1 Tame Urban Pollution Management Foxton Road & Sir Johns Road CSOs - collaborative working to deliver innovative solutions Severn Trent Water Ltd has undergone a massive investment programme in the River Tame catchment over the AMP3 / AMP4 period (2000 to 2010) with the emphasis on improving the river quality of the River Tame and its many tributaries. Within the catchment there are 374 Combined Sewer Overflows (CSOs), providing hydraulic relief points for the sewerage system during periods of heavy rain, 92 of which were identified and categorised as Unsatisfactory Intermittent Discharges (UIDs) to be improved. River Tame catchment WRc were commissioned to assist STW by carrying out a major Urban Pollution Management (UPM) study for the Tame catchment. The River Tame UPM catchment has an area of 1,067km 2 covering the whole of Birmingham, Solihull, Sandwell, Walsall and the majority of Wolverhampton and Dudley. The population is approximately 1.9 million and there are 6 significant sewage treatment works within the catchment. To complete the UPM study, it was first necessary to upgrade and verify the individual sewer hydraulic models and integrate them by adding the major Black Country Trunk Sewer, which carries flows from Wolverhampton, Walsall, Sandwell and central Birmingham to Minworth Works to the east of Birmingham. Courtesy Severn Trent Water WRc used the integrated sewerage model to help conceptualise a SIMPOL3 water quality model of the complete system, including receiving watercourses. This model was calibrated against the sewer model and sampling data collected from the river reaches. The model was used to establish the base line performance and additional storage requirements to achieve water quality standards agreed with the Environment Agency. Two major projects, both part of the southern area River Tame UPM programme, are described in this article. 63
2
3 Foxton Road CSO Washwood Heath, Birmingham The CSO located in Foxton Road, Washwood Heath in Birmingham was identified as an UID as part of the Tame South UPM Study. The receiving watercourse, the Washwood Heath Brook, flows through a parkland of high amenity value and suffers from aesthetic pollution and a reduction in water quality due to excess spill flows. Three other UIDs were initially identified discharging to the Washwood Heath Brook; Ward End Park Road / Washwood Heath Road was shown to be satisfactory following detailed analysis and a joint scheme to address Harts Road and Nansen Road UIDs was completed in The improvements to the sewerage system were considered holistically with all of the storage to address the water quality problems provided at the Foxton Road site. Restricted site Many of the Tame UIDs have been located in heavily urbanised areas and for the Foxton Road scheme, Severn Trent Water commissioned Mott MacDonald Ltd (MM) to investigate the feasibility of constructing the scheme on such a restricted site. In addition to the technical and construction difficulties managing the customer interface was extremely important as several residents would have restricted access to their properties throughout the works in addition to concerns over the proximity of major works. Restricted Access for Some Residents courtesy of Forkers Ltd The scheme comprises of a new CSO chamber, incorporating a mechanical screen, and the provision of 1000m 3 of shaft storage. The spill flows will be screened to 6mm, for rainfall events up to a 5 year return period, and the stored flows returned to the sewerage system after the rainfall event has finished. Design For the design and construction of the shaft (12.5m diameter by 12m deep), various options had been considered by Mott MacDonald. The main considerations were the high ground water table and the close proximity of the residential houses to the shaft location. As sand materials exist to a depth of approximately 30m below ground with the groundwater table close to the ground surface, if large scale pumping is required during construction, it will be bound to cause unacceptable settlement to the adjacent house structures. Constructing piles to 30m depth to form a complete cut off is neither technically attractive nor economically desirable. Secant piling shaft Taking into considerations all the constraints, MM recommended the option of adopting a shallow secant piling shaft with a jet grouted plug formed at the bottom of the shaft to support the excavation. The shaft was formed in circular shape with 72 No. secant piles of 880mm diameter. 76 No. single and double jet grouted columns ranging from 1.6m to 2.8m diameter were used to form the grout plug at a depth between 12.5m and 17.5m below ground. Foxton Road Site during piling works courtesy of Forkers Ltd Grout Plug Construction Sequence Courtesy of Severn Trent Water 65
