1 Name: Instructions: Auditor Information (1) Use all three tools for your assessment (2) If the tool can not determine the criteria, check (3) Indicate the tools used (4) Rate the effectiveness of the tool Street 1. What is the average number of driving lanes on this segment? One Two Four 2. What is the approximate width of the street? (Street plus sidewalks) Total street width estimated 3. What are the on-street parking configurations on this segment? One Side of the Street Both Sides of the Street No on-street parking allowed 1
2 4. Is the On-Street Parking on this segment currently used? Not at all Few cars are parked on the segment Half of the segment is full with cars Entire Segment is full 5. What is the road base material on this segment of the street? (driving surface) Asphalt Bricks Concrete Interlocking pavers (others) 6. What is the arrangement of Sidewalks on this segment? None One Side of the Street Both Sides of the Street 2
3 7. What is the base material of the sidewalk on this segment of the street? (walking surface) Side One Asphalt Bricks Concrete Interlocking pavers Other Side Two Asphalt Bricks Concrete Interlocking pavers Other 8. What is the approximate width of the sidewalks on this segment of the Street? (estimated) Side One Estimated sidewalk Not applicable width Side Two Not applicable Estimated sidewalk width 9. Are there street Curbs and Edging on this segment of the street? None One Side of the Street Both Sides of the Street 3
4 10. What is the type of Curb? Straight Rolling Without Gutter With Gutter Not useful Somewhat Very Not useful Somewhat Very Not useful Somewhat Very 11. What is the material of the Curb? Concrete Wood Granite Not useful Somewhat Very Not useful Somewhat Very Not useful Somewhat Very 12. Are there walk ramps on this segment of street? Not Applicable None On only one end On both ends On Both Sides and Ends Not useful Somewhat Very Not useful Somewhat Very Not useful Somewhat Very 4
5 13. What is the condition of the walk ramps on this segment of street?- can they be used easily by someone with walking disabilities? Can t be used Used but with some difficulty Easily used 14. What is the average building setback on this segment of the street? Building Setback 15. Are there Planting Strips between sidewalks and curb on this street? None One Side of the Street Both Sides of the Street 16. What is the approximate width of the planting strips on this Street? (estimated) Not applicable Estimated planting strip width 5
6 17. Are there Crossing aids for pedestrians to cross the street safely (e.g crosswalks, stoplight, overpass, traffic island, curb extension)? None Some Many 18. Are there benches in this segment of the street? None Over Are there Fences on this segment of the street? None One Side of the Street Both Sides of the Street 20. Are there street lighting on this segment of the street? Yes No 6
7 21. What is the average spacing between street lights? (estimated) Street light Spacing 22. What is the approximate height of the street lights? (estimated) Street light Height 23. Are there street trees on this segment of the street? Yes No 24. What is the average spacing between street trees? (estimated) Street trees Spacing 7
8 25. What is the average height of the street trees? (estimated) Street trees height 26. What is the shade coverage (canopy?) of the street trees on this segment? Not applicable No coverage Some Area of Street Most Area of Street 27. In your estimation, and based on the web tools how comfortable do you think the walk along this segment of the street would be? (from tree shades, architectural features, other amenities) Very uncomfortable Somewhat comfortable Somewhat comfortable Very Comfortable 28. In your estimation, and based on the web tools how aesthetically pleasant do you think the walk along this segment of the street would be? (presence of broken bottles, abandoned cars, road signs, graffiti, plantings, pedestrian signage, etc) Very unpleasant Somewhat unpleasant Somewhat pleasant Very pleasant 8
Topic 2 11/28/2012 Blocks & Street Network
TOPIC 2 Blocks & Street Network Implementation Note: 1. Some recommendations are summarized in the tables herein. For complete recommendation language, please see the. 2. Recommendations referenced in
More informationEvanston Main Street Station TOD Plan and Study. Appendix A.1: Station Area Existing Conditions
Evanston Main Street Station TOD Plan and Study Appendix A.1: Station Area Existing Conditions EvanstonMainStreetStation TODPlanandStudy A 1 AppendixA.1: ExistingConditions Table of Contents Station Locations
More informationFY 2011 OHIO SMALL CITIES COMMUNITY DEVELOPMENT BLOCK GRANT COMPREHENSIVE DOWNTOWN REVITALIZATION PROGRAM
CITYOFOBERLIN OHIO CITY OF OBERLIN, OHIO FY 2011 OHIO SMALL CITIES COMMUNITY DEVELOPMENT BLOCK GRANT COMPREHENSIVE DOWNTOWN REVITALIZATION PROGRAM Background In October, 2011, the City of Oberlin Planning
More informationADA POST INSPECTION CHECKLIST. Job No. Route County Location
ADA POST INSPECTION CHECKLIST Job No. Route County Location SIDEWALKS All sidewalks constructed within the project limits are ADA compliant. Sidewalks are 5 or greater in width. Exception, existing sidewalks
More informationCity of Auburn Americans with Disabilities Act (ADA) Transition Plan for Curb Ramps, Sidewalks, and Pedestrian Signals ADA TRANSITION PLAN
Americans with Disabilities Act (ADA) Transition Plan for Curb Ramps, Sidewalks, and Pedestrian Signals ADA TRANSITION PLAN December 21, 2009 Public Works Department 171 N. Ross Street, Suite 200 Auburn,
More informationFoot Both Location Information - A Footwear Checklist
Audit information collected by: Foot Auto Both Location information collected by: Foot Auto Both LAND USE ENVIRONMENT 1. How much integration of residential and non-residential land uses is visible in
More informationBEST PRACTICES. Smart Transportation is a key concept for the Paoli Roadway Improvement Project.
