Frost and Cooper Renovations



Similar documents
SAN FRANCISCO UNIFIED SCHOOL DISTRICT 2011 PROPOSITION A BOND PROGRAM Paul Revere School Modernization and Interim Housing ADDENDUM NO.

SECTION ALUMINUM FRAMED ENTRANCES and STOREFRONTS. System 402 Flush-Glazed Screw Spline Storefront

DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS

RICHARD B. HUDGENS ARCHITECT, INC.AIA

Division 8 Doors & Windows

SECTION TABLE OF CONTENTS. H Proposed Material, Product or Equipment Substitution Request

ADDENDUM NO. 1. DATE: February 10, 2015 INVITATION FOR BID: IFB K Commerce Road Renovations Project DATED: February 9, 2015

SODA SPRINGS JOINT SCHOOL DISTRICT NO. 150 RECOMMENDED REPAIRS, REPLACEMENT, AND ADDITIONS OPINIONS OF PROBABLE COST

ST. MONICA FOOD PANTRY HOUSTON, TEXAS

2.02. Specifications. General. Products. Execution. Offset Pivots P-694 Top and Bottom Pivots

VOLUME V GUIDELINES FOR DESIGN CONSULTANT TABLE OF CONTENTS APPENDIX B: MASTER CONSTRUCTION SPECIFICATIONS AND PREPARATION GUIDE, DIVISIONS 0-10

HMMA 810 HOLLOW METAL DOORS HOLLOW METAL MANUAL -87 NAAMM STANDARD FOURTH EDITION METAL DOORS & FRAMES NAAMM 2 NAAMM 2 METAL DOORS & FRAMES

Think Of Us First! When It s Time to Distribute Your Plans

MIAMI-DADE COUNTY PERFORMANCE TEST REPORT. Report No.: B Rendered to: AMERICAN PRODUCTS, INC Tampa, Florida

ADVERTISEMENT FOR PREQUALIFICATION FOR THE FOLLOWING BID PACKAGES *RE-ADVERTISED*

The replacement or modification of existing windows shall comply with the following requirements:

Renovations for a New 18 Bed Gero-Psych Nursing Unit August 7, 2014 Lower Bucks Hospital Second Floor 501 Bath Road, Bristol, PA Addendum No.

KIEWIT CM/GC Enabling/Utilities

SAMPLE SCHEDULE OF VALUES APPLICATION & CERTIFICATE FOR PAYMENT

Judy P. Rosenstreich, Senior Policy Advisor

City of San Diego, CWP Guidelines

Braselton Bros. Store Redevelopment 5134 HWY 53 BRASELTON, GA LEVEL 0 - DEMO & NEW PLAN. Room. Room. Room. Room. Room. Room. Room. Room.

Repair and Remodeling Estimating Methods. 4th Edition. RSMeans

How To Test For An Architectural Test

A site plan or floor plan clearly identifying the location(s) of all new replacement window(s)

BASIC FIRE DOOR REQUIREMENTS TECHNICAL DATA SHEET NO. 401

Facility Summary. Facility Condition Summary. Seattle School District David T. Denny International Infrastructure. Facility Components

From the Office of: MAHLUM ARCHITECTS 71 Columbia Street Floor 4 Seattle, WA 98104

Fire-rated Aluminum Doors

The 60 minute Fire Rated Application Explained

Sub-Bid Contractor Update Statement. Tab A - Invitation for Bids. Tab B - Instructions to Bidders

All bidders shall indicate in their bid/proposal that this Addendum has been received and considered in their bid proposal.

