FY 2011 OHIO SMALL CITIES COMMUNITY DEVELOPMENT BLOCK GRANT COMPREHENSIVE DOWNTOWN REVITALIZATION PROGRAM



Similar documents
BEST PRACTICES. Smart Transportation is a key concept for the Paoli Roadway Improvement Project.

Topic 2 11/28/2012 Blocks & Street Network

Lincoln Downtown Master Plan Update

Street Audit Tool: Web 2.0 Tools

LAKE SHORE DRIVE CTA RED LINE BROADWAY SHERIDAN FOSTER ARGYLE. Pedestrian Access Advisory Committee. April 25, 2014


ALKS SIDEW II. TK TK TK TK TK TK TK TK 40 BOSTON COMPLETE STREETS GUIDELINES DRAFT - JULY 2011 BOSTON TRANSPORTATION DEPARTMENT

MAIN STREET IMPROVEMENTS Water, Sewer, Stormwater and Streetscape Improvements

Downtown Tampa Transportation Vision

CITY OF BRAMPTON STREET CORRIDOR MASTER PLAN

ADA POST INSPECTION CHECKLIST. Job No. Route County Location

CENTRAL BUSINESS DISTRICT STREETSCAPE AND IMPROVEMENT GUIDELINES

Draft Non Transportation Performance Measures Including Related Qualitative Assessment of Example Sections

Parklet FAQs. Each parklet has a sign on it clearly indicating that it is a public space.

HARRIS TEETER AT LADY S ISLAND CITY OF BEAUFORT DRB CONCEPTUAL PROJECT NARRATIVE Submittal Date: September 2, 2015 Meeting Date: September 10, 2015

OVERVIEW PROJECT SUMMARY

Bicycle and Pedestrian Subcommittee (BPS) Recommendation FY 2015 Transportation Alternatives Program (TAP) Allocation

BETTER STREETS PLAN SAN FRANCISCO POLICIES AND GUIDELINES FOR THE PEDESTRIAN REALM DRAFT PLAN RELEASE PACKET JUNE inside:

Guiding Principles. McCauley Area Focused Urban Design Plan. 1 Connect: Chinatown and Little Italy with downtown and surrounding areas

DIVISION STREET CORRIDOR STRATEGY Arlington, Texas May 17, 2012

Executive Director s Recommendation Commission Meeting: March 5, 2015

5 th Ward Alderman Neighborhood Representative Local media outlets

City of Auburn Americans with Disabilities Act (ADA) Transition Plan for Curb Ramps, Sidewalks, and Pedestrian Signals ADA TRANSITION PLAN

in Marina Del Rey Prepared by: County of Los Angeles Department of Public Works

Draft Goals and Objectives Wadena Comprehensive Plan City of Wadena, Minnesota. Land Use Goals:

ENGINEERING SOLUTIONS FOR DESIGNING YOUR SAFE ROUTES

North Avenue Corridor Study. Advisory Committee Meeting #5 June 11, 2014

City of Ashland Downtown Central Business District. Downtown Revitalization Grant Program APPLICATION PACKAGE

ARTICLE 32 - DOWNTOWN SIDEWALK DINING

Evanston Main Street Station TOD Plan and Study. Appendix A.1: Station Area Existing Conditions

CD i -STREETS- Detail #

SCHOOL OF ARCHITECTURE & COMMUNITY DESIGN COLLEGE OF THE ARTS UNIVERSITY OF SOUTH FLORIDA

KENTUCKY TRANSPORTATION CABINET. Department of Rural and Municipal Aid. Office of Local Programs

IN THE CITY COUNCIL OF THE CITY OF LIVERMORE, CALIFORNIA A RESOLUTION TO APPROVE A COMPLETE STREETS POLICY

WESTFIELD-WASHINGTON ADVISORY PLAN COMMISSION December 7, SPP-24 & 1512-ODP-24

ORDINANCE NO (As Amended)

01/31/13 ACHIEVING THE VISION FOR RESTON. Reston Master Plan Special Study Task Force

Tier 1 Strategies. WV Route 14 Corridor Management Plan

Rapid City Downtown Area Master Plan. Draft Plan Concepts April 2016

RESIDENTIAL DRIVEWAYS

APPENDIX C INLETS. The application and types of storm drainage inlets are presented in detail in this Appendix.

