JOINT CORE STRATEGY PROGRAMME MANAGEMENT FRAMEWORK GOVERNANCE PROCESSES AND PROCEDURES. Draft

Size: px
Start display at page:

Download "JOINT CORE STRATEGY PROGRAMME MANAGEMENT FRAMEWORK GOVERNANCE PROCESSES AND PROCEDURES. Draft"

Transcription

1 APPENDIX 1 JOINT CORE STRATEGY PROGRAMME MANAGEMENT FRAMEWORK GOVERNANCE PROCESSES AND PROCEDURES Draft

2 CONTENTS 1. INTRODUCTION 2. SCOPE 3. PROGRAMME AND PROJECT MANAGEMENT GOVERNANCE 4. PROGRAMME MANAGEMENT FRAMEWORK - OVERVIEW 5. CROSS-BOUNDARY PROGRAMME BOARD 6. PROJECT BOARD 7. POLICY DEVELOPMENT GROUP 8. INFRASTRUCTURE DELIVERY GROUP 9. SUB-GROUPS (COMMUNICATIONS AND SA/SEA) 10. SUMMARY APPENDICES APPENDIX 1 PROGRAMME MANAGEMENT FRAMEWORK DIAGRAM AND SUMMARY TABLES Programme Management Framework - Draft 2

3 1. INTRODUCTION 1.1 In the context of the Government s current policy with regard to the Regional Spatial Strategy and the Local Development Framework, there is a statutory duty on Cheltenham Borough, Tewkesbury Borough and Gloucester City Councils to produce a Core Strategy. 1.2 The preparation of a Joint Core Strategy has been agreed in principle across the three authorities, with support to joint working and infrastructure delivery being given by Gloucestershire County Council. 1.3 The development of a Joint Core Strategy presents numerous opportunities but it also creates a number of challenges. A key challenge will be the coordination of joint working and governance (decision-making) between the local authorities. 1.4 To this end, this document sets out an overview of the programme and project management processes and procedures deemed necessary to coordinate joint working and to deliver a sound Joint Core Strategy document, supported by an infrastructure delivery plan. 2. SCOPE 2.1 Outside of the scope of this document are the detailed processes and procedures necessary to deliver the Joint Core Strategy. 2.2 The focus is on the overall process of joint working between the local authorities within which the development and delivery of the Joint Core Strategy will take place. 3. PROGRAMME AND PROJECT MANAGEMENT GOVERNANCE 3.1 The Association for Project Management defines programme and project management thus: Governance is how businesses can assure the effectiveness and efficiency of their project sponsorship, project management and portfolio direction and how they can ensure proper coherent disclosure and reporting of these systems and of their performance. 3.2 Programme Management governance differs from corporate or organisational governance in so far as it concentrates on the aspects of business integrity designed to produce successful, quality project solutions. It can and should, however, feed into organisational governance from an audit perspective. Based on Prince2 methodology, the governance processes and procedures within this document should dovetail comfortably with Council governance procedures. 3.3 The governance processes set out in this framework are designed to streamline effort and ensure that all groups and teams involved in joint working, including the delivery of the Joint Core Strategy, are working in the same way: to a clearly defined set of processes and procedures. 3.4 Streamlined working means that groups and individuals understand their roles and responsibilities within the context of the programme, and have clear expectations with regard to the extent and limitations of their contributions. Programme Management Framework - Draft 3

4 3.5 Programme and Project Management governance enables the effective management of quality, risk and ultimately delivery. In this context successful delivery of outcomes is made possible. 3.6 One objective of the project management approach adopted is that the governance framework is flexible, enabling additional Project Boards, with related Project and Sub groups to be brought within the Cross Boundary Programme Board umbrella. It is envisaged that they would all work to the same basic governance principles, ensuring consistency across the programme. 4. PROGRAMME MANAGEMENT FRAMEWORK - OVERVIEW 4.1 The proposed programme management framework is based on established PRINCE2 project management methodology and, subject to approval by Members, will form the basis on which joint working between the local authorities and stakeholders is taken forward including the development and delivery of the Joint Core Strategy. 4.2 The proposed framework is a hierarchal structure headed by a Cross Boundary Programme Board. Underneath the Programme Board is a Project Board and underneath that a Policy Development Group and Infrastructure Delivery Group. Beneath these are several sub-groups. 4.3 Below is a brief description of each tier of the framework. Further information is set out in the tables and diagram attached at Appendix CROSS BOUNDARY PROGRAMME BOARD 5.1 The Cross Boundary Programme Board will take an overarching, strategic overview of the entire joint working programme, including the development of the Joint Core Strategy and related projects focused on the delivery of the Joint Core Strategy. 5.2 The main function of the board will be to sponsor and champion the joint working process and related projects within the programme. 5.3 It is envisaged that the Programme Board will generally meet bi-monthly unless there is a need for a specific meeting to be called. The board will have delegated authority to steer the joint working process but key decisions including those relating to the development of the Joint Core Strategy will still be made by each individual Council, as indicated in the Joint Core Strategy Project Initiation Document (PID). 5.4 The membership of the Cross Boundary Programme Board is, at the time of writing, currently being considered and a verbal update will be provided to Members at the meeting. Programme Management Framework - Draft 4

5 6. PROJECT BOARD 6.1 Sitting under the Programme Board is the Project Board. The main role of a Project Board is to focus on a specific project, in this case the delivery of the Joint Core Strategy and the infrastructure necessary to support the Joint Core Strategy. Members of the Project Board will include senior officers with experience and knowledge applicable to the project as well as appropriate external partners. 6.2 It is envisaged that the Project Board will generally meet monthly unless there is a need for a specific meeting to be called. The Project Board will be responsible for ensuring the operational delivery of the Joint Core Strategy in accordance with the project plan (GANTT) set out in the Project Initiation Document (PID). 7. JOINT CORE STRATEGY POLICY DEVELOPMENT GROUP 7.1 The Joint Core Strategy Policy Development Group includes Officers from each Council and Gloucestershire County Council. 7.2 The group has already been established and has been meeting on a weekly basis to develop the joint working arrangements. The group will have particular responsibility for drafting and developing the Joint Core Strategy. 8. INFRASTRUCTURE DELIVERY GROUP 8.1 Sitting alongside the Joint Core Strategy Policy Development Group is the Infrastructure Delivery Group. The group is led by Gloucestershire County Council and will consist of relevant officers from the local authorities as well as external stakeholders with responsibility for the delivery of infrastructure. 8.2 The group is currently being established and once in place will meet weekly. 8.3 Both the Policy Development Group and Infrastructure Delivery Group will report to the Project Board. 9. SUB-GROUPS (COMMUNICATION AND SUSTAINABILITY APPRAISAL / STRATEGIC ENVIRONMENTAL ASSESSMENT GROUPS) 9.1 Underpinning the Policy Development and Infrastructure Delivery groups are the Communications Group and the Sustainability Appraisal/Strategic Environmental Assessment (SA/SEA) Group. 9.2 These groups have already been established and will meet on a frequent basis as and when required. The Communication Group will have particular responsibility for public and stakeholder engagement, PR and the development of shared ICT arrangements. The SA/SEA Group will develop the Joint Core Strategy SA Scoping Report, consultation on which will signal the commencement of preparation of the Joint Core Strategy. Programme Management Framework - Draft 5

