1 200 Project Management: Trainee Guide Module 5 POST IMPLEMENTATION Bridges Social Development Project Management Training Program 09/09/2009
2 PROJECT MANAGEMENT TRAINING PROGRAM FRAMEWORK Module Topic Highlights Learning Resources Estimated Time Requirements 1. Introduction to Project Management A. Key learning principles B. Introductions and logistics C. What is a project? D. Elements of a project E. Project management toolkit and case study F. Personal experience with projects G. Individual commitment to learning 2. Project Proposals A. Project proposals B. Evaluating alternatives C. Getting approvals Trainer s Guide and Trainee s Guide are resources available to support the entire training program Project Proposal Tool 1.5 hours hours 3. Project Design and Plan A. Project Charter Plan first, then do! What is a project charter? Key elements of a project charter B. Team Creation Establishing project team values Roles and responsibilities Conducting project team meetings C. The Project Plan Introduction to the Detailed Project Plan Using the milestones Setting tasks Completing the Project Plan D. Budgeting Introduction to Cash Budgets Creating a budget E. Risk Management Anticipating and mitigating risks 4. Plan Implementation A. Implementing the Project Plan Tasking and tracking Scope management Risk monitoring B. Change Management The human dynamics of change and transition Leading change Building change into your project plan Project Charter Tool Case Study Project Charter Tool Team Tools Project Charter Tool Detailed Project Planning Tool Cash Budget Template Budget Detail Worksheet Template Risk Matrix Tool Project Charter Tool; Detailed Project Planning Tool; Variance Analysis Report; Risk Management Status Report 3 hours hours 1 2 hours 2 hours 1 hour 1.5 hours 2 hours 5. Post Implementation Review A. Evaluating projects B. Lessons learned C. Project management training evaluation Post Implementation Review Tool 1.5 hours Module 5: Trainee Guide Page 2
3 TABLE OF CONTENTS PROJECT MANAGEMENT TRAINING PROGRAM FRAMEWORK... 2 MODULE 5A: EVALUATING PROJECTS... 4 MODULE 5B: LESSONS LEARNED... 5 MODULE 5C: PROJECT MANAGEMENT TRAINING EVALUATION... 9 Module 5: Post Implementation Review Page 3
4 MODULE 5A: EVALUATING PROJECTS After a project is concluded, it is important to look back to assess the project: to evaluate the results, identify positive and negative lessons learned and agree to follow up steps. Module 5: Post Implementation Review Page 4
5 MODULE 5B: LESSONS LEARNED Small Group Activity: Based on the additional information provided, about the project outcomes for the Healthcare Case Study or your own, review the Project Charter and complete the Post Implementation Review for the project. If you worked on a different Case Study, your answers should relate to the facts of your case study. To be able to assess the Lessons Learned from your project, you need to look at the Deviations from the Planned Objectives. Ensure you include the following: Project Name: Project Number: Module 5: Post Implementation Review Page 5
6 Project Description: Deviations from Planned Objectives Compare what you had originally planned to deliver with the project and what was ultimately delivered in the end. Planned objectives can and should be taken from the original Project Plan and Project Charter. OBJECTIVES OUTCOMES RESULT X Reasons for deviations Provide a summary of the project organisation. Explain or provide information on problems (e.g. roles and responsibilities, timeframes, risk management etc.) Provide an explanation of when the objectives and outcomes did not match consider what contributed to the mismatch. Do not try to justify but rather simply state the facts. Module 5: Post Implementation Review Page 6
7 Review Tool Project Focus Achievements Areas for Improvement Suggested Future Mitigation Scope Timelines Budget Management Quality Management Change Management Risk Management Under the heading Achievements, list the most important positive outcomes or lessons learned from the project. In the next column, under the heading Areas for Improvement, identify deficiencies in the project where improvements could be made. In the final column, under the heading Suggested Future Mitigation, identify actions that can be taken to improve future projects. Module 5: Post Implementation Review Page 7
