ADVERTISEMENT FOR PREQUALIFICATION FOR THE FOLLOWING BID PACKAGES *RE-ADVERTISED*

Size: px
Start display at page:

Download "ADVERTISEMENT FOR PREQUALIFICATION FOR THE FOLLOWING BID PACKAGES *RE-ADVERTISED*"

Transcription

1 ADVERTISEMENT FOR PREQUALIFICATION FOR THE FOLLOWING BID PACKAGES *RE-ADVERTISED* BID PACKAGE DESCRIPTION REQUIRED LICENSE Bid Package No. 1 Asbestos Abatement C22 or B, with ASB & HAZ Certification Bid Package No. 2 Hard Demolition C21 Bid Package No. 4 Fiber-Reinforced Polymer Reinforcing A or B or C33 Bid Package No. 5 Shotcrete B or C8 Bid Package No. 6 Ceramic Tile, Flooring B or C54 Bid Package No. 7 Masonry C29 Bid Package No. 9 Ornamental Metal C23 Bid Package No. 11 Drywall and Plaster, Building Insulation B or C9 Bid Package No. 12 Finish Carpentry B or C6 Bid Package No. 15 Aluminum Panels, Flashing, Expansion Jt. Cover C43 Bid Package No. 16 Doors, Door Frames and Hardware B or C28 or D28 Bid Package No. 17 Glass and Glazing C-17 Bid Package No. 19 Terrazzo C-15 Bid Package No. 24 Toilet Partitions and Accessories / Wall and Corner Protection D34 Bid Package No. 27 Sprinkler, Fire Protection C-16 Subject to conditions prescribed by the CM/Contractor, responses to the CM/Contractor s prequalification documents for a Combined Bid Subcontract are sought from prospective subcontractor bidders (hereafter subcontractors ) for the following projects: UCLA CHS SEISMIC CORRECTION AND FIRE SAFETY Project Number UCLA CHS SOM WEST SEISMIC RENOVATION Project Number NOTE: Subcontractors who submitted documents during the first prequalification for these projects are not required to attend the Mandatory Prequalification Conference, and are not required to submit any further documentation, unless requested by the CM/Contractor. All subcontractors will be notified of their prequalification status once the verification process is complete. PREQUALIFICATION OF PROSPECTIVE BIDDERS: The CM/Contractor has determined that subcontractors who submit bids on these Bid Packages must be prequalified. SUBCONTRACTOR PREQUALIFICATION #2 1

2 GENERAL DESCRIPTION OF WORK: CHS SEISMIC CORRECTION AND FIRE SAFETY: Seismic and Fire Life Safety corrections to the 7 level Southeast Wing, 7 level School of Medicine East/Vivarium, and the 7 level Biomedical Library in the Center for the Health Sciences (CHS). Seismic correction work includes selective structural strengthening including Fiber Reinforced Polymer (FRP) wrapping of structural elements, cast in place concrete and exterior and interior shotcrete shear walls. Fire Life Safety correction work includes both Fire Suppression and Fire Alarm work upgrades. Fire Suppression work includes a new fire-main sprinkler loop expansion and new vertical wet standpipes. Fire alarm work includes the infrastructure for a new replacement fire alarm system. The scope of work to complete the seismic corrections and non-structural upgrades will include the removal, replacement and repair of building systems, elements, and finishes obstructing the proposed work. Additional work includes the abatement of hazardous materials, exterior brick and masonry repair, and code upgrades to existing door hardware, and toilet facilities. The buildings will remain occupied and operational during construction and require the coordination and staging of occupants. All work will be sequenced and phased and all work will be performed off-hours. The Anticipated Contract Value of this project is: $40,000, CHS SOM WEST SEISMIC RENOVATION: Seismic and Fire/life safety corrections to the School of Medicine West (SOM-W), Brain Research Institute and REED buildings and subterranean levels in the Center for the Health Sciences (CHS). Seismic correction work includes selective structural strengthening including Fiber Reinforced Polymer (FRP) wrapping of structural elements, cast in place concrete and interior shotcrete. Fire Life Safety correction work includes both Fire Suppression and Fire Alarm work upgrades. Fire Suppression work includes an expansion of the existing fire-main SUBCONTRACTOR PREQUALIFICATION #2 2

3 sprinkler loop and new vertical wet standpipes within the REED building. The work will also include the resupply to the existing lower levels within CHS from the main fire loop located on the first floor. Additionally, the existing fire main loop will be interconnected between the Semel Institute and CHS South Tower along the 1st floor bridge. Fire alarm work includes the infrastructure and backbone for a new replacement fire alarm system, within the subterranean levels of the CHS complex, School of Medicine West, REED and Brain Research Institute. Additional work includes relocation of existing utilities obstructing seismic correction work; tenant improvements, accessibility upgrades to toilet facilities, drinking fountains, doors and hardware; signage, control panels and handrails. Selective demolition of walls, ceilings and floor finishes to accommodate the structural repair will be required in addition to the restoration and installation of new interior finishes. The buildings will remain occupied and operational during construction and require the coordination and staging of occupants. All work will be sequenced and phased and all work will be performed off-hours. The Anticipated Contract Value of this project is: $20,000, ESTIMATED VALUE OF BID PACKAGES: Refer to specific Bid Package advertisement pages at for Estimated Bid Package Values. PREQUALIFICATION SCHEDULE: On Tuesday, May 17, 2016, prequalification documents will be available to intending Subcontractor bidders online at (each bidder must contact PCL Construction Services, Inc. to obtain access to view and download the prequalification documents) same documents will be issued at no cost at: PCL Construction Services, Inc. 650 Charles E. Young Dr. S Los Angeles, CA Level B, PCL Office BS-330 Tel: (310) MANDATORY PRE-QUALIFICATION CONFERENCE: A mandatory Pre-Qualification Conference for the above listed Bid Packages will be conducted on Thursday, May 19, 2016, beginning promptly at 10:00 a.m. Only Subcontractor bidders who participate in the Conference in its entirety will be allowed to submit prequalification documents, and if prequalification is achieved, bid on one of the above listed Bid Packages. Participants must arrive at or before the above-specified time. Persons arriving later than said time will not be allowed to submit prequalification documents or submit bids. Participants shall meet at: SUBCONTRACTOR PREQUALIFICATION #2 3

