price Averages Page 3 of 4 Based on 2015 Construction Prices tendered between August 01, 2014 and September 30, 2015 Item G320 Topsoil (Supply and Place) 1 $14,677 1,300 m2 $11.29 M102 Crack Repair - Spray Patch 2 $62,655 9,255 m $6.77 Q185 Gravel Surfacing - Des. 4 Cl $3, t $70.06 Q186 Gravel Surfacing - Des. 4 Cl $21, t $38.74 Q510 Asphalt Mix For Others 3 $157,010 3,000 t $52.34 Q565 Cold Milling Asphalt Pavement 4 $178,298 43,841 m2 $4.07 Q722 Supply and Place Fog Coat 5 $86, ,910 m2 $0.85 Q990 Asphalt Concrete Pavement - EPS Mix Type H1 6 $36,973, ,280 t $69.20 Q991 Asphalt Concrete Pavement - EPS Mix Type H2 2 $2,240,402 30,600 t $73.22 Q992 Asphalt Concrete Pavement - EPS Mix Type M1 1 $4,447,328 65,450 t $67.95 Q993 Asphalt Concrete Pavement - EPS Mix Type L1 2 $2,518,760 33,425 t $75.36 Q994 Asphalt Concrete Pavement - EPS Mix Type S1 4 $4,602,755 54,540 t $84.39 Q996 Asphalt Concrete Pavement - EPS Mix Type S3 4 $8,053, ,550 t $60.76 S261 Concrete Base - Supply and Install 1 $43, units $1, S270 Supply of Signs, 3/4" Plywood 1 $2,352 6 m2 $ S271 Supply of Signs, Extruded Aluminum 1 $53, m2 $ S272 Supply of Signs, Aluminum 5 $7, m2 $ S273 Supply of Signs, Aluminum - 3M Diamond Grade (VIP) 4 $6, m2 $ S275 Removal and Reinstallation or Disposal of Existing Signs - One 5 $40, signs $ S277 Removal and Reinstallation or Disposal of Existing Signs - Two 4 $11, signs $ S283 Concrete Base - Remove and Reinstall 1 $1,867 2 units $ S288 Install Sign - Less than 1 m2 5 $10, signs $ S289 Install Sign - 1 m2 to 3 m2 2 $5, signs $ S290 Install Sign - over 3 m2 1 $6,050 6 signs $1, S291 Remove and Reinstall Breakaway Steel Posts 1 $1,350 2 posts $ S292 Remove and Dispose - Breakaway Steel Posts 1 $6, posts $ S309 Pavement Messages - Gore Area 4 $45, messages $1, S341 Durable Pavement Messages - Turn or Straight Arrows (Single 7 $35, messages $ S342 Durable Pavement Messages - Stop Bar 8 $28, messages $ S343 Durable Pavement Messages - Railway Crossing 1 $1,738 2 messages $ S344 Durable Pavement Messages - Stop Ahead 3 $6,205 7 messages $ S345 Durable Pavement Messages - Aircraft Patrol Zone 3 $14, messages $1, S347 Durable Pavement Messages - STOP 7 $19, messages $ S348 Durable Pavement Messages - SCHOOL ZONE 1 $1,755 2 messages $ S349 Removal of Existing Durable Pavement Messages 2 $1,527 5 messages $ S350 Roadway Lines - Supplying Paint and Painting (Directional Divid 9 $59, km $ S351 Roadway Lines - Supplying Paint and Painting (Lane Dividing a 5 $115, km $ S352 Roadway Lines - Supplying Paint and Painting (Lane Dividing L 4 $3, km $ S355 Roadway Lines - Supplying Paint and Paiting (Directional Divid 1 $1,202 2 km $ S360 Intersection Lines - Supplying Paint and Painting 8 $13, intersection $ S370 Interchange Lines - Supplying Paint and Painting 3 $39, interchange $3, S375 Removal of Existing Painted Lines 2 $3, m $5.08 S376 Removal of Existing Roadway Lines 1 $2,415 0 km $5, S400 Underground Electrical Conduit - Supply and Install - Trench Ex 2 $1, m $58.19 S405 Underground Electrical Conduit - Supply and Install - Pushed C 1 $12, m $86.39

12 10/23/2015 SOUTHERN REGION, Weighted Unit Price Averages Page 4 of 4 Based on 2015 Construction Prices tendered between August 01, 2014 and September 30, 2015 Item S700 Milled Rumble Strips for Stop Conditions 3 $12,125 5 sets $2, S706 Milled Rumble Strips 7 $257, km $ S745 Supply and Install Breakaway Steel Posts - W200 X 27 1 $38, m $1, S772 Supply and Install Post (100mm X 150mm) 5 $24, posts $ S775 Removal and Reinstallation or Disposal of Existing Signs 1 $763 2 signs $ S800 W-Beam Guardrail - Supply and Install 1 $14, m $ S805 Strong Post W-Beam Guardrail - Supply and Install 7 $988,999 8,214 m $ S820 Remove, Salvage and Reinstall Existing Guardrail 4 $54, m $ S822 Supply of Guardrail Posts 2 $1, posts $80.18 S825 Remove and Dispose of Existing Guardrail 8 $367,072 11,491 m $31.94 S830 Flexible Guide Post/Delineators - Round - Supply and Install 7 $83, posts $85.13 U100 Trenching and Backfilling 2 $29,452 1,257 m $23.43 U105 Secondary Cable - Supply and Install 2 $26,757 2,645 m $10.12 U110 Removal and Salvage of Existing Standards 1 $2,143 2 units $1, U115 Removal and Disposal of Existing Light Fixures 1 $4,700 6 units $ U120 Cast In Place Concrete Base - Supply and Install 1 $4,000 2 units $2, U125 Street Light Standard - Supply and Install 1 $65, units $4, U130 Salvaged Street Light Standard - Install 1 $2,143 2 poles $1, U135 Distribution Enclosure - Supply and Install 1 $12,700 1 units $12, X325 Curb and Gutter (all heights) 1 $237,518 1,765 m $ X350 Solid Concrete Islands 1 $6, m2 $ X415 Granular Fill for Medians 1 $18, t $28.67 X440 Median Concrete Surfacing 1 $143,948 1,400 m2 $ X510 Cutting of Pavement Edge 8 $92,780 15,209 m $6.10

13 10/23/2015 CENTRAL REGION, Weighted Unit Price Averages Page 1 of 3 Based on 2015 Construction Prices tendered between August 01, 2014 and September 30, 2015 Item A051 Supply of Aggregate - No Option 1 $0 2,600 m3 $0.00 A805 Supply of Aggregate - No Option 2 $103, ,365 t $0.80 B100 Subgrade Excavation 1 $3, m3 $73.83 B152 Granular Fill (Pit-run) - Des. 6 3 $219,066 7,550 t $29.02 B153 Granular Fill - Des. 2 1 $32, t $33.57 B154 Granular Fill (Pit-Run) 2 $212,702 10,450 t $20.35 B175 Granular Fill, 6, $42, m3 $ B180 Preparing Subgrade Surface (First Layer) 6 $115,937 77,820 m2 $1.49 B181 Preparing Subgrade Surface (Second Layer) 1 $11,055 16,500 m2 $0.67 B282 Granular Base Course - Des. 2 Cl $3,065,306 91,318 t $33.57 D100 Culverts - Remove and Dispose (C.S.P.) (up to 700 mm dia.) 6 $87, m $ D105 Culverts - Remove and Dispose (C.S.P.) (over 700 mm dia.) 5 $16, m $ D235 Granular Backfill - Culverts 3 $18, t $54.73 D410 Culverts - Supply and Install (600 mm dia. C.S.P.) 5 $384,949 1,136 m $ D425 Culverts - Supply and Install (800 mm dia. C.S.P.) 3 $58, m $ D430 Culverts - Supply and Install (900 mm dia. C.S.P.) 2 $37, m $ D435 Culverts - Supply and Install (1200 mm dia. C.S.P.) 1 $7,000 6 m $1, D460 Culverts - Supply and Install (450 mm dia. R.C.P.) 1 $5, m $ D520 Smoothwall Steel Pipe Culvert - Supply and Auger (800 mm dia 1 $163, m $1, D540 Grouting of Abandoned Culverts 4 $71, m3 $ D732 Adjust Manholes 1 $4,167 2 units $2, D734 Ajust Water Valve 1 $18, units $1, E003 Misc. Environmental Work 3 $57, plantings $ E331 Gabion Mattress - Supply and Install 1 $83, m2 $ E435 Geotextile Fence Barrier - Ditch 9 $42,015 2,660 m $15.80 E452 Geotextile - Nonwoven (Supply and Install) 2 $38,909 10,950 m2 $3.55 E453 Geogrid - Supply and Install 1 $1, m2 $2.67 E456 Geotextile for Stabilization - Supply and Install 2 $87,903 21,140 m2 $4.16 E500 Soil Covering (Low Flow) 1 $2,040 1,000 m2 $2.04 E505 Soil Covering (Medium Flow) 2 $9,705 4,550 m2 $2.13 E510 Soil Covering (High Flow) 4 $21,261 2,244 m2 $9.47 E607 Drill Seeding 2 $18,700 7 ha $2, E608 Broad-Cast Seeding 5 $22, ha $1, E609 Hydro-Seeding 1 $14,233 2 ha $7, E610 Slope Texturing 1 $14,444 31,400 m2 $0.46 F169 Haul of Bridge Materials 1 $5,682 1 t.km $5, F189 Excavation - Channel 1 $6, m3 $13.51 F195 Backfill - Non-Granular 2 $36, m3 $73.95 F200 Backfill - Pit Run Granular - Des. 6 Cl $54, m3 $ F203 Backfill - Crushed Granular, 2, 25 2 $35, m3 $ F500 Heavy Rock RipRap (Class 1) 7 $305,893 1,395 m3 $ F505 Heavy Rock RipRap (Class 1M) 1 $57, m3 $ F525 Heavy Rock RipRap (Class 3) 2 $760,138 5,700 m3 $ F755 Surface Removal 1 $31, m2 $46.33 F760 Partial Depth Repair 4 $113, m2 $960.48

