1 Policy Guidance Notes and Requirements Building over/close to Public Sewers Domestic Extensions and Garages 1.0 Introduction Householders and developers planning to build close to or over a public sewer have to seek permission from the relevant sewerage company. Building close to or over a public sewer without having obtained formal approval is illegal. It may also jeopardise the future sale of your property. Severn Trent Water is responsible for public sewers within its area. We have to ensure that no development is carried out that could damage pipe work, cause risk of flooding or affect future access for maintenance. Wherever possible we prefer to see a solution that involves repositioning of the proposed development or diverting the sewer. However in some cases where risk to public sewer is small, Severn Trent Water is normally willing to permit building over or close to sewers where diversion is not practical and the extension cannot be redesigned. This includes those sewers known as Section 24 sewers, which were constructed before 1 October 1937 and serve more than one property. However, please note that these may not be shown on our record plans. There are 3 different pay structures; the application fee is dependent on the nature of the public sewer or type of development. In cases of added complexity: The sewer has a formal easement preventing over building this is shown in the deeds of a modern property The sewer depth exceeds 3 metres The sewer is a pressurised pumping main Strategic sewers, or those which require future upgrading, are affected Piling or ground stabilisation works are required. Class 1 Applications Up to and including 150mm sewers Class 2 Applications mm sewers Class 3 Applications Sewers greater than 300mm or non-domestic developments You must contact Severn Trent Water for technical advice, before submitting a Class 3 application. Any permission will be subject to the following conditions: At Cost 2.0 General Conditions All building works shall comply with the requirements of Building Regulations 2000, Part H4 All building work must be approved by the building control inspector before backfilling. It must be acknowledged that the sewerage undertaker s statutory rights in relation to the affected sewer are not in any way prejudiced by the approval of Severn Trent Water to the proposed building work. A Severn Trent Water final approval to build over or close to a public sewer will be issued when a satisfactory post construction CCTV survey report has been provided.
2 3.0 Outline of the building over or close to sewer process In order to protect both the public sewer and your proposed works it is necessary to establish the position and preferably the condition of the sewer. This is preferably done by inserting a camera and carrying out a Closed Circuit Television Survey (CCTV). The position of the camera is monitored at the surface by electro location. You then send us a copy of the report of the survey together with plans showing your proposed works. We will look at the information and decide whether your proposals will have an unacceptable impact on the sewer. If we are prepared to agree to your proposals, we will issue a provisional approval. This may be subject to conditions. Please note that the building control officer will need to approve your proposals for compliance with Building Regulations 2000, Part H4. When your works are complete, the sewer must be inspected by CCTV survey to confirm that the sewer has not been damaged. You will be responsible for the cost of any repairs. A final letter of agreement to build over or close to the sewer will be issued after CCTV survey or when repairs are complete. The process is described in more detail below. 4.0 Building close to the sewer (within 3.0m of the sewer) The 3.0m is measured from the nearest point of the building, including foundations to the middle (centreline) of the sewer Depth is measured to the underside (invert) of the pipe For sewers of 100mm or 150mm diameter, providing the accurate position of the sewer can be demonstrated and you can prove that the construction of the foundation will not adversely affect the public sewer, no CCTV and electro location survey will be required before the building works take place. For sewers of 225mm or 300mm diameter no CCTV survey will be required before the building works take place, if you can prove that the sewer is no closer than 1 metre to the new building. In all other cases a CCTV and electro location survey is required. A CCTV survey will be required on completion of your building works, in order to prove that you have not damaged the public sewer.
