1 DOCUMENT TYPE: DOCUMENT STATUS: POLICY OWNER POSITION: INTERNAL COMMITTEE ENDORSEMENT: APPROVED BY: Council policy Approved Manager Organisational Development Risk Management Committee Council DATE ADOPTED: 26/05/2015 VERSION NUMBER: 4 REVIEW DATE: 26/05/2017 DATE RESCINDED: RELATED STRATEGIC DOCUMENTS, POLICIES OR PROCEDURES: Risk Management Framework Risk Management Procedure Occupational Health and Safety Policy RELATED LEGISLATION: Occupational Health and Safety Act 2004 Occupational Health and Safety Regulations 2007 AS/NZS ISO Risk Management Principles and Guidelines EVIDENCE OF APPROVAL: Signed by Chief Executive Officer FILE LOCATION: K:\EXECUTIV\policies and procedures\policies - adopted PDF and Word\POL Risk Management Policy v4.docx Policy documents are amended from time to time, therefore you should not rely on a printed copy being the current version. Please consult the Loddon Shire website to ensure that the version you are using is up to date. This document is available in alternative formats (e.g. larger font) if requested. Page 1 of 8
2 1 PURPOSE Risk management is the coordinated activities to direct and control an organisation with regard to risk where risk 1 is defined as the effect of uncertainty on objectives. This policy provides a statement of Council s commitment to risk management. 2 SCOPE This policy applies to Councillors, Council staff, volunteers, and contractors operating for and on behalf of Council. 3 POLICY Loddon Shire Council is committed to proactive risk management and will support this by implementing a risk management framework to be applied to all activities undertaken by the organisation: which documents the roles and responsibilities of risk management in the organisation, opportunities for identification of risks, and the reporting structure is aligned to the International Risk Management Guidelines and Principles (ISO 31000), which documents the principles, framework, and processes for achieving best practice in risk management. (Refer to Attachment A). Council will review this policy regularly to ensure that the risk assessment criteria contained in the policy reflects the current internal and external environment such as organisational objectives, laws, standards, guidelines, and policies. (Refer to Attachments B and C). 4 DEFINITIONS OF TERMS OR ABBREVIATIONS USED Term Risk Management Definition Risk Management is the coordinated activities to direct and control an organisation with regard to risk where risk is defined as the effect of uncertainty on objectives. 1 Notes from the International Risk Management Principles and Guidelines Note 1: An effect is a deviation from the expected positive and/or negative. Note 2: Objectives can have different aspects (such as financial, health and safety, and environmental goals) and can apply at different levels (such as strategic, organisation-wide, project, product and process). Note 3: Risk is often characterised by reference to potential events and consequences, or a combination of these. Note 4: Risk is often expressed in terms of a combination of the consequences of an event (including changes in circumstances) and the associated likelihood of occurrence. Note 5: Uncertainty is the state, even partial, of deficiency of information related to, understanding or knowledge of an event, its consequence, or likelihood. Page 2 of 8
3 5 HUMAN RIGHTS STATEMENT It is considered that this policy does not impact negatively on any rights identified in the Charter of Human Rights Act (Vic). Loddon Shire Council is committed to consultation and cooperation between management and employees. The Council will formally involve elected employee Health and Safety Representatives in any workplace change that may affect the health and safety of any of its employees. 6 REVIEW The Manager Organisational Development will review this policy for any necessary amendments no later than 2 years after adoption of this current version. 7 ATTACHMENTS 7.1 Attachment A Risk Management Framework - ISO Attachment B Risk Assessment Criteria 7.3 Attachment C Action plans Page 3 of 8
4 7.1 Attachment A Risk Management Framework - ISO Page 4 of 8
5 7.2 Attachment B Risk Assessment Criteria Consequence criteria Consequence criteria 1 Insignificant 2 Minor 3 Moderate 4 Major 5 Catastrophic Financial impact Cost is less than $100K Cost is greater than $100K and less Cost is greater than $250K and less than Cost is greater than $500K and less than Cost is greater than $1 million than $250K $500K $1 million People impact (Occupational health and safety of employees, volunteers, clients, public) First aid or minor medical treatment, full recovery Reputation impact Results in local gossip; Complaint to employee Service impact Minimal disruption to one service Significant medical treatment, lost injury time less than two weeks Results in regional gossip; Complaint to management Service disruption in one area for a few weeks Legal and compliance impact Minor legal issues; Minor litigation, Minor breach of fines, or legal costs; regulations Breach of regulations