1 Proposed SM Wright Freeway Redevelopment Dallas District Halff Associates Baker Consulting Associates April 28, 2009 Introduction & Welcome Alva Baker Baker Consulting Associates Page 1
2 Project Overview Concept Development Issues to Resolve Roadway Alignment Access/Connections to S.M. Wright Aesthetic Treatments Agenda Adjacent Neighborhood Associations South Boulevard/Park Row Historic District Queen City Neighborhood Association Wendelkin/Driscoll Neighborhood Association Forest Heights Neighborhood Association Ideal Neighborhood Association Nonprofit Organizations SouthFair Community Development Corporation Forest Heights Neighborhood Development Corp. Clean South Dallas Dallas Black Chamber of Commerce Innercity Community Development Corp. T. R. Hoover CDC Other Key Stakeholders New Hope Baptist Church Greater New Zion Baptist Church Peoples Missionary Baptist Church Grace & Mercy Missionary Baptist Church South Dallas Baptist Church St. Philip s School and Community Center South Dallas Nursing Home Major commercial property owners Public Agencies NTTA DHA Park Manor DART DHA Turner Courts City of Dallas (PW & T, PARD, DPD) DHA Rhoades Terrace TxDOT MLK, Jr. Elementary School (DISD) NCTCOG H.S. Thompson Elementary School (DISD) Invited Community Participants Page 2
3 Dallas Council Trinity River Committee Briefing - February 5, 2008 SM Wright 1 st Stakeholder Work Group Meeting Mar. 31, 2008 SM Wright 2 nd Stakeholder Work Group Meeting Sept. 9, 2008 City of Dallas Public Meeting hosted by Councilmember Davis Oct. 14, 2008 SM Wright 3 rd Stakeholder Work Group Meeting Dec 9, 2008 SM Wright 4 th Stakeholder Work Group Meeting Jan. 13, 2009 Dallas Council Trinity River Committee Briefing - April 21, 2009 SM Wright TxDOT Public Meeting April 28, 2009 Topic: SM Wright Preferred Design Trinity Pkwy NTTA Public Hearing May 5, 2009 Topic: Trinity SDEIS Results & Public Comment SM Wright TxDOT Public Meeting Spring 2010 Topic: SM Wright Final Design & Environmental Community Involvement Project Overview Timothy Nesbitt, P.E. Page 3
4 To develop concepts for the redesign of SM Wright Freeway with a focus on transportation mobility and efficiency, and improving community cohesion and safety. Proposed Trinity Parkway SM Wright Project Scope Project Study Area 175 Ideal Neighborhood US 175 Rochester Park SM Wright Freeway Today s Commuter Flow Lamar Future Future Commuter Commuter Flow Flow 45 IH 45 Proposed Trinity Parkway N Ultimate / Proposed Scenario Page 4
5 Colonial Ave 45 S.M. Wright Freeway Hatcher St Current 6-Lane freeway & frontage roads serve over 100,000 vehicles per day (vpd). Diversion to Trinity Parkway and I-45 reduces SM Wright traffic to under 40,000 vpd. Traffic reduction no longer requires freeway or bridges. Remaining local & through traffic volume requires only 6-lane signalized arterial. No added (new) right-of-way is anticipated to be required. Design of SM Wright interchange at SH 310 is part of Trinity Parkway construction. Project Fundamentals Public Participation and Agency Coordination 1. DEVELOP CONCEPT ALTERNATIVES 2. EVALUATE CONCEPT ALTERNATIVES 3. SELECT PREFERRED ALTERNATIVE 4. REQUIRED FHWA APPROVAL PREPARE DRAFT SCHEMATIC & ENVIRONMENTAL DOCUMENT 5. REQUIRED FHWA APPROVAL PREPARE FINAL SCHEMATIC & ENVIRONMENTAL DOCUMENT WE ARE HERE Project Process Page 5
6 S. M. Wright Redevelopment April 28, 2009 Public Meeting Concept Development Section Break Lenny Hughes, R.L.A. Dir. of Landscape Architecture Commercial Areas Civic Areas Park Areas Undeveloped Areas Section Break Residential Residential Areas Areas Existing Land Use and Crossings Major Linkages & Nodes Page 6