Smart Transportation Smart Transportation is a key concept for the Paoli Roadway Improvement Project. PennDOT s Smart Transportation Guidebook (2008) outlines a comprehensive approach to transportation
More informationWalkable Communities Florida Department of Transportation State Safety Office Pedestrian and Bicycle Program April 1995 www.dot.state.fl.us/safety Twelve Steps for an Effective Program Page 1 Twelve Steps
More informationCity of St. Petersburg Development Services. February 2006. Driveways for Residential Properties
City of St. Petersburg Development Services February 2006 Citizen s s Guide to Driveways for Residential Properties Pursuant to Section 29-909 of the City s Zoning Ordinance, all passenger motor vehicles
More informationALKS SIDEW II. TK TK TK TK TK TK TK TK 40 BOSTON COMPLETE STREETS GUIDELINES DRAFT - JULY 2011 BOSTON TRANSPORTATION DEPARTMENT
40 Sidewalk Materials Materials and Sidewalk Zones Permeable Pavement Accessibility The key components of sidewalk construction are material selection and installation. These two aspects should come together
More informationVERTICAL SPEED CONTROL DEVICES
H-3.8 VERTICAL SPEED CONTROL DEVICES GENERAL 1. Description This standard identifies minimum requirements that shall be met for all Vertical Speed Control Devices in the design and construction of elements
More informationRESIDENTIAL DRIVEWAYS
RESIDENTIAL DRIVEWAYS If you have specific questions or want to confirm your plans, our staff is available to assist in person, by telephone, or by e-mail. City of St. Petersburg Division of Development
More informationCity of Wichita, Kansas Americans with Disabilities Act Transition Plan Main Library Address
City of Wichita, Kansas Americans with Disabilities Act Transition Plan Main Library Address July 005 Prepared by DMCG Disability Management Consulting Group L.L.C. 801 Jonquil Place Columbia, MO 650 In
More informationMAIN STREET IMPROVEMENTS Water, Sewer, Stormwater and Streetscape Improvements
MAIN STREET IMPROVEMENTS Water, Sewer, Stormwater and Streetscape Improvements Presentation July 23, 2014 A. Morton Thomas and Associates, Inc. 800 King Farm Boulevard, 4 th Floor Rockville, Maryland 20850
More informationThe first step to repairing a sidewalk damaged by a tree is to enlarge the tree pit.
The first step to repairing a sidewalk damaged by a tree is to enlarge the tree pit. Many sidewalks are far wider than they need to be. Enlarging a tree pit not only gives Many sidewalks are far wider
More informationChapter 162 SHADE TREE COMMISSION
Chapter 162 SHADE TREE COMMISSION 162-1. Purpose. 162-2. Definitions. 162-3. Shade Tree Commission. 162-4. Powers and duties of Commission. 162-5. Approval required. 162-6. Duties and responsibilities.
