1 Name: Instructions: Auditor Information (1) Use all three tools for your assessment (2) If the tool can not determine the criteria, check (3) Indicate the tools used (4) Rate the effectiveness of the tool Street 1. What is the average number of driving lanes on this segment? One Two Four 2. What is the approximate width of the street? (Street plus sidewalks) Total street width estimated 3. What are the on-street parking configurations on this segment? One Side of the Street Both Sides of the Street No on-street parking allowed 1

2 4. Is the On-Street Parking on this segment currently used? Not at all Few cars are parked on the segment Half of the segment is full with cars Entire Segment is full 5. What is the road base material on this segment of the street? (driving surface) Asphalt Bricks Concrete Interlocking pavers (others) 6. What is the arrangement of Sidewalks on this segment? None One Side of the Street Both Sides of the Street 2

3 7. What is the base material of the sidewalk on this segment of the street? (walking surface) Side One Asphalt Bricks Concrete Interlocking pavers Other Side Two Asphalt Bricks Concrete Interlocking pavers Other 8. What is the approximate width of the sidewalks on this segment of the Street? (estimated) Side One Estimated sidewalk Not applicable width Side Two Not applicable Estimated sidewalk width 9. Are there street Curbs and Edging on this segment of the street? None One Side of the Street Both Sides of the Street 3

4 10. What is the type of Curb? Straight Rolling Without Gutter With Gutter Not useful Somewhat Very Not useful Somewhat Very Not useful Somewhat Very 11. What is the material of the Curb? Concrete Wood Granite Not useful Somewhat Very Not useful Somewhat Very Not useful Somewhat Very 12. Are there walk ramps on this segment of street? Not Applicable None On only one end On both ends On Both Sides and Ends Not useful Somewhat Very Not useful Somewhat Very Not useful Somewhat Very 4

5 13. What is the condition of the walk ramps on this segment of street?- can they be used easily by someone with walking disabilities? Can t be used Used but with some difficulty Easily used 14. What is the average building setback on this segment of the street? Building Setback 15. Are there Planting Strips between sidewalks and curb on this street? None One Side of the Street Both Sides of the Street 16. What is the approximate width of the planting strips on this Street? (estimated) Not applicable Estimated planting strip width 5

6 17. Are there Crossing aids for pedestrians to cross the street safely (e.g crosswalks, stoplight, overpass, traffic island, curb extension)? None Some Many 18. Are there benches in this segment of the street? None Over Are there Fences on this segment of the street? None One Side of the Street Both Sides of the Street 20. Are there street lighting on this segment of the street? Yes No 6

7 21. What is the average spacing between street lights? (estimated) Street light Spacing 22. What is the approximate height of the street lights? (estimated) Street light Height 23. Are there street trees on this segment of the street? Yes No 24. What is the average spacing between street trees? (estimated) Street trees Spacing 7

8 25. What is the average height of the street trees? (estimated) Street trees height 26. What is the shade coverage (canopy?) of the street trees on this segment? Not applicable No coverage Some Area of Street Most Area of Street 27. In your estimation, and based on the web tools how comfortable do you think the walk along this segment of the street would be? (from tree shades, architectural features, other amenities) Very uncomfortable Somewhat comfortable Somewhat comfortable Very Comfortable 28. In your estimation, and based on the web tools how aesthetically pleasant do you think the walk along this segment of the street would be? (presence of broken bottles, abandoned cars, road signs, graffiti, plantings, pedestrian signage, etc) Very unpleasant Somewhat unpleasant Somewhat pleasant Very pleasant 8

Topic 2 11/28/2012 Blocks & Street Network

Topic 2 11/28/2012 Blocks & Street Network TOPIC 2 Blocks & Street Network Implementation Note: 1. Some recommendations are summarized in the tables herein. For complete recommendation language, please see the. 2. Recommendations referenced in

More information

Evanston Main Street Station TOD Plan and Study. Appendix A.1: Station Area Existing Conditions

Evanston Main Street Station TOD Plan and Study. Appendix A.1: Station Area Existing Conditions Evanston Main Street Station TOD Plan and Study Appendix A.1: Station Area Existing Conditions EvanstonMainStreetStation TODPlanandStudy A 1 AppendixA.1: ExistingConditions Table of Contents Station Locations

More information

FY 2011 OHIO SMALL CITIES COMMUNITY DEVELOPMENT BLOCK GRANT COMPREHENSIVE DOWNTOWN REVITALIZATION PROGRAM

FY 2011 OHIO SMALL CITIES COMMUNITY DEVELOPMENT BLOCK GRANT COMPREHENSIVE DOWNTOWN REVITALIZATION PROGRAM CITYOFOBERLIN OHIO CITY OF OBERLIN, OHIO FY 2011 OHIO SMALL CITIES COMMUNITY DEVELOPMENT BLOCK GRANT COMPREHENSIVE DOWNTOWN REVITALIZATION PROGRAM Background In October, 2011, the City of Oberlin Planning

More information

ADA POST INSPECTION CHECKLIST. Job No. Route County Location

ADA POST INSPECTION CHECKLIST. Job No. Route County Location ADA POST INSPECTION CHECKLIST Job No. Route County Location SIDEWALKS All sidewalks constructed within the project limits are ADA compliant. Sidewalks are 5 or greater in width. Exception, existing sidewalks

More information

City of Auburn Americans with Disabilities Act (ADA) Transition Plan for Curb Ramps, Sidewalks, and Pedestrian Signals ADA TRANSITION PLAN

City of Auburn Americans with Disabilities Act (ADA) Transition Plan for Curb Ramps, Sidewalks, and Pedestrian Signals ADA TRANSITION PLAN Americans with Disabilities Act (ADA) Transition Plan for Curb Ramps, Sidewalks, and Pedestrian Signals ADA TRANSITION PLAN December 21, 2009 Public Works Department 171 N. Ross Street, Suite 200 Auburn,

More information

Foot Both Location Information - A Footwear Checklist

Foot Both Location Information - A Footwear Checklist Audit information collected by: Foot Auto Both Location information collected by: Foot Auto Both LAND USE ENVIRONMENT 1. How much integration of residential and non-residential land uses is visible in

More information

BEST PRACTICES. Smart Transportation is a key concept for the Paoli Roadway Improvement Project.