14 10/23/2015 CENTRAL REGION, Weighted Unit Price Averages Page 2 of 3 Based on 2015 Construction Prices tendered between August 01, 2014 and September 30, 2015 Item F765 Full Depth Repair 1 $9,908 5 m2 $1, F770 Sandblasting (Deck Surface) 1 $12, m2 $19.33 F775 Deck Overlay Concrete 1 $63, m3 $1, F776 Placement Deck Overlay Concrete 1 $93, m2 $ F816 Pile Set-up 1 $5, piles $ F818 Pile Driving 1 $26, m $64.46 F820 Loading Tests 1 $17,378 5 tests $3, F834 Concrete - Class C 1 $27, m3 $2, F854 Reinforcing Steel - Place 1 $2,779 1,570 kg $1.77 F974 Deck Waterproofing 1 $22, m2 $68.20 F980 Asphalt Concrete Pavement - Mix Type H2 ( A) 1 $213, t $ F982 Asphalt Concrete Pavement - Mix Type M1 ( A) 1 $52, t $ G100 Clearing 1 $4,571 0 ha $114, G220 Channel Excavation 4 $29,541 2,555 m3 $11.56 G225 Common Excavation 7 $1,546, ,080 m3 $9.66 G230 Borrow Topsoil Excavation 1 $98,315 26,500 m3 $3.71 G236 Borrow Excavation - Contractor's Supply 4 $833,309 43,127 m3 $19.32 G248 Common and/or Borrow Excavation Loaded to Trucks 1 $1,065,750 87,000 m3 $12.25 G270 Sideslope Improvement 1 $439, km $39, G300 Topsoil Placement 7 $250, ,003 m2 $1.40 G452 Remove and Dispose of Existing Fence 7 $17,195 4 km $4, G453 Remove and Salvage of Existing Fence 1 $2,505 0 km $17, G470 New Fence - Supply and Install - Class A 1 $0 0 km $0.00 G475 New Fence - Supply and Install - Class B 6 $69,166 5 km $14, G483 New Fence - Supply and Install - Class F 1 $2,087 0 km $20, Q185 Gravel Surfacing - Des. 4 Cl $6, t $33.63 Q186 Gravel Surfacing - Des. 4 Cl $55,539 1,700 t $32.67 Q560 Cold Milling Asphalt Pavement 1 $154,000 3,500 m3 $44.00 Q565 Cold Milling Asphalt Pavement 4 $465, ,700 m2 $2.28 Q567 Supply Rejuvenating Agent 1 $6,315 2,170 l $2.91 Q990 Asphalt Concrete Pavement - EPS Mix Type H1 3 $5,832,218 72,470 t $80.48 Q991 Asphalt Concrete Pavement - EPS Mix Type H2 4 $13,150, ,220 t $83.64 Q992 Asphalt Concrete Pavement - EPS Mix Type M1 3 $12,365, ,880 t $71.53 Q993 Asphalt Concrete Pavement - EPS Mix Type L1 1 $2,025,051 27,410 t $73.88 Q994 Asphalt Concrete Pavement - EPS Mix Type S1 1 $497,988 5,800 t $85.86 Q996 Asphalt Concrete Pavement - EPS Mix Type S3 6 $15,704, ,250 t $69.72 S261 Concrete Base - Supply and Install 4 $69, units $1, S270 Supply of Signs, 3/4" Plywood 3 $2, m2 $ S271 Supply of Signs, Extruded Aluminum 3 $68, m2 $ S272 Supply of Signs, Aluminum 5 $7, m2 $ S273 Supply of Signs, Aluminum - 3M Diamond Grade (VIP) 4 $43, m2 $ S275 Removal and Reinstallation or Disposal of Existing Signs - One 6 $19, signs $ S277 Removal and Reinstallation or Disposal of Existing Signs - Two 4 $9, signs $ S288 Install Sign - Less than 1 m2 6 $14, signs $73.75 S289 Install Sign - 1 m2 to 3 m2 5 $6, signs $267.51

15 10/23/2015 CENTRAL REGION, Weighted Unit Price Averages Page 3 of 3 Based on 2015 Construction Prices tendered between August 01, 2014 and September 30, 2015 Item S290 Install Sign - over 3 m2 3 $17, signs $ S292 Remove and Dispose - Breakaway Steel Posts 2 $1,053 6 posts $ S309 Pavement Messages - Gore Area 1 $1,970 2 messages $ S310 Pavement Messages - Turn Arrow (Single or Double) 1 $8, messages $ S315 Pavement Messages - Stop Bar 3 $3, messages $ S320 Pavement Messages - Stop Ahead 3 $2,072 8 messages $ S321 Pavement Messages - STOP 2 $612 3 messages $ S341 Durable Pavement Messages - Turn or Straight Arrows (Single 5 $25, messages $ S342 Durable Pavement Messages - Stop Bar 4 $13, messages $ S343 Durable Pavement Messages - Railway Crossing 1 $3,600 4 messages $ S344 Durable Pavement Messages - Stop Ahead 1 $2,880 3 messages $ S347 Durable Pavement Messages - STOP 1 $953 2 messages $ S350 Roadway Lines - Supplying Paint and Painting (Directional Divid 5 $56, km $ S351 Roadway Lines - Supplying Paint and Painting (Lane Dividing a 2 $60, km $ S352 Roadway Lines - Supplying Paint and Painting (Lane Dividing L 1 $1,625 5 km $ S360 Intersection Lines - Supplying Paint and Painting 5 $11, intersection $ S400 Underground Electrical Conduit - Supply and Install - Trench Ex 3 $18, m $71.24 S405 Underground Electrical Conduit - Supply and Install - Pushed C 4 $49, m $98.81 S700 Milled Rumble Strips for Stop Conditions 4 $21, sets $1, S706 Milled Rumble Strips 4 $145, km $ S730 Supply and Install Breakaway Steel Posts - W150 X 14 3 $40, m $1, S740 Supply and Install Breakaway Steel Posts - W150 X 22 1 $19, m $1, S765 Cluster Frames - Supply and Install 1 $683 1 frames $ S772 Supply and Install Post (100mm X 150mm) 6 $38, posts $ S805 Strong Post W-Beam Guardrail - Supply and Install 4 $176,125 1,194 m $ S815 Cable Barrier - Supply and Install 1 $43, m $ S825 Remove and Dispose of Existing Guardrail 7 $232,529 6,796 m $34.22 S830 Flexible Guide Post/Delineators - Round - Supply and Install 7 $96,734 1,310 posts $73.84 U100 Trenching and Backfilling 4 $75,125 5,015 m $14.98 U105 Secondary Cable - Supply and Install 5 $130,740 6,917 m $18.90 U110 Removal and Salvage of Existing Standards 1 $3,250 6 units $ U115 Removal and Disposal of Existing Light Fixures 3 $22, units $ U120 Cast In Place Concrete Base - Supply and Install 3 $121, units $2, U125 Street Light Standard - Supply and Install 4 $202, units $2, U130 Salvaged Street Light Standard - Install 1 $4,930 6 poles $ U135 Distribution Enclosure - Supply and Install 4 $68,768 6 units $11, X235 Removing Curb 1 $1,800 9 m $ X320 Concrete Curb (all Types) 2 $98,912 1,260 m $78.50 X325 Curb and Gutter (all heights) 1 $139,380 1,000 m $ X346 Rock Rip-Rap - Hand Laid 1 $9, m2 $78.33 X350 Solid Concrete Islands 1 $104, m2 $ X400 Solid Concrete Medians 1 $31, m2 $ X435 Median Asphalt Concrete Surfacing 1 $139, t $ X440 Median Concrete Surfacing 1 $341,582 3,800 m2 $89.89 X510 Cutting of Pavement Edge 5 $90,480 12,410 m $7.29

