1 ADDENDUM NO. 1 DATE: February 10, 2015 INVITATION FOR BID: IFB K Commerce Road Renovations Project DATED: February 9, 2015 RECEIPT DATE: March 17, 2015 at 2:30 p.m. OPENING DATE: March 18, 2015 at 2:30 p.m. SUBJECT: Pre-Bid Meeting & Site Visit/Revised Table of Contents Ladies/Gentlemen: Please take note of the following: Pre-Bid Meeting revised location: 1. Is scheduled for, Tuesday, February 17, 2015 at 10:00 a.m. Location: Department of Utilities, Wastewater Treatment Plant Admin Conference Room: 1400 Brander Street, Richmond, VA. A site visit will immediately follow the pre-bid meeting. Table of Contents: 1. Delete and replace in its entirety the front cover and Table of Contents with the attached revised front cover and Table of Contents. Vendor must take due notice and be governed accordingly. This addendum must be acknowledged as indicated in the Bid Book or your bid may not be considered. Sincerely, Kristina Jones Kristina Jones Contract Specialist 804/

2 CITY OF RICHMOND DEPARTMENT OF PROCUREMENT SERVICES RICHMOND, VIRGINIA (804) February 9, 2015 Invitation for Bid K PROJECT BOOK For the construction of 1801 Commerce Road Renovation Due Date: March 17, 2015 / Time: 2:30 P.M. Opening Date: March 18, 2015/ Time: 2:30 P.M. Receipt Location: City Hall, 900 East Broad Street, 11 th Floor, Room 1104 Pre-Bid Meeting: Is scheduled for, Tuesday, February 17, 2015 at 10:00 a.m. Location: Department of Utilities, Wastewater Treatment Plant Admin Conference Room: 1400 Brander Street, Richmond, VA. A site visit will immediately follow the pre-bid meeting. Invitation for Bid Prepared by: Name: Kristina Jones, VCO Title: Contract Specialist Telephone: (804) Fax: (804) kristina.jones@richmondgov.com City of Richmond, Department of Procurement Services 900 East Broad Street, Room 1104, Richmond, VA Page 1 of 60

3 TABLE OF CONTENTS 1801 Commerce Road Renovation Page(s) 1. Bid Form Part 1 - Statement of Work Part 2 General Conditions of the Contract Part 3 Special Conditions of the Contract Forms and Attachments Affidavit of Payment and Claims City of Richmond Bid Bond Sample Contract City of Richmond Performance Bond City of Richmond Labor and Material Payment Bond Field Change Order Directive (FCOD) Proposed Change Order Form (PCO Form) Construction Change Order Summary ACH-Direct Deposit Form EDI Payment Agreement for Contractors Construction Contractor Performance Evaluation MBE/ESB Participation Form (MBE-2) Monthly Compliance Report (MBE-3) VOLUME 1 DIVISION GENERAL REQUIREMENTS Summary Measurement and Payment Limitation on Sequence of Construction Change Order Procedures Administrative Requirements Coordination and Meetings Construction Progress Schedule Quality Requirements Regulatory Requirements Definitions Code-Required Special Inspections Temporary Facilities and Controls Temporary Utilities Field Offices and Sheds Temporary Erosion and Sediment Control Page 2 of 60

4 Indoor Air Quality Controls Temporary Project Signage Product Requirements Volatile Organic Compound (VOC) Content Restrictions Execution and Closeout Requirements Shutdown And Tie-ins Closeout Submittals Demonstration and Training Special Project Provisions DIVISION EXISTING CONDITIONS Demolition DIVISION CONCRETE Cast-in-Place Concrete DIVISION MASONRY Maintenance of Masonry Unit Masonry DIVISION METALS Structural Steel Framing Cold-Formed Metal Framing Metal Fabrications Metal Stairs DIVISION WOOD, PLASTICS, AND COMPOSITES Rough Carpentry Finish Carpentry Architectural Wood Casework DIVISION THERMAL AND MOISTURE PROTECTION Thermal Insulation Weather Barriers Metal Composite Material Wall Panels Ethylene-Propylene-Diene-Monomer Roofing (EPDM) Page 3 of 60

5 Sheet Metal Flashing and Trim Roof Specialties Roof Accessories Joint Sealers Gas Vapor Barrier System Soil Gas Collection System DIVISION OPENINGS Hollow Metal Doors and Frames Flush Wood Doors Access Doors and Panels Coiling Counter Doors Overhead Coiling Doors Aluminum-Framed Storefronts Glazed Aluminum Curtain Walls Unit Skylights Door Hardware Glazing Mirrors Louvers DIVISION FINISHES Gypsum Board Assemblies Tiling Acoustical Ceilings Luminous Ceilings Wood Panel Ceilings Resilient Flooring Static Dissipative Resilient Flooring Fluid-Applied Flooring Tile Carpeting Painting and Coating High-Performance Coatings DIVISION SPECIALTIES Visual Display Boards Page 4 of 60

6 Plastic Toilet Compartments Folding Panel Partitions Wall and Corner Guards Toilet, Bath, and Laundry Accessories Fire Protection Specialties Lockers Free Standing Mezzanines DIVISION EQUIPMENT Projection Screens Laboratory Fume Hoods DIVISION FURNISHINGS Steel Laboratory Casework and Flex-Core Adaptable Furniture Cores Countertops Entrance Floor Mats And Frames DIVISION SPECIAL CONSTRUCTION DIVISION CONVEYING EQUIPMENT (NOT USED) APPENDIX A -- HAZARDOUS MATERIALS REPORT APPENDIX B -- GEOTECHNICAL REPORT APPENDIX C SUBSURFACE CONTAMINATION REPORT VOLUME 2 DIVISION FIRE SUPPRESSION Basic Fire Protection Requirements Wet Pipe Sprinkler Systems DIVISION PLUMBING Common Work Results for Plumbing Sleeves and Sleeve Seals for Plumbing Piping Escutcheons for Plumbing Piping Page 5 of 60

