ES281 COMPANY-SPECIFIC APPENDICES TO ENA ENGINEERING RECOMMENDATION G81 PART 1



Similar documents
Engineering Recommendation G81 - Part 1: Design and Planning

Engineering Recommendation G81 Issue: October 2004

Networks. ESB Networks Ltd Basis of Charges for Connection to the Distribution System. Commercial and Customer Asset Management ESB Networks Ltd.

DOMESTIC ELECTRICAL INSTALLATION CERTIFICATE (Requirements for Electrical Installations BS 7671 IEE Wiring Regulations)

DESCRIPTION DWG DESCRIPTION DWG

Chapter 1. Network Structures

EARTHING AND BONDING AT SECONDARY SUBSTATIONS

Document No Amendment No Approved By Approval Date Review Date NS112 DESIGN STANDARDS FOR INDUSTRIAL AND COMMERCIAL DEVELOPMENTS

Rule Fast Track Analysis for National Life Insurance Co.

Earthing Guidance Notes

Distribution Substation Manual (DSM) Section I - Introduction

Cables, Cable Laying & Accessories Manual

F.C. Chan General Manager, CLP Engineering Ltd., Hong Kong SAR, China

Hyperlinks are Inactive

ELECTRICAL INSULATION TESTING OF HV EQUIPMENT UP TO 33kV

How To Choose A Transformer

Unified requirements for systems with voltages above 1 kv up to 15 kv

EDS LV NETWORK EARTHING DESIGN

For a phase-to-phase voltage between 100 V and 1000 V. The standard ratings are: 400 V V V (at 50 Hz)

Connection of micro-generation to the electricity distribution network

ESB Networks Response. ERGEG Consultation. Voltage Quality Regulation in Europe

How To Monitor Water Penetration In A Cable Screen

The electrical energy produced at the gen

INDUSTRIAL AND COMMERCIAL SERVICE TRANSFORMER & METERING INSTALLATION SPECIFICATION

REQUIREMENTS FOR CUSTOMER-OWNED PRIMARY SERVICES SUPPLIED AT 4 kv TO 35 kv PRIMARY GUIDE

1. Electrical Equipment A) Transformer

Modular Systems, PPMV, 2014 UniPack-G Glass Fiber Reinforced Polyester Compact Secondary Substation

SELECTION OF FINAL CIRCUIT PROTECTION

Comparison of GIS and AIS systems for urban supply networks

Code of Practice Electricity transmission and distribution asset management. February 2009

Simulation of Cable Overloading Problem on a University Distribution System

4 IX D N E P P A Installation methods Current-carrying capacity and voltage drop for cables Reference method IET Wiring Matters

13. Electrical network design methodology and application example

POWER CORPORATION Requirements for Distribution Wires Access

ScottishPower Distribution Cables & Equipment. Metal Theft

Title 20 PUBLIC SERVICE COMMISSION. Subtitle 50 SERVICE SUPPLIED BY ELECTRIC COMPANIES. Chapter 02 Engineering

CODE OF PRACTICE NINE

LV MCC LOW VOLTAGE SWITCHGEAR MOTOR CONTROL CENTRE PRODUCT GUIDE

Respecting the environment

CHECKING AND TESTING ELECTRICAL INSTALLING WORK

NORTHERN IRELAND ELECTRICITY Ltd STATEMENT OF CHARGES FOR USE OF. THE NORTHERN IRELAND ELECTRICITY Ltd ELECTRICITY DISTRIBUTION SYSTEM

Trade of Electrician. Three-phase Distribution Boards And Socket Circuits

LIMITING SHORT-CIRCUIT CURRENTS IN MEDIUM-VOLTAGE APPLICATIONS

A B Brown. This sheet forms part of *Inspection Report Number/*Certificate Number NA/ * EC/ * PIR *Delete as applicable DB