4 Case Secant Piling Construction While the design of the secant pile shaft was relatively standard, the design of the jet grouted plug required serious consideration. The plug was analysed as an arch to resist the water pressure below. The compressive strength of the soilcrete (cemented soil) was a key consideration in the design. The plug will also need to be bonded to the secant pile surface such that the two elements can act together against the full hydrostatic uplift load. Due to the potential high variation in the quality of the soilcrete and the consequence of failure to the adjacent households, an appropriate factor of safety was built in the design. Another key parameter to be considered for the soilcrete is its permeability. Substantial water drawdown outside the shaft would still occur if too much water entered into the shaft. Construction Forkers Ltd is the main contractor for the works and Bachy Soletanche (BS) was the subcontractor carrying out the secant piling and jet grouted column works. As the quality of the grout plug heavily depends on the grout mix design and jetting technique, BS also carried out the final design of the jet grouted columns. The cased CFA technique was adopted for the secant piling works and Courtesy of Mott MacDonald which was proven to be a much faster method of completing the 18m long secant piles. Site control was crucial to ensure the quality of the jet grouted columns works met with the design requirements. During construction, a tight monitoring programme was implemented to monitor the ground and groundwater movement. The completed works have lived up to the design expectation. The permeability of the soilcrete was estimated only to be in the order of 1 x 10-9 m/s and most of the cored samples taken from the grout plug reached the design strength. Very minimal dewatering was required within the shaft during the excavation works and no tangible ground movement had occurred as a result. Programme Work started in September 2009 with beneficial use of the asset achieved in March 2010 meeting the regulatory delivery date. The complete project costs are 3.4m. Severn Trent Water and Forkers Ltd have received praise from the local residents for the level of communication regarding the scheme and managing the disturbance during the construction phase. Drilling of Jet Grouted Columns Courtesy of Mott MacDonald 66
5 Sir Johns Road CSO Cannon Hill Park, Birmingham Sir Johns Road CSO is in the Selly Oak area to the south of Birmingham city centre within Birmingham City Council s Cannon Hill Park and serves a population of approximately 149,000. The catchment served by the CSO is predominantly partially separate. The CSO is a high sided weir which spills via twin 525mm diameter pipes to the River Rea which in turn discharges to the River Tame. Continuation flows discharge via the Lower Rea main trunk sewer to the Black Country Trunk Sewer and onto Minworth STW. Hydraulic & Water Quality Analysis Hydraulic analysis of the catchment was completed using a macro model of verified Hydroworks & Infoworks drainage area models within the Tame catchment. WRc used this hydraulic model to build, conceptualise and calibrate a SIMPOL catchment model to identify water quality problems in receiving watercourses caused by poorly performing CSO s and additional storage requirements in the sewer network necessary to achieve the required improved river quality. The Tame UPM study identified Sir Johns Road CSO as a large spiller with a predicted spill frequency of 58 spills per annum and an annual spill volume of approximately 233,000cu.m. The UPM study suggested 3,000cu.m of storage was required at the overflow to secure biochemical oxygen demand (BOD) compliance in the local watercourse (River Rea). An additional 7,000cu.m was also recommended to assist in reducing the dissolved oxygen (DO) noncompliance in the Lower Tame. During AMP4, local re-verification of the hydraulic model was undertaken including flow monitoring and updated asset surveys. These changes as well as improvements completed in other catchments local to Sir Johns Road CSO were used by WRc to reassess storage requirements. Analysis showed that the there were no local quality compliance issues in the River Rea. Various storage volumes were then assessed to determine the optimum storage required to address DO non-compliance in the Lower Tame. A solution incorporating 4,075cu.m of storage and an increased pass forward flow was approved by the Environment Agency as being acceptable to meet the overall spill reduction requirement of 5,000cu.m and deliver the improved river quality. Solution Development Following identification of the storage requirements at the CSO, a delivery team consisting of STW s In House Asset Delivery team with Barhale Construction appointed as main contractor worked collaboratively to develop the preferred solution procured using a Target Price Contract in accordance with STW s AMP4 Contract Strategy. STW s In House Service Delivery team responsible for future operation and maintenance of the new assets were an integral part of the delivery team in ensuring operational risk was considered at each stage of the solution development process. The existing CSO is within a heavily wooded area of Cannon Hill Park where access for construction plant would be difficult. An area downstream of the CSO, still