6 10. SUMMARY 10.1 In order to guide the process of joint working between the local authorities and external stakeholders, it is essential to put in place an agreed structure or framework The programme management framework described above and set out in detail at Appendix 1 provides a solid, agreed basis on which to take joint working forward including the delivery of the Joint Core Strategy The following tables expand on the Joint Working framework diagram in terms of the governance detail associated with each group within the diagram. Programme Management Framework - Draft 6

7 APPENDIX 1 CROSS BOUNDARY PROGRAMME BOARD GOVERNANCE PROCEDURES: Role Sponsors of the delivery of the Joint Core Strategy. Delegated authority from each of the Local Authorities and the County to direct and guide the programme; however formal sign off by the 3 District Authorities individually will be necessary at identified milestones (see Project Initiation Document (PID). An overarching board which will oversee the suite of projects which falls under its remit. The Programme Board takes a strategic overview, ensuring that the projects are on target to meet the objectives of the programme in a timely manner and to budget. The Programme Board ensures that the Project Boards are aware of any changes to the programme, which affect their work emanating from political or higher officer levels. Membership To be confirmed Status Clear terms of reference An operational board, with formal decision making retained by the 3 District Authorities. Chair To be appointed. Someone with a good strategic overview of the LDF programme and an understanding of the varied interests of the groups involved. Responsibilities Agree terms of reference Political brokers and Spokespersons for the programme. High level guidance and direction Advisers and enablers Mandate and Sponsor the programme. Mandate the projects comprising the programme. Initiate new projects to meet the programme s objectives as required. Senior officer level guidance and direction. Facilitate visibility of the programme within the authorities. Communicate and escalate as necessary upwards (to authorities) and downwards (Project Boards and delivery groups). Review and provide feedback on project reports. Escalation of issues to authorities, and communication across the programme. Provide strategic guidance to the 3 District Authorities to help inform decision making at the key milestones Programme Management Framework - Draft 7

8 Accountability Overall responsibility for the programme, with delegated authority from the local authorities to direct and guide the programme. Meetings Bi-Monthly Must be quorate Structured agendas, to include progress reports on all projects within the programme. All meetings minuted and action points monitored. Papers to be received 5 working days prior to meetings. Reporting Responsibilities Key Reports Receive and review bi-monthly progress reports from the programme manager and project managers 5 days prior to meeting dates (Highlight Reports). Escalation of issues up and down as necessary. Receive and review Exception Reports (reports denoting programme or project issues or variances from plan which require decisions outside the usual reporting timeframe) as appropriate. Report back to the authorities, and represent local authority views within the context of the programme. Report back to interested parties and represent their views within the context of the programme. The Programme Board can expect to receive and monitor, at a high and not overly detailed level, progress of the following: Programme and Project Initiation documents Project Briefs Business cases Highlight and Exception Reports. Council/Cabinet Reports Lessons Learned Reports at project closure Minutes of meetings. The Programme Board can expect to contribute to the following, as required: Project briefs. Communication Programme and project level communications plans to be developed, to include: o Electronic document management, accessible by all o Details of what information to be provided, by whom, how often and by what method. o Details of the derivation of the information to be communicated (which boards, which project groups, which specific documents). o Details of escalation procedures. Programme Management Framework - Draft 8

9 PROJECT BOARD GOVERNANCE PROCEDURES: Role A project specific board. A Project Board sponsors one project e.g. the Joint Core Strategy, ensuring that there is an accurately scoped brief with defined, measurable outputs, that there is a detailed Project Initiation document and that the project plan is on target to meet the objectives of the project in a timely manner and to budget. The Project Board ensures that the project is being carried out in accordance with quality standards and that risks to the project are mitigated or managed. Membership Lead Sponsor: A senior officer with experience and knowledge applicable to the project. Representative local authority officers with an operational interest in the programme. The Project Manager, with attendance from team members as appropriate. Stakeholders (to be identified). Status Clear terms of reference An operational board Chair To be appointed. Someone with a good understanding of delivery mechanisms and the range of issues which applies. Responsibilities Sponsors the project Overall management and direction of the project. Approves the appointment and responsibilities of the Project Manager Provides the Project Brief (although the Project Manager may flesh it out). Approves the Project Initiation Document (which includes risk assessment, quality assurance and audit procedures) and project plans with the Project Manager. Decision making at key stages and milestones in the project. Agrees any deviations from plan outside agreed tolerance levels. Signs off each stage of completed work, and authorises the next stage. Ensures the required resources are committed to the project. Arbitrates on any conflicts and negotiates solutions if appropriate. Responsible for assurance that the project is on course to deliver in line with the Brief. Be the voice of the project both internally an externally. Sign off the completed project, and the lessons learned report. Escalates issues to the Programme Board as and when required. Ensures the project is fully resourced. Programme Management Framework - Draft 9

10 Accountability Overall accountability for the delivery of the project. Meetings Monthly Must be quorate Structured agendas. All meetings minuted and action points monitored. Papers to be received 5 working days prior to meetings. Reporting Responsibilities Key Reports Receive and review monthly progress reports from the project managers 5 days prior to meeting dates (Highlight Reports). Escalation of issues up and down as necessary. Receive and review Exception Reports (reports denoting programme or project issues or variance which require decisions outside the usual reporting timeframe) as appropriate. Provide formal high-level reports to the Programme Board. The Project Board can expect to receive and/or sign off the following: The Brief The Project Initiation document The project plan, including project specific procedures, milestones and critical path information. The business case. Highlight and Exception Reports. End stage reports. Project Completion / Handover The Lessons Learned Report Minutes of meetings. Communication Project level communications plans to be developed, to include: o Electronic document management, accessible by all o Details of what information to be provided, by whom, how often and by what method. o Details of the derivation of the information to be communicated. o Details of escalation procedures. Programme Management Framework - Draft 10