7 Determine Preferred Roadway Alignment Determine Preferred Connection Options Concepts for Use of Residual Land Ideas for Aesthetics Landscape Hardscape Gateways Project Goals CONCEPTS DEFINED BY: Roadway Alignment Split Alignment Single Alignment one side Single Alignment meandering Connections & Access Through Streets Cul-de-Sacs Tee Intersections Residual Land Use Recreation/Park or Green Space Parking Redevelopment Concept Development Page 7
8 Meandering Alignment Preferred Concept Turtle Creek Boulevard Concept Access/Residual Land Page 8
9 S. M. Wright Redevelopment April 28, 2009 Public Meeting Concept Enhancement Plan SM Wright Freeway Enhancements & Revitalization Study Concept Aesthetics North at Pennsylvania SM Wright Freeway Enhancements & Revitalization Study Page 9
10 S. M. Wright Redevelopment April 28, 2009 Public Meeting South at Metropolitan Concept Aesthetics Concept Enhancement Plan SM Wright Freeway Enhancements & Revitalization Study Page 10
11 C B A D E Design Elements A) Enhanced Vehicular Paving B) Gateway Arch C) Major/Minor Decorative Gateway Monuments Trinity Parkway Intersection D) Vegetative Greenwall E) Potential Commercial Development C A D B E F Design Elements A) Enhanced Vehicular Paving B) Iconic Gateway Entry Monuments C) Decorative Gateway Monuments D) Form Line Concrete E) Ornamental Grass Plantings F) Potential Commercial Development Trinity Parkway Intersection Page 11
12 Monuments and Gateways Neighborhood Gateways Page 12
13 Greenwalls Form Line Concrete Page 13
14 Enhanced Vehicular Paving Trinity Parkway SDEIS Hearing- May 5, 2009 S.M. Wright Roadway Schematic & Environmental Review & Approval 12 month process S.M. Wright Public Meeting early 2010 F.H.W.A. Approval mid 2010 S.M. Wright Construction (Dependent on Trinity Parkway Construction First) Adjacent Corridor Redevelopment (City of Dallas) - Ongoing Next Steps Page 14
15 Tim Nesbitt, P.E. TxDOT Project Manager of Transportation P.O. Box Dallas, Phone: Fax: Alva Baker Consultant Public Involvement Specialist Baker Consulting Associates, Inc South Blvd. Dallas, Phone: For More Information Page 15
Dallas-Fort Worth Area Major Transportation Projects
Dallas-Fort Worth Area Major Transportation Projects Presented by: Jeffrey C. Neal Program Manager Transportation North Central Texas Council of Governments (NCTCOG) August 14, 2014 Texas Society of Professional
DESIGN ASSISTANCE APPLICATION
DESIGN ASSISTANCE APPLICATION for FY 2016 NEW RIVER MULTI USE PATH: PINNACLE PEAK ROAD TO HAPPY VALLEY ROAD CITY OF PEORIA APPLICATIONS ARE DUE VIA ONLINE SUBMITTAL BY 10:00 AM ON MONDAY, JUNE 29, 2015
Corridor Goals and Objectives
Corridor Goals and Objectives This chapter presents the goals and objectives, developed by the Corridor Study Committee, that serve as the purpose and intent of the Corridor Plan. This plan covers a twenty
North Avenue Corridor Study. Advisory Committee Meeting #5 June 11, 2014
North Avenue Corridor Study Advisory Committee Meeting #5 June 11, 2014 Agenda Welcome and introductions Concept refinement and evaluation: Public meeting and web survey General cross-section concepts
Florida Avenue Multimodal Transportation Study. June 19, 2013
Florida Avenue Multimodal Transportation Study June 19, 2013 Today s Agenda Team & project introduction Project Timeline What you said Tools we use Mapped data and what clues it can provide Highlights
Light Rail Transit in Phoenix