in the park, and known as the redgra area offered the ideal location to relocate the CSO and storage tank to, both for construction and also future operation and maintenance. The key features of the developed solution are: New bifurcation chamber on the Lower Rea Main trunk sewer to replace the existing CSO with a 1050mm continuation sewer connected to a new CSO; New CSO incorporating a Longwood Stormguard model 650 6mm mechanical screen with 825mm diameter continuation sewer connected to the existing trunk sewer and 1050mm diameter overflow pipe connected to a pumped return storage tank; 4,075m 3 of screened storage incorporating pump return with a capacity of 256l/s operating on a duty/assist/standby basis; New 1050mm diameter overflow pipe from the storage tank to a new outfall structure discharging to the River Rea. Aerial View of storage tank site Courtesy of Commission Air 67
6 First Weholite manifold placement Courtesy of Barhale Construction This solution allows flows to spill via the new bifurcation chamber diverted through the new CSO with spill flows screened before discharging to the storage tank. Depending on the rainfall intensity and the consequential volume of spill to the tank, the total spill is either retained in the tank or if the spill volume exceeds the tank capacity, the additional screened spill volume discharges to the River Rea. Level control equipment located in the pumped return manhole on the trunk sewer inhibits emptying of the tank until the storm has abated and levels in the receiving trunk sewer return to normal. In developing the preferred construction method for the storage tank, the delivery team considered a number of alternatives including: A reinforced concrete storage tank with separate pump return chamber; A series of linked shaft storage tanks with pump return; A series of Weholite HDPE pipes with integral pump return chamber. The delivery team considered each alternative with respect to buildability, programme duration, health and safety, operation and maintenance, cost and carbon reduction and agreed to proceed with more innovative Weholite HDPE solution. The pipe supplier, Asset International, worked closely with the delivery team to develop the optimum solution which included approximately 500m of 3.5m diameter pipe laid in 47m long rows interconnected by nine manifold sections and includes a 3.5m diameter integral sewage pumping station. Publicity Cannon Hill Park is a popular public open space in the centre of Birmingham and is also used as a thoroughfare by cyclists making their way to and from the city centre. Before work commenced, STW hosted a 3 day publicity drop in centre in the park to inform STW s customers and park users of the impending works. This event was supported with a press release, publicity leaflets and a link on the River Rea through Cannon Hill Park Courtesy of Severn Trent Water 68
7 Weholite tank construction STW website. Members of the delivery team also supported park user groups at a number of public events in the park again to promote STW s work and to keep the community informed. The publicity campaign helped keep enquiries during construction to an absolute minimum bearing in mind the high profile location of the site. Construction and Programme This large CSO project has improved operational performance of the sewerage network in Cannon Hill Park through the construction of a new screened CSO and associated storage tank. The project has significantly reduced aesthetic pollution in the River Rea and has helped address water quality problems in the Lower Tame. Work started in May 2009 and the new assets were commissioned in March 2010 meeting the regulatory delivery date for the project. Final reinstatement and soft landscaping is due for completion in June Delivery of the project was achieved for a total cost of 3.33M. During 11 months of construction there were no lost time incidents, Courtesy of Severn Trent Water Ltd no written customer complaints and no category 1, 2 or 3 pollution incidents. Conclusion Severn Trent Water Ltd has undergone a massive investment programme in the River Tame catchment, Foxton Road and Sir Johns Road are two examples of collaborative working to deliver innovative solutions to meet the required water quality standards. The collaborative approach adopted during the design and construction process of the projects clearly demonstrates the delivery team s capability of developing the best investment choice for STW and its customers. The projects also demonstrate how STW s investment is meeting the objectives set out under the company s Key Strategic Intentions of dealing effectively with waste water and minimising our carbon footprint. Note: The Editor and Publishers thank Severn Trent Water Ltd for providing the above article. The UK Water Projects Publica on is now online. over 500 case studies from the edi ons indexed in six categories, sub-divided into over 50 index headings: Water Company, Consultants, Civil Engineers, Process Engineers, Plant & Equipment Suppliers & Publica on Date experience it for yourself at 69