Management impact Requires some management attention for a few days Likelihood criteria Requires some management attention for several days or a few weeks Short term disability to one or more persons Results in regional media coverage; Senior manager departs Single service ceases to be delivered for a few months; Multiple services cease to be delivered for several weeks Litigation and legal costs up to $500K; Breach of regulation results in investigation by authority and possible moderate fine Requires senior management time over several weeks Extensive injury or impairment to one or more persons Results in state media coverage; CEO departs Multiple services disrupted for several months Significant litigation involving many weeks of management time and/or legal costs up to $1 million; Major breach of regulation with punitive fine Requires considerable senior management time over several weeks; Loss of many managers Fatality and/or severe irreversible injury to one or more persons Results in national media coverage; CEO departs and Councillors are removed Multiple services cease to be delivered for many months Major litigation costing $1 million or more; Investigation by regulatory body resulting in longterm interruption of operations Suspension of management activities for many months; Loss of many senior managers Page 5 of 8
6 Likelihood Criteria A Almost Certain B Likely C Possible D Unlikely E Rare Consequence could occur within days or weeks Consequence could occur within weeks to months Consequence could occur within months to years Consequence could occur within years to decades Consequence is considered a 100- year event Consequence is expected to occur in most circumstances Consequence will probably occur in most circumstances Consequence may occur but there is a distinct possibility that it won t occur Consequence may occur but is not anticipated Consequence would only occur in exceptional circumstances There is a greater than 90% chance of it occurring within the next year There is a greater than 50% chance of it occurring within the next year There is a greater than 20% chance of it occurring within the next year There is a greater than 5% chance of it occurring within the next year Consequence is exceptionally unlikely event in the very long term Page 6 of 8
7 7.2.3 Risk matrix Consequence criteria 1 Insignificant 2 Minor 3 Moderate 4 Major 5 Catastrophic Overall Rating Likelihood Criteria A Medium (11) High (16) High (20) Very High (23) Very High (25) B Medium (7) Medium (12) High (17) High (21) Very High (24) C Low (4) Medium (8) Medium (13) High (18) High (22) D Low (2) Low (5) Medium (9) Medium (14) High (19) E Low (1) Low (3) Low (6) Medium (10) Medium (15) Page 7 of 8
8 7.3 Attachment C Action plans Once the level of risk has been determined the following table may be of use in determining when to act to intervene and institute the control measures. Risk level Action Details Very high High Medium Low Act immediately to mitigate the risk. Eliminate, substitute, or implement engineering control measures. Act immediately to mitigate the risk. Eliminate, substitute, or implement engineering control measures. If these controls are not immediately accessible, set a timeframe for their implementation and establish interim risk reduction strategies for the period of the set timeframe. Take reasonable steps to mitigate the risk. Until elimination, substitution, or engineering controls can be implemented, institute administrative or personal protective equipment controls. These lower level controls must not be considered permanent solutions. Take reasonable steps to mitigate and monitor the risk. Institute permanent controls in the long term. Permanent controls may be administrative in nature if the hazard has low frequency, rare likelihood and insignificant consequence. Remove the hazard at the source. An identified very high risk does not allow scope for the use of administrative controls, even in the short term. An achievable timeframe must be established to ensure that elimination, substitution or engineering controls are implemented. Note: Risk, and not cost, must be the primary consideration in determining the timeframe. Interim measures until permanent solutions can be implemented: develop administrative controls to limit the use or access provide supervision and specific training related to the issue of concern. Hierarchy of control Most effective Least effective Action Elimination Details Eliminate the hazard. Substitution Provide an alternative that is capable of performing the same task and is safer to use. Engineering controls Provide or construct a physical barrier or guard. Administrative controls Develop policies, procedures, practices, and guidelines, in consultation with employees, to mitigate the risk. Provide training, instruction, and supervision about the hazard. Personal protective equipment Personal equipment designed to protect the individual from the hazard. Page 8 of 8
Risk Management: Coordinated activities to direct and control an organisation with regard to risk.