4. Presentation and Discussion: Phoenix Light Rail Implementation Wulf Grote Planning and Development Director, Phoenix Valley Metro Light Rail Transit in Phoenix Broadway Citizen s Task Force February
Presentation to Knox County Commission Monday, February 23, 2015
The Northwest County Sector Plan Update Presentation to Knox County Commission Monday, February 23, 2015 COMMUNITIES OF THE NORTHWEST COUNTY SECTOR Ball Camp Cedar Bluff Last NW Sector Update: 2003 Land
Near Westside Neighborhood and University Avenue Corridor Transportation Study. Public Workshop #2. September 12 and 23, 2013
Near Westside Neighborhood and University Avenue Corridor Transportation Study Public Workshop #2 September 12 and 23, 2013 Presentation Outline: Brief Review of Study Scope, Background, and Current Conditions
Truck Lane Restriction Expansion
Truck Lane Restriction Expansion Dallas City Council Transportation and Environment Committee August 25, 2009 North Central Texas Council of Governments Transportation Department 1 Truck Lane Restrictions
Improving Access in Florida International University Biscayne Bay Campus Executive Summary
EXECUTIVE SUMMARY Improving Access in Florida International University Biscayne Bay Campus Executive Summary Prepared for: Miami-Dade County Metropolitan Planning Organization (Miami-Dade MPO) Prepared
Section 6 Traffic Analysis
Section 6 Traffic Analysis Traffic Operations of the Preferred Network Alternative After the Preferred Network was identified and confirmed by local policy makers and area residents, detailed traffic analysis
BEST PRACTICES. Smart Transportation is a key concept for the Paoli Roadway Improvement Project.
Smart Transportation Smart Transportation is a key concept for the Paoli Roadway Improvement Project. PennDOT s Smart Transportation Guidebook (2008) outlines a comprehensive approach to transportation
PLANNING DIVISION STAFF REPORT February 23, 2015. Summary. Background Information PREPARED FOR THE PLAN COMMISSION. Legistar File ID # 36810
PLANNING DIVISION STAFF REPORT PREPARED FOR THE PLAN COMMISSION Project Address: Application Type: Legistar File ID # 36810 Prepared By: Summary Conditional Use Timothy M. Parks, Planning Division Report
LBJ Express Project (LBJ Managed Lanes Project)
(LBJ Managed Lanes Project) LBJ Through the Years LBJ Through the Years LBJ Through the Years History 1987 LBJ Corridor Study Begins 1987 2004 Extensive Planning - 200+ Public Meetings June 2004 LBJ Coalition
I-676 (Vine Expressway) Bridge Reconstruction Project 22 nd - 18 th Streets Philadelphia, PA. PSPE Presentation, December 3, 2015
I-676 (Vine Expressway) Bridge Reconstruction Project 22 nd - 18 th Streets Philadelphia, PA PSPE Presentation, December 3, 2015 Location Map N PROJECT LOCATION 22 nd 18 th Streets PHILADELPHIA, PA General
RESOLUTIONS FOR APPROVAL OF AMENDMENTS TO THE 2015-2018 TRANSPORTATION IMPROVEMENT PROGRAM (TIP) AND 2040 REGIONAL TRANSPORTATION PLAN (RTP)
TPC Agenda Item 6A Mailout - 10/16/15 RESOLUTIONS FOR APPROVAL OF AMENDMENTS TO THE 2015-2018 TRANSPORTATION IMPROVEMENT PROGRAM (TIP) AND 2040 REGIONAL TRANSPORTATION PLAN (RTP) OCTOBER AMENDMENTS Amendment
KYTC, District 2 Chief District Engineer KYTC, District 2 Planning Supervisor & LPA Coordinator. KYTC, Central Office Planning
MINUTES Field Visit for Local Officials and Stakeholders Bluegrass Crossings Regional Business Centre Improved Access Road Study Ritatsu Manufacturing (Board Room) Beaver Dam, Kentucky June 11, 2014 1:30
Schenk-Atwood Neighborhood Business District Master Plan