8 Distribution Copies of this document have been issued to: Version Name Title Date Issued Initials Module 5: Post Implementation Review Page 8
9 MODULE 5C: PROJECT MANAGEMENT TRAINING EVALUATION Individual Exercise: Refer back to the Individual Exercise completed in Module 1F. Look at your answers to those questions, and think about what you wanted to learn about project management at the outset of this training. Think back to projects that you have been involved with over the past few years.as project team leader, project champion and/or a member of the project team. List 2 or 3 of these projects, large and small, and your role: Project My Role Were all of these projects effective? Were all the outcomes positive? Which project did you enjoy the Discussion Question: Has this training met your needs? Will this training help you to initiate, plan and implement projects more effectively? What changes to the training would you suggest? Are there any Project Management topics that you would like to continue to study independently? *Please take time to complete the formal evaluation form in the Project Toolkit: Additional Resources. Your comments will be very helpful in improving the training we provide. Module 5: Trainee Guide Page 9
10 Additional Resources: resources available at training.canadabridges.com if you would like to dig deeper. CONGRATULATIONS On your successful completion of the Project Management training! Module 5: Trainee Guide Page 10
200Canada Bridges Page 1 07/11/2009. Project Management: Trainee Guide Module 1 INTRODUCTION
200Canada Bridges Page 1 07/11/2009 Project Management: Trainee Guide Module 1 INTRODUCTION Bridges Social Development Project Management Training Program www.canadabridges.com http://training.canadabridges.com/
More informationSCHEDULE AND BUDGETING
PROJECT CONTROLS The right combination of software management tools, proper initial project set-up, timely and accurate data input, continuous tracking of progress, a meaningful reporting structure, strong
More informationPHASE 8: IMPLEMENTATION PHASE
PHASE 8: IMPLEMENTATION PHASE The Implementation Phase has one key activity: deploying the new system in its target environment. Supporting actions include training end-users and preparing to turn the
More informationTRANSITION PLAN TEMPLATE
TRANSITION PLAN TEMPLATE In this template, instructions are included in italics. When you have completed the template and no longer need the instructions, delete them. Provide a brief overview of the transition
More informationWMS SOFTWARE - TRAINING SCHEDULE
WMS SOFTWARE - TRAINING SCHEDULE During this process the following outlined activities will occur. SAGE ACCOUNTING CONCEPTS: 1. Overall concepts and functions that are common to all modules 2. Print Files
More informationA Project Manager's Book of Forms. A Companion to the PMBOK Guide. 2nd Edition
Brochure More information from http://www.researchandmarkets.com/reports/2326795/ A Project Manager's Book of Forms. A Companion to the PMBOK Guide. 2nd Edition Description: A compendium of ready made
More informationUser Guide for Contract Costs Statement
User Guide for Contract Costs Statement 1 Introduction 1. Introduction 1.1 This document is issued by the Single Source Regulations Office (SSRO) and sets out guidance to assist contractors with statutory
More informationRISK MANAGEMENT POLICY
DOCUMENT TYPE: DOCUMENT STATUS: POLICY OWNER POSITION: INTERNAL COMMITTEE ENDORSEMENT: APPROVED BY: Council policy Approved Manager Organisational Development Risk Management Committee Council DATE ADOPTED:
More informationITRM Guideline CPM 110-01 Date: January 23, 2006 SECTION 5 PROJECT CLOSEOUT PHASE
PROJECT MANAGEMENT GUIDELINE SECTION 5 PROJECT CLOSEOUT PHASE Table of Contents Introduction... 3 Project Closeout Phase... 3 Activities and Documents in the Closeout Phase... 4 Project Closeout Task...