7 Thermometers and Gages for Plumbing Piping General-Duty Valves for Plumbing Piping Hangers and Supports for Plumbing Piping and Equipment Identification for Plumbing Piping and Equipment Plumbing Piping Insulation Domestic Water Piping Domestic Water Piping Specialties Domestic Water Pumps Sanitary Waste and Vent Piping Sanitary Waste Piping Specialties Facility Storm Drainage Piping Storm Drainage Piping Specialties General-Service Compressed-Air Piping General-Service Packaged Air Compressors and Receivers Fuel-Fired, Domestic-Water Heaters Plumbing Fixtures Emergency Plumbing Fixtures Drinking Fountains Natural-Gas Piping Specialty Gas Piping for Laboratory Facilities Processed Water Systems for Laboratory Facilities DIVISION HEATING, VENTILATING, AND AIR-CONDITIONING (HVAC) Basic Mechanical Requirements HVAC Air Distribution System Cleaning Common Work Results for HVAC Common Motor Requirements for HVAC Equipment Meters and Gages for HVAC Piping General-Duty Valves for HVAC Piping Hangers and Supports for HVAC Piping and Equipment Heat Tracing for HVAC Piping Identification for HVAC Piping and Equipment Testing, Adjusting, and Balancing for HVAC HVAC Insulation Commissioning of HVAC Instrumentation and control for HVAC Page 6 of 60

8 Sequence of Operations for HVAC Controls Variable-Frequency Motor Controllers Enclosed Controllers Hydronic Piping Underground Hydronic Energy Distribution Hydronic Pumps Metal Ducts Air Duct Accessories HVAC Power Ventilators Air Terminal Units Diffusers, Registers, and Grills HVAC Gravity Ventilators Condensing Boilers Scroll Water Chillers Modular Indoor Central-Station Air-Handling Units Split-System Air-Conditioners Hydronic Unit Heaters Electric Unit Heaters DIVISION ELECTRICAL Basic Electrical Requirements Basic Electrical Materials and Methods Conductors and Cables Grounding and Bonding Hangers and Supports Raceway and Boxes Cable Trays Identification for Electrical Systems Lighting Control Devices Relay Lighting Control System Dry-Type Transformers Switchboards Panelboards Wiring Devices Fuses Enclosed Switches and Circuit Breakers Page 7 of 60

9 Packaged Engine Generators Transfer Switches Lighting Fire Alarm DIVISION COMMUNICATIONS DIVISION ELECTRONIC SAFETY AND SECURITY DIVISION EARTHWORK DIVISION EXTERIOR IMPROVEMENTS Chain Link Fences and Gates DIVISION UTILITIES End of Table of Contents Page 8 of 60

SECTION 00 0110 TABLE OF CONTENTS. H. 00 2115.01 - Proposed Material, Product or Equipment Substitution Request

SECTION 00 0110 TABLE OF CONTENTS. H. 00 2115.01 - Proposed Material, Product or Equipment Substitution Request SECTION 00 0110 PROCUREMENT AND CONTRACTING REQUIREMENTS 1.1 DIVISION 00 -- PROCUREMENT AND CONTRACTING REQUIREMENTS A. 00 0101 - Project Title Page B. 00 0105 - Certifications Page C. 00 0110 - Table

More information

DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS

DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS NOTICE TO BIDDERS BID FORM INSTRUCTIONS TO BIDDERS CONTRACTOR S BID FOR PUBLIC WORK - FORM 96 MINORITY AND WOMEN S BUSINESS ENTERPRISE PARTICIPATION

More information

ST. MONICA FOOD PANTRY HOUSTON, TEXAS

ST. MONICA FOOD PANTRY HOUSTON, TEXAS PROJECT MANUAL FOR ST. MONICA FOOD PANTRY HOUSTON, TEXAS OWNER: ST. MONICA CATHOLIC CHURCH 8421 W. MONTGOMERY ROAD HOUSTON, TEXAS 77088 ARCHITECT: C SIX ARCHITECTURE, LLC 4606 F.M. 1960 WEST, STE 400 HOUSTON,

More information

Sub-Bid Contractor Update Statement. Tab A - Invitation for Bids. Tab B - Instructions to Bidders

Sub-Bid Contractor Update Statement. Tab A - Invitation for Bids. Tab B - Instructions to Bidders INTRODUCTORY INFORMATION TABLE OF CONTENTS 00 0101 PROJECT TITLE PAGE PROCUREMENT REQUIREMENTS (PROJECT MANUAL) Tab A - Invitation for Bids Tab B - Instructions to Bidders Tab C Bid Form for General Bids

More information

MTA UNIVERSAL STATION PEDESTRIAN BRIDGE Los Angeles, CA. Project Manual and Specification 100% PE SUBMITTAL TABLE OF CONTENTS

MTA UNIVERSAL STATION PEDESTRIAN BRIDGE Los Angeles, CA. Project Manual and Specification 100% PE SUBMITTAL TABLE OF CONTENTS Los Angeles, CA Project Manual and Specification DIVISION 1 GENERAL CONDITIONS 01 01 10 STATEMENT OF WORK 01 11 00 SUMMARY OF THE WORK 01 14 05 METRO (OWNER) - DIRECTED STOPPAGES 01 20 00 PRICE AND PAYMENT

More information

Table of Contents. Division 2 Site Work Site Preparation Site Demolition Tree Protection Excavation, Trenching, and Backfilling for Utilities

Table of Contents. Division 2 Site Work Site Preparation Site Demolition Tree Protection Excavation, Trenching, and Backfilling for Utilities Division 1 Requirements Design and Construction Quality Campus Master Plans Texas Tech University System Operating and Building Maintenance Project Administration Historically Underutilized Business (HUB)

More information

VOLUME I PROCUREMENT AND CONTRACTING DOCUMENTS GROUP

VOLUME I PROCUREMENT AND CONTRACTING DOCUMENTS GROUP 11044 1 VOLUME I PROCUREMENT AND CONTRACTING DOCUMENTS GROUP DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS 00 31 32 Geotechnical Data 00 70 00 General Conditions 00 73 00 Supplementary Conditions

More information

SAMPLE SCHEDULE OF VALUES APPLICATION & CERTIFICATE FOR PAYMENT

SAMPLE SCHEDULE OF VALUES APPLICATION & CERTIFICATE FOR PAYMENT SAMPLE SCHEDULE OF S 1.00 General Conditions 1.01 Project Management 1.02 General Superintendent 1.03 Superintendents 1.04 Safety Engineer 1.05 Scheduling 1.06 Field Engineering 1.07 Bonds 1.08 Trailer

