STORMWATER POLLUTION PREVENTION PLAN TEMPLATE. 1.0 SITE DESCRIPTION 1.1 Project Name and Location Date
|
|
|
- Leslie Glenn
- 10 years ago
- Views:
Transcription
1 STORMWATER POLLUTION PREVENTION PLAN TEMPLATE Disclaimer: This template was developed for guidance purposes only in an effort to assist Construction Storm Water permit applicants in meeting state and local requirements. Completion of this template is not a requirement for permit authorization and is not intended to be used as a substitute for professional review. 1.0 SITE DESCRIPTION 1.1 Project Name and Location Date Project Name Address NDEQ NOI Number City County Latitude Longitude State Zip Code 1.2 Construction Project Description Describe the nature/function of the construction project and its impact on the surrounding environment 1.3 Name of Receiving Waters Identify and name any receiving waters within one mile of the site. Include drains and ditches that lead to streams or rivers.
2 1.3 Existing Site Conditions Describe the existing site conditions, including the storm drainage system. Include quantities of flow and site conditions around all points of surface water discharge from the site. 1.3 Sequence of Major Construction Activities Describe the intended sequence and timing of activities that disturb soil on the site. Include the following: Clearing and grubbing for areas necessary for installation of perimeter erosion control devices Construction of perimeter erosion control devices Remaining interior site clearing and grubbing Installation of permanent and temporary stabilization measures Road grading Grading for the remainder of the site Utility installation and whether storm drains will be used or blocked after construction Building, parking lot, and site construction Final grading, landscaping, or stabilization Implementation and maintenance of final erosion control structures Removal of temporary erosion control devices
3 1.4 Site Data Estimates of the total area expected to be disturbed by excavation, grading, or other construction activities, including dedicated off-site borrow and fill areas. 1.5 Industrial Activities Indicate the location of any stormwater discharges associated with industrial activity other than at the site (e.g., dedicated asphalt, concrete plants, etc). 1.6 Pollution Sources Identify all potential sources of pollution that might affect the quality of storm water discharge from the site.
4 1.7 OPERATORS Identify the types of OPERATORS (e.g. grading contractor, residential and commercial lot builders, public improvement contractor, subcontractors, suppliers, trades people, etc.) who will be at the site, and the areas over which OPERATOR has control. 2.0 CONTROLS TO REDUCE POLLUTANTS 2.1 Control Measures For each major activity identified (see section 1.3), describe all control measures, the timing during construction when measures will be installed, and the OPERATOR responsible for accomplishing the installation.
5 2.2 Interim and Permanent Stabilization Practices Describe all interim and permanent stabilization practices with the associated installation schedule. 2.3 Construction Activity Record Keeping Maintaining a record of the dates when major grading activity occurs, when construction activity has been temporarily or permanently ceased on a portion of a site, and when stabilization practices are initiated is an integral part of the SWPPP. Explain how the construction activity record keeping will be accomplished for the duration of the permit. 2.4 Structural Practices Describe any structural practices used to divert flows from exposed soils, retain/detain flows, or otherwise limit runoff/pollutants from exposed areas, 2.5 Post-Construction Storm Water Management Controls Describe any post-construction storm water management controls to be installed at the site, and identify any applicable federal, state, local, and/or tribal requirements for design or installation. Include maintenance plans of permanent management measures.
6 2.6 Measures/Waste Disposal Practices Describe all measures/waste disposal practices to prevent discharge of solid material, including building materials and cement truck washout, to waters of the state. 2.7 Sediment Track-Out Prevention Practices Describe measures to minimize off-site tracking of sediments to paved surfaces and the generation of dust. 2.8 Waste or Construction Materials Storage Practices Describe any waste or construction materials to be stored onsite, and list all measures to limit exposure, including storage, spill prevention and response practices. 2.9 Pollutants From Sources other than Construction Describe controls to minimize pollutants from sources other than construction (e.g., dedicated asphalt, concrete plants, etc.)
7 3.0 NON-STORM WATER DISCHARGE MANAGEMENT Identify and list pollution prevention measure for any allowable non-storm water discharges. (For a list of allowable non-storm water discharges, see CSW General Permit Part I.C.2) 4.0 PERMIT ELIGIBILITY RELATED TO ENDANGERED SPECIES Document your project s eligibility for permit coverage with regard to endangered species. 5.0 PERMIT ELIGIBILITY RELATED TO MAXIMUM DAILY LOADS Document your project s eligibility for permit coverage with regard to discharging to water bodies with an approved TMDL.
