1 DESIGN ASSISTANCE APPLICATION for FY 2016 NEW RIVER MULTI USE PATH: PINNACLE PEAK ROAD TO HAPPY VALLEY ROAD CITY OF PEORIA APPLICATIONS ARE DUE VIA ONLINE SUBMITTAL BY 10:00 AM ON MONDAY, JUNE 29, 2015 Page 5 of 15
2 DESIGN ASSISTANCE FY 2016 APPLICATION Peoria: New River Multi use Path: Pinnacle Peak Road to Happy Valley Road Contact Information 1. Name of Sponsoring Agency PART A - CONTACT AND PROJECT DESCRIPTION Peoria 2. Project Manager Name and Title Brandon Forrey 3. Phone Number of Project Manager E Mail Address of Project Manager [email protected] 5. Mailing Address of Project Manager 9875 N. 85th Avenue Peoria, AZ Project Description 6. Please provide the Project Title. 7. Please provide the amount of funding requested: $36,000 New River Multi use Path: Pinnacle Peak Road to Happy Valley Road 8. Please provide a specific description of the project (i.e. bike path or sidewalk, width, length, cement or asphalt, etc.) (250 character limit): Project to connect two missing segments along the New River Multi use Path from Pinnacle Peak Road to Happy Valley Road. These gaps exist along this one mile segment, as some of the portions have already been built by development. Peoria would like to review the alignment of the path where not already constructed, as well as at locations where the existing path creates tight turns or visibility concerns, and identify all easements or rights of way that need to be acquired for path construction. 9. Please provide the project limits: East bank of New River from Pinnacle Peak Road to Happy Valley Road Part A, Page 6 of 15
3 DESIGN ASSISTANCE FY 2016 APPLICATION Peoria: New River Multi use Path: Pinnacle Peak Road to Happy Valley Road 1. What type of project is this? PART B - PROJECT DESCRIPTION Bicycle lane (4' min. w/o curb/gutter) Bicycle lane (5' min. with curb/gutter) Buffered Bike Lane Grade separated crossing Sidewalk (5' min.) Wide Sidewalk (8' min.) Protected Bike Lane Detached Sidewalk with 4' min. buffer X Shared use path (10' min.) Midblock Crossing 2a. Please describe the existing condition of the project site and any problem(s) being addressed. The New River Multi use path in the project area alternates between unpaved and paved 12' wide concrete segments behind single family residential developments from Happy Valley Road to Pinnacle Peak Road. North of this segment, there is a grade separated crossing under Happy Valley Road, but the paved path terminates at this underpass. The unpaved portions of the path between the Hatfield Road alignment and Calle Lejos are on State Land, and are overgrown with desert vegetation in many locations. The unpaved portion between the approximate Cielo Grande alignment and Pinnacle Peak Road has an existing 20' Trail Easement that extends to approximately 300' north of Pinnacle Peak Road. The adjacent property owner would like the path /easement relocated further from their property, though this might require bank protection for construction. The paved portion of the path continues south of these gaps from Pinnacle Peak south to Bethany Home Road, where in connects to the Grand Canal Multi use Path. 2b. Why is this project important to the community? The project area represents a critical gap between more than 14 miles of continuous paved pathways and 10 miles of continuous bike lanes on Happy Valley Road/Parkway and Vistancia Boulevard. This area will be heavily used by people riding bicycles and is a highly anticipated connection by the residential developments in the vicinity. 3. Connectivity: (Check all that apply) X X X Project fills a gap in the regional system Explain: Closes two gaps in the New River Multi use Path, with paved portions extending 13 miles to the south and providing a direct connection to the Skunk Creek, Arizona Canal, and Grand Canal Multi use Paths. Project connects to other local facilities List the connected facilities: Connects to bike lanes on Happy Valley Road (10 miles), Deer Valley Road (4 miles), and Beardsley Road (2.5 miles), as well as Rio Vista Regional Park and Glendale Sports and Entertainment District via the Grand Canal Multi use Path. Multi Jurisdictional Project List of Participating Jurisdictions: City of Glendale 24 Total length of facilities connected by this project (in miles) Part B, Page 7 of 15
4 DESIGN ASSISTANCE FY 2016 APPLICATION Peoria: New River Multi use Path: Pinnacle Peak Road to Happy Valley Road 4. Describe how this project will improve access from nearby neighborhoods and/or adjacent uses: This project will provide access to the New River Multi use Path from numerous residential developments to the north, south, east, and west of the project. Many of these residential areas were constructed too recently to be reflected in the Census data. 5. Describe how this project will improve access to transit: This project will provide access to the Thunderbird Road bus route (7.5 miles from project) and Peoria Avenue bus route (9.5 miles from project) via the New River Multi use Path. This is a long distance for pedestrians, but could be part of a multimodal commute for people riding bicycles. 6. Describe how this project will address bike/vehicle or pedestrian/vehicle conflicts: This project will provide greater access to the New River Path, reducing bike and pedestrian travel distances along busy arterial streets, such as Happy Valley Road or 83rd Avenue, eliminating conflicts with motor vehicles. 