DAWSON-WAM. Specialist Civil Engineering and Piling Contractors

Similar documents
Brom 31 pton Square SW3

STRUCTURES Excavation and backfill for structures should conform to the topic EXCAVATION AND BACKFILL.

Building over or close to a public sewer

Greater Dublin Strategic Drainage Study Regional Drainage Policies - Volume 2 New Development

Severn Trent Water Ltd has undergone a massive investment programme in the River Tame catchment over the

Project Portfolio. Tunnels & Shafts

Source: Port Mann Bridge Plans Unveiled Today, CBC News, February 4, 2009.

90 Brighton Road, Surbiton, Surrey

GEORGE J. CAMBOURAKIS, P.E., C. ENG. PRESIDENT & CHIEF STRUCTURAL ENGINEER

Delivering Engineering Services to UK Infrastructure through our branded businesses nationwide

Alphington sewer replacement

IH-635 MANAGED LANES PROJECT, SEG. 3.2

Micropiles Reduce Costs and Schedule for Merchant RR Bridge Rehabilitation

TOTAL CAPABILITY IN SCAFFOLDING & ACCESS SYSTEMS REACHING NEW HEIGHTS OF INNOVATION & SAFETY

ARCHITECTURAL TECHNOLGY 4 ADVANCED CONSTRUCTION TECHNOLOGY BASEMENT CONSTRUCTION YEAR 3 SEMESTER 1 AIDAN WALSH R Lecturer: Jim Cahill

Emergency repair of Bridge B421

High Capacity Helical Piles Limited Access Projects

PROPOSAL FOR CONTRACTORS ALL RISKS

PROPERTY RISK MANAGEMENT BUSINESS EMERGENCY, FLOOD PLANNING AND MITIGATION GUIDANCE

Geotechnical Building Works (GBW) Submission Requirements

BUILDING OVER OR NEAR WATER & SEWER MAINS POLICY

C-2 Construction, Inc. - NAICS Codes

Buildings Construction Procurement Strategy

BOAT YARD SERVICES & MOORINGS

Pipeline design. concrete for life

KAWERAU DISTRICT COUNCIL BUSINESS DISASTER RECOVERY PLAN 2011

The Mersey Gateway Project

King Post Wall Information

SEPTIC TANKS FOR THE COLLECTION & SETTLEMENT OF DOMESTIC SEWAGE

A Solid Foundation Solution for Homeowners. from. Our products are made with 90% Recycled Material Down. Right. Solid. GREEN.

-SQA-SCOTTISH QUALIFICATIONS AUTHORITY HIGHER NATIONAL UNIT SPECIFICATION GENERAL INFORMATION

Member Nation Report 2010 from Denmark.

Executive Director, Engineering & Construction Services Director, Purchasing & Materials Management Division

50 YEARS OF ACHIEVEMENT

City of Shelbyville Site Inspection Checklist

Frequently asked questions July 2014

Thames Water s Thames Tunnel Consultation

Piling Datasheets. Continuous flight auger (CFA) Driven Rotary

Commercial Property Features List 2016

Certificate of Registration

Township of Enniskillen. Asset Management Plan

BERMUDA MARITIME SECURITY (HARBOUR AREAS) (RESTRICTED ZONES) ORDER 2010 BR 79 / 2010

The Lee Tunnel - Tideway Pumping Station an 87m deep/38m diameter pumping shaft to transfer the volume of the Lee Tunnel to BecktonSTW

The Town of Lakeshore Basement Flooding Information to Residents

50AI01oe 02/15. Labko GRP cesspools. Instructions for installation, operation and maintenance

Home page Previous Next

Introduction. Options. This JCB Finance Toolkit has been put together to give some handy

specified contract works and legal liability proposal

Scope of EN Clarification Document

Tunnelling & Underground. Specialists

Ridgistorm-XL - the latest innovative

Chapter 13 Route Window C11 Isle of Dogs station. Transport for London

Construction insurance. Product overview

MLD: Domestic Maritime Transport Project

WORK SCOPE. Domains in which we work:

Designed and Engineered to Perform

Guide to Improving Your Home

2007 Operating Budget Capital Budget 2007 Proposed Water and Wastewater Service Rate

Caring for. our. harbour

Erection of replacement warehouse building and erection of two buildings in connection with builder s merchants

Proposed Construction of Basement Flood Risk Assessment. 35 Edwardes Square London W8 6HH

Advantages of our solution

Building Success. Name : MCE S.A. Head Office 7th floor. Al-Khaima City Center, 10 Rue Mamadou Konaté Nouakchott, Mauritania