16 10/26/2015 NORTH CENTRAL REGION, Weighted Unit Price Averages Page 1 of 3 Based on 2015 Construction Prices tendered between August 01, 2014 and September 30, 2015 Item A805 Supply of Aggregate - No Option 3 $126, ,930 t $0.56 B100 Subgrade Excavation 5 $224,223 8,490 m3 $26.41 B152 Granular Fill (Pit-run) - Des. 6 4 $327,493 10,500 t $31.19 B153 Granular Fill - Des. 2 3 $183,333 5,570 t $32.91 B180 Preparing Subgrade Surface (First Layer) 4 $46,437 15,250 m2 $3.05 B282 Granular Base Course - Des. 2 Cl $251,304 8,780 t $28.62 D100 Culverts - Remove and Dispose (C.S.P.) (up to 700 mm dia.) 4 $32, m $ D105 Culverts - Remove and Dispose (C.S.P.) (over 700 mm dia.) 3 $20, m $ D235 Granular Backfill - Culverts 1 $7, t $43.33 D405 Culverts - Supply and Install (500 mm dia. C.S.P.) 1 $10, m $ D410 Culverts - Supply and Install (600 mm dia. C.S.P.) 3 $79, m $ D425 Culverts - Supply and Install (800 mm dia. C.S.P.) 3 $37, m $ D430 Culverts - Supply and Install (900 mm dia. C.S.P.) 2 $34, m $ D510 Smoothwall Steel Pipe Culvert - Supply and Auger (600 mm dia 2 $338, m $1, D540 Grouting of Abandoned Culverts 4 $181, m3 $ D607 Filter Material 1 $30, m3 $ D615 Perforated Pipe 1 $29, m $ D732 Adjust Manholes 1 $1,167 1 units $1, D733 Adjust Catch Basins 1 $1,083 1 units $1, D795 Leads - Supply and Install 1 $8, m $ D850 Culvert Liner - Supply and Install (S.W.S.P.) ( mm) 1 $44, m $ E435 Geotextile Fence Barrier - Ditch 1 $ m $28.33 E454 Geotextile for Materials Separation - Supply and Install 1 $4, m2 $5.47 E456 Geotextile for Stabilization - Supply and Install 3 $15,342 2,950 m2 $5.20 E505 Soil Covering (Medium Flow) 1 $11, m2 $13.33 E510 Soil Covering (High Flow) 3 $25,410 2,705 m2 $9.39 E607 Drill Seeding 1 $1,000 1 ha $1, F500 Heavy Rock RipRap (Class 1) 3 $118, m3 $ F515 Heavy Rock RipRap (Class 2) 2 $52, m3 $ F755 Surface Removal 2 $195,692 11,813 m2 $16.57 F760 Partial Depth Repair 2 $167, m2 $1, F765 Full Depth Repair 1 $15, m2 $1, F770 Sandblasting (Deck Surface) 1 $34,832 1,493 m2 $23.33 F775 Deck Overlay Concrete 1 $125, m3 $1, F776 Placement Deck Overlay Concrete 1 $121,426 1,493 m2 $81.33 F834 Concrete - Class C 1 $344, m3 $2, F841 Concrete - Class HPC 1 $96, m3 $1, F850 Plain Reinforcing Steel - Supply 1 $3,292 1,799 kg $1.83 F854 Reinforcing Steel - Place 2 $34,837 17,920 kg $1.94 F980 Asphalt Concrete Pavement - Mix Type H2 ( A) 2 $363,399 1,239 t $ G100 Clearing 1 $0 0 ha $0.00 G225 Common Excavation 1 $58,000 5,800 m3 $10.00 G236 Borrow Excavation - Contractor's Supply 1 $243,000 13,500 m3 $18.00 G270 Sideslope Improvement 4 $1,760, km $97, G300 Topsoil Placement 1 $26,000 13,000 m2 $2.00

17 10/26/2015 NORTH CENTRAL REGION, Weighted Unit Price Averages Page 2 of 3 Based on 2015 Construction Prices tendered between August 01, 2014 and September 30, 2015 Item G320 Topsoil (Supply and Place) 1 $2, m2 $5.17 G452 Remove and Dispose of Existing Fence 1 $0 0 km $0.00 G475 New Fence - Supply and Install - Class B 1 $0 0 km $0.00 M103 Transverse Crack Repair - Mill & Fill 1 $142,476 3,100 m $45.96 Q185 Gravel Surfacing - Des. 4 Cl $25, t $33.00 Q186 Gravel Surfacing - Des. 4 Cl $18, t $23.29 Q510 Asphalt Mix For Others 1 $28, t $56.89 Q560 Cold Milling Asphalt Pavement 2 $514,605 17,043 m3 $30.19 Q565 Cold Milling Asphalt Pavement 2 $702, ,730 m2 $2.49 Q770 Graded Aggregate Seal Coat - Des. 3 Cl. 12.5C 2 $915, ,412 m2 $3.06 Q771 Graded Aggregate Seal Coat - Bridge Decks 2 $18, m2 $19.28 Q785 Chip Seal Coat - Des. 3 Cl. 12.5BW 2 $1,926, ,660 m2 $3.39 Q798 Chip Seal Coat - Bridge Decks 2 $32, m2 $37.34 Q990 Asphalt Concrete Pavement - EPS Mix Type H1 4 $16,664, ,523 t $89.34 Q991 Asphalt Concrete Pavement - EPS Mix Type H2 3 $12,939, ,097 t $79.34 Q992 Asphalt Concrete Pavement - EPS Mix Type M1 5 $14,535, ,620 t $80.48 Q994 Asphalt Concrete Pavement - EPS Mix Type S1 2 $2,198,366 25,100 t $87.58 Q996 Asphalt Concrete Pavement - EPS Mix Type S3 2 $1,747,907 20,900 t $83.63 S261 Concrete Base - Supply and Install 1 $2,967 2 units $1, S271 Supply of Signs, Extruded Aluminum 1 $1,260 3 m2 $ S272 Supply of Signs, Aluminum 3 $2,928 7 m2 $ S273 Supply of Signs, Aluminum - 3M Diamond Grade (VIP) 3 $3, m2 $ S275 Removal and Reinstallation or Disposal of Existing Signs - One 3 $10, signs $ S277 Removal and Reinstallation or Disposal of Existing Signs - Two 3 $1,900 4 signs $ S288 Install Sign - Less than 1 m2 5 $3, signs $87.69 S289 Install Sign - 1 m2 to 3 m2 1 $1,000 2 signs $ S290 Install Sign - over 3 m2 1 $485 1 signs $ S309 Pavement Messages - Gore Area 2 $20, messages $ S310 Pavement Messages - Turn Arrow (Single or Double) 4 $12, messages $ S315 Pavement Messages - Stop Bar 5 $3, messages $ S326 Pavement Messages - Railway Crossing 1 $1,433 2 messages $ S327 Pavement Messages - Pedestrian Crossing 1 $518 2 messages $ S341 Durable Pavement Messages - Turn or Straight Arrows (Single 3 $26, messages $ S342 Durable Pavement Messages - Stop Bar 3 $40, messages $ S344 Durable Pavement Messages - Stop Ahead 1 $867 1 messages $ S346 Durable Pavement Messages - Pedestrian Crossing 1 $9,900 6 messages $1, S350 Roadway Lines - Supplying Paint and Painting (Directional Divid 7 $107, km $ S351 Roadway Lines - Supplying Paint and Painting (Lane Dividing a 2 $62, km $ S352 Roadway Lines - Supplying Paint and Painting (Lane Dividing L 4 $8, km $ S360 Intersection Lines - Supplying Paint and Painting 8 $11, intersection $ S370 Interchange Lines - Supplying Paint and Painting 1 $11,177 3 interchange $3, S405 Underground Electrical Conduit - Supply and Install - Pushed C 1 $4, m $ S700 Milled Rumble Strips for Stop Conditions 1 $2,500 1 sets $2, S706 Milled Rumble Strips 5 $149, km $ S730 Supply and Install Breakaway Steel Posts - W150 X 14 1 $2,030 2 m $1,015.00

18 10/26/2015 NORTH CENTRAL REGION, Weighted Unit Price Averages Page 3 of 3 Based on 2015 Construction Prices tendered between August 01, 2014 and September 30, 2015 Item S772 Supply and Install Post (100mm X 150mm) 4 $8, posts $ S805 Strong Post W-Beam Guardrail - Supply and Install 3 $333,824 2,204 m $ S815 Cable Barrier - Supply and Install 2 $1,070,000 10,051 m $ S820 Remove, Salvage and Reinstall Existing Guardrail 2 $111, m $ S822 Supply of Guardrail Posts 1 $24, posts $ S825 Remove and Dispose of Existing Guardrail 3 $321,623 14,187 m $22.67 S830 Flexible Guide Post/Delineators - Round - Supply and Install 6 $64, posts $98.28 U100 Trenching and Backfilling 1 $4, m $30.93 U105 Secondary Cable - Supply and Install 1 $2, m $11.64 U125 Street Light Standard - Supply and Install 1 $8,882 3 units $2, U135 Distribution Enclosure - Supply and Install 1 $10,028 1 units $10, X215 Removing Curb and Gutter 1 $75, m $ X220 Removing Concrete Surface 1 $1,333 5 m2 $ X225 Removing Manhole 1 $4,667 1 units $4, X230 Removing Catch Basin 1 $17,333 4 units $4, X325 Curb and Gutter (all heights) 1 $65, m $ X415 Granular Fill for Medians 1 $33, t $52.42 X435 Median Asphalt Concrete Surfacing 1 $54, t $ X440 Median Concrete Surfacing 1 $1,023 5 m2 $ X510 Cutting of Pavement Edge 3 $16,704 1,780 m $9.38

