1 City of Virginia Beach Arena Infrastructure Preliminary Conceptual Cost Estimates Doug Smith, Deputy City Manager Carl Tewksbury, Kimley-Horn City Council Briefing July 8, 2014
2 July 8, 2014 Presentation Overview Background Discussion of preliminary conceptual cost estimates for public infrastructure based on concept plans Parking assumptions, needs and costs Roadway improvements and costs Site development, utility improvements and costs Overall project infrastructure costs Discussion of path forward 2
3 July 8, 2014 Background 3 November 8, 2013: City received an unsolicited private proposal from the W.M. Jordan Company, HKS Sports & Entertainment, and Global Spectrum. November 12, 2013: City Council authorized the City Manager to accept the proposal for further study. The Council agreed to allow 90 days for competing private proposals to be submitted. February 17, 2014: City received an arena proposal from a consortium of United States Management LLC, AECOM Architects, Clark Nexsen Architects, Mortenson Construction, SB Ballard Construction and SMG.
4 July 8, 2014 Background March 24, 2014: Both companies presented their proposals to the City Council-appointed Citizens Communications Committee. May 13, 2014: City Council received a briefing from Convention Sports & Leisure (CSL), a consultant brought in to provide an independent overview of each proposal. May 27, 2014: City Council adopted a resolution directing the city staff to: Pursue negotiations with USM, Hold the PPEA process and the Jordan proposal pending the outcome of these negotiations, To prepare a report determining the scope and cost of public infrastructure, and Continue involvement of the Citizens Communications Committee. 4
5 5 July 8, 2014 USM Proposal Details USM proposal is to construct a locally owned, privately financed 18,000-seat capacity, 550,000-square foot entertainment and sports venue adjacent to the Virginia Beach Convention Center The facility would incorporate flexible seating and the amenity upgrade capabilities necessary to attract a professional sports franchise.
6 July 8, 2014 USM Proposal The Arena, as proposed, accomplishes three major goals for the City: Establishes a significant economic generator in Virginia Beach, creating new jobs and attracting new events and new visitors to the City Creates a year-round attraction at the oceanfront, boosting existing businesses and dramatically enhancing the City s national convention draw Provides a signature development that will offer events consistent with our City s stature and enhance our national and international exposure. Council directed staff to develop preliminary conceptual cost estimates for public infrastructure based upon conceptual plans. The following presentation provides the preliminary infrastructure costs. 6
7 7 July 8, 2014 Kimley-Horn Presentation Summary Parking Assumptions, Needs, and Costs Roadway Improvements and Costs Site Development, Utility Improvements, and Costs Overall Preliminary Conceptual Cost Estimates Presented by Carl Tewksbury, P.E. Sr. Vice President, Kimley-Horn
8 Parking Assumptions, Needs, and Costs
9 9 July 8, 2014 Parking and Traffic Assumptions Attendance Levels/Arena Size: 18,000 seat capacity 15,500 permanent seats 13,950 design attendance (90% of 15,500) Oct-April 7,500 design attendance (90% of 8,300) May-September Convention Center Overlap: 300 parking spaces Mode Split: 85% vehicular; 15% other Vehicle Occupancy: 2.75 people per vehicle Shared Parking Occupancy: 50% Occupancy of Public Parking: 5% October-April; 70% May- September Acceptable Walking Distance to/from Dome Site: minutes Employees will park off-site for large events
10 10 July 8, 2014 Parking Demand 13,950 Design Attendance Oct-April 7,500 Design Attendance May-Sept Planned On-Site 2,770 2,770 Proposed Additional Surface Parking (Treasurer s Block) Available Public Spaces w/in Dome walking distance Available Commercial Spaces w/in Dome walking distance Available Shared Parking Spaces (50% of Available Inventory) Total Parking Inventory Available 4,600 4,017 Arena Parking Demand 4,312 2,318 VBCC Parking Demand 300* 300* Total Parking Demand 4,612 2,618 Parking Surplus/Deficit -12 1,399 Anticipated People to be Shuttled 40 0 * VBCC parking demands for larger events will be met by reserving parking directly adjacent to the facility. This will require additional people to be shuttled for arena events.