APPLICATION FOR OUTDOOR DINING

AREA: 2.37 acres NUMBER OF LOTS: 1 FT. NEW STREET: 0 LF. Single-family, Non-conforming machine shop

SCHEDULE 16 TO THE SPECIAL USE ZONE. Shown on the planning scheme map as SUZ16. BALLARAT RAILWAY STATION PRECINCT. Purpose

Pavement Management Program

Smart Growth Illustrated: Developer s Guidebook. City of Bentonville Community Development Department October 2006

Indiana Multimodal Project Indiana County, PA Mackin Engineering Company, Project No#5063 Date- January 22, 2015 FINAL REPORT.

Measuring the Street:

CITY OF ROANOKE AND TOWN OF VINTON, VIRGINIA. RSTP Funds Joint Application FOR

INFORMATION & APPLICATION FOR LARGE SIDEWALK PATIOS ON CITY PROPERTY

Schenk-Atwood Neighborhood Business District Master Plan

PLANNED UNIT DEVELOPMENT & SIDEWALK WAIVER REQUEST STAFF REPORT Date: November 7, 2013

UNIT PRICE LIST January 2009

Mississippi Drive Kickoff Event. 8/31/2015 & 9/1/2015 Meeting Minutes. Blue Zones: Dan Burden Presentation (Rotary Club Meeting)

How To Understand Were Street

CITY OF VAUGHAN EXTRACT FROM COUNCIL MEETING MINUTES OF JUNE 23, 2015

Guidelines for Fiber Optic Cable Permits

5. Guidelines for Site Elements

Demolition of 50% or more of an above grade main structure requires a demolition permit.

Developing Street Standards That Allow Flexibility

CITY COUNCIL WORKSHOP MAY 24, 2016

Preliminary Plan Application and Checklist

VISION, DESIGN PRINCIPLES & OVERALL PLANNING STRATEGY

City of Quesnel Business Façade improvement Program Guidelines for 2016 year

Houston BC s Age Friendly Plan: Executive Summary

Bicycle Parking Guide

Indiana Avenue Redevelopment Plan and Implementation Strategy

For more information, visit: rethinkingstreets.com

PEDESTRIAN SAFETY AND LAWS IN PENNSYLVANIA

GEORGIA COLLEGE & STATE UNIVERSITY

Update on Previous Related Transportation Enhancement Grants

G James Contractors Ltd.

The National Capital Urban Design and Security Plan. Designing and Testing. of Perimeter Security. Elements. National Capital Planning Commission

Roadway Cost Per Centerline Mile Revised June 2014

DESCRIPTION OF ACCOUNTING AND FINANCIAL REPORTING SYSTEM

Moving Ruston Forward. City of Ruston Infrastructure Maintenance and Improvements

How To Improve Safety

CITY COUNCIL PACKET MEMORANDUM

Envision Venice Strategic Plan for Fiscal Year Ending. September 30, Preserving and Enhancing the Venice Quality of Life.

City of Wichita, Kansas Americans with Disabilities Act Transition Plan Main Library Address

City of Valdosta Land Development Regulations. Table of Contents

Boise State University Bicycle/Pedestrian Safety Master Plan

Review Public Input Report Jenn Toothaker. Approval of Meeting Summaries: May 21, May 23, May 30, & June 20, 2013 Meetings

Design Guidelines for School Site and Adjacent Lands Planning

Alternatives to the Circ Project Prioritization Methodology Prepared for Circ Task Force July 28, 2011

Residential Driveway Installation Requirements. Table of Contents

Item No. 432S Portland Cement Concrete Sidewalks. 432S.1 Description

PLANNING DIVISION STAFF REPORT February 23, Summary. Background Information PREPARED FOR THE PLAN COMMISSION. Legistar File ID # 36810

