1 APPLICATION FOR AN ELECTRICITY CONNECTION (PROJECTS) Completing this form accurately will help us deal with your application as quickly as possible. Please complete all sections. You can complete this form: Online Download or complete the form at (navigate to Connection Services) it to By post Projects Gateway, UK Power Networks, Metropolitan House, Darkes Lane, Potters Bar, Hertfordshire EN6 1AG Fax: Safety note: before you allow anyone to start digging or building near to any overhead or underground electricity cables, please get a copy of our cable records for your site from our plan provision team on Sometimes there s a charge for this service. Please complete this application form for: Any development requiring more than four connections Any development with a power requirement of more than 70 Any commercial development requiring more than one single or three phase connection The diversion of existing electricity assets, e.g. cables, substations, overhead lines Alterations to an existing electricity connection of more than 70. For enquiries that involve the connection of generation please visit (navigate to Connection Services) to see our application process. This isn t the correct application form if you require: Alterations to your existing electricity connection including bracket moves and earthing up to 70 Up to four new domestic electricity connections Single commercial supplies including temporary builders supplies up to 70 Upgrades up to 70. If any of these apply to your application, please call (select option 3) and ask for a small services application form, or visit (navigate to Connection Services). Any questions? Call Monday to Friday 8.30am to 5pm
2 02 Section A: Your details A1. Details of the person making this application and to whom we will issue a budget estimate or quotation (we will consider you to be the Applicant). The Applicant will also receive any payments due under our guaranteed standards of performance during the estimate and quotation stage of your application. The Applicant must also sign and complete Section I. Title: Name: Company name: Telephone: Mobile: A2. Site address (where the work is taking place) A3. How would you prefer to be contacted by us during the application process? Phone Letter A4. Your authorised representative s details (to allow someone to act on your behalf during this application). If you complete this, we will deal with this person s instructions as if they are your own Contact name: Company name: Relationship to you (e.g. developer, consultant): Telephone: Mobile: Section B: Quotation requirements B1. Did you know you can seek competitive quotations from an Independent Connection Provider for many elements of the work involved in getting an electricity connection? Please indicate if you: Want UK Power Networks to complete all of the work Are intending to use or are acting as an Independent Connection Provider (ICP). Are intending to use or are acting as an Independent Distribution Networks Operator (IDNO). Are intending to self-determine a Point of Connection No Quotation required. (Go to Section C) More information can be found in our helpsheet Did you know you have a choice? found at Independent Connections Provider (ICP) is an accredited company that is entitled to build electricity owned by UK Power Networks Independent Distribution Network Operator (IDNO) an IDNO has a wider scope than an ICP; after building the local network, it will continue to own the local network and provide maintenance and 24 hour fault repairs. B2. Please tick which you require (tick only one box): Budget estimate This is based on a desktop assessment only without any site spe being taken into account. It may vary considerably from a formal connection offer. It is not capable of acceptance and does not secure any network capacity. Quotation This is a connection offer which is made following an assessment of your requirements. It is capable of acceptance and is normally valid for 90 days from the date issued. Please note offer within 90 days of issue. If this is not the case then please request a budget estimate. B3. tion issued by: (we will use the details provided in A1) Letter B4. Have you had a budget estimate or quotation from us before for this site address? Yes No If yes, please state your previous UK Power Networks reference number (this will be a nine digit number starting with 40 or 30)
3 03 Section C: Your requirements C1. What is your required date for the connection(s) to be provided? (we call this the power on date) C2. Does your project require notification under the Construction (Design and Management) (CDM) Regulations 2015? Yes No For guidance on CDM please go to If yes, please provide contact details below for your CDM Coordinator and Principal Contractor: CDM Coordinator Name: Company name: Telephone: Mobile: Principal Contractor Name: Company name: Telephone: Mobile: C3. Please tick which service(s) you require: Office use only (project ref no): New connection Total number of connections required: Please complete C4. Upgrade of an existing connection Existing service capacity: Existing 13-digit Meter Point Administration Number MPAN): (this can be found on your electricity bill and will start with 19, 10 or 12) / kw Please complete C4. Temporary connection Capacity required for the temporary connection single phase three phase Please complete C4. Diversion work (this is an alteration or diversion of electricity cables, overhead lines or substations) Please complete section F. C4. Will any of these connections power any motors or welders? Yes No If yes, please note that you will need to provide further details in Section E