More informationBest Practice. Change Management. Guidelines
Best Practice Change Management Guidelines 1 Created by: Denise Phelan, Demand Management lead, (LPP) Reviewed by: Jonathan Porter, HR Workstream Lead, St George s Healthcare NHS Trust Approved by: Mick
More informationHSEEP Exercise Documentation
This brief summary provides the basic rationale for the HSEEP resources and documents. 1 It is not meant to be a full summary of the HSEEP program. For more information on HSEEP compliance and the exercise
More informationProject Quality Review Form
(ee key Project Initiation and Planning 1. Project ponsor identified and named? 2. Project opened on Project Repository and communicated to project team? 3. Project Chartered (using Project Charter or
More informationNSW Government ICT Benefits Realisation and Project Management Guidance
NSW Government ICT Benefits Realisation and Project Management Guidance November 2014 CONTENTS 1. Introduction 1 2. Document purpose 1 3. Benefits realisation 1 4. Project management 4 5. Document control
More informationCandidate Support Pack HNC Management. Management: Plan, Lead and Implement Change [DV8C 35]
Candidate Support Pack HNC Management Management: Plan, Lead and Implement Change [DV8C 35] Sample Activities Plan, Lead and Implement Change INTRODUCTION It is important for you to complete the activities
More informationScope Management Guideline August, 2015
Scope Management Guideline August, 2015 Check the Capital Project Delivery website to ensure this is the current version. Table of Contents Scope Management Overview... 1 Charter... 4 Scope Statement...
More informationRequest for Proposals Evaluation Guide
Request for Proposals Evaluation Guide Introduction The purpose of this publication is to assist State and local education agencies in defining the evaluation process for a Request for Proposal (RFP).
More informationSMART GOAL SETTING WORKSHEET With Guidance Notes
SMART GOAL SETTING WORKSHEET With Guidance Notes A Brief Guide to SMART goal setting A SMART goal is a goal that is specific, measurable, attainable, relevant and time based. In other words, a goal that
More informationIT Project Management Methodology. Project Execution Support Guide. Version 0.3
NATIONAL INFORMATION TECHNOLOGY AUTHORITY - UGANDA IT Project Management Methodology Project Execution Support Guide Version 0.3 Table of Contents 1 INTRODUCTION... 4 1.1 When should Project Execution
More informationPHASE 6: DEVELOPMENT PHASE
PHASE 6: DEVELOPMENT PHASE The Phase features a key step in the project: system construction. The previous phases lay the foundation for system development; the following phases ensure that the product
More informationWelcome to the Data Analytic Toolkit PowerPoint presentation an introduction to project management. In this presentation, we will take a brief look
Welcome to the Data Analytic Toolkit PowerPoint presentation an introduction to project management. In this presentation, we will take a brief look at project management to understand the process and some
More information<name of project> Software Project Management Plan
The document in this file is adapted from the IEEE standards for Software Project Management Plans, 1058-1998, which conforms to the requirements of ISO standard 12207 Software Life Cycle Processes. Tailor
More informationOFFICE OF THE CIO. PROCEDURE Informational VERSION: 1.0
OFFICE OF THE CIO PROCEDURE Informational VERSION: 1.0 Purpose Project Management of Major or Large NDUS Information Technology Projects Project Managers Guide/Checklist This procedural process will ensure
More informationINTEGRATED PROJECT MANAGEMENT (IPM) DOCUMENT SECTION 1
PMO QA/Approval: September 11, 2015 Project Title/Subject: INTEGRATED PROJECT MANAGEMENT (IPM) DOCUMENT SECTION 1 Back Office Collaboration and Integration Project GENERAL INFORMATION [this section completed
More informationOrganization. Project Name. Project Overview Plan Version # Date
Project Overview Plan Template Organization Project Name Project Overview Plan Version # Date REVISION HISTORY VERSION # REVISION DATE COMMENT 1 APPROVALS: Authorized Signature DATE 2 Table of Contents
More informationITRM Guideline CPM 110-01 Date: January 23, 2006 SECTION 4 - PROJECT EXECUTION AND CONTROL PHASE
PROJECT MANAGEMENT GUIDELINE SECTION 4 - PROJECT EXECUTION AND CONTROL PHASE Table of Contents Introduction... 3 Project Execution and Control Phase Overview... 3 Activities and Documents in the Execution
More informationPROJECT MANAGEMENT FRAMEWORK