More information

OPTIMUS WORK CLASSIFICATION LIST ENTER ALL THAT APPLY

OPTIMUS WORK CLASSIFICATION LIST ENTER ALL THAT APPLY Cost Code # Description Cost Code # Description 01 00 00.001 General Requirements 02 00 00.001 Existing Conditions 01 31 19.13.001 Preconstruction Meetings 02 21 00.001 Surveys 01 32 33.001 Photographic

More information

VOLUME V GUIDELINES FOR DESIGN CONSULTANT TABLE OF CONTENTS APPENDIX B: MASTER CONSTRUCTION SPECIFICATIONS AND PREPARATION GUIDE, DIVISIONS 0-10

VOLUME V GUIDELINES FOR DESIGN CONSULTANT TABLE OF CONTENTS APPENDIX B: MASTER CONSTRUCTION SPECIFICATIONS AND PREPARATION GUIDE, DIVISIONS 0-10 VOLUME V GUIDELINES FOR DESIGN CONSULTANT TABLE OF CONTENTS APPENDIX B: MASTER CONSTRUCTION SPECIFICATIONS AND PREPARATION GUIDE, DIVISIONS 0-10 SECTION B1: PREPARATION GUIDE B1.1 INTRODUCTION... B1-1

More information

KIEWIT CM/GC Enabling/Utilities

KIEWIT CM/GC Enabling/Utilities South Terminal Redevelopment Program KIEWIT CM/GC Enabling/Utilities Contract Value $50 million M/WBE Goal 20 percent Contact John Todd, LEED AP Project Manager 303.930.9046 john.todd@kiewit.com General

More information

TruexCullins Architecture Fairfield Center School Bid Documents Kitchen and Bathroom Renovation March 1, 2015

TruexCullins Architecture Fairfield Center School Bid Documents Kitchen and Bathroom Renovation March 1, 2015 Fairfield Center School Kitchen and Bathroom Renovation Project Specifications Owner: Fairfield Center School, 57 Park Street, Fairfield VT 05455 Franklin Central Supervisory Union, 28 Catherine Street,

More information

Think Of Us First! When It s Time to Distribute Your Plans

Think Of Us First! When It s Time to Distribute Your Plans Think Of Us First! When It s Time to Distribute Your Plans CONSTRUCTION NOTEBOOK WILL LIST YOUR PLANS AND SPECS FREE CALL TODAY FOR DETAILS 702-876-8660 Why use Experience We have over 60 years of experience

More information

HEANEY General Contracting, Inc.

HEANEY General Contracting, Inc. HEANEY General Contracting, Inc. March 26, 2016 AAPS BID NO. 16-019-665 ADDENDUM NO. 03- PROJECT: DESCRIPTION: Ann Arbor Public Schools Mitchell Expansion Phase I Bid Pkg. 3 (MEP) Building Addition and

More information

All substantial design decisions and budget confirmation shall be resolved for the College to approve the Design Development Submittal.

All substantial design decisions and budget confirmation shall be resolved for the College to approve the Design Development Submittal. 2.02 DESIGN DEVELOPMENT PHASE GENERAL The Architect shall prepare the Design Development Documents from the approved Schematic Design. The Design Development Documents shall consist of drawings and other

More information

SECTION 08 41 1 ALUMINUM FRAMED ENTRANCES and STOREFRONTS. System 402 Flush-Glazed Screw Spline Storefront

SECTION 08 41 1 ALUMINUM FRAMED ENTRANCES and STOREFRONTS. System 402 Flush-Glazed Screw Spline Storefront PART 1 GENERAL 1.01 Work Included SECTION 08 41 1 ALUMINUM FRAMED ENTRANCES and STOREFRONTS System 402 Flush-Glazed Screw Spline Storefront A. Furnish and install aluminum architectural storefront system

More information

Inspecting to a higher standard.

Inspecting to a higher standard. Inspecting to a higher standard. Rob Hopkin Silver Spring, MD 20902 Monday, June 2, 2014 ProTec Inspection Services Inc. 19736 Selby Ave Poolesville, MD 20837 301-972-8531 www.protec-inspections.com rob@protec-inspections.com

More information

Repair and Remodeling Estimating Methods. 4th Edition. RSMeans

Repair and Remodeling Estimating Methods. 4th Edition. RSMeans Brochure More information from http://www.researchandmarkets.com/reports/2214808/ Repair and Remodeling Estimating Methods. 4th Edition. RSMeans Description: This estimating guide for repair and remodeling

More information

Hamilton-Wentworth Catholic District School Board Event Listing By Ascending Event Year

Hamilton-Wentworth Catholic District School Board Event Listing By Ascending Event Year Hamilton-Wentworth Catholic District School Board Event Listing By Ascending Event Year Printed On: 2003/04/03 St Patrick CES, 7932 Study [03.3-050 Plumbing Piping Systems] Study condition, remaining service

More information

Construction Technologies Career Field Pathways and Course Structure

Construction Technologies Career Field Pathways and Course Structure Courses in Structural Systems (DD) Construction Technologies Career Field Pathways and Course Structure PATHWAY COURSES SUBJECT CODE Construction Technology-Core and Sustainable Construction 1 178000 Carpentry

More information

Building Condition Assessment Report

Building Condition Assessment Report C2 - Nurses Resident (aka Administration) Building Condition Assessment Report Asset Address Address Construction Year Size (Gross Floor Area) Asset Type Floors Above Ground Inspection Date C2 - Nurses

More information

ADDENDUM NO. 2. DATE: September 14, 2015 INVITATION FOR BID: IFB J160004535 Fire Station #22 Roof Replacement Project DATED: August 25, 2015

ADDENDUM NO. 2. DATE: September 14, 2015 INVITATION FOR BID: IFB J160004535 Fire Station #22 Roof Replacement Project DATED: August 25, 2015 ADDENDUM NO. 2 DATE: September 14, 2015 INVITATION FOR BID: IFB J160004535 Fire Station #22 Roof Replacement Project DATED: August 25, 2015 RECEIPT DATE: September 30, 2015 (CHANGED) OPENING DATE: October

More information

When is a Permit Required? What Types of Permits are Required? The most common types of projects that require permits are:

When is a Permit Required? What Types of Permits are Required? The most common types of projects that require permits are: When is a Permit Required? The most common types of projects that require permits are: -New Houses or buildings -Room Additions or Expansions -Structural repairs, remodeling and alterations -Accessory