11 JOINT CORE STRATEGY POLICY DEVELOPMENT GROUP GOVERNANCE PROCEDURES: Role To deliver a sound Joint Core Strategy. Membership The Project Manager. Representative local authority officers with operational responsibility for delivering the Joint Core Strategy (JCS). Status Clear terms of reference An operational working group focused on delivery of the Joint Core Strategy. Chair The Project Manager Responsibilities Delivery of a Joint Core Strategy document, on plan, on time, within budget and within agreed tolerance levels. Development of a Project Initiation document and project plan, with clear timelines and clearly stated project governance procedures. Keep the Project Board appraised of key stage and milestone progress, seeking decisions and input as necessary. Accountability Answerable to the Project Board. Meetings Weekly Must be quorate Structured agendas. All meetings minuted and action points monitored. Papers to be received at least 2 working days prior to meetings. Reporting Responsibilities Report on project progress to the Project Board. Contribute to Programme Board reporting as required. Prepare regular highlight reports for both boards. Prepare exception reports as necessary. Receive reports from associated sub groups. Escalation of issues up and down as necessary. Key Reports The Policy Development Group (PDG) can expect to generate the following: The Project Brief two way process of creation between the project group and the Project Board. The Project Initiation document The Project Plan, including project specific procedures, milestones and critical path information generally in gantt chart format. The business case. Highlight and Exception Reports. End stage reports. Project Completion Report The Lessons Learned Report Minutes of meetings Programme Management Framework - Draft 11

12 The PDG can expect to receive: Highlight and exception reports from sub groups Minutes of sub group meetings Communication Project level communications plans to be included in the PID, to include: o Electronic document management, accessible by all o Details of what information to be provided, by whom, how often and by what method. o Details of the derivation of the information to be communicated. o Details of escalation procedures. Programme Management Framework - Draft 12

13 JOINT CORE STRATEGY INFRASTRUCTURE DELIVERY GROUP GOVERNANCE PROCEDURES: Role To deliver a sound Evidence Base to support preparation of a sound Joint Core Strategy. Membership The Project Manager. Representative local authority officers with operational responsibility for delivering the individual infrastructure studies which form the Evidence Base for the JCS and associated infrastructure delivery plan. Status Clear terms of reference An operational working group focused on delivery. Chair The Project Manager Responsibilities Delivery of the Evidence Base, on plan, on time, within budget and within agreed tolerance levels. Development of a Project Initiation Document and an overall delivery project plan, with clear timelines and clearly stated project governance procedures. To keep track of the overall timeframe and ensure issues affecting the delivery of the Joint Core Strategy are flagged up and mitigated in a timely manner. Keep the JCS Policy Development Group and the Project Board appraised of key stage and milestone progress, seeking decisions and input as necessary. Accountability Answerable to the Project Board. Informally responsible to the JCS PDG. Meetings Weekly Must be quorate Structured agendas. All meetings minuted and action points monitored. Papers to be received at least 2 working days prior to meetings. Reporting Responsibilities Report on project progress to the JCS PDG and the Project Board. Contribute to Programme Board reporting as required. Prepare regular highlight reports for both boards. Prepare exception reports as necessary. Receive reports from associated infrastructure delivery sub groups and monitor progress. Escalation of issues up and down as necessary. Key Reports The Infrastructure Studies Delivery Group can expect to generate the following: A Project Initiation document An overall Project Plan, including project specific procedures, milestones and critical path information in gantt chart format. Highlight and Exception Reports. End stage reports. Programme Management Framework - Draft 13

14 Project Completion Report The Lessons Learned Report Minutes of meetings The Infrastructure Studies Delivery Group can expect to receive: Regular highlight and exception reports from delivery sub groups Minutes of sub group meetings Communication Project level communications plans to be included in the PID, to include: o Electronic document management, accessible by all o Details of what information to be provided, by whom, how often and by what method. o Details of the derivation of the information to be communicated. o Details of escalation procedures. Programme Management Framework - Draft 14

15 JOINT CORE STRATEGY SUB GROUPS EXAMPLE: COMMUNICATIONS SUB GROUP GOVERNANCE PROCEDURES: Role To deliver a specific aspect of the project. Example: A Communications Sub group is necessary to manage the communications aspects of delivering the Joint Core Strategy document. Membership A Team Leader. Representative local authority officers with operational responsibility for developing a project plan to deliver the Communications elements of the overall Joint Core Strategy PID. Status An operational working group focused on delivering a specific part of a larger project. Chair The Team Leader Responsibilities Delivery of the communications plan, on time, within budget and within agreed tolerance levels. Development of a project plan with clear timelines and clearly stated project governance procedures. Keeping the Joint Core Strategy Policy Development Group appraised of key stage and milestone progress, seeking decisions and input as necessary. Accountability Answerable to the Joint Core Strategy Policy Development Group. Meetings Weekly, or as often as is necessary. Must be quorate Structured agendas. All meetings minuted and action points monitored. Papers to be received at least 2 working days prior to meetings. Reporting Responsibilities Report on sub group progress to the JCS PDG. Contribute to reporting to the Boards as required.. Escalation of issues up and across to other sub groups as necessary. Key Reports The Sub Group can expect to generate the following: A sub task project plan. Regular highlight reports for the JCS PDG. Prepare exception reports as necessary. End stage reports. Sub task Completion Report The Lessons Learned Report Minutes of meetings. Programme Management Framework - Draft 15

16 Communication A Sub Group level communications plan to be included in the PID, which the sub group will adopt, to include: o Electronic document management, accessible by all o Details of what information to be provided, by whom, how often and by what method. o Details of the derivation of the information to be communicated. o Details of escalation procedures. Programme Management Framework - Draft 16

17 Cross Boundary Programme Board Membership to include: CROSS BOUNDARY PROGRAMME BOARD Senior operational group, also including Cabinet Member representation & key partners LSP RDA / Glos Economic Partnership Natural England Environment Agency Other partners, to be identified Function: Cross boundary programme management. To sponsor and champion the programme. Delegated authority from each of the Councils to take strategic and political decisions to guide the joint working process. Act as internal and external spokespersons for the programme. Key Tasks: Develop an overarching cross boundary vision and objectives. Ensure projects are delivered in line with both. High-level coordination of workload (infrastructure workload key) and delegation of Briefs to Project Boards. Advice and enabling, programme planning to deliver objectives, progress monitoring, decision making, escalation of issues to local authorities if necessary. Receives progress reports from the Project Boards, guide and direct. PROJECT BOARD LDF Joint Core Strategy & Cross Boundary Infrastructure Lead: District Sponsor POLICY DEVELOPMENT GROUP Key outputs: To prepare a sound joint core strategy for Cheltenham, Gloucester and Tewkesbury that is approved by all local authorities for the purposes of statutory public consultation and appropriate for submission to the Secretary of State. Lead: Project Manager COMMUNICATIONS GROUP Key Outputs: The planning and implementation of all JCS related internal and external communications, including PR activity and materials, consultation and the management of information through IT systems TRANSPORT STRATEGY & INFRASTRUCTURE DELIVERY GROUPS: Transport Flood risk Health services Education Bio diversity Green space/strategic green infrastructure Recreation Employment Retailing Sustainability Water management Waste management Others tbd Function: Cross boundary infrastructure studies, maximising resources, minimising duplication and waste. Responsibility Key: Outputs: A strategic and joined-up process that connects spatial, investment and business planning processes to deliver a costed infrastructure delivery Gloucestershire County plan Framework: Key Success Criteria: Competent facilitation and framework training Unified, focussed leadership Competent programme and project Key Linkages managers Clear roles and responsibilities Clear communication and decision making strategies Member Involvement Information management and dissemination web based document management Skills Audit population of groups All Three District Authorities Competent project governance procedures Competent programme and project support (document management, version control, change control, quality Programme Management Framework - Draft assurance etc.) 17