7. What are the demographics of the area served: 348 People Per Square Mile 4 % Families in Poverty 4 % Age 65 Plus MAG Demographic Mapping Use the MAG Demographic Mapping link above. Zoom in to your project area. On the right hand side of the screen, under Reports, select Custom Summary. Next, select Corridor of Interest. Left click to begin drawing. Draw a line through all census blocks adjacent to your project, left clicking where needed to change the direction of the line. Double click to finish drawing the line. The selected census blocks will become highlighted in blue. A pop up box will appear with Report Results for Selected Block Groups. Select the Summary Report tab, and use the data found there. You may export the results to Excel (click the Excel icon at the top right side of the pop up window) for your records. 8. How will this project benefit families in poverty? This project will provide greater access to grocery and retail located at the southwest, southeast, and northeast corners of 67th Avenue and Happy Valley Road with a safe, convenient multi use facility for people of all income levels who cannot afford or choose not to use motor vehicles. Part B, Page 8 of 15
5 9. How will this project benefit minority residents? DESIGN ASSISTANCE FY 2016 APPLICATION Peoria: New River Multi use Path: Pinnacle Peak Road to Happy Valley Road This project will provide greater access to safe, convenient multi use facilities for people of all races and backgrounds. 10. How will this project benefit elderly residents? This project will improve non motorized access to grocery and phamacies located at 67th Avenue and Happy Valley Road for elderly residents who can no longer or choose not to drive motor vehicles. 11. How will this project benefit school children? This project will connect to the New River Multi use Path underpass at Happy Valley Road, providing a grade separated crossing for Happy Valley Basic School students living south of the busy arterial street. 12. Please list any schools within 1/4 mile of the project: Happy Valley Basic School is located 1/4 mile west of the project location on Happy Valley Road. 13. How does the project benefit persons with disabilities? The paved path will provide an all weather surface designed to current ADA standards, providing full access to people with disabilities. Part B, Page 9 of 15
6 DESIGN ASSISTANCE FY 2016 APPLICATION Peoria: New River Multi use Path: Pinnacle Peak Road to Happy Valley Road 14. The project is: (Check one) X Identified in General Plan, council adopted policy, or Capital Improvements Program (provide source) List: Identified in Parks and Recreation Open Space and Trails (PROST) and partially funded in the City's CIP in FY18 Consistent with general policy/practices, but not formally identified (provide source) Explain: Not addressed by jurisdiction's plans, policies, or practices Explain: 15. List the community partners that will be supporting the development and promotion of this project. Include city departments that will also be supporting the project. The Development and Engineering Department and Community Services Department. 16. Does the jurisdiction have a dedicated staff person to manage the project? Which city department will be responsible to provide information to the consultant? City staff is available to administer this project and the project manager will be a Civil Engineer in the Development and Engineering Department. 17. Does the jurisdiction have base information available (topo survey, aerial photography, ALTA survey in electronic/digital format, easement information, utility placement information)? Peoria has access to all documents needed to successfully complete this project. Part B, Page 10 of 15
7 Part C - Attachments Listed below are the required attachments for this project application. These attachments are intended to demonstrate the need of the project. They should clearly show the segment alignment and features that connect to other bicycle, pedestrian, and/or shared-use facilities, as well as washes, canals, railroad crossings, and other crossing features that may affect the project. PLEASE INCLUDE EACH ATTACHMENT AS A SEPARATE.JPEG OR.PDF FILE IN YOUR ELECTRONIC SUBMITTAL. 1. Please attach a map with street names clearly showing the project area boundaries and surrounding land uses, including a north arrow. 2. Please attach up to 2 aerial photos, if available (two 4x6 photos per page). 3. Please attach up to 4 photographs with captions of the study area showing the problems/issue (two 4x6 photos per page). 4. If the applicant is not the owner(s) of the project area, a letter of support and cooperation from the property owner(s) is required. This letter shall state that the property owner(s) agree to participate in the development of preliminary plans, and to permit improvements that may be identified as a result of this program. 5. (OPTIONAL) Up to 3 letters of support for the project. Part C, Page 11 of 15
