GEOMEMBRANE LINERS, GEOSYNTHETIC SYSTEMS & FLOATING COVERS FOR LAGOONS

Similar documents
Corrosion protection linings. Issue 1

CCU Engineering Specifications. Section PRECAST CONCRETE PRODUCTS

FY08 SEWER POINT REPAIRS BID TABULATION

SECTION 807 PUMP STATION REHABILITATION

SECTION CEMENT-MORTAR LINED AND COATED STEEL PIPE

FY11 Sanitary Sewer Main Rehab and Point Repair Bid Tabulation

SECTION STORM DRAINAGE TABLE OF CONTENTS

SEPTIC SYSTEM CONSTRUCTION REQUIREMENTS ST. MARY S COUNTY HEALTH DEPARTMENT

HYLINER AKS HDPE LINING

LOWER NORTH OUTFALL SEWER AND NORTH OUTFALL SEWER REHABILITATION USING AMERON S T HAB METHOD

SECTION PRECAST CONCRETE UTILITY STRUCTURES

Cellar Tech Containment Well Cellar Systems

SUBDRAINS AND FOOTING DRAIN COLLECTORS. A. Construct subdrains, subdrain cleanouts and outlets, and footing drain collectors.

PUBLIC WORKS DESIGN, SPECIFICATIONS & PROCEDURES MANUAL LINEAR INFRASTRUCTURE

CITY OF SELMA, TEXAS Inspection Checklist: Commercial

725-R-599 PIPE LINING. (Revised ) SECTION 725, BEGIN LINE 1, INSERT AS FOLLOWS: SECTION 725 SLIP LINING OF EXISTING PIPE

Improving the flood resistance of your home. Advice sheet 6: Flood-resilient floors

DIVISION 2 - SEWERAGE AND DRAINAGE SECTION STORM DRAIN SYSTEMS PART 1 - GENERAL

Mark Cramer Inspection Services, Inc.

PIPE REHABILITATION. Industrial Wastewater Municipal Wastewater Drinking Water Pressure Pipes

Wastewater Collection System Supplemental Design Standards for Capital Improvement Program Projects

FORM DESIGN. easy to work with, and generally available.

SANITARY SEWER SPECIFICATIONS

Rehabilitation of an Aging Concrete Reservoir Adit Tower

AIR RELEASE, CLEANOUT, AND SEWER MANHOLES

The Most Advanced Name in Drainage Systems. Sanitary Sewer Pipe

Basement Moisture Problems

SECTION STORM DRAINAGE SYSTEM

Emerging Technologies in Wastewater Collection Systems

Section SEWER PIPE INSTALLATION AND TESTING

All content including text and photographs are protected by law - Copyright 2010 by

SECTION 3 SANITARY SEWER DESIGN

Wastewater Capital Projects Management Standard Construction Specification

Requirements for Building Application Submission

Lighthouse Engineering, L.L.C.

SUFFOLK COUNTY DEPARTMENT OF HEALTH SERVICES TOXIC/HAZARDOUS MATERIAL TRANSFER FACILITY DESIGN GUIDELINES

SECTION PUBLIC STORM UTILITY DRAINAGE PIPING

SECTION REMOVAL OR ABANDONMENT OF EXISTING UTILITIES AND UNDERGROUND STRUCTURES. 1. Trench excavation, backfill, and compaction; Section

8.7 Schluter -KERDI-LINE

TECHNICAL NOTE Culvert Sliplining and Lining of Casings with HPPipe

Plastics Engineering SYSTEM BEKAPLAST. Mechanically anchored thermoplastic lining for extreme conditions

SECTION 22 LIGHTNING PROTECTION SYSTEM

SECTION NONREINFORCED CONCRETE SEWER PIPE

SECTION PRECAST CONCRETE STRUCTURES

Secondary Containment: Regulations & BMPs. Beth Powell Vice-President and General Manager New Pig Energy bethp@newpigenergy.com

SECTION ASBESTOS CEMENT PIPE REPAIRS, DEMOLITION, AND DISPOSAL

Welcome: What is U Drain? Drain Materials. Flow

Drum Dispensing Stations

Native InDesign 2890 SaniTite Brochure 1/8" CMYK April 17, 07

San Antonio Water System Standard Specifications for Construction ITEM NO SLIP-LINING SANITARY SEWERS

ENERGY STAR Qualified New Homes Thermal Enclosure Checklist. Water Management Checklist. Eli Caudill

VOLUME V GUIDELINES FOR DESIGN CONSULTANT TABLE OF CONTENTS APPENDIX B: MASTER CONSTRUCTION SPECIFICATIONS AND PREPARATION GUIDE, DIVISIONS 0-10

This handout is a guide only and does not contain all of the requirements of the Minnesota State Building Code or city ordinances.