4 650 Charles E. Young Dr. S. Los Angeles, CA 90095, Conference Room BS-673 on Level B. (see map at end of this document) For further information, contact PCL Project Manager Sam Wen at NOTES: 1. Attendee shall be a staff member of the subcontractors firm who will be actively involved in responding to this Prequalification, and who is highly knowledgeable of the firm s potential response to the prequalification criteria. 2. Attendees are advised that time be allocated to secure parking. Attendees must allow ample time to drive to the above location in heavy traffic, find a parking space, walk to the building, and arrive in the designated Meeting Room prior to the required time. It is currently anticipated that the Conference will last 60 minutes. RFI PROCEDURES: Any questions related to the questionnaire shall be submitted in the form of an RFI. All RFI s are to be ed only, to Sam Wen, Sr. Project Manager, at swen@pcl.com and Ara Gregorian, Field Engineer, at agregorian@pcl.com. The deadline for RFI submission is Friday, May 20, 2016, 2:00 p.m. SUBMITTAL DEADLINE: Each bidder s completed Prequalification Questionnaire and associated documents must be received at: PCL Construction Services, Inc. 650 Charles E. Young Dr. S Los Angeles, CA Level B, PCL Office BS-330, (CM/Contractor s Office) Tel: (310) in a sealed envelope no later than: Wednesday, May 25, 2016, 2:00 p.m. NOTE: Only hard copy submittals will be accepted. Telephonic, electronic mail ( ), facsimile, or telegraphic Prequalification Questionnaires are invalid and will not be accepted. Only CM/Contractor s Prequalification Questionnaires (and associated documents) will be accepted. CM/Contractor reserves the right (but is not obligated) to request, receive, and evaluate supplemental information after the above time and date at its sole determination. Any person or entity not satisfied with the outcome of the prequalification must file a writ challenging the outcome within 10 calendar days from the date of the CM/Contractor s written notice regarding prequalification determination as further detailed in the Prequalification SUBCONTRACTOR PREQUALIFICATION #2 4

5 Questionnaire. Any assertion that the outcome of the prequalification process was improper will not be a ground for a bid protest. The dates, times, and location set for receiving and opening of bids will be set forth in an Advertisement for Bids. The CM/Contractor reserves the right to reject any or all responses to Prequalification Questionnaires and to waive non-material irregularities in any response received. All information submitted for prequalification evaluation will be considered official information acquired in confidence, and the CM/Contractor will maintain its confidentiality to the extent permitted by law. Every effort will be made to ensure that all persons have equal access to contracts and other business opportunities with the CM/Contractor within the limits imposed by law or University policy. Each bidder may be required to show evidence of its equal employment opportunity policy. The successful Bidder and its subcontractors will be required to follow the nondiscrimination requirements set forth in the Bidding Documents and to pay prevailing wage at the location of the work. The work described in the contract is a public work subject to section 1771 of the California Labor Code. No contractor or subcontractor, regardless of tier, may be listed on a Bid for, or engage in the performance of, any portion of this project, unless registered with the Department of Industrial Relations pursuant to Labor Code section and These projects are subject to compliance monitoring and enforcement by the Department of Industrial Relations. SUBCONTRACTOR PREQUALIFICATION #2 5

6 DIRECTIONS TO CONFERENCE ROOM #BS-673 SUBCONTRACTOR PREQUALIFICATION #2 6

NOTICE TO CONTRACTORS

NOTICE TO CONTRACTORS NOTICE TO CONTRACTORS Notice is hereby given that San Luis Obispo County Community College District, ( District ) is accepting sealed Informal Bidding Prequalification Applications and Formal Bidding Prequalification

More information

Solicitation 4448/4449 COOK/CHILL EQUIPMENT INSTALLATION & KITCHEN AIR CONDITIONING INSTALLATION. State of California

Solicitation 4448/4449 COOK/CHILL EQUIPMENT INSTALLATION & KITCHEN AIR CONDITIONING INSTALLATION. State of California Solicitation 4448/4449 COOK/CHILL EQUIPMENT INSTALLATION & KITCHEN AIR CONDITIONING INSTALLATION State of California May 20, 2010 2:04:19 PM PDT p. 1 Bid 4448/4449 COOK/CHILL EQUIPMENT INSTALLATION & KITCHEN

More information

College of the Siskiyous Insurance Requirements

College of the Siskiyous Insurance Requirements College of the Siskiyous Insurance Requirements Minimum Insurance Coverages for 2016 Pre-Qualification Contractor Insurance. The Contractor shall obtain and maintain the following insurance coverages with

More information

PRE BID MEETING AGENDA

PRE BID MEETING AGENDA PRE BID MEETING AGENDA Project Name: UCHC Academic Bldg. Addition & Renovation Meeting Location: UCHC, Farmington, CT Campus Project #: 901729 Meeting Date: December 10, 2014 1. Team Introductions: Construction

More information

Sub-Bid Contractor Update Statement. Tab A - Invitation for Bids. Tab B - Instructions to Bidders

Sub-Bid Contractor Update Statement. Tab A - Invitation for Bids. Tab B - Instructions to Bidders INTRODUCTORY INFORMATION TABLE OF CONTENTS 00 0101 PROJECT TITLE PAGE PROCUREMENT REQUIREMENTS (PROJECT MANUAL) Tab A - Invitation for Bids Tab B - Instructions to Bidders Tab C Bid Form for General Bids

More information

DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS

DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS NOTICE TO BIDDERS BID FORM INSTRUCTIONS TO BIDDERS CONTRACTOR S BID FOR PUBLIC WORK - FORM 96 MINORITY AND WOMEN S BUSINESS ENTERPRISE PARTICIPATION

More information

TruexCullins Architecture Fairfield Center School Bid Documents Kitchen and Bathroom Renovation March 1, 2015

TruexCullins Architecture Fairfield Center School Bid Documents Kitchen and Bathroom Renovation March 1, 2015 Fairfield Center School Kitchen and Bathroom Renovation Project Specifications Owner: Fairfield Center School, 57 Park Street, Fairfield VT 05455 Franklin Central Supervisory Union, 28 Catherine Street,

More information

KIEWIT CM/GC Enabling/Utilities

KIEWIT CM/GC Enabling/Utilities South Terminal Redevelopment Program KIEWIT CM/GC Enabling/Utilities Contract Value $50 million M/WBE Goal 20 percent Contact John Todd, LEED AP Project Manager 303.930.9046 john.todd@kiewit.com General

More information

17,280 square feet Overview:

17,280 square feet Overview: CENTRAL OFFICE Located at 167 Boston Post Road, East Lyme, Connecticut, the Central Office was built in 1916 as the original Flanders Elementary School and remains connected to the current school. The

More information

Repair and Remodeling Estimating Methods. 4th Edition. RSMeans

Repair and Remodeling Estimating Methods. 4th Edition. RSMeans Brochure More information from http://www.researchandmarkets.com/reports/2214808/ Repair and Remodeling Estimating Methods. 4th Edition. RSMeans Description: This estimating guide for repair and remodeling

More information

VOLUME V GUIDELINES FOR DESIGN CONSULTANT TABLE OF CONTENTS APPENDIX B: MASTER CONSTRUCTION SPECIFICATIONS AND PREPARATION GUIDE, DIVISIONS 0-10