8 DESIGN ASSISTANCE FY 2016 APPLICATION Peoria: New River Multi use Path: Pinnacle Peak Road to Happy Valley Road PART D - PROJECT COSTS 1. What is the approximate cost for 15% preliminary plans* for this project? Estimate cost for each task below: $1,800 Scope of Work $11,880 Stakeholder and Core Team Meetings $1,800 Data Collection $1,800 Data Analysis $9,000 Project Assessment Report (Draft) $9,000 Project Assessment Report (Final) $720 Executive Summary and Regional Significance Report $36,000 TOTAL COST ESTIMATE FOR 15% PRELIMINARY PLANS (SHOULD MATCH PART A, #7) *15% Preliminary Plans generally include: Project Information (location, description, map) Background data including the need for the project Project Scope (length, type of work, how it is to be constructed) Project Development Environmental overview Geotechnical and drainage requirements Critical outside agency involvement Preliminary Right of Way requirements Preliminary Utility relocation requirements Preliminary Traffic requirements Seasonal consideration Design Criteria Itemized Cost Estimate Schedule Preliminary Plans Preliminary Pathway Horizontal Layout Typical Sections Preliminary Aesthetic Concept Information on potential funding sources Executive Summary 2. What is the anticipated cost for the whole project (please break down costs by design, environmental, ROW, utilities, construction, etc)? Design $94,000 (includes $36,000 for 15% Design), ROW $70,000 Utilities $11,000, and Construction $500,000. TOTAL PROJECT ESTIMATE $675, Are there designated funds for construction of this project? If yes, what funding sources have been identified? This project is partially funded in FY18 in the amount of $181,000 for design and right of way / easement dedications. Part B, Page 12 of 15
9 DESIGN ASSISTANCE FY 2016 APPLICATION Peoria: New River Multi use Path: Pinnacle Peak Road to Happy Valley Road 4. If funding has NOT been identified for construction of the project, what efforts have been made to identify funds that could be used for this project? Though partially funded in FY18, additional funds will be allocated as the scope of the project is better defined by the final alignment of the path. 5. Are there funds for maintenance? Who has the responsibility for maintenance? Maintenance of the off street path system is the responsibility of the Community Service Department, which receives annual funding with support from the Mayor, City Council, and Executive Management. 6. Is an easement required for this project? If YES, please attach a Property Owner Letter of Support. In the northern gap, easements or right of way will be need to be obtained from the Bureau of Land Management, which has been supportive of the establishment of the New River Multi use path corridor in multiple segments along the river. However, BLM will not commence discussions with Peoria or provide support concerning easement or right of way dedication until the alignment fo the path is finalized. In the southern gap, there is an existing 20' easement for the majority of the path, though Peoria is seeking a recommendation on path alignment along the southernmost 300' 500' of the path as one of the deliverables of the feasibility study. Part B, Page 13 of 15
10
11 FY16 Design Assistance Program New River Multi-use Path: Pinnacle Peak Road to Happy Valley Road City of Peoria Project Location
12 FY16 Design Assistance Program New River Multi-use Path: Pinnacle Peak Road to Happy Valley Road City of Peoria City Park Happy Valley Basic School Terramar Elementary School Retail Path Underpass Happy Valley Rd CCV Church New Retail Retail New 2 1 New 73 rd Ave Hatfield Rd 67 th Ave Project Location 3 Calle Lejos CITY OF PEORIA CITY OF PHOENIX CITY OF PEORIA CITY OF GLENDALE 4 Pinnacle Peak Rd Cielo Grande 71 st Ave CITY OF PEORIA CITY OF GLENDALE Patrick Ln Pinnacle Pointe Academy CITY OF PHOENIX CITY OF GLENDALE Hillcrest Middle School Mountain Ridge High School Mountain Preserve 71 st Ave Hillcrest Blvd Legend 75 th Ave Existing Paved Multi-use Path (or soon to be scheduled for construction) Existing 20' Trail Easement N # Proposed FY16 Design Assistance Project Segment Photo Number
13 Photo 1: Sharp turn in path 1000' south of Happy Valley Road facing south Proposed path realignment Photo 2: Path termination at Hatfield Road alignment facing south
14 Photo 3: Path termination at Calle Lejos facing north Photo 4: Path termination at Cielo Grande alignment facing south Approximate location of 20' Trail Easement
15
16 6333 W. Range Mule Drive ~ Phoenix, AZ ~ ~ [email protected] ~ June 11, 2015 Brandon Forrey, Transportation Planning Engineer Engineering Department, City of Peoria 9875 N. 85th Avenue Peoria, AZ RE: Support for request of Design Assistance Funds/ New River Multi-use Path Dear Brandon, I am writing in support of the City of Peoria s request for Design Assistance Funds to be used to study the New River Multi-use Path from Pinnacle Peak Road to Happy Valley Road. I am the co-founder and president of a local 100+ member cycling club; the SouthWest Bicycles Cycling Club. As our name implies, SouthWest Bicycles located in the city of Peoria, is our sponsoring bicycle shop. Our club members routinely utilize portions or all of the New River Trail/Multi-use path for personal use, commuting and club rides. The connection of the current trail north to Happy Valley Rd is long-awaited among our members. As you may know, Happy Valley Road is a well-traveled arterial for the cycling community. With over 20 miles of bicycle lanes, Happy Valley Rd provides a great east/west corridor for cyclists in the north Peoria area and