PROJECT MANAGEMENT FRAMEWORK DOCUMENT INFORMATION DOCUMENT TYPE: DOCUMENT STATUS: POLICY OWNER POSITION: INTERNAL COMMITTEE ENDORSEMENT: APPROVED BY: Strategic document Approved Executive Assistant to
More informationNinth Round PROJECT MONITORING, REPORTING, REVISION AND EXTENSION GUIDELINES
Ninth Round PROJECT MONITORING, REPORTING, REVISION AND EXTENSION GUIDELINES For all reporting templates, please visit the UNDEF website: http://www.un.org/democracyfund/grantees/grantees_r7.html This
More informationInformation Technology Project Oversight Framework
i This Page Intentionally Left Blank i Table of Contents SECTION 1: INTRODUCTION AND OVERVIEW...1 SECTION 2: PROJECT CLASSIFICATION FOR OVERSIGHT...7 SECTION 3: DEPARTMENT PROJECT MANAGEMENT REQUIREMENTS...11
More informationHow to use Microsoft Project? Basic Training to Help You during the BYI challenge
How to use Microsoft Project? Basic Training to Help You during the BYI challenge Table of Contents I. Main Concepts 1. Overview of Microsoft Project 2. Explanation of the main concepts II. How to : Create
More informationAdaptive Project Management
1201 Peachtree St. Suite 622 Atlanta GA 30362 info@pm4dev.com Adaptive Project Management In this comprehensive course, you will learn how to initiate, plan, implement, adapt and close a project that meets
More informationBETTER RECORDS MANAGEMENT
BETTER RECORDS MANAGEMENT THROUGH PROJECT MANAGEMENT Maura L. Dunn, CRM President April 8, 2015 What is the difference between program management and project management? Why does it matter? Programs Are
More informationProject Management Fundamentals. Office of the Senior Associate Vice President for Finance
Project Management Fundamentals Project Management Institute PMI is an aggregation of best practices from thousands of professional project managers Principles in this training are based on PMI methodologies,
More informationTraining in Sustainable Supply Chain
Training in Sustainable Supply Chain thefuturebuild.com Why Sustainable Supply Chain Management? Sustainable supply chains are an increasing priority for companies, governments and other organisations
More informationRisk Management Strategy & Implementation Plan 2014 2016
St George s Healthcare NHS Trust: the next decade Risk Management Strategy & Implementation Plan 2014 2016 DRAFT VERSION 6.0 UPDATED 19.11.14 Executive summary We know, from external assurances received
More informationDPC - Strategy and Project Delivery Unit Project Management Methodology. Updated April 2010
DPC - Strategy and Project Delivery Unit Project Management Methodology Updated April 2010 This project management methodology is designed to help SPDU staff to plan, manage and measure a successful project
More informationEHR Readiness Assessment
EHR Assessment Overview This tool is designed to help physicians assess where they are in their readiness to implement an EHR. With a more accurate portrait of their readiness, their practice will be better
More informationHow To Implement One Maricopa
Maricopa Priorities Update Spring 2015 Agenda Overview Strategic Directions Implementation process Categorized Recommendations Preliminary Timeline Overview ONE Maricopa: Ten community colleges, one world-class
More informationPMO Metrics Recommendations
Introduction The purpose of this document is to recommend metrics to be used by the Project Management Office (PMO) to measure and analyze their project and PMO success. The metrics are divided into Project
More informationIt0x Enhanced data storage services Sharepoint Teamsites
UCD IT Services It0x Enhanced data storage services Sharepoint Teamsites Project Initiation Document Version 1.0 2, December 2014 Version History Version Date Summary of Changes Changed by 1 2/12/2014
More informationSCHEDULE 8 Generalist Project Services Framework 2015
SCHEDULE 8 Generalist Project Services Framework 2015 Nominal Insurer And Schedule 8 (Project Services Framework) Page: 1 of 6 Schedule 8 Generalist Project Services Framework Contents Overview... 3 1.
More informationSAP ERP Upgrade Checklist Project Preparation
A SAP ERP Upgrade Checklist Project Preparation Upgrade Project Phase Project Preparation Definition From the project perspective the project preparation phase includes: Learning about the new functionality
More informationSection 1: Simple Procurement Resource Module Objectives...3 Part 1: Welcome and Introductions... 3
Simple Resource Module: Project Management Section 1: Simple Resource Module Objectives...3 Part 1: Welcome and Introductions... 3 Section 2: Project Management and...6 Key Competencies for you to Consider...