POLICY CG01 RISK MANAGEMENT Document Control Statement This Policy is maintained by the Governance and Organisational Strategy. Any printed copy may not be up to date and you are advised to check the electronic
RISK MANAGEMENT FRAMEWORK
RISK MANAGEMENT FRAMEWORK DOCUMENT INFORMATION DOCUMENT TYPE: DOCUMENT STATUS: POLICY OWNER POSITION: INTERNAL COMMITTEE ENDORSEMENT: APPROVED BY: Strategic document Approved Manager Organisational Development
Risk Management. Policy
Policy Risk Management Endorsed: 26 February 2014 Brief description The GPC Risk Management Policy and its supporting standards and procedures provide a framework to ensure that risks arising from our
Council Meeting Agenda 27/07/15
3 Risk Management Framework Abstract Council s Risk Management Framework ( the Framework ) was adopted by Council in 2012. The Framework provides structure and guidance to Council s risk management activities
Title: OHS Risk Management Procedure
Issue Date: July 2011 Review Date: July 2013 Page Number: 1 of 9 1. Purpose: To outline the methodology by which Department of Education and Early Childhood Development (DEECD) identifies, assesses, controls
The Lowitja Institute Risk Management Plan
The Lowitja Institute Risk Management Plan 1. PURPOSE This Plan provides instructions to management and staff for the implementation of consistent risk management practices throughout the Lowitja Institute
Core Infrastructure Risk Management Plan
SHIRE OF MOUNT MAGNET Roads and Buildings Core Infrastructure Risk Management Plan Version 1 May 2013 AM4SRRC Document Control Asset Management for Small, Rural or Remote Communities Document ID: 59_280_110211
POL ENTERPRISE RISK MANAGEMENT SC51. Executive Services Department BUSINESS UNIT: Executive Support Services SERVICE UNIT:
POL ENTERPRISE RISK MANAGEMENT SC51 POLICY CODE: SC51 DIRECTORATE: Executive Services Department BUSINESS UNIT: Executive Support Services SERVICE UNIT: Executive Support Services RESPONSIBLE OFFICER:
RISK MANAGEMENT STRATEGY 2013-2016
RISK MANAGEMENT STRATEGY 2013-2016 As presented and endorsed by the Mornington Peninsula Shire s Audit Committee at its meeting of 20 February, 2013 and subsequent adoption by Council at its meeting of
Risk Management Policy
Risk Management Policy DOCUMENT CONTROL Developed by: Date: Origination: Quality, Systems & Shared s March 2014 Authorised by: Colette Kelleher April 2014 DOCUMENT REVIEW HISTORY Original Circulation date:
How To Manage A Disruption Event
BUSINESS CONTINUITY FRAMEWORK DOCUMENT INFORMATION DOCUMENT TYPE: DOCUMENT STATUS: POLICY OWNER POSITION: INTERNAL COMMITTEE ENDORSEMENT: APPROVED BY: Strategic document Approved Manager Organisational
Risk Management Policy and Framework
Risk Management Policy and Framework December 2014 phone 1300 360 605 08 89589500 email [email protected] location 1Bagot Street Alice Springs NT 0870 post PO Box 2257 Alice Springs NT 0871
Discipline: Technical Services Category: Procedure. Risk Management RM-01 2013. Applicability. ARTC Network Wide. Interstate Network.