11 11 Parking Inventory 2, ,600 Planned On-Site Parking Proposed Surface Parking Lot Available w/in Dome Walking Distance Oct. - April (Public and Commercial Inventory) Available Shared Parking Lots Total Planned or Available Min. Walk LEGEND Proposed Parking Public Parking Shared Parking Commercial Parking
12 Roadway Improvements and Costs
13 Parks Avenue 13 July 8, 2014 Traffic Distributions 15% 70% Virginia Beach Convention Center 19th Street Virginia Beach Boulevard 15%
14 July 8, 2014 Roadway Improvements Birdneck Road Median Opening (Event Use Only) 14 Remove Remove EB Channelization Construct Second EB Right Turn Lane Modify Birdneck Rd median Modify Traffic Signal Modify Modify Channelization to allow right-turns from through lane (large events only) Restripe inside SB Through Lane to a Second Left Turn Lane Reconstruct Traffic Signal Extend WB Right Turn Lane
15 July 8, 2014 Roadway Improvements 19 th Street 15 Driveway/19 th St Proposed Rd/19 th St Construct EB Right Turn Lane Allow Second Right Turn Lane from Through Lane (Event Only) Construct EB Right Turn Lane
16 July 8, 2014 Roadway Improvements Virginia Beach Boulevard 16 Driveway/VA Beach Blvd Driveway/VA Beach Blvd Washington Ave/VA Beach Blvd Construct Left and Right Turn Lanes from New Parking Lot Construct WB Right Turn Lane Extend EB Left Turn Lane Construct Left and Through/Right Lanes from New Parking Lot Construct WB Right Turn Lane Restripe/Extend EB Left Turn Lane Construct Left and Right Lanes from New Parking Lot Construct WB shared Through/Right Turn Lane
17 July 8, 2014 Roadway Improvements Parks Avenue 17 Traffic Signal Modification Restripe NB Through/Right Turn Lane Allow shared EB Through/Right Turn Lane (Event Only) Construct EB Right Turn Lane Contraflow In Contraflow Out
18 July 8, 2014 Roadway Improvements Improvement Cost Birdneck Road/I-264 Eastbound Off-Ramp Improvements $761,000 Birdneck Road/I-264 Westbound On-Ramp Improvements $131,000 Birdneck Road/19th Street Improvements $1,590,000 19th Street/West Parking Lot Access Improvements $178,000 Birdneck Road/Virginia Beach Boulevard Improvements $200,000 Virginia Beach Boulevard/Parking Lot Access/Birch Lake Drive Improvements $370,000 Virginia Beach Boulevard/Parking Lot Access/Seabridge Road Improvements $307,000 Virginia Beach Boulevard/Jefferson Avenue Improvements $236,000 Parks Avenue/19th Street/Monroe Avenue Improvements $100,000 Parks Avenue between 19th and 22nd Street Improvements $11,000 Parks Avenue/21st Street Improvements $318,000 Parks Avenue/22nd Street Improvements $125,000 Wayfinding & Directional Signing $150,000 Total $4,478,000 18
19 Site Development, Utility Improvements, and Costs
20 20 July 8, 2014 Utilities Item Cost Water $257,000 Sewer $1,105,000 Drainage* $1,301,000 Electric Duct Banks (Dominion Virginia Power) $1,680,000 Telecommunications (Verizon and Cox) $279,000 Virginia Natural Gas $100,000 Total $4,722,000 * Drainage includes the use of permeable pavement cost captured in site development
21 21 July 8, 2014 Site Development Demolition Item Cost Clearing and Grubbing $71,000 Existing Parking Lots and Roadways $519,000 Utilities (Water, Sewer, Storm, and Lighting) $269,000 Structures $21,000 Total $880,000
22 July 8, 2014 Site Development Areas 22
23 23 July 8, 2014 Site Development Item Cost Surface Parking Development (Asphalt) $2,979,000 Surface Parking Development (Permeable Pavement) $3,738,000 Surface Parking Development (Pavers) $2,661,000 Site Lighting $1,575,000 Internal Roadways $2,100, th Street Streetscape $341, Space Off-Site Surface Parking Lot $1,200,000 (Treasurer s Site) Hardscaping (Plaza Pavers and Paver Walkways) $2,752,000 East and West Concourse Access Treatment $1,000,000 Enhance Veteran s Memorial and Park $250,000 Marquees $3,000,000 Site Furnishings and Irrigation $1,047,000 Environmental $770,000 Total $23,413,000
24 July 8, 2014 Optional Site Development Areas th Street Virginia Beach Boulevard VIRGINIA BEACH BLVD/BIRDNECK RD INTERSECTION IMPROVEMENTS BIRDNECK ROAD STREETSCAPE VIRGINIA BEACH BOULEVARD STREETSCAPE 19TH STREET STREETSCAPE IMPROVEMENTS Optional Site Development Items Cost* Virginia Beach Boulevard Streetscape $7,473,000 Birdneck Road Streetscape $2,482,000 Intersection Improvements $6,491, th Street Streetscape Improvements $9,716,000 Total $26,162,000 *Does not include right-of-way acquisition that may be necessary pending further design.