UDG Spring Conference Birmingham 2016
Use of Monitoring Equipment to Proactively Manage the Waste Water Network Presenters James Mason (RPS), Joanna Kelsey (Severn Trent Water) Contributors Andrew Bailey (RPS), John Hateley (RPS) Ruth Clarke
Module 7: Hydraulic Design of Sewers and Storm Water Drains. Lecture 7 : Hydraulic Design of Sewers and Storm Water Drains
1 P age Module 7: Hydraulic Design of Sewers and Storm Water Drains Lecture 7 : Hydraulic Design of Sewers and Storm Water Drains 2 P age 7.1 General Consideration Generally, sewers are laid at steeper
Vital Earth Composting Facility Flood Risk and Drainage Statement
Vital Earth Flood Risk and Drainage Statement Final December 2011 Prepared for Vital Earth Ltd Revision Schedule Flood Risk and Drainage Statement December 2011 Rev Date Details Prepared by Reviewed by
Ridgistorm-XL - the latest innovative
Ridgistorm-XL - the latest innovative solution to SUDS and stormwater management Combined with the technical expertise, knowledge and support of Polypipe, Ridgistorm-XL is designed as a bespoke application
Greater Dublin Strategic Drainage Study Regional Drainage Policies - Volume 2 New Development
7 SPECIFICATIONS There is currently no Irish specification for construction of drainage works, or water supply works. There are several publications that give guidance on drainage works, such as the Building
Creating the environment for business
1. Introduction 1.1 Introduction to Water Cycle Strategies (WCS) 1.1.1 Background The water cycle describes the pathways and processes through which water moves through the natural and built environment,
INFRASTRUCTURE, FLOOD PROTECTION AND REMEDIATION. Infrastructure Flood Protection Remediation Policies
INFRASTRUCTURE, FLOOD PROTECTION AND REMEDIATION Infrastructure Flood Protection Remediation Policies DRAFT POOLBEG PLANNING SCHEME 196 FIGURE 9.1: UTILITIES WAYLEAVES Electricity Cables 8m Wayleave for
Policy Guidance Notes and Requirements
Policy Guidance Notes and Requirements Building over/close to Public Sewers Domestic Extensions and Garages 1.0 Introduction Householders and developers planning to build close to or over a public sewer
Building over or close to a public sewer
Building over or close to a public sewer thameswater.co.uk/developerservices thameswater.co.uk/developerservices 1 Questions and answers Did you know Thames Water is legally responsible for more than 100,000
The Lee Tunnel - Tideway Pumping Station an 87m deep/38m diameter pumping shaft to transfer the volume of the Lee Tunnel to BecktonSTW
www.waterprojectsonline.com The Lee Tunnel - Tideway Pumping Station an 87m deep/38m diameter pumping shaft to transfer the volume of the Lee Tunnel to BecktonSTW by Phil Muir CEng MIMechE T he Lee Tunnel
SEWERS FOR ADOPTION 6 PIPE MATERIALS TABLE AND CONDITIONS OF USE VERSION 4 March 09
SEWERS FOR ADOPTION 6 PIPE MATERIALS TABLE AND CONDITIONS OF USE VERSION 4 March 09 Foul and Storm Lateral Drains (100 & 150 mm Diameters) Pumped Storage General Exceptions General Exceptions General Exceptions
Type of Sewer Systems. Solomon Seyoum
Type of Sewer Systems Solomon Seyoum 0 Learning objectives Upon completion of this lecture, the participants will be able to differentiate between types of sewer systems and discuss different aspects of
Stormwater Control Measures for Tokyo
Stormwater Control Measures for Tokyo M. Sugai* *Planning Section, Planning and Coordination Division, Bureau of Sewerage, Tokyo Metropolitan Government, 2-8-1 Nishi-Shinjuku, Shinjuku-ku, Tokyo 163-8001
Executive Director, Engineering & Construction Services Director, Purchasing & Materials Management Division
PW8.5 STAFF REPORT ACTION REQUIRED Contract Award Request for Proposal No. 9117-15-7122 Engineering Services for the Detailed Design, Services During Construction, and Post-Construction Services for an
Emerging Technologies in Wastewater Collection Systems
Keville Enterprises Emerging Technologies in Wastewater Collection Systems Douglas McCutchen, CCM Brian Karmasin, P.E., BCEE CMAA Annual Conference Oct 2008 San Francisco, California Today s s Presentation
Application of InfoWorks CS Software for the Hydraulic Design of HATS Stage 2 Sewage Conveyance System in Hong Kong, China
Proceedings of 2013 IAHR World Congress Application of InfoWorks CS Software for the Hydraulic Design of HATS Stage 2 Sewage Conveyance System in Hong Kong, China Anil Kumar Senior Engineer, ARUP, Level
Micropiles Reduce Costs and Schedule for Merchant RR Bridge Rehabilitation
Micropiles Reduce Costs and Schedule for Merchant RR Bridge Rehabilitation Jeff R. Hill, P.E. Hayward Baker Inc. 111 W. Port Plaza Drive Suite 600 St. Louis, MO 63146 314-542-3040 [email protected]
High-Rate Retention Treatment Facility for CSO Control in Windsor Riverfront East
High-Rate Retention Treatment Facility for CSO Control in Windsor Riverfront East Jian Li, Ph.D., P.Eng., PE Senior Environmental Engineer Stantec Consulting Ltd. Water & Wastewater Treatment BMP Forum
Specialists in the Refurbishment, Replacement and Renewal of Water Mains throughout the UK