BEST PRACTICES. Smart Transportation is a key concept for the Paoli Roadway Improvement Project. Smart Transportation Smart Transportation is a key concept for the Paoli Roadway Improvement Project. PennDOT s Smart Transportation Guidebook (2008) outlines a comprehensive approach to transportation

More information

Walkable Communities Florida Department of Transportation State Safety Office Pedestrian and Bicycle Program April 1995 www.dot.state.fl.us/safety Twelve Steps for an Effective Program Page 1 Twelve Steps

More information

City of St. Petersburg Development Services. February 2006. Driveways for Residential Properties

City of St. Petersburg Development Services. February 2006. Driveways for Residential Properties City of St. Petersburg Development Services February 2006 Citizen s s Guide to Driveways for Residential Properties Pursuant to Section 29-909 of the City s Zoning Ordinance, all passenger motor vehicles

More information

ALKS SIDEW II. TK TK TK TK TK TK TK TK 40 BOSTON COMPLETE STREETS GUIDELINES DRAFT - JULY 2011 BOSTON TRANSPORTATION DEPARTMENT

ALKS SIDEW II. TK TK TK TK TK TK TK TK 40 BOSTON COMPLETE STREETS GUIDELINES DRAFT - JULY 2011 BOSTON TRANSPORTATION DEPARTMENT 40 Sidewalk Materials Materials and Sidewalk Zones Permeable Pavement Accessibility The key components of sidewalk construction are material selection and installation. These two aspects should come together

More information

VERTICAL SPEED CONTROL DEVICES

VERTICAL SPEED CONTROL DEVICES H-3.8 VERTICAL SPEED CONTROL DEVICES GENERAL 1. Description This standard identifies minimum requirements that shall be met for all Vertical Speed Control Devices in the design and construction of elements

More information

RESIDENTIAL DRIVEWAYS

RESIDENTIAL DRIVEWAYS RESIDENTIAL DRIVEWAYS If you have specific questions or want to confirm your plans, our staff is available to assist in person, by telephone, or by e-mail. City of St. Petersburg Division of Development

More information

City of Wichita, Kansas Americans with Disabilities Act Transition Plan Main Library Address

City of Wichita, Kansas Americans with Disabilities Act Transition Plan Main Library Address City of Wichita, Kansas Americans with Disabilities Act Transition Plan Main Library Address July 005 Prepared by DMCG Disability Management Consulting Group L.L.C. 801 Jonquil Place Columbia, MO 650 In

More information

MAIN STREET IMPROVEMENTS Water, Sewer, Stormwater and Streetscape Improvements

MAIN STREET IMPROVEMENTS Water, Sewer, Stormwater and Streetscape Improvements MAIN STREET IMPROVEMENTS Water, Sewer, Stormwater and Streetscape Improvements Presentation July 23, 2014 A. Morton Thomas and Associates, Inc. 800 King Farm Boulevard, 4 th Floor Rockville, Maryland 20850

More information

The first step to repairing a sidewalk damaged by a tree is to enlarge the tree pit.

The first step to repairing a sidewalk damaged by a tree is to enlarge the tree pit. The first step to repairing a sidewalk damaged by a tree is to enlarge the tree pit. Many sidewalks are far wider than they need to be. Enlarging a tree pit not only gives Many sidewalks are far wider

More information

Chapter 162 SHADE TREE COMMISSION

Chapter 162 SHADE TREE COMMISSION Chapter 162 SHADE TREE COMMISSION 162-1. Purpose. 162-2. Definitions. 162-3. Shade Tree Commission. 162-4. Powers and duties of Commission. 162-5. Approval required. 162-6. Duties and responsibilities.

More information

LAKE SHORE DRIVE CTA RED LINE BROADWAY SHERIDAN FOSTER ARGYLE. Pedestrian Access Advisory Committee. April 25, 2014

LAKE SHORE DRIVE CTA RED LINE BROADWAY SHERIDAN FOSTER ARGYLE. Pedestrian Access Advisory Committee. April 25, 2014 FOSTER LAKE SHORE DRIVE CTA RED LINE BROADWAY SHERIDAN ARGYLE ARGYLE STREET STREETSCAPE - S-1-323 Pedestrian Access Advisory Committee BROADWAY ARGYLE CTA RED LINE WINTHROP KENMORE SHERIDAN Broadway -

More information

PLEASE PRINT. Job Name: Job # City File No. SIDEWALK; DRIVEWAY APPROACH; CURB & GUTTER; PEDESTRIAN RAMP; STREET LIGHT; PLANTER STRIP;

PLEASE PRINT. Job Name: Job # City File No. SIDEWALK; DRIVEWAY APPROACH; CURB & GUTTER; PEDESTRIAN RAMP; STREET LIGHT; PLANTER STRIP; City of Santa Rosa ENCROACHMENT PERMIT APPLICATION Application#: Inspector: Liability Ins: WComp. Ins: FOR OFFICE USE ONLY NOTE: YOUR APPLICATION CANNOT BE PROCESSED WITHOUT COMPLETE INFORMATION IN AREAS