across north Phoenix. What we are lacking is a viable, direct north/south arterial to easily connect with the current Rio Vista Multi-use path. The mile segment from Happy Valley to Pinnacle Peak Rd would become our north/south arterial, and its completion is strongly desired. The completion of this path would enable cyclists to ride nearly 12 miles along the New River Wash and away from the vehicular traffic on our busy, North Peoria streets. It is a relatively short segment to complete the New River trail system. I am hopeful that the City of Peoria can engineer and construct this portion in a timely manner with help from the Design Assistance Funds. I look forward to any updates you can provide moving forward on this project. Regards, Teresa Filleman, President SouthWest Bicycles Cycling Club 8155 W. Bell Rd. Ste 116 ~ Peoria, AZ ~ ~ [email protected] ~
17 June 19, 2015 Brandon Forrey Transportation Planning Engineer Engineering Department City of Peoria 8975 N 85 Ave Peoria, AZ Subject: Completion of New River Bike Trail Mr Brandon Forrey The MAG Bikeways is a fabulous collection of trails throughout the Phoenix Valley that are used and enjoyed by a large and growing bicycling community. When completed these will surly be world class and an asset to all the Valley communities. A key portion is the New River Bike Trail, which allows Peoria residents to connect with the other MAG Bikeways. This trail is planned to serve the residents in north Peoria, starting at Happy Valley Pkwy and go some 11 miles south to Northern Ave. On Happy Valley Pkwy, from Vistancia to New River, Peoria City has provided safe bike lanes and easy access to the New River Bike Trail. Unfortunately, the Happy Valley Pkwy segment is not completed and we currently have to ride through traffic to reach the trail at Deer Valley or Beardsley Roads. The biking community of Vistancia Village is totally supportive of getting the New River Bike Trail completed from Happy Valley Pkwy to Deer Valley Rd. Jim Haile Vistancia Chapter Arizona Bike Club
Narrative Response/Attachment 1 (WisDOT 2014-2018 TAP- Second Round Application ID-SWBP22)
Narrative Response/Attachment 1 (WisDOT 2014-2018 TAP- Second Round Application ID-SWBP22) 2. For Bicycle and Pedestrian Projects: Clearly indicate the location, length, width, surface materials, and any
CITY OF ROANOKE AND TOWN OF VINTON, VIRGINIA. RSTP Funds Joint Application FOR
CITY OF ROANOKE AND TOWN OF VINTON, VIRGINIA RSTP Funds Joint Application FOR Tinker Creek Pedestrian Bridge: Tinker Creek and Glade Creek Greenways Connection Date: September 15, 2014 RSTP Project Profile
Lincoln Downtown Master Plan Update
Lincoln Downtown Master Plan Update Table of Contents Executive Summary........................................... 1 Complete Streets Framework.................................... 3 Promenade Creating
Motorcycle & Pedestrian Master Plans in Indianapolis, Indiana
PROJECT PURPOSE The Warsaw + Winona Lake Bicycle and Pedestrian Master Plan establishes a comprehensive framework for a connected bicycle and pedestrian system that will be used for both recreation and
SAN DIEGO - A BICYCLE FRIENDLY CITY
SAN DIEGO - A BICYCLE FRIENDLY CITY MANY OPPORTUNITIES FOR IMPROVEMENT SUMMARY The designated bicycle paths and lanes in the City of San Diego (City) are often substandard because of their location and
Light Rail Transit in Phoenix
4. Presentation and Discussion: Phoenix Light Rail Implementation Wulf Grote Planning and Development Director, Phoenix Valley Metro Light Rail Transit in Phoenix Broadway Citizen s Task Force February
APPENDIX F RIGHTS-OF-WAY PRESERVATION GUIDELINES
Los Angeles County Metropolitan Transportation Authority (Metro) 2009 Transportation Improvement Program Call for Projects APPENDIX F RIGHTS-OF-WAY PRESERVATION GUIDELINES Los Angeles County Metropolitan
Executive Summary. Transportation Needs CHAPTER. Existing Conditions
CHAPTER 1 Executive Summary The City of Forest Grove Transportation System Plan (TSP) was updated to keep it consistent with recent growth trends in the city and other transportation planning efforts in
Assessing Paved Trails for Compliance with Standards and Best Practices
Assessing Paved Trails for Compliance with Standards and Best Practices Session Presenters: Kristin Maravilla, Planner/Designer Masters in Landscape Architecture (UC Berkeley) Masters in City and Regional
BEST PRACTICES. Smart Transportation is a key concept for the Paoli Roadway Improvement Project.
Smart Transportation Smart Transportation is a key concept for the Paoli Roadway Improvement Project. PennDOT s Smart Transportation Guidebook (2008) outlines a comprehensive approach to transportation
Walkable Communities Florida Department of Transportation State Safety Office Pedestrian and Bicycle Program April 1995 www.dot.state.fl.us/safety Twelve Steps for an Effective Program Page 1 Twelve Steps
3.1 Historical Considerations
3. Recommended Scope of Bridge improvements 3.1 Historical Considerations In the fall of 2000, an outside consultant, Fraser Design, suggested that the existing 4 th St. Bridge is potentially eligible
8+ %!0"% 8+1!%"'$%,$"$
8+ 8+ %!0"% The next step in developing recommendations for improvements to Grand Avenue was to identify, develop and evaluate alternatives to address the issues and needs identified in the previous chapter.