Discipline: Technical Services Category: Procedure Risk Management RM-01 2013 Applicability ARTC Network Wide Interstate Network Hunter Valley Document Status Version Prepared by Reviewed by Endorsed Approved
Hazard Identification, Risk Assessment and Control Procedure
Hazard Identification, Risk Assessment and Control Procedure 1. Purpose To ensure that there is a formal process for hazard identification, risk assessment and control to effectively manage workplace and
SOUTHERN RURAL WATER POLICY RISK MANAGEMENT POLICY
SOUTHERN RURAL WATER POLICY RISK MANAGEMENT POLICY 1. POLICY STATEMENT Having regard to AS/NZS ISO 31000 Risk Management, it shall be the Policy of SRW to manage risk to protect public safety, quality
Managing Risk in Procurement Guideline
Guideline DECD 14/10038 Managing Risk in Procurement Guideline Summary The Managing Risk in Procurement Guideline assists in the identification and minimisation of risks involved in the acquisition of
WHS Risk Assessment and Control Form
WHS Risk Assessment and Control Form Step 1: Who has conducted the Risk Assessment Risk Assessment completed by (name): Staff / Student Number: Signature: Date: Step 4: Documentation and initial approval
POLICY. Number: 7311-10-005 Title: Enterprise Risk Management. Authorization
POLICY Number: 7311-10-005 Title: Enterprise Risk Management Authorization [ ] President and CEO [ X] Vice President, Finance and Corporate Services Source: Director, Enterprise Risk Management Cross Index:
Integrated Risk Management Policy
Integrated Management Policy Document reference number Document developed by Quality and Patient Safety Directorate Revision number 4 Document approved by Quality and Patient Safety Directorate Approval
RISK MANAGEMENT FOR INFRASTRUCTURE
RISK MANAGEMENT FOR INFRASTRUCTURE CONTENTS 1.0 PURPOSE & SCOPE 2.0 DEFINITIONS 3.0 FLOWCHART 4.0 PROCEDURAL TEXT 5.0 REFERENCES 6.0 ATTACHMENTS This document is the property of Thiess Infraco and all
AFTRS Health and Safety Risk Management Policy
AFTRS Health and Safety Risk Management Policy Responsible Officer Contact Officer Authorisation Director, Corporate and Student Services Head of Human Resources Chief Executive Officer Effective Date
Compliance Management Framework. Managing Compliance at the University
Compliance Management Framework Managing Compliance at the University Risk and Compliance Office Effective from 07-10-2014 Contents 1 Compliance Management Framework... 2 1.1 Purpose of the Compliance
COMPLIANT CONTRACTOR GUIDELINES
COMPLIANT CONTRACTOR GUIDELINES DOCUMENT INFORMATION DOCUMENT TYPE: DOCUMENT STATUS: POLICY OWNER POSITION: INTERNAL COMMITTEE ENDORSEMENT: APPROVED BY: Guidelines Approved Director Corporate Services
University of New England Compliance Management Framework and Procedures
University of New England Compliance Management Framework and Procedures Document data: Document type: Administering entity: Framework and Procedures Audit and Risk Directorate Records management system
Title: Rio Tinto management system
Standard Rio Tinto management system December 2014 Group Title: Rio Tinto management system Document No: HSEC-B-01 Standard Function: Health, Safety, Environment and Communities (HSEC) No. of pages: 23
An Introduction to Risk Management. For Event Holders in Western Australia. May 2014
An Introduction to Risk Management For Event Holders in Western Australia May 2014 Tourism Western Australia Level 9, 2 Mill Street PERTH WA 6000 GPO Box X2261 PERTH WA 6847 Tel: +61 8 9262 1700 Fax: +61
Risk Assessment Tool and Guidance (Including guidance on application)
Risk Assessment Tool and Guidance (Including guidance on application) Document reference number Revision number OQR012 Document developed by 5 Document approved by Revision date October 2011 Responsibility
Business Resilience and Risk Management
Policy Business Resilience and Risk Management Document Number GOV-POL-37 1.0 Policy Statement Stanwell is committed to delivering a business resilience platform across all levels of the business and its
Shepway District Council Risk Management Policy
Shepway District Council Risk Management Policy Contents Section 1 Risk Management Policy... 3 1. Updates and amendments... 3 2. Definition... 3 3. Policy statement... 3 4. Objectives... 3 Section 2 Risk
RISK ASSESSMENT. Australian Risk Management Standard AS/NZS 4360:200 defines a risk as;
RISK ASSESSMENT Australian Risk Management Standard AS/NZS 4360:200 defines a risk as; the possibility of something happening that impacts on your objectives. It is the chance to either make a gain or
6. Risk management plans for high risk activities and special events
6. Risk management plans for high risk activities and special events What is a high risk activity or special event? The answer to this question will be different for every organisation. A high risk activity
Risk Assessment: An introduction
Preamble The purpose of a risk assessment is to systematically identify all of the risks associated with a task, activity or process, and put appropriate controls in place to eliminate or reduce the risks
Analyzing Risks in Healthcare. February 12, 2014
Analyzing s in Healthcare February 12, 2014 1 Content What is Enterprise Management (ERM) ERM Benefits ERM Standards / ISO 31000:2009 ERM Process Register ERM Governance Model s Q&A 2 What is Enterprise
Version: 3.0. Effective From: 19/06/2014
Policy No: RM66 Version: 3.0 Name of Policy: Business Continuity Planning Policy Effective From: 19/06/2014 Date Ratified 05/06/2014 Ratified Business Service Development Committee Review Date 01/06/2016
How To Manage Safety Risk In Aviation
4 AVIATION RISK MANAGEMENT AN INTRODUCTION Civil AVIATION AuthORITy of New Zealand BOOKLET FOUR PUBLISHED: JUNE 2013 Preface The Civil Aviation Authority (CAA) published Advisory Circular AC00-4 Safety
identify hazards, analyze or evaluate the risk associated with that hazard, and determine appropriate ways to eliminate or control the hazard.