25 Overall Preliminary Conceptual Cost Estimates
26 Overall Preliminary Conceptual Project Costs Construction Item Cost Mobilization $2,500,000 Roadway Improvements $4,478,000 Utilities $4,722,000 Demolition $880,000 Site Development $23,413,000 Total Construction Costs $35,993,000 Soft Costs Cost Contingency and Escalation (20%) $7,199,000 Design (15%) $6,479,000 Construction Inspection $3,000,000 Total Soft Costs $16,678,000 Total Infrastructure Cost $52,671,000 Birdneck Road Streetscape Costs* $2,482,000 Virginia Beach Blvd. Streetscape Costs* $7,473, th Street Streetscape Costs* $9,716,000 Optional Intersection Improvements* $6,491,000 Estimated Total Project Infrastructure Costs $78,833,000 * Does not include right-of-way acquisition that may be necessary pending further design. 26 July 8, 2014
27 July 8, 2014 Summary of Estimated Total Project Infrastructure Costs 27 These are preliminary conceptual cost estimates were developed based on conceptual layouts. They are subject to change based on detailed engineering design. Direct Arena Infrastructure Costs $52,671,000 Optional Infrastructure Costs* $26,162,000 * Does not include right-of-way acquisition that may be necessary pending further design.
28 July 8, 2014 The Path Forward 28 Continue to refine infrastructure design elements and costs Continue to quantify fiscal impacts Develop an operational and management plan Negotiate the business terms and booking policies with United States Management Develop Central Beach District Master Plan Milestones Summer 2014 Finalize Traffic and Parking Study Integrate Light Rail Plan into Arena Study Late Summer 2014 Visit Pinnacle Bank Arena in Lincoln Nebraska to tour comparable facility; Citizens Communications Committee Briefing and Discussion Fall 2014 Term Sheet presented to City Council for consideration Late 2014/Early 2015 Agreements presented to City Council for consideration
29 29 July 8, 2014 Discussion
30 Light Rail Transit Integration
31 July 8, th Station and East End of Direct Oceanfront/Former NSRR 31
SEMINOLE PRATT WHITNEY ROAD & NORTHLAKE BLVD. FREQUENTLY ASKED QUESTIONS
UPDATED: 01/31/14 SEMINOLE PRATT WHITNEY ROAD & NORTHLAKE BLVD. FREQUENTLY ASKED QUESTIONS Q. 1. What are the County s plans for Seminole Pratt Whitney Road between SR 80 (Southern Blvd) and the Bee Line
MAIN STREET IMPROVEMENTS Water, Sewer, Stormwater and Streetscape Improvements
MAIN STREET IMPROVEMENTS Water, Sewer, Stormwater and Streetscape Improvements Presentation July 23, 2014 A. Morton Thomas and Associates, Inc. 800 King Farm Boulevard, 4 th Floor Rockville, Maryland 20850
Improving Access in Florida International University Biscayne Bay Campus Executive Summary
EXECUTIVE SUMMARY Improving Access in Florida International University Biscayne Bay Campus Executive Summary Prepared for: Miami-Dade County Metropolitan Planning Organization (Miami-Dade MPO) Prepared
Lincoln Downtown Master Plan Update
Lincoln Downtown Master Plan Update Table of Contents Executive Summary........................................... 1 Complete Streets Framework.................................... 3 Promenade Creating
Downtown Tampa Transportation Vision
Downtown Tampa Transportation Vision Executive Summary August 1, 2006 Hillsborough County Metropolitan Planning Organization County Center, 18 th Floor Tampa, Florida 33602 813-272-5940 www.hillsboroughmpo.org
MEMORANDUM. Robert Nichols, Acting Corridor Design Manager Northgate Link Extension
MEMORANDUM DATE: September 23, 2014 TO: Robert Nichols, Acting Corridor Design Manager Northgate Link Extension FROM: SUBJECT: COPIES: Katherine Casseday, PE, PTOE, Casseday Consulting Tony Lo, PE, Parsons
3 Tappan Zee Bridge Rehabilitation Options
3 Tappan Zee Bridge Rehabilitation Options 3.1 Introduction This chapter describes possible options that rehabilitate and enhance the existing Tappan Zee Bridge. Four Rehabilitation Options have been developed:
Public Involvement Meeting Handout