More information

PROPERTY INSPECTION OR ASSESSMENT OF DAMAGES

PROPERTY INSPECTION OR ASSESSMENT OF DAMAGES PROPERTY INSPECTION OR ASSESSMENT OF DAMAGES ADDRESS: 123 MAIN ST MIAMI, FL CLIENT: BUYER ID No: 2014193 DATE: 5/13/2014 INSPECTION OR ASSESSMENT BY: GAIA CONSTRUCTION INC. CGC 1516136 FLORIDA HI-2792

More information

Facility Summary. Facility Condition Summary. Seattle School District David T. Denny International Infrastructure. Facility Components

Facility Summary. Facility Condition Summary. Seattle School District David T. Denny International Infrastructure. Facility Components Infrastructure Facility Condition Summary Weighted Avg Condition Score Facility Components Systems Surveyor/ Date Done Comments G Sitework.9 Site Improvements Parking Pedestrian Paving Site Development

More information

PLAN REVIEW SERVICES CONSTRUCTION DOCUMENTS NECESSARY FOR A THOROUGH PLAN REVIEW

PLAN REVIEW SERVICES CONSTRUCTION DOCUMENTS NECESSARY FOR A THOROUGH PLAN REVIEW CONSTRUCTION DOCUMENTS NECESSARY FOR A THOROUGH PLAN REVIEW PRELIMINARY BUILDING REVIEW two sets of the following: Architectural/engineering design development drawings indicating size of the building,

More information

Vision Home Inspection

Vision Home Inspection Vision Home Inspection 324 Rams Run Shepherdsville KY 40165-7877 Inspector: James McFadden Property Inspection Report Client(s): Property address: Inspection date: View report summary This report is the

More information

Home Inspection Report

Home Inspection Report 4949 Brownsboro Rd Suite 293 Louisville, KY 40223 (502) 414-1440 tripleainspections@gmail.com Inspected By: William Carter, HI-1956 Home Inspection Report Prepared For: Edward Cullen Property Address:

More information

NOTICE TO CONTRACTORS

NOTICE TO CONTRACTORS NOTICE TO CONTRACTORS Notice is hereby given that San Luis Obispo County Community College District, ( District ) is accepting sealed Informal Bidding Prequalification Applications and Formal Bidding Prequalification

More information

SODA SPRINGS JOINT SCHOOL DISTRICT NO. 150 RECOMMENDED REPAIRS, REPLACEMENT, AND ADDITIONS OPINIONS OF PROBABLE COST

SODA SPRINGS JOINT SCHOOL DISTRICT NO. 150 RECOMMENDED REPAIRS, REPLACEMENT, AND ADDITIONS OPINIONS OF PROBABLE COST SODA SPRINGS JOINT SCHOOL DISTRICT NO. 150 RECOMMENDED REPAIRS, REPLACEMENT, AND ADDITIONS OPINIONS OF PROBABLE COST SODA SPRINGS HIGH SCHOOL REPAIRS AND UPGRADES SITE Construction Estimate = $100,000

More information

Estimating Database Checklist

Estimating Database Checklist Estimating Database Checklist If you are creating a new estimating database for projects, the following list offers a thorough listing of Main and Sub Categories. You can also use it as a checklist to

More information

Asbestos Procedures. Asbestos Products

Asbestos Procedures. Asbestos Products Asbestos Procedures Asbestos Products Where is asbestos known to be located on The Evergreen State College? Please see Appendix A for a list of known asbestos containing materials located on the Olympia

More information

SUCF PROJECT COST REPORTING GUIDE

SUCF PROJECT COST REPORTING GUIDE SUCF PROJECT COST REPORTING GUIDE State University Construction Fund 353 Broadway / ALBANY, NY 12246 SUCF 900 / 11 Table of Contents Page A. Preface 1 B. Area Takeoff Methodology 1. General 2 2. Net Assignable

More information

SECTION 23 00 01 HEATING, VENTILATION AND AIR CONDITIONING EQUIPMENT

SECTION 23 00 01 HEATING, VENTILATION AND AIR CONDITIONING EQUIPMENT SECTION 23 00 01 HEATING, VENTILATION AND AIR CONDITIONING EQUIPMENT PART 1 - GENERAL 1.1 DESCRIPTION A. The Work specified in this Section consists of designing, furnishing and installing factory-assembled

More information

COST OF WORK FORM. Abbreviations: ea = each, LF = linear feet, SF = square feet, HSF = square feet of living area (including garage conversion space)

COST OF WORK FORM. Abbreviations: ea = each, LF = linear feet, SF = square feet, HSF = square feet of living area (including garage conversion space) COST OF WORK FORM All costs shown are estimates using base grade materials, taxes, and labor. For houses where a higher quality is indicated, the costs should be increased for work requiring upgraded materials.

More information

Property Condition Assessment

Property Condition Assessment Property Condition Assessment Business, Wisconsin Inspection Date: 8/2009 Prepared For: Business Owner Report Number: TD999909 Prepared By: Shamrock Building Inspection Consultants LLC N29 W29951 Shel-Mar

More information

Nominal Life Expectancy for Building Components

Nominal Life Expectancy for Building Components Nominal Life Expectancy for Building Components Building System Page A. HVAC 2 B. Elevator/Escalator 6 C. Plumbing 7 D. Roofing 8 E. Electrical 10 F. Fire/Life/Safety/Security System 11 G. Interior Finishes

More information

17,280 square feet Overview:

17,280 square feet Overview: CENTRAL OFFICE Located at 167 Boston Post Road, East Lyme, Connecticut, the Central Office was built in 1916 as the original Flanders Elementary School and remains connected to the current school. The

More information

Veterans Memorial Coliseum Options Study Appendix A - Deconstruction Scope of Work and Cost Estimate August 31, 2015

Veterans Memorial Coliseum Options Study Appendix A - Deconstruction Scope of Work and Cost Estimate August 31, 2015 Stage 1 DA.01 Fencing and cameras deployed Baseline - 3-5 years for Stage 1 for purposes of this study costs are described for a 3 year period $45,000 $0 Stage 1 DA.02 Secure all building doors and access

More information

Crawford Inspection Services C.C.B. # 76914 www.crawfordinspections.com

Crawford Inspection Services C.C.B. # 76914 www.crawfordinspections.com Crawford Inspection Services C.C.B. # 76914 www.crawfordinspections.com Portland Area PO Box 665 West Linn, OR 97068 Ph: (503) 650-6957 Salem Area 5434 River Rd. N; #192 Keizer, OR 97303 Ph: (503) 362-5809

More information

Building Condition Assessment Report

Building Condition Assessment Report Building Condition Assessment Report Asset C3c - Oak Terrace Cottage 121 Address Riverview Lands, 2601 Lougheed Highway, Coquitlam, BC. V5C 4J2 Construction Year Size (Gross Floor Area) 1920. 2,553 Sq.Ft.