Specialists in the Refurbishment, Replacement and Renewal of Water Mains throughout the UK North East Pipelines Limited Manor House Farm, East Cowton, Northallerton, DL7 0DE Tel: 01325 713296 Mob: 07802
PRODUCT SELECTOR Pollution Control, Pumping and Rainwater Harvesting Systems
PRODUCT SELECTOR Pollution Control, Pumping and Rainwater Harvesting Systems PACKAGE SEWAGE TREATMENT SYSTEM Clearwater treatment plants are ideal for single houses and employ the well proven aerobic biological
Thames Water key Messages for London Borough of Ealing 25 th October 2005
Thames Water key Messages for London Borough of Ealing 25 th October 2005 Item 1: Drainage & ownership The area of drainage is complex. Thames Water, the Local Authority, the Environment Agency and property
COMBINED SEWER OVERFLOW OPERATIONAL AND MAINTENANCE PLAN SUMMARY
COMBINED SEWER OVERFLOW OPERATIONAL AND MAINTENANCE PLAN SUMMARY Revised: April 2014 Village of Wilmette, Illinois NPDES CSO Permit No. ILM580012 Chapter 1 Introduction This Operational and Maintenance
Household customer. Wastewater flooding guidelines. www.thameswateruk.co.uk
Household customer Wastewater flooding guidelines www.thameswateruk.co.uk We are very sorry that you have recently suffered wastewater flooding to your property. This leaflet has been designed to answer
Action plans for hotspot locations - Ash Study
Appendix 9 Action plans for hotspot locations - Ash Study Ash Vale North 1. Local evidence indicates the culvert could not discharge during December 2013 because the outlet was blocked on the western side
CHAPTER 2 HYDRAULICS OF SEWERS
CHAPTER 2 HYDRAULICS OF SEWERS SANITARY SEWERS The hydraulic design procedure for sewers requires: 1. Determination of Sewer System Type 2. Determination of Design Flow 3. Selection of Pipe Size 4. Determination
Source Water Protection Practices Bulletin Managing Sanitary Sewer Overflows and Combined Sewer Overflows to Prevent Contamination of Drinking Water
United States Office of Water EPA 916-F-01-032 Environmental Protection (4606) July 2001 Agency Source Water Protection Practices Bulletin Managing Sanitary Sewer Overflows and Combined Sewer Overflows
Pro-Lift Steel Pile Foundation Repair
Pro-Lift Steel Pile Foundation Repair Pro-Lift Steel Pile Foundation Repair System Pro-lift steel piles are designed for the stresses of Texas soils. They can have multiple steel walls, depending on the
CITY OF ST. CA THARINE S. cn- Olc.4 BY-LAW NO. WHEREAS the Council of the Corporation of the City of St. Catharines, is
~: ~,,' " CITY OF ST. CA THARINE S BY-LAW NO. cn- Olc.4 A By-law to regulate sanitary and storm drainage. WHEREAS the Council of the Corporation of the City of St. Catharines, is authorized by the provisions
Our sewerage services - how we deal with your used water. www.nwl.co.uk
Our sewerage services - how we deal with your used water www.nwl.co.uk Our sewerage services A sewer is a pipe which carries and removes either rain water or foul water from more than one property. This
KAWERAU DISTRICT COUNCIL BUSINESS DISASTER RECOVERY PLAN 2011
KAWERAU DISTRICT COUNCIL BUSINESS DISASTER RECOVERY PLAN 2011 Kawerau District Council Private Bag 1004 Ranfurly Court KAWERAU 3169 Tel (07) 306 9009 Fax (07) 323 8072 Email [email protected]
SECTION 02401 SHEETING, SHORING AND BRACING
SECTION 02401 SHEETING, SHORING AND BRACING This section should be edited to reflect soil conditions specific to the project site and the recommendations of a Geotechnical Engineer licensed in the State
Review of Footing Drain Disconnection Projects
Wastewater Master Plan DWSD Project No. CS-1314 Review of Footing Drain Disconnection Projects Technical Memorandum Original Date: August 8 2002 Revision Date: September 2003 Author: CDM Table of Contents
MARYLAND AVENUE BACKUPS DURING AUGUST 31, 2014 STORM EVENT COMMUNITY OUTREACH
MARYLAND AVENUE BACKUPS DURING AUGUST 31, 2014 STORM EVENT COMMUNITY OUTREACH MARYLAND AVENUE BACKUPS COMMUNITY OUTREACH MEETING AGENDA Introductions History of PWSA Actions August 31 Storm Impacts Short
SHAFT CONSTRUCTION IN TORONTO USING SLURRY WALLS
SHAFT CONSTRUCTION IN TORONTO USING SLURRY WALLS Vince Luongo Petrifond Foundation Co., Ltd. PROJECT DESCRIPTION The York Durham Sanitary System (YDSS) Interceptor in the Town of Richmond Hill located
Sewerage Management System for Reduction of River Pollution
Sewerage Management System for Reduction of River Pollution Peter Hartwig Germany Content page: 1 Introduction 1 2 Total emissions 3 3 Discharge from the wastewater treatment plants 4 4 Discharge from
DESCRIPTION OF STORMWATER STRUCTURAL CONTROLS IN MS4 PERMITS
DESCRIPTION OF STORMWATER STRUCTURAL CONTROLS IN MS4 PERMITS Phase I MS4 permits require continuous updating of the stormwater system inventory owned and operated by the MS4. They also include inspection
Draft Water Services Strategic Plan
Draft Water Services Strategic Plan A Plan for the Future of Water Services Customer Water Wastewater Environment Growth Investment Safeguarding your water for your future Irish Water at a glance... Irish
Bolton s Flood Risk Management Strategy
