1 PRE FEASIBILITY REPORT FOR DANKARI BLACK STONE QUARRY EXTENT-4.00Acres PLOT NO-600, KHATA NO-221 SAIRAT CASE NO-74/ VILLAGE: DANKARI, TAHSIL: DHARMASALA DISTRICT: JAJPUR, STATE-ODISHA. LESSEE M/S S.T. MINERAL PVT LTD PLOT NO.-403 ACRUX GOKUL PLAZA CUTTACK ROAD BHUBANESWAR STATE-ODISHA

2 Chapter 1. Executive Summary Auction holder M/S S T Minerals Pvt. Ltd. of Dankari black stone quarry is a private Limited firm having its office At Plot No , Acrus Gokul Plaza, Cuttack Road, Bhubaneswar of Odisha state. The Dankari black stone quarry was initially executed earlier by so many auction holder these are the sairat sources coming under revenue department to perform the auction procedure and to award the highest bidder to execute the quarry. M/S S T Minerals Pvt. Ltd. has awarded the Dankari Black stone Quarry having area of 4.00 acares Kisam Pahad, with sairat case No -74/14-15 khata No 221, Plot No 600 for a period of 1 year. As per MOEF notification dated 24 th December 2013, the provision of mineral conservation and development rules 1988 mining plan has been repaired by RQP Shri Sushanta Kumar Mishra, RQP/BBS/049/2004/A. The method of mining indicated in the mining plan is semi-mechanised open cast working with bench wise development. There is no any forest land within the vicinity of working. The total mineable reserve of black stone is 3,96,900Cum, it has been planned to produced 41,437.5 Cum during the lease period by open cast semi-mechanised mining along strike direction and both in east & west direction as per MOEF this project is coming under B2 category where both pre-feasibility report and approve mining plan is required for miner mineral environmental clearance of Dankari black stone quarry.

3 Chapter -2 Introduction of the Project / Background information I)Identification of project and project proponent. In case of mining project, a copy of mining lease letter of intent should be given. For Dankari black stone quarry of M/S S T Minerals Pvt. Ltd.is situated in Village Dankari, PO Mahisara, Tahasil Dharmasala, Dist. Jajpur of odisha state. The area is featured in the Survey Of India Topo Sheet No. F45U1, Latitude: N min second to N min 41.4 second, Longitude: E min second to E min second. The mining lease of Dankari black stone quarry mine was granted as auction holder to M/S S T Minerals Pvt. Ltd. for a period of one year. The auction awarded paper (quarry lease) is attached. ii) Brief description of nature of the project. The Dankari black stone quarry is a mine for exploitation of stone boulders. The production is proposed 41,437.5 Cum during the lease period. The expansion of the quarry project under reference has got its importance because it is mainly used in civil work like major projects and infrastructure development so to meet the market potential and cost to cost basis semimechanised method of mining is feasible. 2 P a g e

4 iii) Need for the project and its importance to the country and or region. The major use of boulder stone of dankari black stone quarry for stone crushers situated in Jajpur district. Those stone crushers are the major suppliers to the nearby upcoming Tata projects in Kalinga Nagar Steel Complex, East Coast Railway, National High Way, State High way and Paradip port Trust, Jetty development work. So the development of Jajpur district and nearby districts also depends upon Dankari black stone Quarry. This has necessitated the enhancement in production of raw materials to cater the demand and also these value added product will fetch more royalty and revenue to the state as well as to the country as a whole. iv) Demand-Supply Gap The relationship between demand and supply underlie the forces behind the allocation of resources. In market economy theories, demand and supply theory will allocate resources in the most efficient way possible. As per estimation the granite black stone production in the country is not matching the growing consumer demand this clearly show the gap between the demand and supply of boulder stone materials. To minimise the gap auction holder has initiated to enhance the production the stone quarry. 3 P a g e

5 v) Imports vs. Indigenous Production. Development of infrastructure growth of a country depends to a great extent on the availability of economic minable minerals. This minor minerals of black stone quarry plentily available in Jharkhand, Chhattisgarh, Odisha and west Bengal. Our quality of black stone granite is much better than the material available in other states and abroad it is less cost if the stone quarry material available, if we will import the said material its cost will be three times more than the available black stone material in our state because of logistic cost. vi) Export Possibility Earlier our country exported hues quantity of granite stones to middle east, European and Arab countries for their infrastructure developments projects but now our country and regional local demand prevents us to export the building stone materials to other country. The major projects depend upon the Dankari black stone quarry is given below. 1. Tata Steel Ltd. Kalinga Nagar, Jajpur. 2. NH 215, NH 5 Expansion road and bridge work. 3. Dhamara & Paradip port Trust. 4. The BRPL Project. 5. IOCL, Paradip. 6. Essar Steel Ltd, Paradip. 4 P a g e

6 vii) Domestic / Export Markets. The Quarry project is design to meet 100% of the demand of the domestic market the total quantity of 41,437.5 Cum is proposed during the plan period produced from the lease from the shall be consumed in the domestic market. viii) Employment Generation (Direct & Indirect) due to the project. The mining operation is carried out by semi- mechanised method having the total employment of 35 persons direct & indirect means including or ricers labours & supervisory staffs. 5 P a g e

7 Chapter 3 Project Description i)type of project including interlinked and interdependent projects, if any. Our stone quarry projects are mainly for exploitations of boulder stone. The present project is well connected by roads to all important construction sites of the local area and inside the states it is not link or dependant or any other project so far us the production of black stone us concern. I)Location (Map showing general location, specific location and project boundary & project site layout with coordinates. Dankari black stone quarry is coming within the survey of India Topo Sheet No. F45U1, Latitude: N min second to N min 41.4 second, Longitude: E min second to E min second. The Subject area is marked on Indian Topo Sheet No and it is F45U1 enclosed in location cum key plan (plat-!). The village map showing the khata No. Of the lease area, is enclosed in plate II). The area is located at a distance of 20 KM from NH - 5 at Chandikhole. Chandikhole is the nearest place to the lease for all infrastructure facilities like hospital, school, bus service and market. The nearest railway station is Haridaspur which is 10 KM from the mine site. It Comes under Dharmasala Police station. 6 P a g e

8 a) Details of alternate sites considered and the basis of selecting the proposed site particularly the environmental consideration gone into should be highlighted. As far the environmental consideration the lessee is abiding by all relevant acts and rule provisions of environmental protection act. There is no environmentally fragile area such as century or biosphere reserve within the 10 KM radios of the applied area. There is no endangered or rare species are found in the above lease hold area. i) Size or magnitude of Operation. It is proposed to produced the black stone of 41,437.5 Cum during the lease period. ii) Project description with process details (a schematic diagram / flow chart showing the project layout, components of the projects etc. Should be given.) Production during the 1 year will be about 41,437.5 Cum. The details of development and production are given in the following table. Year Section Area In Sq. m Length of Influen ce in Mts Volume in Cum Ore in Cum O.b 15% In Cum Bulk density Ore In Mts P a g e

9 OPERATIONAL FLOW SHEET OF DANKARI BLACK STONE QUARRY OF M/S S T MINERALS PVT. LTD. PLANNING SITE PREPARATION & ROAD WAY TO HILL TOP REMOVAL OF TOP SOIL EXPOSURE OF GRANITE BLACK STONE FACE MARKING OF DRILLING PATTERN DRILLING OPERATIONAL CLEANING CHARGING OF DRILL HOLES BY EXPLOSIVE BLASTING OPERATION ENGAGEMENT OF ROCK BREAKER FOR UNIFORM SIZING LOADING AND DISPATCH FOR MARKETING 8 P a g e

10 Keeping a proposed production target of 41,437.5 Cum per annum the development of the ensuring 1 years has been proposed. The year wise production planning waist generation already mentioned in the table. The projected year wise production planning is projected based on the following parameters. i) The slope of the individual bench will be almost vertical where as the overall pit slope will be less than 45 degree. ii) The height of the benches will be kept maximum 5 meters and width of the benches is twice of the HEMM width plus 30% clearance. iii) The tones factor is consider to in case of black stone and 1.6 in case of OB. VI) Raw material required along with estimated quantity, likely sources, marketing area of final products, mode of transport of raw material and finished product. This is mining project, so raw material is not required. Here the black stone produced from the mine is the raw material for stone crushers, civil and other construction work. 9 P a g e

