MAIN STREET IMPROVEMENTS Water, Sewer, Stormwater and Streetscape Improvements

Similar documents

Topic 2 11/28/2012 Blocks & Street Network

in Marina Del Rey Prepared by: County of Los Angeles Department of Public Works

ENGINEERING SOLUTIONS FOR DESIGNING YOUR SAFE ROUTES

FY 2011 OHIO SMALL CITIES COMMUNITY DEVELOPMENT BLOCK GRANT COMPREHENSIVE DOWNTOWN REVITALIZATION PROGRAM

OVERVIEW PROJECT SUMMARY

KENTUCKY TRANSPORTATION CABINET. Department of Rural and Municipal Aid. Office of Local Programs

VISION, DESIGN PRINCIPLES & OVERALL PLANNING STRATEGY

BEST PRACTICES. Smart Transportation is a key concept for the Paoli Roadway Improvement Project.

Guiding Principles. McCauley Area Focused Urban Design Plan. 1 Connect: Chinatown and Little Italy with downtown and surrounding areas

Downtown Tampa Transportation Vision

Table of Contents ALPHABETIZED LIST OF CIP PROJECTS... 1 CIP 5 YEAR SUMMARY BY CATEGORY SMART CITY CIP 5 YEAR SUMMARY BY VISION...

Flood Mitigation Strategy for the Milwaukee 30 th Street Corridor Redevelopment Program

Draft Non Transportation Performance Measures Including Related Qualitative Assessment of Example Sections

8.1.3 General Design Guidelines. The following guidelines shall be used when designing inlets along a street section:

PROJECT COST ESTIMATE ASSUMPTIONS AND EXCLUSIONS

Engineering Major Service Actual Budget Projected Request Executive Adopted

The Bond Release Process for New Subdivision Developments: An Overview for Homeowners Associations DRAFT Revised

Interlocking Concrete Pavement Institute (ICPI) Model Stormwater Ordinance for Permeable Interlocking Concrete Pavements August 2010

HARRIS TEETER AT LADY S ISLAND CITY OF BEAUFORT DRB CONCEPTUAL PROJECT NARRATIVE Submittal Date: September 2, 2015 Meeting Date: September 10, 2015

BETTER STREETS PLAN SAN FRANCISCO POLICIES AND GUIDELINES FOR THE PEDESTRIAN REALM DRAFT PLAN RELEASE PACKET JUNE inside:

Fairlington Community Center

Street Audit Tool: Web 2.0 Tools

ALKS SIDEW II. TK TK TK TK TK TK TK TK 40 BOSTON COMPLETE STREETS GUIDELINES DRAFT - JULY 2011 BOSTON TRANSPORTATION DEPARTMENT

PLANNED UNIT DEVELOPMENT & SIDEWALK WAIVER REQUEST STAFF REPORT Date: November 7, 2013

Mississippi Drive Kickoff Event. 8/31/2015 & 9/1/2015 Meeting Minutes. Blue Zones: Dan Burden Presentation (Rotary Club Meeting)

Kansas City s Overflow Control Program

Toronto's New Soil and Tree-based Standards for Boulevards

Bond Release Process for New Subdivision Developments in Fairfax County

CITY OF ROANOKE AND TOWN OF VINTON, VIRGINIA. RSTP Funds Joint Application FOR

LOCATIONS OF UTILITIES IN PUBLIC RIGHTS-OF-WAY Examples from various Cities

PUBLIC WORKS DESIGN, SPECIFICATIONS & PROCEDURES MANUAL LINEAR INFRASTRUCTURE

DE 8 Concept Plan and Operations Study. Dover Safety Advisory and Transportation Committee October 23, 2007

CITY COUNCIL WORKSHOP MAY 24, 2016

DRAFT MAINTAINING HOUSTON S STREETS REPAIR, REHABILITATION, RECONSTRUCTION. Using the Full Range of Tools for a Challenging Job