More informationIT Services Website Redevelopment
UCD IT Services IT01 IT Services Website Redevelopment Project Initiation Document Version 1.0 1, December 2014 Version History Version Date Summary of Changes Changed by 1 1/12/2014 Brian Morrissey IT
More informationMGMT 4135 Project Management. Chapter-16. Project Oversight
MGMT 4135 Project Management Chapter-16 Project Oversight Project Oversight: defined as a set of principles and processes to guide and improve the management of projects. Ensures projects meet the needs
More informationGCCSI CCS REGULATORY TEST TOOLKIT
GCCSI CCS REGULATORY TEST TOOLKIT Mark Bonner, Principal Manager Policy, Legal and Regulatory (mark.bonner@globalccsinstitute.com) 2 nd South African CCS Week, 27 October, 2011 Johannesburg WWW.GLOBALCCSINSTITUTE.COM
More informationEssential Elements for Any Successful Project
In this chapter Learn what comprises a successful project Understand the common characteristics of troubled projects Review the common characteristics of successful projects Learn which tools are indispensable
More informationLMI Aerospace PROJECT MANAGEMENT PLAN ACCESS REQUEST PROCESS IMPROVEMENT FEBRUARY 7, 2012
PROJECT MANAGEMENT PLAN ACCESS REQUEST PROCESS IMPROVEMENT FEBRUARY 7, 2012 TABLE OF CONTENTS INTRODUCTION... 2 PROJECT MANAGEMENT APPROACH... 2 PROJECT SCOPE... 2 MILESTONE LIST... 2 SCHEDULE BASELINE
More informationPrepared for: Prepared by:
Executive Project Review Prepared for: Prepared by: Table of contents Introduction... 3 WHY an Executive Project Review?... 3 WHO is Involved?... 4 WHAT is an Executive Project Review?... 5 WHEN? - Schedule
More informationJOINT CORE STRATEGY PROGRAMME MANAGEMENT FRAMEWORK GOVERNANCE PROCESSES AND PROCEDURES. Draft
APPENDIX 1 JOINT CORE STRATEGY PROGRAMME MANAGEMENT FRAMEWORK GOVERNANCE PROCESSES AND PROCEDURES Draft CONTENTS 1. INTRODUCTION 2. SCOPE 3. PROGRAMME AND PROJECT MANAGEMENT GOVERNANCE 4. PROGRAMME MANAGEMENT
More informationHow To Monitor A Project
Module 4: Monitoring and Reporting 4-1 Module 4: Monitoring and Reporting 4-2 Module 4: Monitoring and Reporting TABLE OF CONTENTS 1. MONITORING... 3 1.1. WHY MONITOR?... 3 1.2. OPERATIONAL MONITORING...
More informationResources for Implementing the WWF Project & Programme Standards. Step 4.3 Analyze Operational and Financial Functions/ Performance
Resources for Implementing the WWF Project & Programme Standards Step 4.3 Analyze Operational and Financial Functions/ Performance March 2007 Step 4.3 Analyze Operational and Financial Performance Contents
More informationWorkforce Planning & Development Model
Workforce Planning & Development Model Overview what is workforce planning? Workforce planning is an organised process for: Identifying the number of employees and the types of employee skill sets required
More informationSeries 4 Human Resource Management Unit 4.4 Team Development. EPO Training 2000 to date Gord Gibben, PMP
Series 4 Human Resource Management Unit 4.4 Team Development Unit 4.4 Team Development Learning Objectives Team Development stages Team Charter Team Development Quiz Recommended Reading Unit 4.4 Learning
More informationProject Management Courses
"A well planned project will give results exactly as planned." Project Management Courses Professional Development Training has a specialised division of Project Management experts that will tailor the
More informationCommunity-Based Prevention Marketing Step 7: Monitor and Evaluate Full Transcript
Community-Based Prevention Marketing Step 7: Monitor and Evaluate Full Transcript Introduction In this step, titled, "Monitor and Evaluate," the coalition will learn about the importance of monitoring
More informationIf yes, complete the savings plan using the worksheet that follows. To complete this worksheet, you will need to know:
Savings plan This tool can help you make a plan to save money for: Your goals Expenses Unexpected expenses and emergencies There are two steps to making a savings plan. First, answer the set of questions