11 VII) Resources optimization / recycling and reuse envisaged in the project, if any, should be briefly outlined. During ensuing 1 year proposed production the mine will produce cum of waste including top soil and overburden. The manner of year wise dumping, save of dump along with protective majors and plantation has to be taken up phase wise manner. VIII) Availability of water its sources, Energy / power requirement and source should be given. The ground water level of the area, observed from open wells, tube wells, nallas, nearby quarry and ponds within 5 km radius of the mining lease hold area during monsoon and perk summers. Water required for domestic purpose, will be sourced from ground water, i.e. bore well. Consumption of water (Domestic) It is estimated that about 1000 litre per day water will be required for domestic purpose. Consumption of water for mining Activities and Plantation. About 6000 litres per day of water will be required for sprinkling purpose to suppress the dust and another 7000 litre per day will be required for the plantation. 10 P a g e

12 Total Consumption of water. A total of = litre per day of water is required at the mine site daily for domestic as well as non- domestic purposes. IX) Quantity of wastes to be generated (liquid and solid) and scheme for their management/disposal. During ensuing 1 year proposed production the mine will produce cum of over burden waste. Year Top Soil in Cum Over Burden Waste Total in cum in Cum First NIL Total NIL Waste Management Waste materials likely to be generated are a total of cum during the lease period. Toxic elements from the solid waste material are not expected. To control erosion in the proposed waste dump, regular compaction development of terraces and vegetation are proposed. Also the retaining wall and garland drain for the proposed waste dump will be constructed to arrest wash offs from the dump. It is proposed to construct both the retaining wall and garland drain during the lease period. 11 P a g e

13 Top-Soil: As the out crop is mainly hard granite and very little quantity of top soil available with overburden in the hill. Sub-Grade Dump: There is no generation of sub grade material in this plan period. Tailing Dump: As there is no proposal for processing plant within the lease area, management of tailing dam does not arises. X) Schematic representation of the feasibility drawing which give information of EIA purpose. Location plant and surface plan are attached to give information about the surrounding & inside the lease hold. 12 P a g e

14 Chapter - 4 Site Analysis i) General Dankari Black stone quarry of M/S S T Minerals Pvt. Ltd.is situated in Village Dankari, PO Mahisara, Tahasil Dharmasala, Dist. Jajpur of odisha state. The area is featured in the Survey of India Topo Sheet No. F45U1, Latitude: N min second to N min 41.4 second, Longitude: E min second to E min second. ii) Connectivity The area is located at a distance of 20 KM from NH -5 at Chandikhole. Chandikhole is the nearest place to the lease for all infrastructure facilities like hospital, school, bus service and market. The nearest railway station is Haridaspur which is 10 KM from the mine site. iii) Land form, Land use and land ownership. The lease hold area bears hilly topography. The mining lease hold area is 4.00 acres contains both Hilly (Kisam _ Pahad) not suitable for agree culture land and situated At - Dankari whose land ownership is Govt. Of Odisha. 13 P a g e

15 iv)topography (along with map). The applied area forms a hilly topography. The highest & lowest contour is 52m RL & 42m RL respectively. One jeepable road runs parallel to western side of mining lease, with minor bends, maximum part of the area is covered by 15% top soil and 85% black stone.the drainage pattern of the area is hilly one, only during rainy seasons the rain water will flow all around. There is no water in and around the area.the area falls in the Survey If India Topo Sheet No. F45U1, Latitude: N min second to N min 41.4 second, Longitude: E min second to E min second.a topo sheet map is attached herewith. v)existing and use pattern (agriculture, non-agriculture, forest, water bodies (including area under CRZ), shortest distances from the periphery of the project to periphery of the forests, national park, wild life sanctuary, eco sensitive areas, water bodies (distance from the HFL of the river), CRZ. In case of notified industrial area, a copy of the Gazette notification should be given. Dankari Black Stone Quarry having area 4 acres (1.618 Hects.) includes nonagriculture land & Waste land. The land use pattern is given below. CLASS REVENUE CLASS AREA IN ACRES IN HECTS. Hilly Area Kisam - Pahad P a g e

16 Bramhani River is bout 10Km and the national park and wild life century is more than 40km and no eco sensitive areas and industrial area situated within 10km from the lease hold area. vi)existing Infrastructure There is no infrastructure developed within 2km around the mining periphery only small hutments present in nearby village which is 3-4km away from the lease hold area. The area is located at a distance of 20 KM from NH - 5 at Chandikhole. Chandikhole is the nearest place to the lease for all infrastructure facilities like hospital, school, bus service and market. The nearest railway station is Haridaspur which is 10 KM from the mine site. The postal and telephone facility is available in Chandikhole and Dharmsala. vii)soil Classification As no toxic substance will be generated or involved, the impact on soil quality is not likely to be more intensive than the existing level. However the dust generated during operation of mining activity like excavation, loading, unloading and vehicular movement normally constitute heavier particles that would readily settle on very small areas within the mines itself and due to water sprinkling arrangement the emission of dust reduced. viii) Climatic data from secondary sources The area has a topical climate. The peak summer will be in month of May. During the summer the temperature varies from 40 0 c to 44 0 c.the winter will be effective in this area. The lowest temperature during the winter is between 15 P a g e

17 12 0 c to 18 0 c. Rain fall is normal in this area. There is no flood due heavy rain or river. ix)social Infrastructure available Dankari black stone quarry lease area is located near village Dankari in the district of Jajpur Odisha. Primary school level education is available at Baramana Village at the distance of 2.5Km from the lease hold area. Hospital, Bank and college level education is available at Chandikhole at a distance of 20km from the lease area. Electricity and telecommunication and railway facility are available at Haridas Pur 10km from the lease area. Nearest airport (Biju Pattnaik Airport Bhubaneswar) is 110km away from lease area. Nearest port (paradip port ) is about 89km away from lease area. 16 P a g e

18 Chapter -5 Planning Brief (I) Planning Concept (type of industries, facilities, transportation etc.) Town and country Planning/development authority Classification. First by the excavator one road way has to make for transportation of man and material to the working point. The top soil has to be excavated and kept separately for back filling or reclamation purpose. The granite black stone has to be thoroughly cleaned by excavator and then drilled as per the specification taking into account of spacing and burden the height of the drill hold has to decide then the holes are cleaned by compressed air.after that the holds are charged by explosives like gun powder or ANFO and steamed properly after the safety fuse and detonator in shorted in the holes. In multi row blasting for vibration control and good fragmentation mille second delay detonators are used. When finally the circuit examined, all clear signals has to ensured after establishing the danger zone 500mts radius around the blasting sport. As per the scheduled blasting time fixed by the authority the charged holes fired. The big stone maxes the further fragmented into bolder of various sizes from 150mm to 600mm size by engaging rock breaker attached with crawler mounted excavator. When the desired size is ready then it has to be loaded and transported day by day because the process starts from hilltop towards bottom of the heal with the number of working pits. After removing the black stone the void area has to be filled by the top soil for reclamation and green belt creation purpose. 17 P a g e

19 (II) Population Projection: For the production of 41,437.5 cum of black stone the following personal to be deployed. Sl No category Strength 1 Mine Manger 01 2 Driver 04 3 Mine mate 01 4 Supervisor 02 5 Operator 02 6 Labour 23 7 Helper 02 Average Black Stone production per annum= 41,437.5cum/Annum Working days in the Year= 250days Per Day production = cum. Total Manpower=35 OMS= 4.73 cum/sift. 18 P a g e

20 (III) Land use Planning (breakup along with green belt etc.) Out of total leasehold are of 4acre (1.618heac) the land use planning for the said area is given below. Sl. No. Particulars Area put to use (in hects.) 1 Area under excavation Area for plantation Area for dump Total Area in use Area under which financial assurance is computed = = Ha. Afforestation During this plan period 0.42 ha. Land will be used for plantation process along the lease boundary 40 nos of sapling proposed to be planted in spacing of 2.5 m. 2.5m. The species to be planted are Neem, Nilagiri, sal, teak etc. 19 P a g e

21 Plantation Program during the plan period Year Area in hectares No of saplings Types of plants 1 st Neem & Nilagiri sal, teak etc. IV) Assessment of Infrastructure Demand (Physical & Social) The required infrastructural facilities like mine office, rest shed, first-aid enter and drinking water facilities, mess canteen, store room of mining equipment etc. are not currently available within the lease hold area as it is a new project. Other social infrastructure will be developed like employment of local people in the mines, provision of communicational educational & medical facilities, sanitation, family planning, provision & supply of clean & whole sum drinking water capacity buildings etc. V ) Amenities / Facilities Helments, safety shoes, ear plugs, spectacles, gloves etc will be provides to the labour to save their body parts while working. Rest shed will be provided to take rest in lunch period. Vocational training will be provided to the labours by trained executive to work safety in the mine. First-aid as well as medical facilities will be made available in the mine or to take care of the health. In 20 P a g e