REVEWED BY: Ross Rogien B.O/P.R. ADDITIONAL REVIEW(S) REQ.-FIRE DEPT Y/N

SECTION SECTIONAL OVERHEAD DOORS 521 SERIES ALUMINUM SECTIONAL OVERHEAD DOORS

Table of Contents. Division 2 Site Work Site Preparation Site Demolition Tree Protection Excavation, Trenching, and Backfilling for Utilities

DENVER PUBLIC SCHOOLS DESIGN AND CONSTRUCTION STANDARDS This Standard is for guidance only. SECTION SECURITY SYSTEMS

ASTM E 1886 / ASTM E 1996 AND ASTM E 283, ASTM E 330, ASTM E 331 TEST REPORT. Rendered to: BEKAERT SPECIALTY FILMS, LLC

17,280 square feet Overview:

The better way to build TM. Installation Manual. FOUNDATION SIPs & FROST WALLS SIPs

MOCK-UP TEST REPORT. Rendered to: TUBELITE, INC. PROJECT: 200 Series Curtain Wall Mock-Up

CSTM 102 Spring Construction Documents to Contract Documents

A ROAD MAP FOR YOUR CODE, SMOKE BARRIER & SMOKE PARTITION REQUIREMENTS

HEATING, VENTILATING, AND AIR CONDITIONING EQUIPMENT. Application Guidelines

CONSOLIDATED EDISON CO. OF NEW YORK, INC. 4 IRVING PLACE NEW YORK, NY DISTRIBUTION ENGINEERING DEPARTMENT SUBSTATION & EQUIPMENT SECTION

GUIDELINES FOR REHABILITATION OF TRADITIONAL COMMERCIAL BUILDINGS DESIGN GUIDELINES

PUBLIC RESTROOMS, DESIGN INTENT

Class A Office Buildings Commercial Facilities College and University Campuses K-12 Buildings Healthcare Facilities Government & Military Structures

SUCF PROJECT COST REPORTING GUIDE

JANUARY, 2016 TR-7100 Windows (Fixed) 1 EC ALUMINUM WINDOWS Guide Specs

Eggers meticulously-crafted door frames are rivaled only by their beauty, quality and lasting performance. Turning nature s beauty into works of art

All substantial design decisions and budget confirmation shall be resolved for the College to approve the Design Development Submittal.

Basic Fire Door Requirements

NOTICE TO CONTRACTORS

Automatic Door Selection Guide

The WANZ Guide to Window Installation

TEST REPORT. Report No.: B Rendered to: CROFT, LLC. Magnolia, Mississippi. PRODUCT TYPE: Aluminum Single Hung Window SERIES/MODEL: 95

WINDOWS AND PATIO DOORS

EAST LYME HIGH SCHOOL

A D D E N D U M # 3 QUESTIONS FROM BIDDERS: DATE: November 5, All Bidders. Jenne dos Santos, CBI Consulting Inc. City of Chelsea, MA

NORTH PENN HIGH SCHOOL RENOVATIONS

BUILDING PERMIT SPECIFICATIONS

Lincoln Public Schools. 15 Attachments (separately bound) Schematic Design Schematic Design Project Manual

BUNKER HILL ELEMENTARY SCHOOL

TruexCullins Architecture Fairfield Center School Bid Documents Kitchen and Bathroom Renovation March 1, 2015

Sapa: SECTION ARCHITECTURAL ALUMINUM HANDRAILS AND RAILINGS

JANUARY, 2016 NX-8900 Terrace Doors 1 EC ALUMINUM-FRAMED ENTRANCES AND STOREFRONTS Guide Specs

PERFORMANCE TEST REPORT. Rendered to: GLASSCRAFT DOOR COMPANY

CLIENT. Inspection Report. 271 Front St. Alert Bay, B.C. Island Building Inspections V ANCOUVER I SLAND B. C.

A. Project Name: NEW POLICE STATION HARRISON TOWNSHIP

TEST REPORT. Rendered to: INTERNATIONAL WINDOW Hayward, California. PRODUCT TYPE: Aluminum Hopper SERIES/MODEL: 7222

Residential Plan Routing Information

Fig. 2 WALL-TO-WALL PANEL CONNECTIONS CORNER WALL CONNECTION

C. Codes and References: Comply with the version year adopted by the Authority Having Jurisdiction.

SUBSTANTIAL IMPROVEMENT OR SUBSTANTIAL DAMAGE NOTICE TO PROPERTY OWNER

PARKVILLE HIGH SCHOOL LIMITED RENOVATION

PERFORMANCE TEST REPORT. Rendered to: GLASSCRAFT DOOR COMPANY

SECTION 3 ONM & J STRUCTURAL ANALYSIS

Mequon - Thiensville School District Long Range Facilities Plan Monthly Project Schedule