8 6.0 APPLICABLE STATE, TRIBAL, OR LOCAL REQUIREMENTS Document your project s compliance with any applicable state, local, and/or tribal requirements for erosion control and stormwater management. 7.0 INSPECTIONS 7.1 Inspection Schedule, Procedures, and Frequency Proposed conditions inspections must be conducted at least once every fourteen calendar days, and within 24 hours of storms that have occurred in a 24 hour period with an accumulation of precipitation that measures.5 inches or greater. A rain gauge will be maintained on site to measure precipitation. Describe routine inspection schedules, procedures, and frequency to ensure control measures are operating effectively. 7.2 Personnel Performing Inspections Indicate who will be to perform inspections and describe the person s qualifications.
9 7.3 Report Format Describe the format for the inspection reports documenting each inspection, including documentation of incidents of noncompliance or certifying full compliance, and indicating who will be authorized to sign the report. 8.0 OPERATOR RESPONSIBILITY AND NOTIFICATION 8.1 Responsibility Describe in detail each OPERTOR S (see section 1.7 for a list of OPERATORS) responsibility for implementing and maintaining the SWPPP in the APPLICANT S behalf. 8.2 Notification Describe in detail how each OPERATOR (see section 1.7 for a list of OPERATORS) will be informed of the existence of the SWPPP and requirements.
10 9.0 MAINTENANCE OF CONTROLS 9.1 Procedures and Activities Describe the procedures and activities that will be used to maintain all best management practices in an effective operational condition. 9.2 Modifications Describe in detail a protocol for modifying the SWPPP whenever there is a change in design, construction, operation, or maintenance at the site, or if during inspections or investigations it is determined that the SWPPP is ineffective in minimizing pollutant discharge fromo the site.
11 10.0 MANAGEMENT PRACTICES 10.1 Control Measure Management Practices Describe the protocol for insuring that all controls will be properly selected, installed, and maintained in accordance with manufacturer specifications and good engineering practices Off-Site Management Practices Describe the protocol for ensuring off-site accumulations of sediment will be removed as necessary Litter, Debris, and Chemical Management Practices Describe the protocols for ensuring the prevention of stormwater contamination associated with pollutants such as litter, debris, and chemicals.
12 10.4 Stabilization Management Practices Following initial soil disturbance or redisturbance, permanent or temporary stabilization shall be completed within seven (7) calendar days on all perimeter dikes, swales, ditches, perimeter slopes, and all slopes greater than 3 horizontal to 1 vertical (3:1); embankments of ponds, basins, and traps; and within fourteen (14) days on all other disturbed or graded areas. The requirements of this section do not apply to those areas which are shown on the plan and are currently being used for material storage or for those areas on which actual construction activities are currently being performed. Describe the protocol for ensuring the implementation of stabilization measures Maximum Pollutant Removal Management Practices Describe the protocol for ensuring a combination of sediment and erosion control measures will be used to achieve a maximum pollutant removal. Also, document any factors considered when determining whether to use sediment basin(s) as a control measure Velocity Dissipation Management Practices Describe the protocol for ensuring velocity dissipation devices will be used at discharge locations and along outfall channels to provide non-erosive flow.
13 11.0 CONTACT INFORMATION Owner/Developer Phone number Address City State Zip 12.0 MAPS AND ATTACHMENTS The following must be included with the SWPPP: 1. General Location Map (e.g., USGS quadrangle map, a portion of a city or county map, or other map) with enough detail to identify the location of the construction site and waters of the state within one mile of the site 2. Site map(s) showing the entire site during grading, construction, and post-construction phases, identifying a. Direction(s) of storm water flow and approximate slopes anticipated after major grading events b. Areas of soil disturbance and areas that will not be disturbed c. Locations of major structural and nonstructural Best Management Practices (BMPs) identified in the SWPPP d. Locations where stabilization practices are expected to occur e. Locations of off-site material, waste, borrow, or equipment storage areas f. Location of all Waters of the State g. Location of any wetlands, natural or artificial water storage detention areas, and drainage ditches on the site h. Locations where storm water discharges to a surface water i. Areas where final stabilization have been accomplished and no further construction-phase permit requirements apply j. An indication of the scale used k. Suitable contours for the existing and proposed topography l. A clear and definite delineation of any areas of vegetation or trees to be saved m. A clear and definite delineation of any one hundred (100) year floodplain on or near the site n. Location of rain gauge to be maintained on site o. The location on site where the SWPPP will be kept 3. Design details for both temporary and permanent erosion control structures 4. A statement noting that the contractor, developer, and owner shall request the Stormwater Pollution Prevention Plan Inspector to inspect and approve work completed at the following stages: a. Upon completion of installation of perimeter erosion and sediment controls, prior to proceeding with any other land disturbance or grading b. Upon the completion of stripping, the stockpiling of topsoil, the construction of temporary erosion and sediment control facilities, disposal of all waste material, and preparation of the ground and completion of rough grading, but prior to placing top soil, permanent drainage, or other site development improvements and ground covers c. Upon completion of final grading, permanent drainage, and erosion control facilities including established ground covers and planting, and all other work of the permit 5. A signed statement by the owner, developer, and contractor that any clearing, grading, construction, or development, or all of these, will be done pursuant to the plan. 6. Inspection reports must include the following: a. Inspection time and date b. Name, titles, and qualifications of personnel making the inspection c. Weather information for the period since the last inspection including a best estimate of the beginning of each storm event, duration of each storm event, approximate amount of rainfall for each storm event (in inches), and whether any discharges occurred d. Weather information and a description of any discharges occurring at the time of the inspection e. Location(s) of discharges of sediment or other pollutants from the site
14 f. Location(s) of BMPs that need to be maintained g. Location(s) of BMPs that failed to operate as designed or proved inadequate for a particular location h. Monitoring results if requested i. Records of the last grading activity j. Location(s) where additional BMPs are needed that did not exist at the time of inspection k. Corrective action required including any changes to the SWPPP necessary and implementation dates
CONSTRUCTION STORMWATER POLLUTION PREVENTION PLAN TEMPLATE
CONSTRUCTION STORMWATER POLLUTION PREVENTION PLAN TEMPLATE The following template may be used as a general guide for development of a Stormwater Pollution Prevention Plan (SWPPP) for construction activities.