STORM WATER PROJECT COST ESTIMATES & LOCATION MAPS. Appendix F

Infrastructure assets are distinguished from other capital assets because they normally:

Extreme Wet Weather in Brookfield. How to Keep Your Basement Dry During Heavy Rains and Floods

Review Public Input Report Jenn Toothaker. Approval of Meeting Summaries: May 21, May 23, May 30, & June 20, 2013 Meetings

SEMINOLE PRATT WHITNEY ROAD & NORTHLAKE BLVD. FREQUENTLY ASKED QUESTIONS

Legacy Trail Extension Feasibility Study. Preliminary Cost Estimate

SANITARY SEWER PROJECT COST ESTIMATES & LOCATION MAPS. Appendix D

ODOT Major Construction, Bikeways and Enhancements Report for Lucas County. (State Fiscal Years 2007 to 2010)

CONSTRUCTION MANAGER S WEEKLY PROGRESS REPORT

Corridor Goals and Objectives

Pavement Asset Management Guidance Section 5.3: Condition Surveying and Rating - Drainage

A Developer s Guide: Watershed-Wise Development

Maintenance Management and Asset Management

North Avenue Corridor Study. Advisory Committee Meeting #5 June 11, 2014

Project Rankings. Fiscal Year Capital Improvement Plan

For more information, visit: rethinkingstreets.com

Post-Construction Stormwater Management Checklist* (5,000 SF or Greater)

CASFM Stormwater Quality Field Trip June 23rd, 2011

Guidelines for. Permeable Pavement

Draft Goals and Objectives Wadena Comprehensive Plan City of Wadena, Minnesota. Land Use Goals:

SCHOOL OF ARCHITECTURE & COMMUNITY DESIGN COLLEGE OF THE ARTS UNIVERSITY OF SOUTH FLORIDA

SEPTEMBER 2015 SCOPE OF WORK. MONTGOMERY COUNTY PLANNING DEPARTMENT M-NCPPC MontgomeryPlanning.org

General Obligation Bond Projects FYE

AGENCY COORDINATION AND PUBLIC INVOLVEMENT

Moving Ruston Forward. City of Ruston Infrastructure Maintenance and Improvements

LS 2540 SEWER LATERALS AND INSPECTION TEES

Green Infrastructure for Great Cities

Premature Storm Drainage System Repairs and Replacement

Lincoln Downtown Master Plan Update

CITY OF VISTA STANDARD DRAWINGS (PRELIMINARY, FOR REVIEW)


Infrastructure and Growth Leadership Advisory Group Ideas and Approaches Survey

LAKE SHORE DRIVE CTA RED LINE BROADWAY SHERIDAN FOSTER ARGYLE. Pedestrian Access Advisory Committee. April 25, 2014

MICHIGAN S LANDSCAPE ARCHITECTS

Alternatives to the Circ Project Prioritization Methodology Prepared for Circ Task Force July 28, 2011

Assessing Paved Trails for Compliance with Standards and Best Practices

CITY OF BRAMPTON STREET CORRIDOR MASTER PLAN

Chapter 22. Lump Sum Project Guidelines

APPENDIX C INLETS. The application and types of storm drainage inlets are presented in detail in this Appendix.

Accident Analysis of Sheridan Road between Isabella Street and South Boulevard

S. BLOCK 68 REDEVELOPMENT PROJECT AREA

How To Build A City Of Virginia Beach Arena

Implementation Strategy

JULY 24, 2009 WEST-END FLOODING INVESTIGATION ACTION PLAN. Presentation to Insurance Companies 19 January 2012

East Lake Park {xäñ Çz uâ Äw t à z{àxü véååâç àç

City of Hilshire Village Pine Creek Ln Reconstruction

Implementing a Work Order and. Asset Management System? Learning Objectives. What We Have. The City of Colleyville

Background and Goals for the Project

Bicycle riding is a great way to get into shape

(Version 1.0 August 2014) Cover Letter. (See Paragraph 9 of Section 1A.10)