4 04 Section D: Site and load details Depending on your project, there may be a requirement to install a substation on your site. Our design team will discuss this with you in more detail but it would be helpful at this stage if you could indicate a preferred location on a plan (explained in section H). D1. Please complete the section(s) which best match your project: i. Domestic a. Please complete this table: Type of property (e.g. house or flat) No. of bedrooms No. of properties Load required per property b. How will the property be heated? Gas Electric Other If electric, please provide the space or water heating demand per property c. Are landlord connections required? Yes No please complete D2 How many landlord s are required? If you require more than one landlord supply please supply full details in section G Capacity required for the landlord s connection: The landlord s connection is: single phase three phase Please complete D2. ii. Commercial/Industrial a. Please complete this table: Type of property (e.g. office, industrial, warehouse unit) No. of metering points Load required per metering point b. Maximum power required (after diversity): / kw Please complete D2. D2. Will any new street lights be required? Yes No If known, how many? (if yes please mark the proposed location on the plan that you send to us, in section H)
5 05 Section E: Motors/welders or other disturbing loads E1. Some types of load can disturb our electricity network. Please provide details of any air conditioning, fuel or heat pumps, lifts, motors, refrigeration, welders or other industrial machinery. If the electrical characteristics are unknown please refer to the manufacturer or the equipment installer. Please use the following conversions as a guide: 4 amps = 1 kilowatt or 1 kilowatt = 1.1 Type of appliance (e.g. motor, welder, heat pump, wind turbine) Rating of appliance How often will the appliance be started in one hour? Single or three phase? Starting method (Star Delta, Direct On Line, Soft start) Starting current kw amps kw amps kw amps kw amps Section F: Diversion works F1. If applying for diversion work please provide a full description of the work that you propose to carry out. Please detail whether you require the diversion of electricity cables, overhead lines or substations. Please send us detailed plans of your works to allow us to identify the impact on our electricity assets. F2. What is the planned start date for your work?
6 06 Section G: Additional information Please provide any additional information that you think will help us process your application. For example, any details of land ownership, planning constraints, site hazards or areas of contamination. Section H: Checklist of what to send us Before you submit your application, please ensure that you have enclosed the following information which will allow us to process your application as quickly as possible: 1. Plan showing the site location (an example is shown on page 7) 2. Plan showing the site layout (an example is shown on page 7) Section I: Signature of the Applicant The applicant must sign this section (the person named in A1). Signature of applicant: Date: Print name: Acting on behalf of company name (from section A1):
7 07 1. Plan showing the site location Example site location plan What is this? A map showing us where your site is so we can accurately assess your requirements. Station Road What should the map show? the site location in relation to the surrounding area which roads are closest to the site the site boundary Oak Tree Close Where to find one Location plans can be found by using street maps or via internet sites such as: Googlemaps Ordnance Survey Multimap Site boundary New site High Street 2. Plan showing the site layout What is this? A scaled plan showing us the layout of the site and the ground floor layout of any buildings. Please make sure you provide us with an appropriate sized plan. The size we require will depend on the size of your development but it should be no smaller than A3. Example site layout plan Where to find one If you have an architect working on your project, they will be able to provide this. If you haven t an architect please send a detailed location plan showing the details (below). What should the plan show? the layout of the development any footpaths, roads or access routes where you d prefer the electricity cable entering the building your proposed duct and cable route any existing service routes (if known) where you d like the electricity meter positioned (internal or external) the site boundary any buildings that will be demolished proposed location of any new street-lights depending on your project, there may be a requirement to install a substation on your site. Our design team will discuss this with you in more detail but it would be helpful at this stage if you could indicate a preferred location on a plan. Proposed electrical main, service and supply point Proposed electrical main, unmetered supply and street-light position Can I send these documents electronically? Yes, we accept most file types such as PDF, JPG, DWG or GIF.