VOLUME V GUIDELINES FOR DESIGN CONSULTANT TABLE OF CONTENTS APPENDIX B: MASTER CONSTRUCTION SPECIFICATIONS AND PREPARATION GUIDE, DIVISIONS 0-10 VOLUME V GUIDELINES FOR DESIGN CONSULTANT TABLE OF CONTENTS APPENDIX B: MASTER CONSTRUCTION SPECIFICATIONS AND PREPARATION GUIDE, DIVISIONS 0-10 SECTION B1: PREPARATION GUIDE B1.1 INTRODUCTION... B1-1

More information

PASADENA AREA COMMUNITY COLLEGE DISTRICT (PACCD) 2015 California Uniform Public Construction Cost Accounting Act (CUPCCAA) Informal Bid List

PASADENA AREA COMMUNITY COLLEGE DISTRICT (PACCD) 2015 California Uniform Public Construction Cost Accounting Act (CUPCCAA) Informal Bid List PASADENA AREA COMMUNITY COLLEGE DISTRICT (PACCD) 2015 California Uniform Public Construction Cost Accounting Act (CUPCCAA) Informal Bid List At their Board meeting of August 21, 2013, the Trustees of the

More information

Hunt Construction Group, Inc. LEVEL 1 DESIGN BUILD SPECIALTY CONTRACTOR PREQUALIFICATION DOCUMENTS FOR:

Hunt Construction Group, Inc. LEVEL 1 DESIGN BUILD SPECIALTY CONTRACTOR PREQUALIFICATION DOCUMENTS FOR: Hunt Construction Group, Inc. LEVEL 1 DESIGN BUILD SPECIALTY CONTRACTOR PREQUALIFICATION DOCUMENTS FOR: San Diego State University Basketball Practice Facility Project Number: 03400200 October 2013 San

More information

NOTICE TO CONTRACTORS INVITATION FOR BIDS

NOTICE TO CONTRACTORS INVITATION FOR BIDS NOTICE TO CONTRACTORS INVITATION FOR BIDS The REDEVELOPMENT AGENCY OF THE CITY OF SAN JOSE invites sealed written proposals for the FOUNTAIN ALLEY PEDESTRIAN WALK PROJECT ( Project ), located in the Century

More information

TOWN of NEW BOSTON. Bid Package. Refurbishment and Upgrade of Basement of the New Boston Town Hall

TOWN of NEW BOSTON. Bid Package. Refurbishment and Upgrade of Basement of the New Boston Town Hall TOWN of NEW BOSTON Bid Package Refurbishment and Upgrade of Basement of the New Boston Town Hall Your bid Envelope must be marked with Basement Upgrade at Town Hall and the due date and time. If you send

More information

How To Bid On A Building Project In San Jose

How To Bid On A Building Project In San Jose NOTICE TO CONTRACTORS INVITATION FOR BIDS The REDEVELOPMENT AGENCY OF THE CITY OF SAN JOSE invites sealed written proposals for the CIVIC AUDITORIUM BOILER SYSTEM REPLACEMENT PROJECT ( Project ), located

More information

Code Requirements for Existing Buildings

Code Requirements for Existing Buildings Code Requirements for Existing Buildings Kevin S. Hastings, P.E., LEED AP R. W. Sullivan, Inc. 529 Main St., Suite 203 Charlestown, MA (617) 523-8227 www.rwsullivan.com R.W. Sullivan Engineering (RWS)

More information

SECTION 00 0110 TABLE OF CONTENTS. H. 00 2115.01 - Proposed Material, Product or Equipment Substitution Request

SECTION 00 0110 TABLE OF CONTENTS. H. 00 2115.01 - Proposed Material, Product or Equipment Substitution Request SECTION 00 0110 PROCUREMENT AND CONTRACTING REQUIREMENTS 1.1 DIVISION 00 -- PROCUREMENT AND CONTRACTING REQUIREMENTS A. 00 0101 - Project Title Page B. 00 0105 - Certifications Page C. 00 0110 - Table

More information

Solicitation BF-6739 5109567/180437. Install Security System, Med Surge II. Bid designation: Public. State of California

Solicitation BF-6739 5109567/180437. Install Security System, Med Surge II. Bid designation: Public. State of California Solicitation BF-6739 Bid designation: Public State of California 1/10/2014 3:44 PM p. 1 Bid Number BF-6739 Bid Title Bid Start Date Jan 10, 2014 2:42:59 PM PST Bid End Date Feb 6, 2014 1:30:00 PM PST Question

More information

City and County of San Francisco Department of Public Works TABULATION OF BIDS

City and County of San Francisco Department of Public Works TABULATION OF BIDS City and County of Department of Public Works TABULATION OF BIDS SPEC NO.: 7536A(R ) TITLE: Potrero Branch Library Renovation BIDS RECEIVED: March 26.2008 BIDDERS (in the order received & opened): Bid

More information

Lee, Here are the questions from bidders received between August 17, 2015 and August 24, 2015 followed by our responses.

Lee, Here are the questions from bidders received between August 17, 2015 and August 24, 2015 followed by our responses. Lee Householder Project Homes 88 Carnation Street Richmond, VA 2325 Re: William Byrd Renovation, Addendum 01 August 24, 2015 Lee, Here are the questions from bidders received between August 17, 2015 and

More information

Building Condition Assessment Report

Building Condition Assessment Report C2 - Nurses Resident (aka Administration) Building Condition Assessment Report Asset Address Address Construction Year Size (Gross Floor Area) Asset Type Floors Above Ground Inspection Date C2 - Nurses

More information

INFORMAL BIDDING APPLICATION FOR REGISTRATION November 2015 October 2016

INFORMAL BIDDING APPLICATION FOR REGISTRATION November 2015 October 2016 INFORMAL BIDDING APPLICATION FOR REGISTRATION General Instructions: Bidders must complete the entire Application. If the requested information does not apply please indicate by N/A. If there is not enough

More information

Number Northern Arizona University Facility Services Section Page. Effective April 1, 2011

Number Northern Arizona University Facility Services Section Page. Effective April 1, 2011 Facility Services Section Page Recharge Services, Maintenance and Construction PURPOSE 1 of 6 The purpose of this policy is to set forth standards for chargeable services for maintenance and construction

More information

SUBSTANTIAL IMPROVEMENT OR SUBSTANTIAL DAMAGE APPLICATION REVIEW

SUBSTANTIAL IMPROVEMENT OR SUBSTANTIAL DAMAGE APPLICATION REVIEW CITY OF EDGEWATER BUILDING DEPARTMENT 104 North Riverside Drive Edgewater, Florida 32132 Phone: (386) 424-2400 X 1514 FAX: (386) 424-2423 SUBSTANTIAL IMPROVEMENT OR SUBSTANTIAL DAMAGE APPLICATION SUBSTANTIAL