3 5.0 Building over the sewer When building over the sewer you may either: Replace all public sewer pipes within the footprint of the building at your cost, ensuring that there is manhole access for a CCTV inspection to be carried out after completion of building works. If there is no existing manhole then building a new manhole outside the footprint of the building will be necessary. OR Carry out a CCTV survey of the public sewer before works begin and after completion of building work. After the first CCTV survey it may be necessary for localised repairs to be made to the pipe at householder s expense. In either case a CCTV survey will be required on completion of your building works, in order to prove that you have not damaged the public sewer. 6.0 Locating the position and condition of public sewer The survey will consist of inspection of the condition of the sewer by CCTV and establish its position by electro location. If a survey is required then you will need to employ the services of a specialist CCTV contractor. Please ensure that the contractor is capable of undertaking the work to the standards described below. If information is missing we will have to reject your application. This will obviously delay your work. The survey report should be carried out by a competent contractor who will produce a report complying with the WRc Model Contract Document for Non Man Entry Sewer Inspection Third Edition and UK Water Industry Manual of Sewer Condition Classification Third Edition. The contractor will have to seek our permission to work on our sewers and will be required to provide evidence of their health and safety competence in the form of a written method statement. The survey should include: A block plan showing the point of entry of the CCTV into the public sewer, the length of sewer surveyed, any drain connections and the location of the sewer as confirmed by direct line tracing in relation to the existing building and boundary fences. The plan should be to scale and dimensioned. An inspection report to WRC standards including; sewer details such as type (foul or surface water), pipe size, pipe material, pipe depth, condition classification, drain connections, defects and recommendations, photographs of significant defects. A list of contractors is included for your information. These contractors have been vetted for health and safety competence and are authorised to work on the public sewer network. Please note manhole access is necessary for a CCTV survey to be carried out from. You will need to arrange manhole access prior to the CCTV contractor coming to do the survey. If you are unable to find a manhole to carry out the survey from, it will be necessary to build a new manhole on the public sewer line in this case please contact us for further information. If you believe that the sewer shown on the enclosed plan is in the wrong location or does not exist, please contact us for further advice before arranging the CCTV survey.
4 7.0 Building close to the sewer (within 3.0m of the sewer) Construction Details Where foundations to the buildings are at any point 1.0m from the sewer, they are to be carried down below the invert level of the sewer. At a greater distance, an angle of 45 degrees can be taken from a point one metre clear of the sewer up to the required footing level, as shown in the diagram below
5 8.0 Building over the sewer Construction Details Where an existing chamber, rodding eye or any form of access will come within the new building, a new manhole should be constructed on the line of sewer outside the limits of the building, to provide a replacement point of access to the sewer. Connections to the existing chamber will need to be diverted and re-laid to the new manhole. Any connections onto the sewer within the footprint of the new building should be diverted and reconnected outside unless it can be shown to be impractical. If as a result of building over, access to the sewer for maintenance becomes restricted, you may be required to provide a new manhole chamber. Where foundations to the buildings are at any point 1.0m from the sewer, they are to be carried down below the invert level of the sewer. At a greater distance, an angle of 45 degrees can be taken from a point one metre clear of the sewer up to the required footing level, as shown in the diagram above
6 9.0 Application requirements If, having considered the alternatives, your only option is to apply for building over or close to a public sewer; you should make an application to us on the form approved. In some circumstances we will allow to build over but you must have written agreement to do this before you start. The sewer must be in a satisfactory condition. If you do not obtain our approval to build over or build close to a public sewer, you may find the property very difficult to sell if in the future you wish to move home. Please note the checklist which is included for your assistance, within the Application Form. We will be unable to process your application and make a decision on your proposals if all of information is not supplied. When we receive a complete application we will normally provide you with a decision within 10 working days.
Building over or close to a public sewer
Building over or close to a public sewer thameswater.co.uk/developerservices thameswater.co.uk/developerservices 1 Questions and answers Did you know Thames Water is legally responsible for more than 100,000
Greater Dublin Strategic Drainage Study Regional Drainage Policies - Volume 2 New Development
7 SPECIFICATIONS There is currently no Irish specification for construction of drainage works, or water supply works. There are several publications that give guidance on drainage works, such as the Building
BUILDING OVER OR NEAR WATER & SEWER MAINS POLICY
MURRAY SHIRE COUNCIL BUILDING OVER OR NEAR WATER & SEWER MAINS POLICY ADOPTED: 1 May 2012 1 BUILDING OVER OR NEAR WATER AND SEWER MAINS POLICY CONTENTS 1. Objective... 2 2. Requirements for Building Near
Guide to working on Public Sewers
Guide to working on Public Sewers affected by Building Works Introduction Severn Trent Water Ltd requires the work to be done in order to protect the public sewer and minimise the risk of us having to
ALL YOUR DRAINAGE NEEDS. Tel: 01384 482228 www.midlanddrainage.co.uk
ALL YOUR NEEDS Tel: 01384 482228 www.midlanddrainage.co.uk Welcome to Midland Drainage Services Midland Drainage Services is a family owned and operated Drainage Company, based in the West Midlands and
Water Leakage & Your Responsibilities
Water Leakage & Your Responsibilities Information & Guidance Contents 1. Introduction 2. Who is responsible for underground pipework? 3. Who is responsible for repairing the supply pipe if there is a leak?