18 Programme Management Framework - Draft 18

Trust Board Report. Review of the effectiveness of the IM&T Committee

Trust Board Report. Review of the effectiveness of the IM&T Committee 1. Introduction Trust Board Report Review of the effectiveness of the The meets every eight weeks, with a specific responsibility for governance, strategic direction, approval and direction of developments

More information

Retained Fire Fighters Union. Introduction to PRINCE2 Project Management

Retained Fire Fighters Union. Introduction to PRINCE2 Project Management Retained Fire Fighters Union Introduction to PRINCE2 Project Management PRINCE2 PRINCE stands for: PRojects IN Controlled Environments and is a structured method which can be applied to any size or type

More information

Programme Governance and Management Plan Version 2

Programme Governance and Management Plan Version 2 PROCESS FOR CHANGE - Detailed Design Programme Governance and Management Plan Version 2 1 INTRODUCTION In October 2008, the Council approved the selection of seven opportunity themes to take forward from

More information

CONFIGURATION COMMITTEE. Terms of Reference

CONFIGURATION COMMITTEE. Terms of Reference SWBTB (8/13) 166 (g) CONFIGURATION COMMITTEE Terms of Reference 1. CONSTITUTION 1.1 The Board hereby resolves to establish a Committee of the Board to be known as the Configuration Committee (The Committee).

More information

Project Management Toolkit Version: 1.0 Last Updated: 23rd November- Formally agreed by the Transformation Programme Sub- Committee

Project Management Toolkit Version: 1.0 Last Updated: 23rd November- Formally agreed by the Transformation Programme Sub- Committee Management Toolkit Version: 1.0 Last Updated: 23rd November- Formally agreed by the Transformation Programme Sub- Committee Page 1 2 Contents 1. Introduction... 3 1.1 Definition of a... 3 1.2 Why have

More information

General Notes Time allowed 1 hour. Answer all 60 multiple choice questions Use the proforma answer sheet provided.

General Notes Time allowed 1 hour. Answer all 60 multiple choice questions Use the proforma answer sheet provided. Introductory Certificate The APM Project Fundamentals Qualification. Examination paper Candidate Number Date Location Examination Paper Sample Paper v1.4 General Notes Time allowed 1 hour. Answer all 60

More information

PROCESS FOR CHANGE Programme Governance Plan

PROCESS FOR CHANGE Programme Governance Plan High Level Design Stage and Beyond Arrangements for Programme and Project Management Recognising the complexity of delivering all the elements of the programme in a tight timescale the following governance

More information

Maturity Model. March 2006. Version 1.0. P2MM Version 1.0 The OGC logo is a Registered Trade Mark of the Office of Government Commerce

Maturity Model. March 2006. Version 1.0. P2MM Version 1.0 The OGC logo is a Registered Trade Mark of the Office of Government Commerce Maturity Model March 2006 Version 1.0 P2MM Version 1.0 The OGC logo is a Registered Trade Mark of the Office of Government Commerce This is a Value Added product which is outside the scope of the HMSO

More information

(1) To approve the proposals set out in paragraphs 3.1-2 to ensure greater transparency of partnership board activity; and

(1) To approve the proposals set out in paragraphs 3.1-2 to ensure greater transparency of partnership board activity; and Agenda Item No. 7 Governance Committee 23 November 2015 Partnership Governance for Contract Management Report by Director of Law Assurance and Strategy Executive Summary This report sets out some areas

More information

How To Be Accountable To The Health Department

How To Be Accountable To The Health Department CQC Corporate Governance Framework Introduction This document describes the components of CQC s Corporate Governance Framework: what it is intended to achieve, what the components of the Framework are

More information

Place Scrutiny Briefing AGENDA ITEM 13

Place Scrutiny Briefing AGENDA ITEM 13 Place Scrutiny Briefing AGENDA ITEM 13 Meeting date: 13.7.15 Heading: Joint Spatial Plan and Joint Transport Study - Update Ward: All Bristol wards Author: Sarah O Driscoll Ext. No: 36722 Officer presenting

More information

Terms of Reference - Board Risk Committee

Terms of Reference - Board Risk Committee Terms of Reference - Board Risk Committee The Board Risk Committee is authorised by the Board to oversee the Group s risk management arrangements. It ensures that the overarching risk appetite is appropriate

More information

Department of the Environment and Local Government. Project Management. Public Private Partnership Guidance Note 7. 14 April 2000

Department of the Environment and Local Government. Project Management. Public Private Partnership Guidance Note 7. 14 April 2000 Project Management Project Management Public Private Partnership Guidance Note 7 14 April 2000 Guidance Note 7 14 April 2000 Project Management Contents Section Page I INTRODUCTION...1 SCOPE AND PURPOSE

More information

Senate. SEN15-P17 11 March 2015. Paper Title: Enhancing Information Governance at Loughborough University

Senate. SEN15-P17 11 March 2015. Paper Title: Enhancing Information Governance at Loughborough University SEN15-P17 11 March 2015 Senate Paper Title: Enhancing Information Governance at Loughborough University Author: Information Technology & Governance Committee 1. Specific Decision Required by Committee

More information

Self Assessment guidance and matrix for National Indicator NI 188 Planning to adapt to climate change

Self Assessment guidance and matrix for National Indicator NI 188 Planning to adapt to climate change Self Assessment guidance and matrix for National Indicator NI 188 Planning to adapt to climate change Version 1.0 April 09 Defra 1 Contents Introduction...3 Submission of Data for NI188...3 How does this

More information

Project, Programme and Portfolio Management Delivery Plan 6

Project, Programme and Portfolio Management Delivery Plan 6 Report title Agenda item Project, Programme and Portfolio Management Delivery Plan 6 Meeting Performance Management and Community Safety Panel 27 April 2009 Date Report by Document number Head of Strategy

More information

Risk Management Policy

Risk Management Policy Principles Through a process of Risk Management, the University seeks to reduce the frequency and impact of Adverse Events that may affect the achievement of its objectives. In particular, Risk Management

More information

Request for feedback on the revised Code of Governance for NHS Foundation Trusts

Request for feedback on the revised Code of Governance for NHS Foundation Trusts Request for feedback on the revised Code of Governance for NHS Foundation Trusts Introduction 8 November 2013 One of Monitor s key objectives is to make sure that public providers are well led. To this