More information

When is a Permit Required? What Types of Permits are Required? The most common types of projects that require permits are:

When is a Permit Required? What Types of Permits are Required? The most common types of projects that require permits are: When is a Permit Required? The most common types of projects that require permits are: -New Houses or buildings -Room Additions or Expansions -Structural repairs, remodeling and alterations -Accessory

More information

REQUEST FOR QUALIFICATIONS FROM FOUNDATION REPAIR CONTRACTORS BROOMFIELD DEPOT FOUNDATION REHABILITATION PROJECT

REQUEST FOR QUALIFICATIONS FROM FOUNDATION REPAIR CONTRACTORS BROOMFIELD DEPOT FOUNDATION REHABILITATION PROJECT Project Description and Scope The City and County of Broomfield, Colorado (Broomfield) hereby solicits this Request for Qualifications (RFQ) to prequalify and shortlist up to five (5) foundation repair

More information

Think Of Us First! When It s Time to Distribute Your Plans

Think Of Us First! When It s Time to Distribute Your Plans Think Of Us First! When It s Time to Distribute Your Plans CONSTRUCTION NOTEBOOK WILL LIST YOUR PLANS AND SPECS FREE CALL TODAY FOR DETAILS 702-876-8660 Why use Experience We have over 60 years of experience

More information

All bidders shall indicate in their bid/proposal that this Addendum has been received and considered in their bid proposal.

All bidders shall indicate in their bid/proposal that this Addendum has been received and considered in their bid proposal. Addendum #1 Fire Damage Repairs 4316 City View Terrace, Units A and B City View Terrace, OH5-13C, AMP 4 IFB #14-03 October 23, 2014 Greater Dayton Premier Management 400 Wayne Ave. Dayton, Ohio 45410 This

More information

CULVER CITY UNIFIED SCHOOL DISTRICT PREQUALIFICATION INFORMATION FOR PROSPECTIVE CONTRACTORS. May 21, 2015

CULVER CITY UNIFIED SCHOOL DISTRICT PREQUALIFICATION INFORMATION FOR PROSPECTIVE CONTRACTORS. May 21, 2015 I. BACKGROUND AND OVERVIEW PREQUALIFICATION INFORMATION FOR PROSPECTIVE CONTRACTORS May 21, 2015 The Culver City Unified School District ( District ), is prequalifying contractors to perform construction

More information

Capital Programs CHS SEISMIC CORRECTION AND FIRE SAFETY PROJECT NUMBER: 948943.01 CHS - SOM WEST SEISMIC RENOVATION PROJECT NUMBER: 948909.

Capital Programs CHS SEISMIC CORRECTION AND FIRE SAFETY PROJECT NUMBER: 948943.01 CHS - SOM WEST SEISMIC RENOVATION PROJECT NUMBER: 948909. Capital Programs CHS SEISMIC CORRECTION AND FIRE SAFETY PROJECT NUMBER: 948943.01 CHS - SOM WEST SEISMIC RENOVATION PROJECT NUMBER: 948909.01 REQUEST FOR QUALIFICATIONS MATERIALS TESTING AND INSPECTION

More information

ADDENDUM NO. 1. DATE: February 10, 2015 INVITATION FOR BID: IFB K150015033 1801 Commerce Road Renovations Project DATED: February 9, 2015

ADDENDUM NO. 1. DATE: February 10, 2015 INVITATION FOR BID: IFB K150015033 1801 Commerce Road Renovations Project DATED: February 9, 2015 ADDENDUM NO. 1 DATE: February 10, 2015 INVITATION FOR BID: IFB K150015033 1801 Commerce Road Renovations Project DATED: February 9, 2015 RECEIPT DATE: March 17, 2015 at 2:30 p.m. OPENING DATE: March 18,

More information

RESOLUTION NO. 2012-11

RESOLUTION NO. 2012-11 RESOLUTION NO. 2012-11 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF GARIBALDI ACTING AS CONTRACT REVIEW BOARD APPROVING A REQUEST FOR PROPOSAL DOCUMENT AND SAMPLE CONTRACT FOR THE GARIBALDI FIRE STATION

More information

Prequalification Supplement for First Tier Subcontractors under CM at Risk Wake Technical Community College Early Site North Campus Project

Prequalification Supplement for First Tier Subcontractors under CM at Risk Wake Technical Community College Early Site North Campus Project NC General Statue 143-128.1.c states, The construction manager at risk shall contract directly with the public entity for all construction; shall publically advertise as prescribed in G.S. 143-129; and

More information

REVEWED BY: Ross Rogien B.O/P.R. ADDITIONAL REVIEW(S) REQ.-FIRE DEPT Y/N

REVEWED BY: Ross Rogien B.O/P.R. ADDITIONAL REVIEW(S) REQ.-FIRE DEPT Y/N PLAN REVIEW FOR: PROJECT NAME: OWNER: ARCH/DESIGNER: ADDRESS: Ph/Fx: Plans Dated: E-mail: Sealed By: Estimated Project Cost - $ REVEWED BY: Ross Rogien B.O/P.R. ADDITIONAL REVIEW(S) REQ.-FIRE DEPT Y/N

More information

How To Plan A Building

How To Plan A Building State of Nevada Department of Administration Purchasing Division Las Vegas Purchasing Warehouse Facility Condition Analysis LAS VEGAS PURCHASING WAREHOUSE 1054 South Commerce Street Las Vegas, Nevada Site

More information

KBC Chapter 34 : Applying the Kentucky Building Code to Existing and Historic Buildings

KBC Chapter 34 : Applying the Kentucky Building Code to Existing and Historic Buildings KBC Chapter 34 : Applying the Kentucky Building Code to Existing and Historic Buildings Presented by: Kentucky Department of Housing, Buildings, and Construction Kentucky Heritage Council Louisville Metro

More information

SECTION 00100 NOTICE TO BIDDERS IVY TECH COLLEGE OF INDIANA NMC INFRASTRUCTURE IMPROVEMENTS INDIANAPOLIS, INDIANA

SECTION 00100 NOTICE TO BIDDERS IVY TECH COLLEGE OF INDIANA NMC INFRASTRUCTURE IMPROVEMENTS INDIANAPOLIS, INDIANA Ivy Tech Community College of Indiana, hereinafter referred to as the Owner, furnishes the following information and special instructions to prospective Bidders desiring to submit Bids for the Work on

More information

REQUEST FOR PROPOSALS

REQUEST FOR PROPOSALS ROWAN COUNTY 130 West Innes Street Salisbury, NC 28144 Tel: (704) 216-8174 Email: david.sifford@rowancountync.gov REQUEST FOR PROPOSALS FOR REPLACEMENT OF COMMERCIAL ROOFTOP AIR CONDITIONING UNIT Issued