What is a risk assessment? Risk assessment is the process where you: identify hazards, analyze or evaluate the risk associated with that hazard, and determine appropriate ways to eliminate or control the
POLICY : CORPORATE RISK MANAGEMENT
APPENDIX 5 POLICY : CORPORATE RISK MANAGEMENT 1 Scope This is a Service wide policy. 2 Aims and Objectives Lancashire Combined Fire Authority provides services to a diverse range of people and organisations,
Risk Management Policy Adopted by:
Risk Management Policy Adopted by: Infigen Energy Limited Infigen Energy (Bermuda) Limited Infigen Energy RE Limited in its capacity as Responsible Entity of Infigen Energy Trust Adopted: 17 December 2009
Bridgend County Borough Council. Corporate Risk Management Policy
Bridgend County Borough Council Corporate Risk Management Policy December 2014 Index Section Page No Introduction 3 Definition of risk 3 Aims and objectives 4 Strategy 4 Accountabilities and roles 5 Risk
Hazard Identification, Risk Assessment and Control Management
The Paraplegic and Quadriplegic Association of SA Inc Hazard Identification, Risk Assessment and Control Management STATEMENT The Paraplegic and Quadriplegic Association of South Australia Incorporated
River Stour (Kent) Internal Drainage Board Risk Management Strategy and Policy
River Stour (Kent) Internal Drainage Board Risk Management Strategy and Policy Page: 1 Contents 1. Purpose, Aims & Objectives 2. Accountabilities, Roles & Reporting Lines 3. Skills & Expertise 4. Embedding
Hazard Identification, Risk Assessment And Control Procedure
Hazard Identification, Risk Assessment And Control Procedure 1. Purpose 1.1 To ensure that there is a formal process for hazard identification, risk assessment and control to effectively manage hazards
CONTROLLED DOCUMENT. Number: Version Number: 4. On: 25 July 2013 Review Date: June 2016 Distribution: Essential Reading for: Information for:
CONTROLLED DOCUMENT Risk Management Strategy and Policy CATEGORY: CLASSIFICATION: PURPOSE: Controlled Number: Document Version Number: 4 Controlled Sponsor: Controlled Lead: Approved By: Document Document
ENTERPRISE RISK M A NAGEMENT POLICY
Tablelands Regional Council ENTERPRISE RISK M A NAGEMENT POLICY Draft Final Policy No: PD 3.3.1 File ref: PD 3.3.1 Policy Section: INSURANCE AND RISK MANAGEMENT Version: 1 Date Adopted: 7 July 2010 Review
A guide and tool kit for non-government organisations to plan future workforce needs
Workforce Planning A guide and tool kit for non-government organisations to plan future workforce needs Table of contents WORKFORCE PLANNING...1 TABLE OF CONTENTS...2 NON-GOVERNMENT ORGANISATIONS...4 INTRODUCTION...4
Bedford Group of Drainage Boards
Bedford Group of Drainage Boards Risk Management Strategy Risk Management Policy January 2010 1 Contents 1. Purpose, Aims & Objectives 2. Accountabilities, Roles & Reporting Lines 3. Skills & Expertise