More information

Information Governance Strategy

Information Governance Strategy Information Governance Strategy Document Status Draft Version: V2.1 DOCUMENT CHANGE HISTORY Initiated by Date Author Information Governance Requirements September 2007 Information Governance Group Version

More information

Audit and risk assurance committee handbook

Audit and risk assurance committee handbook Audit and risk assurance committee handbook March 2016 Audit and risk assurance committee handbook March 2016 Crown copyright 2016 This publication is licensed under the terms of the Open Government Licence

More information

Unit 8 Project management

Unit 8 Project management 2016 Suite Cambridge TECHNICALS LEVEL 3 IT Unit 8 Project management F/507/5008 Guided learning hours: 60 Version 1 September 2015 ocr.org.uk/it LEVEL 3 UNIT 8: Project management F/507/5008 Guided learning

More information

Project Management Fact Sheet:

Project Management Fact Sheet: Project Management Fact Sheet: Project Documentation Version: 2.2, November 2008 DISCLAIMER This material has been prepared for use by Tasmanian Government agencies and Instrumentalities. It follows that

More information

State and Regional Emergency Management Committees Part 5: Emergency Management Manual Victoria

State and Regional Emergency Management Committees Part 5: Emergency Management Manual Victoria State and Regional Emergency Management Committees Part 5: Emergency Management Manual Victoria Contents 5.1 Introduction...5 1 5.2 Committees in Emergency Management...5 1 5.3 State Crisis and Resilience

More information

The Sub-National Review. A Change Management Programme for the South West

The Sub-National Review. A Change Management Programme for the South West The Sub-National Review A Change Management Programme for the South West 1. INTRODUCTION 1.1 Prosperous Places: Taking Forward the Review of Sub-National Economic Development and Regeneration was published

More information

NOT PROTECTIVELY MARKED. Suffolk County Council DATA QUALITY POLICY

NOT PROTECTIVELY MARKED. Suffolk County Council DATA QUALITY POLICY Suffolk County Council DATA QUALITY POLICY This policy is sponsored by the Director of Resource Management on behalf of the Chief Executive of Suffolk County Council. Responsibility for maintaining, reviewing

More information

SUBJECT: SHADOW GOVERNANCE ARRANGEMENTS FOR THE DEVELOPMENT OF A HEALTH AND SOCIAL CARE INTEGRATION SCHEME FOR MORAY

SUBJECT: SHADOW GOVERNANCE ARRANGEMENTS FOR THE DEVELOPMENT OF A HEALTH AND SOCIAL CARE INTEGRATION SCHEME FOR MORAY PAGE: 1 REPORT TO: THE MORAY COUNCIL ON 2 JULY 2014 SUBJECT: SHADOW GOVERNANCE ARRANGEMENTS FOR THE DEVELOPMENT OF A HEALTH AND SOCIAL CARE INTEGRATION SCHEME FOR MORAY BY: CORPORATE DIRECTOR (EDUCATION

More information

Project Management. From web projects through to major change projects

Project Management. From web projects through to major change projects S O L U T I O N S * I D E A S * S O L U T I O N S * I D E A S Project Management From web projects through to major change projects Project Agency S O L U T I O N S * I D E A S * S O L U T I O N S * I

More information

RISK MANAGEMENT POLICY AND STRATEGY. Document Status: Draft. Approved by. Appendix 1. Originator: A Struthers. Updated: A Struthers

RISK MANAGEMENT POLICY AND STRATEGY. Document Status: Draft. Approved by. Appendix 1. Originator: A Struthers. Updated: A Struthers Appendix 1 RISK MANAGEMENT POLICY AND STRATEGY Document Status: Draft Originator: A Struthers Updated: A Struthers Owner: Executive Director Corporate Services Version: 01.01.03 Date: 30/3/14 Approved

More information

HARLOW COUNCIL PERFORMANCE MANAGEMENT FRAMEWORK

HARLOW COUNCIL PERFORMANCE MANAGEMENT FRAMEWORK HARLOW COUNCIL PERFORMANCE MANAGEMENT FRAMEWORK July 2013 1 P age Contents Page 1.0 Definition 3 2.0 Context 3 3.0 Purpose and aim of the policy 4 4.0 Policy Statement 4 5.0 Framework for Performance Management

More information

NHS Sheffield CCG Performance Management Framework

NHS Sheffield CCG Performance Management Framework NHS Sheffield CCG Performance Management Framework Governing Body meeting 3 December 2015 Author(s) Rachel Gillott, Deputy Director of Delivery and Performance Sponsor Tim Furness, Director of Delivery

More information

STAFFORDSHIRE MOORLANDS DISTRICT COUNCIL. Report to Cabinet. 9 th January 2007

STAFFORDSHIRE MOORLANDS DISTRICT COUNCIL. Report to Cabinet. 9 th January 2007 AGENDA ITEM 9.3 STAFFORDSHIRE MOORLANDS DISTRICT COUNCIL Report to Cabinet 9 th January 2007 TITLE: The Role of City Development Companies in English Cities and City-Regions A Consultation PORTFOLIO: OFFICER:

More information

Governance of the Business Transformation Partnership Responsible Officer: Executive Director (Business Development)

Governance of the Business Transformation Partnership Responsible Officer: Executive Director (Business Development) Meeting: Cabinet Date: 6 October 2005 Subject: Governance of the Business Transformation Partnership Responsible Officer: Executive Director (Business Development) Contact Officer: Portfolio Holder: Key

More information

Commissioning Strategy

Commissioning Strategy Commissioning Strategy This Commissioning Strategy sets out the mechanics of how Orkney Alcohol and Drugs Partnership (ADP) will implement its strategic aims as outlined in the ADP Strategy. Ensuring that

More information

Network Rail Infrastructure Projects Joint Relationship Management Plan

Network Rail Infrastructure Projects Joint Relationship Management Plan Network Rail Infrastructure Projects Joint Relationship Management Plan Project Title Project Number [ ] [ ] Revision: Date: Description: Author [ ] Approved on behalf of Network Rail Approved on behalf

More information

Blank Project Management Templates. Saving Time! Saving Money! Saving Stress!