More information

ST. MONICA FOOD PANTRY HOUSTON, TEXAS

ST. MONICA FOOD PANTRY HOUSTON, TEXAS PROJECT MANUAL FOR ST. MONICA FOOD PANTRY HOUSTON, TEXAS OWNER: ST. MONICA CATHOLIC CHURCH 8421 W. MONTGOMERY ROAD HOUSTON, TEXAS 77088 ARCHITECT: C SIX ARCHITECTURE, LLC 4606 F.M. 1960 WEST, STE 400 HOUSTON,

More information

OPTIMUS WORK CLASSIFICATION LIST ENTER ALL THAT APPLY

OPTIMUS WORK CLASSIFICATION LIST ENTER ALL THAT APPLY Cost Code # Description Cost Code # Description 01 00 00.001 General Requirements 02 00 00.001 Existing Conditions 01 31 19.13.001 Preconstruction Meetings 02 21 00.001 Surveys 01 32 33.001 Photographic

More information

How to Estimate the Cost of Interior Building Finishes from Schematic Drawings. CPE Candidate No. 0714108. December 2014

How to Estimate the Cost of Interior Building Finishes from Schematic Drawings. CPE Candidate No. 0714108. December 2014 How to Estimate the Cost of Interior Building Finishes from Schematic Drawings CPE Candidate No. 0714108 December 2014 1 How to Estimate the Cost of Interior Building Finishes from Schematic Drawings Table

More information

Building 5315. DEADLINE for PROPOSALS and PROPOSAL HOLDERS LIST

Building 5315. DEADLINE for PROPOSALS and PROPOSAL HOLDERS LIST BID SOLICITATION NOTICE - Turnpike FLORIDA DEPARTMENT OF TRANSPORTATION CONSTRUCTION AND MAINTENANCE PROGRAMS Orlando, Florida July 19, 2013 Advertisement No. 1 Bids for construction projects listed in

More information

SECTION 08 41 1 ALUMINUM FRAMED ENTRANCES and STOREFRONTS. System 402 Flush-Glazed Screw Spline Storefront

SECTION 08 41 1 ALUMINUM FRAMED ENTRANCES and STOREFRONTS. System 402 Flush-Glazed Screw Spline Storefront PART 1 GENERAL 1.01 Work Included SECTION 08 41 1 ALUMINUM FRAMED ENTRANCES and STOREFRONTS System 402 Flush-Glazed Screw Spline Storefront A. Furnish and install aluminum architectural storefront system

More information

MARKET SCOUT CONTRACTORS QUESTIONNAIRE (complete in addition to an Acord application) 1. Applicant:

MARKET SCOUT CONTRACTORS QUESTIONNAIRE (complete in addition to an Acord application) 1. Applicant: 1. Applicant: 2. Type of all work performed by or for applicant (check You if performed by applicant and Subs if performed by subcontractors and both if done by both): Air Condition Systems Installation,

More information

ESTIMATE ORIG. ESTIMATE: TOTAL: $204,249 DATE: 01/15/08 DESCRIPTION OF WORK QUANTITY DIVISION TOTAL

ESTIMATE ORIG. ESTIMATE: TOTAL: $204,249 DATE: 01/15/08 DESCRIPTION OF WORK QUANTITY DIVISION TOTAL PARTITIONS REGULAR WALLS 9' HIGH 214 LF TENANT DEMISING WALL 150 LF INTERIOR FURRED WALLS 9' 86 LF OFFICE DEMISING WALL 98 LF DOUBLE FRAME RADIUS WALL 18 LF RADIUS SOFFITS 172 LF SOFFIT 76 LF FINISH NEW

More information

State of North Carolina Prequalification for First Tier Subcontractors under CM at Risk

State of North Carolina Prequalification for First Tier Subcontractors under CM at Risk NC General Statute 143.128.1.c states, The construction manager at risk shall contract directly with the public entity for all construction; shall publicly advertise as prescribed in G.S. 143 129; and

More information

REQUEST FOR PROPOSALS SPEC. # 4995

REQUEST FOR PROPOSALS SPEC. # 4995 Department of Finance Tel (914) 654-2072 515 North Avenue Fax (914) 654-2057 New Rochelle, NY 10801 Howard Rattner Commissioner City of New Rochelle New York REQUEST FOR PROPOSALS SPEC. # 4995 NEW RO WORKS!

More information

HOUSING AUTHORITY OF THE COUNTY OF SAN JOAQUIN QUOTES FOR SMALL PURCHASE (QSP) 1314-011:

HOUSING AUTHORITY OF THE COUNTY OF SAN JOAQUIN QUOTES FOR SMALL PURCHASE (QSP) 1314-011: Interior Water Damage Repairs Water Line Repairs, Replace Drywall, Apply Painting and Install Carpeting & Rolled Vinyl Artesi II Daycare Facility at 777 W. Mathews Road, French Camp, CA 95231 Introduction:

More information

Renovations for a New 18 Bed Gero-Psych Nursing Unit August 7, 2014 Lower Bucks Hospital Second Floor 501 Bath Road, Bristol, PA 19007 Addendum No.

Renovations for a New 18 Bed Gero-Psych Nursing Unit August 7, 2014 Lower Bucks Hospital Second Floor 501 Bath Road, Bristol, PA 19007 Addendum No. Charles H. Cross III, AIA, NCARB, LEED AP Charles Cross Architecture, PC Renovations for a New 18 Bed Gero-Psych Nursing Unit Lower Bucks Hospital Second Floor 501 Bath Road, Bristol, PA 19007 Addendum

More information

Article 5: Building Regulations

Article 5: Building Regulations Article 5: Building Regulations Division 37: Additional Building Regulations for Archaic Materials and Methods of Construction (Added Additional Building Regulations for Archaic Materials and Methods of

More information

T34 - PUBLIC WORK IN MASSACHUSETTS, UNDERSTANDING CHAPTER 149 AND CHAPTER 149A

T34 - PUBLIC WORK IN MASSACHUSETTS, UNDERSTANDING CHAPTER 149 AND CHAPTER 149A T34 - PUBLIC WORK IN MASSACHUSETTS, UNDERSTANDING CHAPTER 149 AND CHAPTER 149A PANELISTS: Deborah Anderson, Esq. Office of the Attorney General Laura Wernick, FAIA, REFP, LEED AP HMFH Architects, Inc.