Multi-Modal Corridor Degree of Complexity: High Cost/Benefit: High
Multi-Modal Corridor Degree of Complexity: Cost/Benefit: Maintain the same level of service for Ensures continuous flow through the Might impact other transportation Consider road diet and/or different
FILE NO.: Z-6915-C. Gamble Road Short-form PCD and Land Alteration Variance Request
FILE NO.: Z-6915-C NAME: Gamble Road Short-form PCD and Land Alteration Variance Request LOCATION: Located on the Northwest corner of Chenal Parkway and Gamble Road DEVELOPER: Davis Properties P.O. Box
Introduction to Station Area Planning The Charlotte Story
Introduction to Station Area Planning The Charlotte Story Boston 2009 Steve Hamwey - Sasaki Associates, Inc. Troy Russ - Glatting Jackson, Inc. October 31 st, 2009 Station Area Planning October 15th History
N Street Protected Bikeway
N Street Protected Bikeway The N Street Protected Bikeway project was identified in the 2005 City of Lincoln Downtown Master Plan and the 2012 Downtown Master Plan Update as the completion of the last
REGIONAL NON-MOTORIZED TRANSPORTATION NETWORK
Chapter 10 Bicycle and Pedestrian SAFETEA-LU legislation requires that non-motorized users be considered in the LRTP. The legislation allows for bicycle and pedestrian safety to be incorporated into the
This section summarizes the relevant transportation policies, laws, and regulations that apply to the proposed project.
6. Transportation 6.1 OVERVIEW This chapter describes the existing transportation conditions in the Southwest Fresno Specific Plan Area. This includes the existing roadway, transit, bicycle, and pedestrian
2010 Salida Community Priorities Survey Summary Results
SURVEY BACKGROUND The 2010 Salida Community Priorities Survey was distributed in September in an effort to obtain feedback about the level of support for various priorities identified in the draft Comprehensive
New Jersey SRTS Travel Plan Guide
New Jersey SRTS Travel Plan Guide Prepared For: Funded By: Prepared By: New Jersey Department of Transportation Federal Highway Administration Alan M. Voorhees Transportation Center Edward J. Bloustein
PLANNING FOR NEW DEVELOPMENT AT THE COTTONWOOD MALL SITE
APPENDIX F PLANNING FOR NEW DEVELOPMENT AT THE COTTONWOOD MALL SITE Table of Contents The Setting Background Planning Objectives Neighborhood Protection The Concept Plan Exhibits Cottonwood Mall Site 1
September 2005. Sponsored by: John H. Chafee Blackstone River Valley National Heritage Corridor Commission Woonsocket, RI
Sponsored by: John H. Chafee Blackstone River Valley National Heritage Corridor Commission Woonsocket, RI Worcester Historical Museum Worcester, MA September 2005 mawald/ld/0909700/graphics/covers/september05cover
EPA Technical Assistance for Sustainable Communities Building Blocks
EPA Technical Assistance for Sustainable Communities Technical Assistance Tool: Complete Streets Deerfield Beach, Florida February 16, 2012 To: CC: Amanda Martinez, City of Deerfield Beach Roger Millar,
Topic 2 11/28/2012 Blocks & Street Network
TOPIC 2 Blocks & Street Network Implementation Note: 1. Some recommendations are summarized in the tables herein. For complete recommendation language, please see the. 2. Recommendations referenced in
For more information, visit: rethinkingstreets.com
For more information, visit: rethinkingstreets.com 37 Arterial Rehab Busy, multi-lane streets, often referred to as arterials, crisscross the landscape of our cities and suburbs. Alongside these wide thoroughfares,
Stone Way N Rechannelization: Before and After Study. N 34th Street to N 50th Street
City of Seattle Department of Transportation Stone Way N Rechannelization: Before and After Study N 34th Street to N 50th Street May, 2010 INTRODUCTION Population density in Seattle is increasing within
APPLICATION LAFAYETTE METROPOLITAN PLANNING ORGANIZATION (MPO) SURFACE TRANSPORTATION PROGRAM (STP) FUNDS TRANSPORTATION IMPROVEMENT PROGRAM (TIP)
APPLICATION LAFAYETTE METROPOLITAN PLANNING ORGANIZATION (MPO) SURFACE TRANSPORTATION PROGRAM (STP) FUNDS TRANSPORTATION IMPROVEMENT PROGRAM (TIP) To be considered for STP funding, a proposed project must
In 2005, the City of Pasadena, CA, USA, with the support of consultants,
Creating a Citywide Safe Routes to School Program: Pasadena, CA, USA s Step-by-Step Approach In 2005, the City of Pasadena, CA, USA, initiated development of a comprehensive Safe Routes to School Program.