InsulView Window Installation Instructions

TECHNICAL SPECIFICATION SERIES 8000 PRECAST CONCRETE

CHAPTER 11 STORM DRAINAGE

After reading this lesson you will be able to: 12.3 IMPORTANCE OF ROOF 12.4 TYPES OF ROOF IN A HOUSE

Rehabilitation or Replacement? That Is The Question

Specifications for Residential Property Owners Connection to New Public Sewer

SEBENICO ATSI COMPANY OVERVIEW

SECTION FACILITY STORM DRAINAGE PIPING

Storm Sewer Trenchless Upgrade Alternatives and Recommendations

Project : CONSTRUCTION OF BUILDING(including electrical and plumbing works) FOR NATIONAL CENTRE FOR SUSTAINABLE COASTAL MANAGEMENT,CHENNAI

Guide to working on Public Sewers

Element D Services Plumbing

Table of Contents. Division 2 Site Work Site Preparation Site Demolition Tree Protection Excavation, Trenching, and Backfilling for Utilities

Summary 7/11/2012. Michigan Water Environment Association 2012 Annual Conference Boyne Mountain Resort

Installation of Large Diameter Buried Pipes

The ACR : Advanced Design Features for a Short Construction Schedule

Mobile Home Pre-Inspection Checklist

Pipe Bursting. Case Study at Zeeland, MI Collections Seminar September 6, Presentation Agenda. What is Pipe Bursting? What is Pipe Bursting?

SECTION GROUND WATER STORAGE TANKS

SECTION ABANDONMENT OF SEWER MAINS

Jay R. Smith Mfg. Co.

INTERCEPTORS TABLE OF CONTENTS S-WD-INTER

Coast Trunk Sewer Rehabilitation Project for the Orange County Sanitation District

Sewer Pipe Lining An Economic Solution for Pipe Rehabilitation By Tawana Albany Nicholas, Virgin Islands Waste Management Authority

Product Systems AQUAFIN-IC CEMENTITIOUS CRYSTALLINE PENETRATING WATERPROOFING. Waterproofing Specification

NCMA TEK CONCRETE MASONRY FOUNDATION WALL DETAILS. TEK 5-3A Details (2003)

L_All_Vocatinal_Ed_Construction. Sector: Construction. Sr. No Specialisation Page No 1 Construction and Building Technology 02.

SECTION STORM DRAIN SYSTEM

TARIFF CODE and updates standard

City of West Linn Public Works Standard Construction Specifications. Table of Contents

TABLE OF CONTENTS. Manhole, Frame, and Cover Installation (includes Drop Manhole) Additional Manhole Depth

Up-Down Construction Utilizing Steel Sheet Piles and Drilled Shaft Foundations

50AI01oe 02/15. Labko GRP cesspools. Instructions for installation, operation and maintenance

DIVISION 4300 STORM DRAINAGE

STANDARD SPECIFICATIONS SECTION PRECAST REINFORCED CONCRETE MANHOLES AND MANHOLE BASES. 1. Structure Earthwork: 02200

CHAPTER 11 STORM DRAINAGE

Meeting the Challenge of Pipeline Emergency Repair

CONTENTS. Page KERBS ETHEKWINI PRODUCTS ETHEKWINI PRODUCTS WATER CHANNELS WATER CHANNELS / GRILL BLOCKS / CHANNEL DRAIN COVERS

Drain & Tank Cleaning

R E S I D E N T I A L H O U S I N G

CONSOLIDATED EDISON CO. OF NEW YORK, INC. 4 IRVING PLACE NEW YORK, NY DISTRIBUTION ENGINEERING DEPARTMENT SUBSTATION & EQUIPMENT SECTION

SECTION 36 - CAST-IN-PLACE CONCRETE PIPE (CIPCP) TABLE OF CONTENTS

TYPICAL FIRE SAFETY INSPECTION VIOLATIONS

Sewer Rehabilitation Design Requirements

Waste Management. Infrastructure Rehabilitation in the U.S. Virgin Islands

SECTION UNDERGROUND ELECTRIC SERVICE

Transcription:

800-356-1480 256 852-0378 256 852-0388 fax GEOMEMBRANE LINERS, GEOSYNTHETIC SYSTEMS & FLOATING COVERS FOR LAGOONS Floating covers for odor control. Floating cover with gas extraction system. 1

Your Total Containment Resource GEOMEMBRANE LINERS, GEOSYNTHETIC SYSTEMS & FLOATING COVERS FOR LAGOONS Solid waste liner installation. Landfill closure with HDPE & other geosynthetics. Specialized Geomembrane liner installations for secondary containment. 2

800-356-1480 256 852-0378 256 852-0388 fax CONCRETE PROTECTIVE LINERS Concrete protective liner custom fabricated structures. Pump bases installed with lined trenches. Pump bases with secondary containment. Prefabricated double-contained sump liners. 3

Your Total Containment Resource CONCRETE PROTECTIVE LINERS INDUSTRIAL WASTEWATER SUMPS Polypropylene pipe penetration. Form tie caps welded to liner. tie caps Liner system with beam pockets. Field fabrication services. 4