More informationPersonal Financial Planning As a Project
Personal Financial Planning As a Project By Greg Caramanica, PMP, General Securities Representative Financial Planner with Arlington Wealth Planning (www.arlingtonwealthplanning.com) Introduction Having
More informationCreating a Coaching Plan Toolkit
Creating a Coaching Plan Toolkit OVERVIEW Sample Development Area Root Cause Analysis Page 3 Coaching Plan Template Pages 4 5 Coach the Root Cause, Not the End Result Maximize your coaching efforts by
More informationProject Planning Worksheet
Project Planning Worksheet Project Name: Prepared by: Department: Date: Background and Overview Give the business reason for requesting this project, and an overview of the work to be completed. Risks
More informationProject Management Guidelines
Project Management Guidelines Overview Section 86-1506 (5) directs the NITC to adopt guidelines regarding project planning and management. The goal of project management is to achieve the objectives of
More informationProject Risk Analysis toolkit
Risk Analysis toolkit MMU has a corporate Risk Management framework that describes the standard for risk management within the university. However projects are different from business as usual activities,
More informationProject Charter and Scope Statement
Prepared by: Mike Schmidt Version: 1.0 Last Revision Date: April 14, 2010 Create Date: May 6, 2010 EXECUTIVE SUMMARY... 3 1 INTRODUCTION... 4 2 PROJECT OBJECTIVES... 4 2.1 MISSION... 4 2.2 OBJECTIVES...
More informationStep by Step Project Planning
Step by Step Project Planning Contents Introduction The Planning Process 1 Create a Project Plan...1 Create a Resource Plan...1 Create a Financial Plan...1 Create a Quality Plan...2 Create a Risk Plan...2
More informationCHANGE MANAGEMENT for Continuous Improvement. Guidance Document
CHANGE MANAGEMENT for Continuous Improvement Guidance Document Change Management for Continuous Improvement Table of Contents Purpose...page 2 An Overview...page 3 Process Chart...page 4 Process Flowchart...page
More informationStrategic Sourcing. Increasing competitiveness and profitability with effective purchasing
Strategic Sourcing Increasing competitiveness and profitability with effective purchasing Reduction of purchasing costs has significant leverage effect on profit. Impact of purchasing cost reduction on
More informationIndustry training plan template
Industry training plan template Last updated: 8 April 2015 An industry training plan describes the details of the training to be offered in order to issue industry-specific certificates. The plan also
More informationSPF GOOD PRACTICE GUIDE
Using this guide This guide accompanies the National Treasury s Strategic Procurement Framework (SPF) for Strategic Sourcing in the Public Sector. For more information, visit the National Treasury website
More informationVICE PRESIDENT PUBLIC RELATIONS
ACHIEVING SUCCESS AS VICE PRESIDENT PUBLIC RELATIONS Club Leadership Training Session WHERE LEADERS ARE MADE Club Leadership Training Session THE MISSION OF THE CLUB The mission of a Toastmasters club
More informationProject Management Courses
A well planned project will give results exactly as planned. Project Management Courses Professional Development Training has a specialised division of Project Management experts that will tailor the delivery
More informationDOC Electronic Timekeeping System Quarterly Project Oversight Report: Comprehensive Review For Period January March 2015
Department of Corrections Electronic Timekeeping System Project For Period: January March 2015 Quarter Ending: 3/31/2015 Agency Name: Department of Corrections (DOC) Project Name: Electronic Timekeeping
More informationINTRODUCTION: Plan and Schedule Development Create a Work Breakdown Structure (WBS) The detailed guidelines and examples start on the following page.