19 10/26/2015 PEACE REGION, Weighted Unit Price Averages Page 1 of 3 Based on 2015 Construction Prices tendered between August 01, 2014 and September 30, 2015 Item A805 Supply of Aggregate - No Option 3 $188,190 13,572 t $13.87 B100 Subgrade Excavation 6 $205,648 3,540 m3 $58.09 B152 Granular Fill (Pit-run) - Des. 6 2 $58,920 1,440 t $40.92 B153 Granular Fill - Des. 2 5 $184,296 4,150 t $44.41 B180 Preparing Subgrade Surface (First Layer) 7 $478, ,000 m2 $1.74 B181 Preparing Subgrade Surface (Second Layer) 1 $77,550 55,000 m2 $1.41 B282 Granular Base Course - Des. 2 Cl $4,673, ,816 t $23.51 C225 Erosion Control Blanket 1 $3, m2 $3.92 D100 Culverts - Remove and Dispose (C.S.P.) (up to 700 mm dia.) 6 $63, m $ D105 Culverts - Remove and Dispose (C.S.P.) (over 700 mm dia.) 5 $16, m $ D200 Granular Backfill - Culverts 1 $ m3 $41.67 D235 Granular Backfill - Culverts 2 $5, t $34.20 D410 Culverts - Supply and Install (600 mm dia. C.S.P.) 5 $190, m $ D425 Culverts - Supply and Install (800 mm dia. C.S.P.) 3 $99, m $ D430 Culverts - Supply and Install (900 mm dia. C.S.P.) 2 $16, m $ D435 Culverts - Supply and Install (1200 mm dia. C.S.P.) 2 $30, m $ D500 Smoothwall Steel Pipe Culvert - Supply and Auger (750 mm dia 1 $49, m $1, D510 Smoothwall Steel Pipe Culvert - Supply and Auger (600 mm dia 1 $26, m $ D520 Smoothwall Steel Pipe Culvert - Supply and Auger (800 mm dia 1 $230, m $ D525 Smoothwall Steel Pipe Culvert - Supply and Auger (900 mm dia 2 $258, m $1, D540 Grouting of Abandoned Culverts 4 $206, m3 $ D615 Perforated Pipe 1 $5, m $76.67 E435 Geotextile Fence Barrier - Ditch 5 $23,328 1,395 m $16.72 E452 Geotextile - Nonwoven (Supply and Install) 3 $5, m2 $6.21 E454 Geotextile for Materials Separation - Supply and Install 1 $8,535 1,500 m2 $5.69 E505 Soil Covering (Medium Flow) 2 $18,825 1,855 m2 $10.15 E510 Soil Covering (High Flow) 4 $35,211 2,920 m2 $12.06 E515 Synthetic Permeable Ditch Barrier 3 $22, m $23.56 E608 Broad-Cast Seeding 5 $12, ha $1, E610 Slope Texturing 1 $5,600 8,000 m2 $0.70 F200 Backfill - Pit Run Granular - Des. 6 Cl $32, m3 $ F500 Heavy Rock RipRap (Class 1) 7 $419,176 1,793 m3 $ F515 Heavy Rock RipRap (Class 2) 1 $23, m3 $ F755 Surface Removal 1 $58, m2 $ F760 Partial Depth Repair 1 $20, m2 $ F765 Full Depth Repair 1 $7,830 5 m2 $1, F770 Sandblasting (Deck Surface) 1 $11, m2 $22.28 F775 Deck Overlay Concrete 1 $126, m3 $2, F776 Placement Deck Overlay Concrete 1 $53, m2 $ F812 Supply of Piling - H-Pile 2 $63, m $ F814 Supply of Piling - Pipe Pile 2 $88, m $ F816 Pile Set-up 4 $282, piles $4, F818 Pile Driving 4 $87, m $95.39 F822 Pile Concrete 4 $1,274,404 3,434 m3 $ F824 Drill Rig Set-up 3 $209, piles $1,516.74

20 10/26/2015 PEACE REGION, Weighted Unit Price Averages Page 2 of 3 Based on 2015 Construction Prices tendered between August 01, 2014 and September 30, 2015 Item F826 Pile Installation 2 $630,932 2,955 m $ F834 Concrete - Class C 4 $695, m3 $1, F841 Concrete - Class HPC 4 $643, m3 $2, F850 Plain Reinforcing Steel - Supply 5 $650, ,088 kg $1.61 F854 Reinforcing Steel - Place 5 $532, ,435 kg $1.17 F974 Deck Waterproofing 2 $105,961 1,281 m2 $82.72 F980 Asphalt Concrete Pavement - Mix Type H2 ( A) 2 $97, t $ G100 Clearing 3 $20,433 2 ha $10, G220 Channel Excavation 5 $6, m3 $9.64 G225 Common Excavation 5 $736,970 90,417 m3 $8.15 G230 Borrow Topsoil Excavation 1 $12, m3 $12.75 G236 Borrow Excavation - Contractor's Supply 3 $708,644 48,290 m3 $14.67 G248 Common and/or Borrow Excavation Loaded to Trucks 2 $424,373 24,550 m3 $17.29 G270 Sideslope Improvement 2 $199,750 4 km $53, G300 Topsoil Placement 5 $150, ,180 m2 $1.46 G452 Remove and Dispose of Existing Fence 1 $0 0 km $0.00 G475 New Fence - Supply and Install - Class B 1 $0 0 km $0.00 M102 Crack Repair - Spray Patch 2 $567,555 93,500 m $6.07 Q185 Gravel Surfacing - Des. 4 Cl $13, t $27.41 Q186 Gravel Surfacing - Des. 4 Cl $43,192 1,170 t $36.92 Q510 Asphalt Mix For Others 5 $375,106 5,525 t $67.89 Q565 Cold Milling Asphalt Pavement 7 $1,103, ,921 m2 $2.40 Q770 Graded Aggregate Seal Coat - Des. 3 Cl. 12.5C 1 $1,730, ,419 m2 $3.86 Q771 Graded Aggregate Seal Coat - Bridge Decks 1 $61,266 2,839 m2 $21.58 Q785 Chip Seal Coat - Des. 3 Cl. 12.5BW 1 $2,585, ,671 m2 $4.20 Q798 Chip Seal Coat - Bridge Decks 1 $82,957 3,386 m2 $24.50 Q990 Asphalt Concrete Pavement - EPS Mix Type H1 1 $6,473,447 87,550 t $73.94 Q991 Asphalt Concrete Pavement - EPS Mix Type H2 5 $9,498, ,350 t $92.80 Q992 Asphalt Concrete Pavement - EPS Mix Type M1 6 $33,409, ,465 t $82.20 Q993 Asphalt Concrete Pavement - EPS Mix Type L1 1 $2,554,902 24,300 t $ Q994 Asphalt Concrete Pavement - EPS Mix Type S1 3 $3,635,176 40,000 t $90.88 Q996 Asphalt Concrete Pavement - EPS Mix Type S3 1 $7,009, ,600 t $68.99 S261 Concrete Base - Supply and Install 2 $9,020 8 units $1, S270 Supply of Signs, 3/4" Plywood 3 $5, m2 $ S271 Supply of Signs, Extruded Aluminum 3 $12, m2 $ S272 Supply of Signs, Aluminum 6 $12, m2 $ S273 Supply of Signs, Aluminum - 3M Diamond Grade (VIP) 7 $27, m2 $ S275 Removal and Reinstallation or Disposal of Existing Signs - One 8 $43, signs $ S277 Removal and Reinstallation or Disposal of Existing Signs - Two 5 $7, signs $ S288 Install Sign - Less than 1 m2 9 $22, signs $85.87 S289 Install Sign - 1 m2 to 3 m2 5 $4, signs $ S290 Install Sign - over 3 m2 2 $3,850 5 signs $ S292 Remove and Dispose - Breakaway Steel Posts 1 $1,200 4 posts $ S309 Pavement Messages - Gore Area 1 $9,042 7 messages $1, S310 Pavement Messages - Turn Arrow (Single or Double) 3 $6, messages $174.17

Permeable Pavement Construction Guide

Permeable Pavement Construction Guide Permeable Pavement Construction Guide Permeable pavement at Olympic Park, Waitakere Final Construction result What are permeable pavements? Permeable pavements are hard surface paving systems that reduce

More information

FDOT DBE CERTIFICATION NAICS CODE GUIDE WITH CAP SIZES

FDOT DBE CERTIFICATION NAICS CODE GUIDE WITH CAP SIZES NAICS CODE Highway, Street, and Bridge Construction SIZE CAP ($ MIL) 237310 Asphalt Roadway (includes 300, 320, 327, 330, 334, 336, 337, 338) Application of prime and tack coats, leveling surfaces and

More information

SECTION 02530 STORM DRAINAGE STRUCTURES. 1. Trench excavation, backfill, and compaction; Section 02250.

SECTION 02530 STORM DRAINAGE STRUCTURES. 1. Trench excavation, backfill, and compaction; Section 02250. 02530-1 of 5 SECTION 02530 STORM DRAINAGE STRUCTURES 02530.01 GENERAL A. Description Storm drainage structure construction shall include, but not necessarily be limited to, furnishing and installing or

More information

DESCRIPTION OF WORK:

DESCRIPTION OF WORK: DEPARTMENT OF PUBLIC WORKS COUNTY OF HENRICO P.O. BOX 27032 RICHMOND, VIRGINIA 23273 PERMIT NO. One (1) copy of application and four (4) copies of plans are hereby made to the Director of Public Works

More information

NOTICE TO CONTRACTORS. CALL ORDER 700 FEDERAL PROJECT NO. STPD-6-2(122) LOCATION: US-34/US-6,CULBERTSON-McCOOK COUNTIES: HITCHCOCK RED WILLOW

NOTICE TO CONTRACTORS. CALL ORDER 700 FEDERAL PROJECT NO. STPD-6-2(122) LOCATION: US-34/US-6,CULBERTSON-McCOOK COUNTIES: HITCHCOCK RED WILLOW NOTICE TO CONTRACTORS CALL ORDER 700 FEDERAL PROJECT NO. STPD-6-2(122) LOCATION: US-34/US-6,CULBERTSON-McCOOK COUNTIES: HITCHCOCK RED WILLOW The Nebraska Department of Roads will receive sealed bids in

More information

How To Build A Road In A Townhouse

How To Build A Road In A Townhouse FDOT DBE CERTIFICATION SPECIALTY/ SHEET WITH CAP SIZES Highway, Street, and Bridge Construction SIZE CAP ($ MIL) 237310 Asphalt Roadway $ 22.41 Application of prime and tack coats, leveling surfaces and

More information

Stormwater/Wetland Pond Construction Inspection Checklist

Stormwater/Wetland Pond Construction Inspection Checklist : Construction Inspection ChecklistsTools Stormwater/Wetland Pond Construction Inspection Checklist Project: Location: Site Status: Date: Time: Inspector: SATISFACTORY/ UNSATISFACTORY COMMENTS Pre-Construction/Materials

More information

VILLAGE OF LOMBARD CONTRACT DOCUMENT NUMBER ST-09-06 BID PROPOSAL

VILLAGE OF LOMBARD CONTRACT DOCUMENT NUMBER ST-09-06 BID PROPOSAL VILLAGE OF LOMBARD CONTRACT DOCUMENT NUMBER ST-09-06 BID PROPOSAL I/We hereby agree to furnish to the Village of Lombard all necessary materials, equipment, and labor, to complete the North Industrial