COLORADO DEPARTMENT OF TRANSPORTATION STORMWATER FIELD INSPECTION REPORT - ACTIVE CONSTRUCTION
COLORADO DEPARTMENT OF TRANSPORTATION STORMWATER FIELD INSPECTION REPORT - ACTIVE CONSTRUCTION (1) Project Name: (2) Project Contractor: (3) Erosion Control Supervisor/SWMP Administrator: (4) CDOT Project
Activity Yes No N/A Notes
CE 2020 (Rev. 12/11) Page 1 of 5 PROJECT NAME AND SITE ADDRESS: CONTRACT NUMBER: ORACLE NUMBER: WDID NUMBER: CONTRACTOR NAME AND ADDRESS: PROJECT SITE RISK LEVEL: Risk Level 1 Risk Level 2 Risk Level 3
City of Shelbyville Site Inspection Checklist
City of Shelbyville Site Inspection Checklist General Information Project Name: KYR10 Permit Number: Date: Project Location: Contractor: Conractor Representative: Inspector's Name: Title: Signature : Weather
SITE-SPECIFIC BEST MANAGEMENT PRACTICES (SSBMP) PLAN/STORM WATER POLLUTION PREVENTION PLAN (SWPPP) REVIEW CHECKLIST
This checklist may be used by applicants for encroachment permits, and contractors in development of Site Specific Best Management Practice (SSBMP) Plans or Storm Water Pollution Prevention Plans (SWPPP)
Land Disturbance, Erosion Control and Stormwater Management Checklist. Walworth County Land Conservation Department
Land Disturbance, Erosion Control and Stormwater Management Checklist Walworth County Land Conservation Department The following checklist is designed to assist the applicant in complying with the Walworth
SECTION A: LOCAL STORM WATER POLLUTION PREVENTION PLAN
INSTRUCTIONS FOR PREPARING THE LOCAL STORM WATER POLLUTION PREVENTION PLAN City of Hawthorne For sites between 1 and 5 acres As of March 10, 2003, EPA Phase II rules will supercede this document. The Local
Appendix I: BMP Inspection Form CASQA SWPPP Template 91 January2011 BMP INSPECTION REPORT Date and Time of Inspection: Date Report Written: Inspection Type: (Circle one) Weekly Complete Parts I,II,III
SITE-SPECIFIC BEST MANAGEMENT PRACTICES (BMP) PLAN REVIEW CHECKLIST
This checklist may be used by applicants for encroachment permits, and contractors in development of Site- Specific BMP Plans for projects. plan reviewers will use this checklist to review the Site-Specific
CONSTRUCTION PERMIT SUBMITTAL CHECKLIST
LAS VEGAS VALLEY STORMWATER QUALITY MANAGEMENT PROGRAM CONSTRUCTION PERMIT SUBMITTAL CHECKLIST (Applies to all Grading Site Development Building and Encroachment Permits and plans including Final Parcel
STANDARD INSPECTION FORM GENERAL PERMIT FOR STORMWATER ASSOCIATED WITH CONSTRUCTION ACTIVITY
STANDARD INSPECTION FORM GENERAL PERMIT FOR STORMWATER ASSOCIATED WITH CONSTRUCTION ACTIVITY Project Name Permittee NOI # Start Time Inspector s Name(s) Green Card Certification # Inspector s Contact Information
Construction Site Inspection Checklist for OHC000004 By making use of some simple Best Management Practices (BMPs) a construction site operator can
Construction Site Inspection Checklist for OHC000004 By making use of some simple Best Management Practices (BMPs) a construction site operator can do his or her share to protect Ohio's water resources
Storm Water Management Requirements for Construction Projects Less than One Acre
Storm Water Management Requirements for Construction Projects Less than One Acre Purpose: UC Irvine s Phase II Small MS4 Storm Water Permit requires construction projects less than one acre in size to
Low Impact Development Checklist
New Jersey Stormwater Best Management Practices Manual February 2004 A P P E N D I X A Low Impact Development Checklist A checklist for identifying nonstructural stormwater management strategies incorporated
SAMPLE COPY. Stormwater Pollution Prevention Plan. A site map must be developed and must contain, at a minimum, the following information:
Stormwater Pollution Prevention Plan "I certify under penalty of law that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure
State of Florida. Department of Environmental Protection. Generic Permit. For. Stormwater Discharge from Large and Small Construction Activities
State of Florida Department of Environmental Protection Generic Permit For Stormwater Discharge from Large and Small Construction Activities February 2009 This permit is issued under the provisions of
SECTION 104 PREVENTION, CONTROL, AND ABATEMENT OF EROSION AND WATER POLLUTION
SECTION 104 PREVENTION, CONTROL, AND ABATEMENT OF EROSION AND WATER POLLUTION 104-1 Description. Provide erosion control measures on the project and in areas outside the right-of-way where work is accomplished
City of Paso Robles Community Development Department Construction Site Storm Water Quality Requirements
City of Paso Robles Community Development Department Construction Site Storm Water Quality Requirements Overview of the City s Construction Storm Water Program The City of Paso Robles is committed to protecting
Interlocking Concrete Pavement Institute (ICPI) Model Stormwater Ordinance for Permeable Interlocking Concrete Pavements August 2010
Interlocking Concrete Pavement Institute (ICPI) Model Stormwater Ordinance for Permeable Interlocking Concrete Pavements August 2010 Background What are permeable interlocking concrete pavements (PICP)?
Waste Handling & Disposal
Objectives Cover Contain Educate Reduce/Minimize Product Substitution Description Improper storage and handling of solid wastes can allow toxic compounds, oils and greases, heavy metals, nutrients, suspended
TCEQ TPDES CGP EPA NPDES GCP Inspection of Controls Report
TCEQ TPDES CGP EPA NPDES GCP Inspection of Controls Report Complete this form every seven days and after every rain event of 0.5" or greater and retain in your SWP3. General Information Name of Project:
Developing Your Stormwater Pollution Prevention Plan A Guide for Construction Sites
Developing Your Stormwater Pollution Prevention Plan A Guide for Construction Sites Who? Construction site operators (generally, the person who has operational control over construction plans and/or the
CLACKAMAS COUNTY ZONING AND DEVELOPMENT ORDINANCE
1008 STORM DRAINAGE (3/24/05) 1008.01 PURPOSE To minimize the amount of stormwater runoff resulting from development utilizing nonstructural controls where possible, maintain and improve water quality,
COMMONWEALTH OF KENTUCKY CITY OF LONDON ORDINANCE NO. 2006-19 AN ORDINANCE ESTABLISHING EROSION AND STORM WATER CONTROL
COMMONWEALTH OF KENTUCKY CITY OF LONDON ORDINANCE NO. 2006-19 AN ORDINANCE ESTABLISHING EROSION AND STORM WATER CONTROL For health, safety and welfare reasons, particularly due to problems experienced
Outlet stabilization structure
Overview of Sedimentation and Erosion Control Practices Practice no. 6.41 Outlet stabilization structure Erosion at the outlet of channels, culverts, and other structures is common, and can cause structural
TABLE OF CONTENTS. Page 2 of 37 Ohio EPA Permit No.: OHC000004
Page 2 of 37 TABLE OF CONTENTS PART I. COVERAGE UNDER THIS PERMIT A. Permit Area B. Eligibility C. Requiring an individual permit or an alternative general permit D. Permit requirements when portions of
STORMWATER DISCHARGES ASSOCIATED WITH CONSTRUCTION ACTIVITY STORMWATER MANAGEMENT PLAN PREPARATION GUIDANCE. Revised 4/2011. Contact information
COLORADO DEPARTMENT OF PUBLIC HEALTH AND ENVIRONMENT Water Quality Control Division Stormwater Program STORMWATER DISCHARGES ASSOCIATED WITH CONSTRUCTION ACTIVITY STORMWATER MANAGEMENT PLAN PREPARATION
Operations and Maintenance Plan The Residences at Johnson Farm 189 Landham Road Sudbury, Massachusetts. Submitted to: Town of Sudbury
Operations and Maintenance Plan The Residences at Johnson Farm 189 Landham Road Sudbury, Massachusetts Submitted to: Town of Sudbury December 2011 Table of Contents 1.0 Introduction... 1 1.1 Responsibility...