More information

RESPONSIBILITY FOR REPAIRS AND MAINTENANCE FAIR FUNDING: April 2002

RESPONSIBILITY FOR REPAIRS AND MAINTENANCE FAIR FUNDING: April 2002 RESPONSIBILITY FOR REPAIRS AND MAINTENANCE FAIR FUNDING: April 2002 INDEX New Build Flat and Pitched Roofs Rainwater Goods Porches to Existing Buildings / Covered Links etc, Between Buildings Floors /

More information

ELECTRICAL CONTRACTORS THE UNIVERSITY OF TENNESSEE KNOXVILLE, TENNESSEE SECTION 16050 PAGE 1

ELECTRICAL CONTRACTORS THE UNIVERSITY OF TENNESSEE KNOXVILLE, TENNESSEE SECTION 16050 PAGE 1 KNOXVILLE, TENNESSEE SECTION 16050 PAGE 1 PART 1 - GENERAL 1.01 RELATED DOCUMENTS: SECTION 16050 A. Drawings and general provisions of Contract, including General and Supplementary Conditions and Division-1

More information

Upper Southampton Township Department of Licenses and Inspections 939 Street Rd. Southampton, Pa. 18966 Phone: 215-322-9700 Fax: 215-322-5842

Upper Southampton Township Department of Licenses and Inspections 939 Street Rd. Southampton, Pa. 18966 Phone: 215-322-9700 Fax: 215-322-5842 Upper Southampton Township Department of Licenses and Inspections 939 Street Rd. Southampton, Pa. 18966 Phone: 215-322-9700 Fax: 215-322-5842 APPLICATION for ZONING and BUILDING PERMIT APPLICATION INSTRUCTIONS:

More information

MECHANICAL TRADE SCOPE OF WORK GUIDELINES

MECHANICAL TRADE SCOPE OF WORK GUIDELINES MECHANICAL TRADE SCOPE OF WORK GUIDELINES OTTAWA REGION 2009 Comprised of Piping Trade, Ventilation (HVAC) Trade, Fire Protection Trade Endorsed by the following organizations Ottawa Construction Association

More information

PROPERTY INSPECTION REPORT

PROPERTY INSPECTION REPORT (850) 297-1998 1716 Monticello Dr Tallahassee, Florida 32303 PROPERTY INSPECTION REPORT THIS INSPECTION IS A DETAILED LISTING OF AREAS VISUALLY INSPECTED AT:, Tallahassee FL Client Tallahassee, FL 32304

More information

REVEWED BY: Ross Rogien B.O/P.R. ADDITIONAL REVIEW(S) REQ.-FIRE DEPT Y/N

REVEWED BY: Ross Rogien B.O/P.R. ADDITIONAL REVIEW(S) REQ.-FIRE DEPT Y/N PLAN REVIEW FOR: PROJECT NAME: OWNER: ARCH/DESIGNER: ADDRESS: Ph/Fx: Plans Dated: E-mail: Sealed By: Estimated Project Cost - $ REVEWED BY: Ross Rogien B.O/P.R. ADDITIONAL REVIEW(S) REQ.-FIRE DEPT Y/N

More information

SECTION 11 78 13 MORTUARY REFRIGERATORS

SECTION 11 78 13 MORTUARY REFRIGERATORS PART 1 - GENERAL 1.1 DESCRIPTION SECTION 11 78 13 MORTUARY REFRIGERATORS SPEC WRITER NOTE: Delete between //---// if not applicable to project. Also delete any other item or paragraph not applicable in

More information

All bidders shall indicate in their bid/proposal that this Addendum has been received and considered in their bid proposal.

All bidders shall indicate in their bid/proposal that this Addendum has been received and considered in their bid proposal. Addendum #1 Fire Damage Repairs 4316 City View Terrace, Units A and B City View Terrace, OH5-13C, AMP 4 IFB #14-03 October 23, 2014 Greater Dayton Premier Management 400 Wayne Ave. Dayton, Ohio 45410 This

More information

2012 BIM Guidelines and Standards (Rev. 00) University at Albany

2012 BIM Guidelines and Standards (Rev. 00) University at Albany A. Building Information Modeling (BIM) Guidelines: The Office of AECM will require the submission of BIM modeling files as part of an electronic file submission to the AECM project manager as requested

More information

CHARLOTTE COUNTY Community Development Department

CHARLOTTE COUNTY Community Development Department CHARLOTTE COUNTY Community Development Department Building Construction Services Division 18400 Murdock Circle, Port Charlotte FL 33948 Phone: 941.743.1201 Fax: 941.764.4907 www.charlottecountyfl.gov 50

More information

SECTION 23 05 12 GENERAL PROVISIONS FOR HVAC WORK

SECTION 23 05 12 GENERAL PROVISIONS FOR HVAC WORK SECTION 23 05 12 GENERAL PROVISIONS FOR HVAC WORK 1 GENERAL 1.1 GENERAL REQUIREMENTS A. This Section is coordinated with and complementary to the General Conditions and Supplementary General Conditions

More information

www.citiesinspection.com October 5, 2015 Dear Client,

www.citiesinspection.com October 5, 2015 Dear Client, www.citiesinspection.com October 5, 2015 Dear Client, On 9/14/2015, Cities Inspection Service, Inc. completed a building inspection of the property located at 123 Oak Street, Someplace, Minnesota for you.

More information

WOODLAND HOMES BUILDING PROCESS A STEP BY STEP CONSTRUCTION GUIDE TO YOUR NEW HOME

WOODLAND HOMES BUILDING PROCESS A STEP BY STEP CONSTRUCTION GUIDE TO YOUR NEW HOME WOODLAND HOMES BUILDING PROCESS A STEP BY STEP CONSTRUCTION GUIDE TO YOUR NEW HOME 1 THE BUILDING PROCESS The focus of Woodland Homes building department is Quality, Service and Predictability. Through

More information

November 3, 2015 Bond and District Additional Assistance Election Information

November 3, 2015 Bond and District Additional Assistance Election Information November 3, 2015 Bond and District Additional Assistance Election Information Proposition 432 - $22 million General Obligation Bond 150+ facility projects across all schools Building renovations and improvements

More information

Gramercy Place Condo Association, Inc.