3 August 2012 Policy updated to reflect name changes and alignment with current Aurora Energy Group Policy standards.
Aurora Energy Risk Management Policy Version History REV NO. DATE REVISION DESCRIPTION APPROVAL 0 19/11/98 Risk Management Policy Prepared by: Manager Internal Audit 1 March 2007 Risk Management Policy
Waveney Lower Yare & Lothingland Internal Drainage Board Risk Management Strategy and Policy
Waveney Lower Yare & Lothingland Internal Drainage Board Risk Management Strategy and Policy Page: 1 Contents 1. Purpose, Aims & Objectives 2. Accountabilities, Roles & Reporting Lines 3. Skills & Expertise
Qualification details
Qualification details Title New Zealand Diploma in Organisational Risk and Compliance (Level 6) Version 1 Qualification type Diploma Level 6 Credits 120 NZSCED 080317 Quality Management DAS classification
AS/NZS 4801:2001. Safety Management Systems (SMS) Self-Assessment Checklist. Revision 1 (January 2014)
AS/NZS 4801:2001 Safety Management Systems (SMS) Self-Assessment Checklist This document restates the requirements of AS/NZS 4801:2001 for Safety Management Systems (SMS) and has been developed to assist
Guidance on Risk Assessment and Control
Guidance on Risk Assessment and Control Page 1 of 18 CONTENTS Section Page Executive Summary 2. FLOWCHART 4. 1. Introduction and Scope 5. Hierarchy of risk control 5. Definitions 5. 2. Related Documents
RISK MANAGEMENT POLICY
RISK MANAGEMENT POLICY Nuffield College s Risk Management Policy defines the College's approach to risk and how risk management should be embedded into management processes to ensure that the major risks
BUSINESS CONTINUITY POLICY
BUSINESS CONTINUITY POLICY Last Review Date Approving Body n/a Audit Committee Date of Approval 9 th January 2014 Date of Implementation 1 st February 2014 Next Review Date February 2017 Review Responsibility
RISK AND OPPORTUNITY MANAGEMENT STRATEGY 2013-2014
RISK AND OPPORTUNITY MANAGEMENT STRATEGY 2013-2014 Version 1.0 October 2013 Not protectively marked INDEX PAGE NO TITLE 3 Executive Summary 4 Our Shared Vision and Priorities 5 Outline of the Risk and
CORP 600 00 RISK MANAGEMENT POLICY & METHODOLOGY
CORP 600 00 RISK MANAGEMENT POLICY & METHODOLOGY CORP 600 RISK MANAGEMENT POLICY Purpose In March 2003, the Australian Stock Exchange (ASX) Corporate Governance Council released the first version of its
Service Risk Assessment. Consultant PQC
Service Risk Assessment Consultant PQC For further information or additional copies of this document contact either: Principal Policy Manager Building Policy Unit Works Division Telephone 07 3224 5482
G8 Education Limited ABN: 95 123 828 553. Risk Management Policy and Risk Management Framework
G8 Education Limited ABN: 95 123 828 553 Risk Management Policy and Risk Management Framework Table of Contents Introduction... 4 Policy Statement... 4 Policy Conditions... 4 Responsibilities... 4 Implementation
ERM Program. Enterprise Risk Management Guideline
ERM Program Enterprise Management Guideline Table of Contents PREAMBLE... 2 When should I refer to this Guideline?... 3 Why do we need a Guideline?... 4 How do I use this Guideline?... 4 Who is responsible
Getting Started with Workplace Health and Safety
Getting Started with Workplace Health and Safety An Introduction to Workplace Health and Safety Policies, Procedures and Evaluation Victorian WorkCover Authority Revised June 2001 First published February
A guide for members APES 325 Risk Management for Firms
A guide for members APES 325 Risk Management for Firms An explanation and introduction to APES 325 Risk Management for Firms Overview of the scope and application of a risk management framework. APES 325
Risk assessment (appendix 2 of the Event Registration Form)
Risk assessment (appendix 2 of the Event Registration Form) Event Name Date In the preparation of this risk assessment you must involve the following; internal and external event coordinators, stakeholders,
Risk Management Strategy and Policy. The policy provides the framework for the management and control of risk within the GOC
Annex 1 TITLE VERSION Version 2 Risk Management Strategy and Policy SUMMARY The policy provides the framework for the management and control of risk within the GOC DATE CREATED January 2013 REVIEW DATE
Risk Methodology. Contents. Introduction... 2. The Risk Management Structure... 2. The Risk Management Cycle... 2. Methodology...