City of Beaumont, Texas Grading Permit Information
General Information City of Beaumont, Texas Grading Permit Information The permit application shall be signed by the property owner (or lessee) or his authorized representative and by the contractor (if
CHAPTER 2 CONSTRUCTION STORMWATER POLLUTION PREVENTION
CHAPTER 2 CONSTRUCTION STORMWATER POLLUTION PREVENTION CONTENTS 2.0 INTRODUCTION 2-1 2.1 MIMINUM REQUIREMENT #2 SWPP 2-1 ELEMENT 1: MARK CLEARING LIMITS 2-1 ELEMENT 2: ESTABLISH CONSTRUCTION ACCESS 2-2
Chapter 2 Stormwater Pollution Prevention Plan (SWPPP) for Park Operations
SWPPP for Park Operations 2 Chapter 2 Stormwater Pollution Prevention Plan (SWPPP) for Park Operations Bordered by Lake Washington & Lake Sammamish, the City of Bellevue has more than 60 miles of streams,
NPDES Industrial Stormwater Inspection Worksheet
NPDES Industrial Stormwater Inspection Worksheet General Information Inspection Type 1200-Z DEQ Inspector Name Mark Riedel, Bob Schwarz DEQ Permit No. 106959 Entry Time 10:00 AM Inspection Date 1/8/15
Module 6: Pollution Prevention Plans and SWPPP Overview
Module 6: Pollution Prevention Plans and SWPPP Overview Module 6 Objectives After completing this module, you should be able to: Explain the minimum requirements of a SWPPP Recognize and identify basic
Town of Elkton & Cecil Soil Conservation District Checklist for Joint Agency Review Stormwater Management / Erosion and Sediment Control
Town of Elkton & Cecil Soil Conservation District Checklist for Joint Agency Review Stormwater Management / Erosion and Sediment Control Project Name: Tax Map Parcel: Acreage: Plat: ADC Map & Grid Engineering
STORM WATER MANAGEMENT HANDBOOK FOR CONSTRUCTION ACTIVITIES
STORM WATER MANAGEMENT HANDBOOK FOR CONSTRUCTION ACTIVITIES Prepared by City of Houston Harris County Harris County Flood Control District 2006 Edition NOTICE TO USERS The Storm Water Management Handbook
DESCRIPTION OF STORMWATER STRUCTURAL CONTROLS IN MS4 PERMITS
DESCRIPTION OF STORMWATER STRUCTURAL CONTROLS IN MS4 PERMITS Phase I MS4 permits require continuous updating of the stormwater system inventory owned and operated by the MS4. They also include inspection
DOÑA ANA COUNTY DESIGN STORM CRITERIA GUIDELINES FOR COMMERCIAL AND RESIDENTIAL SITES. Run-off Analysis Methods
DOÑA ANA COUNTY DESIGN STORM CRITERIA GUIDELINES FOR COMMERCIAL AND RESIDENTIAL SITES Run-off Analysis Methods This document sets forth the minimum design, technical criteria and specifications for the
Definition of Tower from the Bradley County Zoning Resolution
Definition of Tower from the Bradley County Zoning Resolution 43. TOWER. Any outdoor structure designed and constructed to support one (1) or more transmitting or receiving devices for telephone, radio
MONTANA Water Quality & Storm Water Management Training Programs For Construction Activities
MONTANA Water Quality & Storm Water Management Training Programs For Construction Activities Program Delivery: Altitude Training Associates (ATA) Course # Title Length *Prerequisite BMP 101 Introduction
Construction Site Inspection. Inspecting to Keep You in Compliance
Construction Site Inspection Inspecting to Keep You in Compliance Inspection/Monitoring/Reporting Know if your plan is working Document corrective actions Ketchikan A Contractor that destroys their site
Index. protection. excavated drop inlet protection (Temporary) 6.50.1 6.51.1. Block and gravel inlet Protection (Temporary) 6.52.1
6 Index inlet protection excavated drop inlet protection (Temporary) 6.50.1 HARDWARE CLOTH AND GRAVEL INLET PROTECTION Block and gravel inlet Protection (Temporary) sod drop inlet protection ROCK DOUGHNUT
GENESEE COUNTY DRAIN COMMISSIONER S OFFICE
GENESEE COUNTY DRAIN COMMISSIONER S OFFICE DIVISION OF SURFACE WATER MANAGEMENT G-4608 BEECHER ROAD, FLINT, MI 48532 PHONE (810) 732-1590 FAX (810) 732-1474 JEFFREY WRIGHT COMMISSIONER October 1, 2012
Carlton Fields Memorandum
Carlton Fields Memorandum TO: FROM: RE: DAN WEEDE FRED RUSHING RIPARIAN BUFFER DATE: JULY 26, 2013 BACKGROUND Both the state of Georgia and the city of Atlanta 1 have certain guidelines that must be followed
SECTION 02100 SITE PREPARATION
SECTION 02100 SITE PREPARATION PART 1 - GENERAL 1.01 RELATED DOCUMENTS A. Drawings and General Provisions of Contract, including General Conditions and Supplementary Conditions and Division 1 through Division
ALLEGANY WIND POWER PROJECT CONSTRUCTION SPILL PREVENTION PLAN
ALLEGANY WIND POWER PROJECT CONSTRUCTION SPILL PREVENTION PLAN Best Management Practices (BMPs) will be implemented during construction of the Allegany Wind Power Project to prevent and contain spills.