More information

FY08 SEWER POINT REPAIRS BID TABULATION

FY08 SEWER POINT REPAIRS BID TABULATION 6-07-831 Page 1 of 12 1 FOR CLEANING AND TELEVISING EXISTING SEWERS, AS SPECIFIED, ANY REQUIRED CLEANING, ANY LOCATION, ANY LENGTH OF SEWER, COMPLETE IN PLACE, FOR VARIOUS PIPE DIAMETERS. A. EXISTING "

More information

FY11 Sanitary Sewer Main Rehab and Point Repair Bid Tabulation

FY11 Sanitary Sewer Main Rehab and Point Repair Bid Tabulation 644-10-569 Page 1 of 9 1 FOR CLEANING AND TELEVISING EXISTING SEWERS, AS SPECIFIED, ANY REQUIRED CLEANING, ANY LOCATION, ANY LENGTH OF SEWER, COMPLETE IN PLACE, FOR VARIOUS PIPE DIAMETERS. A. EXISTING

More information

CW 3110 SUB-GRADE, SUB-BASE AND BASE COURSE CONSTRUCTION TABLE OF CONTENTS

CW 3110 SUB-GRADE, SUB-BASE AND BASE COURSE CONSTRUCTION TABLE OF CONTENTS December 2014 CW 3110 SUB-GRADE, SUB-BASE AND BASE COURSE CONSTRUCTION TABLE OF CONTENTS 1. DESCRIPTION... 1 1.1 General... 1 1.2 Definitions... 1 1.3 Referenced Standard Construction Specifications...

More information

The Manitoba Water Services Board SECTION 022180 Standard Construction Specifications PIPE EXCAVATION, BEDDING AND BACKFILL Page 1 of 11

The Manitoba Water Services Board SECTION 022180 Standard Construction Specifications PIPE EXCAVATION, BEDDING AND BACKFILL Page 1 of 11 Page 1 of 11 Part 1 General 1.1 DESCRIPTION OF WORK.1 The work described herein shall consist of the excavation of trenches (or excavation of tunnels); the supply and placing of bedding and backfill materials;

More information

3. Amend the following: Item 410 Traffic Compacted Surface, Type C to Item 446 Cold Patch.

3. Amend the following: Item 410 Traffic Compacted Surface, Type C to Item 446 Cold Patch. To Prospective Bidders: CITY OF TOLEDO, OHIO PARKSIDE AREA SSO ELIMINATION PHASE 2 GRAVITY RELIEF SEWER NO. 2011 Addendum No. 2 December 8, 2011 Information disclosed and/or questions raised since issuing

More information

SEDIMENT/STORMWATER MANAGEMENT BASIN CONSTRUCTION CHECKLIST

SEDIMENT/STORMWATER MANAGEMENT BASIN CONSTRUCTION CHECKLIST SEDIMENT/STORMWATER MANAGEMENT BASIN CONSTRUCTION CHECKLIST For permanent structures per Delaware SCS Pond Code 378 and Delaware Sediment and Stormwater Regulations KEY PROJECT INFORMATION Item meets standard

More information

Helen Mercury Mine EE/CA OPINION OF PROBABLE COST

Helen Mercury Mine EE/CA OPINION OF PROBABLE COST G Cost Estimates Helen Mercury Mine EE/CA Alternative 2: Limited Action 3 Minor Road Improvements 4 Clear & Grub diversion channel areas 5 Surveying 6 Cleanup & Demobilization 7 Pull back of material 8

More information

Construction Specification for Concrete Curb and Concrete Curb and Gutter

Construction Specification for Concrete Curb and Concrete Curb and Gutter Engineering & Construction Services Division Standard Specifications for Road Works TS 3.50 April 2015 for Concrete Curb and Table of Contents TS 3.50.01 SCOPE... 3 TS 3.50.02 REFERENCES... 3 TS 3.50.03

More information

Infrastructure Cost Data

Infrastructure Cost Data Hewitt Estimating Consultants a Division of International Project Estimating Limited Infrastructure Cost Data www.infrastructurecost.com The Chief Estimator Software 150 Couling Crescent, Guelph Ontario,

More information

Underground Injection Control Storm Water Information

Underground Injection Control Storm Water Information Underground Injection Control Storm Water Information Best Management Practices DEQ has reviewed the EPA definition of a subsurface fluid distribution system and the infiltration design best management

More information

Section 2100-Trenching and Tunneling

Section 2100-Trenching and Tunneling SECTION 5200 - STORM SEWER PART 1 - GENERAL 1.01 SCOPE: This Section covers installation of storm sewer mains and culverts. Topics include permits and fees, trench widths, pipe laying, bedding, initial

More information

UNIT PRICE LIST January 2009

UNIT PRICE LIST January 2009 UNIT PRICE LIST January 2009 1 INTRODUCTION The purpose of the Unit Price List is to provide a resource for the preparation of cost estimates for subdivisions and permit projects and should be used only

More information

Catch Basin Rehabilitation Road Commission for Oakland County, Michigan

Catch Basin Rehabilitation Road Commission for Oakland County, Michigan Date: Location: September 14, 2011, 9:45a.m. start East side of street in front of 4656 Maura Lane, West Bloomfield Participants: Oakland County Michelle Belanger, Rick Hall, Matt Mountain, Gary Flounory,

More information

VDOT 2001 Road and Bridge Standards Section 100 - Drainage Items

VDOT 2001 Road and Bridge Standards Section 100 - Drainage Items VDOT 2001 Road and Bridge s Page Title EW-1 EW-1A 101.01 Endwall for Pipe Culverts 12" - 36" Circular and 23" X 14" - 53" X 34" Elliptical Pipes EW-1PC EW-1APC 101.02 Precast Endwall for Pipe Culverts

More information

Section 2 Specification 2.18 Concrete and/or Corrugated Steel Storm Sewer TABLE OF CONTENTS

Section 2 Specification 2.18 Concrete and/or Corrugated Steel Storm Sewer TABLE OF CONTENTS TABLE OF CONTENTS 2.18 CONCRETE AND/OR CORRUGATED STEEL STORM SEWER... 1 2.18.1 GENERAL... 1 2.18.2 MATERIALS... 1 2.18.2.1 Storm Sewer Pipe... 1 2.18.2.2 Cement Mortar... 1 2.18.2.3 Granular Materials...

More information

TABLE OF CONTENTS. Manhole, Frame, and Cover Installation (includes Drop Manhole) Additional Manhole Depth

TABLE OF CONTENTS. Manhole, Frame, and Cover Installation (includes Drop Manhole) Additional Manhole Depth TABLE OF CONTENTS NO. MP-1 MP-2 MP-3 MP-4 MP-4.01 MP-4.02 MP-4.03 MP-5 MP-5.01 MP-5.02 MP-5.03 MP-5.04 MP-5.05 MP-5.06 MP-5.07 MP-5.08 MP-5.11 MP-5.12 MP-5.13 MP-5.14 MP-5.15 MP-5.16 MP-5.18 MP-5.19 MP-5.20

More information

SECTION III-06 Surfacing Page 1 Revised 3/2/10. See the DESIGN GUIDELINES in Section I-06 for requirements for cross slope of the roadway.

SECTION III-06 Surfacing Page 1 Revised 3/2/10. See the DESIGN GUIDELINES in Section I-06 for requirements for cross slope of the roadway. Page 1 Revised 3/2/10 See the DESIGN GUIDELINES in Section I-06 for requirements for cross slope of the roadway. For New/Reconstruction projects: The cross slope of the driving lanes range from 1.5% to

More information

APPLICATION PROCEDURES FOR PLACEMENT OF UNDERGROUND WATER AND SEWER PIPELINES IN THE VICINITY OF TRANSPORTATION FACILITIES UNDER THE

APPLICATION PROCEDURES FOR PLACEMENT OF UNDERGROUND WATER AND SEWER PIPELINES IN THE VICINITY OF TRANSPORTATION FACILITIES UNDER THE APPLICATION PROCEDURES FOR PLACEMENT OF UNDERGROUND WATER AND SEWER PIPELINES IN THE VICINITY OF TRANSPORTATION FACILITIES UNDER THE JURISDICTION OF ALBERTA TRANSPORTATION 1.0 Application Procedures 2.0

More information

Permeable Pavement Operation & Maintanence Guide

Permeable Pavement Operation & Maintanence Guide Permeable Pavement Operation & Maintanence Guide Permeable pavement at Olympic Park, Waitakere Final Construction result What are permeable pavements? Permeable pavements are hard surface paving systems

More information

City of Shelbyville Site Inspection Checklist

City of Shelbyville Site Inspection Checklist City of Shelbyville Site Inspection Checklist General Information Project Name: KYR10 Permit Number: Date: Project Location: Contractor: Conractor Representative: Inspector's Name: Title: Signature : Weather

More information

Storm Drain Inlet Protection - IP

Storm Drain Inlet Protection - IP Storm Drain Inlet Protection - IP DEFINITION A temporary protective device formed around a storm drain drop inlet to trap sediment. PURPOSE To prevent sediment from entering storm drainage systems, prior

More information

ROADS CONSTRUCTION 2012 STANDARD SPECIFICATIONS

ROADS CONSTRUCTION 2012 STANDARD SPECIFICATIONS ROADS CONSTRUCTION 2012 STANDARD SPECIFICATIONS Transportation Department The City of Calgary, ROADS Construction Division The City of Calgary, 2012. ALL RIGHTS RESERVED. No part of this document may be

More information

No allowance will be made for classification of different types of material encountered.