Blank Project Management Templates. Saving Time! Saving Money! Saving Stress! www.projectagency.co.uk Blank Project Management Templates Saving Time! Saving Money! Saving Stress! Please feel free to copy any of the attached documents. You can alter any of them to suit the needs

More information

Guidance on testing the handover from Response to Recovery

Guidance on testing the handover from Response to Recovery Guidance on testing the handover from Response to Recovery Exercising the handover phase from response (from the Strategic Co-ordinating Group) to recovery (to the Recovery Co-ordinating Group) is an important

More information

Confident in our Future, Risk Management Policy Statement and Strategy

Confident in our Future, Risk Management Policy Statement and Strategy Confident in our Future, Risk Management Policy Statement and Strategy Risk Management Policy Statement Introduction Risk management aims to maximise opportunities and minimise exposure to ensure the residents

More information

Update on Programme Management Controls & Risks

Update on Programme Management Controls & Risks Committee and Date Audit Committee 26/06/14 Update on Programme Management Controls & Risks Responsible Officer George Candler Director of Commissioning e-mail: George.Candler@shropshire.gov.uk Tel: 01743

More information

Project Management. From small self contained projects through to major change projects. Brought to you by Project Agency www.projectagency.co.

Project Management. From small self contained projects through to major change projects. Brought to you by Project Agency www.projectagency.co. Solutions * Ideas * Tips Project Management From small self contained projects through to major change projects Solutions * Ideas * Tips Brought to you by Project Agency www.projectagency.co.uk Why Write

More information

Improving Project Governance

Improving Project Governance Improving Project Governance By Phil Mann 31 October 2012 Overview This whitepaper provides a synopsis of the Victorian Government s Ombudsman s Own motion investigation into ICT-enabled, November 2011.

More information

Richmond-upon-Thames Performance Management Framework

Richmond-upon-Thames Performance Management Framework Richmond-upon-Thames Performance Management Framework Introduction Everyone at the Council has a role in Performance Management. It is therefore important that we all understand what is involved. This

More information

Project Management Policy and Procedure

Project Management Policy and Procedure Project Management Policy and Procedure Author(s): Laura Graham Peter Griggs Approved SMT: October 2006 Issue Date: October 2006 Policy Review Date Ref: Contents: 1. Purpose and Scope 2. Aims and Objectives

More information

Appendices to Practice Guide to Project Management for IT Projects under an Outsourced Environment

Appendices to Practice Guide to Project Management for IT Projects under an Outsourced Environment Appendices to Practice Guide to Project Management for IT Projects under an Outsourced Environment [S19a] Version 2.1 March 2011 COPYRIGHT NOTICE 2011 by the Government of the Hong Kong Special Administrative

More information

MEMBERS CONSIDER THE RISK STRATEGY AND RECOMMEND APPROVAL TO COUNCIL.

MEMBERS CONSIDER THE RISK STRATEGY AND RECOMMEND APPROVAL TO COUNCIL. Agenda item: 8 Committee: Audit & Standards Committee Date of meeting: 19 th September 2011 Subject: Risk Management Strategy Lead Officer: Head of Finance Portfolio Holder: Resources - Councillor T Oliver

More information

A Framework of Quality Assurance for Responsible Officers and Revalidation

A Framework of Quality Assurance for Responsible Officers and Revalidation A Framework of Quality Assurance for Responsible Officers and Revalidation Supporting responsible officers and designated bodies in providing assurance that they are discharging their statutory responsibilities.

More information

Information Governance Framework and Strategy. November 2014

Information Governance Framework and Strategy. November 2014 November 2014 Authorship : Committee Approved : Chris Wallace Information Governance Manager CCG Senior Management Team and Joint Trade Union Partnership Forum Approved Date : November 2014 Review Date

More information

www.monitor.gov.uk The NHS Foundation Trust Code of Governance

www.monitor.gov.uk The NHS Foundation Trust Code of Governance www.monitor.gov.uk The NHS Foundation Trust Code of Governance About Monitor Monitor is the sector regulator for health services in England. Our job is to protect and promote the interests of patients

More information

ESKITP7145.01 Manage IT service delivery performance metrics

ESKITP7145.01 Manage IT service delivery performance metrics Overview This sub-discipline covers the competencies required to manage the monitoring, analysis and communication of IT service delivery performance metrics. Monitoring service level performance is a

More information

Managing ICT contracts in central government. An update

Managing ICT contracts in central government. An update Managing ICT contracts in central government An update Prepared by Audit Scotland June 2015 Auditor General for Scotland The Auditor General s role is to: appoint auditors to Scotland s central government

More information

UoD IT Job Description

UoD IT Job Description UoD IT Job Description Role: Projects Portfolio Manager HERA Grade: 8 Responsible to: Director of IT Accountable for: Day to day leadership of team members and assigned workload Key Relationships: Management

More information

PROJECT SCOPE STRENGTHENING COMMUNITY GOVERNANCE IN RSD SITES IN CENTRAL AUSTRALIA. December 2010

PROJECT SCOPE STRENGTHENING COMMUNITY GOVERNANCE IN RSD SITES IN CENTRAL AUSTRALIA. December 2010 PROJECT SCOPE STRENGTHENING COMMUNITY GOVERNANCE IN RSD SITES IN CENTRAL AUSTRALIA December 2010 PROJECT DETAILS Project Title Strengthening community governance in RSD sites in central Australia Project

More information

Authorised by the Victorian Government 1 Treasury Place, Melbourne, 3002

Authorised by the Victorian Government 1 Treasury Place, Melbourne, 3002 Project Governance Project Governance The Secretary Department of Treasury and Finance 1 Treasury Place Melbourne Victoria 3002 Australia Telephone: +61 3 9651 5111 Facsimile: +61 3 9651 5298 www.dtf.vic.gov.au

More information

Syllabus 2nd Edition

Syllabus 2nd Edition Syllabus 2nd Edition 2 Introductory Certificate Syllabus 2nd Edition 2nd Edition Introductory Certificate syllabus All of the syllabus elements should be taken within the context of a project and project.

More information

ITS Project Management

ITS Project Management ITS Project Management Policy Contents I. POLICY STATEMENT II. REASON FOR POLICY III. SCOPE IV. AUDIENCE V. POLICY TEXT VI. PROCEDURES VII. RELATED INFORMATION VIII. DEFINITIONS IX. FREQUENTLY ASKED QUESTIONS

More information

Draft Corporate Governance Standard for Central Government Departments

Draft Corporate Governance Standard for Central Government Departments 2015 Draft Corporate Governance Standard for Central Government Departments FOR PUBLIC CONSULTATION CONTENTS About this Standard... 1 Governance Principles... 3 Part 2 - Governance Framework... 7 Chapter

More information

Quality Governance Strategy 2011-2013

Quality Governance Strategy 2011-2013 Quality Governance Strategy 2011-2013 - 1 - Index Content Page Number Key Messages and context of the Strategy 3 Introduction What is Quality governance? What do we want to achieve? Trust Objectives Key

More information

South East Water Corporation Finance Assurance and Risk Management Committee Charter

South East Water Corporation Finance Assurance and Risk Management Committee Charter South East Water Corporation Finance Assurance and Risk Management Committee Charter Created: October 2012 Document number: BS 2359 Last reviewed: May 2015 1. Purpose The South East Water Corporation Board's