What This Is INTRODUCTION: Plan and Schedule Development Create a Work Breakdown Structure (WBS) The detailed guidelines and examples start on the following page. First of a series of guidelines for project
More informationPosition description and specification
Position description and specification Position: Change Management Advisor Group: Customers and People Classification: Band 9 Maximum term: 31 December 2017 Organisational context Barwon Water s mission
More informationFinancial Reporting Budgeting Consolidations Financial Modeling
REASONS TO USE XCELLEGEN FOR FINANCIAL REPORTING A natural extension of Microsoft Excel, with a tight integration to an Accounting Intelligent Database Current methodology is time consuming, inaccurate,
More informationPHASE 6: DEVELOPMENT PHASE
PHASE 6: DEVELOPMENT PHASE The Phase features a key step in the project: system construction. The previous phases lay the foundation for system development; the following phases ensure that the product
More informationPDNPA Project Management Peak District National Park Authority Internal Audit Report 2014/15
Audit, Resources and Performance Committee 20 March 2015 Item 10 Appendix 2 PDNPA Project Management Peak District National Park Authority Internal Audit Report 2014/15 Business Unit: Project Management
More informationUnderstand why, when and how-to to formally close a project
Project Closure Purpose: Understand why, when and how-to to formally close a project Audience: Project managers, project sponsors, team members and other key stakeholders Learning Objectives: Describe
More informationDepartment of Training and Workforce Development Western Australia. RPL Assessment Tool Kit. BSB41507 Certificate IV in Project Management
Department of Training and Workforce Development Western Australia RPL Assessment Tool Kit BSB41507 Certificate IV in Project Management First published 2010 ISBN 978-1-74205-510-7 Department of Training
More informationConsultancy Services Proposal
Consultancy Services Proposal August, 2007 ISO 9001 : 2000 CERTIFIED www.genivar.com 5858 Côte-des-Neiges Rd, 4 th Floor, Montreal, Quebec, Canada, H3S 1Z1 Telephone: (1) 514 340-0046 Fax: (1) 514 340-2847
More informationReadiness Assessment Survey
Readiness Assessment Survey Version 1.1, April 2014 Contents Readiness Survey... 0 Scoring the Survey... 7 Survey Scoring Matrix... 8 Measuring Your Data Integration Readiness... 9 Readiness Measurement
More informationAchievement Program. Primary Schools. Celebrate
Achievement Program Primary Schools Celebrate Visit www.achievementprogram.healthytogether.vic. gov.au, phone 1300 721 682 or email admin@achievementprogram.org.au to access this document in an accessible
More informationSales Funnel Calculator Template User Guide
Excel Spreadsheet Sales Funnel Calculator Template User Guide This Excel-based template is is a convenient application for Sales Funnel/Pipeline management. You can use the sales pipeline management tool
More informationCOMNAVCRUITCOMINST 1136.2R N7 26 Mar 2014 COMNAVCRUITCOM INSTRUCTION 1136.2R. From: Commander, Navy Recruiting Command
N7 COMNAVCRUITCOM INSTRUCTION 1136.2R From: Commander, Navy Recruiting Command Subj: PERSONNEL QUALIFICATION STANDARDS Ref: (a) COMNAVCRUITCOMINST 1500.4 (b) COMNAVCRUITCOMINST 5400.2 (c) COMNAVCRUITCOMINST
More informationModule 3. Ways of Finding Answers to Research Questions
Module 3 Ways of Finding Answers to Research Questions Module 3: Ways of Finding Answers to Research Questions 3: 1 Module 3: Ways of Finding Answers to Research Questions (How are you going to answer
More informationOrganizational Change Management Standards. Table of Contents
Organizational Change C Management M Standards S Office O of Major Projects Department of Technology & Information October 2008 Pam Waters, Organizational Change Management Team Leader Office of Major
More informationProject Money Strategies in Four Easy Steps
Take Control of Your Finances Action Step Packet Welcome to the Take Control of Your Finances Program Ac on Step Packet. We ve modeled the Take Control of Your Finances Pilot Program a er our na onally