STATEMENT OF ACKNOWLEDGMENT
General Permit for the Discharge of Stormwater and Dewatering Wastewaters from Construction Activities, issued 8/21/13, effective 10/1/13 Stormwater Monitoring Report SITE INFORMATION Permittee: BNE Energy
CITY UTILITIES DESIGN STANDARDS MANUAL
CITY UTILITIES DESIGN STANDARDS MANUAL Book 2 (SW) SW9 June 2015 SW9.01 Purpose This Chapter provides information for the design of open channels for the conveyance of stormwater in the City of Fort Wayne.
APPLICATION PROCESS FOR LAND DISTURBING PERMIT
PREFACE: APPLICATION PROCESS FOR LAND DISTURBING PERMIT The property owner, developer and designated planners and engineers shall review the general development plans and detailed plans of the Local Issuing
Storm Drain System Operation and Maintenance
Santa Clara Valley Urban Runoff Pollution Prevention Program PUBLIC AGENCY ACTIVITIES Performance Standard and Supporting Documents for Storm Drain System Operation and Maintenance December 19, 1996 March
Chapter 3 SENSITIVE AREAS AND VEGETATED CORRIDORS
Chapter 3 3.01 General Provisions 3.01.1 Introduction 3.01.2 Application and Interpretation of Chapter 3.01.3 Unbuildable Lots 3.01.4 Other Permits 3.01.5 Prohibited Activities 3.02 Service Provider Letter
A Developer s Guide: Watershed-Wise Development
A Developer s Guide: Watershed-Wise Development Environmental Protection What is a watershed? It does not matter how far away you build from a creek, lake, or the ocean, you are in a watershed. Another
Concrete Waste Management
Categories EC SE TC WE NS WM Erosion Control Sediment Control Tracking Control Wind Erosion Control Non-Stormwater Management Control Waste Management and Materials Pollution Control Legend: Primary Category
Florida Department of Environmental Protection
Florida Department of Environmental Protection Background Mobile vehicle and equipment washing involves washing at a location where vehicles are based (such as a trucking company, warehouse, bus station,
PRIVATE TREATMENT CONTROL BMP OPERATION AND MAINTENANCE VERIFICATION FORM BIORETENTION FACILITIES, VEGETATED SWALES & HIGHER RATE BIOFILTERS
BIORETENTION FACILITIES, VEGETATED SWALES & HIGHER RATE BIOFILTERS Check here for Address or phone number change the fiscal year (July 1 June 30), and date(s) maintenance was performed. Under Inspection,
C. Storm Water Pollution Prevention Plan (SWPPP) Yes No Response / Comment. D. Good Site Management Housekeeping Yes No Response / Comment
CE 2063 (Rev. 12/11) Page 1 of 8 PROJECT NAME AND SITE ADDRESS: CONTRACT NUMBER: CONTRACTOR NAME AND ADDRESS: Submitted by (Print Name and Sign): ORACLE NUMBER: WDID NUMBER: PROJECT SITE RISK LEVEL: Risk
3.4 DRAINAGE PLAN. 3.4.1 Characteristics of Existing Drainages. 3.4.2 Master Drainage System. Section 3: Development Plan BUTTERFIELD SPECIFIC PLAN
3.4 DRAINAGE PLAN This section describes the existing onsite drainage characteristics and improvements proposed within this Specific Plan. Following this description, drainage plan development standards
Block and Gravel Inlet Protection (BIP)
Block and Gravel Inlet Protection (BIP) Practice Description Block and gravel inlet protection is a sediment control barrier formed around a storm drain inlet by the use of standard concrete block and
Pervious Pavers. By: Rich Lahren. Hebron Brick & Block Supply
Pervious Pavers By: Rich Lahren Hebron Brick & Block Supply Stormwater Management and Control Issues Past emphasis was on flood control Today s emphasis is also on pollution More impermeable areas are
Storm Drain Inlet Protection - IP
Storm Drain Inlet Protection - IP DEFINITION A temporary protective device formed around a storm drain drop inlet to trap sediment. PURPOSE To prevent sediment from entering storm drainage systems, prior
Preventing Storm Water Pollution: What We Can Do
Preventing Storm Water Pollution: What We Can Do ~Employee Training Series~ Streets and Drainage Maintenance PREPARED IN COOPERATION WITH THE Texas Commission on Environmental Quality AND U.S. ENVIRONMENTAL
CITY AND COUNTY OF DENVER CONSTRUCTION ACTIVITIES STORMWATER MANUAL. Wastewater Management Division Department of Public Works
CITY AND COUNTY OF DENVER CONSTRUCTION ACTIVITIES STORMWATER MANUAL Wastewater Management Division Department of Public Works City and County of Denver Revised June, 2010 Table of Contents 2 City and County
SE-10 STORM DRAIN INLET PROTECTION. Objectives
STORM DRAIN INLET PROTECTION SE-10 Objectives Erosion Control - EC Sediment Control - SE Tracking Control - TC Wind Erosion Control - WE Non-Storm Water Management - NS Waste and Materials Management -
A. Describe the existing drainage patterns on-site as shown on Map I, including any potential flooding and erosion problems.
