SECTION III DRAINAGE
|
|
|
- Hubert Thornton
- 10 years ago
- Views:
Transcription
1 SECTION III DRAINAGE
2 TOC-III.1 of 5 TABLE OF CONTENTS DRAINAGE FACILITIES No. Title D-1 Standard Underdrains D-2 Longitudinal Underdrain for Flexible Paving D-3 Spring Control Method & Detail D-4 Trench Detail D-5 Temporary Pavement Detail and Crusher Run Stone Payment Quantities D-6 Payment Quantities for Repaving Trenches D-6A Trench Detail for Flowable Fill D-7 Permissible Depth Table Concrete Pipe D-8 Computed Loads on Conduits D-9 Standard Limits of Tamped Fill Over Pipe Culverts D-10 Standard Limits of Tamped Fill Over Box Culverts D-11 Type A-1 Manhole (For Normal Depths) D-12 Type A-2 & A-3 Precast Manhole D-13 Type B Manhole (Shallow) D-14 Type C Manhole 42" & Larger Pipes D-15 Standard Drop Manhole D-16 Heavy Traffic Manhole Frame and Cover D-17 Sidewalk Frame and Cover D-18 Bend Structure Circular Pipe D-19 Bend Structure Elliptical Pipe D-20 Connection Locations to Bend Structures D-21 Type I Junction Chamber Top Slab Reinforcing
3 TOC-III.2 of 5 TABLE OF CONTENTS DRAINAGE FACILITIES No. Title D-22 Standard Brick Y Single & Double D-23 Type A-1 Inlet D-24 Type A-2 Inlet D-25 Type B-1 Inlet D-26 Type B-2 Inlet D-27 Type C Inlet D-28 Type D Inlet D-29 Type E Inlet D-30 Type No. 4 E Grate D-31 Standard Type E & H Inlet Combination Reticular Replacement Grate D-32 Standard Cog Inlets 5', 10', 15' & 20' D-33 Standard Cog Inlets 5' & 15' D-34 Pre-Cast Square and rectangular Cog Inlets 5', 10', 15' & 20' D-34A Details For Pre-Cast Concrete Cog-20 Trough Slabs & Details For Adjustment Collars And Inlet Slabs D-34B Pre-Cast Circular Cog Inlets 5', 10', 15' & 20' D-35 Pre-Cast Square and Rectangular Cog Inlets 5' and 15' D-35A Pre-Cast Circular Cog Inlets 5', 10', 15' & 20' D-35B Alternate Pre-Cast Troughs For Pre-Cast Circular Cog & Cog Inlets D-36 Standard NR Inlet D-37 Standard NRM Inlet
4 TOC-III.3 of 5 TABLE OF CONTENTS DRAINAGE FACILITIES No. Title D-38 Standard NR Inlet Frame & Grate D-39 Standard NR Inlet Frame & Grate D-40 Type S Inlet D-41 Standard Type SD Inlet Single Grate D-42 Double Type S Inlet D-43 Standard Type SDT Inlet Double Grate Tandem D-44 Standard Double WR Inlet D-45 Standard WRM Inlet D-46 Standard Single WR Inlet D-47 S Grate Details D-48 Standard WR Inlet Frame & Grate D-49 Standard WR Inlet Frame & Grate D-50 Yard Type Inlet D-51 Inlet Depression Detail D-52 Typical Infiltration Structure D-52A D-52B Typical Infiltration Structure (From Roof Leaders of Building) Typical Infiltration Structure (Baffel) D-53 Standard Curb Opening Detail Curb Section D-54 Standard Curb Opening Detail Curb & Gutter Section D-55 Type A Headwall Circular Pipe D-56 Modified Type A-1 Headwall (48", 54" & 60") D-57 Modified Type A-1 Headwall (66", 72", 78" & 84")
5 TOC-III.4 of 5 TABLE OF CONTENTS DRAINAGE FACILITIES No. Title D-58 Type A Headwall Metal Pipe Arch D-59 Type A Headwall Elliptical Concrete Pipe D-60 Type B Headwall Circular Pipie D-61 Standard Type C Endwall Round Pipe D-62 Standard Type C Endwall Arch Pipe D-63 Type E Headwall Circular Pipe D-64 Type E Headwall Metal Pipe Arch D-65 Standard Type F Headwall Modification D-66 Standard Type F Headwall Round Pipe D-67 Standard Type F Headwall Arch Pipe D-68 Standard Type H Endwall Round Pipe D-68A Standard Type H Endwall Dimensions and Quantities D-69 Type O Headwall Circular Pipe D-70 Type O Headwall Circular Pipe D-71 Type O Headwall Elliptical Pipe D-72 Type O Headwall Elliptical Pipe D-73 Details of Weepholes For Headwalls D-74 Standard Concrete End Section Round Concrete Pipe D-75 Standard Concrete End Section Round Concrete Pipe D-76 Standard Metal End Section Round Metal Pipe D-77 Standard Metal End Section Round Metal Pipe