8 Completing this form accurately will help us deal with your application as quickly as possible. Please complete all sections. You can complete this form: Online Download or complete the form at (navigate to Connection Services) it to By post Projects Gateway, UK Power Networks, Metropolitan House, Darkes Lane, Potters Bar, Hertfordshire EN6 1AG Fax: Any questions? Call Monday to Friday 8.30am to 5pm UK Power Networks (Operations) Limited Registered office: Newington House, 237 Southwark Bridge Road, London SE1 6NP Registered number: registered in England and Wales v2 June CON a
Application for electricity connections Business premises
Electricity Thank you for considering Western Power Distribution for your electricity connections. We have put together these notes to help you fill out your and to ensure we receive all the correct information
Application for electricity connections Business premises. Electricity. Send your completed application form with supporting documentation to:
Electricity Thank you for considering for your electricity connections. We have put together these notes to help you fill out your and to ensure we receive all the correct information for your application
How To Connect To A Power Station In Kennedy Town
ELECTRICITY CONNECTIONS IN LONDON Getting a connection to UK Power Networks London Network Contents Which team will deal with my connection? 3 Information to consider when getting a connection in London
Getting Connected. A guide to how to apply for a New Connection to the Network
Getting Connected A guide to how to apply for a New Connection to the Network About Us SP Energy Networks is part of the ScottishPower Group of companies. We provide power on behalf of supply companies
Power cut. Powering your business is our priority
Power cut Powering your business is our priority Contents 2 Preventing power cuts 3 Who are UK Power Networks 4 Plans for your business in case of a power cut 6 My business has lost money 8 Your rights
All fields marked with an * denote mandatory information which must be completed in order to satisfy minimum information requirements.
n Domestic and Multiple Development Application Form Project Reference For office use only Date Received Time Received All fields marked with an * denote mandatory information which must be completed in
Replacing lead and common supply pipes
Replacing lead and common supply pipes How do I know if I have lead pipes? If your home was built before 1970, there s a chance that your water supply pipe is made from lead. This is the pipe that brings
Your Guide to Household Water Metering
Your Guide to Household Water Metering Introduction It s generally considered that it s fairer to pay for the amount of water you actually use, rather than by a fixed amount. After all, you pay for electricity
Dealing with leaks. Our code of practice: on leakage
Dealing with leaks Our code of practice: on leakage Our code of practice on leakage In this leaflet Here at Northumbrian Water we have a duty to all of our customers and to the environment to promote the
Application for a water connection to a commercial or mixed use development
Application for a water connection to a commercial or mixed use development Providing clean, safe water: It s part of our Blueprint for Yorkshire Your application form for a water connection to a commercial
Internet Application for New Multi-Family Electric Service Builders/Developers Fax to: (800) 351-3853 or call (800) 454-3853 Date Faxed: 1
Internet Application for New Multi-Family Electric Service Builders/Developers Fax to: (800) 351-3853 or call (800) 454-3853 Date Faxed: 1 2 Service address City 3 (Inside city: Yes No) State 4 Complex
Application for the Alteration of a Gas Supply
Application for the Alteration of a Gas Supply SSE Enterprise Utilities is a trading name of SSE Utility Solutions Limited which is part of the SSE Group. The Registered Office of SSE Utility Solutions
BGE Service Application Guidelines Commercial & Industrial Projects
BGE Service Application Guidelines Commercial & Industrial Projects To the Customer Following is important information to assist you in applying for BGE gas and/or electric service and in completing the
ES281 COMPANY-SPECIFIC APPENDICES TO ENA ENGINEERING RECOMMENDATION G81 PART 1
ES281 COMPANY-SPECIFIC APPENDICES TO ENA ENGINEERING RECOMMENDATION G81 PART 1 Design and Planning Specification for New Low Voltage Installations for Housing Developments 1. SCOPE This appendix to ENA
Addendum #2 Contract UK-11-13
Addendum #2 Contract UK-11-13 Utilities Kingston Purchase and Replacement of Switchgear at Kingston Hydro Substation MS11 March 25, 2011 Delivered to: All RFP recipients Total number of pages: Nine (9)
Scrip Dividend Scheme
Scrip Dividend Scheme Scrip Dividend Scheme The following explains how the Scheme operates and sets out further details and terms of the Scheme. 1. What is the Scheme? The Scheme enables you to receive
Does your new building
Does your new building need electricity? To save you time and money, talk to us early about your power supply. Our equipment will occupy ground space on your property. You need to consider the size and
A quick guide to our floodcare scheme
A quick guide to our floodcare scheme What to do in case of sewer flooding We re here to help We appreciate that dealing with the results of sewage flooding is always unpleasant and we know how upsetting
HOW TO FILL IN THE FORM. Guidance Notes. Section 5. Colour and type of materials. Section 6. Property Ownership Certificate. Section 1.