No allowance will be made for classification of different types of material encountered. PROJECT : Repair/ Maintenance of Flood Control and Drainage Structures Along Butuan City Cagayan de Oro City Iligan City Road LOCATION : San Antonio, Jasaan, Misamis Oriental SUBJECT : General Notes and

More information

Civil. 2. City of Seattle Supplement to the Specification for Road, Bridge and Municipal Construction, most current addition.

Civil. 2. City of Seattle Supplement to the Specification for Road, Bridge and Municipal Construction, most current addition. Design Guide Basis of Design This section applies to the design and installation of earthwork and backfill. Design Criteria No stockpiling of excavation materials is allowed unless the Geotechnical Engineer

More information

FDOT Specifications List

FDOT Specifications List FDOT Specifications List TABLE OF CONTENTS DIVISION II CONSTRUCTION DETAILS CLEARING CONSTRUCTION SITE 110 Clearing and Grubbing... 152 EARTHWORK AND RELATED OPERATIONS 120 Excavation and Embankment...

More information

SECTION 02100 SITE PREPARATION

SECTION 02100 SITE PREPARATION SECTION 02100 SITE PREPARATION PART 1 - GENERAL 1.01 RELATED DOCUMENTS A. Drawings and General Provisions of Contract, including General Conditions and Supplementary Conditions and Division 1 through Division

More information

Section 402. STORM SEWERS

Section 402. STORM SEWERS 402.02 Section 402. STORM SEWERS 402.01. Description. This work consists of constructing storm sewers of the size and class required, including excavation, bedding, and backfill. 402.02. Materials. Provide

More information

SECTION 33 41 13 PUBLIC STORM UTILITY DRAINAGE PIPING

SECTION 33 41 13 PUBLIC STORM UTILITY DRAINAGE PIPING SECTION 33 41 13 PUBLIC STORM PART 1 - GENERAL 1.01 SECTION INCLUDES A. Storm drainage piping, fittings, and accessories at proposed station areas and locations other than under and immediately adjacent

More information

SECTION 02221 SELECTIVE DEMOLITION

SECTION 02221 SELECTIVE DEMOLITION SECTION 02221 PART 1 -GENERAL 1.01 DESCRIPTION This section includes all material, labor, machinery and supervision required to demolish and remove the following items where applicable and as noted on

More information

State of Illinois Department Of Transportation CONSTRUCTION INSPECTOR S CHECKLIST FOR STORM SEWERS

State of Illinois Department Of Transportation CONSTRUCTION INSPECTOR S CHECKLIST FOR STORM SEWERS State of Illinois Department Of Transportation CONSTRUCTION INSPECTOR S CHECKLIST FOR STORM SEWERS While its use is not required, this checklist has been prepared to provide the field inspector a summary

More information

SECTION 02150 REMOVAL OR ABANDONMENT OF EXISTING UTILITIES AND UNDERGROUND STRUCTURES. 1. Trench excavation, backfill, and compaction; Section 02250.

SECTION 02150 REMOVAL OR ABANDONMENT OF EXISTING UTILITIES AND UNDERGROUND STRUCTURES. 1. Trench excavation, backfill, and compaction; Section 02250. 02150-1 of 6 SECTION 02150 REMOVAL OR ABANDONMENT OF EXISTING 02150.01 GENERAL A. Description Removal or abandonment of existing utilities and underground structures shall include, but not necessarily

More information

Vehicle Tracking Pad

Vehicle Tracking Pad Stormwater Quality Best Management Practices Construction Sites s When to use: Where construction vehicles leave active construction areas onto surfaces where runoff is not checked by sediment controls

More information

CITY OF SAN ANTONIO. Issued By: Transportation and Capital Improvements Date Issued: February 10, 2016 ID NO.: 23-01472-05-03

CITY OF SAN ANTONIO. Issued By: Transportation and Capital Improvements Date Issued: February 10, 2016 ID NO.: 23-01472-05-03 CITY OF SAN ANTONIO Issued By: Transportation and Capital Improvements Date Issued: February 10, 2016 ID NO.: 23-01472-05-03 (010) FORMAL INVITATION FOR BIDS (IFB) to CONTRACT 2016-2017 TASK ORDER CONTRACT

More information

The unit costs are based on the trend line of the 3 low bids for the average quantity.

The unit costs are based on the trend line of the 3 low bids for the average quantity. Page 1 of 8 COST ESTIMATE GENERAL INSTRUCTIONS The unit costs are based on the trend line of the 3 low bids for the average quantity. Apply the Unit Costs to ordinary structures. Unit Costs should generally

More information

SECTION 08000 STORM DRAINAGE TABLE OF CONTENTS

SECTION 08000 STORM DRAINAGE TABLE OF CONTENTS SECTION 08000 STORM DRAINAGE 08010 DESIGN A. Location B. Sizing TABLE OF CONTENTS 08020 MATERIALS A. Pipe Materials B. Structure Materials C. Installation D. Inlets and Outlets 08030 INSPECTIONS AND TESTING

More information

Tabulation of Bids. Opened at: Easter Federal Lands Highway Division, Sterling, VA Opened by: Jason Albright Date: 03/04/14

Tabulation of Bids. Opened at: Easter Federal Lands Highway Division, Sterling, VA Opened by: Jason Albright Date: 03/04/14 Solcitation No: DTFH71-14-B-00008 Division: Eastern Federal Lands State: DC County: Federal Land: 1 out of 9 Opened at: Easter Federal Lands Highway Division, Sterling, VA Opened by: Jason Albright Date:

More information

Demo Existing Curb Demo Existing Asphalt Roadway Demo Asphalt Saw Cutting Protection Fence - 4 Snow Fence with T posts

Demo Existing Curb Demo Existing Asphalt Roadway Demo Asphalt Saw Cutting Protection Fence - 4 Snow Fence with T posts SECTION 00300 BID FORM S For additions and deletions to the Contract, the following unit prices shall be applicable for the specific items listed. Unit Prices shall be complete, in place including required

More information

Tobique Employment & Training

Tobique Employment & Training APPENDICES 3 Tobique Employment & Training Flood Mitigation July 30, 2012 Overview This proposal outlines the work required and budget for flood mitigation measures on Tobique First Nation which is required

More information

NRC INSPECTION MANUAL

NRC INSPECTION MANUAL NRC INSPECTION MANUAL INSPECTION PROCEDURE 88001 LLUR ON-SITE CONSTRUCTION PROGRAM APPLICABILITY: 2600, 2801 88001-01 INSPECTION OBJECTIVES 01.01 To determine by direct observation if on-site construction

More information

SECTION 4Aggegate Subbase

SECTION 4Aggegate Subbase The contractor shall moist-cure the completed Lime Treated Subbase for a minimum of days before allowing any traffic on the compacted surface. The contractor shall be responsible for repairing any damages

More information

CHAPTER 17: STORM SEWER STANDARDS. 17.00 Introduction. 17.01 Administration. 17.02 Standards 17.1

CHAPTER 17: STORM SEWER STANDARDS. 17.00 Introduction. 17.01 Administration. 17.02 Standards 17.1 CHAPTER 17: STORM SEWER STANDARDS 17.00 Introduction 17.01 Administration 17.02 Standards 17.1 17.00 INTRODUCTION The purpose of this chapter is to provide guidance for the design and construction of storm

More information

BUSINESS DEVELOPMENT INITIATIVE SMALL BUSINESS PROGRAM GUIDANCE FOR RESERVING CONTRACTS

BUSINESS DEVELOPMENT INITIATIVE SMALL BUSINESS PROGRAM GUIDANCE FOR RESERVING CONTRACTS Construction/Maintenance Contracts and Design/Build Low Bid Contracts 1. Districts are responsible for reviewing their work program and identifying contracts that are good candidates for the Business Development

More information

2006-2008 MHD BRIDGE SECTION WEIGHTED AVERAGE UNIT PRICES GUIDELINES FOR THE USE OF THE WEIGHTED AVERAGE UNIT PRICE TABULATION SHEETS

2006-2008 MHD BRIDGE SECTION WEIGHTED AVERAGE UNIT PRICES GUIDELINES FOR THE USE OF THE WEIGHTED AVERAGE UNIT PRICE TABULATION SHEETS 2006-2008 MHD BRIDGE SECTION WEIGHTED AVERAGE UNIT PRICES GUIDELINES FOR THE USE OF THE WEIGHTED AVERAGE UNIT PRICE TABULATION SHEETS GENERAL 10/16/2008 The listed average unit prices are based on the

More information

SPECIFICATION FOR PIPE SUBSOIL DRAIN CONSTRUCTION

SPECIFICATION FOR PIPE SUBSOIL DRAIN CONSTRUCTION SPECIFICATION FOR PIPE SUBSOIL DRAIN CONSTRUCTION 1. SCOPE Pipe subsoil drains shall be constructed in accordance with this specification and in conformity with the lines, grades and cross-sections shown

More information

PROJECT COST ESTIMATE ASSUMPTIONS AND EXCLUSIONS

PROJECT COST ESTIMATE ASSUMPTIONS AND EXCLUSIONS C PROJECT ESTIMATE ASSUMPTIONS AND EXCLUSIONS In support of the alternatives development process, preliminary cost estimates were prepared for each of the three Candidate Build Alternatives. The cost estimates

More information

Nebraska Department of Roads Drainage and Erosion Control Manual December 2011 Appendix C: Pipe Material Policy Page C-1 PIPE MATERIAL POLICY

Nebraska Department of Roads Drainage and Erosion Control Manual December 2011 Appendix C: Pipe Material Policy Page C-1 PIPE MATERIAL POLICY Appendix C: Pipe Material Policy Page C-1 PIPE MATERIAL POLICY Policy: This policy will replace all previous policies regarding the selection of pipe material for cross drains, drive pipe, drop pipe, storm

More information

Section 600 Incidental Construction

Section 600 Incidental Construction Table of Contents 1. Pipe Culverts... 600-1 A. Endwalls, Inlets, Manholes, and Spring Boxes... 600-5 2. Grade Adjustment of Existing Miscellaneous Structures... 600-8 3. Rebuilt Miscellaneous Structures...