More informationLAKE SHORE DRIVE CTA RED LINE BROADWAY SHERIDAN FOSTER ARGYLE. Pedestrian Access Advisory Committee. April 25, 2014
FOSTER LAKE SHORE DRIVE CTA RED LINE BROADWAY SHERIDAN ARGYLE ARGYLE STREET STREETSCAPE - S-1-323 Pedestrian Access Advisory Committee BROADWAY ARGYLE CTA RED LINE WINTHROP KENMORE SHERIDAN Broadway -
More informationPLEASE PRINT. Job Name: Job # City File No. SIDEWALK; DRIVEWAY APPROACH; CURB & GUTTER; PEDESTRIAN RAMP; STREET LIGHT; PLANTER STRIP;
City of Santa Rosa ENCROACHMENT PERMIT APPLICATION Application#: Inspector: Liability Ins: WComp. Ins: FOR OFFICE USE ONLY NOTE: YOUR APPLICATION CANNOT BE PROCESSED WITHOUT COMPLETE INFORMATION IN AREAS
More informationOVERVIEW PROJECT SUMMARY
OVERVIEW Cesar Chavez showcases how to successfully redesign a primary arterial route into a neighborhood destination, improving modal share, water sensitive design, biodiversity and safety whilst maintaining
More informationASSESSMENT OF LANDCAPE PROVISIONS FOR PROPOSED PLAN CHANGE 1. Inner Business Zone. Outer Business Zone PALMERSTON NORTH CITY COUNCIL
A division of Hudson Group Ltd ASSESSMENT OF LANDCAPE PROVISIONS FOR PROPOSED PLAN CHANGE 1 Inner Business Zone Outer Business Zone PALMERSTON NORTH CITY COUNCIL 1 2 A division of Hudson Group Ltd Prepared
More informationArchitectural Design Standards Example Guide DESIGN STANDARDS EXAMPLE GUIDE
Architectural Design Standards Example Guide DESIGN STANDARDS EXAMPLE GUIDE Commercial, Professional Office, and Public Facility Developments Purpose This Guide offers examples to clarify and explain the
More informationPavement Management Program
Pavement Management Program 2014 Street Maintenance Program Executive Summary 01/21/2014 Presented by Mark Thiel Assistant Director of Public Works Program Overview Start of current program 2005 825.1
More informationMinister s Guideline MG-12 Siting and Design of Single Dwellings
Minister s Guideline MG-12 Siting and Design of Single Dwellings This replaces previous Minister s Guideline MG/12 issued June 2005 Pursuant to section 188 A of the Building Act 1993 (the Act) I hereby
More informationFor more information, visit: rethinkingstreets.com
For more information, visit: rethinkingstreets.com 37 Arterial Rehab Busy, multi-lane streets, often referred to as arterials, crisscross the landscape of our cities and suburbs. Alongside these wide thoroughfares,
More informationENGINEERING SOLUTIONS FOR DESIGNING YOUR SAFE ROUTES
How to Get Started ENGINEERING SOLUTIONS FOR DESIGNING YOUR SAFE ROUTES Design Elements Selecting appropriate design treatments for school neighborhoods creates environments that address the needs of all
More informationSITE SAFETY LOGISTIC PLAN
SITE SAFETY LOGISTIC PLAN SHEET #1 Title Sheet Site Safety Logistic Plan For Project name & Address as it appears on the NB permit Or as it appears in the BIS system, with Borough Also include the following;
More informationUNIT PRICE LIST January 2009
UNIT PRICE LIST January 2009 1 INTRODUCTION The purpose of the Unit Price List is to provide a resource for the preparation of cost estimates for subdivisions and permit projects and should be used only
More informationCOURTING YOUR BICYCLE AND PEDESTRIAN FACILITIES... FROM A FORENSIC ENGINEERING AND PLANNING PERSPECTIVE
COURTING YOUR BICYCLE AND PEDESTRIAN FACILITIES... FROM A FORENSIC ENGINEERING AND PLANNING PERSPECTIVE 1 PRESENTED BY: J.M. TEAGUE ENGINEERING, PLLC 2 OBJECTIVES 1. What is Transportation Forensic Engineering
More informationB. Improve the appearance and character of areas surrounding new development.