Public Involvement Meeting Handout WIS 93 Detloff Drive to WIS 95 Trempealeau County Project ID 7130-01-72 June 18, 2014 5:00 P.M. 401 W. Main Street Arcadia WI Purpose of the meeting The Wisconsin Department
DISTRICT 3 TRAFFIC MANAGEMENT PLAN CHECKLIST
State of California Business, Transportation and Housing Agency DISTRICT 3 TRAFFIC MANAGEMENT PLAN CHECKLIST District / EA: District 3/ EA 03-3E380 Date Prepared: 1/10/2013 Prepared By: Robert Himes Stage
CHAN & PARTNERS ENGINEERING, LLC
July 2012 CHAN & PARTNERS ENGINEERING, LLC Consulting Civil Engineers Imagine Austin Comprehensive Plan Infrastructure, Operations, Maintenance & Service Cost Comparison Preferred Growth Scenario and Trend
Light Rail Transit in Phoenix
4. Presentation and Discussion: Phoenix Light Rail Implementation Wulf Grote Planning and Development Director, Phoenix Valley Metro Light Rail Transit in Phoenix Broadway Citizen s Task Force February
EXHIBIT A Accessible Truck Routes Map
EXHIBIT A Accessible Truck Routes Map ASHEVILLE, NORTH CAROLINA ROUTE: A ROUTE: B ROUTE: C ROUTE: D ROUTE: E EXHIBIT A EXHIBIT B Craven Street Improvements Map ASHEVILLE, NORTH CAROLINA EXHIBIT B EXHIBIT
Impact Analysis: The Atlanta Braves new Stadium Project. March 2014. A Cushman & Wakefield Research Publication
Impact : The new Stadium Project A Cushman & Wakefield Research Publication March 2014 1 Executive Summary The new baseball stadium project will dramatically transform the Cumberland/Galleria area of Northwest
Ohio Department of Transportation. Lytle Tunnel Rehabilitation Phase 2 Public Information Meeting
Ohio Department of Transportation John R. Kasich, Governor Jerry Wray, Director Lytle Tunnel Rehabilitation Phase 2 Public Information Meeting HAM-71-1.34, PID 87268 July 23, 2013 Project Overview Purpose
Significant investment and improvement of infrastructure and transport networks, delivered at no cost and no risk
December 2014 FACT SHEET: TRANSPORT AND INFRASTRUCTURE Significant investment and improvement of infrastructure and transport networks, delivered at no cost and no risk The Gold Coast Integrated Resort
Table of Contents ALPHABETIZED LIST OF CIP PROJECTS... 1 CIP 5 YEAR SUMMARY BY CATEGORY... 18 SMART CITY CIP 5 YEAR SUMMARY BY VISION...
Table of Contents ALPHABETIZED LIST OF CIP PROJECTS... 1 CIP 5 YEAR SUMMARY BY VISION... 5 CIP 5 YEAR SUMMARY BY CATEGORY... 18 SMART CITY CIP 5 YEAR SUMMARY BY VISION... 33 CAPITAL IMPROVEMENT PROJECTS
BEST PRACTICES. Smart Transportation is a key concept for the Paoli Roadway Improvement Project.
Smart Transportation Smart Transportation is a key concept for the Paoli Roadway Improvement Project. PennDOT s Smart Transportation Guidebook (2008) outlines a comprehensive approach to transportation
9988 REDWOOD AVENUE PROJECT TRAFFIC IMPACT ANALYSIS. April 24, 2015
9988 REDWOOD AVENUE PROJECT TRAFFIC IMPACT ANALYSIS April 24, 2015 Kunzman Associates, Inc. 9988 REDWOOD AVENUE PROJECT TRAFFIC IMPACT ANALYSIS April 24, 2015 Prepared by: Bryan Crawford Carl Ballard,
North Avenue Corridor Study. Advisory Committee Meeting #5 June 11, 2014
North Avenue Corridor Study Advisory Committee Meeting #5 June 11, 2014 Agenda Welcome and introductions Concept refinement and evaluation: Public meeting and web survey General cross-section concepts
CONSTRUCTION MANAGER S WEEKLY PROGRESS REPORT
Volkert Field Office 80 M Street SE, Suite 725 Washington, DC 20003 RIVERSMART WASHINGTON - CONSTRUCTION RIVERSMART MACFARLAND, RIVERSMART LAFAYETTE AND GREEN ALLEYS CHEVY CHASE D.C. Contract No.: DCKA-2013-C-0160
Bond Release Process for New Subdivision Developments in Fairfax County
Bond Release Process for New Subdivision Developments in Fairfax County An Overview for Homeowners Associations A Fairfax County, Va., publication April 2009 For more information or to request this document
South Florida East Coast Corridor (SFECC) Projects. February 7, 2012
Project Update to City of Ft. Lauderdale Central lbroward deast West ttransit it& South Florida East Coast Corridor (SFECC) Projects February 7, 2012 Transit Studies Building a network of premium transit.