Risk Methodology Contents Introduction... 2 The Risk Management Structure... 2 The Risk Management Cycle... 2 Methodology... 3 Appendix 1...5 Definition of Controls... 5 Appendix 2...6 Definition of Impact...
SAFETY and HEALTH MANAGEMENT STANDARDS
SAFETY and HEALTH STANDARDS The Verve Energy Occupational Safety and Health Management Standards have been designed to: Meet the Recognised Industry Practices & Standards and AS/NZS 4801 Table of Contents
Take Five for Safety. Use to identify AND control hazards before you start work. Take Five prove it safe before you start work
Build something great Take Five for Safety Use to identify AND control hazards before you start work. 1. Stop, look, walk around the task 2. Think about the task, have a clear plan 3. Identify and assess
SAI GLOBAL LIMITED Risk Management Policy
SAI GLOBAL LIMITED Risk Management Policy SAI Global Ltd ABN 67050611642 Last Updated: February 2012 Contents 1. Risk Management... 3 2. Policy... 3 3. Risk Management Philosophy... 3 4. Risk Appetite...
ENTERPRISE RISK MANAGEMENT FRAMEWORK
ROCKHAMPTON REGIONAL COUNCIL ENTERPRISE RISK MANAGEMENT FRAMEWORK 2013 Adopted 25 June 2013 Reviewed: October 2015 TABLE OF CONTENTS 1. Introduction... 3 1.1 Council s Mission... 3 1.2 Council s Values...
Global Health & Safety Policy and Management Standards
Global Health & Safety Policy and Management Standards February 2009 Introduction Jones Lang LaSalle is dedicated to avoiding accidents, injuries and work-related illnesses in the properties we occupy
Health, Safety and Environment Management System
Health, Safety and Environment Management System For Bridgeport Energy Ltd Level 7, 111 Pacific Highway North Sydney 2011 June, 2010 DOCUMENT CONTROL Title: Document Number: Health, Safety and Environmental
RISK MANAGEMENT POLICY. Version 3
RISK MANAGEMENT POLICY Version 3 Version: Version 3 Version 3 Authors: Liz Hollman, Mary Klaus, Sarah Langan-Hart Approved by: Healthcare Governance Committee Trust Board Approved date: May 2009 Review
ST MARGARET S RISK MANAGEMENT STRATEGY AND OPERATIONAL FRAMEWORK
ST MARGARET S RISK MANAGEMENT STRATEGY AND OPERATIONAL FRAMEWORK Introduction St Margaret s Anglican Girls School recognises the management of the school s risks are an important and serious responsibility.
Risk Management Policy
Risk Management Policy Responsible Officer Author Ben Bennett, Business Planning & Resources Director Julian Lewis, Governance Manager Date effective from December 2008 Date last amended December 2012
Good Governance Guide. www.accs.ie. Risk Management in Community and Comprehensive Schools
www.accs.ie Cumann na Scoileanna Pobail is Cuimsitheacha Association of Community and Comprehensive Schools Risk Management in Community and Comprehensive Schools Good Governance Guide 2013 Association
Step 4. Monitor / Review Control Measures
Overview Step 1. Identify Hazards Step 2. Assess the Risks Assess the Likelihood & Consequences Classify the Risk Step 3. Control the Risks The hierarchy of risk control can be used as a guide Step 4.
The Risk Management strategy sets out the framework that the Council has established.