Building Department John Fiedler Construction Official Ext SAMPLE GUIDE FOR 1&2 FAMILY DWELLING BASEMENTS Rev

Point Auditorium Design Narrative PROJECT NAME: Point Auditorium DATE: 06/25/15 TO: Lance Francis FROM: Leslie Ellsworth

SECTION SERIES 1500 VINYL PATIO DOORS

COST OF WORK FORM. Abbreviations: ea = each, LF = linear feet, SF = square feet, HSF = square feet of living area (including garage conversion space)

190/350/500 Standard Entrances

Single Family Residential Basement Finish

C.R. LAURENCE COMPANY Worldwide Manufacturer and Supplier. Frameless and Framed Office Systems. CAT. NO. GW0S15 Glass Wall Office Systems

EDD-401. Stationary Louver Dual Drainable Blade. Application and Design. Standard Construction

COMMONLY USED RESIDENTIAL BUILDING CODES

SECTION FREIGHT & PARKING GARAGE ELEVATORS PART I - GENERAL

City and County of San Francisco Department of Public Works TABULATION OF BIDS

ASTM E 1886 and ASTM E 1996 TEST REPORT. Rendered to: Atrium Companies, Inc. SERIES/MODEL: 50/305 HS PRODUCT TYPE: Vinyl Horizontal Slider

NC Rehab Code Case Study Cheerwine Building January 17, 2002; rev 4/12/02

HOMEOWNER S PERMIT GUIDE

Steel Door Institute. Fire Rated Doors and Frames

Element D Services Plumbing

2 Flushline Entrances JANUARY, 2016 Guide Specs ALUMINUM-FRAMED ENTRANCES AND STOREFRONTS EC

Facility Assessment for East Main Street, Huntley, IL

Transcription:

Barton Malow Company LIVONIA PUBLIC SCHOOLS Livonia, Michigan Frost and Cooper Renovations BID PACKAGE No. 1 ADDENDUM # 3 February 17, 2014

Barton Malow Company Frost and Cooper Renovations MEMORANDUM ADDENDUM NO. 3 Client: Project Name: Livonia Public Schools Frost and Cooper Renovations Bid Package No.: 1 Issue : February 17, 2014 Bid Due : February 20, 2014 @ 12:00 p.m. (Official school clock) All requirements contained in the Contract Documents shall apply to this addendum no. 3 and the general character of the work called for in this addendum shall be the same as originally set forth in the applicable portions of the contract. This addendum no. 3 is hereby made a part of the contract documents and shall assume its position of relevance in the contract documents. TABLE OF CONTENTS 1) Barton Malow Issued Documents Fire Glass Substitution Request (2 Pages) Domestic Water Heater Substitution Request (2 Pages) Pre- Bid RFI Responses (4 Pages) 2) Barton Malow Clarifications: Work Scope 042000 Masonry (Not Re-Issued) o Clarify work scope Item #29: The $10,000 should be included at both schools ($10,000 at Frost and $10,000 at Cooper). 3) SHW Group Clarification Items and Sketches Addendum #3 Narrative (2 Pages) (End of Addendum No. 3 - Memorandum) Page 1 of 1 Addendum #3: February 17, 2014

X JPW 2-17-14

Sean McIntosh 02/14/14

Proposed water heater is acceptable pending owner approval.