Chapter 4.3: Landscape Regulations Sections: 4.301 Purposes 4.302 Applicability 4.303 General Provisions 4.304 Landscape Maintenance 4.301 Purposes The purposes of these regulations are to: A. Promote
More informationVILLAS OF TRADITIONS AT GREY OAKS
Report of Turnover Survey VILLAS OF TRADITIONS AT GREY OAKS Grey Oaks Development Naples, Collier County, Florida Forge Engineering Project Number 2907-001.01 March 2015 Richard P..Lundberg, P.E cn=richard
More informationEngineering Standard
Public Transport Services Engineering Standard Stations - Bicycle Facilities PART 129013 AR-PW-PM-SPE-00129013 (D073) Document Control Document Status Document Amendment Record Revision Change Description
More informationDeveloping Street Standards That Allow Flexibility
Developing Street Standards That Allow Flexibility ABSTRACT GWEN OWENS City of Sacramento 927 10th Street Sacramento, CA 95814 gowens@sacto.org The City of Sacramento, California, recently updated its
More informationCITY OF BRAMPTON STREET CORRIDOR MASTER PLAN
1.0 INTRODUCTION... 1 1.1 Purpose of Document... 1 1.2 Master Plan Goal...1 1.3 Design Objectives... 2 1.4 Design Approach... 2 2.0 PROJECT SCOPE...2 2.1 City Context 2 2.2 Regional Context 2 3.0 DESIGN
More informationBETTER STREETS PLAN SAN FRANCISCO POLICIES AND GUIDELINES FOR THE PEDESTRIAN REALM DRAFT PLAN RELEASE PACKET JUNE 2008. inside:
SAN FRANCISCO BETTER STREETS PLAN POLICIES AND GUIDELINES FOR THE PEDESTRIAN REALM DRAFT PLAN RELEASE PACKET JUNE 2008 inside: LETTER FROM MAYOR GAVIN NEWSOM EXECUTIVE SUMMARY SAN FRANCISCO PLANNING DEPARTMENT
More informationBicycle Parking Guide
Safe Routes to School Bicycle Parking Guide Get the most out of federal Safe Routes to School Funds B I K E R A C K S Cover photo courtesy of Bikes Belong Coalition Contents What is Safe Routes to School?
More informationAPPLICATION LAFAYETTE METROPOLITAN PLANNING ORGANIZATION (MPO) SURFACE TRANSPORTATION PROGRAM (STP) FUNDS TRANSPORTATION IMPROVEMENT PROGRAM (TIP)
APPLICATION LAFAYETTE METROPOLITAN PLANNING ORGANIZATION (MPO) SURFACE TRANSPORTATION PROGRAM (STP) FUNDS TRANSPORTATION IMPROVEMENT PROGRAM (TIP) To be considered for STP funding, a proposed project must
More informationUDRB APPLICATION URBAN DEVELOPMENT REVIEW BOARD
UDRB APPLICATION CITY OF MIAMI VISION STATEMENT: To Be an International City that Embodies Diversity, Economic Opportunity, Effective Customer Service and a Highly Rated Quality of Life OBJECTIVE: The
More informationArchitectural Control Guidelines
Architectural Control Guidelines The following Architectural Control Guidelines have been customized for 386 Beaverbrook and are intended to maintain a minimum standard of new construction within the development.
More information5. Guidelines for Site Elements
5. Guidelines for Site Elements City of San Antonio Historic Design Guidelines Office of Historic Preservation CONTENTS Introduction 1 Applicability 1 Guidelines 1 Topography 2 Fences and Walls 4 Landscape
More informationSCHOOL OF ARCHITECTURE & COMMUNITY DESIGN COLLEGE OF THE ARTS UNIVERSITY OF SOUTH FLORIDA
SCHOOL OF ARCHITECTURE & COMMUNITY DESIGN COLLEGE OF THE ARTS UNIVERSITY OF SOUTH FLORIDA PROJECT OVERVIEW OVERVIEW The FCCD+R, in coordination with the FDOT District 7, are to facilitate numerous meetings
More informationRoadway Cost Per Centerline Mile Revised June 2014
Rural Arterial From LRE MOT * Mobilization * Subtotal Total PE Design (15%) CEI (15%) Total Project ** New (2-Lane Roadway) with 5' Paved Shoulders $3,351,896 $335,190 $368,709 $4,055,794 $1,013,949 $5,069,743
More informationResidential Driveway Installation Requirements. Table of Contents
Residential Driveway Installation Requirements Table of Contents Residential Driveway Requirements Sidewalk Construction Specifications for Residential Properties Hold Harmless Agreement for Residential
More informationCorridor Goals and Objectives
Corridor Goals and Objectives This chapter presents the goals and objectives, developed by the Corridor Study Committee, that serve as the purpose and intent of the Corridor Plan. This plan covers a twenty
More informationChapter 25. Trees. Part 1 Trees
Chapter 25 Trees Part 1 Trees 25-101. Placement of Trees along Streets 25-102. Penalty for Unlawful Placement of Trees along Streets 25-103. Planting of North Carolina Poplar Trees Unlawful 25-104. Removal
More informationPavement Management Program
Pavement Management Program 2013 Street Maintenance Program Executive Summary 1/15/2013 Presented by Mark Thiel Assistant Director Public Works Program Overview Start of current program 2005 812.5 Lane