Gramercy Place Condo Association, Inc. Gramercy Place Condo Association, Inc. UNIT MODIFICATION REQUEST Date of Application: Name of Owner (s): Telephone: (Home) (Cell) E-Mail: Anticipated start date: Anticipated ending date: Permission is

More information

2. What building projects are exempted? (permit not required)

2. What building projects are exempted? (permit not required) BUILDING AND SAFETY DEPARTMENT 1. What building projects require a permit? Following is a list of projects that require building permits based on Appendix chapter 1 of the California Building Code and

More information

HAMILTON SCHOOL. 1401 Brentwood Parkway, N.E., Washington, DC INITIAL YEAR BUILT 1968 BUILDING AREA

HAMILTON SCHOOL. 1401 Brentwood Parkway, N.E., Washington, DC INITIAL YEAR BUILT 1968 BUILDING AREA INITIAL YEAR BUILT 1968 BUILDING AREA 187,700 SF CURRENT PROGRAM CAPACITY N/A ENROLLMENT 2008 129 WARD 5 PROPOSED PROGRAM CAPACITY N/A Site Plan HAMILTON - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION

More information

Project Close Out Summary

Project Close Out Summary Project Close Out Summary 1. Final Cleaning and Inspection 2. Testing and Certification 3. Demonstration of Systems and Equipment 4. Inspections by Authorities Having Jurisdiction 5. O&M Manuals and As

More information

S E C T I O N 9 0 5 -- P R O P O S A L (CONTINUED)

S E C T I O N 9 0 5 -- P R O P O S A L (CONTINUED) S E C T I O N 9 0 5 -- P R O P O S A L (CONTINUED) I (We) further propose to execute the attached contract agreement (Section 902) as soon as the work is awarded to me (us), and to begin and complete the

More information

CSTM 102 Spring 2013. Construction Documents to Contract Documents

CSTM 102 Spring 2013. Construction Documents to Contract Documents CSTM 102 Spring 2013 Construction Documents to Contract Documents The Construction Industry THE PROJECT TEAM A Project and a Client A Designer Constructors THE GAME PLAN Risk Management Scope of Work The

More information

Inspecton Report. Property Address:

Inspecton Report. Property Address: Inspecton Report Provided by: National Home Inspections Inspector: Bob Smith 456 S Main Denver, CO 46312 (645) 423-3242 bob@nationalhomeinspections.com www.nationalhomeservices.com Property Address: 873

More information

APEC CAPABILITIES PROJECT MANAGEMENT / SUPPORT

APEC CAPABILITIES PROJECT MANAGEMENT / SUPPORT PROJECT MANAGEMENT / SUPPORT Capital Cost Savings Construction Monitoring and Assistance In-Plant Production Assistance In-Plant Maintenance Assistance Procurement Assistance Project Cost Estimating o

More information

HOMEOWNER S PERMIT GUIDE

HOMEOWNER S PERMIT GUIDE HOMEOWNER S PERMIT GUIDE WHEN IS A PERMIT REQUIRED? Department of Development and Permits 306 Cedar Road, City Hall 2 nd Floor P.O. Box 15225 Chesapeake, VA 23328 Phone: (757) 382-6018 Fax: (757) 382-8448

More information

INVITATION FOR BIDS CCK-2139-16 PROJECT 2369.2 PEDIATRIC CRITICAL CARE RENOVATION PHASE 3 ADDENDUM #3 6-22-16

INVITATION FOR BIDS CCK-2139-16 PROJECT 2369.2 PEDIATRIC CRITICAL CARE RENOVATION PHASE 3 ADDENDUM #3 6-22-16 INVITATION FOR BIDS CCK-2139-16 PROJECT 2369.2 PEDIATRIC CRITICAL CARE RENOVATION PHASE 3 ADDENDUM #3 6-22-16 ATTENTION: This is not an order. Read all instructions, terms and conditions carefully. IMPORTANT:

More information

BUNKER HILL ELEMENTARY SCHOOL

BUNKER HILL ELEMENTARY SCHOOL INITIAL YEAR BUILT 1970 BUILDING AREA 98,200 SF CURRENT PROGRAM CAPACITY 332 ENROLLMENT 2008 387 WARD 5 PROPOSED PROGRAM CAPACITY 750 Site Plan BUNKER HILL - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION

More information

City and County of San Francisco Department of Public Works TABULATION OF BIDS

City and County of San Francisco Department of Public Works TABULATION OF BIDS City and County of Department of Public Works TABULATION OF BIDS SPEC NO.: 7536A(R ) TITLE: Potrero Branch Library Renovation BIDS RECEIVED: March 26.2008 BIDDERS (in the order received & opened): Bid

More information

GROWTH MANAGEMENT DEPARTMENT 201 SE 3 rd ST, (Second Floor), Ocala, FL 34471 (352) 629-8421; FAX: (352) 629-8264

GROWTH MANAGEMENT DEPARTMENT 201 SE 3 rd ST, (Second Floor), Ocala, FL 34471 (352) 629-8421; FAX: (352) 629-8264 BUILDING CODE GUIDELINES FOR ELECTRICAL INSPECTIONS Building Code compliance is the obligation of design professionals and/or contractors. Plan Review and Inspection Guidelines are intended to be used

More information

City of Treasure Island FEMA Cost Breakdown Worksheet For Substantial Improvement / Damage

City of Treasure Island FEMA Cost Breakdown Worksheet For Substantial Improvement / Damage City of Treasure Island FEMA Cost Breakdown Worksheet For Substantial Improvement / Damage Property Address: Company Name: Contractor Name: Contractor Address: City: State: Zip: License Number: Phone Number

More information

UNDERSTANDING PROJECT DESIGN CRITERIA

UNDERSTANDING PROJECT DESIGN CRITERIA Chapter II Section 1 The design of each project must be divided into phases of development that Massport reviews periodically to ensure that the Consultant has achieved all of the project s goals and objectives,