FOR IMMEDIATE RELEASE September 17, 2013 Contact:
NEWS RELEASE FOR IMMEDIATE RELEASE September 17, 2013 Contact: Diana L. Klink 757.514.4104 757.359.1845 Tim Kelley 757.514.4103 757.871.3039 UPDATE (Bridge Road/Mills Godwin Bridge) The work scheduled
Appendix J Transportation Management Plan Report. Traffic Operational Analysis Report
Appendix J Transportation Management Plan Report Traffic Operational Analysis Report Transportation Management Plan Report VIRGINIA AVENUE TUNNEL RECONSTRUCTION PROJECT WASHINGTON, DC PRELIMINARY TRANSPORTATION
APPENDIX J TRAFFIC STUDY
APPENDIX J TRAFFIC STUDY May 7, 2014 Ms. Leianne Humble Denise Duffy and Associates, Inc. 947 Cass Street, Suite 5 Monterey, CA 93940 Re: Traffic Study for the Heritage Oaks Memorial Park in San Jose,
Aerial View E Looking West
Figure 3-9 Aerial View E Looking West 3-19 Urban Design Figure 3-10 Aerial View F Looking North West 3-20 Urban Design Figure 3-11 Skyline and Massachusetts Avenue Gateway 3-21 Urban Design 4.0 TRANSPORTATION
Surface Transportation Program (STP)
Project Name: Project Sponsor: FEDERAL FUNDS PROJECT APPLICATION TRANSPORTATION IMPROVEMENT PROGRAM 2008-2013 SALT LAKE and OGDEN/ LAYTON URBAN AREAS Surface Transportation Program (STP) Urban Surface
The Bond Release Process for New Subdivision Developments: An Overview for Homeowners Associations DRAFT 6-4-08. Revised 9-25-08
The Bond Release Process for New Subdivision Developments: An Overview for Homeowners Associations DRAFT 6-4-08. Revised 9-25-08 Fairfax County requires developers to post a performance bond if they are
Economic Impact of Redeveloping The World Trade Center Site: New York City, New York State, And the New York-New Jersey Area
Economic Impact of Redeveloping The World Trade Center Site: New York City, New York State, And the New York-New Jersey Area Appleseed October 30, 2003 Executive Summary The redevelopment of the World
3.1 Historical Considerations
3. Recommended Scope of Bridge improvements 3.1 Historical Considerations In the fall of 2000, an outside consultant, Fraser Design, suggested that the existing 4 th St. Bridge is potentially eligible
TABLE OF CONTENTS TABLES FIGURES
TABLE OF CONTENTS Introduction...1 1. On-Site Stacking...2 2. Number of School Driveways...2 3. School Driveway Standards...3 3A. Driveway Spacing...3 3B. Driveway Location...4 3C. Driveway Lane Widths
Capital Projects Town Hall Meeting
Capital Projects Town Hall Meeting Planning, Architectural & Engineering Services September 15, 2014 Agenda Project Updates Recently Completed and in Construction Projects in Design Projects in Planning
Maryland Invests $845 Million in New Highway and Bridge Projects
Maryland Invests $845 Million in New Highway and Bridge Projects Completing Widening of MD 404 Talbot And Caroline Counties Top Regional Priority Queen Anne s, Talbot, and Caroline Counties Widening MD
KENTUCKY TRANSPORTATION CABINET. Department of Rural and Municipal Aid. Office of Local Programs
KENTUCKY TRANSPORTATION CABINET Department of Rural and Municipal Aid Office of Local Programs Office of Local Programs Transportation Enhancements Safe Routes to School Congestion Mitigation and Air Quality
PROJECT COST ESTIMATE ASSUMPTIONS AND EXCLUSIONS
C PROJECT ESTIMATE ASSUMPTIONS AND EXCLUSIONS In support of the alternatives development process, preliminary cost estimates were prepared for each of the three Candidate Build Alternatives. The cost estimates
DESIGN PUBLIC HEARING. August 10, 2015 WEST BOYLSTON TOWN HALL, BOARD MEETING ROOM. 140 Worcester Street WEST BOYLSTON, MASSACHUSETTS 6:30 PM
DESIGN PUBLIC HEARING August 10, 2015 AT WEST BOYLSTON TOWN HALL, BOARD MEETING ROOM 140 Worcester Street WEST BOYLSTON, MASSACHUSETTS 6:30 PM FOR THE PROPOSED Rehabilitation & Stormwater Improvements
ENGINEERING REPORT. College Street: Interstate 85 to Donahue Drive Traffic Signal System Feasibility Study Auburn, Alabama
ENGINEERING REPORT College Street: Interstate 85 to Donahue Drive Traffic Signal System Feasibility Study Auburn, Alabama Prepared for: The City of Auburn Prepared by: 3644 Vann Road Suite 100 Birmingham,
Downtown Louisville Two-Way Street Study
Final Draft Report Downtown Louisville Two-Way Street Study Submitted to Downtown Development Corporation Submitted by ENTRAN, PLC Submitted October 2009 Table of Contents Introduction Study Purpose...1
Executive Summary. Transportation Needs CHAPTER. Existing Conditions
CHAPTER 1 Executive Summary The City of Forest Grove Transportation System Plan (TSP) was updated to keep it consistent with recent growth trends in the city and other transportation planning efforts in
Illinois Tollway and Chicago Department of Transportation Construction Networking Event. March 13, 2015
Illinois Tollway and Chicago Department of Transportation Construction Networking Event March 13, 2015 Today s Agenda Welcome Illinois Tollway projects Chicago Department of Transportation (CDOT) projects