6 TOC-III.5 of 5 TABLE OF CONTENTS DRAINAGE FACILITIES No. Title D-78 Standard Connections Metal End Sections D-79 Standard Metal End Section Arch Metal Pipe D-80 Standard Metal End Section Arch Metal Pipe D-81 Cutoff Wall And Outlet Paving D-82 Energy Dissipator D-83 Energy Dissipator Floor D-84 Energy Dissipator Walls D-85 Energy Dissipator Baffle D-86 Energy Dissipator Wing and Backwall D-87 5" concrete Energy Dissipating Gutter D-88 Riser Detail D-89 Water Quality Inlet D-89A Water Quality Inlet D-90 Concrete Cradle Detail
7 III-1 of 99
8 III-2 of 99
9 III-3 of 99
10 III-4 of 99
11 III-5 of 99
12 III-6 of 99
13 III-7 of 99
14 III-8 of 99
15 III-9 of 99
16 III-10 of 99
17 III-11 of 99
18 III-12 of 99
19 III-13 of 99
20 III-14 of 99
21 III-15 of 99
22 III-16 of 99
23 III-17 of 99
24 III-18 of 99
25 III-19 of 99
26 III-20 of 99
27 III-21 of 99
28 III-22 of 99
29 III-23 of 99
30 III-24 of 99
31 III-25 of 99
32 III-26 of 99
33 III-27 of 99
34 III-28 of 99
35 III-29 of 99
36 III-30 of 99
37 III-31 of 99
38 III-32 of 99
39 III-33 of 99
40 III-34 of 99
41 III-35 of 99
42 III-36 of 99
43 III-37 of 99
44 III-38 of 99
45 III-39 of 99
46 III-40 of 99
47 III-41 of 99
48 III-42 of 99
49 III-43 of 99
50 III-44 of 99
51 III-45 of 99
52 III-46 of 99
53 III-47 of 99
54 III-48 of 99
55 III-49 of 99
56 III-50 of 99
57 III-51 of 99
58 III-52 of 99
59 III-53 of 99
60 III-54 of 99
61 III-55 of 99
62 III-56 of 99
63 III-57 of 99
64 III-58 of 99
65 III-59 of 99
66 III-60 of 99
67 III-61 of 99
68 III-62 of 99
69 III-63 of 99
70 III-64 of 99
71 III-65 of 99
72 III-66 of 99
73 III-67 of 99
74 III-68 of 99
75 III-69 of 99
76 III-70 of 99
77 III-71 of 99
78 III-72 of 99
79 III-73 of 99
80 III-74 of 99
81 III-75 of 99
82 III-76 of 99
83 III-77 of 99
84 III-78 of 99
85 III-79 of 99
86 III-80 of 99
87 III-81 of 99
88 III-82 of 99
89 III-83 of 99
90 III-84 of 99
91 III-85 of 99
92 III-86 of 99
93 III-87 of 99
94 III-88 of 99
95 III-89 of 99
96 III-90 of 99
97 III-91 of 99
98 III-92 of 99
99 III-93 of 99
100 III-94 of 99
101 III-95 of 99
102 III-96 of 99
103 III-97 of 99
104 III-98 of 99
105 III-99 of 99
VDOT 2001 Road and Bridge Standards Section 100 - Drainage Items
VDOT 2001 Road and Bridge s Page Title EW-1 EW-1A 101.01 Endwall for Pipe Culverts 12" - 36" Circular and 23" X 14" - 53" X 34" Elliptical Pipes EW-1PC EW-1APC 101.02 Precast Endwall for Pipe Culverts
SECTION 02530 STORM DRAINAGE STRUCTURES. 1. Trench excavation, backfill, and compaction; Section 02250.
02530-1 of 5 SECTION 02530 STORM DRAINAGE STRUCTURES 02530.01 GENERAL A. Description Storm drainage structure construction shall include, but not necessarily be limited to, furnishing and installing or
SECTION 08000 STORM DRAINAGE TABLE OF CONTENTS
SECTION 08000 STORM DRAINAGE 08010 DESIGN A. Location B. Sizing TABLE OF CONTENTS 08020 MATERIALS A. Pipe Materials B. Structure Materials C. Installation D. Inlets and Outlets 08030 INSPECTIONS AND TESTING
SECTION 108 - INLETS 108.1 INLET LOCATIONS
Greene County Design Standards -Adopted April 5, 1999 SECTION 108 - INLETS SECTION 108 - INLETS 108.1 INLET LOCATIONS 108.2 INLET INTERCEPTION CAPACITIES 108.2.1 Clogging Factors 108.3 INTERCEPTION AND
Section 600 Incidental Construction
Table of Contents 1. Pipe Culverts... 600-1 A. Endwalls, Inlets, Manholes, and Spring Boxes... 600-5 2. Grade Adjustment of Existing Miscellaneous Structures... 600-8 3. Rebuilt Miscellaneous Structures...