More information

OVERVIEW PROJECT SUMMARY

OVERVIEW PROJECT SUMMARY OVERVIEW Cesar Chavez showcases how to successfully redesign a primary arterial route into a neighborhood destination, improving modal share, water sensitive design, biodiversity and safety whilst maintaining

More information

ASSESSMENT OF LANDCAPE PROVISIONS FOR PROPOSED PLAN CHANGE 1. Inner Business Zone. Outer Business Zone PALMERSTON NORTH CITY COUNCIL

ASSESSMENT OF LANDCAPE PROVISIONS FOR PROPOSED PLAN CHANGE 1. Inner Business Zone. Outer Business Zone PALMERSTON NORTH CITY COUNCIL A division of Hudson Group Ltd ASSESSMENT OF LANDCAPE PROVISIONS FOR PROPOSED PLAN CHANGE 1 Inner Business Zone Outer Business Zone PALMERSTON NORTH CITY COUNCIL 1 2 A division of Hudson Group Ltd Prepared

More information

Architectural Design Standards Example Guide DESIGN STANDARDS EXAMPLE GUIDE

Architectural Design Standards Example Guide DESIGN STANDARDS EXAMPLE GUIDE Architectural Design Standards Example Guide DESIGN STANDARDS EXAMPLE GUIDE Commercial, Professional Office, and Public Facility Developments Purpose This Guide offers examples to clarify and explain the

More information

Pavement Management Program

Pavement Management Program Pavement Management Program 2014 Street Maintenance Program Executive Summary 01/21/2014 Presented by Mark Thiel Assistant Director of Public Works Program Overview Start of current program 2005 825.1

More information

Minister s Guideline MG-12 Siting and Design of Single Dwellings

Minister s Guideline MG-12 Siting and Design of Single Dwellings Minister s Guideline MG-12 Siting and Design of Single Dwellings This replaces previous Minister s Guideline MG/12 issued June 2005 Pursuant to section 188 A of the Building Act 1993 (the Act) I hereby

More information

For more information, visit: rethinkingstreets.com

For more information, visit: rethinkingstreets.com For more information, visit: rethinkingstreets.com 37 Arterial Rehab Busy, multi-lane streets, often referred to as arterials, crisscross the landscape of our cities and suburbs. Alongside these wide thoroughfares,

More information

ENGINEERING SOLUTIONS FOR DESIGNING YOUR SAFE ROUTES

ENGINEERING SOLUTIONS FOR DESIGNING YOUR SAFE ROUTES How to Get Started ENGINEERING SOLUTIONS FOR DESIGNING YOUR SAFE ROUTES Design Elements Selecting appropriate design treatments for school neighborhoods creates environments that address the needs of all

More information

SITE SAFETY LOGISTIC PLAN

SITE SAFETY LOGISTIC PLAN SITE SAFETY LOGISTIC PLAN SHEET #1 Title Sheet Site Safety Logistic Plan For Project name & Address as it appears on the NB permit Or as it appears in the BIS system, with Borough Also include the following;

More information

UNIT PRICE LIST January 2009

UNIT PRICE LIST January 2009 UNIT PRICE LIST January 2009 1 INTRODUCTION The purpose of the Unit Price List is to provide a resource for the preparation of cost estimates for subdivisions and permit projects and should be used only

More information

COURTING YOUR BICYCLE AND PEDESTRIAN FACILITIES... FROM A FORENSIC ENGINEERING AND PLANNING PERSPECTIVE

COURTING YOUR BICYCLE AND PEDESTRIAN FACILITIES... FROM A FORENSIC ENGINEERING AND PLANNING PERSPECTIVE COURTING YOUR BICYCLE AND PEDESTRIAN FACILITIES... FROM A FORENSIC ENGINEERING AND PLANNING PERSPECTIVE 1 PRESENTED BY: J.M. TEAGUE ENGINEERING, PLLC 2 OBJECTIVES 1. What is Transportation Forensic Engineering

More information

B. Improve the appearance and character of areas surrounding new development.

B. Improve the appearance and character of areas surrounding new development. Chapter 4.3: Landscape Regulations Sections: 4.301 Purposes 4.302 Applicability 4.303 General Provisions 4.304 Landscape Maintenance 4.301 Purposes The purposes of these regulations are to: A. Promote

More information

VILLAS OF TRADITIONS AT GREY OAKS

VILLAS OF TRADITIONS AT GREY OAKS Report of Turnover Survey VILLAS OF TRADITIONS AT GREY OAKS Grey Oaks Development Naples, Collier County, Florida Forge Engineering Project Number 2907-001.01 March 2015 Richard P..Lundberg, P.E cn=richard

More information

Engineering Standard

Engineering Standard Public Transport Services Engineering Standard Stations - Bicycle Facilities PART 129013 AR-PW-PM-SPE-00129013 (D073) Document Control Document Status Document Amendment Record Revision Change Description

More information

Developing Street Standards That Allow Flexibility

Developing Street Standards That Allow Flexibility Developing Street Standards That Allow Flexibility ABSTRACT GWEN OWENS City of Sacramento 927 10th Street Sacramento, CA 95814 gowens@sacto.org The City of Sacramento, California, recently updated its