Walkable Communities Florida Department of Transportation State Safety Office Pedestrian and Bicycle Program April 1995 www.dot.state.fl.us/safety Twelve Steps for an Effective Program Page 1 Twelve Steps
TRAFFIC IMPACT ANALYSIS
TRAFFIC IMPACT ANALYSIS Presenter Gerry Harter, PE, Area Traffic Engineer Acting Transportation and Land Use Director Why a TIA? Roads are a critical public resource and a major investment of public funds
DRAFT. Light Rail Corridor Shared-Use Path Study. September 2014. Prepared for: Prepared by:
Light Rail Corridor Shared-Use Path Study Prepared for: Prepared by: Introduction With the plans to extend transit from ewtown Road to the oceanfront in the City of Virginia Beach progressing, there is
AGENCY COORDINATION AND PUBLIC INVOLVEMENT
5 AGENCY COORDINATION AND PUBLIC INVOLVEMENT 5.1 AGENCY COORDINATION As part of the planning process for the Oregon Avenue Final EA, DDOT conducted an agency coordination program. This coordination included
Tier 1 Strategies. WV Route 14 Corridor Management Plan
1.1 1.2 1.3 1.4 Signal timing optimization system improvements. Improve geometry traffic control at high crash intersections. Construct intersection capacity improvement projects. Widen longer sections
The Need for Traffic Incident Management
The Need for Traffic Incident Management With traffic incidents responsible for approximately 50-60% of the congestion delays motorists encounter on the nation s roadways every day, increased roadway capacity
Infrastructure assets are distinguished from other capital assets because they normally:
4. REPORTING 4.2 Government-Wide Financial Statements 4.2.6 Infrastructure Reporting 4.2.6.10 Governments are required to report all of their capital assets in the statement of net position. Infrastructure
STANDARDIZED CLASSIFICATION SYSTEM TO ASSESS THE STATE AND CONDITION OF INFRASTRUCTURE IN EDMONTON
STANDARDIZED CLASSIFICATION SYSTEM TO ASSESS THE STATE AND CONDITION OF INFRASTRUCTURE IN EDMONTON Theresa Cloake, P.Eng. Infrastructure Analyst and K.L. Siu, P.Eng. Senior Infrastructure Officer Office
Review Public Input Report Jenn Toothaker. Approval of Meeting Summaries: May 21, May 23, May 30, & June 20, 2013 Meetings
Call to the Audience Guidelines 2 Call to the Audience opportunities Must fill out participant card Participants called in the order cards are received 3 minutes allowed per participant CTF Facilitator
Schenk-Atwood Neighborhood Business District Master Plan
Schenk-Atwood Neighborhood Business District Master Plan Prepared for the Schenk-Atwood Revitalization Association (SARA) and the City of Madison SCHREIBER/ANDERSON ASSOCIATES, INC. BEST Real Estate Group,
ADA POST INSPECTION CHECKLIST. Job No. Route County Location
ADA POST INSPECTION CHECKLIST Job No. Route County Location SIDEWALKS All sidewalks constructed within the project limits are ADA compliant. Sidewalks are 5 or greater in width. Exception, existing sidewalks
Chapter 22. Lump Sum Project Guidelines
Chapter 22 Lump Sum Project Guidelines 22.1 General...22-1 22.2 Project Selection...22-3 22.3 Plans Preparation...22-5 22.4 Preliminary Estimate...22-7 22.5 Specifications...22-9 22.6 Contracts Administration...22-11
Chapter 10.48 BICYCLES
Chapter 10.48 BICYCLES Sections: 10.48.010 Traffic Laws Applied to Persons Riding Bicycles. 10.48.110 Equipment on Bicycles; Brakes and Lights. 10.48.130 Right-of-Way. 10.48.140 Right Turn Lanes. 10.48.150
Permeable Pavers. calstone.com. Permeable Interlocking Concrete Pavements (PICP s)
Permeable Pavers Permeable Interlocking Concrete Pavements (PICP s) CBC Title 24/ADA Compliant LEED Functional Optimum balance of surface infiltration and joint interlock Available in a 6 x 9 Quarry Stone
INDOT 2000-2025 Long Range Plan
Chapter 9 INDOT 2000-2025 Long Range Plan Highway Needs Analysis Overview The statewide transportation planning process provides for the identification of highway needs through a comprehensive process
CITY COUNCIL WORKSHOP MAY 24, 2016
1 CITY COUNCIL WORKSHOP MAY 24, 2016 Capital Budget FY 2016-2017 & 2017-2018 Robert Ovadia, PE, City Engineer 2 Overview FY 2015-16 Accomplishments Projects Completed during FY 2015-16 Projects Under Construction
Northwest Light Rail Extension Pre-Construction/Final Design. Public Meeting November 27 & 29, 2012
Northwest Light Rail Extension Pre-Construction/Final Design Public Meeting November 27 & 29, 2012 6:00 6:30 p.m. Open House 6:30 7:00 p.m. Presentation 7:00 8:00 p.m. Open House 2 Project Overview Carla
1800 Washington Boulevard, Baltimore, MD 21230-1718 www.mde.maryland.gov 410-537-3000 800-633-6101 TTY Users 800-735-2258 Larry Hogan, Governor Boyd
ENVIRONMENTAL SITE DESIGN (ESD) REDEVELOPMENT EXAMPLES OCTOBER 2010 1800 Washington Boulevard, Baltimore, MD 21230-1718 www.mde.maryland.gov 410-537-3000 800-633-6101 TTY Users 800-735-2258 Larry Hogan,
The financial plan was prepared in conjunction with the Technical Working Group. Refer to Table 3-1: Funding and Implementation Plan.