More informationDepartment of Training and Workforce Development Western Australia. RPL Assessment Tool Kit. BSB51407 Diploma of Project Management
Department of Training and Workforce Development Western Australia RPL Assessment Tool Kit BSB51407 Diploma of Project Management First published 2010 ISBN 978-1-74205-511-4 Department of Training and
More information44-76 mix 2. Exam Code:MB5-705. Exam Name: Managing Microsoft Dynamics Implementations Exam
44-76 mix 2 Number: MB5-705 Passing Score: 800 Time Limit: 120 min File Version: 22.5 http://www.gratisexam.com/ Exam Code:MB5-705 Exam Name: Managing Microsoft Dynamics Implementations Exam Exam A QUESTION
More informationTrust Board. 19 May 2009. Complaints and Compliments Report. Karen Cooper Patient Services Manager. Fiona Barr Acting Corporate Affairs Director
Trust Board 19 May 2009 Paper Ref: 18.8 Title: Summary: Action Required: Author: Accountable Director: FOI Status: Complaints and Compliments Report Overview of the number of complaints, comments and compliments
More informationFinancial Services FINANCIAL SERVICES UTILITIES 57 FINANCIAL SERVICES AND UTILITIES 2016-2018 BUSINESS PLAN. CR_2215 Attachment 1
CR_2215 Attachment 1 Financial Services FINANCIAL SERVICES & UTILITIES 57 FINANCIAL SERVICES AND UTILITIES 2016-2018 BUSINESS PLAN Acting Branch Manager: Stacey Padbury Table of Contents INTRODUCTION Our
More informationNew Energy Jobs Fund. Application Guidelines
New Energy Jobs Fund Application Guidelines i Table of Contents 1. Background... 1 2. The Program... 1 2.1. Objectives... 1 2.2. Overview... 1 2.3. Program Timetable... 2 3. Funding... 3 4. Eligibility...
More informationPROPOSAL PREPARATION USING THE LOGICAL FRAMEWORK APPROACH DAY 4
PROPOSAL PREPARATION USING THE LOGICAL FRAMEWORK APPROACH DAY 4 Cook Islands Facilitators: Damien Sweeney & Martin Pritchard Pacific Research & Evaluation Associates 1 Recap Day 3 http://office.microsoft.com/en-au/images/?ctt=97
More informationModule 1 Diploma of Project Management
Module 1 Diploma of Project Management Project Management Fundamentals in association with This two day course takes participants through all aspects of Project Management and provides in depth examination
More informationOutline Brief for Development of Strategic Estates Plan for Bristol, South Gloucester, North Somerset and Somerset Clinical Commissioning Groups
Item 13 Strategic Estates Planning Outline Brief for Development of Strategic Estates Plan for Bristol, South Gloucester, North Somerset and Somerset Clinical Commissioning Groups Phase 1: Priorities and
More informationBRITISH COLUMBIA INSTITUTE OF TECHNOLOGY ( BCIT ) PROJECT BUSINESS PLAN PROPOSAL TEMPLATE
BRITISH COLUMBIA INSTITUTE OF TECHNOLOGY ( BCIT ) PROJECT BUSINESS PLAN PROPOSAL TEMPLATE 1 PROJECT PROPOSAL PREAMBLE To obtain project approval from BCIT each school/department must submit a Project Business
More informationQuick guide: Implementing an IT solution
Quick guide: Implementing an IT solution This Quick Guide is part of a series of information products aimed to assist small to medium sized businesses purchasing an Information Technology (IT) solution.
More informationProject Management. Sally Buck, MS. Chief Executive Officer July 2014
600 East Superior Street, Suite 404 I Duluth, MN 55802 I Ph. 800.997.6685 or 218.727.9390 I www.ruralcenter.org Project Management Sally Buck, MS Chief Executive Officer July 2014 Purpose The National
More informationWorkbook 2: Business Plan Writing
Agricultural high school businesses Workbook 2: Business Plan Writing School Name: Contributors: Emily Boothroyd & Mohammad Akram Azam Contact: matous.borkovec@peopleinneed.cz Contents WELCOME TO BUSINESS
More informationCertificate IV The Road Ahead for Driver Trainers
Certificate IV The Road Ahead for Driver Trainers Jeff McDougall 1 (Presenter) 1 ADTA (NSW) Biography Managing Director of Trent Driving School, NSW President of the Australian Driver Trainers Association
More informationDepartment of Technology & Information
Change Management Standards Major Projects Department of Technology & Information December 2003 Pam Waters, Change Management Team Leader Office of Major Projects Department of Technology & Information