SECTION 02400 - STORM DRAIN SYSTEM
SECTION 02400 - STORM DRAIN SYSTEM CONTENTS: Part 1 - General... 1 1.01 Work Included... 1 1.02 Related Requirements... 1 1.03 Reference Standards... 1 1.04 Quality Assurance... 1 1.05 Measurement And
Table of Contents. 2015 Con Cast Pipe Price List - Page 1
Table of Contents Conditions of Sale - Pages 2 & 3 Reinforced Concrete Pipe, Caps, and Plugs - Page 4 Scribed Holes & Knockouts - Page 4 Reducers & Increasers - Page 4 Concrete Pipe Approximate Mass &
SECTION 6A STORM DRAIN DESIGN Mar. 2002 S E C T I O N 6A STORM DRAIN - DESIGN
S E C T I O N 6A STORM DRAIN - DESIGN 6A.l Scope 6A.2 Storm Water Quantity 6A.3 Storm Drain Hydraulics 6A.4 Depths 6A.5 Locations 6A.6 Curved Storm Drains 6A.7 Manholes 6A.8 Catch basins 6A.9 Storm Drain
CITY OF VISTA STANDARD DRAWINGS (PRELIMINARY, FOR REVIEW)
CITY OF VISTA STANDARD DRAWINGS (PRELIMINARY, FOR REVIEW) January, 2013 THIS SHEET INTENTIONALLY LEFT BLANK TABLE OF CONTENTS DRAINAGE STRUCTURES DRN-01 Corrugated metal pipe drop inlet DNR-02 Storm Drain
PUBLIC WORKS DESIGN, SPECIFICATIONS & PROCEDURES MANUAL LINEAR INFRASTRUCTURE
REGION OF PEEL PUBLIC WORKS DESIGN, SPECIFICATIONS & PROCEDURES MANUAL LINEAR INFRASTRUCTURE Storm Sewer Design Criteria REVISED July 2009 PUBLIC WORKS STORM SEWER DESIGN CRITERIA TABLE OF CONTENTS 1.0
Stormwater/Wetland Pond Construction Inspection Checklist
: Construction Inspection ChecklistsTools Stormwater/Wetland Pond Construction Inspection Checklist Project: Location: Site Status: Date: Time: Inspector: SATISFACTORY/ UNSATISFACTORY COMMENTS Pre-Construction/Materials
STORM WATER PROJECT COST ESTIMATES & LOCATION MAPS. Appendix F
STORM WATER PROJECT COST ESTIMATES & LOCATION MAPS Appendix F RIVERDALE CITY CAPITAL FACILITIES PLAN STORM DRAINAGE Engineer's Cost Estimate January 2009 Project Name: 4400 South Street - Piping and Collection
CHAPTER 5. Storm Sewer
CHAPTER 5 Storm Sewer A. Introduction All proposed developments shall have a properly designed and constructed storm water conveyance system. This chapter deals only with the conveyance system. Storm water
CHAPTER 17: STORM SEWER STANDARDS. 17.00 Introduction. 17.01 Administration. 17.02 Standards 17.1
CHAPTER 17: STORM SEWER STANDARDS 17.00 Introduction 17.01 Administration 17.02 Standards 17.1 17.00 INTRODUCTION The purpose of this chapter is to provide guidance for the design and construction of storm
FY11 Sanitary Sewer Main Rehab and Point Repair Bid Tabulation
644-10-569 Page 1 of 9 1 FOR CLEANING AND TELEVISING EXISTING SEWERS, AS SPECIFIED, ANY REQUIRED CLEANING, ANY LOCATION, ANY LENGTH OF SEWER, COMPLETE IN PLACE, FOR VARIOUS PIPE DIAMETERS. A. EXISTING
STANDARD SPECIFICATIONS & CONSTRUCTION DETAILS MANUAL SECTION 5 - STORM DRAINAGE. 5.01 Design
SECTION 5 - STORM DRAINAGE 5.01 Design Storm drainage facilities shall be designed in accordance with the goals and guidelines set forth in the Unified Development Ordinance. The goal shall be to collect
SECTION 7- STORM SEWER
SECTION 7- STORM SEWER 7.1. STORM SEWERS.... 7-1 7.2. SUMP DRAINS... 7-3 7.3. CATCH BASINS... 7-3 7.4. MANHOLES... 7-4 7.5. STORM SEWER CALCULATIONS... 7-4 7.6. CULVERTS AND BRIDGES... 7-5 7.7. OPEN CHANNELS...
FY08 SEWER POINT REPAIRS BID TABULATION
6-07-831 Page 1 of 12 1 FOR CLEANING AND TELEVISING EXISTING SEWERS, AS SPECIFIED, ANY REQUIRED CLEANING, ANY LOCATION, ANY LENGTH OF SEWER, COMPLETE IN PLACE, FOR VARIOUS PIPE DIAMETERS. A. EXISTING "
FDOT DBE CERTIFICATION NAICS CODE GUIDE WITH CAP SIZES
NAICS CODE Highway, Street, and Bridge Construction SIZE CAP ($ MIL) 237310 Asphalt Roadway (includes 300, 320, 327, 330, 334, 336, 337, 338) Application of prime and tack coats, leveling surfaces and
How To Build A Road In A Townhouse
FDOT DBE CERTIFICATION SPECIALTY/ SHEET WITH CAP SIZES Highway, Street, and Bridge Construction SIZE CAP ($ MIL) 237310 Asphalt Roadway $ 22.41 Application of prime and tack coats, leveling surfaces and
APPENDIX C INLETS. The application and types of storm drainage inlets are presented in detail in this Appendix.