More information

APPENDIX E: CAPITAL NEEDS SUMMARY

APPENDIX E: CAPITAL NEEDS SUMMARY APPENDIX E: CAPITAL NEEDS SUMMARY Building A Foundation Hall Building to be replaced ARCHITECTURAL Roof Repair North Structural Wall Repair Flooring Repairs Ceiling Repairs Lighting Repairs Lighting Repairs

More information

APPLICATION FOR NEW CONSTRUCTION

APPLICATION FOR NEW CONSTRUCTION CITY OF ELKINS 401 DAVIS AVE ELKINS WV 26241 Date Pd: Receipt #: Session #: PHIL ISNER BLDG INSPECTOR / CODE ENFORCEMENT OFFICER 304-636-1414 Ext 1431 APP. DATE APPLICATION FOR NEW CONSTRUCTION APPLICANT

More information

PLAN SUBMITTAL INFORMATION

PLAN SUBMITTAL INFORMATION PLAN SUBMITTAL INFORMATION APPLICATION FOR A BUILDING PERMIT Prior to drafting construction drawings, please check with the North Miami Beach Community Development Department concerning the following:

More information

Solicitation Items Report

Solicitation Items Report Solicitation Items Report Solicitation 91036-12295-208 Title: M/R of Air Conditioning Units & Split A/C Units Estimated Total Value: Description: Delivery Terms: Free On Board Destination Payment Terms:

More information

ESTIMATE ORIG. ESTIMATE: TOTAL: $204,249 DATE: 01/15/08 DESCRIPTION OF WORK QUANTITY DIVISION TOTAL

ESTIMATE ORIG. ESTIMATE: TOTAL: $204,249 DATE: 01/15/08 DESCRIPTION OF WORK QUANTITY DIVISION TOTAL PARTITIONS REGULAR WALLS 9' HIGH 214 LF TENANT DEMISING WALL 150 LF INTERIOR FURRED WALLS 9' 86 LF OFFICE DEMISING WALL 98 LF DOUBLE FRAME RADIUS WALL 18 LF RADIUS SOFFITS 172 LF SOFFIT 76 LF FINISH NEW

More information

#506 New Multi-Family Buildings & Additions Plan Intake Submittal Checklist

#506 New Multi-Family Buildings & Additions Plan Intake Submittal Checklist #506 New Multi-Family Buildings & Additions Plan Intake Submittal Checklist Case #: Date: Project Name: Site Address: Application Submittal Building permit applications and plans can be submitted to the

More information

Outline. Owner Perspective CM Definition Working Relationships Why CM? Project Approach Pre-construction Construction. Iowa League of Cities // 2011

Outline. Owner Perspective CM Definition Working Relationships Why CM? Project Approach Pre-construction Construction. Iowa League of Cities // 2011 Building the Case for Construction Management Dick Hierstein, IaCMA and Larry Gleason, CPMI Handouts and presentation are available Iowa League of online Cities // 2011 at www.iowaleague.org Outline Owner

More information

NORTH PENN HIGH SCHOOL RENOVATIONS

NORTH PENN HIGH SCHOOL RENOVATIONS NORTH PENN HIGH SCHOOL RENOVTIONS PRELIMINRY SCOPE, BUDGET & PHSING CONSIDERTIONS 401 EST HNCOCK STREET LNSDLE, P 19446 PREPRED BY BONNETT SSOCITES INCORPORTED 220 BLDWIN TOWER, 1510 CHESTER PIKE EDDYSTONE,

More information

Exhibit C: Scope of Work and Schedule of Deliverables

Exhibit C: Scope of Work and Schedule of Deliverables Exhibit C: Scope of Work and Schedule of Deliverables Project Scope of Work Phases: A City Hall Envelope Renovations B City Hall Skylight Replacement C City Hall Chiller Replacement D City Hall Annex Plaza

More information

SPACE TYPE: LABORATORY (WET) FOR CHEMISTRY AND BIOLOGY

SPACE TYPE: LABORATORY (WET) FOR CHEMISTRY AND BIOLOGY SPACE TYPE: LABORATORY (WET) FOR CHEMISTRY AND BIOLOGY Construction Criteria The unit costs for (Wet) space types are based on the construction quality and design features in the following table. This

More information

BILL OF QUANTITIES Part No.: Part Description

BILL OF QUANTITIES Part No.: Part Description Page 1 of 5 A. REMOVAL OF STRUCTURES 801 Demolition of Existing Structure lot 1 in words in words B. MASONRY WORKS 506(1)a Masonry Units (CHB) sq.m. 58.80 in words in words C. FABRICATED MATERIALS & HARDWARE

More information

Mequon - Thiensville School District Long Range Facilities Plan Monthly Project Schedule

Mequon - Thiensville School District Long Range Facilities Plan Monthly Project Schedule Mequon - Thiensville School District Long Range Facilities Plan Monthly Project Schedule Homestead HS Sept.'15 Oct'15 Nov'15 Dec'15 Jan'16 Feb'16 Repair Asphalt @ Main Garage Replace Exterior Hollow Metal

More information

STATE OF FLORIDA HOME INSPECTION STANDARDS OF PRACTICE:

STATE OF FLORIDA HOME INSPECTION STANDARDS OF PRACTICE: STATE OF FLORIDA HOME INSPECTION STANDARDS OF PRACTICE: 61-30.801 Standards of Practice, General. (1) Home inspections performed to these Standards of Practice are intended to provide the client with information

More information

Renovation instructions

Renovation instructions 1(13) Renovation instructions The purpose of these instructions is to inform you of the things to consider when renovating an apartment. You can avoid many possible problems and additional costs following

More information

ADDENDUM # 1 To: 1112-909-62-3698 RFP for: Various Construction Maintenance & Repair Services

ADDENDUM # 1 To: 1112-909-62-3698 RFP for: Various Construction Maintenance & Repair Services 818 S. FLORES ST. SAN ANTONIO, TEXAS 78204 www.saha.org Procurement Department ADDENDUM # 1 To: 1112-909-62-3698 RFP for: Various Construction Maintenance & Repair Services Remove and replace in their

More information

A Residential Owner s Guide to PERMITS. Elgin CITY OF PLANNING & NEIGHBORHOOD SERVICES

A Residential Owner s Guide to PERMITS. Elgin CITY OF PLANNING & NEIGHBORHOOD SERVICES A Residential Owner s Guide to PERMITS CITY OF Elgin PLANNING & NEIGHBORHOOD SERVICES CITY OF Elgin A Residential Owner s Guide Welcome! This booklet has been prepared to provide residential property owners

More information

In Partnership with. TDIndustries 13850 Diplomat Drive Dallas, Texas 75234 Phone: 1-972-888-6751 Fax: 1-972-888-9621 Website: TDIndustries.