More information

CITY OF BRAMPTON STREET CORRIDOR MASTER PLAN

CITY OF BRAMPTON STREET CORRIDOR MASTER PLAN 1.0 INTRODUCTION... 1 1.1 Purpose of Document... 1 1.2 Master Plan Goal...1 1.3 Design Objectives... 2 1.4 Design Approach... 2 2.0 PROJECT SCOPE...2 2.1 City Context 2 2.2 Regional Context 2 3.0 DESIGN

More information

BETTER STREETS PLAN SAN FRANCISCO POLICIES AND GUIDELINES FOR THE PEDESTRIAN REALM DRAFT PLAN RELEASE PACKET JUNE 2008. inside:

BETTER STREETS PLAN SAN FRANCISCO POLICIES AND GUIDELINES FOR THE PEDESTRIAN REALM DRAFT PLAN RELEASE PACKET JUNE 2008. inside: SAN FRANCISCO BETTER STREETS PLAN POLICIES AND GUIDELINES FOR THE PEDESTRIAN REALM DRAFT PLAN RELEASE PACKET JUNE 2008 inside: LETTER FROM MAYOR GAVIN NEWSOM EXECUTIVE SUMMARY SAN FRANCISCO PLANNING DEPARTMENT

More information

Bicycle Parking Guide

Bicycle Parking Guide Safe Routes to School Bicycle Parking Guide Get the most out of federal Safe Routes to School Funds B I K E R A C K S Cover photo courtesy of Bikes Belong Coalition Contents What is Safe Routes to School?

More information

APPLICATION LAFAYETTE METROPOLITAN PLANNING ORGANIZATION (MPO) SURFACE TRANSPORTATION PROGRAM (STP) FUNDS TRANSPORTATION IMPROVEMENT PROGRAM (TIP)

APPLICATION LAFAYETTE METROPOLITAN PLANNING ORGANIZATION (MPO) SURFACE TRANSPORTATION PROGRAM (STP) FUNDS TRANSPORTATION IMPROVEMENT PROGRAM (TIP) APPLICATION LAFAYETTE METROPOLITAN PLANNING ORGANIZATION (MPO) SURFACE TRANSPORTATION PROGRAM (STP) FUNDS TRANSPORTATION IMPROVEMENT PROGRAM (TIP) To be considered for STP funding, a proposed project must

More information

UDRB APPLICATION URBAN DEVELOPMENT REVIEW BOARD

UDRB APPLICATION URBAN DEVELOPMENT REVIEW BOARD UDRB APPLICATION CITY OF MIAMI VISION STATEMENT: To Be an International City that Embodies Diversity, Economic Opportunity, Effective Customer Service and a Highly Rated Quality of Life OBJECTIVE: The

More information

Architectural Control Guidelines

Architectural Control Guidelines Architectural Control Guidelines The following Architectural Control Guidelines have been customized for 386 Beaverbrook and are intended to maintain a minimum standard of new construction within the development.

More information

5. Guidelines for Site Elements

5. Guidelines for Site Elements 5. Guidelines for Site Elements City of San Antonio Historic Design Guidelines Office of Historic Preservation CONTENTS Introduction 1 Applicability 1 Guidelines 1 Topography 2 Fences and Walls 4 Landscape

More information

SCHOOL OF ARCHITECTURE & COMMUNITY DESIGN COLLEGE OF THE ARTS UNIVERSITY OF SOUTH FLORIDA

SCHOOL OF ARCHITECTURE & COMMUNITY DESIGN COLLEGE OF THE ARTS UNIVERSITY OF SOUTH FLORIDA SCHOOL OF ARCHITECTURE & COMMUNITY DESIGN COLLEGE OF THE ARTS UNIVERSITY OF SOUTH FLORIDA PROJECT OVERVIEW OVERVIEW The FCCD+R, in coordination with the FDOT District 7, are to facilitate numerous meetings

More information

Roadway Cost Per Centerline Mile Revised June 2014

Roadway Cost Per Centerline Mile Revised June 2014 Rural Arterial From LRE MOT * Mobilization * Subtotal Total PE Design (15%) CEI (15%) Total Project ** New (2-Lane Roadway) with 5' Paved Shoulders $3,351,896 $335,190 $368,709 $4,055,794 $1,013,949 $5,069,743

More information

Residential Driveway Installation Requirements. Table of Contents

Residential Driveway Installation Requirements. Table of Contents Residential Driveway Installation Requirements Table of Contents Residential Driveway Requirements Sidewalk Construction Specifications for Residential Properties Hold Harmless Agreement for Residential

More information

Corridor Goals and Objectives

Corridor Goals and Objectives Corridor Goals and Objectives This chapter presents the goals and objectives, developed by the Corridor Study Committee, that serve as the purpose and intent of the Corridor Plan. This plan covers a twenty

More information

Chapter 25. Trees. Part 1 Trees

Chapter 25. Trees. Part 1 Trees Chapter 25 Trees Part 1 Trees 25-101. Placement of Trees along Streets 25-102. Penalty for Unlawful Placement of Trees along Streets 25-103. Planting of North Carolina Poplar Trees Unlawful 25-104. Removal

More information

Pavement Management Program

Pavement Management Program Pavement Management Program 2013 Street Maintenance Program Executive Summary 1/15/2013 Presented by Mark Thiel Assistant Director Public Works Program Overview Start of current program 2005 812.5 Lane

More information

SECTION 02100 SITE PREPARATION

SECTION 02100 SITE PREPARATION SECTION 02100 SITE PREPARATION PART 1 - GENERAL 1.01 RELATED DOCUMENTS A. Drawings and General Provisions of Contract, including General Conditions and Supplementary Conditions and Division 1 through Division