Derbyshire County Council Management Policy Statement The Authority adopts a proactive approach to Management to achieve Best Value and continuous improvement and is committed to the effective management
Risk Management Policy. Corporate Governance Risk Management Policy
Corporate Governance Risk Management Policy Approved by the Council of Ministers, May 2006 1. Background The Isle of Man Government is working to promote better risk management, with emphasis on the importance
GUIDELINE NO. 22 REGULATORY AUDITS OF ENERGY BUSINESSES
Level 37, 2 Lonsdale Street Melbourne 3000, Australia Telephone.+61 3 9302 1300 +61 1300 664 969 Facsimile +61 3 9302 1303 GUIDELINE NO. 22 REGULATORY AUDITS OF ENERGY BUSINESSES ENERGY INDUSTRIES JANUARY
PROJECT MANAGEMENT FRAMEWORK
PROJECT MANAGEMENT FRAMEWORK DOCUMENT INFORMATION DOCUMENT TYPE: DOCUMENT STATUS: POLICY OWNER POSITION: INTERNAL COMMITTEE ENDORSEMENT: APPROVED BY: Strategic document Approved Executive Assistant to
APPENDIX 4. Risk Tables
APPENDIX 4 Tables Preliminary Qualitative Criteria The qualitative risk assessment criteria have been developed to identify key risks to the environment, society, heritage and business reputation. The
RISK MANAGEMENT FOR COMMUNITY GROUPS. ESTABLISH THE CONTEXT The Strategic Context The Organisational Context The Risk Management Context
RISK MANAGEMENT FOR COMMUNITY GROUPS Develop Assessment Criteria ESTABLISH THE CONTEXT The Strategic Context The Organisational Context The Risk Management Context Decide the structure IDENTIFY RISKS What
APPENDIX 50. Enterprise risk management - Risk management overview
APPENDIX 50 Enterprise risk management - Risk management overview Energex regulatory proposal October 2014 ENTERPRISE RISK MANAGEMENT Risk Management Overview (RMO) 06 11 2013 Table of Contents 1. INTRODUCTION...
OURIMBAH FLOOD RESPONSE PLAN
OURIMBAH FLOOD RESPONSE PLAN February 2014 2 EMERGENCY CONTACT DETAILS Security Services for all Emergencies (24 Hours) Ourimbah 4348 4222 If not able to be reached please call Newcastle on Newcastle 4921
Policy (Board Approved)
Policy (Board Approved) Legal and Regulatory Compliance Policy Document Number GOV-POL-20 1.0 Policy Statement Stanwell is committed to and conducts its business activities lawfully and in a manner that
SAMPLE. BSBCOM603 Plan and establish compliance management systems
Student Workbook BSBCOM603 Plan and establish compliance management systems 1 st Edition 2015 Part of a suite of support materials for the BSB Business Services Training Package Acknowledgment Innovation
Project & Task Work Health and Safety Risk Management Procedure
Project & Task Work Health and Safety Risk Management Procedure Related Policy Work Health and Safety Policy Responsible Officer Executive Director Human Resources Approved by Executive Director Human
Risk Management Framework
Risk Management Framework Category or Type Originally approved by, and date Administration and Management Vice Chancellor at VCAG on December 2008 Last approved revision October 2011 Sponsor Chief Operating
RISK MANAGEMENT AND COMPLIANCE
RISK MANAGEMENT AND COMPLIANCE Contents 1. Risk management system... 2 1.1 Legislation... 2 1.2 Guidance... 3 1.3 Risk management policy... 4 1.4 Risk management process... 4 1.5 Risk register... 8 1.6
MANAGEMENT SYSTEMS PROCEDURE. Procedure 06: Non-Conformance, Incidents and Complaints
WAPRES P06 Non-Conformance, Incidents and Complaints Page 1 of 8 MANAGEMENT SYSTEMS PROCEDURE Procedure 06: Non-Conformance, Incidents and Complaints OBJECTIVE: To outline the reporting and processing
ENTERPRISE RISK MANAGEMENT NARACOORTE LUCINDALE COUNCIL GUIDELINES
ENTERPRISE RISK MANAGEMENT NARACOORTE LUCINDALE COUNCIL GUIDELINES December 2015 NLC Enterprise Risk Management Guidelines Contents INTRODUCTION... 3 1. Enterprise Risk Management Principles... 5 2. The