Bolton s Flood Risk Management Strategy www.bolton.gov.uk Public Summary Bolton s Flood Risk Management Strategy Public Summary Introduction Over 5.5 million properties in England and Wales are at risk
guide for obtaining new water and waste water services
You can write to us at: Customer Connections Scottish Water 419 Balmore Road Glasgow G22 6NU Please quote this reference code when contacting us: SWP&DS/DG2 04/08 Alternative formats of this leaflet can
Newbiggin House Farm,
Newbiggin House Farm, Near Waberthwaite Flood Investigation Report 32 Flood Event 30/8/2012 Cumbria County Council Version Undertaken by Reviewed by Approved by Date Preliminary Colin Parkes Anthony Lane
MONITORING AND MODEL CALIBRATION FOR THE SEWER NETWORK IN OSLO
MONITORING AND MODEL CALIBRATION FOR THE SEWER NETWORK IN OSLO Authors: Ulf E. Roysted 1, Marit Melhuus 1 and Geir J. Lindholm 2 1. Oslo Water and Sewage Works(VAV), Herslebs gate 5, N-0561 Oslo e-mail:
MAP KEYS GLOSSARY FOR THE DRAINAGE AND WATER REPORT
Record MAP KEYS GLOSSARY FOR THE DRAINAGE AND WATER REPORT Abandoned Gravity Private Combined Gravity Private Foul Gravity Private Surface Water Gravity Public Combined Gravity Public Foul Gravity Public
Alphington sewer replacement
Alphington sewer replacement Frequently asked questions We understand you might have some questions for us so here are a few to provide you with more information. You are also welcome to call us on 1800
Guide to working on Public Sewers
Guide to working on Public Sewers affected by Building Works Introduction Severn Trent Water Ltd requires the work to be done in order to protect the public sewer and minimise the risk of us having to
Foul Drainage, systems and responsibility. Environmental Protection
Foul Drainage, systems and responsibility Environmental Protection The Building Act 1984 The Building Act 1984 can be used to deal with unsatisfactory provision for drainage and appliances which are harmful
Essex County Council Flood Investigation Report
Essex County Council Stock City of Chelmsford Rev Date Details Author Checked and Approved By 01 February 2015 Draft report for stakeholder consultation Ed Clarke Flood Investigation Engineer Lucy Shepherd
Earthquake damage in wastewater systems and postearthquake repair methods; limitation and practice
Earthquake damage in wastewater systems and postearthquake repair methods; limitation and practice M. R. Zare 1, S. Wilkinson 2, R. Potangaroa 3 1. PhD candidate, University of Auckland, Auckland, New
Sewer Flooding Alleviation in the Counters Creek Catchment
Sewer Flooding Alleviation in the Counters Creek Catchment London Borough of Hammersmith and Fulham Monday, 14 November 2011 at 7.00pm The Small Hall, Hammersmith Town Hall, King Street, W6 9JU Agenda
4.3 Cisterns and Rain Barrels
4.3 Cisterns and Rain Barrels Rain barrels, cisterns, and tanks are structures designed to intercept and store runoff from rooftops. Rain barrels are used on a small scale while cisterns and tanks may
3. Given the geographic extent of the area, amendments have been made to the following regional planning documents
AMENDMENTS TO THE REGIONAL PLANS RELATING TO LAND REPAIR ON EARTHQUAKE DAMAGED RESIDENTIAL LAND UNDER s27 OF THE CANTERBURY EARTHQUAKE RECOVERY ACT 2011 1. This memorandum outlines the specific changes
Glen Hills Area: Septic System and Public Sewer Q & A Information Sheet Page 1
Glen Hills Area: Septic System and Public Sewer Q & A Information Sheet Page 1 The Montgomery County Dept. of Environmental Protection, in cooperation with the Dept. of Permitting Services and the Washington
SECTION IX SLIP LINING PIPELINES
AN SECTION IX SLIP LINING PIPELINES February, 2008 TABLE OF CONTENTS SECTION IX - SLIP LINING PIPELINES 9.01.00 GENERAL...2 9.01.01 SCOPE... 2 9.02.00 MATERIAL...2 9.03.00 CONSTRUCTION...2 9.03.01 REQUIREMENTS...
Guidance Notes: GARDEN FLOODING
Page 1 of 7 Guidance Notes: GARDEN FLOODING If you are unsure about anything within these notes then please contact the Flood Risk Management (FRM) team using the details at the end of this document. Water
Development enquiry request
Development enquiry request Water supply and/or drainage capacity assessment for a proposed development NOTE: Please ensure all relevant sections of the application are completed and refer to the attached
COMBINED SEWER OVERFLOW LONG-TERM CONTROL PLAN Executive Summary
CITY OF LAKEWOOD COMBINED SEWER OVERFLOW LONG-TERM CONTROL PLAN Executive Summary MAY 2006 storage conveyance treatment performance Prepared for: City of Lakewood, Ohio Prepared by: Metcalf & Eddy of Ohio,
STRUCTURES. 1.1. Excavation and backfill for structures should conform to the topic EXCAVATION AND BACKFILL.
STRUCTURES 1. General. Critical structures may impact the integrity of a flood control project in several manners such as the excavation for construction of the structure, the type of foundation, backfill
SEPTIC TANKS FOR THE COLLECTION & SETTLEMENT OF DOMESTIC SEWAGE
SEPTIC TANKS FOR THE COLLECTION & SETTLEMENT OF DOMESTIC SEWAGE Let us help! Free professional site visit with friendly support and advice. [email protected] to make the right decision or call