City of Hilshire Village Pine Creek Ln Reconstruction

Bond Release Process for New Subdivision Developments in Fairfax County

APPENDIX F:TRIPLE BOTTOM LINE ANALYSIS

Road Repaving and Street Safety Bond Quarterly Status Report presented to the Citizens General Obligation Bond Oversight Committee As of March 2016

Los Angeles Union Station, CA Sustainable Neighborhood Assessment. April 22-23, 2014

Designing Pedestrian Facilities for Accessibility. ADA Compliance Training. Local Programs Engineer FHWA NJ Division

CONSTRUCTION MANAGER S WEEKLY PROGRESS REPORT

28.0 Development Permit Area #2 (Neighbourhood District)

- FREE! - The Official San Francisco BIKE GUIDE. 1st Edition

COURTING YOUR BICYCLE AND PEDESTRIAN FACILITIES... FROM A FORENSIC ENGINEERING AND PLANNING PERSPECTIVE

APPLICATION LAFAYETTE METROPOLITAN PLANNING ORGANIZATION (MPO) SURFACE TRANSPORTATION PROGRAM (STP) FUNDS TRANSPORTATION IMPROVEMENT PROGRAM (TIP)

Bicycle Safety Quiz Answers Parental Responsibilities

Transcription:

CITYOFOBERLIN OHIO CITY OF OBERLIN, OHIO FY 2011 OHIO SMALL CITIES COMMUNITY DEVELOPMENT BLOCK GRANT COMPREHENSIVE DOWNTOWN REVITALIZATION PROGRAM

Background In October, 2011, the City of Oberlin Planning and Development Department, with the authorization of City Council, applied to the Ohio Department of Development for funding under the State s FY 2011 Ohio Small Cities Community Development Block Grant Comprehensive Downtown Revitalization Program. The State s Community Development Block Grant (CDBG) Program is available to communities that have prepare a Downtown Revitalization Plan. The State receives funding to offer such grant programs from HUD. The City received notification of a grant award in the amount of $400,000.00 which amount is the maximum award possible under this grant program. The State s grant award indicates that: Funds are to be used for the historical preservation of 15 buildings in Oberlin s Central Business District. Other work includes code improvements, replacing water lines, electric service and storm sewers. The resurfacing of pavement, traffic management, street signs, street lighting and parking will be completed within the Central Business District. All eligible activities are to be completed no later than December 31, 2013.

Target Area

Private Building Rehabilitation The Downtown Revitalization Grant provides funding to assist building and business owners with building improvements in the Downtown District. Such improvements are intended to address Code violations or updates to meet current Code requirements. Eligible activities include electrical, plumbing, HVAC improvements; building accessibility; façade improvements; signage; etc. Any exterior changes to buildings must be reviewed locally, and subsequently approved by the Ohio Historic Preservation Office. Up to $15,000 is available to building or business owners in the form of a matching grant. $170,000.00 is available for this purpose. To date, fifteen (15) businesses in fourteen (14) buildings have benefitted under this program activity. Approximately $63,000.00 has been committed to those projects, and we encourage other building and business owners to consider applying.

East Block Pathway and Parking Improvements Concept

Recent Public Participation March 1, 2013. Public meeting for building and business owners and other stakeholders March 22, 2013. Building owners meeting to discuss project, esp. sanitary sewer replacement. April 19, 2013. OBP Design Sub Committee April 26, 2013. OBP Design Sub Committee May 8, 2013. OBP Design Sub Committee Task Groups: Wayfinding, Streetscape, Public Art

OMLPS and Public Works Projects 1. Community Power Improvement Project 2. MLK, Jr. Monument, Pathway and Lighting Improvements 3. College/Main Traffic Signal Upgrade for the Visually Impaired 4. Electric Vehicle Charging Station 5. West College Sanitary Sewer Main/Lateral Replacement 6. West College Paving Improvements 7. Central Business District Streetscape Improvements

Streetscape Improvements GOAL: TO DEVELOP AN ATTRACTIVE AND CONSISTENT DESIGN AESTHETIC TO EMPLOY THROUGHOUT THE CENTRAL BUSINESS DISTRICT Sidewalk Improvements replace Pavers select Repair/Replacement Street Furniture: Benches Refuse/Recycling Containers Planters Street Trees Bike Parking Facilities i Way finding Improvements Parking Improvements * All pictures from Conditions Assessment and Recommendations for Downtown Oberlin Streetscape, Oberlin Main Street Chamber Design Committee, March, 2010. Elizabeth Tisher