12 SOLAR PHOTOVOLTAIC POWER SUPPLY SYSTEMS by John Ware. PV modules are current-limiting

Standard: Distribution Design Manual Vol 4 Underground Cable Distribution

Inverter / Charger Installation General Operations and AC and DC Connections

Distribution Design Manual

CONNECTING YOU TO SPECIALIST ELECTRICAL SUPPORT services

AMSC s Superconductor Cable Technologies for Electric Utilities

Network Standard Advice No. 1420C 9/6/2011

SURGE PROTECTIVE DEVICES

Short Circuit Current Calculations

POWER NETWORKS Electricity Network Tariffs and Charges and Future Price Trends

Product brochure Multi Functional Switchgear PASS M kv Flexible and compact switchgear solutions for windfarms

CURRENT TRANSFORMERS INSTALLATION GUIDE

Simple Methods for Calculating Short Circuit Current Without a Computer By Dennis McKeown, PE GE Senior System Application Engineer

Unitil Energy Systems, Inc. Interconnection Standards For Inverters Sized Up To 100 kva

Comparative study for cables and busbars

EFFICIENT ELECTRICAL ENERGY TRANSMISSION AND DISTRIBUTION INTERNATIONAL ELECTROTECHNICAL COMMISSION

Electrical Practices for Construction Work

MEDIUM VOLTAGE CE-BF SWITCHBOARDS. UP TO 40.5 kv. CE - BF - C - en - REV

June July 18, of 7

Addendum #2 Contract UK-11-13

Presentation to CIGRE Next Generation Network. Visit of Seine substation

Emirates Aluminium starts up World s first fully integrated power distribution system from ABB

ESB Networks Ltd Statement of Charges

SERVICE - GENERAL Residential, Commercial, Industrial

The Intelligent AX1 Switchgear for Medium Voltage

BL20A0501 Electricity distribution technology. Introduction Jarmo Partanen

PRIMARY SERVICE LINE: The Company's conductors which connect the supply line with a transformer located on private property.

ELECTRICAL INSTALLATION CONDITION REPORT (Requirements for Electrical Installations BS 7671 IEE Wiring Regulations)

N.J.A.C. 14:8-4 NET METERING FOR CLASS I RENEWABLE ENERGY SYSTEMS

APPLICATION FOR AN ELECTRICITY CONNECTION (PROJECTS)

Operational Control of the UKPN Low Voltage Distribution Network for EPN and LPN Regions

SIZING THE PRIMARY POWER SYSTEM FOR RESISTANCE WELDERS

SHE Transmission. 2015_10_30 Transmission Losses Strategy Rev 2.0 October 2015

FAQs-Main switchboard design criteria

STATEMENT OF CHARGING METHODOLOGY FOR USE OF ELECTRICITY NORTH WEST LIMITED S ELECTRICITY DISTRIBUTION NETWORK

EDS KV TRIPLEX CABLE

Current valve. for AC 24 V pulse/pause control of electrical loads up to 30 kw

Service and Installation Rules of New South Wales

Western Australian Distribution Connections Manual. Document Control

EVALUATION OF ALTERNATIVE BACKUP PROTECTION SCHEMES ON A 66KV DISTRIBUTION NETWORK

3. TYPES OF SERVICE AVAILABLE. 3.1 Scope

Approved Meter Sockets and Cabinets

Electrical Resistance Resistance (R)

MEM10019 Select circuit protection devices by type and rating, fit to switchboards and install earthing

Guidelines on the Short Circuit Current Rating for Industrial Control Panels

SWITCHGEAR SOLUTIONS FOR MISSION CRITICAL APPLICATIONS. Presented by SAI Advanced Power Solutions

chapter8 Testing and commissioning Unit 2 outcome 2

CODE OF PRACTICE FOR THE ELECTRICITY (WIRING) REGULATIONS

UNIVERSITY OF WASHINGTON Facilities Services Design Guide. Electrical. Switchboards. Basis of Design. Design Evaluation

Building Services Engineering Technician

Secondary Unit Substations

3.1.1 Full Type Tests & Routine Tests according to Clause 8 2 & Instructions For Installation, Operation & Maintenance

TECHNICAL BRIEF. Commercial PV in Australia and New Zealand Using the Enphase Microinverter System