METHOD OF STATEMENT FOR STATIC LOADING TEST
Compression Test, METHOD OF STATEMENT FOR STATIC LOADING TEST Tension Test and Lateral Test According to the American Standards ASTM D1143 07, ASTM D3689 07, ASTM D3966 07 and Euro Codes EC7 Table of Contents
16. Storm water drainage
16. Storm water drainage There are three principal ways to dispose of rainwater from roofs, courtyards and paved areas: storm water sewers, soakaways and collection in storage tanks. Storm water sewers,
Rouge River Watershed, MI Region 5. Community Case Study ROU-1. Number of CSO Outfalls. Combined Sewer Service Area. Wastewater Treatment Capacity
Community Case Study Rouge River Watershed, MI Region 5 Number of CSO Outfalls 168 Combined Sewer Service Area 93 square miles Wastewater Treatment Capacity 1,700 mgd (primary) 930 mgd (secondary) Receiving
Needs Report. Application for Development Consent. Thames Tideway Tunnel Thames Water Utilities Limited. Application Reference Number: WWO10001
Thames Tideway Tunnel Thames Water Utilities Limited Application for Development Consent Application Reference Number: WWO10001 Needs Report Doc Ref: 8.3 Main Report APFP Regulations 2009: Regulation 5(2)(q)
Storm Sewer Trenchless Upgrade Alternatives and Recommendations
Storm Sewer Trenchless Upgrade Alternatives and Recommendations Background Approximately 1,930 feet of the 40-inch and 42-inch CMP storm sewer pipe from manhole M22 to manhole M12 will be evaluated for
PART 5 : WASTEWATER DRAINAGE
Authorised by : City Waters Unit Manager Page 1 of 15 PART 5 : WASTEWATER DRAINAGE 5.1 INTRODUCTION This Manual sets out the basic design principles for drainage of wastewater. While some construction
Maine Department of Environmental Protection Program Guidance On Combined Sewer Overflow Facility Plans
Maine Department of Environmental Protection Program Guidance On Combined Sewer Overflow Facility Plans OVERVIEW The objective of a Combined Sewer Overflow (CSO) Facility Plan is to abate CSO discharges
STANDARD AND SPECIFICATIONS FOR STORM DRAIN INLET PROTECTION
STANDARD AND SPECIFICATIONS FOR STORM DRAIN INLET PROTECTION Design Criteria Drainage Area The drainage area for storm drain inlets shall not exceed one acre. The crest elevations of these practices shall
London Borough of Merton Local Flood Risk Management Strategy
Local Flood Risk Management Strategy Summary 2014-2020 Introduction In response to the severe flooding across large parts of England and Wales in summer 2007, the Government has recently enacted the Flood
Designed and produced by geo-graphicsdesign.com DP 300 3/02
Designed and produced by geo-graphicsdesign.com DP 300 3/02 Guidance for Developers and Regulators Purpose This booklet is produced on behalf of the North East Scotland Flooding Advisory Group and is intended
Essential Water. Customer Charter
Essential Water Customer Charter Who is Essential Water? Essential Water is a division of Essential Energy and provides water supply services to over 20,000 people in Broken Hill, Menindee, Sunset Strip
Standard terms and conditions
Standard terms and conditions INTRODUCTION For the provision of a water service (Water Supply, Wastewater and Drainage) Under Section 73(2)(a) of the Water Services Act 2012, landowners may be entitled
London Borough of Waltham Forest LOCAL FLOOD RISK MANAGEMENT STRATEGY. Summary Document
LOCAL FLOOD RISK MANAGEMENT STRATEGY Summary Document October 2013 Local Flood Risk Management Strategy Summary 1 Introduction 2 Partner responsibilities 3 What do we know about flooding in the borough?
Domestic Wastewater Treatment Up to 6 Population (6PE)
Domestic Wastewater Treatment Up to 6 Population (6PE) www.mjabbott.co.uk Tel: 01722 716361 e-mail: [email protected] Fax: 01722 716828 The Solido EN 12566-3 Test Certificate Our system was tested with
List of Figures List of Abbreviations Executive Report
Table of Contents List of Figures List of Abbreviations Executive Report (ii) (iii) (iv) 1. INTRODUCTION... 1 1.1 BACKGROUND TO THE GDSDS... 1 1.2 BACKGROUND INVESTIGATIONS... 1 1.3 REPORT OBJECTIVES...
SPECIFICATIONS FOR SEWER PIPE AND LINING INSERTION - TRENCHLESS; GENERAL GUIDELINES (As Provided by NASSCO)
SPECIFICATIONS FOR SEWER PIPE AND LINING INSERTION - TRENCHLESS; GENERAL GUIDELINES (As Provided by NASSCO) 1 Intent: The intent of trenchless sewer pipe Insertion is to rehabilitate the existing sewer
London Borough of Croydon Local Flood Risk Management Strategy
London Borough of Croydon Local Flood Risk Management Strategy Summary 2014-2020 Introduction In response to the severe flooding across large parts of England and Wales in summer 2007, the Government has
On Site Treatment Systems
On Site Treatment Systems Introduction In cases where houses require to be located in the countryside,(i.e. where no sewerage is available),it is necessary to provide a specific on-site treatment system
A Guide to Specifying Reed Beds and Constructed Wetland Systems
NIRBC The Northern Ireland Reed Bed Company. Constructed Wetlands for Northern Ireland A Guide to Specifying Reed Beds and Constructed Wetland Systems A Summary for Consultants, Engineers and Architects