Downtown South Salt Lake Redevelopment City of South Salt Lake
Project Information LOCAL PLANNING RESOURCE PROGRAM 2015 Downtown South Salt Lake Redevelopment City of South Salt Lake Overview of Objectives: Building a downtown city center could be the most significant
Needs Analysis. Long Beach Bicycle Master Plan. Bicycle Commuter Needs. LONG BEACH BICYCLE MASTER PLAN Needs Analysis
Long Beach Bicycle Master Plan Needs Analysis The purpose of reviewing the needs of commuter and recreational bicyclists is twofold: (1) it is instrumental when planning a system which must serve both
EXHIBIT A LOCATION MAP AND LAND USE INFORMATION
EXHIBIT A LOCATION MAP AND LAND USE INFORMATION In accordance with Arizona Corporation Commission Rules of Practice and Procedure R14-3-219, Applicant provides the following location maps and land use
ENGINEERING SOLUTIONS FOR DESIGNING YOUR SAFE ROUTES
How to Get Started ENGINEERING SOLUTIONS FOR DESIGNING YOUR SAFE ROUTES Design Elements Selecting appropriate design treatments for school neighborhoods creates environments that address the needs of all
Wilmington Urban Area Metropolitan Planning Organization Surface Transportation Program Direct Attributable Project Submittal Guide Fiscal Year 2016
Wilmington Urban Area Metropolitan Planning Organization Surface Transportation Program Direct Attributable Project Submittal Guide Fiscal Year 2016 Date of Release: September 14, 2015 Pre application
3 Tappan Zee Bridge Rehabilitation Options
3 Tappan Zee Bridge Rehabilitation Options 3.1 Introduction This chapter describes possible options that rehabilitate and enhance the existing Tappan Zee Bridge. Four Rehabilitation Options have been developed:
North Avenue Corridor Study. Advisory Committee Meeting #5 June 11, 2014
North Avenue Corridor Study Advisory Committee Meeting #5 June 11, 2014 Agenda Welcome and introductions Concept refinement and evaluation: Public meeting and web survey General cross-section concepts
Collingwood Trails Network Management Guidelines. Parks, Recreation & Culture Department
Collingwood Trails Network Management Guidelines 2012 Parks, Recreation & Culture Department 1 SECTION 1: INTRODUCTION IN December 1998 the Town of Collingwood Parks, Recreation and Culture Department
1. REPORT CONTEXT Description of the development (include all of the following that are known at the time of the application):
Transportation Assessment and Management Study Guidelines for Consultants INTRODUCTION This document is intended to provide guidelines for transportation consultants who produce Transportation reports
Pavement Management Program
Pavement Management Program 2014 Street Maintenance Program Executive Summary 01/21/2014 Presented by Mark Thiel Assistant Director of Public Works Program Overview Start of current program 2005 825.1
Florida Avenue Multimodal Transportation Study. June 19, 2013
Florida Avenue Multimodal Transportation Study June 19, 2013 Today s Agenda Team & project introduction Project Timeline What you said Tools we use Mapped data and what clues it can provide Highlights
Harlem River Bridges Access Plan
Harlem River Bridges Access Plan Workshop Round 2 September 10, 2015 Harlem River Bridges Access Plan: Overview Agenda Presentation: Background + overview of concepts for review (15 20 min) Participation:
Is Encouraging More Bike Ridership On El Camino Real A Good Idea?
Is Encouraging More Bike Ridership On El Camino Real A Good Idea? In the above illustration there is a shared right turn lane on southbound El Camino Real at the intersection with Santa Cruz Avenue. Turning
Rapid City Downtown Area Master Plan. Draft Plan Concepts April 2016
Rapid City Downtown Area Master Plan Draft Plan Concepts April 2016 CALL TO ACTION! A Thriving Downtown = Regional Economic Prosperity Rapid City is competing nationally for a limited supply of young skilled
Mid-Coast Corridor Transit Project San Diego, California New Starts Project Development (Rating Assigned November 2014)
Mid-Coast Corridor Transit Project San Diego, California New Starts Project Development (Rating Assigned November 2014) Summary Description Proposed Project: Light Rail Transit 10.9 Miles, 9 Stations Total
Guiding Principles. McCauley Area Focused Urban Design Plan. 1 Connect: Chinatown and Little Italy with downtown and surrounding areas
McCauley Area Guiding Principles 1 Connect: Chinatown and Little Italy with downtown and surrounding areas 2 Strengthen: Cultural character in Chinatown and Little Italy 3 Develop: Strong East West pedestrian
Introduction & Welcome
Proposed SM Wright Freeway Redevelopment Dallas District Halff Associates Baker Consulting Associates April 28, 2009 Introduction & Welcome Alva Baker Baker Consulting Associates Page 1 Project Overview
Accident Analysis of Sheridan Road between Isabella Street and South Boulevard