Guidance Notes Making an Application for Listed Building Consent If you want to alter, extend or demolish all or part of a building which is Listed as being of Architectural or Historic Interest, it is
Electric Service Conversion Overhead-to-Underground. Minnesota
Electric Service Conversion Overhead-to-Underground Xcel Energy Electric Connections Minnesota Process Please fill out these forms and complete this checklist to begin your application process: 1) Overhead-to-Underground
Approved Installer Programme
Approved Installer Programme Helping to build your business Why sign up? Vokèra values the important contribution our loyal installers make towards the success of our brand and so are offering you the
Your new electricity supply. A guide to procedures for customers requiring A NEW ELECTRICITY SUPPLY
Your new electricity supply A guide to procedures for customers requiring A NEW ELECTRICITY SUPPLY YOUR NEW ELECTRICITY SUPPLY This booklet will provide you with all the information you need to help us
The standards you can expect
The standards you can expect Another year has passed and it s time for us to tell you how we ve performed, and how the network operators have performed too. This booklet gives you important information
Guide to lodging a certified building permit application (form BA1)
Guide to lodging a certified building permit application (form BA1) If you lodge an incomplete application to the permit authority, it can be refused and you may lose your fees. These notes are to assist
South East Region Leakage Code of Practice. Affinity Water Limited CODE OF PRACTICE ON LEAKAGE
1 of 13 Affinity Water Limited CODE OF PRACTICE ON LEAKAGE LEAKAGE FROM DOMESTIC CUSTOMERS WATER SUPPLY PIPES Dated: 10 July 2014 1 INTRODUCTION 2 of 13 The Company is committed to a policy of water efficiency
Who is National Grid?
Who is National Grid? National Grid is a leading international energy infrastructure business In the UK, our business includes electricity and gas transmission networks and gas distribution networks. We
How To Get A Power Line Extension
GUIDELINES FOR COMMERCIAL ELECTRIC SERVICE HOOKUP 1 Steps to Commercial Service Pay the Design Deposit Commercial Buildings: Up to 1, sq ft = $1,. 1, 5, sq ft = $2,. Over 5, sq ft = $3,. Commercial jobs
We look forward to serving you!
Dear Construction Customer: Enclosed you will find your DP&L Electric Construction Packet. This packet provides you with the information needed to obtain your new electric service or electric service change
A clear, impartial guide to. Renting a property. Tenant Moving in Checklist. rics.org/usefulguides
A clear, impartial guide to Renting a property Tenant Moving in Checklist Contents 03 How an RICS member can help you rent a property 04 The process 05 Finding a property to rent 07 Role of the letting
4. REQUEST FOR ELECTRIC SERVICE. 4.1 General Service Information
4. REQUEST FOR ELECTRIC SERVICE To establish an electric service, temporary or permanent, contact UI s Customer Care Center by calling: 1-800-722-5584 (7:00 a.m. 7:00 p.m., Monday Friday and 7:00 AM to
Application for a Discretionary Housing Payment
RBBNBDHP Benefit Ref : Date of issue:... To :........ Application for a Discretionary Housing Payment Please return this form by post to: Harrogate Borough Council, Benefit Services, PO Box 787, Harrogate,
Customer connection enquiry form (For the connection of loads and generators)
Customer connection enquiry form (For the connection of loads and generators) Please provide as much detail as possible to ensure TasNetworks can meet your requirements. When completed please attach and
A guide to. Using your prepayment meter
A guide to Using your prepayment meter Take control of your energy costs Our prepayment service lets you pay-as-you-go for gas and electricity so you can keep control of your energy use and costs. This
Connecting to the network information pack Version 2
Connecting to the network information pack Version 2 Updated: Contents 1.0 What is a new connection or connection alteration?... 3 2.0 Connection enquiry... 3 3.0 Connection application... 3 3.1 Processing
MLGW Contact Numbers. Memphis Light, Gas and Water Division P.O. Box 430. Memphis, TN 38101-0430
MLGW Contact Numbers Address Assignment 901-729-8620 To obtain or verify addresses for new services. Builder Services 901-729-8630, Option 1 Initial meter turn-ons- FOR NEW CONSTRUCTION ONLY Billing inquiries
Landlord Insurance. Summary of cover
Landlord Insurance Summary of cover March 2013 Why choose AXA s Landlord Insurance policy? The Landlord Insurance offers a range of covers and caters for a variety of customers, from individuals who own
Landlord Insurance. Summary of cover. October 2013. 35039_ACLD0520ZB_BRO_A5.indd 1 23/10/2013 16:20
Landlord Insurance Summary of cover October 2013 35039_ACLD0520ZB_BRO_A5.indd 1 23/10/2013 16:20 Why choose AXA s Landlord Insurance policy? The Landlord Insurance offers a range of covers and caters for
ADVICE NOTE EMPLOYING CONTRACTORS. How to go about employing competent contractors
ADVICE NOTE EMPLOYING CONTRACTORS How to go about employing competent contractors 2 CONTENTS Note: As the leading trade body for residential leasehold management, ARMA is also an important resource for
Using Energy and Meter Reading
Using Energy and Meter Reading Using Energy Lesson Overview Using Energy This lesson helps Girl Scouts understand how we use energy every day in our lives and how to read an electric meter. Someone from
53 & 55 London Road. Heating & hot water services All you need to know
53 & 55 London Road Heating & hot water services All you need to know Introduction Welcome to London Road. Your new home is served by a communal heating system. Your heating system is robust, reliable
Making changes to your home
Making changes to your home If you are a tenant living in one of our rented homes, you may be allowed to make some changes or improvements to your home. This guide tells you: what changes you can make
WANT TO MAKE YOUR HOME YOUR OWN?