Paver Condition

Benches

Refuse/Recycling Collection

Planters and Planting Beds

Bike Parking

Way Finding

Public Works Department Contract 2013 04 West College and South Main St. Improvements Bid Opening: May 28, 2013 Target Award Date: June 3, 2013 West College Start Date: After Juneteenth West College Completion Date: August 2, 2013 South Main Start Date: After June 24, 2013 South Main Completion Date: August 23, 2013 Contract Incentive: $7,000 on or before July 19 th or $500/calendar day before August 2 nd

West College Sanitary Sewer Replacement New SAS Main from College Place to Main St. moves from south curb line +/ 10 north for required separation from water main. Per C.O. 915.11, the City is responsible for laterals l from the main to the edge of the right of way. West College SAS lateral condition survey finds cast iron services under building footers. Coordinate with building owners to replace building main under foundation into building. Owners eligible for 50% cost share through CDBG/DTR Grant.

Street Improvements GOAL: USE COMPLETE STREETS PRINCIPLES TO DESIGN, CONSTRUCT AND OPERATE THE PUBLIC RIGHTS OF WAY TO SAFELY ACCOMMODATE USERS OF ALL AGES AND ABILITIES INCLUDING PEDESTRIANS, CYCLISTS, MOTORISTS AND EMERGENCY, SERVICE AND TRANSIT VEHICLES. Change cross slope at east end to add 2 accessible parking spaces with a shared d5 wide access aisle il with a new ramp to the sidewalk Add on street bike parking at each end and on Tappan Square side, east of bookstorecrosswalk crosswalk. Actual bike rack equipment TBD. Improved bike access using shared lane markings sharrows east/west

West College Sidewalk Improvements Approximately 21 of right of way from the face of the curb to the front of the buildings Sidewalk segregated into 3 zones 1. RETAIL ZONE. +/ 10 from store front for outdoor seating/dining, sidewalk sales, etc. 2. PEDESTRIAN ZONE. 6 clear from College Place to Main 3. AMENITY ZONE. 18 curb width plus new 4 paver strip over infiltration trench. New conduit installed by OMLPS for West College lightingand convenience outlet circuit for West College lighting and convenience outlet circuit. Contract includes removal of existing street furniture Garbage cans, cigarette urns, concrete planters, hitching posts, benches, etc.

AzekPavers Joints and grid allow for permeable design Manufactured with up to 95 % post consumer recycled rubber and plastics, AZEK VAST Pavers offer visual appeal, design flexibility, strength, and durability. Grid system allows ease of installation

West College Landscape Concept Zelkovia Trees in triangular planters anchor corners Remove (5) existing red maples Remove existing tub planters Re purpose (7) existing tree wells as new landscape planting beds

South Main Improvements Community Power Improvement Project (by OMLPS/Contractor) Replacement of underground circuits, distribution junction boxes and relocation of outlets. Remove existing street furniture Garbage cans, cigarette urns, concrete planters, hitching posts, benches, etc. Paver replacement Concrete driveway aprons New ADA ramps at mid block bump outs Discussions continue with Oberlin Business Partnership Design sub committee on new street furniture, landscaping, way finding, etc.

West College Bid Alternate #1 Diagonal parking on the north side of West College April 30, 2008Planning Commission approval ofthe OC JazzStudies addition was received subject to the provision of angled parking on West College St. April 26, 2013 Letter from Oberlin Business Partnership: The Board of Trustees for the Oberlin Business Partnership proposes that the Oberlin City Manager and City Council recommend the expansion of the sewer replacement project scheduled dfor June and July 2013 to include creating diagonal parking spaces on the north side of West College Street Current configuration includes 13 parallel parking spaces. Diagonal parking within ihi the existing i R/W would provide adequate space for 19 parking spaces and would help to minimize the impact of moving bicycle parking off the sidewalks to the street.