More information

Appendix 4 - Statutory Officers Protocol

Appendix 4 - Statutory Officers Protocol Appendix 4 - Statutory Officers Protocol Accountability Protocol for role of Director of Children s Services within the London Borough of Barnet Introduction In September 2014, the Chief Executive of the

More information

PLANNING FOR YOUR PROJECT

PLANNING FOR YOUR PROJECT PLANNING FOR YOUR PROJECT This tool kit has been designed to provide an introduction to planning. It will help you to think about the reasons behind why you should plan, what to plan and the variations

More information

PM Governance. Executive Team ADCA ADCA

PM Governance. Executive Team ADCA ADCA Item 6.5a Action Plan against the Recommendations Made in the Review of Risk Management Arrangements by PM Governance, November 2014 Key: PM Governance Paul Moore, Risk Consultant ADCA Associate Director

More information

IPL Service Definition - Project Management, Programme Management and Governance

IPL Service Definition - Project Management, Programme Management and Governance IPL Proposal IPL Service Definition - Project Management, Programme Management and Governance Project: Date: 16th Dec 2014 Issue Number: Issue 1 Customer: Crown Commercial Service Page 1 of 8 IPL Information

More information

Code of Corporate Governance

Code of Corporate Governance www.surreycc.gov.uk Making Surrey a better place Code of Corporate Governance October 2013 1 This page is intentionally blank 2 CONTENTS PAGE Commitment to good governance 4 Good governance principles

More information

Informatics: The future. An organisational summary

Informatics: The future. An organisational summary Informatics: The future An organisational summary DH INFORMATION READER BOX Policy HR/Workforce Management Planning/Performance Clinical Document Purpose Commissioner Development Provider Development Improvement

More information

Corporate Governance Framework June 2015

Corporate Governance Framework June 2015 Corporate Governance Framework June 2015 This publication has been compiled by Don Clunes of the Office of the Director-General, Department of Energy and Water Supply. State of Queensland, 2015. The Queensland

More information

Do not open this paper until instructed by the invigilator. Please note: This question paper must not be removed from the examination room.

Do not open this paper until instructed by the invigilator. Please note: This question paper must not be removed from the examination room. APM Introductory Certificate in Project Management Exam paper Candidate Reference Number Date of Exam Location of the Exam General Notes Time allowed 1 hour Answer all 60 multiple choice questions Use

More information

Risk Management. National Occupational Standards February 2014

Risk Management. National Occupational Standards February 2014 Risk Management National Occupational Standards February 2014 Skills CFA 6 Graphite Square, Vauxhall Walk, London, SE11 5EE T: 0207 0919620 F: 0207 0917340 E: info@skillscfa.org www.skillscfa.org Skills

More information

OE PROJECT CHARTER TEMPLATE

OE PROJECT CHARTER TEMPLATE PROJECT : PREPARED BY: DATE (MM/DD/YYYY): Project Name Typically the Project Manager Project Charter Last Modified Date PROJECT CHARTER VERSION HISTORY VERSION DATE (MM/DD/YYYY) COMMENTS (DRAFT, SIGNED,

More information

Report of the Assistant Director Strategy & Performance to the meeting of Corporate Governance & Audit Committee to be held on 20 March 2009.

Report of the Assistant Director Strategy & Performance to the meeting of Corporate Governance & Audit Committee to be held on 20 March 2009. Report to the Corporate Governance & Audit Committee. Report of the Assistant Director Strategy & Performance to the meeting of Corporate Governance & Audit Committee to be held on 20 March 2009. Subject:

More information

ERP Stakeholder Engagement Strategy

ERP Stakeholder Engagement Strategy ERP Stakeholder Engagement Strategy Context The Energy Research Partnership was announced by the Chancellor in his March 2005 Budget Statement. Its Statement of Purpose covers research and development,

More information

How To Prepare A Configuration Change Change Request For The Tfnsw Cmaac

How To Prepare A Configuration Change Change Request For The Tfnsw Cmaac Guide TfNSW Configuration Management and Asset Assurance Committee Submissions Guide Important Warning This document is one of a set of standards developed solely and specifically for use on public transport

More information

National Standards for Safer Better Healthcare

National Standards for Safer Better Healthcare National Standards for Safer Better Healthcare June 2012 About the Health Information and Quality Authority The (HIQA) is the independent Authority established to drive continuous improvement in Ireland

More information

Councillor role descriptions

Councillor role descriptions Councillor role descriptions All Councillors:- Community Leader Champion your division Deal with casework Represent the community within the Council and other agencies Campaign on local issues Keep in

More information

Resource Management. Determining and managing the people resources on projects can be complex as:

Resource Management. Determining and managing the people resources on projects can be complex as: Baseline Resource Management RESOURCE MANAGEMENT Purpose To provide a procedure and associated guidelines to facilitate the management of project people resources. Overview This Phase is used to establish

More information

Middlesbrough Manager Competency Framework. Behaviours Business Skills Middlesbrough Manager

Middlesbrough Manager Competency Framework. Behaviours Business Skills Middlesbrough Manager Middlesbrough Manager Competency Framework + = Behaviours Business Skills Middlesbrough Manager Middlesbrough Manager Competency Framework Background Middlesbrough Council is going through significant

More information

NSW Government ICT Governance Framework for Whole of Government Investments

NSW Government ICT Governance Framework for Whole of Government Investments NSW Government ICT Governance Framework for Whole of Government Investments November 2014 CONTENTS 1. Introduction 1 2. Scope and application 2 3. Purpose 2 4. Outcomes 2 5. Governance framework 3 6. Governance

More information

LGS Project Management Methodology

LGS Project Management Methodology Page: 32 LGS Project Management Methodoy The LGS project management methodoy is integral to our overall delivery methodoy. Based on inpro, one of the LGS inspiration series documents, our methodoy is compliant

More information

John A Manzoni Chief Executive of the Civil Service. Email chief.executive@cabinetoffice.gov.uk

John A Manzoni Chief Executive of the Civil Service. Email chief.executive@cabinetoffice.gov.uk John A Manzoni Chief Executive of the Civil Service Email chief.executive@cabinetoffice.gov.uk 70 Whitehall London SW1A 2AS Telephone +44 (0) 20 7271 8822 Web www.cabinetoffice.gov.uk Paul Chinn Cabinet

More information

RISK MANAGEMENT FRAMEWORK. 2 RESPONSIBLE PERSON: Sarah Price, Chief Officer

RISK MANAGEMENT FRAMEWORK. 2 RESPONSIBLE PERSON: Sarah Price, Chief Officer RISK MANAGEMENT FRAMEWORK 1 SUMMARY The Risk Management Framework consists of the following: Risk Management policy Risk Management strategy Risk Management accountability Risk Management framework structure.