More information

INVITATION FOR BIDS CCK-2139-16 PROJECT 2369.2 PEDIATRIC CRITICAL CARE RENOVATION PHASE 3 ADDENDUM #3 6-22-16

INVITATION FOR BIDS CCK-2139-16 PROJECT 2369.2 PEDIATRIC CRITICAL CARE RENOVATION PHASE 3 ADDENDUM #3 6-22-16 INVITATION FOR BIDS CCK-2139-16 PROJECT 2369.2 PEDIATRIC CRITICAL CARE RENOVATION PHASE 3 ADDENDUM #3 6-22-16 ATTENTION: This is not an order. Read all instructions, terms and conditions carefully. IMPORTANT:

More information

Table of Contents. Division 2 Site Work Site Preparation Site Demolition Tree Protection Excavation, Trenching, and Backfilling for Utilities

Table of Contents. Division 2 Site Work Site Preparation Site Demolition Tree Protection Excavation, Trenching, and Backfilling for Utilities Division 1 Requirements Design and Construction Quality Campus Master Plans Texas Tech University System Operating and Building Maintenance Project Administration Historically Underutilized Business (HUB)

More information

DOCUMENT 00 11 16 NOTICE TO BIDDERS

DOCUMENT 00 11 16 NOTICE TO BIDDERS DOCUMENT 00 11 16 NOTICE TO BIDDERS 1. Notice is hereby given that The County of Alameda General Services Agency ( GSA ) Purchasing Department ( County or Owner ) will receive sealed bids for the following

More information

NOTICE INVITING BIDS. CIVIC FACILITIES AIR CONDITIONING REPLACEMENT PROJECT, CIP No. 14 03

NOTICE INVITING BIDS. CIVIC FACILITIES AIR CONDITIONING REPLACEMENT PROJECT, CIP No. 14 03 NOTICE INVITING BIDS CIVIC FACILITIES AIR CONDITIONING REPLACEMENT PROJECT, CIP No. 14 03 PUBLIC NOTICE IS HEREBY GIVEN that the City of National City, hereinafter referred to as the Agency, invites sealed

More information

SUBSTANTIAL IMPROVEMENT OR SUBSTANTIAL DAMAGE NOTICE TO PROPERTY OWNER

SUBSTANTIAL IMPROVEMENT OR SUBSTANTIAL DAMAGE NOTICE TO PROPERTY OWNER NOTICE TO PROPERTY OWNER Rebuilding your Home after the storm? Adding on, renovating, or remodeling your home? Here's information YOU need to know about the 50% Rule. If your home or business is below

More information

SODA SPRINGS JOINT SCHOOL DISTRICT NO. 150 RECOMMENDED REPAIRS, REPLACEMENT, AND ADDITIONS OPINIONS OF PROBABLE COST

SODA SPRINGS JOINT SCHOOL DISTRICT NO. 150 RECOMMENDED REPAIRS, REPLACEMENT, AND ADDITIONS OPINIONS OF PROBABLE COST SODA SPRINGS JOINT SCHOOL DISTRICT NO. 150 RECOMMENDED REPAIRS, REPLACEMENT, AND ADDITIONS OPINIONS OF PROBABLE COST SODA SPRINGS HIGH SCHOOL REPAIRS AND UPGRADES SITE Construction Estimate = $100,000

More information

REQUEST FOR PROPOSAL windows,sliding glass door repair and replacement contractors

REQUEST FOR PROPOSAL windows,sliding glass door repair and replacement contractors REQUEST FOR PROPOSAL windows,sliding glass door repair and replacement contractors TABLE OF CONTENTS INTRODUCTION AND BACKGROUND... 3 Purpose Of The Request For Proposal window repair and replacement contractors...

More information

Request for Proposal For Internet Service

Request for Proposal For Internet Service Request for Proposal For Internet Service Issue Date: Monday May 16, 2016 Due Date and Time: Wednesday June 8, 2016, 3:00 PM Mountain Time Receipt Location: City of Cottonwood Heights City Recorder s Office

More information

Core & Shell Construction. Rules and Regulations

Core & Shell Construction. Rules and Regulations Core & Shell Construction Rules and Regulations 1. Protection: During the construction Contractor shall endeavor to protect all areas of work from damage caused by workers, weather or equipment. 2. Permits

More information

QSP INFORMATION AT A GLANCE

QSP INFORMATION AT A GLANCE QSP INFORMATION AT A GLANCE CONTACT PERSON FOR QUESTIONS/INTERPRETATIONS: HOW TO OBTAIN THE QSP DOCUMENTS: HOW TO FULLY RESPOND TO THIS QSP BY SUBMITTING A QUOTE: NON-MANDATORY JOB WALK: PROJECT LOCATION:

More information

REQUEST FOR QUOTES (RFQ)

REQUEST FOR QUOTES (RFQ) REQUEST FOR QUOTES (RFQ) Lincoln County Public Works is requesting quotes (RFQ) through its Small Works Roster Process. Quotes are being requested for a project to replace the roof on the Crew Headquarters/Truck

More information

CHARLOTTE COUNTY Community Development Department

CHARLOTTE COUNTY Community Development Department CHARLOTTE COUNTY Community Development Department Building Construction Services Division 18400 Murdock Circle, Port Charlotte FL 33948 Phone: 941.743.1201 Fax: 941.764.4907 www.charlottecountyfl.gov 50

More information

New Ontario Building Code Requirements for Mid-rise Wood Frame Buildings

New Ontario Building Code Requirements for Mid-rise Wood Frame Buildings New Ontario Building Code Requirements for Mid-rise Wood Frame Buildings Note: This information addresses complex issues in a summary fashion. Consideration should be given to the official version of the

More information

7. Do you perform any out of state work?... If yes, in what states and provide details of work performed

7. Do you perform any out of state work?... If yes, in what states and provide details of work performed Applicant s Name* (*If more than one entity, attach separate sheet with description of each entity s operations, relationship to each other and ownership.) Contractors Application Agent Applicant Mailing

More information

SUCF PROJECT COST REPORTING GUIDE

SUCF PROJECT COST REPORTING GUIDE SUCF PROJECT COST REPORTING GUIDE State University Construction Fund 353 Broadway / ALBANY, NY 12246 SUCF 900 / 11 Table of Contents Page A. Preface 1 B. Area Takeoff Methodology 1. General 2 2. Net Assignable

More information

Corrected Form: Revised Attachment 7B Cost Proposal Distribution Exhibits A1 and A2 Attached

Corrected Form: Revised Attachment 7B Cost Proposal Distribution Exhibits A1 and A2 Attached ADDENDUM #1 RFP: 500 16 Design Build Maintenance & Operations Complex The following changes to the Request for Proposal and clarifications are provided based on questions received and must be added/considered

More information

CITY OF LOS ANGELES CALIFORNIA

CITY OF LOS ANGELES CALIFORNIA MERCEDES M. MÁRQUEZ GENERAL MANAGER PUBLIC COUNTERS 3550 WILSHIRE BOULEVARD, 15 TH FLOOR LOS ANGELES, CA 90010 3415 SOUTH SEPULVEDA BOULEVARD, SUITE 150 LOS ANGELES, CA 90034 8475 SOUTH VERMONT AVENUE

More information

Pumphouse Museum at the Historic Ottawa Beach Parks Park Township

Pumphouse Museum at the Historic Ottawa Beach Parks Park Township Pumphouse Museum at the Historic Ottawa Beach Parks Park Township Project Description: Wedged between Ottawa Beach Road and the Lake Macatawa Shoreline, the historic red brick industrial building commonly

More information

CONSTRUCTION LAW. Mechanical Roofing Contractor. Electrical Class A Air Conditioning. Contractor Class B Air Conditioning

CONSTRUCTION LAW. Mechanical Roofing Contractor. Electrical Class A Air Conditioning. Contractor Class B Air Conditioning CONSTRUCTION LAW I. Contractor Licensing 1. The Basic Rule: No person who is not certified or registered shall engage in the business of contracting in this state. FS 489.113. Pinellas County Code 22-14

More information

Mechanical Contractor Pre-Qualification Packet. SPSC N180 Computer Data Room Phase II. Project No. CP 159313. Notice No. Notice 13-11.