Request for Information Summary Log, Open RFIs with Q/A 130736 - Livonia Public Schools RFI # Subject Author Company Answer Company Authored By Answered By Question Answer Created Req'd Answered In Review Days Late Closed BP 1 PB - 027 Frost - Aluminum Entrances Clarifications Barton Malow Company SHW Group Scott Lone John Waldrop 1) Which work category is responsible for the 45 min rated glass infill of hollow metal borrow lite frame per 8/A431? 2) Please reference section 2/A321, which work category is responsible for the 2 ½" x 3" aluminum angle secured to existing precast below the FRP panels? 3) Please reference section 2/A321, which work category is responsible for the 2 ½" x 6" bent plate fastened to the precast at the top of the FRP panels? 4) Please reference floor plan A111A, doors and framing at H001, H001B, H001C and H001D. What is the glass infill at this interior framing? 5) Please reference floor plan A111B at east wall shows note #1 for new storefront and glazing on both sides of (3) pairs of doors. There is no note for replacing the door and frame. Per D7/A201 it looks like the door, door frame and transom infill are to be existing to remain? Please confirm that only the framing and infill adjacent to the doors is to be provided. 6) Please reference door schedule A501 door # H009E. This door shows ETR with hardware set 61 listed. This set includes electrified panic, power transfer and power supply. What work category is responsible for this hardware? 2/14/14 2/14/14 2/17/14 3 3 Yes

Request for Information Summary Log, Open RFIs with Q/A RFI # Subject Author Company Answer Company Authored By Answered By Question Answer Created Req'd Answered In Review Days Late Closed 7) Please reference floor plan A111F and new FRP door H007C. There is not a note #1 to replace the sidelites of door. Elevation F4/A204 shows possible new FRP panels in sidelites. Is lower row of infill to be replaced with new FRP panels or is the sidelite framing and all infill to be new? Please clarify. 8) Please reference floor plan A111E rooms 009/ 010. There is no note indicating louver in storefront for unit ventilator. A louver is shown at both on G7/A202. Please advise. 9) Please reference elevation C7/A201 section G6/A301 thru slider window in storefront. Please reference sill condition on blow up 13/A321. This blow up does not show the slider window glazed into storefront. Furthermore spec section 084113 2.9 C states "subsill receptor" to be used. Is it the design intent to use a receptor inside the storefront? Please provide detail of design intent. 1) Aluminum Entrances contractor 084000 is responsible for glass infill. 2) See work scope item #10 in 084000 Aluminum Entrances work scope. 3) See work scope item #10 in 084000 Aluminum Entrances work scope. 4) Refer to door schedule A501, frame type K. 5) Existing doors and frames to remain. See pre-bid RFI BP 1 PB - 025. 6) By 084000 Aluminum Entrances contractor. 7) See note 3 and Frame Type D on A501. 8) Louvers to be supplied by the Mechanical contractor and installed by the 084000 Aluminum Entrances contractor. 9) The intent is to glaze the windows into the storefront with the thinest sightlines possible. BP 1 PB - 028 Cooper- Aluminum Entrances Clarifications Barton Malow Company SHW Group Scott Lone John Waldrop 1) Reference page A111A room 409, there is a pair of doors marked note #3 for new FRP. It has no door number associated with it. 2) Reference page A111E at room 117 door at court yard. Also (2) doors adjacent to same courtyard at corridor H004B. No door numbers at doors (3) total. 3) Lastly, please reference page A111B room 303 shows unit ventilator on floor plan. Looks like it is integrated into glazing but no note 31. Also there is no louver shown on elevation G7/A201. 2/17/14 2/17/14 2/17/14 0 0 Yes