Storm Drainage 13-C-1 APPENDIX C INLETS 1.0 Introduction The application and types of storm drainage inlets are presented in detail in this Appendix. 2.0 Inlet Locations Inlets are required at locations
SECTION 02630 STORM DRAINAGE SYSTEM
SECTION 02630 PART 1 - GENERAL 1.01 DESCRIPTION A. Section includes specifications for storm drainage systems including modifications and connections to existing storm drainage systems. 1.02 REFERENCE
Drainage DR-701. Materials Field Sampling. Purpose of the Guidance Manual. General DR 701-1
DR-701 Chapter Materials Field Sampling Drainage Subject INLETS INTRODUCTION & STORM SEWERS General Purpose of the Guidance Manual DR 701-1 STORM SEWER DEFINITION KYTC defines a storm sewer as two or more
INDEX STORM DRAINAGE PRE-APPROVED NOTES, DESIGN CRITERIA, & PLANS
INDEX STORM DRAINAGE POLICIES D-1 NOT USED D-2 Small Project Drainage Review Requirements D-3 Targeted and Full Drainage Review Requirements D-4 Prohibited and Allowed Discharges to the Storm Drainage
volume of concrete occupied by the drain pipe in a cast-in-place structure or structure extension.
715.01 430 volume of concrete occupied by the drain pipe in a cast-in-place structure or structure extension. No additional payment will be made for the repair or replacement of existing concrete damaged
SEDIMENT/STORMWATER MANAGEMENT BASIN CONSTRUCTION CHECKLIST
SEDIMENT/STORMWATER MANAGEMENT BASIN CONSTRUCTION CHECKLIST For permanent structures per Delaware SCS Pond Code 378 and Delaware Sediment and Stormwater Regulations KEY PROJECT INFORMATION Item meets standard
Section 2100-Trenching and Tunneling
SECTION 5200 - STORM SEWER PART 1 - GENERAL 1.01 SCOPE: This Section covers installation of storm sewer mains and culverts. Topics include permits and fees, trench widths, pipe laying, bedding, initial
VILLAGE OF LOMBARD CONTRACT DOCUMENT NUMBER ST-09-06 BID PROPOSAL
VILLAGE OF LOMBARD CONTRACT DOCUMENT NUMBER ST-09-06 BID PROPOSAL I/We hereby agree to furnish to the Village of Lombard all necessary materials, equipment, and labor, to complete the North Industrial
City of La Quinta Public Works Department - Storm Drain Plan Review Checklist
Tract or Parcel Project Name PCN Checked By Date City of La Quinta Public Works Department - Storm Drain Plan Review Checklist SUBMITTAL REQUIREMENTS Approved Tentative Tract Map Conditions of Approval
State of Illinois Department Of Transportation CONSTRUCTION INSPECTOR S CHECKLIST FOR STORM SEWERS
State of Illinois Department Of Transportation CONSTRUCTION INSPECTOR S CHECKLIST FOR STORM SEWERS While its use is not required, this checklist has been prepared to provide the field inspector a summary
STORM DRAIN STRUCTURES (G 600)
TABLE OF CONTENTS STORM DRAIN STRUCTURES (G 600) SECTION NO. SUBJECT DATE G 601 Design Responsibility G 602 Structural Criteria " G 610 CONDUITS " G 611 Applications " G 612 Configurations " G 613 Loading
PROJECT COST ESTIMATE ASSUMPTIONS AND EXCLUSIONS
C PROJECT ESTIMATE ASSUMPTIONS AND EXCLUSIONS In support of the alternatives development process, preliminary cost estimates were prepared for each of the three Candidate Build Alternatives. The cost estimates
FDOT Specifications List
FDOT Specifications List TABLE OF CONTENTS DIVISION II CONSTRUCTION DETAILS CLEARING CONSTRUCTION SITE 110 Clearing and Grubbing... 152 EARTHWORK AND RELATED OPERATIONS 120 Excavation and Embankment...
June 2007 CHAPTER 7 - CULVERTS 7.0 CHAPTER 7 - CULVERTS 7.1 GENERAL
7.0 7.1 GENERAL For the purpose of this manual, culverts are defined as structures that are completely surrounded by soil and located below the surface of the roadway parallel to the general direction
SECTION 55 PIPE FOR STORM DRAINS AND CULVERTS (FAA D-701)
SECTION 55 PIPE FOR STORM DRAINS AND CULVERTS (FAA D-701) 55-1 GENERAL The Contractor shall perform all work required by the plans for construction of pipe for storm drains, precast polymer trench drains
Introduction. Contents. General. Materials and workmanship. Diagrams. Other regulations. References
Introduction General This Technical Booklet has been prepared by the Department of the Environment for Northern Ireland and provides for certain methods and standards of building which, if followed, will
CD i -STREETS- Detail #
-STREETS- Detail # 3000 Vertical Curb, Gutter and Sidewalk 3010 Low-Profile Curb, Gutter and Sidewalk 3020 Rolled Curb, Gutter and Sidewalk 3030 Separated Sidewalk, Curb & Gutter 3040 Sidewalk Staged Construction
SECTION 33 41 13 PUBLIC STORM UTILITY DRAINAGE PIPING
SECTION 33 41 13 PUBLIC STORM PART 1 - GENERAL 1.01 SECTION INCLUDES A. Storm drainage piping, fittings, and accessories at proposed station areas and locations other than under and immediately adjacent
Defra s Water Availability and Quality Evidence Programme. COMPARATVE COSTINGS FOR SURFACE WATER SEWERS & SuDS
Defra s Water Availability and Quality Evidence Programme COMPARATVE COSTINGS FOR SURFACE WATER SEWERS & SuDS Caledonian Road Housing, Islington, London. R&D Technical Report Produced: February 2011 Author:
STORM DRAINS CHAPTER 7
CHAPTER 7 Chapter 7 - Storm Drains A storm drain is a drainage system that conveys water or stormwater, consisting of two or more pipes in a series connected by one or more structures. Storm drains collect
CW 2130 - GRAVITY SEWERS TABLE OF CONTENTS
August 2010 CW 2130 - GRAVITY SEWERS TABLE OF CONTENTS 1. DESCRIPTION... 1 1.1 General... 1 1.2 Definitions... 1 1.3 Referenced Standard Construction Specifications... 1 1.4 Referenced Standard Details...