Accident Analysis of Sheridan Road between Isabella Street and South Boulevard Prepared for TranSystems Corporation for the City of Evanston Submitted by Regina Webster & Associates, Inc. Date: 08/15/2008
001722 - Phoenix. Description: US 60 WS 300ft N/O Thomas Rd F/S - 1. TAB Panel ID: 295472 City: PHOENIX Latitude: 33.482
001722 - Phoenix Description: US 60 WS 300ft N/O Thomas Rd F/S - 1 TAB Panel ID: 295472 City: PHOENIX Latitude: 33.482 Media Type: Bulletin State: AZ Longitude: -112.118 Dimensions: 14' x 48' Zip: 85017
OVERVIEW PROJECT SUMMARY
OVERVIEW Cesar Chavez showcases how to successfully redesign a primary arterial route into a neighborhood destination, improving modal share, water sensitive design, biodiversity and safety whilst maintaining
Protected Bicycle Lanes in NYC
Protected Bicycle Lanes in NYC New York City Department of Transportation Polly Trottenberg, Commissioner September 2014 NEW YORK CITY DEPARTMENT OF TRANSPORTATION 1 Overview Since 2007, the New York City
Task 1 Project Management and Project Organization Work Plan
City of Palmdale Active Transportation Program Plan Scope of Work At their January 22, 2015 meeting, the California Transportation Commission (CTC) allocated funding for the above-referenced project as
Mayors Welcome Strong Surrey Votes Yes Coalition Support. Yes Vote Would Vastly Improve Transit and Transportation in Fast Growing City
Mayors Welcome Strong Surrey Votes Yes Coalition Support Yes Vote Would Vastly Improve Transit and Transportation in Fast Growing City February 11, 2015 Vancouver, BC The Mayors Council on Regional Transportation
Presentation to Knox County Commission Monday, February 23, 2015
The Northwest County Sector Plan Update Presentation to Knox County Commission Monday, February 23, 2015 COMMUNITIES OF THE NORTHWEST COUNTY SECTOR Ball Camp Cedar Bluff Last NW Sector Update: 2003 Land
Downtown Tampa Transportation Vision
Downtown Tampa Transportation Vision Executive Summary August 1, 2006 Hillsborough County Metropolitan Planning Organization County Center, 18 th Floor Tampa, Florida 33602 813-272-5940 www.hillsboroughmpo.org
Pedestrian & Bicycle Plan
RAMSEY COMMUNITIES COUNTYWIDE Pedestrian & Bicycle Plan PRIMER: LEGAL FRAMEWORK PRIMER: LEGAL FRAMEWORK Walking and Biking for All e 2 CHAPTER 2: Walking and Biking for All This page intentionally left
TH 23 Access Management Study Richmond to Paynesville
TH 23 Access Management Study Richmond to Paynesville Prepared For: Minnesota Department of Transportation District 8 Prepared By: Short Elliott Hendrickson Inc. July 2015 Table of Contents I. Introduction...
Alternatives Evaluation Overview
Alternatives Evaluation Overview 124 Alternatives were analyzed against the evaluation criteria Criteria and criteria weighting were set by the Community Task Force Ratings were quantitative and qualitative
Goals & Objectives. Chapter 9. Transportation
Goals & Objectives Chapter 9 Transportation Transportation MISSION STATEMENT: TO PROVIDE A TRANSPORTATION NETWORK CAPABLE OF MOVING PEOPLE AND GOODS EFFICIENTLY AND SAFELY. T he transportation system
Clean, Green, Fun! Cady Way. Trail
Clean, Green, Fun! Cady Way Trail Seminole County Burkett Osceola 426 Mizell Sylvan 426 Ward Memorial Cady Way 436 426 551 Nan Waunatta Martha Mira Pearl George Virginia Berry Irma Winter Pines Golf Course
A PPENDICES C OLLIERVILLE 2040 LAND USE PLAN UPDATE
A PPENDICES C OLLIERVILLE 2040 LAND USE PLAN UPDATE Traditional Neighborhood Character Study with a Neighborhood Center Commercial Node Aldi s is appropriate in a Neighborhood Center School Greenbelt Trail
28.0 Development Permit Area #2 (Neighbourhood District)
28.0 Development Permit Area #2 (Neighbourhood District) Goals and Objectives To provide a guide for infill and new development in the Neighbourhood District. To outline the nature, form and character
HARRIS TEETER AT LADY S ISLAND CITY OF BEAUFORT DRB CONCEPTUAL PROJECT NARRATIVE Submittal Date: September 2, 2015 Meeting Date: September 10, 2015
HARRIS TEETER AT LADY S ISLAND CITY OF BEAUFORT DRB CONCEPTUAL PROJECT NARRATIVE Submittal Date: September 2, 2015 Meeting Date: September 10, 2015 PROPOSED REDEVELOPMENT The project consists of demolishing
COUNTY OF ALBEMARLE PLANNING STAFF REPORT SUMMARY. Staff: Claudette Grant
COUNTY OF ALBEMARLE PLANNING STAFF REPORT SUMMARY Project Name: ZMA 2013-00004 Hollymead Town Center Block VI Planning Commission Public Hearing: July 29, 2014 Staff: Claudette Grant Board of Supervisors
CITY COUNCIL PACKET MEMORANDUM
CITY COUNCIL PACKET MEMORANDUM DOCUMENT: Final Plan and Final Plat SUBJECT: City Center Lenexa The Domain at City Center CONTACT PERSON: Beccy Yocham, Director of Community Development DATE: December 3,
Chapter 5. Transportation. Decatur County Comprehensive Plan. Introduction. Goals and Objectives. Goal. Objectives. Goal.