More information

June 2007 CHAPTER 7 - CULVERTS 7.0 CHAPTER 7 - CULVERTS 7.1 GENERAL

June 2007 CHAPTER 7 - CULVERTS 7.0 CHAPTER 7 - CULVERTS 7.1 GENERAL 7.0 7.1 GENERAL For the purpose of this manual, culverts are defined as structures that are completely surrounded by soil and located below the surface of the roadway parallel to the general direction

More information

Mine Plan of Operations Reclamation Bond Checklist

Mine Plan of Operations Reclamation Bond Checklist Mine Plan of Operations Reclamation Bond Checklist NOTE: This checklist is provided to assist the operator in calculating the engineering and environmental costs required to properly stabilize, reclaim,

More information

Table 4.9 Storm Drain Inlet Protetion Applicable for

Table 4.9 Storm Drain Inlet Protetion Applicable for BMP C220: Storm Drain Inlet Protection Purpose To prevent coarse sediment from entering drainage systems prior to permanent stabilization of the disturbed area. Conditions of Use Type of Inlet Protection

More information

FLORIDA DEPARTMENT OF TRANSPORTATION GUIDELINE FOR

FLORIDA DEPARTMENT OF TRANSPORTATION GUIDELINE FOR FLORIDA DEPARTMENT OF TRANSPORTATION GUIDELINE FOR ESTABLISHING CONSTRUCTION CONTRACT DURATION July 2010 DISCLAIMER: The following documentation as a whole was derived from Federal Highway Administration

More information

BUSINESS DEVELOPMENT INITIATIVE SMALL BUSINESS PROGRAM GUIDANCE FOR RESERVING CONTRACTS

BUSINESS DEVELOPMENT INITIATIVE SMALL BUSINESS PROGRAM GUIDANCE FOR RESERVING CONTRACTS Construction/Maintenance Contracts and Design/Build Low Bid Contracts 1. Districts are responsible for reviewing their work program and identifying contracts that are good candidates for the Business Development

More information

Los Angeles County Department Of Public Works. Land Development Division. Bond Calculation Sheets

Los Angeles County Department Of Public Works. Land Development Division. Bond Calculation Sheets Los Angeles County Department Of Public Works Land Development Division Bond Calculation Sheets Effective July 1, 2015 COUNTY OF LOS ANGELES DEPARTMENT OF PUBLIC WORKS LAND DEVELOPMENT DIVISION ROADS COST

More information

A. Structures Quantity Item Price Cost @ $3,500 EA

A. Structures Quantity Item Price Cost @ $3,500 EA PRINCE WILLIAM COUNTY Department of Development Services Land Development Division UNIT PRICE LIST (Performance Bonds, Landscaping Escrows, and Siltation & Erosion Control Escrows) Revised: November 17,

More information

Herbicide Application. Irrigation System (Only) Sanitary System Testing & Inspections

Herbicide Application. Irrigation System (Only) Sanitary System Testing & Inspections NAICS Code Work Description Work Item 115310 - Support Activities for Forestry 221310 Water Supply and Irrigation Systems 221320 - Sewage Treatment Facilities 236118 Residential Remodelers 236220 Commercial

More information

CONSTRUCTION MANAGER S WEEKLY PROGRESS REPORT

CONSTRUCTION MANAGER S WEEKLY PROGRESS REPORT Volkert Field Office 80 M Street SE, Suite 725 Washington, DC 20003 RIVERSMART WASHINGTON - CONSTRUCTION RIVERSMART MACFARLAND, RIVERSMART LAFAYETTE AND GREEN ALLEYS CHEVY CHASE D.C. Contract No.: DCKA-2013-C-0160

More information

BMP-7. A sediment filter or an excavated impounding area around a storm drain drop inlet or curb inlet.

BMP-7. A sediment filter or an excavated impounding area around a storm drain drop inlet or curb inlet. BMP-7 BMP: STORM DRAIN INLET PROTECTION Definition A sediment filter or an excavated impounding area around a storm drain drop inlet or curb inlet. To prevent sediment from entering storm drainage systems

More information

SECTION 13 REPLACEMENT AND CLEANUP 13.01 SCOPE OF WORK

SECTION 13 REPLACEMENT AND CLEANUP 13.01 SCOPE OF WORK 13.01 SCOPE OF WORK Under this item, the Contractor will restore all lawns, trees, gardens, landscape plantings, sidewalks, ramps, trails, fences, commercial signs, water courses and sand, gravel, dirt,

More information

City of Virginia Beach Public Utilities HRPDC Regional Construction Standards, 5 TH Edition Amendments May 19, 2014

City of Virginia Beach Public Utilities HRPDC Regional Construction Standards, 5 TH Edition Amendments May 19, 2014 City of Virginia Beach Public Utilities HRPDC Regional Construction Standards, 5 TH Edition Amendments May 19, 2014 Section Subsection Name Date Modification Division 1 All subsections General Provisions

More information

Safe & Sound Bridge Terminology

Safe & Sound Bridge Terminology Safe & Sound Bridge Terminology Abutment A retaining wall supporting the ends of a bridge, and, in general, retaining or supporting the approach embankment. Approach The part of the bridge that carries

More information

C. Section 014510 TESTING LABORATORY SERVICE.

C. Section 014510 TESTING LABORATORY SERVICE. SECTION 014500 QUALITY CONTROL PART 1 GENERAL 1.01 RELATED REQUIREMENTS A. Drawings and General Provisions of Contract, including General and Special Conditions and other Division 1 Specification Sections,

More information

Division 2 Section 32 14 13.19 Section 02795

Division 2 Section 32 14 13.19 Section 02795 Note: The text must be edited to suit specific project requirements. It should be reviewed by a qualified civil or geotechnical engineer, or landscape architect familiar with the site conditions. Edit

More information

SPECIFICATIONS FOR PRECAST MODULAR BLOCK RETAINING WALL SYSTEM (revised 11/5/13)

SPECIFICATIONS FOR PRECAST MODULAR BLOCK RETAINING WALL SYSTEM (revised 11/5/13) Page 1 of 7 STONE STRONG SYSTEMS SPECIFICATIONS FOR PRECAST MODULAR BLOCK RETAINING WALL SYSTEM (revised ) PART 1: GENERAL 1.01 Description A. Work includes furnishing and installing precast modular blocks

More information

DESIGN AND CONSTRUCTION GUIDELINES AND STANDARDS DIVISION 33 UTILITIES 33 00 00 SITE UTILITIES

DESIGN AND CONSTRUCTION GUIDELINES AND STANDARDS DIVISION 33 UTILITIES 33 00 00 SITE UTILITIES SECTION INCLUDES Domestic Water Fire Water Service Water Well Sanitary Sewer Storm Drains Foundation Drainage RELATED SECTIONS 03 30 00 Concrete 21 00 00 Fire Suppression - Sprinklers 22 00 00 Plumbing

More information

CD i -STREETS- Detail #

CD i -STREETS- Detail # -STREETS- Detail # 3000 Vertical Curb, Gutter and Sidewalk 3010 Low-Profile Curb, Gutter and Sidewalk 3020 Rolled Curb, Gutter and Sidewalk 3030 Separated Sidewalk, Curb & Gutter 3040 Sidewalk Staged Construction

More information

SECTION 31 20 00 EARTH MOVING

SECTION 31 20 00 EARTH MOVING SECTION 31 20 00 PART 1 - GENERAL 1.01 DESCRIPTION A. This Section describes the requirements for excavating, filling, and grading for earthwork at Parking Structure, new exit stair and as required to

More information

PUBLIC WORKS DESIGN, SPECIFICATIONS & PROCEDURES MANUAL LINEAR INFRASTRUCTURE

PUBLIC WORKS DESIGN, SPECIFICATIONS & PROCEDURES MANUAL LINEAR INFRASTRUCTURE REGION OF PEEL PUBLIC WORKS DESIGN, SPECIFICATIONS & PROCEDURES MANUAL LINEAR INFRASTRUCTURE Storm Sewer Design Criteria REVISED July 2009 PUBLIC WORKS STORM SEWER DESIGN CRITERIA TABLE OF CONTENTS 1.0

More information

APPLICATION PROCEDURES FOR PLACEMENT OF UNDERGROUND TELECOMMUNICATION CABLES IN THE VICINITY OF TRANSPORTATION FACILITIES

APPLICATION PROCEDURES FOR PLACEMENT OF UNDERGROUND TELECOMMUNICATION CABLES IN THE VICINITY OF TRANSPORTATION FACILITIES APPLICATION PROCEDURES FOR PLACEMENT OF UNDERGROUND TELECOMMUNICATION CABLES IN THE VICINITY OF TRANSPORTATION FACILITIES UNDER THE JURISDICTION OF ALBERTA TRANSPORTATION 1.0 Application Procedures 2.0

More information

DIVISION 2 - SEWERAGE AND DRAINAGE SECTION 02720 - STORM DRAIN SYSTEMS PART 1 - GENERAL

DIVISION 2 - SEWERAGE AND DRAINAGE SECTION 02720 - STORM DRAIN SYSTEMS PART 1 - GENERAL DIVISION 2 - SEWERAGE AND DRAINAGE SECTION 02720 - STORM DRAIN SYSTEMS PART 1 - GENERAL 1.01 DESCRIPTION A. Furnish and install all storm drains, including manholes, inlets, service lines and other appurtenant