22 addition of these, following amenities / facilities will be provided to the local communities in due course of time during operational period. a) Improvement in cultural status through vocational training and recreational facilities. b) Co-operative and fair price shops. c) Parks and gardens for recreational entertainment. d) Public health amenities. e) Sports. f) Greening of the area outside the lease area. 21 P a g e

23 Chapter -6 Proposed Infrastructure I) Mining area (Processing area) At present ha. area is proposed excavated during the plan period. Residential Area ( Non processing area) Office, rest shed-cum fast aid centre etc. will be made available in the lease area for day to day mine operation. since the lease area is near the P.S Haridaspur, in the infrastructural facilities in respect road, market, telephone, power etc. are well developed electricity will be made available for office and quarters in the M.L area. Accommodation or housing As far as experience is concern, local people will work in the mind staying in their own villages. Accommodation and housing will be provide to the essential workers near the M.L area. Rest shed and Fast-Aid facilities. The rest shed will be provided near quarry site as per the mines rule56, toilet, First-aid and lunch facilities will be attached with the rest shed. Magazine There is no proposal for construction of magazine in the M.L area. Alternatively, blasting will not be carried out due to float deposition 22 P a g e

24 II)Green Belt It is a mining project. A green belt is proposed along /Inside the lease boundary to form a barrier mainly for dust flow control. During this plan period 0.42 ha. Land will be used for plantation process along the lease boundary 40 nos of sapling proposed to be planted in s spacing of 2.5 m. 2.5m. The species to be planted are Neem, Nilagiri, sal, teak etc. III) Social Infrastructure. There is provision for develop the social infrastructure like employment of local people in the mines, provision of communicational, educational and medical facilities,emitation,family planning, provision and supply of clean and wholesome drinking water capacity building etc. IV) Connectivity (Traffic and transportation road/rail/water ways etc.) The area is located at a distance of 20 KM from NH-5 at Chandikhole. Chandikhole is the nearest place to the lease for all infrastructure facilities like hospital, school, bus service and market. The nearest railway station is Haridaspur which is 10 KM from the mine site. Nearest airport (Biju Pattnaik Airport Bhubaneswar) is 110km away from lease area. Nearest port (paradip port ) is about 89km away from lease area. V)Water quality management Working benches will be kept free from loose overburden/waste materials. Check dam will be constructed around the dump to prevent washing off of the 23 P a g e

25 loose sediments. All the drainage system used for surface flow water will be cleared off and will be utilized for the natural flow of rain water from the very beginning of 1 st year working. Settling of surface run off will be provided for in settling tank to separate suspended particulate matter from the same. It is anticipated that no perceptible impact on water regime will take place during the working of the mine. VI) Air Quality Management No industrial activities within 5Km radius of the lease area. Therefore air pollution are felt to be below the permissible limit. Impact on air quality due to mining will be reduced by water sprinkling arrangement on haul roads, working phase, loading and unloading point s etc. A thick green belt also check the fugitive dust movements outside the lease hold area VII) Waste Management About Cum waste will be generated during the plan period and waste will be staged on the east side f the mine lease area. VIII) Top-Soil Management There will be no generation of top soil after 1yr workings, If Top Soil will be available it has to be kept separately and used as soling material over the over burden dump for reclamation and plantation purpose. 24 P a g e

26 IX) Tailing Dam Management There is no proposal for any processing plant within the lease area, so management of tailing dam does not arriving. X) Disposal of Mining Machinery There will be no disposal of machineries during 1 st yr. XI) Safety and Security Safety and security will provide to the mine as for statutory requirement. a) Mining area will be fenced off to prevent falling down of man, animals and materials. b) A guard will be employed to prevent theft c) Danger Zone of 500mtrs and blasting time should be marked and displayed in the board for safety during blasting. XII) Disaster and Management and Risk Assessment It is a small mine, there is no chance of disaster or any major type of risk factor in case of any disaster, except natural calamities like(earthquake,cyclone, landslides etc.) The mine owner will be responsible. The address as given below. 25 P a g e M/S S T Minerals Pvt. Ltd. Plot No Acrux Gokul Plaza Cuttack Road, Bhubaneswar Dist- Khurda, State-Odisha

27 Geo logical and climatic hazards such as landslide, subsidence and inundation is not expected owing to the competence of strata available in the area Though earthquake is felt several times in Orissa, damage to man and material has not been accrued to this part of area Keeping in view the past occasions flooding is not expected as the area is located in hilly terrain much above the HFL of the area. No mine fire is possible, since erupt on of inflammable gas in the workings is remote possible. XIII) Care and Maintenance During temporary discountenance Temporary discountenance may happened to various causes such as o Court order o Natural calamities o Accident (Mine related) o Slope Failure o Failure in fulfilment of statutory requirement o Local issue of 26 P a g e

28 o Any other unforeseen circumstances Since it is a temporary discontinuance, the following measures can be undertaken partly /fully depending open the causes. o Intimation to local mine and legal administrative authorities regarding the discontinuance o Preparation of the machine and materials o Tightening the securities at the time of discontinuance o Repair and maintains of haul roads o Regular monitoring of air, water, noise etc. in the permitted area and inspection of quarry working by competent persons. XIV) Power requirement and supply/source Fuel (Diesel would be used for operating equipment and heavy machinery) 27 P a g e

29 Chapter -7 Rehabilitation and resettlement (R&R) Plan I) Policy to be adopted (central/state ) in respect of the project affected persons including home outstees,land outstees and land less labourers (a brief outline to be given). There is no human settlement in the applied lease area which is entirely located in Government land (kisam-padad) is over 1.618ha. Therefore rehabilitation and resettlement proposal is not required. Plantation work is carried out in the area from time to time and shall continue in future also on yearly basis, as a part of rehabilitation to maintain and improve the ecology of the area. 28 P a g e

30 Chapter -8 PROJECT SCHEDULE & COST ESTIMATES a)likely date of start of construction and likely date of completion (Time schedule for the project to be given) Since the geological reserve is sufficient enough, therefore question of time scheduling for abandonment does not arise at present. b) Estimated project cost along with analysis in term of economic viability of the project. Remediation / Mitigation measures : An area of 0.03Cum is proposed for conceptual dumping. Total cost required for constructing check-dam, garland drain and reclamation and rehabilitation of dumps through plantation are calculated as follows. i)construction of check dam : Taking an average length of 27m total amount required will be Rs. Rs.44/- per meter. Size of the check dam will be 27m 9m(length) 2m (width) 1.5m (height) ii) providing garland drain :- Taking an average length of 45m. total amount required will be per meter. Dimension of the garland drain will be of 45m (length) 1m (Width) 1m (Depth) 29 P a g e

31 iii) Total amount required under item no. i&ii comes to be Rs.1200/- + Rs.900/- = Rs.2100/- iv) Standard cost norm for enrichment of plantation per hectares is as under: a)pre-planning & NURSERY Sl. No. 400 plants / hectare Wage Rate Rs. 80/- Item of work Mandays required Amount (In Rs.) 1 Site Preparation Alignment & Stacking Cost of stacking materials 4 Nursery cost of Pitting Total/Ha Rs P a g e

32 b)creation AND MAINTENANCE : 1 Carriage & Planting Weeding and soil working 3 Application insecticide 1 80 (thrice) 4 Fire line tracing inspection path 5 Cost of tantalizer & 1 80 insecticides 6 Watch & ward Sub Total 1040 Grand Total 2960 Reclamation and rehabilitation of workings: i) Waste available during planned period = 4500cum ii) Cost required for levelling and compaction of 1 Rs.1,000/- per hectares = Rs.1,000/- iii) Cost required for rehabilitation by way of vegetation in backfilled area above 1 Rs.1,000/- per hectares = Rs.1,000/- 31 P a g e

33 Total amount required for reclamation And rehabilitation = Rs.2,000/- Administrative Management : i) Fees to be paid for preparation of closure plan procurement of information and data from various institution / organisation is Rs. 1,000/- ii) Salary and wages of supervisory and managerial personnel for maintenance and monitoring activities for 3 months Rs.2314/- per month. iii) Total amount requirement under administrative expenditures is Rs.7,940/- Financial Assurance : Area under which financial assurance is computed Sl. No. Particulars Area put to use in Hect. 1 Area under excavation Area for Plantation Area for Dump 0.03 Total Area in Use = = Hect. The deposit is proposed to be worked as a category B2 mine. Financial assurance will be given as Bank Guaranty as decided by the competent authority. 32 P a g e