3 Financial Plan The purpose of the financial plan is to identify funding options that would be likely sources of money to advance recommendations made by this study. The Capitol Region Transportation
Downtown Community Planning Council Meeting offebruary 18, 2015
- san diego Item #12 DATE ISSUED: ATTENTION: SUBJECT: February 13, 2015 Downtown Community Planning Council Meeting offebruary 18, 2015 Consideration of Support for Grant Applications for the San Diego
ALKS SIDEW II. TK TK TK TK TK TK TK TK 40 BOSTON COMPLETE STREETS GUIDELINES DRAFT - JULY 2011 BOSTON TRANSPORTATION DEPARTMENT
40 Sidewalk Materials Materials and Sidewalk Zones Permeable Pavement Accessibility The key components of sidewalk construction are material selection and installation. These two aspects should come together
APPENDICES G) DETAILED BACKBONE INFRASTRUCTURE CONSTRUCTION COST ESTIMATE SUMMARY
ALAMEDA POINT MASTER INFRASTRUCTURE PLAN March 31, 2014 APPENDICES G) DETAILED BACKBONE INFRASTRUCTURE CONSTRUCTION COST ESTIMATE SUMMARY Carlson, Barbee & Gibson, Inc. Backbone Infrastructure Engineer
PROJECT MANAGEMENT HANDBOOK, PART 1 - ISSUES COMMON TO ALL PROJECT MANAGERS
CHAPTER 11 - Project Continuity Contents Introduction... 2 Phase Hand-Offs... 3 Project Feedback... 9 Project Management Team Approach... 10 Page 1 of 15 Introduction A primary objective of all Project
Road Repaving and Street Safety Bond Quarterly Status Report presented to the Citizens General Obligation Bond Oversight Committee As of March 2016
Road Repaving and Street Safety Bond Quarterly Status Report presented to the Citizens General Obligation Bond Oversight Committee As of March 2016 Overview of RRSS Bond Scope and Budget (including accountability
Accident Analysis of Sheridan Road between Isabella Street and South Boulevard
Accident Analysis of Sheridan Road between Isabella Street and South Boulevard Prepared for TranSystems Corporation for the City of Evanston Submitted by Regina Webster & Associates, Inc. Date: 08/15/2008
Topic 2 11/28/2012 Blocks & Street Network
TOPIC 2 Blocks & Street Network Implementation Note: 1. Some recommendations are summarized in the tables herein. For complete recommendation language, please see the. 2. Recommendations referenced in
Measuring the Street:
Measuring the Street: New Metrics for 21st Century Streets 1 Measuring the Street: New Metrics for 21st Century Streets New York City s streets are constantly called on to the meet new and varied needs
Legacy Trail Extension Feasibility Study. Preliminary Cost Estimate
Preliminary Cost Estimate February 2015 Category item Unit Unit Cost Quantity Cost Notes Trail Corridor (Combined Trail length ~ 25,800' + Separated Trail length ~ 13,700' = Total Length ~ 39,500' or 7.5
Granger Bay Boulevard and Green Point Roundabout
Granger Bay Boulevard and Green Point Roundabout INTRODUCTION Aurecon was appointed for the design and construction supervision of the Granger Bay Boulevard and Green Point roundabout that provides access
City of Chula Vista. Fiscal Year 2016 2017. Proposed Budget Overview. May 9 and 18, 2016
City of Chula Vista Fiscal Year 2016 2017 Proposed Budget Overview May 9 and 18, 2016 Agenda Fiscal Year 2016 17 Proposed Budget All Funds Summary General Fund Summary Long Term Financial Plan Fiscal Year
City of Douglas Commercial Building Permit Site Application
City of Douglas Commercial Building Permit Site Application *Complete the following information including a complete site plan and floor plan. *Incomplete information may result in delay and/or rejection
National Archives and Record Administration