More information

New Road 11.0m Asphalt 23m ROW

New Road 11.0m Asphalt 23m ROW New Road 11.0m Asphalt 23m ROW Granular A - 150 mm sq. m. $5.35 $69.53 Granular B - 300 mm sq. m. $7.35 $95.54 Concrete Curb and Gutter m. $44.67 $89.34 HL3 Asphalt - 40 mm sq. m. $7.66 $84.23 HL 4 or

More information

Developer s/consultants Field Services Guidelines

Developer s/consultants Field Services Guidelines Developer s/consultants Field Services Guidelines 2007 Engineering and Works Department DEVELOPER S/CONSULTANT S FIELD SERVICES GUIDELINES Fourth Electronic Edition February 2007 STATEMENT OF COMPLETION

More information

Advancements in GPR for a Sustainable Tomorrow

Advancements in GPR for a Sustainable Tomorrow Advancements in GPR for a Sustainable Tomorrow Shawn Lapain, BSc. E., EIT Pavement Specialist Applied Research Associates Inc. 5401 Eglinton Avenue West, Suite 105, Toronto, ON, Canada, M9C 5K6 Tel: 416-621-9555,

More information

1. Safety. 2. The Lining Contractor. DEPARTMENT OF AGRICULTURE, AND FOOD Farm Development Service November 2002 S126

1. Safety. 2. The Lining Contractor. DEPARTMENT OF AGRICULTURE, AND FOOD Farm Development Service November 2002 S126 DEPARTMENT OF AGRICULTURE, AND FOOD Farm Development Service November 2002 S126 MINIMUM SPECIFICATION FOR GEOMEMBRANE-LINED SLURRY/EFFLUENT STORES, AND ANCILLARY WORKS This is a minimum specification.

More information

STRUCTURES. 1.1. Excavation and backfill for structures should conform to the topic EXCAVATION AND BACKFILL.

STRUCTURES. 1.1. Excavation and backfill for structures should conform to the topic EXCAVATION AND BACKFILL. STRUCTURES 1. General. Critical structures may impact the integrity of a flood control project in several manners such as the excavation for construction of the structure, the type of foundation, backfill

More information

SE-10 STORM DRAIN INLET PROTECTION. Objectives

SE-10 STORM DRAIN INLET PROTECTION. Objectives STORM DRAIN INLET PROTECTION SE-10 Objectives Erosion Control - EC Sediment Control - SE Tracking Control - TC Wind Erosion Control - WE Non-Storm Water Management - NS Waste and Materials Management -

More information

Land Disturbance, Erosion Control and Stormwater Management Checklist. Walworth County Land Conservation Department

Land Disturbance, Erosion Control and Stormwater Management Checklist. Walworth County Land Conservation Department Land Disturbance, Erosion Control and Stormwater Management Checklist Walworth County Land Conservation Department The following checklist is designed to assist the applicant in complying with the Walworth

More information

SECTION 55 PIPE FOR STORM DRAINS AND CULVERTS (FAA D-701)

SECTION 55 PIPE FOR STORM DRAINS AND CULVERTS (FAA D-701) SECTION 55 PIPE FOR STORM DRAINS AND CULVERTS (FAA D-701) 55-1 GENERAL The Contractor shall perform all work required by the plans for construction of pipe for storm drains, precast polymer trench drains

More information

Local Road Assessment and Improvement Drainage Manual

Local Road Assessment and Improvement Drainage Manual Local Road Assessment and Improvement Drainage Manual Donald Walker, T.I.C. Director, author Lynn Entine, Entine & Associates, editor Susan Kummer, Artifax, design Transportation Information Center University

More information

STORM WATER PROJECT COST ESTIMATES & LOCATION MAPS. Appendix F

STORM WATER PROJECT COST ESTIMATES & LOCATION MAPS. Appendix F STORM WATER PROJECT COST ESTIMATES & LOCATION MAPS Appendix F RIVERDALE CITY CAPITAL FACILITIES PLAN STORM DRAINAGE Engineer's Cost Estimate January 2009 Project Name: 4400 South Street - Piping and Collection

More information

CHAPTER 14: GUARDRAIL and BARRIERS

CHAPTER 14: GUARDRAIL and BARRIERS CHAPTER 14: GUARDRAIL and BARRIERS If you have any questions regarding guardrail, end treatments and/or pay items included in your plan, please contact the Project Design Services Unit or the Design Standards

More information

SECTION 701 CULVERT PIPE, ENTRANCE PIPE, STORM SEWER PIPE, AND EQUIVALENTS

SECTION 701 CULVERT PIPE, ENTRANCE PIPE, STORM SEWER PIPE, AND EQUIVALENTS SECTION 701 CULVERT PIPE, ENTRANCE PIPE, STORM SEWER PIPE, AND EQUIVALENTS 701.01 DESCRIPTION. Furnish and install culvert pipe, entrance pipe, and storm sewer pipe. Use units conforming to the dimensions,

More information

A perforated conduit such as pipe, tubing or tile installed beneath the ground to intercept and convey ground water. or structures.

A perforated conduit such as pipe, tubing or tile installed beneath the ground to intercept and convey ground water. or structures. BMP: SUBSURFACE DRAIN Definition A perforated conduit such as pipe, tubing or tile installed beneath the ground to intercept and convey ground water. PurRoses 1. To prevent sloping soils from becoming

More information

SECTION 02400 - STORM DRAIN SYSTEM

SECTION 02400 - STORM DRAIN SYSTEM SECTION 02400 - STORM DRAIN SYSTEM CONTENTS: Part 1 - General... 1 1.01 Work Included... 1 1.02 Related Requirements... 1 1.03 Reference Standards... 1 1.04 Quality Assurance... 1 1.05 Measurement And

More information

SITE-SPECIFIC BEST MANAGEMENT PRACTICES (SSBMP) PLAN/STORM WATER POLLUTION PREVENTION PLAN (SWPPP) REVIEW CHECKLIST

SITE-SPECIFIC BEST MANAGEMENT PRACTICES (SSBMP) PLAN/STORM WATER POLLUTION PREVENTION PLAN (SWPPP) REVIEW CHECKLIST This checklist may be used by applicants for encroachment permits, and contractors in development of Site Specific Best Management Practice (SSBMP) Plans or Storm Water Pollution Prevention Plans (SWPPP)

More information

CHAPTER 5. Storm Sewer

CHAPTER 5. Storm Sewer CHAPTER 5 Storm Sewer A. Introduction All proposed developments shall have a properly designed and constructed storm water conveyance system. This chapter deals only with the conveyance system. Storm water

More information

Guidelines. Motorcycle and Bicycle Work Zone Safety

Guidelines. Motorcycle and Bicycle Work Zone Safety Guidelines on Motorcycle and Bicycle Work Zone Safety This document describes work zone conditions that can cause safety concerns for motorcyclists and bicyclists. The document offers recommended practices

More information

Chapter 22. Lump Sum Project Guidelines

Chapter 22. Lump Sum Project Guidelines Chapter 22 Lump Sum Project Guidelines 22.1 General...22-1 22.2 Project Selection...22-3 22.3 Plans Preparation...22-5 22.4 Preliminary Estimate...22-7 22.5 Specifications...22-9 22.6 Contracts Administration...22-11

More information

MTA UNIVERSAL STATION PEDESTRIAN BRIDGE Los Angeles, CA. Project Manual and Specification 100% PE SUBMITTAL TABLE OF CONTENTS

MTA UNIVERSAL STATION PEDESTRIAN BRIDGE Los Angeles, CA. Project Manual and Specification 100% PE SUBMITTAL TABLE OF CONTENTS Los Angeles, CA Project Manual and Specification DIVISION 1 GENERAL CONDITIONS 01 01 10 STATEMENT OF WORK 01 11 00 SUMMARY OF THE WORK 01 14 05 METRO (OWNER) - DIRECTED STOPPAGES 01 20 00 PRICE AND PAYMENT

More information

GEOSYNTHETICS ENGINEERING: IN THEORY AND PRACTICE

GEOSYNTHETICS ENGINEERING: IN THEORY AND PRACTICE GEOSYNTHETICS ENGINEERING: IN THEORY AND PRACTICE Prof. J. N. Mandal Department of civil engineering, IIT Bombay, Powai, Mumbai 400076, India. Tel.022-25767328 email: cejnm@civil.iitb.ac.in Module - 4

More information

PLAN VIEW FOR LAKE OR MARSH FRONT VIEW FOR FLOTATION SILT CURTAIN

PLAN VIEW FOR LAKE OR MARSH FRONT VIEW FOR FLOTATION SILT CURTAIN OF WATERWAY PERIMETER CONTROL LESS THAN / THE STREAM/RIVER STEEL FENCE POST ANCHOR TO LAND (TYP.) / DEPTH OF WATER PLOTTED/REVISED:-OCT-0 WIDTH STREAM BANK TEMPORARY ROCK BERM BRIDGE ABUTMENT, CULVERT

More information

CITY ENGINEERS ASSOCIATION OF MINNESOTA

CITY ENGINEERS ASSOCIATION OF MINNESOTA CITY ENGINEERS ASSOCIATION OF MINNESOTA STANDARD SPECIFICATIONS 2600 Trench Excavation and Backfill/Surface Restoration 2611 Water Main and Service Line Installation 2621 Sanitary Sewer and Storm Sewer

More information

OHIO ASPHALT PAVING CONFERENCE

OHIO ASPHALT PAVING CONFERENCE OHIO ASPHALT PAVING CONFERENCE 38 th Annual Conference Wednesday, 2/6/2013 Fawcett Center Campus of The Ohio State University 2400 Olentangy River Road Columbus, Ohio 43210 REHAB STRATEGIES FOR LOCAL

More information