More informationSECTION 02100 SITE PREPARATION
SECTION 02100 SITE PREPARATION PART 1 - GENERAL 1.01 RELATED DOCUMENTS A. Drawings and General Provisions of Contract, including General Conditions and Supplementary Conditions and Division 1 through Division
More informationHow To Understand Were Street
24. Were Street Context Were Street is an asymmetrically aligned double-sided Activity Centre, split into 2 activity clusters separated by residential housing. The centre is approximately 145 metres long
More informationINFORMATION & APPLICATION FOR LARGE SIDEWALK PATIOS ON CITY PROPERTY
INFORMATION & APPLICATION FOR LARGE SIDEWALK PATIOS ON CITY PROPERTY For additional information: Phone: 3-1-1 (outside Vancouver, 604-873-7000) E-mail: street.activities@vancouver.ca or Visit Engineering
More informationPEDESTRIAN PLANNING AND DESIGN MARK BRUSSEL
PEDESTRIAN PLANNING AND DESIGN MARK BRUSSEL CONTENT OF LECTURE a) Walking as a transport mode b) Walking in Sub Sahara Africa c) Policies for pedestrians d) Pedestrian characteristics e) Network planning
More informationHow Walkable is Your Neighborhood? A project of Health by Design
How Walkable is Your Neighborhood? A project of Health by Design A walkable neighborhood one in which all people can safely and easily move about on foot and in which locations, goods, and services can
More informationOMC Study Group MEETING 3: NOTES. Section 1: Building Design Page 2 Section 2: Site Layout Page 9 Section 3: Summary Page 16
OMC Study Group MEETING 3: NOTES Section 1: Building Design Page 2 Section 2: Site Layout Page 9 Section 3: Summary Page 16 Section 1 Building Design Page 2 of 16 General Comments during Building Design
More informationCITY OF SOMERVILLE, MASSACHUSETTS MAYOR S OFFICE OF STRATEGIC PLANNING & COMMUNITY DEVELOPMENT
CITY OF SOMERVILLE, MASSACHUSETTS MAYOR S OFFICE OF STRATEGIC PLANNING & COMMUNITY DEVELOPMENT MICHAEL F. GLAVIN EXECUTIVE DIRECTOR JOSEPH A. CURTATONE MAYOR PLANNING DIVISION STAFF GEORGE PROAKIS, DIRECTOR
More informationHARRIS TEETER AT LADY S ISLAND CITY OF BEAUFORT DRB CONCEPTUAL PROJECT NARRATIVE Submittal Date: September 2, 2015 Meeting Date: September 10, 2015
HARRIS TEETER AT LADY S ISLAND CITY OF BEAUFORT DRB CONCEPTUAL PROJECT NARRATIVE Submittal Date: September 2, 2015 Meeting Date: September 10, 2015 PROPOSED REDEVELOPMENT The project consists of demolishing
More informationD R A W I N G B Y J A M E S W A S S E L L
T1 D R A W I N G B Y J A M E S W A S S E L L T2 T3 T4 T5 T6 NATURAL RURAL SUBURBAN GENERAL URBAN URBAN CENTER URBAN CORE T1 ZONE T2 ZONE T3 ZONE T4 T5 T6 DA ZONE ZONE ZONE ASSIGNED DISTRICT NATURAL DIVERSITY
More informationCommon Property Maintenance Code Violations. An illustrated guide
Common Property Maintenance Code Violations An illustrated guide 1) Lawn and Vegetation Overgrown weeds, grass, or vegetation. Vegetation obstructing sidewalks, driveways, and other right of ways. Improper
More informationDRAFT MAINTAINING HOUSTON S STREETS REPAIR, REHABILITATION, RECONSTRUCTION. Using the Full Range of Tools for a Challenging Job
MAINTAINING HOUSTON S STREETS REPAIR, REHABILITATION, RECONSTRUCTION Using the Full Range of Tools for a Challenging Job Report To: TTI Committee May 13, 2014 1 Pavement Management - Suggested Treatments
More informationOutside Storage Ordinance Amendment
Outside Storage Ordinance Amendment ORDINANCE NO. Formatted: Font: Cambria AN ORDINANCE AMENDING CHAPTER 169 OF THE NORTH LIBERTY CODE OF ORDINANCES BY AMENDING SECTION 169.13 TO ESTABLISH NEW SCREENING
More informationStreet Sections & Materials Palette Applications LOCAL STREET- SPECIAL APPLICATION (EASTERN TRANSIT CORRIDOR)
5.7 Street Sections & Materials Palette Applications 5.7.1 Street Sections - Location Map LACHLAN PLACE L I D F E H C J A B TAYLOR STREET K G M LOCAL STREET- SPECIAL APPLICATION (EASTERN TRANSIT CORRIDOR)
More informationAppendix C. Sign Design Guidelines. Sign Types and Placement
Appendix C Sign Design Guidelines Because signage is intended to be visible and attract attention, it has significant visual impact on the area in which it is placed, particularly in a community that is
More informationODOT Major Construction, Bikeways and Enhancements Report for Lucas County. (State Fiscal Years 2007 to 2010)
Bikeways and Enhancements Report for Lucas County (State Fiscal Years 2007 to 2010) Statewide Construction Summary by Major Work Type (in Millions) WORK TYPE SFY 2007 SFY 2008 SFY 2009 SFY 2010 TOTAL #
More informationThe paper version offers a low-tech option to the smart phone application. Everything needed to implement the paper version of the PEQI is below.