More information

IT Services Risk Management Strategy

IT Services Risk Management Strategy Prepared by: DOCUMENT CONTROL Change Control Table Version Amendment Description Release Date 1.00 Initial Draft Reviewed by DIB 16.01.14 Updated by 1.00 Approved by IT Lead

More information

South Norfolk Council Project Management Handbook

South Norfolk Council Project Management Handbook South Norfolk Council Project Management Handbook Version 1.0 With special thanks and acknowledgement to the Manchester City Council in particular Kevin Fletcher, Bob Rutt, Julie Sprigg, Alan Holding &

More information

For submission to the Web Redevelopment Project Board

For submission to the Web Redevelopment Project Board For submission to the Web Redevelopment Project Board V1.3 March 2015 Web Governance: Executive Summary Purpose of this paper 1 The purpose of the paper is to propose a model of web governance for the

More information

The Risk Management strategy sets out the framework that the Council has established.

The Risk Management strategy sets out the framework that the Council has established. Derbyshire County Council Management Policy Statement The Authority adopts a proactive approach to Management to achieve Best Value and continuous improvement and is committed to the effective management

More information

The NHS Foundation Trust Code of Governance

The NHS Foundation Trust Code of Governance The NHS Foundation Trust Code of Governance www.monitor-nhsft.gov.uk The NHS Foundation Trust Code of Governance 1 Contents 1 Introduction 4 1.1 Why is there a code of governance for NHS foundation trusts?

More information

Agenda Item 9 Report PP17/14. Policy & Programme Committee. Date 24 July 2014

Agenda Item 9 Report PP17/14. Policy & Programme Committee. Date 24 July 2014 Report to Date 24 July 2014 By Title of Report Purpose of Report Policy & Programme Committee Sustainable Futures Manager Our Work with Local Enterprise Partnerships To consider a consultants report on

More information

North Cumbria University Hospitals NHS Trust - FoI 000999 Enclosure 01. Job Description

North Cumbria University Hospitals NHS Trust - FoI 000999 Enclosure 01. Job Description 1. JOB DETAILS Job Description Job title: Head of Communications and Reputation Management Accountable to: Director of Strategic Planning and Clinical Governance Location: Trust-wide across both hospital

More information

APMP. The APM Project Management Qualification. Syllabus, learning outcomes and assessment criteria aligned to the APM Body of Knowledge 6 th edition

APMP. The APM Project Management Qualification. Syllabus, learning outcomes and assessment criteria aligned to the APM Body of Knowledge 6 th edition The syllabus provides a summary of the coverage of the qualification, the details are then found in the learning outcomes and assessment criteria. Both the syllabus and the learning outcomes and assessment

More information

Business Cases: A Summary Of Strategic & Cost Effective Project Management

Business Cases: A Summary Of Strategic & Cost Effective Project Management Page 75 Agenda Item 10 Report to: Strategy and Resources Committee Date: 14 December 2015 Report title: Report from: Ward/Areas affected: Strategic Business Case for sharing HR services with Royal Borough

More information

Internal Audit Report Project Management

Internal Audit Report Project Management Audit Committee, 20 Internal Audit Report Project Management Executive summary and recommendations Introduction As part of the Internal Audit Plan for 2013-14 Mazars have undertaken a review of arrangements

More information

State of Minnesota IT Governance Framework

State of Minnesota IT Governance Framework State of Minnesota IT Governance Framework June 2012 Table of Contents Table of Contents... 2 Introduction... 4 IT Governance Overview... 4 Process for Developing the New Framework... 4 Management of the

More information

Information Pack for Applicants to the MIDLANDS CONNECT PROJECT TEAM

Information Pack for Applicants to the MIDLANDS CONNECT PROJECT TEAM Information Pack for Applicants to the MIDLANDS CONNECT PROJECT TEAM I. Midlands Connect: Strategic Context and progress to date The Midlands Connect (MC) Partnership started in 2014 and brings together

More information

PROJECT MANAGEMENT FRAMEWORK

PROJECT MANAGEMENT FRAMEWORK PROJECT MANAGEMENT FRAMEWORK DOCUMENT INFORMATION DOCUMENT TYPE: DOCUMENT STATUS: POLICY OWNER POSITION: INTERNAL COMMITTEE ENDORSEMENT: APPROVED BY: Strategic document Approved Executive Assistant to

More information

Technical Journal. Paper 142

Technical Journal. Paper 142 Technical Journal 09 Paper 142 142 Kevin Balaam Programme Manager Highways & Transportation Atkins The Area 6 MAC approach to planning and programme management Introduction Steve Dickinson Schemes Manager

More information

INFORMATION GOVERNANCE POLICY

INFORMATION GOVERNANCE POLICY INFORMATION GOVERNANCE POLICY Version: 3.2 Authorisation Committee: Date of Authorisation: May 2014 Ratification Committee Level 1 documents): Date of Ratification Level 1 documents): Signature of ratifying

More information

Performance Management Framework

Performance Management Framework Purpose of the framework: To explain how we manage in Poole. It applies to all directly managed services of the Council. Introduction: Effective management at the council will: Ensure our goals are prioritised

More information

DIRECTORATE OF AUDIT, RISK AND ASSURANCE Internal Audit Service to the GLA REVIEW OF THE IT STRATEGY AND IMPLEMENTATION CONTROL FRAMEWORK

DIRECTORATE OF AUDIT, RISK AND ASSURANCE Internal Audit Service to the GLA REVIEW OF THE IT STRATEGY AND IMPLEMENTATION CONTROL FRAMEWORK Appendix 1b DIRECTORATE OF AUDIT, RISK AND ASSURANCE Internal Audit Service to the GLA REVIEW OF THE IT STRATEGY AND IMPLEMENTATION CONTROL FRAMEWORK DISTRIBUTION LIST Audit Team Steve Hutton, Head of

More information

DORSET & WILTSHIRE FIRE AND RESCUE AUTHORITY Performance, Risk and Business Continuity Management Policy

DORSET & WILTSHIRE FIRE AND RESCUE AUTHORITY Performance, Risk and Business Continuity Management Policy Not Protectively Marked Item 6 Appendix B DORSET & WILTSHIRE FIRE AND RESCUE AUTHORITY Management Policy The Dorset & Wiltshire Fire and Rescue Authority () is the combined fire and rescue authority for

More information

Reporting The Project Board shall report to the sponsoring Department political board.

Reporting The Project Board shall report to the sponsoring Department political board. Appendix 13 La Mare de Carteret Schools Project Board Mandate Summary (Project restart version March 2014) Function The Project Board is accountable to the Education Department for all aspects contributing

More information

Final. North Carolina Procurement Transformation. Governance Model March 11, 2011

Final. North Carolina Procurement Transformation. Governance Model March 11, 2011 North Carolina Procurement Transformation Governance Model March 11, 2011 Executive Summary Design Approach Process Governance Model Overview Recommended Governance Structure Recommended Governance Processes

More information