CONTRACTORS ALL RISKS INSURANCE PROPOSAL FORM CONTRACTORS ALL RISKS INSURANCE PROPOSAL FORM

QUESTIONNAIRE AND PROPOSAL FOR CONTRACTORS ALL RISK INSURANCE

Flood Risk Assessment and Drainage Impact Assessment: Planning Guidance for Developers

The Guide To Waterproofing An Existing Basement

COPYRIGHT. Dincel Construction System Pty Ltd

School Construction Authority Architecture & Engineering

INFORMATION PACK. Registered Company Address. Contact Names Robert Hatton Chris Jones. Telephone

March 2006 DIVISION 3 - CW 2140-R3 TABLE OF CONTENTS

Water Damage on Construction Sites. A guide to loss prevention

USE OF MICROPILES IN TEXAS BRIDGES. by John G. Delphia, P.E. TxDOT Bridge Division Geotechnical Branch

SASTT contact details:

Welcome to our exhibition

City of South Haven Water Plant Projects. Monthly Status Report

POLLUTION PREVENTION GUIDELINES DISPOSAL OF SEWAGE WHERE NO MAINS DRAINAGE IS AVAILABLE: PPG4 1. NEW PUBLIC SEWERS 2. SEPTIC TANKS

Peace River Project Water Use Plan

How To Build A Luxury Apartment Complex In London

The Mersey Gateway Project

INFRASTRUCTURE, FLOOD PROTECTION AND REMEDIATION. Infrastructure Flood Protection Remediation Policies

Policy Guidance Notes and Requirements

Business Unit. Tunnelling & Civil Engineering. Infrastructure solutions from a single source.

FLOOD DAMAGE PREVENTION ORDINANCE

Neil Taylor Programme Manager Royal Borough of Kingston

TECHNICAL SERVICE GROUP

exchange tower new reception, new LanDScaPIng and new tenant FInancIaL ombudsman SerVIce 2

Supplier ID: Local Office: GLASGOW 69 Buchanan Street Glasgow G1 3HL

Type of Sewer Systems. Solomon Seyoum

Transcription:

DAWSON-WAM Specialist Civil Engineering and Piling Contractors

DAWSON-WAM are specialist civil engineering and piling contractors with operations in the UK and Ireland. The company undertakes large scale civil engineering and piling projects for public authorities, contractors and developers. The company was founded in 1971 and has based its business around a collaborative approach to provide our clients with innovative cost effective solutions to today s construction challenges. Contact details: Northern Ireland Southern England Northern England Scotland Wales 028 9081 3105 01525 715522 0161 935 8195 0131 200 6270 0292 064 7384 www.dawsonwam.co.uk

Stormont Wharf Deep water harbour construction for Port of Belfast. Works included installation of new 1400mm diameter steel combi piled wall anchored back to a new contiguous concrete wall; concrete capping beam and hard standing deck construction with all foundation piling, dock mooring facilities and deep water dredging of the River Lagan. Construction period: 12 months; contract budget around 9m.

Stormont Wharf completed

Moneymore Flood Protection Scheme Works included construction of 750m of secant piled floodwall installed within 500mm of existing dwellings; associated civil engineering works, rock armour placement, re-instatement of neighbouring gardens. The scheme achieved an 'Excellent' - 93% CEEQUAL Award and a 'Silver' as part of the Considerate Constructors Scheme. An excellent example of sustainable construction. Construction period: 9 months; contract budget around 1.8m.

Warrenpoint Harbour, Northern Ireland A new harbour facility for the mussel fleet, including 200m of new berthing facilities, new marina and rock armour protection

Culmore Waste Water Treatment Works New treatment facility including refurbishment of existing plant.

Works included: construction in reinforced concrete of a large activated sludge plant ASP, overall dimensions 78m x 66m x 6m deep; 6 final settlement tanks, 23m diameter; a 96m x 33m x 4.5m deep storm retention tank and 2 pumping stations, plus various other minor structures. 12,000 cubic meters of concrete were poured, and 1400 tonnes of reinforcement tied. Construction period: 24 months; contract budget around 17m.

Pennyburn Pumping Station Top down construction of new pumping station. Works included construction of pump shaft; new control building and outfall into Lough Foyle. Construction period: 12 months; contract budget around 4.5m.

Warrenpoint One shaft, fitted with a dividing wall, is a foul and storm pumping station capable of pumping 250 litres per second during storm conditions via 1800 meters of 500mm diameter pumping main constructed within the carriageway towards Warrenpoint wastewater treatment works. The second shaft is a storage tank connected to the pumping station. The combined capacity of the two tanks is more than 800 cubic metres during storm conditions, thus reducing the chances of flooding throughout the town.