Chapter 5 Transportation Chapter 5: Transportation Introduction The transportation system forms the backbone of a community. I-74 connects Decatur County with the large metropolitan areas of Cincinnati
TRANSPORTATION SERVICE STANDARDS ELEMENT GOALS, OBJECTIVES & POLICIES
TRANSPORTATION SERVICE STANDARDS ELEMENT GOALS, OBJECTIVES & POLICIES Background One of the most critical public services provided by a community is the community s transportation system. An effective
IN THE CITY COUNCIL OF THE CITY OF LIVERMORE, CALIFORNIA A RESOLUTION TO APPROVE A COMPLETE STREETS POLICY
IN THE CITY COUNCIL OF THE CITY OF LIVERMORE, CALIFORNIA A RESOLUTION TO APPROVE A COMPLETE STREETS POLICY The term " Complete Streets" describes a comprehensive, integrated transportation network with
Site Deliverability Statement Development at: Beech Lane, Kislingbury. Persimmon Homes Midlands March 2015
Site Deliverability Statement Development at: Beech Lane, Kislingbury Persimmon Homes Midlands March 2015 Contents Site Deliverability Statement Development at: Beech Lane, Kislingbury 1.INTRODUCTION 1.1
KENTUCKY TRANSPORTATION CABINET. Department of Rural and Municipal Aid. Office of Local Programs
KENTUCKY TRANSPORTATION CABINET Department of Rural and Municipal Aid Office of Local Programs Office of Local Programs Transportation Enhancements Safe Routes to School Congestion Mitigation and Air Quality
Executive Director s Recommendation Commission Meeting: March 5, 2015
Executive Director s Recommendation Commission Meeting: March 5, 2015 PROJECT Curseen-Morris Processing and Distribution Center Parking Lot 900 Brentwood Avenue NE Washington, DC SUBMITTED BY United States
Update on Previous Related Transportation Enhancement Grants
ROUND 16 ROUND 16 Update on Previous Related Transportation Enhancement Grants Pima County and City of Tucson staff are implementing the Pima County-Tucson Safe Routes to Schools Pilot Program. This program
PUBLIC INFORMATIONAL MEETING THURSDAY APRIL 30, 2015
PUBLIC INFORMATIONAL MEETING THURSDAY APRIL 30, 2015 AT ACTON TOWN HALL FAULKNER ROOM 472 MAIN STREET ACTON, MASSACHUSETTS 7:00 PM FOR THE PROPOSED ASSABET RIVER RAIL TRAIL (ARRT) IN THE TOWNS OF ACTON
AREA: 0.16 acres NUMBER OF LOTS: 1 FT. NEW STREET: 0 LF
FILE NO.: Z-9020 NAME: Hometown Tax Service Short-form PD-O LOCATION: Located at 3008 West 12 th Street DEVELOPER: Mark Green 65 Westfield Loop Little Rock, AR 72210 SURVEYOR: Kittler-Roberts Group, LLP
the interchange of business
the interchange of business project overview PV303 is a master planned business park designed to meet the growing demand for commercial and industrial opportunities in the greater Phoenix area. Located
Schenk-Atwood Neighborhood Business District Master Plan
Schenk-Atwood Neighborhood Business District Master Plan Prepared for the Schenk-Atwood Revitalization Association (SARA) and the City of Madison SCHREIBER/ANDERSON ASSOCIATES, INC. BEST Real Estate Group,
College of Southern Maryland. Hughesville Transportation Study
College of Southern Maryland Project Overview Existing Conditions Transit Service Land Use CSM Student Demographics Recommendations Methodology Transit Recommendations Transportation Demand Management
BACKGROUND REPORT for the Peoria-Smith Station Area Plan
BACKGROUND REPORT for the Peoria-Smith Station Area Plan Peoria-Smith station I-225 Corridor City of Aurora October, 2009 Acknowledgements Mayor Mayor Ed Tauer City of Aurora Planning Department Robert
1161.01 CONFORMITY WITH PLANS; DRAINAGE.
CHAPTER 1161 Subdivision Requirements 1161.01 Conformity with plans; drainage 1161.07 Easements 1161.02 Trees 1161.08 Streets 1161.03 Subdivision name 1161.09 Blocks 1161.04 Street names 1161.10 Lots 1161.05
DESIGN PUBLIC HEARING. August 10, 2015 WEST BOYLSTON TOWN HALL, BOARD MEETING ROOM. 140 Worcester Street WEST BOYLSTON, MASSACHUSETTS 6:30 PM
DESIGN PUBLIC HEARING August 10, 2015 AT WEST BOYLSTON TOWN HALL, BOARD MEETING ROOM 140 Worcester Street WEST BOYLSTON, MASSACHUSETTS 6:30 PM FOR THE PROPOSED Rehabilitation & Stormwater Improvements
Tier 1 Strategies. WV Route 14 Corridor Management Plan
1.1 1.2 1.3 1.4 Signal timing optimization system improvements. Improve geometry traffic control at high crash intersections. Construct intersection capacity improvement projects. Widen longer sections