19. STORMWATER MANAGEMENT A. Describe the existing drainage patterns on-site as shown on Map I, including any potential flooding and erosion problems. The majority of the approximately ±500 acre Property
Temporary Batch Plants
Categories EC SE TC WE NS WM Erosion Control Sediment Control Tracking Control Wind Erosion Control Non-Stormwater Management Control Waste Management and Materials Pollution Control Legend: Primary Category
STORMWATER MANAGEMENT CHECKLIST
STORMWATER MANAGEMENT CHECKLIST *This checklist must be completed and part of the Land Disturbing Permit submittal for review if the acreage disturbed is one (1) acre or more: I. SUPPORTING DATA Narrative
REFERENCE. All National Grid personnel who plan and perform work involving protected water resources are responsible for:
EG-30NY ENVIRONMENTAL GUIDANCE PAGE 1 of 9 DATE 10/1/10 EP 3 Natural Resource Protection 1.0 SCOPE AND RESPONSIBILITIES National Grid s New York service territory encompasses thousands of wetlands, lakes,
Storm Water Runoff. Managing. A Self-Assessment Guide for Wisconsin Businesses. Storm water runoff is coming. This guide provides businesses
Managing Storm Water Runoff A Self-Assessment Guide for Wisconsin Businesses Storm water runoff is coming under increasing scrutiny as both a source of pollutants to our lakes and streams, and as a cause
1.7.0 Floodplain Modification Criteria
1.7.0 Floodplain Modification Criteria 1.7.1 Introduction These guidelines set out standards for evaluating and processing proposed modifications of the 100- year floodplain with the following objectives:
Post-Construction Stormwater Management Checklist* (5,000 SF or Greater)
Applicability: Required for projects that create and/or replace 5,000 square feet or greater of impervious surface (i.e. asphalt roads, concrete structures, building area, sidewalks, etc.). Impervious
SUSTAINABLE URBAN DRAINAGE SYSTEMS
overflow can lead into a permeable conveyance system to increase further the benefit and reduce the need for pipe systems. Pollutant removal rates have been shown to be high, with some pollutants being
BEST MANAGEMENT PRACTICES (BMPs)... What are They? GOOD HOUSEKEEPING PRACTICES Your Business Should Employ
BEST MANAGEMENT PRACTICES (BMPs)... What are They? CLEAN STREETS MEAN CLEAN STREAMS Inexpensive to implement and easy to use, BMPs help you to do your share to protect the environment. The term Best Management
Improper storage of fuel on construction sites will increase the risk of water pollution that may occur as a result of leaks or spills.
WQ-10 Best Management Practice (BMP) Water Quality Protection Guideline Secondary Containment Design Standards Fuel Storage on Construction Sites According to the EPA, the majority of water pollution in
Minimizes sediment and debris from entering storm drains that lead to waterways and watercourses.
4.5-p DRAIN INLET PROTECTION Alternative Names: DI protection, Drop Inlet Protection DESCRIPTION Storm drain inlet (DI) protection slows and ponds stormwater, and filters sediment and debris before it
Outdoor Storage of Raw Materials SC-33
Objectives Cover Contain Educate Reduce/Minimize Description Raw materials, by-products, finished products, containers, and material storage areas exposed to rain and/or runoff can pollute stormwater.