Project Report Industrial wastewater neutralization plant Installation of 5mm HDPE tank concrete protective liners. 2 each Equalization tank liners - 25 w x 25 l x 17.5 d 2 each neutralization tanks - 10 w x 10 l x 17.5 d Total - 7,000 square feet View of project with plastic cover to maximize welding environment. Floor slab was poured and internal forms were placed. Liner was not installed in the floor at this time. Floor elevation is approx. 3 below finished elevation. Oversized pre-fabricated concrete protective liner panels were placed on forms. Internal view of wall. After concrete was poured and cured, the forms were removed. The liner panels were then welded together and all tie holes were capped. Screeds were formed and poured in floor. Strips of concrete protective liner were then placed on the screeds. Concrete was placed and screeded. 5

Project Report Continued Industrial wastewater neutralization plant Installation of 5mm HDPE concrete protective liners 2 each Equalization tank liners - 25 w x 25 l x 17.5 d 2 each neutralization tanks - 10 w x 10 l x 17.5 d Total - 7,000 square feet Floor panels were placed between screeds. Plywood was placed on panels and concrete blocks were used to keep the panels in place until the concrete cured. Floor panels were prepared for welding in the areas where they intersected on top of the screed strips. Welding of floor panels. Floor sloped to a sump. This photo shows a closeup of the wall and floor weld. 3455 Stanwood Blvd. Huntsville, Alabama 35811 256 852-0378 256 852-0388 fax Closeup of pipe penetrations Closeup of welded seams between panels and wall tie caps. (All welds are spark tested to ensure the liner system s integrity.) 6

Project Report Tank process area containment concrete protective liners Installation of 5mm HDPE non-skid floor, trench and sump liners. Approximately 2,500 square feet of lined area. Tank pad fabricated from HDPE plate. Process area non-skid floor lining. Lined trench with lined floor and acid brick tie-ins. 7

Project Report Tank process area containment concrete protective liners Installation of 5mm HDPE non-skid floor, trench and sump liners. Approximately 2,500 square feet of lined area. Lined sump. Non-skid floor liner Fabricated handrail base plates Floor and sump with fabricated HDPE gutter. Process area with equipment installed. 8

Project Report Pre-cast concrete pump station Installation of a double contained embedded HDPE concrete protective liner 6 0 diameter x 25 4 deep. Fabricated HDPE manhole liners. Manhole tops. The double contained pre-fabricated CPL cylinders are shown here ready for shipment to the concrete precaster. Foam disks were placed in penetration areas to block out concrete when poured. Close-up view of structure with HDPE valve & pipe penetrations connected. The secondary liner is extrusion welded and a 2 cap strip is extrusion welded to the primary liner. View of penetrations from structure interior. A non-destructive vacuum test was performed on the annular space between the primary and secondary liners to ensure system integrity. 9

Your Total Containment Resource DOUBLE CONTAINED TRENCH LINER SYSTEMS Shop fabricated trench liners. Liner system cast in place. Leak detection monitoring pipe. Fabric faced concrete protective liner seat for floor coating tie-in. 10 Formed liner system installation. Field welding and testing.

800-356-1480 256 852-0378 256 852-0388 fax TRENCH LINER INSTALLATION Pouring grout around formed liner system. Final grout placement. Copper sheathing for spark test. Trench liner joint preparation. Extrusion welding of trench sections. Spark testing welded sections. 11

Your Total Containment Resource CONCRETE PROTECTIVE LINER CUSTOM FABRICATED STRUCTURES PRE-FABRICATED TRENCHES Pre-fabrication of sloped trenches with grating seats. Pre-fabricated trench system layout for quality control. 12

800-356-1480 256 852-0378 256 852-0388 fax FABRICATED HDPE MANHOLES Manhole for acid sewer. Manhole section with ladder for landfill. Pre-fabricated manholes for landfill sludge system. Landfill sludge dewatering system with perforated piling and perforated HDPE header. 13

Your Total Containment Resource FABRICATED HDPE MANHOLES 120 x 90 double-contained HDPE pump station. Leachate collection system. Custom fabricated HDPE stuctures. 14

CUSTOM FABRICATED HDPE STRUCTURES HDPE fabricated distribution header box. HDPE specialized fabrication centrifugal separator. FABRICATED STRUCTURES PVC fabricated tanks. Reinforced free standing polypropylene tank. POLYPROPYLENE TANKS 15

CONTAINMENT PIPE Pre-fabricated dual containment pipe. Dual containment pipe assembly with spacer. Single and dual wall fabricated pipe fittings. FIELD FUSION SERVICES 16 Leachate force main. Landfill slope risers.

Your Total Containment Resource 3455 Stanwood Blvd. Huntsville, Alabama 35811 800-356-1480 256 852-0378 256 852-0388 fax