Transcription:

ES281 COMPANY-SPECIFIC APPENDICES TO ENA ENGINEERING RECOMMENDATION G81 PART 1 Design and Planning Specification for New Low Voltage Installations for Housing Developments 1. SCOPE This appendix to ENA ER G81 Part 1 covers the design and planning of new low voltage services and mains, and associated high voltage to low voltage substations for the purpose of connecting housing developments to the electricity distribution network of Electricity North West Limited (Electricity North West). (This Part 1 of ES281 provides the information, specific to Electricity North West, required by Appendix B of Part 1 of ENA ER G81.) 2. DESIGN AND PLANNING OF NEW LV NETWORKS FOR THE CONNECTION OF HOUSING DEVELOPMENTS 2.1 General The design of all new works to be adopted by Electricity North West shall comply with EPD279 - Distribution System Design - General Requirements; that of new HV networks with EPD282 - Distribution System Design - 11/6.6kV Network; and that of new LV networks with EPD283 - Distribution System Design - Low Voltage Network. All these EPDs shall be read in conjunction with each other. The design of connections for new housing developments is also governed by ES213 - Third-Party Provided New Connections for Housing Developments; and the provision of service connections of up to 60kVA rating by ES212 - New whole- Current-Metered Connections up to 60kVA. Designers should pay particular attention to these documents, some salient points from which are detailed below. 2.2 Security of Supply All networks and parts of networks, to be adopted by Electricity North West, shall comply with ENA ER P2/6, Security of Supply. This requirement is imposed by a condition of Electricity North West s Distribution Licence. In particular, in the context of housing developments, any load group in excess of 1MW shall have a switched alternative means of connection, available for a first circuit outage. 2.3 HV Network 2.3.1 The design fault level for HV networks shall be 250MVA. This is equivalent to 13.1kA at 11kV or 21.9kA at 6.6kV. ES281Part1 mft.doc Issue 1 02/04/08 DCB ES281 Part 1 Page 1 of 6

2.3.2 The two sizes of HV cable permitted by the Materials Specification are rated as follows: 11kV Triplex cable Maximum Continuous Rating (A) cross-section (mm 2 ) Laid direct In ducts In air 95 245 208 285 300 461 392 580 Aluminium cored cable, having a cross-section of 95mm 2, may be used for any of the following: a) a new connection to or from an overhead line, or where an overhead line forms part of the circuit, between points of isolation, provided that the current rating of the cable does not limit the rating of the circuit; or b) a new connection between a transformer and its local switchgear. However, all other new cables shall have a cross-section of 300mm 2 aluminium. 26/8/09 2.3.3 Most HV circuits within Electricity North West s network operate radially with one or more open points, which provide alternative means of connection. New substations may be tee-connected to underground circuits, provided that: 2.4 Distribution Substations 2.3.3.1 no such tee is connected between a primary substation and the first downstream switching point; 2.3.3.2 no more than one such tee connection is made on any section of underground cable between switching points; 2.3.3.3 any new substation within 200m of the existing HV cable is looped-in rather than tee-connected; and 2.3.3.4 any newly installed or replacement transformer, whose rating exceeds 500kVA, shall be provided with one or more LV back-feeds, capable of relieving that part of the demand on the substation in excess of 500kVA. 2.4.1 Distribution Substations shall be designed in accordance with ES352 - Design of Distribution Substations. 2.4.2 Distribution Substations shall normally be housed in a GRP enclosure, meeting the requirements of ES301 - Distribution Substation Housings; Replacement Roofs and Doors. Alternatively, enclosed brick-built substations are acceptable. 2.4.3 Distribution Substations shall normally be located near the centre of the load group they are intended to connect. Electricity North West may require an alternative location for a substation, in order to enable its use for other purposes. Designers are, therefore, advised to consult the Engineer at an early stage, when locating substations. Any additional cabling costs incurred by such a change in location will be borne by Electricity North West. 2.4.4 The earthing of Distribution substations shall comply with EPD333 - Supply System Earthing. In particular, the HV and LV earthing systems shall not be combined unless the combined resistance to earth is less than 1Ω. ES281Part1 mft.doc Issue 1 02/04/08 DCB ES281 Part 1 Page 2 of 6