Mechanical Contractor Pre-Qualification Packet. SPSC N180 Computer Data Room Phase II. Project No. CP 159313. Notice No. Notice 13-11. Mechanical Contractor Pre-Qualification Packet SPSC N180 Computer Data Room Phase II Project No. CP 159313 Notice No. Notice 13-11 Issued by Department of Facilities Management Delivery address: Research

More information

9770 CULVER BOULEVARD CULVER CITY, CA 90232-0507 www.culvercity.org. Incidental improvements: improvements that do not qualify as minor or

9770 CULVER BOULEVARD CULVER CITY, CA 90232-0507 www.culvercity.org. Incidental improvements: improvements that do not qualify as minor or 9770 CULVER BOULEVARD CULVER CITY, CA 90232-0507 www.culvercity.org Construction Permitting Guidelines for Businesses Moving into Existing Buildings in Culver City If your business is moving into an existing

More information

Frost and Cooper Renovations

Frost and Cooper Renovations Barton Malow Company LIVONIA PUBLIC SCHOOLS Livonia, Michigan Frost and Cooper Renovations BID PACKAGE No. 1 ADDENDUM # 3 February 17, 2014 Barton Malow Company Frost and Cooper Renovations MEMORANDUM

More information

(On behalf of the homeowners) The YUROK TRIBE REQUEST FOR PROPOSAL (RFP)

(On behalf of the homeowners) The YUROK TRIBE REQUEST FOR PROPOSAL (RFP) 1 (On behalf of the homeowners) The YUROK TRIBE REQUEST FOR PROPOSAL (RFP) Homeowner Rehabilitation: Window Replacement & Repairs: Pecwan District, Yurok Reservation Contractor #2 Home Owners: Lana Crutchfield,

More information

CALLOWAY COUNTY SCHOOLS DISTRICT FACILITIES PLAN

CALLOWAY COUNTY SCHOOLS DISTRICT FACILITIES PLAN DISTRICT "SHELL" SUBMISSION DATE: 4/17/13 (delete following Hearing) KDE "SHELL" RESUBMISSION DATE: 4/19/13 (delete following Hearing) KBE APPROVAL DATE: JUNE 2013 CALLOWAY COUNTY SCHOOLS DISTRICT FACILITIES

More information

Ocoee, FL May 13, 2016 Advertisement No. 1

Ocoee, FL May 13, 2016 Advertisement No. 1 BID SOLICITATION NOTICE Turnpike FLORIDA DEPARTMENT OF TRANSPORTATION CONSTRUCTION AND MAINTENANCE PROGRAMS Ocoee, FL May 13, 2016 Advertisement No. 1 All bids must be completed using Expedite Bid software

More information

BILL OF QUANTITIES Part No.: Part Description

BILL OF QUANTITIES Part No.: Part Description Page 1 of 5 A. REMOVAL OF STRUCTURES 801 Demolition of Existing Structure lot 1 in words in words B. MASONRY WORKS 506(1)a Masonry Units (CHB) sq.m. 58.80 in words in words C. FABRICATED MATERIALS & HARDWARE

More information

RICHARD B. HUDGENS ARCHITECT, INC.AIA

RICHARD B. HUDGENS ARCHITECT, INC.AIA RICHARD B. HUDGENS ARCHITECT, INC.AIA 520 DALLAS AVENUE P.O. BOX 1467 SELMA, ALABAMA 36702 334-874-1335 PROJECT: RENOVATIONS AND ADDITIONS TO PEBBLE HILL (03-01-13) AU PROJECT NO. 06-176 LOCATION: OWNER:

More information

SAMPLE SCHEDULE OF VALUES APPLICATION & CERTIFICATE FOR PAYMENT

SAMPLE SCHEDULE OF VALUES APPLICATION & CERTIFICATE FOR PAYMENT SAMPLE SCHEDULE OF S 1.00 General Conditions 1.01 Project Management 1.02 General Superintendent 1.03 Superintendents 1.04 Safety Engineer 1.05 Scheduling 1.06 Field Engineering 1.07 Bonds 1.08 Trailer

More information

Ocoee, FL July 01, 2016 Advertisement No. 1

Ocoee, FL July 01, 2016 Advertisement No. 1 BID SOLICITATION NOTICE Turnpike FLORIDA DEPARTMENT OF TRANSPORTATION CONSTRUCTION AND MAINTENANCE PROGRAMS Ocoee, FL July 01, 2016 Advertisement No. 1 All bids must be completed using Expedite Bid software

More information

Facility Summary. Facility Condition Summary. Seattle School District David T. Denny International Infrastructure. Facility Components

Facility Summary. Facility Condition Summary. Seattle School District David T. Denny International Infrastructure. Facility Components Infrastructure Facility Condition Summary Weighted Avg Condition Score Facility Components Systems Surveyor/ Date Done Comments G Sitework.9 Site Improvements Parking Pedestrian Paving Site Development

More information

FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT 2 1109 S. Marion Avenue, Mail Station 2015 Lake City, Florida 32025-5874

FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT 2 1109 S. Marion Avenue, Mail Station 2015 Lake City, Florida 32025-5874 ADVERTISEMENT FOR LETTERS OF INTEREST FOR A DESIGN BUILD PROJECT (PROCUREMENT METHOD SHORTLISTING OF PROPOSERS WITH TECHNICAL AND PRICE EVALUATION BY ADJUSTED SCORE) PROCUREMENT NUMBER: E2N44 Financial

More information

Construction Permit Application Instructions Instructions for completing Construction Permit Applications and Technical Sections are as follows:

Construction Permit Application Instructions Instructions for completing Construction Permit Applications and Technical Sections are as follows: Construction Permit Application Instructions Instructions for completing Construction Permit Applications and Technical Sections are as follows: UCC-F100, Construction Permit Application pg. 1. Applicant