Schenk-Atwood Neighborhood Business District Master Plan Prepared for the Schenk-Atwood Revitalization Association (SARA) and the City of Madison SCHREIBER/ANDERSON ASSOCIATES, INC. BEST Real Estate Group,
Alternatives to the Circ Project Prioritization Methodology Prepared for Circ Task Force July 28, 2011
Alternatives to the Circ Project Prioritization Methodology Prepared for Circ Task Force July 28, 2011 CCRPC staff has developed a draft methodology described below and detailed in the attached pages for
Historic Tax Incentive For
Historic Tax Incentive For 501 2 nd Avenue Hickory Street Annex June 12, 2009 Economic Development Committee Request Review of a proposed historic preservation tax incentive over $50,000 for the Hickory
GARFIELD BOULEVARD. concept planning 54TH PL CALUMET AVE ELLSWORTH DR CTA STATION STUDY AREA GAS STATION GARFIELD BLVD PRAIRIE AVE
GARFIELD BOULEVARD concept planning PRAIRIE AVE CTA STATION CURRENCY EXCHANGE CAFE ARTS INCUBATOR CALUMET AVE 54TH PL GAS STATION GARFIELD BLVD MUFFLER SHOP 55TH PL DR MARTIN LUTHER KING JR DR STUDY AREA
US 281 AT PREMONT PUBLIC HEARING. US 281 at Premont Public Hearing
US 281 AT PREMONT PUBLIC HEARING Hearing Purpose The purpose of tonight s Public Hearing is for the public to: Learn about the status of the proposed project Review the purpose and need for the project
Topic 2 11/28/2012 Blocks & Street Network
TOPIC 2 Blocks & Street Network Implementation Note: 1. Some recommendations are summarized in the tables herein. For complete recommendation language, please see the. 2. Recommendations referenced in
Review Public Input Report Jenn Toothaker. Approval of Meeting Summaries: May 21, May 23, May 30, & June 20, 2013 Meetings
Call to the Audience Guidelines 2 Call to the Audience opportunities Must fill out participant card Participants called in the order cards are received 3 minutes allowed per participant CTF Facilitator
OVERVIEW PROJECT SUMMARY
OVERVIEW Cesar Chavez showcases how to successfully redesign a primary arterial route into a neighborhood destination, improving modal share, water sensitive design, biodiversity and safety whilst maintaining
FILE NO.: Z-6915-C. Gamble Road Short-form PCD and Land Alteration Variance Request
FILE NO.: Z-6915-C NAME: Gamble Road Short-form PCD and Land Alteration Variance Request LOCATION: Located on the Northwest corner of Chenal Parkway and Gamble Road DEVELOPER: Davis Properties P.O. Box
CITY COUNCIL PACKET MEMORANDUM
CITY COUNCIL PACKET MEMORANDUM DOCUMENT: Final Plan and Final Plat SUBJECT: City Center Lenexa The Domain at City Center CONTACT PERSON: Beccy Yocham, Director of Community Development DATE: December 3,
APPENDIX F RIGHTS-OF-WAY PRESERVATION GUIDELINES
Los Angeles County Metropolitan Transportation Authority (Metro) 2009 Transportation Improvement Program Call for Projects APPENDIX F RIGHTS-OF-WAY PRESERVATION GUIDELINES Los Angeles County Metropolitan
Memorandum CITY OF DALLAS. April 12, 2013
Memorandum CITY OF DALLAS DATE April 12, 2013 Housing Committee Members: Carolyn R. Davis, Chair, Scott Griggs, Vice Chair, Dwaine Caraway, Linda Koop, and Pauline Medrano SUBJDCT Status of Housing Projects
STATE HIGHWAY 360. PUBLIC HEARING Thursday, October 17, 2013 FROM: E. SUBLETT ROAD/ W. CAMP WISDOM ROAD TO: US 287
STATE HIGHWAY 360 PUBLIC HEARING Thursday, October 17, 2013 FROM: E. SUBLETT ROAD/ W. CAMP WISDOM ROAD TO: US 287 TIMBERVIEW HIGH SCHOOL, ARLINGTON, TEXAS Project Vicinity Proposed Project Length: Approximately
IMPLEMENTATION STRATEGIES The following sections list the implementation strategies for following chapters.