In Partnership with. TDIndustries 13850 Diplomat Drive Dallas, Texas 75234 Phone: 1-972-888-6751 Fax: 1-972-888-9621 Website: TDIndustries. In Partnership with Schedule Contract #GS21F0118X Contract # TXMAS-12-03FAC0110 Schedule 03FAC Facilities Maintenance and Management Federal Supply Service Authorized Federal Supply Schedule Price List

More information

Facilities Operations Customer Service Standards WORK ORDER PRIORITIES

Facilities Operations Customer Service Standards WORK ORDER PRIORITIES Facilities Operations Customer Service Standards WORK ORDER PRIORITIES In order to provide fair and consistent maintenance service to all University faculty, staff and students, a work priority system

More information

Total Building Commissioning: Case Study of the U.S. District Courthouse in Salt Lake City, Utah, USA

Total Building Commissioning: Case Study of the U.S. District Courthouse in Salt Lake City, Utah, USA Total Building Commissioning: Case Study of the U.S. District Courthouse in Salt Lake City, Utah, USA Boggarm S. Setty, P.E., Fellow ASHRAE Setty & Associates, Ltd. 3040 Williams Drive, Suite 600, Fairfax,

More information

DESIGN GUIDELINES AND STANDARDS

DESIGN GUIDELINES AND STANDARDS DESIGN GUIDELINES AND STANDARDS Table of Contents Table of Contents 00 00 00 Procurement and Contracting Requirements 1 00 62 76 Application for Payment Form for AE Services... 2 00 73 16 Summary Construction

More information

OPEN ITEMS LIST - CONSTRUCTION Project Name: East Central Middle School - Jackson County CLA#: 11003

OPEN ITEMS LIST - CONSTRUCTION Project Name: East Central Middle School - Jackson County CLA#: 11003 OPEN ITEMS LIST - CONSTRUCTION Project Name: East Central Middle School - Jackson County CLA#: 11003 No. Discipline Sent to Name Item Date Noted Date Resolved How item was resolved Electrical Contractor

More information

WHEN IS A PERMIT REQUIRED?

WHEN IS A PERMIT REQUIRED? WHEN IS A PERMIT REQUIRED? Any owner, builder, contractor, or other authorized agent who intends to construct, enlarge, alter, repair, move, demolish, or change the occupancy of a building or structure,

More information

NYC Department of Education Building Condition Assessment Survey 2014-2015 BROADWAY EDUCATION CAMPUS - MANHATTAN, 26 BROADWAY, MANHATTAN, NY, 10004

NYC Department of Education Building Condition Assessment Survey 2014-2015 BROADWAY EDUCATION CAMPUS - MANHATTAN, 26 BROADWAY, MANHATTAN, NY, 10004 School: InspectionId Asset Data Inspection Type Building Assessment Survey 204-205 BROADWAY EDUCATION CAMPUS - MANHATTAN, 26 BROADWAY, MANHATTAN, NY, 0004 Time In Last Edited 255 MECHANICAL 205-05-8 09:00AM

More information

Milestones Primary. Early Start. Orig Dur. Early Finish. Act ID. Description NOTICE TO PROCEED START CONSTRUCTION

Milestones Primary. Early Start. Orig Dur. Early Finish. Act ID. Description NOTICE TO PROCEED START CONSTRUCTION Milestones Primary M1500 NOTICE TO PROCEED 0 11/01/ * M1510 START CONSTRUCTION 0 01/02/ * M1550 SUBSTANTIAL COMPLETION [ALL WORK IN PLACE] 0 04/15/ M1600 CERT OF OCCUP 0 04/15/ M1650 FINAL COMPLETION /

More information

Tennessee 07/01/14. Contracting Class Codes with Descriptions 50-6-901(8)

Tennessee 07/01/14. Contracting Class Codes with Descriptions 50-6-901(8) Contracting s with s * NCCI Basic Manual: "The Governing ification" at a specific job or location is the classification, other 0042 LANDSCAPE GARDENING & DRIVERS 0050 FARM MACHINERY OPERATION-BY CONTRACTOR-&

More information

C-2 Construction, Inc. - NAICS Codes

C-2 Construction, Inc. - NAICS Codes C-2 Construction, Inc. - NAICS Codes 212313 - Crushed and Broken Granite Mining and Quarrying This U.S. industry comprises: (1) establishments primarily engaged in developing the mine site, and/or mining

More information

Presentation to Senate Select Committee on Government Facilities: Deferred Maintenance for State Supported Living Centers and State Hospitals

Presentation to Senate Select Committee on Government Facilities: Deferred Maintenance for State Supported Living Centers and State Hospitals Presentation to Senate Select Committee on Government Facilities: Deferred Maintenance for State Supported Living Centers and State Hospitals Les Butler Associate Commissioner for Business and Regional

More information

48. AQUARIUM. Aquarium. Classification: Cluster: Location: Close to junction of Inselrhue and Loiter Way, Belle Isle. Total Area: No.

48. AQUARIUM. Aquarium. Classification: Cluster: Location: Close to junction of Inselrhue and Loiter Way, Belle Isle. Total Area: No. Classification: Cluster: Location: Total Area: No. of Stories Aquarium Acreage Owned: Acquired: 1904 Most Recent Improvements: THE AQUARIUM Close to junction of Inselrhue and Loiter Way, Belle Isle Two

More information

Pre-Drywall Inspection Report

Pre-Drywall Inspection Report SM MEDALLION INSPECTIONS helping people make informed decisions Pre-Drywall Inspection Report 5657 Garden Valley Place Milton, Georgia 30024 Prepared for Betsy and Paul Dougherty January12, 2015 Medallion

More information

All work shall comply with applicable codes and ordinances. Work shall comply with the BOCA National Plumbing Code, latest edition.

All work shall comply with applicable codes and ordinances. Work shall comply with the BOCA National Plumbing Code, latest edition. DIVISION 15 MECHANICAL SECTION 15100 - PLUMBING PART 1 - GENERAL SCOPE Plumbing work includes all domestic water, gas, and sanitary sewer systems as shown on plans. Also all fixtures and equipment which