DRAINAGE MANUAL CHAPTER VII STORM DRAINAGE SYSTEMS
TDOT DESIGN DIVISION DRAINAGE MANUAL CHAPTER VII STORM DRAINAGE SYSTEMS August 1, 2012 CHAPTER 7 STORM DRAINAGE SYSTEMS SECTION 7.01 INTRODUCTION 7.01 INTRODUCTION...7-1 SECTION 7.02 DOCUMENTATION PROCEDURES
Design of Bridges. Introduction. 3 rd to 4 th July 2012. Lecture for SPIN Training at the University of Dar es Salaam
Design of Bridges Introduction 3 rd to 4 th July 2012 1 FUNCTION OF A BRIDGE To connect two communities which are separated by streams, river, valley, or gorge, etc. 2 EVOLUTION OF BRIDGES 1. Log Bridge
CHAPTER 5 STORMWATER DRAINAGE SYSTEM DESIGN. Table of Contents SECTION 5.1 STORMWATER DRAINAGE DESIGN OVERVIEW
CHAPTER 5 STORMWATER DRAINAGE SYSTEM DESIGN Table of Contents SECTION 5.1 STORMWATER DRAINAGE DESIGN OVERVIEW 5.1.1 Stormwater Drainage System Design...5-1 5.1.1.1 Introduction...5-1 5.1.1.2 Drainage System
Photographs: Acceptable, Unacceptable, and Unacceptably Repaired Precast Concrete Products
Photographs: Acceptable, Unacceptable, and Unacceptably Repaired Precast Concrete Products A Visual Aid For: Bureau of Materials and Physical Research s (BMPR) Policy Memorandum, Quality Control/Quality
UNIT PRICE LIST January 2009
UNIT PRICE LIST January 2009 1 INTRODUCTION The purpose of the Unit Price List is to provide a resource for the preparation of cost estimates for subdivisions and permit projects and should be used only
Chapter 22. Lump Sum Project Guidelines
Chapter 22 Lump Sum Project Guidelines 22.1 General...22-1 22.2 Project Selection...22-3 22.3 Plans Preparation...22-5 22.4 Preliminary Estimate...22-7 22.5 Specifications...22-9 22.6 Contracts Administration...22-11
MATERIALS DIVISION MEMORANDUM
MATERIALS DIVISION MEMORANDUM GENERAL SUBJECT: Precast Concrete SPECIFIC SUBJECT: Quality Control Plan Review Check list; Approved list Nos. 26 and 34; Precast Repair Manual NUMBER: MD 286-06 DATE: December
Local Road Assessment and Improvement Drainage Manual
Local Road Assessment and Improvement Drainage Manual Donald Walker, T.I.C. Director, author Lynn Entine, Entine & Associates, editor Susan Kummer, Artifax, design Transportation Information Center University
Louisiana Administrative Code Title 51 Part XIII. Sewage Disposal
Louisiana Administrative Code Title 51 Part XIII. Sewage Disposal Regulations Regarding Septic Tank Installations with Field Beds/Absorption Trenches For Individual Residential Installations Chapter 3.
SECTION 02150 REMOVAL OR ABANDONMENT OF EXISTING UTILITIES AND UNDERGROUND STRUCTURES. 1. Trench excavation, backfill, and compaction; Section 02250.