Request for Information Summary Log, Open RFIs with Q/A RFI # Subject Author Company Answer Company Authored By Answered By Question Answer Created Req'd Answered In Review Days Late Closed 1. ROOM 409 - MISSING DOORS NUMBERS ARE 409 AND 409B - SEE SCHEDULE FOR DETAILS 2. ROOM 117 MISSING DOORS NUMBER IS 117B, TWO COURTYARD DOORS ARE NORTH DOOR - CYEA, SOUTH DOOR - CYEB. SEE SCHEDULE FOR DETAILS ON ALL 3. ROOM 303 - VUV SHOULD BE THRU WALL WITH LOUVER SIMILAR TO ROOM 303B BP 1 PB - 029 Cooper- Aluminum Entrances Clarifications Barton Malow Company Barton Malow Company Scott Lone Scott Lone Bid category 06 1000 Carpentry & General Trades: 1. Which Bid Category is responsible for: -concrete floor patching (ie. Cooper details F1&F6 on A401, Frost demo note 32-reference A111E rooms #34 & #019) -demo countertops at toilets (ie. Cooper- reference dwg AD401 toilets 26, 45, and 46) -Cooper details 9 & 12 on A321: Will all blocking, shims and plywood indicated be by the casework contractor 2. Cooper: Reference drawing AD111B and room # 303- note 35 is pointing at the casework. Is this note correct 3. Are hollow metal window frames to be pre-glazed also. Or will the glazier do in the field 4. Does the $10,000 temporary partition allowance per school include the temporary partitions at the exterior windows (reference bid category Scope of Work item 4) 5. Frost: Reference drawing A111F room #72A Time Out Room note #28. Please provide a detail/elevations or a description of the extent of the wall padding 1. Concrete floor patching - by mechanical. Demo countertops - by mechanical All required blocking or shims by casework contractor. 2/17/14 2/17/14 2/17/14 0 0 Yes 2. This should be note 34. Casework is to be removed by the 061000 General Trades/Carpentry contractor. 3. Hollow metal window frames are to be glazed in the field by the 084000 Aluminum Entrances contractor. 4. No. Include all costs for temporary protection as noted in work scope item #4 in your base bid. Also include a $10,000 for additional temp protection above

Request for Information Summary Log, Open RFIs with Q/A RFI # Subject Author Company Answer Company Authored By Answered By Question Answer Created Req'd Answered In Review Days Late Closed and beyond what is covered in work scope item #4. 5. Per spec section 11 66 23 provide and install 24" x 72" wall pads. Quantity of open RFIs: 3 Quantity of Late RFIs: 1 Overall Averages: 3 3

ADDENDUM Pre-Bid Addendum No. 03 TO PLANS AND SPECIFICATIONS FOR Livonia Public Schools BID Cooper Upper ES and Frost Middle School Renovation SHW Project No. 7113.057.00 February 17, 2014 NOTE: If you have questions about this project, please contact: John Waldrop, SHW- Construction Administrator. This Addendum is generally separated into sections for convenience; however, all contractors, subcontractors, material suppliers and other involved parties shall be responsible for reading the entire Addendum. Failure to list an item(s) in all affected sections of this Addendum does not relieve any party affected from performing per instructions, provided the information is set forth one time anywhere in the Addendum. This document shall become attached to and part of the Construction Documents for the aforementioned project. SPECIFICATIONS 1. Section 08 41 13 ALUMINUM ENTRANCES ANS STOREFRONT (not re-issued) a. Paragraph 2.2.A revise basis of design to Kawneer Trifab VG 451T b. Paragraph 2.3.A.3 revise framing profile to 4 ½ deep with 2 sightline c. Paragraph 2.4.D revise finish to clear anodized aluminum d. Paragraph 2.6.A.2 change Entrance Door Design to wide stile, 6 inch minimum stile width e. Paragraph 2.6.A.3 change door frame to 4 1/2 inches deep by 2 wide extruded aluminum framing members utilizing shear block construction throughout. f. Paragraph 2.11.B change ALUMINIM FINISHES to Project Name: BID Cooper Upper ES and Frost MS Renovation : February 17, 2014 Pre-Bid Addendum No. 03 Page 1 of 2

Clear Anodic Finish: AAMA 611, AA-M12C22A41, Class I, 0.018 mm or thicker DRAWINGS 1. Refer to sheet A111F (not re-issued) a. Add keynote 15 to two banks of lockers on the east side of Corridor H010. Each bank of lockers has (12) L2 lockers END OF PRE-BID ADDENDUM No. 03 Project Name: BID Cooper Upper ES and Frost MS Renovation : February 17, 2014 Pre-Bid Addendum No. 03 Page 2 of 2