34 Chapter 9 Analysis of Proposal (Final Recommendations ) Financial and social benefits with special emphasis on the benefit to the local people including tribal population, if any, in the area. Due to mining activities in the M.L. area, 35 nos. of persons, who includes technical, supervisory, other highly-skilled & skilled category, including the present and proposed employment potential some more persons may be associated with this projects to carry out some other developmental jobs as per need-base from time to time. Satellite income such as shopping, supply of foods items, tailoring, hotelling etc. are extra. Medical, transport, communication facilities including the purchase facilities and cultural improvement will be developed. Moreover the general awareness and lifestyle of the people in the area will be improved. The support extended in the field of education, medical facilities, recreation facilities shall improve the normal status of the living of the local inhabitants. The members of the family of the employee shall also get proportionate benefit out of it. 33 P a g e

2. PRE-FEASIBILITY REPORT

2. PRE-FEASIBILITY REPORT 2. PRE-FEASIBILITY REPORT 2.1 Executive Summary The proposed project is Building stone quarry having lease area of 0.809 ha and falls under Category- A as per EIA Notification 2006 and its amendments of

More information

2. PRE-FEASIBILITY REPORT

2. PRE-FEASIBILITY REPORT 2. PRE-FEASIBILITY REPORT 2.1 Executive Summary The proposed project is Building stone quarry having lease area of 1.214 ha and falls under Category- A as per EIA Notification 2006 and its amendments of

More information

Pre- FEASIBILITY REPORT

Pre- FEASIBILITY REPORT Pre- FEASIBILITY REPORT In Respect Of JHILIMINDA SAND BED OVER 20.30 ACRES OR 8.215 HA IN VILLAGE JHILIMINDA, ATTABIRA TAHASIL OF BARGARH DISTRICT, ODISHA (For the Financial Year-2015-16 to 2019-20) Prepared

More information

PRE- FEASIBILITY STUDY REPORT. M/s. SAI MINERALS

PRE- FEASIBILITY STUDY REPORT. M/s. SAI MINERALS PRE- FEASIBILITY STUDY REPORT FOR M/s. SAI MINERALS BLACK TRAP MINING (AREA 04-00-00 HECTARE) OF APPLICANT (Mr. AMARJITSINH R. VARACHHIYA) (PARTNER) AT SURVEY NO: 13, AT: ASHNAVI, TAL: JHAGADIA, DIST:

More information

Pre-feasibility Report

Pre-feasibility Report 1.0 INTRODUCTION EXECUTIVE SUMMARY Balanga Sand Bed over an area of 12.50Ac./5.06Ha. of, Sri Nilamani Behera is located in village Uthaninuagaon, under Tahasil- Badasahi in Mayurbhanj district of Odisha.

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT PRE FEASIBILITY REPORT ON NAFRI STONE QUARRY NO.2 (IN MAYURBHANJ DISTRICT OF ODISHA) Lease Area: 4.97 acres or 2.01 Ha. of Sri Shyamsundar Bhattar & Others Baripada EXECUTIVE SUMMARY CHAPTER 1 Nafri Stone

More information

Pre- FEASIBILITY REPORT

Pre- FEASIBILITY REPORT Pre- FEASIBILITY REPORT In Respect Of SRIPURA SAND BED-BOVER 35.25 ACRES OR 14.265 HA IN VILLAGE SRIPURA, JHARSUGUDA TAHASIL OF JHARSUGUDA DISTRICT, ODISHA (For the Financial Year-2015-16 to 2019-20) Prepared

More information

PRE- FEASIBILITY STUDY REPORT

PRE- FEASIBILITY STUDY REPORT PRE- FEASIBILITY STUDY REPORT FOR RAJNIKANT GORDHANBHAI CHANIYARA PROPOSED BLACK TRAP MINING (AREA 03-00-53 HECTARE) OF APPLICANT (Mr.Rajnikant Gordhanbhai chaniyara) (PAWOR OF ATTORNEY) AT BLOCK NO: 66

More information

PRE - FEASIBILITY REPORT

PRE - FEASIBILITY REPORT PRE - FEASIBILITY REPORT FOR OBTAINING PRIOR ENVIRONMENT CLEARANCE TO Building Stone MINING ACTIVITY FOR CATEGORY B3 UNDER THE EIA NOTIFICATION 3006 AMENDED ON 31/05/3013 TO 1.97.58 SHREE SHAH ENGINEERING

More information

PRE-FEASIBILITY REPORT

PRE-FEASIBILITY REPORT PRE-FEASIBILITY REPORT OF MASONRY STONE (CHEJA PATTHAR) MINING PROJECT (ML Area: 1.0 ha, M.L. No. 65/2011, Production Capacity-1, 11,780 TPA) Near Village: Gangora, Tehsil: Pahari, District: Bharatapur

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT PRE FEASIBILITY REPORT In Respect Of MAHUMUHAN STONE MINE 9 OVER 2.00 ACRES (0.81 HECTARE) IN VILLAGE MAHUMUHAN, SORO TAHASIL OF BALASORE DISTRICT, ODISHA (FOR THE PERIOD: 2015 16 TO 2019 20) APPLICANT

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT PRE FEASIBILITY REPORT for PROPOSED PROJECT FOR SOIL MINING of M/s. BHAVINKUMAR VINODBHAI LAD SURVEY NO. 98, MOJE ANCHELI, TAL. BARDOLI, DIST. SURAT, GUJARAT 1 CONTENTS Sr. Description Page No. No. 1.

More information

Pre- FEASIBILITY REPORT

Pre- FEASIBILITY REPORT Pre- FEASIBILITY REPORT In Respect Of SARANKOTE STONE QUARRY OVER 2.40 ACRES OR 0.971 HA IN VILLAGE SARANKOTE, BARKOTE TAHASIL OF DEOGARH DISTRICT, ODISHA (For the Financial Year-2015-16 to 2019-20) Prepared

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT PRE FEASIBILITY REPORT FOR M/S. AMRUT STONE QUARRY (AREA 2.57 HECTARE) OF APPILCANT MR. RAJNIKANT BHAGWANJIBHAI KATHIRIYA (Partner) AT BLOCK NO: 98,VILL: ZAB, TAL: MANDVI, DIST: SURAT 394163 GUJARAT. 1

More information

Pre- FEASIBILITY REPORT

Pre- FEASIBILITY REPORT Pre- FEASIBILITY REPORT In Respect Of KAIPADAR NEW BUILDING STONE QUARRY (KHA) OVER 7.50 ACRES OR 3.00 HA IN VILLAGE KAIPADAR, KHURDA TAHASIL OF (For the Financial Year-2015-16 to 2019-20) Prepared on

More information

Pre- FEASIBILITY REPORT

Pre- FEASIBILITY REPORT Pre- FEASIBILITY REPORT In Respect Of KAIPADAR NEW BUILDING STONE QUARRY (GA) OVER 2.50 ACRES OR 1.00 HA IN VILLAGE KAIPADAR, KHURDA TAHASIL OF KHURDA DISTRICT, ODISHA (For the Financial Year-2015-16 to

More information

PROPOSED TERMS OF REFERENCE

PROPOSED TERMS OF REFERENCE PROPOSED TERMS OF REFERENCE ABOUT THE PROJECT: Rampura Marble Mine (ML No.- 420/91) is proposed by M/s Continental Minerals Pvt. Ltd. The Mine Lease area consists of 3.0 ha, which is located at Khasra

More information

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN ENVIRONMENT MANAGEMENT PLAN FOR VILLAGE TEHSIL DISTRICT AREA MINERAL : Makrohar : Mada : Singrauli (M.P.) : 1.00 hect : Metal Stone KHASRA No : 176,178 PRODUCTION CAP : 15375 Cu.mt/year Metal Stone APPLICANT

More information

Project Details- Minor Minerals (Other Than Sand)

Project Details- Minor Minerals (Other Than Sand) Project - Minor Minerals (Other Than Sand) Sr. ABOUT THE PROPOSAL 1. Name of Lease Holder M/s. KARMANBHAI JODHABHAI RABARI (Partner) 2. Location address Mr. Karmanbhai Jodhabhai Rabari Survey No- 194 Paikee,

More information

NUAGADA STONE QUARRY Village: Nuagada,Tahasil: Hinjilicut,District: Ganjam, State: Odisha

NUAGADA STONE QUARRY Village: Nuagada,Tahasil: Hinjilicut,District: Ganjam, State: Odisha PRE FEASIBILITY REPORT NUAGADA STONE QUARRY Village: Nuagada,Tahasil: Hinjilicut,District: Ganjam, State: Odisha Sri Kailash Chandra Goud At-Sompur PO- Hinjilicut Dist: Ganjam (Odisha) Chapter -1 1.1 EXECUTIVE

More information

Pre- FEASIBILITY REPORT

Pre- FEASIBILITY REPORT Pre- FEASIBILITY REPORT In Respect Of (For the Financial Year-2015-16 to 2019-20) Prepared on Behalf of SRI ANTARYAMI BISWAL Chhend, Rourkela, Dist-Sundargarh, Odisha PREPARED BY The Techno Chamber, Plot