WANT TO MAKE YOUR HOME YOUR OWN? 1 Your Right to to Buy Buy FOR COUNCIL AND HOUSING ASSOCIATION TENANTS CONTENTS 3 Why you might like to buy 4 Do you have the Right to Buy? 6 What discount could you get?
KEPPEL GAS GAS SUPPLY HANDBOOK
KEPPEL GAS GAS SUPPLY HANDBOOK Page 1 of 21 INTRODUCTION This Gas Supply Handbook ( Handbook ) is prepared by Keppel Gas to serve as a guide to eligible Customers who are current or future offtakers of
WANT TO MAKE YOUR HOME YOUR OWN?
WANT TO MAKE YOUR HOME YOUR OWN? July 2015 1 Your Right to to Buy Buy FOR COUNCIL AND HOUSING ASSOCIATION TENANTS CONTENTS 3 Why you might like to buy 4 Do you have the Right to Buy? 6 What discount could
COAL MINING SUBSIDENCE DAMAGE. A Guide to Claimants Rights
COAL MINING SUBSIDENCE DAMAGE A Guide to Claimants Rights The original version of this document was published by the Department of Trade and Industry in 2004 and is now out of print. This document published
Payment of bills and guidance for customers in difficulty
Payment of bills and guidance for customers in difficulty SustainableEnergy For residential heat customers This tells you about the different ways to pay your bills and what happens if bills are not paid
Building insurance frequently asked questions
Building insurance frequently asked questions Buildings insurance for Islington Council leaseholders is provided by Zurich Insurance plc (trading as Zurich Municipal). This factsheet is a summary of the
Building over or close to a public sewer
Building over or close to a public sewer thameswater.co.uk/developerservices thameswater.co.uk/developerservices 1 Questions and answers Did you know Thames Water is legally responsible for more than 100,000
Semploy Extra Statement of Fact and Schedule
POLICY NUMBER: 9051938L Page 1 of 7 Semploy Extra Statement of Fact and Schedule Effective Date: 27 May 2015 00:00 Expires On: 26 May 2016 24:00 Agent Number 23303W Date of Issue 27 May 2015 Agency Reference
Leaseholders Handbook
Leaseholders Handbook January 2011 Contents Page 1 Introduction 1 Introduction 2 What is leasehold? 3 Repairs and improvements 4 Service charge 5 Consultation 6 Insurance 7 Selling and renting your home
FLATS INSURANCE. Proposal Form November 2004 Edition
FLATS INSURANCE Proposal Form vember 2004 Edition Completing the Proposal Form To apply for the Flats Insurance Policy, complete this Proposal Form in BLOCK CAPITALS using a ball-point pen (blue or black
BROADBAND CONNECTION VOUCHER SCHEME Application Form
BROADBAND CONNECTION VOUCHER SCHEME Application Form This application form should be filled out by businesses and third sector organisations applying to Newport Council s Broadband Connection Voucher Scheme.
Operational Control of the UKPN Low Voltage Distribution Network for EPN and LPN Regions
Operational Control of the UKPN Low Voltage Distribution Network for EPN and LPN Regions Owner Name Title Signature Steve White Head of Network Control and Operations Date 16 February 2016 Authoriser Name
CHANGES TO HOME INSURANCE
CHANGES TO HOME INSURANCE ESTIMATING REBUILDING COSTS FOR SUM INSURED POLICIES 25 JULY 2013 - PROPERTY INSTITUTE OF NEW ZEALAND WHAT S CHANGING? Home insurance in New Zealand is moving back from unlimited
Demo Permit Guide For Homeowners
Demo Permit Guide For Homeowners Building Services Tel: 705-436-3710 ext. 3504 or 3506 Fax: 705-436-7120 2101 Innisfil Beach Road, Innisfil, ON L9S 1A1 Website: www.innisfil.ca A Demo Permit Guide for
Botetourt County, Virginia. Frequently Asked Questions
Botetourt County, Virginia Development Services Construction Compliance Frequently Asked Questions Permits... 2 When is a permit required?... 2 When is a permit NOT required?... 2 Who may apply for a permit?...