CHAPTER 13: IMPLEMENTATION INTRODUCTION The purpose of the Implementation Chapter is to set forth the actions that the City will take to ensure that the plans, programs, and policies set forth in the plan
Texas Case Studies in Access Management. Ed Hard, TTI
Texas Case Studies in Access Management Ed Hard, TTI 8 th National Conference on Access Management August 15, 2006 Presentation Overview TxDOT Arterial Widenings, College Station, TX Processes for Median
Near West Side Comprehensive Plan Executive Summary (Revised) April 2004 City of Milwaukee DCD
Near West Side Comprehensive Plan Executive Summary (Revised) April 2004 City of Milwaukee DCD Boundaries The Near West Side Comprehensive Plan covers a broad area immediately west of Milwaukee s downtown.
CITY COUNCIL / PLANNING COMMISSION JOINT STUDY SESSION AGENDA REPORT
CITY COUNCIL / PLANNING COMMISSION JOINT STUDY SESSION AGENDA REPORT MEETING DATE: SEPTEMBER 8, 2015 ITEM NUMBER: 1 SUBJECT: PROPOSED GENERAL PLAN LAND USE ALTERNATIVE FOR THE YEAR 2015-2025 GENERAL PLAN
Introduction to Station Area Planning The Charlotte Story
Introduction to Station Area Planning The Charlotte Story Boston 2009 Steve Hamwey - Sasaki Associates, Inc. Troy Russ - Glatting Jackson, Inc. October 31 st, 2009 Station Area Planning October 15th History
Goals & Objectives. Chapter 9. Transportation
Goals & Objectives Chapter 9 Transportation Transportation MISSION STATEMENT: TO PROVIDE A TRANSPORTATION NETWORK CAPABLE OF MOVING PEOPLE AND GOODS EFFICIENTLY AND SAFELY. T he transportation system
Dallas ICM Conception to Implementation
Dallas ICM Conception to Implementation Transit ITS Best Practices Workshop November 13-14, 2013 Agenda Background Conception Procurement -Deployment Q&A Background-DFW Region 5 th most congested region
Waterstone Business Park
Orange County, North Carolina Waterstone Business Park Parcel Size Price Location Zoning Topography Combined total of 47 acres (Parcel #5-22 acres, #7-25 acres) $74,545 per acre (Parcel #5), $32,880 per
Fast Track A Successful Redevelopment: The Palm Beach Outlets Story
Fast Track A Successful Redevelopment: The Palm Beach Outlets Story SPEAKERS Rick Greene, AICP City of West Palm Beach Brian Seymour, Esq. Gunster Ken Tuma, PE UDKS Josh Long, AICP Gunster Grand Opening
IH-635 MANAGED LANES PROJECT, SEG. 3.2
IH-635 MANAGED LANES PROJECT, SEG. 3.2 Location: Dallas, Texas Owner: Texas Department of Transportation Client: Ferrovial Agroman Construction Cost: $1 Billion Construction Completion Date: December,
Downtown Tampa Transportation Vision
Downtown Tampa Transportation Vision Executive Summary August 1, 2006 Hillsborough County Metropolitan Planning Organization County Center, 18 th Floor Tampa, Florida 33602 813-272-5940 www.hillsboroughmpo.org
CITY OF BRAMPTON STREET CORRIDOR MASTER PLAN
1.0 INTRODUCTION... 1 1.1 Purpose of Document... 1 1.2 Master Plan Goal...1 1.3 Design Objectives... 2 1.4 Design Approach... 2 2.0 PROJECT SCOPE...2 2.1 City Context 2 2.2 Regional Context 2 3.0 DESIGN
STATUS. DESCRIPTION New Road Construction 6 to 8 lanes Flexible Pavement Reconstruction CST 2016/17 CST 2014/15. Resurfacing CST 2014/15