2.4.5 A number of different phasing connections are employed within Electricity North West s networks. Transformer windings and HV and LV busbars shall be connected in accordance with local conventions and requirements. Where a new substation is to feed LV network, phasing shall match that of the surrounding network, even if no interconnection facility is to be installed initially. 2.4.6 Any new Distribution Substation shall have facilities for the connection of a mobile generator to the LV distribution board. 2.5 Prospective Short-Circuit Current 2.5.1 For a network fed by a single 1000kVA transformer the maximum PSCC, at the customer s terminals, is not expected to exceed the following values: Three phase = 27kA Single phase = 16kA 2.5.2 Further guidance on the determination of PSCC can be obtained from ENA ER P25/1 for single phase and ENA ER P26 for three phase. 2.6 Protection of LV Networks LV networks and transformers shall be protected in accordance with CP331 - Protection of LV Distributors and Distribution Transformers. In particular: 2.6.1 Designs shall ensure that all LV mains are protected by fuses such that a singlephase to earth or neutral fault will be disconnected in 100s in an underground cable or 10s on an overhead line. 2.6.2 Designs for new distributors shall not include any additional fuses downstream of the substation, eg in a link-box. 2.7 Earth-Loop Impedance 2.8 Losses The earth-loop impedance, as measured at any exit point, shall not exceed the values stated in ENA ER P23/1. 2.8.1 The length of new HV connections to the existing Electricity North West network shall be kept to a minimum, so far as is reasonably practicable. 2.8.2 Distribution transformers shall comply with ES322 - Ground-Mounted Distribution Transformers and, in particular, shall be of low-loss design. 2.8.3 LV networks designed in accordance with the requirements of this ES, in particular 2.6, 2.7 and 2.9.4, can be expected to operate with an acceptable level of loss. However, the length of the LV network shall be kept to a minimum, so far as is reasonably practicable. ES281Part1 mft.doc Issue 1 02/04/08 DCB ES281 Part 1 Page 3 of 6

2.9 Loading of LV Networks 2.9.1 After-Diversity Maximum Demands (ADMD) for new domestic dwellings may be assumed to be as follows: Property Type ADMD per customer (kw) Day Night Small Non-Electric Non-Detached 1.0 0.4 Non-Electric Detached 1.4 0.6 Electric Heating (installed in each of a group of average-sized properties). (This takes account of the large diversity, where electric heating is not subject to a restricted-hour tariff.) See 2.9.2 below regarding high density housing. Restricted-Hour Tariff (where substantial heating load is switched to take advantage of low restricted-hour or off-peak rates) Air conditioning (where installed in each of a group of properties) 3.4 2.4 1.5 0.8 (aggregate installed restrictedhour capacity kw) + 0.5 Taking account of the likely operating regime, it may be appropriate to add a fraction (say 50%) of the installed cooling load to the above daytime ADMD values. 2.9.2 Where electric heating, which is not subject to a restricted-hour tariff is to be used in high-density housing (eg, flats), the ADMD figures given are to be used for all aspects of the electrical design except for the rating of distribution transformers. The ADMD contribution of such housing to the loading of transformers shall be taken as: 0.5(aggregate installed (fixed) space heating (kw) + 3kW water heating). This is to take account of greatly reduced diversity in the event of a cold-start after a prolonged outage. In this context, a transformer shall be taken to be feeding high-density housing, where 50% or more of its demand arises from electrically heated properties, without restricted-hour tariffs. ES281Part1 mft.doc Issue 1 02/04/08 DCB ES281 Part 1 Page 4 of 6