COPPER BEECH TOWNHOME DEVELOPMENT

UNIT PRICE LIST January 2009

PLANNING DIVISION STAFF REPORT February 23, Summary. Background Information PREPARED FOR THE PLAN COMMISSION. Legistar File ID # 36810

Schenk-Atwood Neighborhood Business District Master Plan

Capacity Deficiency Project Application Jackson MPO Surface Transportation Program

Downtown Community Planning Council Meeting offebruary 18, 2015

First in Service First in Safety

Surface Transportation Program (STP)

Green Streets, Places, and Spaces

CD i -STREETS- Detail #

THE IMPLICATIONS OF ALTERNATIVE GROWTH PATTERNS ON INFRASTRUCTURE COSTS

01/31/13 ACHIEVING THE VISION FOR RESTON. Reston Master Plan Special Study Task Force

WESTFIELD-WASHINGTON ADVISORY PLAN COMMISSION December 7, SPP-24 & 1512-ODP-24

SECTION EIGHT BONDING REQUIREMENTS

In 2005, the City of Pasadena, CA, USA, with the support of consultants,

Transcription:

MAIN STREET IMPROVEMENTS Water, Sewer, Stormwater and Streetscape Improvements Presentation July 23, 2014 A. Morton Thomas and Associates, Inc. 800 King Farm Boulevard, 4 th Floor Rockville, Maryland 20850 1

The AMT Team Working with the City to design and prepare construction documents for Main Street Improvements A. Morton Thomas and Associates, Inc. Geo-Technology Associates, Inc. Goel Services Extensive experience with streetscape projects Extensive urban design experience Full-service design team Recent experience with City of Salisbury 2

The AMT Team Experience 3

Project Vision Return Vibrancy Timeless, Memorable, & Inviting Create a Destination Link Marina & Central Greenway Enhance Architecture Create Continuity, Safety, & Parking 4

Project Goals Revitalize the Main Street corridor Create inviting, safe environment Provide access for pedestrians, bikes and vehicles Create a link between downtown and marina 5

Project Masterplan Project Limits 6

Project Overview Replace or improve: o water mains o sewer mains and o storm drain structures Design innovative SWM treatments Upgrade traffic control at Division St. Streetscape / landscape features Pavement repairs and replacement Reconstruct sidewalk and ramps $1.3 million $1.8 million $1.9 million 7

Multi Use Corridor Corridor to include: o travel lanes o bike lanes/ striping o sidewalk o on-street parking o landscape features 8

Multi Use Corridor West Main Street 9

Multi Use Corridor West Main Street 10

Multi Use Corridor East Main Street 11

Multi Use Corridor East Main Street 12

Multi Use Corridor East Main Street 13

Multi Use Corridor Walkable Street 14

Streetscape Features - Trees 15

Streetscape Features Planting 16

Streetscape Features Planting 17

Streetscape Features Furnishings 18

Streetscape Features Lighting 19

Streetscape Features Lighting 20

Streetscape Features Surface Treatment 21

Streetscape Features Water Features 22

Division Street Plaza 23

Drainage Move / Upgrade inlets Inspect System to determine condition of pipes Slope roadway to drain Eliminate ponding 24

Stormwater Management 25

Utilities Pipe Inspection 26

Water and Sewer Pipes PHASE 2 ONLY Replace All Water Pipes Repair or Replace Sanitary Sewer Pipes No disruption of service Add graphic of a section of the road showing the utilities in color 27

Plaza: Main Street and Division Street New signal at Division St Improve cross walk signing and striping Provide pedestrian countdown signals Use decorative support posts 28

Construction Schedule and Impacts Expect to begin construction Fall 2015 - phased in this order Phase 2: Division St. to Rte. 13 Phase 1: Market St to Division St. Phase 3: Plaza Construction will: Maintain 2 way traffic Maintain access to businesses at all times Maintain pedestrian access Eliminate on-street parking periodically Provide advance warning of disruptions 29

Questions? 30