4338801 Gateway Express/118 th Ave N/CR 296 (Future 690) from US 19 (SR 55) to E of 28 th St N 4271421 SR 586 (Curlew Rd) from E of Countrybrook Dr to W of Countryside Blvd 4306601 Alt US 19 (SR 595) from
Walkable Communities Florida Department of Transportation State Safety Office Pedestrian and Bicycle Program April 1995 www.dot.state.fl.us/safety Twelve Steps for an Effective Program Page 1 Twelve Steps
Mission Creek Flood Control & Restoration Project. City of Fremont, Alameda County
Mission Creek Flood Control & Restoration Project City of Fremont, Alameda County Agenda Background Why are proposed improvements necessary? Proposed project components Challenges Construction schedule/phasing
I-90 ALLSTON INTERCHANGE PLACEMAKING STUDY Boston Redevelopment Authority
I-90 ALLSTON INTERCHANGE PLACEMAKING STUDY Boston Redevelopment Authority The Cecil Group Stantec Nelson/Nygaard Task Force Presentation December 17, 2015 I-90 Allston Interchange Placemaking Study Agenda
Background and Goals for the Project
City of Asheville, NC REQUEST FOR PROPOSALS Wilma Dykeman Riverway Environmental Analysis, Project Development, and Preliminary Design Submittal Address: Dan Baechtold, AICP City of Asheville Engineering
The financial plan was prepared in conjunction with the Technical Working Group. Refer to Table 3-1: Funding and Implementation Plan.
3 Financial Plan The purpose of the financial plan is to identify funding options that would be likely sources of money to advance recommendations made by this study. The Capitol Region Transportation
AREA: 0.16 acres NUMBER OF LOTS: 1 FT. NEW STREET: 0 LF
FILE NO.: Z-9020 NAME: Hometown Tax Service Short-form PD-O LOCATION: Located at 3008 West 12 th Street DEVELOPER: Mark Green 65 Westfield Loop Little Rock, AR 72210 SURVEYOR: Kittler-Roberts Group, LLP
BASSETT CREEK VALLEY MASTER PLAN OPEN HOUSE
BASSETT CREEK VALLEY MASTER PLAN OPEN HOUSE February 23, 2006 PROJECT INTRODUCTION Project Area 230 acres $50 million estimated market value (approximately) 50 acres parkland 100 residences (estimated)
Downtown Community Planning Council Meeting offebruary 18, 2015
- san diego Item #12 DATE ISSUED: ATTENTION: SUBJECT: February 13, 2015 Downtown Community Planning Council Meeting offebruary 18, 2015 Consideration of Support for Grant Applications for the San Diego
CHAPTER 1 GENERAL PROVISIONS
CHAPTER 1 GENERAL PROVISIONS 12-1-010 Short Title. 12-1-020 Purpose. 12-1-030 Interpretation. 12-1-040 Definitions. 12-1-050 Considerations. 12-1-060 General Responsibilities. 12-1-070 Appeal of Planning
Comment #1: Provide an interchange at Route 7 and Farm Market Road/White Gate Road. This was studied in the late 1990 s.
Proposed Truck Climbing Lane Route 7 Westbound Between West Market Street and Route 9 UPC# 58599, Project # 6007-053-133, P101 Date of Meeting: August 24, 2010 Time: 6:00PM to 8:00PM Location: Rust Library
8+ %!0"% 8+1!%"'$%,$"$
8+ 8+ %!0"% The next step in developing recommendations for improvements to Grand Avenue was to identify, develop and evaluate alternatives to address the issues and needs identified in the previous chapter.