Awarded for Home and Heating Emergency, and Complete Home and Heating Care. Your guide to Saga Home Emergency. including the Policy Summary
Awarded for Home and Heating Emergency, and Complete Home and Heating Care. Your guide to Saga Home Emergency including the Policy Summary The reassuring home emergency service Saga Home Emergency offers
Power. a world of opportunities! Energy PROFILE. Required Components for the SHSM Energy
PROFILE FOCUS Renewable is an emerging and expanding sector that encompasses all aspects of energy generation, distribution, and consumption, including research and development, design, construction, installation
environment briefing02
PRODUCED BY THE SAFETY, HEALTH & ENVIRONMENT GROUP OF THE ENERGY NETWORKS ASSOCIATION - JULY 2006 environment briefing02 transporting electricity Overhead Lines or Underground Cables? Introduction The
New electricity connection, substantial increase in load and major headworks
This form relates to the installation of new electricity connections, increases in load and major headworks. It applies to all Dampier, Wickham, Tom Price, Paraburdoo and Pannawonica sites. In addition
e-factsheet Feed-in Tariffs what we have to offer
e-factsheet Feed-in Tariffs what we have to offer 2 of 12 Feed-in Tariffs (FITs) make renewable generation more financially rewarding for smaller installations and help reduce the UK s carbon emissions.
Other. Other (e.g. 1 month) 12 month
Deposit account application form Trusts Please complete this form in BLOCK CAPITALS and then return to Close Brothers Limited, 10 Crown Place, London EC2A 4FT. All fields are mandatory, unless otherwise
YOUR ENERGY IS OUR BUSINESS ELECTRICAL. www.glevumheating.co.uk Tel 01452 387066 Freephone 0800 038 1216
YOUR ENERGY IS OUR BUSINESS ELECTRICAL www.glevumheating.co.uk Tel 01452 387066 Freephone 0800 038 1216 Glevum Heating provides heating, electrical and renewable energy solutions to domestic and commercial
Home Insurance. Your policy summary AXA ABC
Home Insurance Your policy summary AXA ABC February 2014 Policy summary This policy summary does not contain full details and conditions of your insurance these are located in your policy booklet. This
An Insurance package suitable for businesses in the professional services industry for example solicitors, accountants etc.
OFFICE INSURANCE Summary of Cover June 2005 Edition An Insurance package suitable for businesses in the professional services industry for example solicitors, accountants etc. Why choose AXA s Offices
Terms and Conditions for Hive Active Heating (Hive Active Heating - professional install for business customers)
Terms and Conditions for Hive Active Heating (Hive Active Heating - professional install for business customers) Please read this document carefully as it will tell you everything you need to know about
Home Emergency Policy Summary
Some important facts about Your Policy Expert Home Emergency Insurance This document provides a summary of what the Policy Expert Home Emergency Policy covers. It does not describe all of the terms and
Ausgrid s Policy on Public Lighting - Contestable Projects. AUSPL CONPOL01 September 2012
Ausgrid s Policy on Public Lighting - Contestable Projects AUSPL CONPOL01 September 2012 Ausgrid s Policy on Public Lighting - Contestable Projects September 2012 Contents 1 OBJECTIVE... 3 2 SCOPE AND
Repairs and looking after your home
A guide to Repairs and looking after your home Contents Page No. Introduction 1 Information for tenants 2 Information for homeowners 3-4 Information for onsite NHS workers 5 Information for students 5
Please Refer to Attached Sample Form
Pacific Gas and Electric Company San Francisco, California U 39 Revised Cal. P.U.C. Sheet No. 32104-E Cancelling Revised Cal. P.U.C. Sheet No. 28312-E Electric Sample Form No. 62-0685 Application for Service
2 Safe by Design. Introduction
This guidance document was created by the Consultants Health & Safety Forum: 2 Safe by Design Introduction Designers are in a unique position to reduce the risks that arise during construction work, and