National Archives and Record Administration Installation of Self-Closing Flood Barriers and Loading Dock Turntable Removal and Structural Slab Repairs ! 2010 Baltimore Washington Chapter Outstanding Repair
Summary of Bicycle Ordinances Tulsa Metropolitan Region. Passing requirement. Use of permanent seat
May 2009 Updated 10/2011 Summary of Bicycle Ordinances Tulsa Metropolitan Region Mandatory Sidepath Two Abreast Bicycles considered vehicles Passing requirement Use of permanent seat Ride as far to the
Mobility Management Plan Study of the Busch Boulevard Corridor
Mobility Management Plan Study of the Busch Boulevard Corridor March 2000 Hillsborough County Metropolitan Planning Organization 601 E. Kennedy, 18th Floor Tampa, Florida 33602-5117 813/272-5940 FAX NO:
EPA Technical Assistance for Sustainable Communities Building Blocks
EPA Technical Assistance for Sustainable Communities Technical Assistance Tool: Complete Streets Deerfield Beach, Florida February 16, 2012 To: CC: Amanda Martinez, City of Deerfield Beach Roger Millar,
RESOLUTION R2004-48. PASSED AT SYCAMORE, ILLINOIS, THIS 16th DAY OF JUNE 2004, A.D. Chairman, DeKalb County Board ATTEST: County Clerk
RESOLUTION R2004-48 WHEREAS, the Governmental Accounting Standards Board issued Pronouncement #34 which requires governmental entities to capitalize and report Fixed Assets on the annual audited financial
2015 ODOT Bridge Design Conference May 12, 2014. DeJong Rd Bridge High- Seismic Zone Case Study: Bridge Rehab vs. Replacement.
2015 ODOT Bridge Design Conference May 12, 2014 DeJong Rd Bridge High- Seismic Zone Case Study: Bridge Rehab vs. Replacement Mary Ann Triska 2015 HDR, all rights reserved. Presentation Outline Project
REQUEST FOR PROPOSAL FOR PROFESSIONAL SERVICES (PS-0748-A) Appendix 1 Project Information. PS-0748-A Page 1 5/4/2016 Appendix 1
REQUEST FOR PROPOSAL FOR PROFESSIONAL SERVICES (PS-0748-A) Project Information PS-0748-A Page 1 5/4/2016 Table of Contents Project Budget Worksheet Program Plan Project Location (Site Plan) Scope of Services
The Northumberland Estates Proposed Residential Development, Prudhoe Town Centre D/I/D/63558/603. Framework Residential Travel Plan
The Northumberland Estates Proposed Residential Development, Prudhoe Town Centre D/I/D/63558/603 Framework Residential Travel Plan September 2013 CONTROL SHEET CLIENT: PROJECT TITLE: REPORT TITLE: THE
Executive Director s Recommendation Commission Meeting: March 5, 2015
Executive Director s Recommendation Commission Meeting: March 5, 2015 PROJECT Curseen-Morris Processing and Distribution Center Parking Lot 900 Brentwood Avenue NE Washington, DC SUBMITTED BY United States
Southern California International Gateway Project Description
Southern California International Gateway Project Description Introduction This Supplemental Notice of Preparation and Initial Study is to inform Responsible, Trustee Agencies, and the public that the
ODOT Major Construction, Bikeways and Enhancements Report for Lucas County. (State Fiscal Years 2007 to 2010)
Bikeways and Enhancements Report for Lucas County (State Fiscal Years 2007 to 2010) Statewide Construction Summary by Major Work Type (in Millions) WORK TYPE SFY 2007 SFY 2008 SFY 2009 SFY 2010 TOTAL #
Temporary Traffic Control for Building and Maintaining Single and Multi-Lane Roundabouts
Purpose and Background Temporary Traffic Control for Building and Maintaining Single and Multi-Lane Roundabouts Although roundabouts have recently gained popularity and use in the United States, minimal
Fast Track A Successful Redevelopment: The Palm Beach Outlets Story
Fast Track A Successful Redevelopment: The Palm Beach Outlets Story SPEAKERS Rick Greene, AICP City of West Palm Beach Brian Seymour, Esq. Gunster Ken Tuma, PE UDKS Josh Long, AICP Gunster Grand Opening