More information

How To Understand Were Street

How To Understand Were Street 24. Were Street Context Were Street is an asymmetrically aligned double-sided Activity Centre, split into 2 activity clusters separated by residential housing. The centre is approximately 145 metres long

More information

INFORMATION & APPLICATION FOR LARGE SIDEWALK PATIOS ON CITY PROPERTY

INFORMATION & APPLICATION FOR LARGE SIDEWALK PATIOS ON CITY PROPERTY INFORMATION & APPLICATION FOR LARGE SIDEWALK PATIOS ON CITY PROPERTY For additional information: Phone: 3-1-1 (outside Vancouver, 604-873-7000) E-mail: street.activities@vancouver.ca or Visit Engineering

More information

PEDESTRIAN PLANNING AND DESIGN MARK BRUSSEL

PEDESTRIAN PLANNING AND DESIGN MARK BRUSSEL PEDESTRIAN PLANNING AND DESIGN MARK BRUSSEL CONTENT OF LECTURE a) Walking as a transport mode b) Walking in Sub Sahara Africa c) Policies for pedestrians d) Pedestrian characteristics e) Network planning

More information

How Walkable is Your Neighborhood? A project of Health by Design

How Walkable is Your Neighborhood? A project of Health by Design How Walkable is Your Neighborhood? A project of Health by Design A walkable neighborhood one in which all people can safely and easily move about on foot and in which locations, goods, and services can

More information

OMC Study Group MEETING 3: NOTES. Section 1: Building Design Page 2 Section 2: Site Layout Page 9 Section 3: Summary Page 16

OMC Study Group MEETING 3: NOTES. Section 1: Building Design Page 2 Section 2: Site Layout Page 9 Section 3: Summary Page 16 OMC Study Group MEETING 3: NOTES Section 1: Building Design Page 2 Section 2: Site Layout Page 9 Section 3: Summary Page 16 Section 1 Building Design Page 2 of 16 General Comments during Building Design

More information

CITY OF SOMERVILLE, MASSACHUSETTS MAYOR S OFFICE OF STRATEGIC PLANNING & COMMUNITY DEVELOPMENT

CITY OF SOMERVILLE, MASSACHUSETTS MAYOR S OFFICE OF STRATEGIC PLANNING & COMMUNITY DEVELOPMENT CITY OF SOMERVILLE, MASSACHUSETTS MAYOR S OFFICE OF STRATEGIC PLANNING & COMMUNITY DEVELOPMENT MICHAEL F. GLAVIN EXECUTIVE DIRECTOR JOSEPH A. CURTATONE MAYOR PLANNING DIVISION STAFF GEORGE PROAKIS, DIRECTOR

More information

HARRIS TEETER AT LADY S ISLAND CITY OF BEAUFORT DRB CONCEPTUAL PROJECT NARRATIVE Submittal Date: September 2, 2015 Meeting Date: September 10, 2015

HARRIS TEETER AT LADY S ISLAND CITY OF BEAUFORT DRB CONCEPTUAL PROJECT NARRATIVE Submittal Date: September 2, 2015 Meeting Date: September 10, 2015 HARRIS TEETER AT LADY S ISLAND CITY OF BEAUFORT DRB CONCEPTUAL PROJECT NARRATIVE Submittal Date: September 2, 2015 Meeting Date: September 10, 2015 PROPOSED REDEVELOPMENT The project consists of demolishing

More information

D R A W I N G B Y J A M E S W A S S E L L

D R A W I N G B Y J A M E S W A S S E L L T1 D R A W I N G B Y J A M E S W A S S E L L T2 T3 T4 T5 T6 NATURAL RURAL SUBURBAN GENERAL URBAN URBAN CENTER URBAN CORE T1 ZONE T2 ZONE T3 ZONE T4 T5 T6 DA ZONE ZONE ZONE ASSIGNED DISTRICT NATURAL DIVERSITY

More information

Common Property Maintenance Code Violations. An illustrated guide

Common Property Maintenance Code Violations. An illustrated guide Common Property Maintenance Code Violations An illustrated guide 1) Lawn and Vegetation Overgrown weeds, grass, or vegetation. Vegetation obstructing sidewalks, driveways, and other right of ways. Improper

More information

DRAFT MAINTAINING HOUSTON S STREETS REPAIR, REHABILITATION, RECONSTRUCTION. Using the Full Range of Tools for a Challenging Job

DRAFT MAINTAINING HOUSTON S STREETS REPAIR, REHABILITATION, RECONSTRUCTION. Using the Full Range of Tools for a Challenging Job MAINTAINING HOUSTON S STREETS REPAIR, REHABILITATION, RECONSTRUCTION Using the Full Range of Tools for a Challenging Job Report To: TTI Committee May 13, 2014 1 Pavement Management - Suggested Treatments

More information

Outside Storage Ordinance Amendment

Outside Storage Ordinance Amendment Outside Storage Ordinance Amendment ORDINANCE NO. Formatted: Font: Cambria AN ORDINANCE AMENDING CHAPTER 169 OF THE NORTH LIBERTY CODE OF ORDINANCES BY AMENDING SECTION 169.13 TO ESTABLISH NEW SCREENING

More information

Street Sections & Materials Palette Applications LOCAL STREET- SPECIAL APPLICATION (EASTERN TRANSIT CORRIDOR)

Street Sections & Materials Palette Applications LOCAL STREET- SPECIAL APPLICATION (EASTERN TRANSIT CORRIDOR) 5.7 Street Sections & Materials Palette Applications 5.7.1 Street Sections - Location Map LACHLAN PLACE L I D F E H C J A B TAYLOR STREET K G M LOCAL STREET- SPECIAL APPLICATION (EASTERN TRANSIT CORRIDOR)