Pedestrian Environmental Quality Index (P.E.Q.I.) The PEQI is a quantitative observational tool that was originally developed in 2008 by the San Francisco Department of Public Health to assess the quality
More informationTEST ON Driving Safely Among Bicyclists and Pedestrians
TEST ON Driving Safely Among Bicyclists and Pedestrians Next you will take a 16 question test about driving safely among bicyclists and pedestrians. Please take out a sheet of paper to mark down and score
More informationItem No. 432S Portland Cement Concrete Sidewalks. 432S.1 Description
Item No. 432S Portland Cement Concrete Sidewalks 432S.1 This item shall govern the construction of Portland cement concrete sidewalks (Standard Detail No. 432S-1), as herein specified, on an approved subgrade
More informationCONSTRUCTION MANAGER S WEEKLY PROGRESS REPORT
Volkert Field Office 80 M Street SE, Suite 725 Washington, DC 20003 RIVERSMART WASHINGTON - CONSTRUCTION RIVERSMART MACFARLAND, RIVERSMART LAFAYETTE AND GREEN ALLEYS CHEVY CHASE D.C. Contract No.: DCKA-2013-C-0160
More informationSTANDARD SPECIFICATIONS
STANDARD SPECIFICATIONS Standard Slope: Unless otherwise specified on the permit, the sidewalk grade shall be sloped upward from the existing curb at a rate of 2% (approx. ¼ inch per foot). New work required
More informationComprehensive Mobility Project Development Process Capital Metro ¼-Cent Fund Analysis
Comprehensive Mobility Project Development Process Capital Metro ¼-Cent Fund Analysis Transportation & Mobility projects that meet the following criteria: enhances regional mobility; supports public transit;
More informationDesigning Pedestrian Facilities for Accessibility. ADA Compliance Training. Local Programs Engineer FHWA NJ Division
Keith et P. Skilton Local Programs Engineer FHWA NJ Division 840 Bear Tavern Road, Suite 310 West Trenton, NJ 08628 Phone: 609-637-4203 Fax: 609-538-4919 keith.skilton@dot.gov Note: Pictures may depict
More information9.8.1.1. General (1) This Section applies to the design and construction of interior and exterior stairs, steps, ramps, railings and guards.
Section 9.8. Stairs, Ramps, Handrails and Guards 9.8.1. Application 9.8.1.1. General (1) This Section applies to the design and construction of interior and exterior stairs, steps, ramps, railings and
More informationBuilding an Accessible and Inclusive School Community
School Leadership Program Tool Kit Building an Accessible and Inclusive School Community Grades 6 to 12 School Leadership Program Tool Kit Table of Contents Welcome to Together We Rock!...4 Acknowledgements...6
More information12 February 8, 2012 Public Hearing APPLICANT:
12 February 8, 2012 Public Hearing APPLICANT: PROPERTY OWNER: VIRGINIA BEACH ASSOCIATES, LC REQUEST: Conditional Change of Zoning (I-1 to Conditional A-36) STAFF PLANNER: Faith Christie ADDRESS / DESCRIPTION:
More informationLincoln Downtown Master Plan Update
Lincoln Downtown Master Plan Update Table of Contents Executive Summary........................................... 1 Complete Streets Framework.................................... 3 Promenade Creating
More information8.1.3 General Design Guidelines. The following guidelines shall be used when designing inlets along a street section:
. Introduction Presented in this chapter are the criteria and methodology for design and evaluation of storm sewer inlets located in Town of Castle Rock. The review of all planning submittals will be based
More informationChristchurch Cycle Design Guidelines
Christchurch Cycle Design Guidelines 2013 Acknowledgements We would like to thank the contributions from ViaStrada and other contributors including Glen Koorey, Spokes, NZTA, Canterbury Public Health,
More informationSECTION 6 COMMERCIAL ZONES
Click here to access definitions SECTION 6 COMMERCIAL ZONES 6.1 CONVENIENCE COMMERCIAL (C.1) ZONE 18116 6.1.1 PERMITTED USES The following are permitted Uses within the C.1 Zone: Artisan Studio Convenience
More informationParklet FAQs. Each parklet has a sign on it clearly indicating that it is a public space.