Detention Ponds. Detention Ponds. Detention Ponds. Detention Ponds. Detention Ponds. Detention Ponds. CIVL 1112 Detention Ponds - Part 1 1/12
CIVL 1112 - Part 1 1/12 The water cycle, also known as the hydrologic cycle, describes the continuous movement of water on, above and below the surface of the Earth. The water cycle, also known as the
Post Construction and Redevelopment Inspection Manual
City of Myrtle Beach Post Construction and Redevelopment Inspection Manual In April 2003, the United States Environmental Protection Agency (USEPA) issued a National Pollutant Discharge Elimination System
Guidelines for Control of Water Runoff on Small Lots. Revised 6/09
Guidelines for Control of Water Runoff on Small Lots Revised 6/09 Table of Contents Introduction and Purpose 3 Administrative Procedures 3 Plan Submittal Requirements 3 General Design Criteria 4 Dry Wells
Annual Standards and Specifications. Erosion and Sediment Control
Annual Standards and Specifications for Erosion and Sediment Control January 2012 Version: September 15, 2009 INTRODUCTION Virginia Commonwealth University (VCU), Annual Standards and Specifications for
Storm Drain Inlet Protection
Categories EC Erosion Control SE Sediment Control TC Tracking Control WE Wind Erosion Control Non-Stormwater NS Management Control Waste Management and WM Materials Pollution Control Legend: Primary Category
III. Relying on another Governmental Entity
I. Permittee Information Permittee Name Cowlitz County Contact Name Patrick Harbison Permittee Coverage Number WAR4-524 Phone Number 36-577-33 Mailing Address 16 13th Ave. S City State Zip + 4 Kelso WA
Sustainable Drainage Systems (SUDS) A guide for developers
Sustainable Drainage Systems (SUDS) A guide for developers We are the Environment Agency. It s our job to look after your environment and make it a better place for you, and for future generations. Your
SECTION 5. Sediment Control Measures
SECTION 5 Sediment Control Measures 60. STORM DRAIN INLET PROTECTION When Runoff from earth change activities will discharge to a catch basin or storm drain inlet. A newly constructed catch basin or storm
WORKERS COMPENSATION REQUIREMENTS UNDER WORKERS COMPENSATION LAW 57
January 1, 2011 WORKERS COMPENSATION REQUIREMENTS UNDER WORKERS COMPENSATION LAW 57 To comply with coverage provisions of the Workers Compensation Law ( WCL ), businesses must: A) be legally exempt from
Sample DEQ Plan Submitter s Checklist for Stormwater Management Plans
APPENDIX IV Version: February 2, 2015 Sample DEQ Plan Submitter s Checklist for Stormwater Management Plans Please fill in all blanks and please reference the plan sheets/pages where the information may
Spill Prevention, Control & Cleanup SC-11
Objectives Cover Contain Educate Reduce/Minimize Product Substitution Description Spills and leaks, if not properly controlled, can adversely impact the storm drain system and receiving waters. Due to
Standard Operating Procedures Storm Drain System Maintenance
s Storm Drain System Maintenance SECTIONS 1. Storm Drain System Inspections 2. Storm Drain System Cleaning 3. Storm Drain System Repairs 4. Proper Disposal of Material Storm Sewer System Cleaning Directive
STANDARD AND SPECIFICATIONS FOR STORM DRAIN INLET PROTECTION
STANDARD AND SPECIFICATIONS FOR STORM DRAIN INLET PROTECTION Design Criteria Drainage Area The drainage area for storm drain inlets shall not exceed one acre. The crest elevations of these practices shall
APPENDIX A: STORMWATER MANAGEMENT CHECKLIST
APPENDIX A: STORMWATER MANAGEMENT CHECKLIST The first thing that applicants and designers must do before beginning a project is to make sure they are familiar with the 11 minimum standards listed in Manual
City of San Diego Urban Runoff Management Program. Appendix XI. Minimum BMPs for Mobile Businesses
City of San Diego Urban Runoff Management Program This Page Left Intentionally Blank. Minimum Best Management Practices (BMPs) for Mobile Businesses No. BMP Title Description and Examples Justification
Exhibit A-7.III. Water Quality Management Plan (WQMP) Checklist
Exhibit A-7.III Water Quality Management Plan (WQMP) Checklist Water Quality Management Plan Checklist The purpose of this checklist is to provide a format for uniform, comprehensive, and welldocumented
SECTION 01 57 19 TEMPORARY ENVIRONMENTAL CONTROLS
SECTION 01 57 19 TEMPORARY ENVIRONMENTAL CONTROLS PART 1 - GENERAL 1.1 DESCRIPTION A. This section specifies the control of environmental pollution and damage that the Contractor must consider for air,
Applicable Rules - Air 30 TAC 116.110 Permits All facilities must be authorized by a permit, a standard permit, or a permit by rule. Small mixers unde
Concrete Batch Plant Investigations 1 Applicable Rules - Air 30 TAC 116.110 Permits All facilities must be authorized by a permit, a standard permit, or a permit by rule. Small mixers under 5 ft 3 are