More information

Appendix C. Sign Design Guidelines. Sign Types and Placement

Appendix C. Sign Design Guidelines. Sign Types and Placement Appendix C Sign Design Guidelines Because signage is intended to be visible and attract attention, it has significant visual impact on the area in which it is placed, particularly in a community that is

More information

ODOT Major Construction, Bikeways and Enhancements Report for Lucas County. (State Fiscal Years 2007 to 2010)

ODOT Major Construction, Bikeways and Enhancements Report for Lucas County. (State Fiscal Years 2007 to 2010) Bikeways and Enhancements Report for Lucas County (State Fiscal Years 2007 to 2010) Statewide Construction Summary by Major Work Type (in Millions) WORK TYPE SFY 2007 SFY 2008 SFY 2009 SFY 2010 TOTAL #

More information

The paper version offers a low-tech option to the smart phone application. Everything needed to implement the paper version of the PEQI is below.

The paper version offers a low-tech option to the smart phone application. Everything needed to implement the paper version of the PEQI is below. Pedestrian Environmental Quality Index (P.E.Q.I.) The PEQI is a quantitative observational tool that was originally developed in 2008 by the San Francisco Department of Public Health to assess the quality

More information

TEST ON Driving Safely Among Bicyclists and Pedestrians

TEST ON Driving Safely Among Bicyclists and Pedestrians TEST ON Driving Safely Among Bicyclists and Pedestrians Next you will take a 16 question test about driving safely among bicyclists and pedestrians. Please take out a sheet of paper to mark down and score

More information

Item No. 432S Portland Cement Concrete Sidewalks. 432S.1 Description

Item No. 432S Portland Cement Concrete Sidewalks. 432S.1 Description Item No. 432S Portland Cement Concrete Sidewalks 432S.1 This item shall govern the construction of Portland cement concrete sidewalks (Standard Detail No. 432S-1), as herein specified, on an approved subgrade

More information

CONSTRUCTION MANAGER S WEEKLY PROGRESS REPORT

CONSTRUCTION MANAGER S WEEKLY PROGRESS REPORT Volkert Field Office 80 M Street SE, Suite 725 Washington, DC 20003 RIVERSMART WASHINGTON - CONSTRUCTION RIVERSMART MACFARLAND, RIVERSMART LAFAYETTE AND GREEN ALLEYS CHEVY CHASE D.C. Contract No.: DCKA-2013-C-0160

More information

STANDARD SPECIFICATIONS

STANDARD SPECIFICATIONS STANDARD SPECIFICATIONS Standard Slope: Unless otherwise specified on the permit, the sidewalk grade shall be sloped upward from the existing curb at a rate of 2% (approx. ¼ inch per foot). New work required

More information

Comprehensive Mobility Project Development Process Capital Metro ¼-Cent Fund Analysis

Comprehensive Mobility Project Development Process Capital Metro ¼-Cent Fund Analysis Comprehensive Mobility Project Development Process Capital Metro ¼-Cent Fund Analysis Transportation & Mobility projects that meet the following criteria: enhances regional mobility; supports public transit;

More information

Designing Pedestrian Facilities for Accessibility. ADA Compliance Training. Local Programs Engineer FHWA NJ Division

Designing Pedestrian Facilities for Accessibility. ADA Compliance Training. Local Programs Engineer FHWA NJ Division Keith et P. Skilton Local Programs Engineer FHWA NJ Division 840 Bear Tavern Road, Suite 310 West Trenton, NJ 08628 Phone: 609-637-4203 Fax: 609-538-4919 keith.skilton@dot.gov Note: Pictures may depict

More information

9.8.1.1. General (1) This Section applies to the design and construction of interior and exterior stairs, steps, ramps, railings and guards.

9.8.1.1. General (1) This Section applies to the design and construction of interior and exterior stairs, steps, ramps, railings and guards. Section 9.8. Stairs, Ramps, Handrails and Guards 9.8.1. Application 9.8.1.1. General (1) This Section applies to the design and construction of interior and exterior stairs, steps, ramps, railings and

More information

Building an Accessible and Inclusive School Community

Building an Accessible and Inclusive School Community School Leadership Program Tool Kit Building an Accessible and Inclusive School Community Grades 6 to 12 School Leadership Program Tool Kit Table of Contents Welcome to Together We Rock!...4 Acknowledgements...6

More information

12 February 8, 2012 Public Hearing APPLICANT:

12 February 8, 2012 Public Hearing APPLICANT: 12 February 8, 2012 Public Hearing APPLICANT: PROPERTY OWNER: VIRGINIA BEACH ASSOCIATES, LC REQUEST: Conditional Change of Zoning (I-1 to Conditional A-36) STAFF PLANNER: Faith Christie ADDRESS / DESCRIPTION:

More information

Lincoln Downtown Master Plan Update

Lincoln Downtown Master Plan Update Lincoln Downtown Master Plan Update Table of Contents Executive Summary........................................... 1 Complete Streets Framework.................................... 3 Promenade Creating

More information

8.1.3 General Design Guidelines. The following guidelines shall be used when designing inlets along a street section:

8.1.3 General Design Guidelines. The following guidelines shall be used when designing inlets along a street section: . Introduction Presented in this chapter are the criteria and methodology for design and evaluation of storm sewer inlets located in Town of Castle Rock. The review of all planning submittals will be based

More information

Christchurch Cycle Design Guidelines

Christchurch Cycle Design Guidelines Christchurch Cycle Design Guidelines 2013 Acknowledgements We would like to thank the contributions from ViaStrada and other contributors including Glen Koorey, Spokes, NZTA, Canterbury Public Health,

More information

SECTION 6 COMMERCIAL ZONES

SECTION 6 COMMERCIAL ZONES Click here to access definitions SECTION 6 COMMERCIAL ZONES 6.1 CONVENIENCE COMMERCIAL (C.1) ZONE 18116 6.1.1 PERMITTED USES The following are permitted Uses within the C.1 Zone: Artisan Studio Convenience

More information

Parklet FAQs. Each parklet has a sign on it clearly indicating that it is a public space.