Water Mains Rehabilitation Framework (NI) Northern Ireland Water
PROJECT: CLIENT: MAIN CONTRACTOR: Water Mains Rehabilitation Framework (NI) Northern Ireland Water Farrans Background Northern Ireland Water manages a water mains infrastructure that supplies 625 million
Local Authority Building Control Technical Information Note 3 Driven and In-situ Piled Foundations
Local Authority Building Control Technical Information Note 3 Driven and In-situ Piled Foundations Cambridge City Council - East Cambridgeshire District Council - Fenland District Council, Huntingdonshire
Amendment to OPSS 415 (Nov 2008) Construction Specification for Pipeline and Utility Installation by Tunnelling
Engineering and Construction Services Division Standard Specifications for Sewers and Watermains TS 415 April 2013 Amendment to OPSS 415 (Nov 2008) Construction Specification for Pipeline and Utility Installation
PRSENTATION ON DRAINAGE SYSTEM DELHI 25.07.2014 EAST DELHI MUNICIPAL CORPORATION
PRSENTATION ON DRAINAGE SYSTEM OF DELHI EAST DELHI MUNICIPAL CORPORATION 25.07.2014 MAP OF DELHI SHOWING MCD s, NDMC & DCB ABOUT DELHI DELHI MANIFESTS UNCONTROLLED URBANISATION POPULATION INDUSTRIALISATION
AVOIDING THE PITFALLS OF DYNAMIC HYDRAULIC CONDITIONS WITH REAL-TIME DATA
AVOIDING THE PITFALLS OF DYNAMIC HYDRAULIC CONDITIONS WITH REAL-TIME DATA TONY CURLING, THAMES WATER UTILITIES LIMITED, GAINSBOROUGH HOUSE, MANOR FARM ROAD, READING, BERKSHIRE, RG JN, UK TEL: 9 898 7,
Land Disturbance, Erosion Control and Stormwater Management Checklist. Walworth County Land Conservation Department
Land Disturbance, Erosion Control and Stormwater Management Checklist Walworth County Land Conservation Department The following checklist is designed to assist the applicant in complying with the Walworth
Oasis Clearwater ENVIRONMENTAL SYSTEMS WASTEWATER TREATMENT ENGINEERS
Oasis Clearwater ENVIRONMENTAL SYSTEMS WASTEWATER TREATMENT ENGINEERS The evolution continues in decentralised wastewater technology... The Process Decentralised wastewater treatment systems are defined
Pollution Control NEW! NEW! Stormwater Attenuation Systems Sustainable Urban Drainage Solutions for Domestic & Commercial Applications. klargester.
Pollution Control NEW! NEW! Stormwater Attenuation Systems Sustainable Urban Drainage Solutions for Domestic & Commercial Applications klargester.com Stormwater Attenuation Systems Sustainable Urban Drainage
Coxwell Sanitary Trunk Sewer Emergency Repair: By-pass Sewer Tunnel Construction Final Report
STAFF REPORT ACTION REQUIRED Coxwell Sanitary Trunk Sewer Emergency Repair: By-pass Sewer Tunnel Construction Final Report Date: July 28, 2014 To: From: Public Works and Infrastructure Committee General
DID YOU KNOW... THE IMPACT OF ON-SITE SEWAGE SYSTEMS AND ILLICIT DISCHARGES ON THE ROUGE RIVER
DID YOU KNOW... THE IMPAT OF ON-SITE SEWAGE SYSTEMS AND ILLIIT DISHARGES ON THE ROUGE RIVER by Barry Johnson, P.E., M.S., amp Dresser & McKee and Dean Tuomari, Wayne ounty Department of Environment The
Member Nation Report 2010 from Denmark.
Member Nation Report 2010 from Denmark. The has during the year 2010 arranged 6 member meetings including two technical site visits. The first technical site visit covered the 5.3 km long Leipzig City
WEST LONDON PIPELINE AND STORAGE LIMITED AND UNITED KINGDOM OIL PIPELINES LIMITED
WEST LONDON PIPELINE AND STORAGE LIMITED AND UNITED KINGDOM OIL PIPELINES LIMITED WLPS BUNCEFIELD REBUILD Flood Risk Assessment Green Lane Hemel Hempstead Hertfordshire HP2 7HZ September 2009 Prepared
A Property Owner s Guide
The Operation and Maintenance of Domestic and Commercial Sewers A Property Owner s Guide KILDARE LOCAL AUTHORITIES WATER SERVICES DEPARTMENT TABLE OF CONTENTS Introduction 1. Why should I care? 2. What
HIGHWAYS. Drainage design on M25 motorway widening project (J16 - J23) Brijesh Vats
Drainage design on M25 motorway widening project (J16 - J23) 76 Brijesh Vats Drainage Engineer Highways & Transportation Abstract Drainage design on the M25 motorway comprises complex drainage networks
Your Guide to Household Water Metering
Your Guide to Household Water Metering Introduction It s generally considered that it s fairer to pay for the amount of water you actually use, rather than by a fixed amount. After all, you pay for electricity
APPENDIX 9 INFRASTRUCTURE SERVICING REPORT
APPENDIX 9 INFRASTRUCTURE SERVICING REPORT Lot 50 Cockram Street, Mundijong Infrastructure Servicing Report Peet Ltd August 2012 LOT 50 COCKRAM STREET, MUNDIJONG-INFRASTRUCTURE SERVICING REPORT Project
CHAPTER 11 STORM DRAINAGE
CHAPTER STORM DRAINAGE SECTION PC 0 GENERAL 0. Scope. The provisions of this chapter shall govern the materials, design, construction and installation of storm drainage. Storm water discharge shall be
SECTION 02763 POINT REPAIRS TO SANITARY SEWERS. A. Repairs to existing sewer lines by replacing short lengths of failed pipe.
SECTION 02763 PART 1 G E N E R A L 1.01 SECTION INCLUDES A. Repairs to existing sewer lines by replacing short lengths of failed pipe. 1.02 UNIT PRICES A. Measurement for point repairs is on a unit price