ParkletFAQs BackgroundandGeneralInformation Whatisaparklet? A parklet is a small public sidewalk extension, usually extending two parking space lengths, that uses non permanent materials (e.g., it is not
More informationHow To Improve Safety
Collision Diagrams Collision diagrams are used to display and identify similar accident patterns. They provide information on the type and number of accidents; including conditions such as time of day,
More informationPLANNED UNIT DEVELOPMENT & SIDEWALK WAIVER REQUEST STAFF REPORT Date: November 7, 2013
PLANNED UNIT DEVELOPMENT & SIDEWALK WAIVER REQUEST STAFF REPORT Date: November 7, 2013 NAME LOCATION Audubon Properties, LLC. 4700 & 4960 Dauphin Island Parkway West side of Dauphin Island Parkway, 580
More informationCity of Leavenworth RIGHT-OF-WAY SPECIAL USE PERMIT APPLICATION * RESTAURANT SEATING
City of Leavenworth RIGHT-OF-WAY SPECIAL USE PERMIT APPLICATION * RESTAURANT SEATING This application must be filled out legibly, in blue or black ink, either hand printed or typewritten APPLICANT* Last
More informationInterlocking Concrete Pavement Institute (ICPI) Model Stormwater Ordinance for Permeable Interlocking Concrete Pavements August 2010
Interlocking Concrete Pavement Institute (ICPI) Model Stormwater Ordinance for Permeable Interlocking Concrete Pavements August 2010 Background What are permeable interlocking concrete pavements (PICP)?
More informationNorth Avenue Corridor Study. Advisory Committee Meeting #5 June 11, 2014
North Avenue Corridor Study Advisory Committee Meeting #5 June 11, 2014 Agenda Welcome and introductions Concept refinement and evaluation: Public meeting and web survey General cross-section concepts
More informationIN THE CITY COUNCIL OF THE CITY OF LIVERMORE, CALIFORNIA A RESOLUTION TO APPROVE A COMPLETE STREETS POLICY
IN THE CITY COUNCIL OF THE CITY OF LIVERMORE, CALIFORNIA A RESOLUTION TO APPROVE A COMPLETE STREETS POLICY The term " Complete Streets" describes a comprehensive, integrated transportation network with
More informationUNEP recommendations to KURA on Improving Safety and Reducing Congestion on UN Avenue (7 October 2009; revised 23 November 2009)
UNEP recommendations to KURA on Improving Safety and Reducing Congestion on UN Avenue (7 October 2009; revised 23 November 2009) UN Avenue extends for 2 km between Limuru Road and Ruaka Road (Runda Roundabout).