Parklet FAQs. Each parklet has a sign on it clearly indicating that it is a public space. ParkletFAQs BackgroundandGeneralInformation Whatisaparklet? A parklet is a small public sidewalk extension, usually extending two parking space lengths, that uses non permanent materials (e.g., it is not

More information

How To Improve Safety

How To Improve Safety Collision Diagrams Collision diagrams are used to display and identify similar accident patterns. They provide information on the type and number of accidents; including conditions such as time of day,

More information

PLANNED UNIT DEVELOPMENT & SIDEWALK WAIVER REQUEST STAFF REPORT Date: November 7, 2013

PLANNED UNIT DEVELOPMENT & SIDEWALK WAIVER REQUEST STAFF REPORT Date: November 7, 2013 PLANNED UNIT DEVELOPMENT & SIDEWALK WAIVER REQUEST STAFF REPORT Date: November 7, 2013 NAME LOCATION Audubon Properties, LLC. 4700 & 4960 Dauphin Island Parkway West side of Dauphin Island Parkway, 580

More information

City of Leavenworth RIGHT-OF-WAY SPECIAL USE PERMIT APPLICATION * RESTAURANT SEATING

City of Leavenworth RIGHT-OF-WAY SPECIAL USE PERMIT APPLICATION * RESTAURANT SEATING City of Leavenworth RIGHT-OF-WAY SPECIAL USE PERMIT APPLICATION * RESTAURANT SEATING This application must be filled out legibly, in blue or black ink, either hand printed or typewritten APPLICANT* Last

More information

Interlocking Concrete Pavement Institute (ICPI) Model Stormwater Ordinance for Permeable Interlocking Concrete Pavements August 2010

Interlocking Concrete Pavement Institute (ICPI) Model Stormwater Ordinance for Permeable Interlocking Concrete Pavements August 2010 Interlocking Concrete Pavement Institute (ICPI) Model Stormwater Ordinance for Permeable Interlocking Concrete Pavements August 2010 Background What are permeable interlocking concrete pavements (PICP)?

More information

North Avenue Corridor Study. Advisory Committee Meeting #5 June 11, 2014

North Avenue Corridor Study. Advisory Committee Meeting #5 June 11, 2014 North Avenue Corridor Study Advisory Committee Meeting #5 June 11, 2014 Agenda Welcome and introductions Concept refinement and evaluation: Public meeting and web survey General cross-section concepts

More information

IN THE CITY COUNCIL OF THE CITY OF LIVERMORE, CALIFORNIA A RESOLUTION TO APPROVE A COMPLETE STREETS POLICY

IN THE CITY COUNCIL OF THE CITY OF LIVERMORE, CALIFORNIA A RESOLUTION TO APPROVE A COMPLETE STREETS POLICY IN THE CITY COUNCIL OF THE CITY OF LIVERMORE, CALIFORNIA A RESOLUTION TO APPROVE A COMPLETE STREETS POLICY The term " Complete Streets" describes a comprehensive, integrated transportation network with

More information

UNEP recommendations to KURA on Improving Safety and Reducing Congestion on UN Avenue (7 October 2009; revised 23 November 2009)

UNEP recommendations to KURA on Improving Safety and Reducing Congestion on UN Avenue (7 October 2009; revised 23 November 2009) UNEP recommendations to KURA on Improving Safety and Reducing Congestion on UN Avenue (7 October 2009; revised 23 November 2009) UN Avenue extends for 2 km between Limuru Road and Ruaka Road (Runda Roundabout).

More information

Management s role in slip, trip and fall prevention

Management s role in slip, trip and fall prevention Management s role in slip, trip and fall prevention Slips, trips and falls (STFs) can present challenges to managers in nearly all types of facilities and businesses, but particularly those with any type

More information

Aqua-Bric PERMEABLE PAVERS

Aqua-Bric PERMEABLE PAVERS Aqua-Bric PERMEABLE PAVERS Essential Pavers for Plazas, Walkways, Entrances and Parking Lots Belden Brick Aqua-Bric Permeable Pavers PERMEABLE PAVING IS A DESIGNED APPLICATION TO MANAGE STORM WATER RUN-OFF

More information

Executive Director s Recommendation Commission Meeting: March 5, 2015

Executive Director s Recommendation Commission Meeting: March 5, 2015 Executive Director s Recommendation Commission Meeting: March 5, 2015 PROJECT Curseen-Morris Processing and Distribution Center Parking Lot 900 Brentwood Avenue NE Washington, DC SUBMITTED BY United States

More information

Goals & Objectives. Chapter 9. Transportation

Goals & Objectives. Chapter 9. Transportation Goals & Objectives Chapter 9 Transportation Transportation MISSION STATEMENT: TO PROVIDE A TRANSPORTATION NETWORK CAPABLE OF MOVING PEOPLE AND GOODS EFFICIENTLY AND SAFELY. T he transportation system