More information

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN ENVIRONMENT MANAGEMENT PLAN OF M/s Baghel Infrastructure Pvt. Ltd. AT Khasra No 1203/1 Vill- Makrohar, Tehsil-Mada, District-Singrauli (M.P.) Production Capacity: 8158Cu.mt/year Metal Stone Area 1.00 Hectare

More information

NIMAPALLI STONE QUARRY

NIMAPALLI STONE QUARRY EIA/ EMP NIMAPALLI STONE QUARRY Village : Nimapalli Tahasil : Purushottampur State : Odisha Lease Area - 4.046 Ha Screening Category B2 SRI SANJAY KUMAR NAYAK At- Pallyama, Dist : Ganjam (Odisha) CONTENTS

More information

M/s. Karshanbhai Bhagvanbhai Rabari

M/s. Karshanbhai Bhagvanbhai Rabari PRE FEASIBILITY REPORT FOR M/s. Karshanbhai Bhagvanbhai Rabari Black TRAP MINING (AREA 1.00 HECTARE) OF APPLICANT Mr. Karshanbhai Bhagvanbhai Rabari (Proprietor) AT Survey No. 194 Paikee, Vill: Thoriyali,

More information

Project Details-Minor Minerals (Other Than Sand)

Project Details-Minor Minerals (Other Than Sand) Project Details-Minor Minerals (Other Than Sand) Sr. No. Details Particulars ABOUT THE PROPOSAL 1. Name Of lease Holder M/s. Kirtikumar Samji Sengani 23 0'27.43"N 69 24'10.21"E 2. Location address Survey

More information

Project Details- Minor Minerals (Other Than Sand)

Project Details- Minor Minerals (Other Than Sand) Project - Minor Minerals (Other Than Sand) Sr. ABOUT THE PROPOSAL 1. Name of Lease Holder M/s. ABDUL MUNAF MOHAMMEDMIYA MALEK Mr.Abdul Munaf Mohammedmiya malek (Proprietor) 2. Location address OPP Block

More information

Environment Management Plan

Environment Management Plan Environment Management Plan FOR Mining of Agariya Crusher stone Quarry Area-4.00,Hectare Kh No-141/3/1,141/4,141/5 At Village- Agariya, Tehsil: Gouharganj Distt. Raisen SHRI. ASHOK SHARMA S/O SHRI GANGAPRASAD

More information

Proposed Terms of Reference for EIA studies

Proposed Terms of Reference for EIA studies 1 Proposed Terms of Reference for EIA studies Base line data collection will be collected for the Post-Monsoon season 2016 (September to November 2016) in study area and 10 kms radius from project site.

More information

APPENDIX I. (See Paragraph-6) FORM 1

APPENDIX I. (See Paragraph-6) FORM 1 APPENDIX I (See Paragraph-6) FORM 1 (I) Basic Information S.. Item Details 1. Name of the Project/s Dankari Granite Black Stone Quarry 2. Sl. in the schedule Sairat case no- 91/ 12-13 3. Proposed capacity

More information

Environment Management Plan

Environment Management Plan Environment Management Plan FOR Mining of Sildhara Flage Stone Quarry Area-.1.50,Hectare Kh No-87 At Village- Sildhara, Tehsil Panna, Distt.Panna MR.BRIJMOHAN SINGH S/O SHRI JAI RAM SINGH RESI-VILLAGE

More information

2x800 MW Thermal Power Project Near Village Paraspani, Tehsil Pathargama, Godda- District By Adani Power (Jharkhand) Limited

2x800 MW Thermal Power Project Near Village Paraspani, Tehsil Pathargama, Godda- District By Adani Power (Jharkhand) Limited (IV) Proposed Terms of Reference for EIA Studies Project Category Project Proponent Location Paraspani Thermal Power Plant (2x800 MW) Coal based Thermal Power Project A [1(d) Thermal Power Plant 500 MW]

More information

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN ENVIRONMENT MANAGEMENT PLAN OF Shri Kuldeep Choudhary AT Khasra No.Part of 112 Vill.-Golpura, Tehsil-Gandhwani, District-Dhar (M.P.) Production Capacity: 4543 Cu.mt/year Basalt Stone&4543 Cu.mt/year Murram

More information

ENVIRONMENTAL MANAGEMENT PLAN :-

ENVIRONMENTAL MANAGEMENT PLAN :- ENVIRONMENTAL MANAGEMENT PLAN :- The Environment Management Plan (EMP) is required to ensure sustainable development in the area of the proposed project. Hence it needs to be all encompassive plan for

More information

How To Conduct An Environmental Impact Assessment

How To Conduct An Environmental Impact Assessment Proposed Terms of Reference for EIA studies 1. Introduction The proposed expansion of Bulk Drugs & Intermediates manufacturing unit by M/s. Sri Krishna Pharmaceuticals Limited (Unit V). is located at Plot

More information

Fauna- No particular type of fauna finds except snakes, hynus & Jackals, wild cat, wildhen etc. are found in and around the area.

Fauna- No particular type of fauna finds except snakes, hynus & Jackals, wild cat, wildhen etc. are found in and around the area. Environmental Management Plan Baseline information Topography:- The general slope of the area is towards east and gently sloping from 25 0 to 30 0 except southern part which is sloping towards south The

More information

PRE- FEASIBILITY REPORT

PRE- FEASIBILITY REPORT PRE- FEASIBILITY REPORT Applicant: M/s Regaliya Minerals Pvt. Ltd. Page 0 1.0 EXECUTIVE SUMMARY This mining project falls under Category A (presence of interstate boundary between Haryana and Rajasthan

More information

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN ENVIRONMENT MANAGEMENT PLAN FOR VILLAGE TEHSIL DISTRICT AREA MINERAL : Kothi : Pawai : Panna (M.P.) : 1.370 Hectare : Flagstone KHASRA No : 31 PRODUCTION CAP : Max 875 Cu.mt/year Flagstone APPLICANT Shri

More information

Form -1 Mining Plan & Pre-feasibility Report

Form -1 Mining Plan & Pre-feasibility Report Form -1 Mining Plan & Pre-feasibility Report FOR QUARRYING OF GREY GRANITE (EXTENT 1.8.0Ha)-B2 PROJECT S.F.Nos 35/2D, 35/3, 35/2E (P)& 3/1A1 (P) Village Chendarapalli Taluk Krishnagiri District Krishnagiri

More information

ABANDONMENT COST, FINANCIAL ASSURANCE AND PRESENTATION OF THE DOCUMENT. Abandonment cost :

ABANDONMENT COST, FINANCIAL ASSURANCE AND PRESENTATION OF THE DOCUMENT. Abandonment cost : ABANDONMENT COST, FINANCIAL ASSURANCE AND PRESENTATION OF THE DOCUMENT. Abandonment cost : Determining the cost associated with closure and accruing these costs during the life of the mining operation

More information

TERMS OF REFERENCE FOR SCOPING OF EIA STUDY

TERMS OF REFERENCE FOR SCOPING OF EIA STUDY TERMS OF REFERENCE FOR SCOPING OF EIA STUDY Ours project is a proposed large scale unit and categorized as 5(h)-B as per the EIA notification 2006 of MoEFCC, New Delhi and subsequent amendments. Looking

More information

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN 6. REHABILITATION AND RESETTLEMENT (R & R) PLAN Since the project is private land, there is no reserves forest or protected forest land within the applied area. There is no human settlements within the

More information

Final Environmental Impact Assessment of Smt. Singam Bhavani Laterite Mining ADDITIONAL STUDIES

Final Environmental Impact Assessment of Smt. Singam Bhavani Laterite Mining ADDITIONAL STUDIES ADDITIONAL STUDIES 7.0 DISASTER MANAGEMENT PLAN It is presumed that the proposed mining process would be designed and engineered with all possible safety measures and standard code of practices. In spite

More information

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN 1.0 INTRODUCTION ENVIRONMENT MANAGEMENT PLAN The Environment Management Plan has been developed with a view to bring down the levels of impacts during proposed mining activities In each of the areas of

More information

S/o Vishnudas Chakraborty, residence at R/o Narsinghgarh, District Rajgarh (M.P.).