02150-1 of 6 SECTION 02150 REMOVAL OR ABANDONMENT OF EXISTING 02150.01 GENERAL A. Description Removal or abandonment of existing utilities and underground structures shall include, but not necessarily
DESIGN COEFFICIENT TABLES
DESIGN COEFFICIENT TABLES Hazen-Williams Friction Factor (C) Pipe Material Values for C Range Average Value Typical Design Value High/Low Plastic, PVC, Polyethylene 160/150 150-155 150 pipe or tubing Cement
Table 4.9 Storm Drain Inlet Protetion Applicable for
BMP C220: Storm Drain Inlet Protection Purpose To prevent coarse sediment from entering drainage systems prior to permanent stabilization of the disturbed area. Conditions of Use Type of Inlet Protection
2011 HYDRAULICS MANUAL
STATE OF LOUISIANA DEPARTMENT OF TRANSPORTATION AND DEVELOPMENT P.O. Box 94245 Baton Rouge, Louisiana 70804-9245 http://www.dotd.la.gov/ HYDRAULICS MANUAL Hydraulics (225) 379-1306 PREFACE The following
SECTION 724 PIPE CULVERTS
SECTION 724 PIPE CULVERTS 724.1 Description. This work shall consist of providing pipe or pipe arch of the diameter or shape designated, laid upon a firm bed and backfilled as specified. Where appropriate
Los Angeles County Department Of Public Works. Land Development Division. Bond Calculation Sheets
Los Angeles County Department Of Public Works Land Development Division Bond Calculation Sheets Effective July 1, 2015 COUNTY OF LOS ANGELES DEPARTMENT OF PUBLIC WORKS LAND DEVELOPMENT DIVISION ROADS COST
NOTICE TO CONTRACTORS. CALL ORDER 700 FEDERAL PROJECT NO. STPD-6-2(122) LOCATION: US-34/US-6,CULBERTSON-McCOOK COUNTIES: HITCHCOCK RED WILLOW
NOTICE TO CONTRACTORS CALL ORDER 700 FEDERAL PROJECT NO. STPD-6-2(122) LOCATION: US-34/US-6,CULBERTSON-McCOOK COUNTIES: HITCHCOCK RED WILLOW The Nebraska Department of Roads will receive sealed bids in
SECTION 33 41 00 REINFORCED CONCRETE PIPE. A. The following is a list of SPECIFICATIONS, which may be related to this section:
SECTION 33 41 00 REINFORCED CONCRETE PIPE PART 1 GENERAL 1.01 SECTION INCLUDES A. This section includes construction of reinforced concrete pipe for storm drainage, culverts, and sanitary sewer, including
SECTION 701 CULVERT PIPE, ENTRANCE PIPE, STORM SEWER PIPE, AND EQUIVALENTS
SECTION 701 CULVERT PIPE, ENTRANCE PIPE, STORM SEWER PIPE, AND EQUIVALENTS 701.01 DESCRIPTION. Furnish and install culvert pipe, entrance pipe, and storm sewer pipe. Use units conforming to the dimensions,
LS 2540 SEWER LATERALS AND INSPECTION TEES
LS 2540 SEWER LATERALS AND INSPECTION TEES A. Summary B. Submittals C. Site Information D. Sewer Pipe and Fittings E. Lateral Locations F. Lateral Installation G. Inspection Tee Installation H. Removal
550 PIPE CULVERTS, SEWERS AND DRAINS
551.01 550 PIPE CULVERTS, SEWERS AND DRAINS 551 GENERAL 551.01 Description 551.02 Materials 551.03 Excavation 551.04 Protection of Excavation 551.05(a) Bedding for Rigid Pipe 551.05(b) Bedding for Non-Rigid
SECTION 200: STORM SEWER CONSTRUCTION STANDARDS
SECTION 200: STORM SEWER CONSTRUCTION STANDARDS Page No. Description 200-2 201 GENERAL 200-2 201.1 SPECIFICATIONS 200-2 201.2 CONNECTION TO EXISTING FACILITIES 200-3 202 MATERIALS 200-3 202.1 PIPES 200-4
Culvert Rehabilitation A presentation by ms consultants, inc. engineers, architects, planners
Culvert Rehabilitation A presentation by ms consultants, inc. engineers, architects, planners McConnell Road Culvert Greensboro, North Carolina Fisher Park Circle Culvert Greensboro, North Carolina Shady
Specification 6020. Underground Services - Subdivisions. Issue 12
Building Industry Consulting Services (BICS) Specification 6020 Underground Services - Subdivisions Issue 12 Page 1 of 59 Distribution Conduit Are Provided By Others In Accordance With CRTC Tariff 21461,
CITY OF COLTON PUBLIC WORKS/ENGINEERING DEPARTMENT STORM DRAIN PLAN REVIEW CHECKLIST (PROVIDE SEPARATE ON-SITE & OFF-SITE STORM DRAIN PLAN SETS)
CITY OF COLTON PUBLIC WORKS/ENGINEERING DEPARTMENT STORM DRAIN PLAN REVIEW LIST (PROVIDE SEPARATE ON-SITE & OFF-SITE STORM DRAIN PLAN SETS) PROJECT NAME: TRACT, PARCEL MAP OR PROJECT ID NO. PLAN ED BY:
CITY OF VAUGHAN SCHEDULE O LOT GRADING DESIGN FOR RESIDENTIAL DEVELOPMENT
Page 1 CITY OF VAUGHAN SCHEDULE O LOT GRADING DESIGN FOR RESIDENTIAL DEVELOPMENT CIVIC CENTRE 2141 MAJOR MACKENZIE DRIVE MAPLE ONTARIO L6A 1T1 905-832-2281 Page 2 SECTION 1 - GENERAL OBJECTIVES To provide
3. Amend the following: Item 410 Traffic Compacted Surface, Type C to Item 446 Cold Patch.
To Prospective Bidders: CITY OF TOLEDO, OHIO PARKSIDE AREA SSO ELIMINATION PHASE 2 GRAVITY RELIEF SEWER NO. 2011 Addendum No. 2 December 8, 2011 Information disclosed and/or questions raised since issuing
40 ltr Domestic Grease Trap GTO1. 200 ltr Commercial Grease Trap GTO2. Rotational Moulders providing State of the Art Product Design and Developement.