More information

CITY OF ROMULUS RFP 13/14-10 REQUEST FOR QUALIFICATIONS FROM CONSULTING FIRMS FOR CONSTRUCTION ENGINEERING SERVICES FOR THE GODDARD ROAD PROJECT

CITY OF ROMULUS RFP 13/14-10 REQUEST FOR QUALIFICATIONS FROM CONSULTING FIRMS FOR CONSTRUCTION ENGINEERING SERVICES FOR THE GODDARD ROAD PROJECT CITY OF ROMULUS RFP 13/14-10 REQUEST FOR QUALIFICATIONS FROM CONSULTING FIRMS FOR CONSTRUCTION ENGINEERING SERVICES FOR THE GODDARD ROAD PROJECT I. PROPOSAL INFORMATION AND SCORING These guidelines detail

More information

Site Development Information Worksheet for single family residential development

Site Development Information Worksheet for single family residential development Site Development Information Worksheet for single family residential development Project description: Address: Owner Name: Phone No. Date Signature & phone number of Individual who Completed this Worksheet

More information

Description Quantity Cost Total Cost

Description Quantity Cost Total Cost APPENDIX: ITEMIZED CONSTRUCTION COST ESTIMATE Description Quantity Cost Total Cost 1 CASCADE FALLS 1a Existing Cascade Falls Upgrades Structural Repairs - Steps, Railing, Walls, Pool Lump Sum $500,000

More information

Industrial Suburban District Regulations City of St. Petersburg City Code Chapter 16, Land Development Regulations

Industrial Suburban District Regulations City of St. Petersburg City Code Chapter 16, Land Development Regulations 16.20.110 - Industrial Suburban District ( IS ) Figure REFERENCE Typical Buildings in the IS District Figure REFERENCE Site Plan of a typical development in the IS District Sections: 16.20.110.1 Composition

More information

KENTUCKY TRANSPORTATION CABINET. Department of Rural and Municipal Aid. Office of Local Programs

KENTUCKY TRANSPORTATION CABINET. Department of Rural and Municipal Aid. Office of Local Programs KENTUCKY TRANSPORTATION CABINET Department of Rural and Municipal Aid Office of Local Programs Office of Local Programs Transportation Enhancements Safe Routes to School Congestion Mitigation and Air Quality

More information

ARTICLE 22. AKB ARTHUR K. BOLTON PARKWAY OVERLAY ZONE

ARTICLE 22. AKB ARTHUR K. BOLTON PARKWAY OVERLAY ZONE ARTICLE 22. AKB ARTHUR K. BOLTON PARKWAY OVERLAY ZONE Sec. 2201. Purpose. AKB is an overlay zone which governs the development of property located along the Arthur K. Bolton Parkway (Georgia Highway 16

More information

Unit Price Averages Reports

Unit Price Averages Reports Unit Price Averages Reports 12/7/2015 UNIT PRICE AVERAGES REPORT Disclaimer The information provided in the following Unit Price Averages Report is only for the use of Alberta Infrastructure & Transportation

More information

VEHICLE CROSSOVER INFORMATION PACK

VEHICLE CROSSOVER INFORMATION PACK VEHICLE CROSSOVER INFORMATION PACK CONTENTS Introduction Section A Section B Section C Section D Section E Criteria for approving a vehicle crossover application (Diagrams to demonstrate measurement criteria)

More information

APPLICATION FOR OUTDOOR DINING

APPLICATION FOR OUTDOOR DINING Planning and Development Services 10 N. Bemiston Avenue Clayton, Missouri 63105 314-727-8100 FAX 314-863-0296 TDD 314-290-8435 APPLICATION FOR OUTDOOR DINING Check off each box to indicate that the required

More information

Architectural Condition Survey

Architectural Condition Survey Architectural Condition Survey Santa Fe Railroad / AMTRAK Depot, Lawrence. Kansas for the City of Lawrence, 2002 Survey: (student) PI: William Carswell, Associate Dean, School of Architecture, University

More information

S.V.P.D s Traffic Unit Parking Enforcement

S.V.P.D s Traffic Unit Parking Enforcement S.V.P.D s Traffic Unit Parking Enforcement The Simi Valley Police Department s Traffic Unit employs Police Service Assistants who are responsible for parking enforcement and a variety of other issues.

More information

agrees to replace at no charge any tree that dies and subsequent inspection shows that the wire basket was not properly removed.

agrees to replace at no charge any tree that dies and subsequent inspection shows that the wire basket was not properly removed. Adopted 12/5/00; revised as of 1/2/07 Marietta Tree Commission Rules and Regulations I. Tree Planting A. Planting Specifications 1. Trees must be: A) of a minimum 1¼ inches caliper; B) single stem, straight,

More information

PROJECT COST ESTIMATE ASSUMPTIONS AND EXCLUSIONS

PROJECT COST ESTIMATE ASSUMPTIONS AND EXCLUSIONS C PROJECT ESTIMATE ASSUMPTIONS AND EXCLUSIONS In support of the alternatives development process, preliminary cost estimates were prepared for each of the three Candidate Build Alternatives. The cost estimates

More information

Spirit of Austin Lane; Cell Phone Waiting Area Artist Information Meeting FAQ s

Spirit of Austin Lane; Cell Phone Waiting Area Artist Information Meeting FAQ s Spirit of Austin Lane; Cell Phone Waiting Area FAQ s Art in Public Places, Cultural Arts Division Economic Growth & Redevelopment Services Office www.austincreates.com 1. Will artist be allowed to place

More information