S/o Vishnudas Chakraborty, residence at R/o Narsinghgarh, District Rajgarh (M.P.). RISK ASSESSMENT The Crusher stone deposit lease area is located at Village Badodiya Jagir, Tehsil - Narsinghgarh, District - Rajgarh (M.P.). 02.00 Ha quarry lease area with production of 3306 cubic meter/year

More information

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN ENVIRONMENT MANAGEMENT PLAN LIMESTONE 1. INTRODUCTION: The proposed Bagdhara Limestone area, near Village- Bagdhara, Taluka- Jamjodhpur and District-Jamnagar, Gujarat has been granted to Dipakkumar Anantray

More information

Environment Management Plan

Environment Management Plan Environment Management Plan FOR Quarry Lease of Crusher Stone Area 1.437Hectare, Kh. No. 40/8 KA AT Village: BHAWANDA, Tehsil: SEONI MALWA Distt HOSHANGABAD (M. P.) Proponent M/S JYORI CONSTRUCTION COMPANY

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT PRE FEASIBILITY REPORT PATHARPUNJI STONE QUARRY (PLOT-14) Village: Patharpunji Tahasil: Sheragada, District: Ganjam, State: Odisha Lease Area 1.080 Ha Screening Category B2 Sri Ramesh Swain S/o-Charan

More information

Environment Management Plan

Environment Management Plan Environment Management Plan FOR Mining of Crusher Stone Area 2.000 Hectare, Khasra No. 42/2 Village AT THANWARI Tehsil District State SEONI SEONI MADHYA PRADESH Proponent SHRI LAKHAN LAL S/O SHRI CHETAN

More information

PRE-FEASIBILITY CUM EMP REPORT FOR SAND EXTRACTION PROJECT (FROM RIVER PURNA PAT) FOR. KESHAVBHAI RATANJIBHAI PATEL 150 MT/day

PRE-FEASIBILITY CUM EMP REPORT FOR SAND EXTRACTION PROJECT (FROM RIVER PURNA PAT) FOR. KESHAVBHAI RATANJIBHAI PATEL 150 MT/day A PRE-FEASIBILITY CUM EMP REPORT FOR SAND EXTRACTION PROJECT (FROM RIVER PURNA PAT) FOR KESHAVBHAI RATANJIBHAI PATEL 150 MT/day VILL.:VIRPOR, TAL.: VALOD, DIST.: TAPI INDEX LIST OF CONTENTS CHAPTER DESCRIPTION

More information

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN ENVIRONMENT MANAGEMENT PLAN ENVIrONMENT MaNaGEMENT plan 1. INTRODUCTION: Shri Ratilal Ravji Solanki have a Blacktrap mining lease project for an area of 1.00.00 Ha located on Survey no. 984 paiki, Village:

More information

The Terms of reference (ToR) for conducting Rapid EIA study for the proposed project is described below:

The Terms of reference (ToR) for conducting Rapid EIA study for the proposed project is described below: Proposed Terms of Reference for EIA Study Objective: In order to identify the environmental impacts due to construction and operation of the proposed project and associated facilities, a study will be

More information

FORM -1 MINING PLAN & PRE-FEASIBILITY REPORT. FOR QUARRYING OF ROUGH STONE (Extent: 3.00.0Ha)-B2 Project

FORM -1 MINING PLAN & PRE-FEASIBILITY REPORT. FOR QUARRYING OF ROUGH STONE (Extent: 3.00.0Ha)-B2 Project FORM -1 MINING PLAN & PRE-FEASIBILITY REPORT FOR QUARRYING OF ROUGH STONE (Extent 3.00.0Ha)-B2 Project!!"# $%&'( )!*+ $*, % -!#( # )(!&.* /012 3345 36 7898 ;?DGGMN

More information

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN ENVIRONMENT MANAGEMENT PLAN 1 [Type the company name] ENVIRONMENT MANAGEMENT PLAN LIMESTONE (BUILDING) 1.0. INTRODUCTION: The proposed M/s. Building Lime Stone Mine of Shree Jitubhai Parbatbhai Chudashma

More information

Form -1 Mining Plan & Pre-feasibility Report

Form -1 Mining Plan & Pre-feasibility Report Form -1 Mining Plan & Pre-feasibility Report TO OBTAIN ENVIRONMENTAL CLEARANCE FOR QUARRYING OF BLACK GRANITE (DOLERITE) (EXTENT 2.81.0Ha)-B2 PROJECT IN S.F.Nos 9,80,258/2B,258/6A & 258/6B Village Naduvanapalli

More information

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN ENVIRONMENT MANAGEMENT PLAN Page 33 ENVIRONMENT MANAGEMENT PLAN BLACK TRAP 1.0. INTRODUCTION: The proposed M/s. Black Trap Mine of Govindbhai Karshanbhai Ram area at near Vill.Chuldi, Tal.Malia-Hatina,

More information

PRE-FEASIBILITY CUM DETAIL PROJECT REPORT FOR SAND EXTRACTION PROJECT: 300 MT/DAY (FROM RIVER TAPI PAT)

PRE-FEASIBILITY CUM DETAIL PROJECT REPORT FOR SAND EXTRACTION PROJECT: 300 MT/DAY (FROM RIVER TAPI PAT) A PRE-FEASIBILITY CUM DETAIL PROJECT REPORT FOR SAND EXTRACTION PROJECT: 300 MT/DAY (FROM RIVER TAPI PAT) OF PADMABEN JAYANTIBHAI OAD RESI. AT: VILL: GHALA, TAL: KAMREJ, DIST: SURAT INDEX LIST OF CONTENTS

More information

PROPOSED TERMS OF REFERENCE

PROPOSED TERMS OF REFERENCE Annexure-IV PROPOSED TERMS OF REFERENCE 1.0 Proposed Scope of Work for EIA Study The components of the EIA study include: Detailed description of all elements of the project activities (existing and proposed

More information

GPS BASED TRUCK DISPATCH SYSTEM (TDS) IN HIGHLY MECHANIZED BAUXITE MINES A CASE STUDY.

GPS BASED TRUCK DISPATCH SYSTEM (TDS) IN HIGHLY MECHANIZED BAUXITE MINES A CASE STUDY. GPS BASED TRUCK DISPATCH SYSTEM (TDS) IN HIGHLY MECHANIZED BAUXITE MINES A CASE STUDY. Dr Ashutosh Roul, PhD Senior Manager(Mines),NALCO. NALCO Asia s largest integrated Aluminium Complex, Encompassing

More information

APPENDIX I (See Paragraph -6) FORM I

APPENDIX I (See Paragraph -6) FORM I APPENDIX I (See Paragraph -6) FORM I (I) Basic Information: Sl.. Item Details 1 Name of the project/s Removal of sand from Sand bar SB-G2 2 S.. in the schedule G 3 Proposed capacity / area/length / tonnage

More information

CHANDAM7AIL,P SAND DEPOSIT

CHANDAM7AIL,P SAND DEPOSIT 1 RVER SAND QUARRY 11 ENVRONMENT MANEGMENT PLAN OF CHANDAM7AL,P SAND DEPOST VLLAGE- GHAWDAWAL, TEHSHL- LAltEAR DSTRCT- BMTUD, STATE- MADHYA PRADESH (MASRL4 NO- 1, 10, 15, AREA- 5.975 Hectare APPLCANT Sub

More information

PRE-FEASIBILITY REPORT

PRE-FEASIBILITY REPORT PRE-FEASIBILITY REPORT FOR QUARRYING ROUGH STONE Over an Extent of 0.34.8 Hectares in S.F. No. 22/5A (Patta Land) in Kachchirayanpatti Village, Melur Taluk, Madurai District & Tamil Nadu State 1. EXECUTIVE

More information

ENVIRONMENTAL MANAGEMENT PLAN

ENVIRONMENTAL MANAGEMENT PLAN ENVIRONMENTAL MANAGEMENT PLAN CONTENTS OF ENVIRONMENTAL MANAGEMENT PLAN Chapter Title Page No. 1. INTRODUCTION 1-4 2. PROJECT PROPONENT 1 2.1 Project Location and Accessibility 1 2.2 Infrastructure and

More information

EnVirOnMEnT ManaGEMEnT PLan. FOr. M/S. LiME STOnE MinE OF. Dhirajlal Panchanbhai Vachhani. area. PrOPOSEd PrOdUCTiOn:-36000 TPa

EnVirOnMEnT ManaGEMEnT PLan. FOr. M/S. LiME STOnE MinE OF. Dhirajlal Panchanbhai Vachhani. area. PrOPOSEd PrOdUCTiOn:-36000 TPa EnVirOnMEnT ManaGEMEnT PLan FOr M/S. LiME STOnE MinE OF dhirajlal PanChhanBhai VaChhani area (SUrVEY no.49 PaiKi, ViLL.Unadari, TaL.Una, dis.junagadh) PrOPOSEd PrOdUCTiOn:-36000 TPa PrOJECT COST: - 15

More information

TERMS OF REFERENCE. BEFORE CONSTRUCTION: Sl No TOR RESPONSE 1. Legalities of the land: Is the land The Project is clear from all angles.