Rotational Moulders providing State of the Art Product Design and Developement. The JFC Grease Trap system is designed: GREASE TRAPS A major problem in the drainage systems of dwelling houses, restaurants,
8-11 Structural Analysis and Fill Height Tables... 42 8-11.1 Pipe Cover... 43 8-11.2 Shallow Cover Installation... 43 8-11.3 Fill Height Tables...
Contents Chapter 8 Pipe Classifications and Materials...1 8-1 Classifications of Pipe... 1 8-1.1 Drain Pipe... 2 8-1.2 Underdrain Pipe... 2 8-1.3 Culvert Pipe... 3 8-1.4 Storm Sewer Pipe... 7 8-1.5 Sanitary
Preliminary Design Report Clay County, Florida Carpet n Drapes Culvert Repair and Rehabilitation July 21, 2006
Clay County, Florida Carpet n Drapes Culvert Repair and Rehabilitation July 21, 2006 1.0 Background and Repair and Rehabilitation Recommendation Clay County has contracted Camp Dresser & McKee Inc. (CDM)
CLARK COUNTY REGIONAL FLOOD CONTROL DISTRICT HYDROLOGIC CRITERIA AND DRAINAGE DESIGN MANUAL SECTION 800 STORM SEWER SYSTEMS TABLE OF CONTENTS
CLARK COUNTY REGIONAL FLOOD CONTROL DISTRICT HYDROLOGIC CRITERIA AND DRAINAGE DESIGN MANUAL SECTION 800 STORM SEWER SYSTEMS TABLE OF CONTENTS 801 INTRODUCTION 803 802 DESIGN PARAMETERS 804 802.1 - Allowable
CONTENTS. Page KERBS ETHEKWINI PRODUCTS ETHEKWINI PRODUCTS WATER CHANNELS WATER CHANNELS / GRILL BLOCKS / CHANNEL DRAIN COVERS
CONTENTS KERBS ETHEKWINI PRODUCTS ETHEKWINI PRODUCTS WATER CHANNELS WATER CHANNELS / GRILL BLOCKS / CHANNEL DRAIN COVERS STADIUM SEATING / ETHEKWINI & TELKOM SPEC PRODUCTS PRECAST PANELS DURBAN BEACHFRONT
CONSOLIDATED EDISON CO. OF NEW YORK, INC. 4 IRVING PLACE NEW YORK, NY 10003 DISTRIBUTION ENGINEERING DEPARTMENT SUBSTATION & EQUIPMENT SECTION
CONSOLIDATED EDISON CO. OF NEW YORK, INC. 4 IRVING PLACE NEW YORK, NY 10003 DISTRIBUTION ENGINEERING DEPARTMENT SUBSTATION & EQUIPMENT SECTION SPECIFICATION EO-5023 REVISION 3 MARCH 2003 REQUIREMENTS FOR
Chapter 5: Drainage, Ditches, and Culverts
Chapter 5: Drainage, Ditches, and Culverts chapter contents Characteristics of Good Drainage 82 Elements of Good Surface Drainage 82 Crown 82 Shoulders 82 Slope 82 Ditches 83 Culverts 83 Inlets 83 Optimal
SUDAS Revision Submittal Form
SUDAS Revision Submittal Form Status Date: As of 3/13/15 Topic: Permeable interlocking pavers Manual: Design & Specs Manual Location: Design Section 5L-1; Spec Section 7080 Requested Revision: Reason for
DESCRIPTION OF WORK:
DEPARTMENT OF PUBLIC WORKS COUNTY OF HENRICO P.O. BOX 27032 RICHMOND, VIRGINIA 23273 PERMIT NO. One (1) copy of application and four (4) copies of plans are hereby made to the Director of Public Works
SECTION 02700 SEWERAGE AND DRAINAGE PART 1 - GENERAL 1.01 RELATED DOCUMENTS
SECTION 02700 SEWERAGE AND DRAINAGE PART 1 - GENERAL 1.01 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including the General and Supplementary Conditions and Division 1 Specification
Chapter 9 Storm Sewers
Contents 1.0 Introduction... 1 2.0 Design Storms... 1 2.1 Minor Event... 1 2.2 Major Event... 1 3.0 Pipe Material and Size... 2 3.1 Pipe Material... 2 3.2 Minimum Pipe Size... 2 3.3 Service Life... 2 3.4
Chapter 9 - Storm Drains
Chapter 9 - Storm Drains TABLE OF CONTENTS CHAPTER 9 - STORM DRAINS... 9-1 9.1 Introduction... 9-1 9.1.1 Objective 9-1 9.2 Design Policy... 9-2 9.2.1 Definition 9-2 9.2.2 General Policies... 9-2 9.3 Design
DIVISION 2 - SEWERAGE AND DRAINAGE SECTION 02720 - STORM DRAIN SYSTEMS PART 1 - GENERAL
DIVISION 2 - SEWERAGE AND DRAINAGE SECTION 02720 - STORM DRAIN SYSTEMS PART 1 - GENERAL 1.01 DESCRIPTION A. Furnish and install all storm drains, including manholes, inlets, service lines and other appurtenant
Fabricated Drainage Products
Fabricated Drainage Products Complete Drainage System Inline Drains are used At the beginning of a drain line Add a new water inlet to an existing drain line using a riser pipe and tee HARCO Surface Drainage
Unit Price Averages Reports
Unit Price Averages Reports 12/7/2015 UNIT PRICE AVERAGES REPORT Disclaimer The information provided in the following Unit Price Averages Report is only for the use of Alberta Infrastructure & Transportation