More information

City of Michigan City Housing Rehabilitation Program RFP Page 1 of 5

City of Michigan City Housing Rehabilitation Program RFP Page 1 of 5 CITY OF MICHIGAN CITY REDEVELOPMENT COMMISSION COMMUNITY DEVELOPMENT BLOCK GRANT (CDBG) HOUSING REHABILITATION PROGRAM REQUEST FOR PROPOSAL (RFP) 100 East Michigan Boulevard Michigan City, IN 46360 The

More information

D Sample Notices to Property Owners, Sample Affidavits, and Other Material

D Sample Notices to Property Owners, Sample Affidavits, and Other Material D Sample Notices to Property Owners, Sample Affidavits, and Other Material These samples are offered to illustrate specific points in the Desk Reference. States and communities should examine them carefully

More information

ROCKDALE COUNTY FINANCE DEPARTMENT PROCUREMENT OFFICE 958 MILSTEAD AVENUE CONYERS, GA 30012 770-278-7552

ROCKDALE COUNTY FINANCE DEPARTMENT PROCUREMENT OFFICE 958 MILSTEAD AVENUE CONYERS, GA 30012 770-278-7552 ROCKDALE COUNTY, GEORGIA April 4, 2011 WINDOWS 2008/EXCHANGE 2010 UPGRADE REQUEST FOR BID #11-15 ROCKDALE COUNTY FINANCE DEPARTMENT PROCUREMENT OFFICE 958 MILSTEAD AVENUE CONYERS, GA 30012 770-278-7552

More information

Request for Qualifications. Owner s Project Manager. Design and Construction of a New School Facility. K~8 Charter School

Request for Qualifications. Owner s Project Manager. Design and Construction of a New School Facility. K~8 Charter School Request for Qualifications Owner s Project Manager Design and Construction of a New School Facility K~8 Charter School 26 Madeira Avenue New Bedford, MA 02746 REQUEST FOR QUALIFICATIONS (RFQ) Issued: 4/16/2014

More information

Fire Damage Repairs, 2510 Burton Street

Fire Damage Repairs, 2510 Burton Street Fire Damage Repairs, 2510 Burton Street Introduction: The Housing Authority of the County of San Joaquin (Authority) is seeking quotes from Class B General Building Contractors (Contractor) to provide

More information

INTRODUCTION COST AND FEASIBILITY OF RENOVATING OR REPLACING AN OLD SCHOOL BUILDING

INTRODUCTION COST AND FEASIBILITY OF RENOVATING OR REPLACING AN OLD SCHOOL BUILDING INTRODUCTION COST AND FEASIBILITY OF RENOVATING OR REPLACING AN OLD SCHOOL BUILDING GS 521C-521 requires a local school board to submit its long-range plan for meeting school facility needs to the State

More information

NORTH PENN HIGH SCHOOL RENOVATIONS

NORTH PENN HIGH SCHOOL RENOVATIONS NORTH PENN HIGH SCHOOL RENOVTIONS PRELIMINRY SCOPE, BUDGET & PHSING CONSIDERTIONS 401 EST HNCOCK STREET LNSDLE, P 19446 PREPRED BY BONNETT SSOCITES INCORPORTED 220 BLDWIN TOWER, 1510 CHESTER PIKE EDDYSTONE,

More information

Why does the renovation and expansion of an EXISTING SCHOOL sometimes cost about the SAME or MORE than the construction of a NEW SCHOOL?

Why does the renovation and expansion of an EXISTING SCHOOL sometimes cost about the SAME or MORE than the construction of a NEW SCHOOL? Why does the renovation and expansion of an EXISTING SCHOOL sometimes cost about the SAME or MORE than the construction of a NEW SCHOOL? 1. BASIC FACTS: The current Abington High School building is 111,831

More information

Important Information for Owners of Buildings in Flood Zones

Important Information for Owners of Buildings in Flood Zones Important Information for Owners of Buildings in Flood Zones Rebuilding your home after the storm? Adding on, renovating, or remodeling your home? Here is information YOU need to know about the 50 percent

More information

Project Management Division

Project Management Division CAPITAL PROJECTS DEPARTMENT MONTHLY ACTIVITY REPORT February 2015 Project Management Division BELOW: Collins Construction crews complete recent exterior work and await delivery of exterior siding. Collins

More information

REQUEST FOR PROPOSAL Procurement of Landscaping Services

REQUEST FOR PROPOSAL Procurement of Landscaping Services City of Montrose Purchasing Division 433 South First Street PO Box 790 Montrose, CO 81402 REQUEST FOR PROPOSAL Procurement of Landscaping Services Issue Date: Thursday February 27, 2014 Bid Number: 14-012

More information

RESNET Building Performance Conference Orlando, FL March 2011

RESNET Building Performance Conference Orlando, FL March 2011 RESNET Building Performance Conference Orlando, FL March 2011 Who we are: Joint Labor-Management Training Trust Fund Est.1969 Training Arm of LIUNA Services 70+ Affiliated Training Centers in the US and

More information

SAN FRANCISCO UNIFIED SCHOOL DISTRICT 2011 PROPOSITION A BOND PROGRAM Paul Revere School Modernization and Interim Housing ADDENDUM NO.

SAN FRANCISCO UNIFIED SCHOOL DISTRICT 2011 PROPOSITION A BOND PROGRAM Paul Revere School Modernization and Interim Housing ADDENDUM NO. SAN FRANCISCO UNIFIED SCHOOL DISTRICT 2011 PROPOSITION A BOND PROGRAM Paul Revere School Modernization and Interim Housing ADDENDUM NO. 1 PROJECT: Paul Revere School DATE: March 25, 2015 Modernization

More information

Program/Construction Management Request for Qualifications

Program/Construction Management Request for Qualifications Solano Community College District Program/Construction Management Request for Qualifications Please note: Applicants must attend the mandatory pre-qualification conference on Friday, January 11, 2013 at

More information

REQUEST FOR PROPOSAL: STRUCTURED CABLING, LAN SWITCHES, LONG DISTANCE SERVICE, ELECTRONIC FAXING, AND HOSTED VOIP SPECIFICATIONS

REQUEST FOR PROPOSAL: STRUCTURED CABLING, LAN SWITCHES, LONG DISTANCE SERVICE, ELECTRONIC FAXING, AND HOSTED VOIP SPECIFICATIONS SECOND ADDENDUM TO RFP DOCUMENTS REQUEST FOR PROPOSAL: STRUCTURED CABLING, LAN SWITCHES, LONG DISTANCE SERVICE, ELECTRONIC FAXING, AND HOSTED VOIP SPECIFICATIONS 11/9/2015 To All Potential Bidders: This

More information

General Fire Code Requirements Within Commercial Tenant Spaces

General Fire Code Requirements Within Commercial Tenant Spaces FIRE DEPARTMENT in cooperation with Scope: General Fire Code Requirements Within Commercial Tenant Spaces This handout is designed to assist owners, architects, contractors and others in understanding

More information