2.9.3 The three sizes of LV cable permitted by the Materials Specification are rated as follows: Aluminium cored, XLPE insulated, copper neutral Maximum Continuous Rating (A) (Waveform) cable cross-section (mm 2 ) Laid direct In ducts In air 95 235 190 230 185 335 275 350 300 435 360 475 2.9.4 The maximum voltage regulation from the LV busbars of a Distribution Substation to any exit point shall not exceed 7%, of which no more than 2% shall be in the service connection. 2.10 Disturbing Loads Where it is known that equipment liable to cause disturbing voltage flicker is to be installed (eg instantaneous showers), distributors shall be designed such that the limits specified in ENA ER P28 are not exceeded. 2.11 Cable Layout 2.11.1 As far as is reasonably practicable, mains cables shall be laid in land adopted or to be adopted by the local authority under the NRSWA; cables shall be positioned in accordance with NJUG publication NJUG Guidelines on the Positioning and Colour Coding of Underground Utilities Apparatus. 2.11.2 All other routes for mains cables shall be secured by means of easements. 2.11.3 Mains cables shall not be laid nor left in position under any building. 2.11.4 Cables laid under carriageways shall be installed in continuous ducts. 2.11.5 As far as is reasonably practicable, mains cables to be adopted by Electricity North West shall be separated from those of other network operators, eg IDNOs. Where, however, it is expedient for Electricity North West s cables and other electricity cables to share the same route, Electricity North West s cables shall not be placed either above or below the other cables, except where cables need to cross each other. 2.12 Service Arrangement 2.12.1 In new housing, service terminations shall preferably be in external meter cabinets. 2.12.2 Looped services are not permitted. 2.12.3 Any service cable laid in private land shall be drawn into a continuous duct between the termination position and the adopted street or service strip. The duct shall take the shortest practicable route, but shall not cross any third-party property. 2.12.4 Each meter point shall have its own means of isolation, by means of a sealable cut-out fuse. ES281Part1 mft.doc Issue 1 02/04/08 DCB ES281 Part 1 Page 5 of 6

2.12.5 Multiple service joints are permitted, connecting a maximum of four services each. In designing for the use of multiple service joints particular care shall be taken to balance the load on the main across the three phases. 2.13 Multiple Occupancy Buildings Connection arrangements for multiple occupancy buildings (flats, office blocks, industrial units etc) shall be in accordance with EPD212 - Supplies to Multi-Occupied Premises. 3. DOCUMENTS REFERENCED Legislation and NJUG New Roads and Street Works Act 1991 National Joint Utilities Group (NJUG) Publication NJUG Guidelines on the Positioning and Colour Coding of Underground Utilities Apparatus Energy Networks Association ER P2/6 - Security of Supply ER P23/1 - Customers Earth Fault Protection for Compliance with the IEE Wiring Regulations for Electrical Installations ER P25/1 - The Short-Circuit Characteristics of Public Electricity Suppliers Low Voltage Distribution Networks and the Co-ordination of Overcurrent Protective Devices on 230V Single-Phase Supplies up to 100A ER P26 - The Estimation of the Maximum Prospective Short-Circuit Current for Three-Phase 415V Supplies ER P28 - Planning Limits for Voltage Fluctuations Caused by Industrial, Commercial and Domestic Equipment in the United Kingdom Note: Electricity North West Electricity North West is not able to supply copies of any of the above documents, but copies may be obtained from the Energy Networks Association. EPD212 - Supplies to Multi-Occupied Premises EPD279 - Distribution System Design - General Requirements EPD282 - Distribution System Design - 11/6.6kV Network EPD283 - Distribution System Design - Low Voltage Network EPD333 - Supply System Earthing CP331 - Protection of LV Distributors and Distribution Transformers ES212 - New whole-current-metered Connections up to 60kVA ES213 - Design Specification for Third-Party Provided New Connections for Housing Developments ES301 - Distribution Substation Housings; Replacement Roofs and Doors ES322 - Ground-Mounted Distribution Transformers ES352 - Design of Distribution Substations 4. KEYWORDS ADMD; connection; design; domestic; ICP; P2/6; service ES281Part1 mft.doc Issue 1 02/04/08 DCB ES281 Part 1 Page 6 of 6