DESCRIPTION OF STORMWATER STRUCTURAL CONTROLS IN MS4 PERMITS
DESCRIPTION OF STORMWATER STRUCTURAL CONTROLS IN MS4 PERMITS Phase I MS4 permits require continuous updating of the stormwater system inventory owned and operated by the MS4. They also include inspection
8.1.3 General Design Guidelines. The following guidelines shall be used when designing inlets along a street section:
. Introduction Presented in this chapter are the criteria and methodology for design and evaluation of storm sewer inlets located in Town of Castle Rock. The review of all planning submittals will be based
Downspout to storm sewer. Leaky laterals
Flooded street Surface water through MH top Blocked street catch basin Cracked MH or sewer Property line Downspout to storm sewer BREATHERS Leaky laterals Weeping Tile to sanitary or storm sewer BASEMENT
ENGINEERING DESIGN GUIDELINES. for SUBDIVISIONS OR COMMERCIAL DEVELOPMENTS
ENGINEERING DESIGN GUIDELINES for SUBDIVISIONS OR COMMERCIAL DEVELOPMENTS City of Birmingham Department of Planning, Engineering and Permits Engineering Division Office of the City Engineer 2008 TABLE
City of West Linn Public Works Standard Construction Specifications. Table of Contents
City of West Linn Public Works Standard Construction Specifications Table of Contents DIVISION SIX STORM DRAIN TECHNICAL REQUIREMENTS... 1 601 PIPE AND FITTINGS... 1 601.01 Description...1 601.02 Materials...1
City of Shelbyville Site Inspection Checklist
City of Shelbyville Site Inspection Checklist General Information Project Name: KYR10 Permit Number: Date: Project Location: Contractor: Conractor Representative: Inspector's Name: Title: Signature : Weather
8.01 STORM SEWERS, CATCH BASIN LEADS, AND EXTENSIONS
8.01 STORM SEWERS, CATCH BASIN LEADS, AND EXTENSIONS 8.01.01 Description This work shall consist of installing lines of storm sewer pipe of the required inside diameter, and the necessary appurtenances,
Table of Contents. Division 2 Site Work Site Preparation Site Demolition Tree Protection Excavation, Trenching, and Backfilling for Utilities
Division 1 Requirements Design and Construction Quality Campus Master Plans Texas Tech University System Operating and Building Maintenance Project Administration Historically Underutilized Business (HUB)
ITD Pipe Materials Selection & Specification Procedures. July 2011
ITD Pipe Materials Selection & Specification Procedures July 2011 INTRODUCTION: This technical memorandum is written as a guide to the selection of compliant pipe materials and the elimination of non-compliant
Culvert Repair, Materials, and Structural Design 4.4-1
Culvert Repair, Materials, and Structural Design 4.4-1 4.4 Culvert Materials 4.4.1 General Culverts are primarily made with reinforced concrete, corrugated metal, and more recently, solidwall, profile
MONETARY GUARANTY PROCEDURE PACKAGE FREDERICK COUNTY, VIRGINIA
MONETARY GUARANTY PROCEDURE PACKAGE FREDERICK COUNTY, VIRGINIA Department of Planning and Development 107 North Kent Street, Suite 202 Winchester, Virginia 22601 Phone: (540) 665-5651 Fax: (540) 665-6395
X Planning X Quality X Maintenance & Operations
Delaware Department of Transportation Division of Transportation Solutions Design Guidance Memorandum Memorandum Number 1-20 Revised 1. Road Design Manual 2. Bridge Design Manual 3. Utilities Design Manual
1.0 INDEX TO SHEETS URGENT STORM DAMAGE REPAIR AVON PARK AIR FORCE RANGE LOCATION MAP LEGEND LOCATION MAP
5 INDEX TO SHEETS. NOTES AND TYPICAL SECTIONS. H. R. SMITH RD.CULVERT.3 0/5 END BARRIER ACCESS ROAD REPAIR. KISSIMMEE RD. AT MORGAN HOLE CR. ROAD REPAIR.5 RANGE INFRASTRUCTURE REPAIR N 0 000' 3 0,000'
SUFFOLK COUNTY DEPARTMENT OF HEALTH SERVICES TOXIC/HAZARDOUS MATERIAL TRANSFER FACILITY DESIGN GUIDELINES
SUFFOLK COUNTY DEPARTMENT OF HEALTH SERVICES TOXIC/HAZARDOUS MATERIAL TRANSFER FACILITY DESIGN GUIDELINES 1.0 GENERAL 1.1 Article 12 of the Suffolk County Sanitary Code requires that toxic/hazardous material