More informationManagement s role in slip, trip and fall prevention
Management s role in slip, trip and fall prevention Slips, trips and falls (STFs) can present challenges to managers in nearly all types of facilities and businesses, but particularly those with any type
More informationAqua-Bric PERMEABLE PAVERS
Aqua-Bric PERMEABLE PAVERS Essential Pavers for Plazas, Walkways, Entrances and Parking Lots Belden Brick Aqua-Bric Permeable Pavers PERMEABLE PAVING IS A DESIGNED APPLICATION TO MANAGE STORM WATER RUN-OFF
More informationExecutive Director s Recommendation Commission Meeting: March 5, 2015
Executive Director s Recommendation Commission Meeting: March 5, 2015 PROJECT Curseen-Morris Processing and Distribution Center Parking Lot 900 Brentwood Avenue NE Washington, DC SUBMITTED BY United States
More informationGoals & Objectives. Chapter 9. Transportation
Goals & Objectives Chapter 9 Transportation Transportation MISSION STATEMENT: TO PROVIDE A TRANSPORTATION NETWORK CAPABLE OF MOVING PEOPLE AND GOODS EFFICIENTLY AND SAFELY. T he transportation system
More informationCITY OF ROMULUS RFP 13/14-10 REQUEST FOR QUALIFICATIONS FROM CONSULTING FIRMS FOR CONSTRUCTION ENGINEERING SERVICES FOR THE GODDARD ROAD PROJECT
CITY OF ROMULUS RFP 13/14-10 REQUEST FOR QUALIFICATIONS FROM CONSULTING FIRMS FOR CONSTRUCTION ENGINEERING SERVICES FOR THE GODDARD ROAD PROJECT I. PROPOSAL INFORMATION AND SCORING These guidelines detail
More informationSite Development Information Worksheet for single family residential development
Site Development Information Worksheet for single family residential development Project description: Address: Owner Name: Phone No. Date Signature & phone number of Individual who Completed this Worksheet
More informationDescription Quantity Cost Total Cost
APPENDIX: ITEMIZED CONSTRUCTION COST ESTIMATE Description Quantity Cost Total Cost 1 CASCADE FALLS 1a Existing Cascade Falls Upgrades Structural Repairs - Steps, Railing, Walls, Pool Lump Sum $500,000
More informationIndustrial Suburban District Regulations City of St. Petersburg City Code Chapter 16, Land Development Regulations
16.20.110 - Industrial Suburban District ( IS ) Figure REFERENCE Typical Buildings in the IS District Figure REFERENCE Site Plan of a typical development in the IS District Sections: 16.20.110.1 Composition
More informationKENTUCKY TRANSPORTATION CABINET. Department of Rural and Municipal Aid. Office of Local Programs
KENTUCKY TRANSPORTATION CABINET Department of Rural and Municipal Aid Office of Local Programs Office of Local Programs Transportation Enhancements Safe Routes to School Congestion Mitigation and Air Quality
More informationARTICLE 22. AKB ARTHUR K. BOLTON PARKWAY OVERLAY ZONE
ARTICLE 22. AKB ARTHUR K. BOLTON PARKWAY OVERLAY ZONE Sec. 2201. Purpose. AKB is an overlay zone which governs the development of property located along the Arthur K. Bolton Parkway (Georgia Highway 16
More informationUnit Price Averages Reports
Unit Price Averages Reports 12/7/2015 UNIT PRICE AVERAGES REPORT Disclaimer The information provided in the following Unit Price Averages Report is only for the use of Alberta Infrastructure & Transportation
More informationVEHICLE CROSSOVER INFORMATION PACK
VEHICLE CROSSOVER INFORMATION PACK CONTENTS Introduction Section A Section B Section C Section D Section E Criteria for approving a vehicle crossover application (Diagrams to demonstrate measurement criteria)
More informationAPPLICATION FOR OUTDOOR DINING
Planning and Development Services 10 N. Bemiston Avenue Clayton, Missouri 63105 314-727-8100 FAX 314-863-0296 TDD 314-290-8435 APPLICATION FOR OUTDOOR DINING Check off each box to indicate that the required
More informationArchitectural Condition Survey
Architectural Condition Survey Santa Fe Railroad / AMTRAK Depot, Lawrence. Kansas for the City of Lawrence, 2002 Survey: (student) PI: William Carswell, Associate Dean, School of Architecture, University
More informationS.V.P.D s Traffic Unit Parking Enforcement
S.V.P.D s Traffic Unit Parking Enforcement The Simi Valley Police Department s Traffic Unit employs Police Service Assistants who are responsible for parking enforcement and a variety of other issues.
More informationagrees to replace at no charge any tree that dies and subsequent inspection shows that the wire basket was not properly removed.
Adopted 12/5/00; revised as of 1/2/07 Marietta Tree Commission Rules and Regulations I. Tree Planting A. Planting Specifications 1. Trees must be: A) of a minimum 1¼ inches caliper; B) single stem, straight,
More informationPROJECT COST ESTIMATE ASSUMPTIONS AND EXCLUSIONS
C PROJECT ESTIMATE ASSUMPTIONS AND EXCLUSIONS In support of the alternatives development process, preliminary cost estimates were prepared for each of the three Candidate Build Alternatives. The cost estimates
More informationSpirit of Austin Lane; Cell Phone Waiting Area Artist Information Meeting FAQ s
Spirit of Austin Lane; Cell Phone Waiting Area FAQ s Art in Public Places, Cultural Arts Division Economic Growth & Redevelopment Services Office www.austincreates.com 1. Will artist be allowed to place
More information