Newcastle Wastewater Treatment Works Extension New 8m extension to Newcastle s Sewage Treatment Works

Moygashel Sewerage Improvement Scheme Works included laying of 7.5km of 600mm diameter HPPE pipeline and construction of pumping station. Construction period: 10 months; contract budget around 2.7m.

Titanic Quarter Civil engineering construction in Titanic Quarter Belfast for the ARC Residential complex. Works included construction of a new harbour wall; large scale temporary works sheet piled cofferdam to enable basement construction; excavation; all foundation piling and basement construction to ground level; concrete construction to first floor level. Construction period: 12 months; contract budget around 13m.

Titanic Quarter - Abercorn residential complex under construction

The Gateway Office Building Civil engineering construction in Titanic Quarter Belfast. Works included large scale temporary works sheet piled cofferdam to enable basement construction; excavation; all foundation piling and basement construction to ground level; concrete construction to first floor level.

Titanic Signature Building 8m deep car park basement for new heritage museum. Works included installation of new hard to hard secant retaining wall, concrete capping beam, temporary anchors, temporary propping and all foundation piling. Construction period: 5 months; contract budget around 2.3m.

Titanic Building - Foundations under construction

New Hotel Development, Ham Yard, Soho, London W1

Connaught Hotel Extension Mayfair City centre basement design and construction to three levels. Works included hard to hard secant piled retaining wall installation to enable 12m deep excavation in immediate proximity to exisiting hotel; capping beam and temporary steel propping. Construction period: 3 months; contract budget around 0.8m.

Connaught Hotel Extension Basement Piling

New Hotel Development, Mayfair, London W1

Victoria Station Upgrades Attendant Works

Lanyon Place Belfast Works included installation of hard to hard secant piled retaining walls; capping beam; temporary steel propping; excavation and disposal; foundation piling, construction of pile caps and sheet piling to tower crane bases. Construction period: 7.5 months; contract budget around 1.8m.

Curzon Apartments Basement Works included installation of hard to hard secant piled retaining wall; capping beam; temporary propping; excavation; foundation piling and construction of pile caps. Construction period: 6 months; contract budget around 0.65m.

Stratfield House Apartments Basement Works included installation of hard to hard secant piled retaining wall; temporary propping and excavation to 7m depth below ground level. Contract period: 2.5 months; contract budget around 0.5m.

St Peter Port Guernsey Works included extreme close proximity hard to hard secant piled retaining wall; steel piled combi retaining wall; temporary walings and anchors, rock excavation. Construction period: 12 months; contract value around 1.5m

Enniskillen Acute Hospital Installation of 4000 foundation piles of 450mm and 600mm diameter to depths of 10m, socketed 750mm into limestone. Construction period: 3.5 months; contract budget around 2.4m.

Runcorn Energy from Waste Power Station Design and installation of 2500 foundation piles up to 750mm diameter to depths of 20m, socketed into sandstone; 5,000 sq. m of temporary steel sheet piles and associated propping; 120 linear metres of 750mm diameter contiguous piled retaining wall to enable a 6m deep excavation. Construction period: 8 months; contract budget around 2.3m.

AZ King Pile wall being installed - M25 Widening Section 4b Clockwise

M25 Emergency Slip Repair during night time TM restrictions East of J23 clockwise Client : Connect Plus Contractor : Jackson Civils

Canary Wharf BP3/4 Works included removal of existing double skin cofferdam and installation of new single skin cofferdam using recycled sheet piles; filling of cofferdam and associated civil engineering works. Construction period: 12 months; contract budget around 4m.

Canary Wharf BP1 Works included provision and driving of 11,000 sq m. (L=420m) of 25m long sheet piles to create a double skin cofferdam; installation of 2 levels of tie rods; filling void between cofferdam walls and dewatering. Construction period: 10 months; contract budget around 4.9m.

Gloucester and Shipness Canal Diversion Scheme Works included installation of 600 linear m. of sheet piles and associated tie bar and anchor system. Construction period: 4 months; contract budget around 0.8m.

Strongford Waste Water Treatment Works Works included installation of 4 temporary works cofferdams and propping to enable deep construction. Construction period: 2 months; contract value around 0.45m.

Penn Mill Sewage Treatment Works, Yeovil

Site perimeter King Post wall at Sainsbury's store compound, Pontypridd

Site perimeter King Post wall at Sainsbury's store compound, Pontypridd

Temporary Bridge Contracting Montrose Basin Scotland

Temporary bridge solutions Cobbins Brook Flood Alleviation Scheme Enablement Essex Thames Estuary, Northfleet, Kent

Supporting major construction projects in cities throughout the UK and Ireland Original book and pdf slide show designed and produced by plaincom.com All images Marcus Brierley/plaincom.com and Dawson Wam Ltd.