TERMS OF REFERENCE. BEFORE CONSTRUCTION: Sl No TOR RESPONSE 1. Legalities of the land: Is the land The Project is clear from all angles. TERMS OF REFERENCE Name of the Project: M/s Suadela Constructions Pvt. Ltd. Address: Sy.No. 321/2B(P),321/2C(P),322/1,323/1(P),323/1(P),323/3,323/4,323/5(P), 323/6,323/7,325/1(P),325/2,327,328/1,328/2(P),328/3,328/4,330,331,332/2

More information

Ratdi Limestone (Building) Mine Location Near Village- Ratdi, Taluka & district Porbandar, (Gujarat) Latitude. 9.0m RL.

Ratdi Limestone (Building) Mine Location Near Village- Ratdi, Taluka & district Porbandar, (Gujarat) Latitude. 9.0m RL. PRE-FEASIBILITY REPORT 1. EXECUTIVE SUMMARY: Particulars Details Project Name Ratdi Limestone (Building) Mine Location Near Village- Ratdi, Taluka & district Porbandar, (Gujarat) Latitude 21 0 73 73.4

More information

ENVIRONMENTAL MANAGEMENT PLAN

ENVIRONMENTAL MANAGEMENT PLAN Of MINING OF BLACK GRANITE 1.0 HA SURVEY NO: 38/11 OF CHINNAGANDLAPALLI VILLAGE, SANTHIPURAM MANDAL, CHITTOOR DISTRICT, ANDHRA PRADESH. By M/s. EVERSHINE GRANITILES LAKSHMIPURAM, KUPPAM, CHITTOOR, ANDHRA

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT PRE FEASIBILITY REPORT. 23 TABLE OF CONTENT Sr. No. Content Page No. 1.0 Executive Summary 25 2.0 Introduction of Project and Background Information 26 3.0 Project Description 28 4.0 Site Analysis 33 5.0

More information

RISK ASSESSMENT. STONE QUARRY (2.40 Ha)

RISK ASSESSMENT. STONE QUARRY (2.40 Ha) RISK ASSESSMENT FOR STONE QUARRY (2.40 Ha) Gat no. 85, A/p Karanjvihire, Tahsil Khed, District Pune, Maharashtra OF M/s Shankar Ramchandra Earthmovers Pvt. Ltd. Risk Assessment for Stone Quarry Mining

More information

PRE FEASIBILITY REPORT & ENVIRONMENT MANAGEMENT PLAN

PRE FEASIBILITY REPORT & ENVIRONMENT MANAGEMENT PLAN PRE FEASIBILITY REPORT & ENVIRONMENT MANAGEMENT PLAN Of COLOUR GRANITE MINE 1.000 HA SURVEY NO: 186/1 OF KUPPIGANIPALLI VILLAGE, GUDUPALLI MANDAL, CHITTOOR DISTRICT, ANDHRA PRADESH. Proposed By M/s. SREE

More information

COMPLIANCE STATUS OF CONDITIONS IMPOSED IN ENVIRONMENTAL CLEARANCE FOR 8.5 MTPA BAUXITE MINING VIDE LETTER NO J-11015/650/2007-IA.II(M),DTD.19.02.

COMPLIANCE STATUS OF CONDITIONS IMPOSED IN ENVIRONMENTAL CLEARANCE FOR 8.5 MTPA BAUXITE MINING VIDE LETTER NO J-11015/650/2007-IA.II(M),DTD.19.02. COMPLIANCE STATUS OF CONDITIONS IMPOSED IN ENVIRONMENTAL CLEARANCE FOR 8.5 MTPA BAUXITE MINING VIDE LETTER NO J-11015/650/2007-IA.II(M),DTD.19.02.09 PROJECT NAME: UTKAL ALUMINA INTERNATIOAL LIMITED. PERIOD

More information

CONTENT LIST PRE-FEASIBILITY REPORT S. NO. CONTENTS PAGE NO. 1.0 EXECUTIVE SUMMARY 1

CONTENT LIST PRE-FEASIBILITY REPORT S. NO. CONTENTS PAGE NO. 1.0 EXECUTIVE SUMMARY 1 CONTENT LIST PRE-FEASIBILITY REPORT S. NO. CONTENTS PAGE NO. 1.0 EXECUTIVE SUMMARY 1 2.0 INTRODUCTION OF THE PROJECT/ BACKGROUND INFORMATION 3 (i) IDENTIFICATION OF PROJECT & PROJECT PROPONENT 3 (ii) BRIEF

More information

Pre-Feasibility Report For Building Stone Quarry Of M/s G T B Enterprises At Sy No: 23, Thammanayakanahally Village, Anekal Taluk, Bengaluru District, Karnataka (Extent- 4-00 Acre) Pre-Feasibility Report

More information

Frequently Asked Questions (FAQs) on Hydropower

Frequently Asked Questions (FAQs) on Hydropower Frequently Asked Questions (FAQs) on Hydropower What are the advantages of Hydropower? A renewable source of energy - saves scarce fuel reserves. Non-polluting and hence environment friendly. Long life

More information

M/s SANGHVI GRUHA NIRMAN PVT. LTD. PROPOSED. REDEVELOPMENT OF BUILDING (JANKI BHAVAN) At

M/s SANGHVI GRUHA NIRMAN PVT. LTD. PROPOSED. REDEVELOPMENT OF BUILDING (JANKI BHAVAN) At M/s SANGHVI GRUHA NIRMAN PVT. LTD. PROPOSED REDEVELOPMENT OF BUILDING (JANKI BHAVAN) At Final Plot No. 1274, situated at T.P.S. IV, Mahim, Hatiskar Marg, Prabhadevi, Mumbai 400 025. EXECUTIVE SUMMARY PREPARED

More information

Form-1, Prefeasibility Report, Mining Plan for Rough Stone for S.F.Nos.: 332/1, 321/1 &

Form-1, Prefeasibility Report, Mining Plan for Rough Stone for S.F.Nos.: 332/1, 321/1 & Form-1, Prefeasibility Report, Mining Plan for Rough Stone for S.F.s.: 332/1, 321/1 & 321/3, THIRUPAIR Village, ULUNDURPET Taluk, VILUPPURAM District Tamil Nadu of THIRU.R. VIJAYAKUMAR. (Extent 0.83.50

More information

ENVIRONMENTAL CODE OF PRACTICE FOR CONCRETE BATCH PLANT & ROCK WASHING OPERATIONS

ENVIRONMENTAL CODE OF PRACTICE FOR CONCRETE BATCH PLANT & ROCK WASHING OPERATIONS ENVIRONMENTAL CODE OF PRACTICE FOR CONCRETE BATCH PLANT & ROCK WASHING OPERATIONS PREPARED BY: DEPARTMENT OF ENVIRONMENT AND LANDS INDUSTRIAL ENVIRONMENTAL ENGINEERING DIVISION APRIL 16, 1992 - TABLE OF

More information

INDEX 1.0 EXECUTIVE SUMMARY... 23

INDEX 1.0 EXECUTIVE SUMMARY... 23 INDEX 1.0 EXECUTIVE SUMMARY... 23 2.0 INTRODUCTION OF THE PROJECT/ BACKGROUND INFORMATION 24 2.1 IDENTIFICATION OF PROJECT AND PROJECT PROPONENT... 24 2.2 BRIEF DESCRIPTION OF THE NATURE OF PROJECT...

More information

APPENDIX I (See Paragraph-6) FORM 1. S. No. Item Details

APPENDIX I (See Paragraph-6) FORM 1. S. No. Item Details 1 APPENDIX I (See Paragraph-6) (I) Basic Information FORM 1 S.. Item Details 1. Name of the Project/s Rojnaguda Stone Quarry In Kalahandi district of Odisha 2. S. in the schedule 1 (a) 3. Proposed capacity

More information

Form-1, Prefeasibility Report, Mining Plan for Rough Stone for S.F.No: 421/4(Part), LEMBALAKUDI Village, THIRUMAYAM Taluk, PUDUKKOTTAI

Form-1, Prefeasibility Report, Mining Plan for Rough Stone for S.F.No: 421/4(Part), LEMBALAKUDI Village, THIRUMAYAM Taluk, PUDUKKOTTAI Form-1, Prefeasibility Report, Mining Plan for Rough Stone for S.F.: 421/4(Part), LEMBALAKUDI Village, THIRUMAYAM Taluk, PUDUKKOTTAI District Tamil Nadu of Thiru. S. APPAZ. (Extent 1.21.5Ha) FORM -1 (I)

More information

Project Name: Nangal (M.L. No. 134/03) Masonary Stone Mine PRE- FEASIBILITY REPORT