City of Santa Ana. FY 2014/2015 Capital Improvement Program. Broadway/Anahurst to 1 st Improvements. First Street Bridge Replacement
Broadway/Anahurst to 1 st Improvements First Street Bridge Replacement MacArthur Rehabilitation/Bristol to Flower Fisher Park Butterfly Garden Improvements 1 Finance, PRCSA, CDA and PWA Data Gathering
LBJ Freeway in Dallas
LBJ Freeway in Dallas Texas/USA Ferrovial Agroman is redeveloping the LBJ Freeway to increase capacity and relieve severe congestion in one of the fastest growing areas in the United States. Ribera del
Alternatives Evaluation Overview
Alternatives Evaluation Overview 124 Alternatives were analyzed against the evaluation criteria Criteria and criteria weighting were set by the Community Task Force Ratings were quantitative and qualitative
Development Brief for New Lodge, Bank Mill Lane Berkhamsted. Adopted November 2007
Development Brief for New Lodge, Bank Mill Lane Berkhamsted Adopted November 2007 This publication seeks your opinions about the design, layout and requirements for new housing development at New Lodge,
Rapid City Downtown Area Master Plan. Draft Plan Concepts April 2016
Rapid City Downtown Area Master Plan Draft Plan Concepts April 2016 CALL TO ACTION! A Thriving Downtown = Regional Economic Prosperity Rapid City is competing nationally for a limited supply of young skilled
Philadelphia County. Land Use and Growth Management Profile
Philadelphia County is located in the southeastern corner of Pennsylvania and is bordered by the Pennsylvania counties of Delaware, Montgomery, and Bucks, and the New Jersey counties of Burlington, Camden,
General Obligation Bond Projects FYE 2013-2018
General Obligation Bond Projects FYE 2013-2018 2009 City of Norman Community Survey Final Report 2011 CTP Survey Results Storm Drainage and Street Widening Projects Combined Storm Water/Transportation
Harlem River Bridges Access Plan
Harlem River Bridges Access Plan Workshop Round 2 September 10, 2015 Harlem River Bridges Access Plan: Overview Agenda Presentation: Background + overview of concepts for review (15 20 min) Participation:
Industrial Suburban District Regulations City of St. Petersburg City Code Chapter 16, Land Development Regulations
16.20.110 - Industrial Suburban District ( IS ) Figure REFERENCE Typical Buildings in the IS District Figure REFERENCE Site Plan of a typical development in the IS District Sections: 16.20.110.1 Composition
3.1 Historical Considerations
3. Recommended Scope of Bridge improvements 3.1 Historical Considerations In the fall of 2000, an outside consultant, Fraser Design, suggested that the existing 4 th St. Bridge is potentially eligible
THIS PAGE INTENTIONALLY LEFT BLANK
Z-60 (2014) Z-60 (2014) THIS PAGE INTENTIONALLY LEFT BLANK APPLICANT: West Cobb Senior Living, LLC PETITION NO: Z-60 PHONE#: (770) 422-7016 EMAIL: [email protected] HEARING DATE (PC): 09-4-14 REPRESENTATIVE:
2010 Salida Community Priorities Survey Summary Results
SURVEY BACKGROUND The 2010 Salida Community Priorities Survey was distributed in September in an effort to obtain feedback about the level of support for various priorities identified in the draft Comprehensive
MAIN STREET IMPROVEMENTS Water, Sewer, Stormwater and Streetscape Improvements
MAIN STREET IMPROVEMENTS Water, Sewer, Stormwater and Streetscape Improvements Presentation July 23, 2014 A. Morton Thomas and Associates, Inc. 800 King Farm Boulevard, 4 th Floor Rockville, Maryland 20850