Project Name: Nangal (M.L. No. 134/03) Masonary Stone Mine PRE- FEASIBILITY REPORT PRE- FEASIBILITY REPORT 1.0 EXECUTIVE SUMMARY 1.1 Executive Summary The proposed mining project falls under Category A Project or activity 1(a) as per EIA Notifications 2006 and amended thereof due to

More information

PRE-FEASIBILITY REPORT

PRE-FEASIBILITY REPORT PRE-FEASIBILITY REPORT OF MASONRY MINING PROJECT (M.L. No. 107/02, ML Area: 1.0 ha) At Near Village-Banar Tehsil- Kotputli District - Jaipur (Raj.) PROJECT PROPONENT R/o Navratan Apartment, Plot No. 7A,

More information

Sl No Specific conditions : Status

Sl No Specific conditions : Status Conditions of MoEF, Govt. of India, New Delhi vide MoEF vide letter No. J-11015/345/2007-IA.II(M) dated 10 th Dec. 2008 issued with Environmental Clearance with reference to Mahagiri Mines (Chromite) of

More information

Definition of Tower from the Bradley County Zoning Resolution

Definition of Tower from the Bradley County Zoning Resolution Definition of Tower from the Bradley County Zoning Resolution 43. TOWER. Any outdoor structure designed and constructed to support one (1) or more transmitting or receiving devices for telephone, radio

More information

Project Details-Minor Minerals ( Rajula Building Stone)

Project Details-Minor Minerals ( Rajula Building Stone) Project Details-Minor Minerals ( Rajula Building Stone) Sr.No. Details Particulars PROPOSAL 1. Name of Lease Holder Dineshbhai Laljibhai Sarvaiya 2. Location address At Village : Rajula, Ta : Rajula, Dist

More information

Project Name: Chanawda & Bijasna (M.L. No. 209/09) Masonary Stone PRE- FEASIBILITY REPORT

Project Name: Chanawda & Bijasna (M.L. No. 209/09) Masonary Stone PRE- FEASIBILITY REPORT Project Name: Chanawda & Bijasna (M.L. No. 209/09) Masonary Stone PRE- FEASIBILITY REPORT 1.0 EXECUTIVE SUMMARY 1.1 Executive Summary The proposed mining project falls under Category A Project or activity

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT PRE FEASIBILITY REPORT 19 1. EXECUTIVE SUMMARY This is a mining project proposal of obtaining Environmental Clearance for Slate Stone with production Capacity 7500 TPA (ROM), Near Village: Anandpura, Tehsil:

More information

Environmental Management Plan

Environmental Management Plan Environmental Management Plan FOR BOULDER, GRAVEL AND SAND MINOR MINERAL Mine lease area: 13.20 Ha Village Mandlai Tehsil Raipur Rani, District- Panchkula and State - Haryana Category of Project: B2 Lease

More information

Proposed Terms of Reference for EIA studies

Proposed Terms of Reference for EIA studies Proposed Terms of Reference for EIA studies 1(a): STANDARD TERMS OF REFERENCE FOR CONDUCTING ENVIRONMENT IMPACT ASSESSMENT STUDY FOR NON-COAL MINING PROJECTS AND INFORMATION TO BE INCLUDED IN EIA/EMP REPORT

More information

TERMS OF REFERENCE FOR THE RAPID EIA STUDY FOR SHIVKAR LIGNITE BLOCK, DIST. BARMER, RAJASTHAN

TERMS OF REFERENCE FOR THE RAPID EIA STUDY FOR SHIVKAR LIGNITE BLOCK, DIST. BARMER, RAJASTHAN 1. GENERAL TERMS OF REFERENCE FOR THE RAPID EIA STUDY FOR SHIVKAR LIGNITE BLOCK, DIST. BARMER, RAJASTHAN The main objective of the EIA study is to assess the positive and negative impacts likely to accrue

More information

Sustainable Resource Management Ltd

Sustainable Resource Management Ltd 6.0 Predicted nvironmental Impacts 6. Stages and Impacts Considered An nvironmental Impact Analysis has been carried out whereby all the possible environmental, socio economic and health & safety aspects

More information

STANDARD TEMPLATE FOR EVALUATION OF ALL PROJECTS / ACTIVITIES. 2 Name of the organization/owner. M/s.N.R.Global Granite

STANDARD TEMPLATE FOR EVALUATION OF ALL PROJECTS / ACTIVITIES. 2 Name of the organization/owner. M/s.N.R.Global Granite STANDARD TEMPLATE FOR EVALUATION OF ALL PROJECTS / ACTIVITIES S.No Information required Information to be furnished by the proponents 1 Name of the project or activity Black Granite Mines 2 Name of the

More information

[SIMPLIFIED MINING SCHEME] Index

[SIMPLIFIED MINING SCHEME] Index Index S.No DESCRIPTION PAGE NO. 01 General information about lessee 05 02 Details of mining lease 06-08 03 No.of existing mining pits, their dimensions and 08-12 locations, plan & section of the pits,

More information

APPLICATION THE GRANT OF ENVIRONMENT CLEARANCE

APPLICATION THE GRANT OF ENVIRONMENT CLEARANCE APPLICATION FOR THE GRANT OF ENVIRONMENT CLEARANCE OF TELO STONE MINE (LEASE AREA- 3.49 HA.) (RENEWAL OF LEASE) AT Village: Telo, P.O.: Pathna, P.S.: Ranga Tehsil: Pathna, District: Sahibganj Jharkhand

More information

Environmental Management Plan

Environmental Management Plan Environmental Management Plan ENVIRONMENTAL MANAGEMENT PLAN An Environmental Management Plan is prepared for construction phase, post construction phase (commissioning & operation) and for post project

More information

THE NATURAL RESOURCES AND ENVIRONMENT ORDINANCE (CAP. 84 - LAWS OF SARAWAK, 1958 Ed.)

THE NATURAL RESOURCES AND ENVIRONMENT ORDINANCE (CAP. 84 - LAWS OF SARAWAK, 1958 Ed.) THE NATURAL RESOURCES AND ENVIRONMENT ORDINANCE (CAP. 84 - LAWS OF SARAWAK, 1958 Ed.) THE NATURAL RESOURCES AND ENVIRONMENT (PRESCRIBED ACTIVITIES) ORDER, 1994 (Made under section 11A(1)) (Incorporating

More information

APPLICATION THE GRANT OF ENVIRONMENT CLEARANCE

APPLICATION THE GRANT OF ENVIRONMENT CLEARANCE APPLICATION FOR THE GRANT OF ENVIRONMENT CLEARANCE OF DAMDAMI STONE & MORUM MINE (LEASE AREA: 18.21 ha) (NEW LEASE) AT Village: Damdami, Tehsil: Hussainabad District: Palamu, Jharkhand (Category- B2) Applicant

More information

APPLICATION (FORM-1, PRE-FEASIBILITY REPORT)

APPLICATION (FORM-1, PRE-FEASIBILITY REPORT) APPLICATION (FORM-1, PRE-FEASIBILITY REPORT) ENVIRONMENTAL CLEARANCE FOR STONE MINE (MINING LEASE AREA 0.40 Ha) AT Gut. 39, Village- Warkhed (Khurd), Tehsil- Shegaon, District- Buldhana, State-Maharashtra

More information

RISK ASSESSMENT REPORT

RISK ASSESSMENT REPORT RISK ASSESSMENT REPORT Submitted by: Rakesh Kumar, Partner M/s Maluka Bricks Industry Village Maluka, Sub-Tehsil Bhagta Bhaika, Tehsil & District Bathinda. (Punjab) (M): 0-98141-22141 1 ACTIVITY 2 1. Construction,

More information

APPENDIX 4. Risk Tables

APPENDIX 4. Risk Tables APPENDIX 4 Tables Preliminary Qualitative Criteria The qualitative risk assessment criteria have been developed to identify key risks to the environment, society, heritage and business reputation. The

More information

PRE-FEASIBILITY CUM DETAIL PROJECT REPORT FOR SAND EXTRACTION. PROJECT- 50 MT/Day (FROM RIVER VALMIKI) VILL:VEDCHHI,TAL:VALOD,DIST:TAPI

PRE-FEASIBILITY CUM DETAIL PROJECT REPORT FOR SAND EXTRACTION. PROJECT- 50 MT/Day (FROM RIVER VALMIKI) VILL:VEDCHHI,TAL:VALOD,DIST:TAPI A PRE-FEASIBILITY CUM DETAIL PROJECT REPORT FOR SAND EXTRACTION PROJECT- 50 MT/Day (FROM RIVER VALMIKI) VILL:VEDCHHI,TAL:VALOD,DIST:TAPI OF ABDUL MUNAF ABDUL KADAR SHAIKH (50 MT/DAY) (0-28-50 Hectors)

More information