Sewers and Drains A GUIDE TO MAINTENANCE RESPONSIBILITIES
Sewers and Drains A GUIDE TO MAINTENANCE RESPONSIBILITIES This leaflet about drains and sewers has been prepared by Breckland Council and gives information and advice to private and commercial property
MAP KEYS GLOSSARY FOR THE DRAINAGE AND WATER REPORT
Record MAP KEYS GLOSSARY FOR THE DRAINAGE AND WATER REPORT Abandoned Gravity Private Combined Gravity Private Foul Gravity Private Surface Water Gravity Public Combined Gravity Public Foul Gravity Public
Storm Sewer Trenchless Upgrade Alternatives and Recommendations
Storm Sewer Trenchless Upgrade Alternatives and Recommendations Background Approximately 1,930 feet of the 40-inch and 42-inch CMP storm sewer pipe from manhole M22 to manhole M12 will be evaluated for
CORPORATION OF THE CITY OF BURLINGTON SPECIFICATION INDEX FOR CCTV VIDEO INSPECTION OF PROPOSED STORM SEWERS (SPEC. NO. SS7) 1. Scope of Work SS7-1
CORPORATION OF THE CITY OF BURLINGTON SPECIFICATION INDEX FOR CCTV VIDEO INSPECTION OF PROPOSED STORM SEWERS (SPEC. NO. SS7) INDEX PAGE 1. Scope of Work SS7-1 2. Contractor Certification SS7-1 3. Flushing
March 2006 DIVISION 3 - CW 2140-R3 TABLE OF CONTENTS
March 2006 CW 2140 - SEWER AND MANHOLE CLEANING TABLE OF CONTENTS 1. DESCRIPTION... 1 1.1 General... 1 1.2 Definitions... 1 1.3 Referenced Standard Constructions... 1 3. CONSTRUCTION METHODS... 1 3.1 High
EXCAVATION AND PILING NEAR SEWERS, STORMWATER DRAINS AND WATER MAINS
NMP 1.4 EXCAVATION AND PILING NEAR SEWERS, STORMWATER DRAINS AND WATER MAINS Index Purpose... 2 Application... 2 Referral Agency... 2 Associated Requirements... 2 Referenced Standards...2 Definitions...
STANDARD OPERATING INSTRUCTION SOI-GVW-198 CCTV Inspection of Sewerage Reticulation Works 1 PURPOSE 2 REFERENCES 3 DEFINITIONS
1 PURPOSE The purpose of this SOI is to provide instruction and guidance for closed circuit television survey (CCTV) inspection, which the Corporation requires to be undertaken by the constructor as part
SECTION IX SLIP LINING PIPELINES
AN SECTION IX SLIP LINING PIPELINES February, 2008 TABLE OF CONTENTS SECTION IX - SLIP LINING PIPELINES 9.01.00 GENERAL...2 9.01.01 SCOPE... 2 9.02.00 MATERIAL...2 9.03.00 CONSTRUCTION...2 9.03.01 REQUIREMENTS...
Mandatory Part 1.4 BUILD OVER OR NEAR SEWERS, STORMWATER DRAINS AND WATER MAINS
Mandatory Part 1.4 BUILD OVER OR NEAR SEWERS, STORMWATER DRAINS AND WATER MAINS Table of Contents Purpose... 2 Commencement... 2 Application... 2 Referral Agency... 2 Compliance with the QDC... 2 Associated
Quick Guide to Application for Clearance for Drainage Works for issuance of Certificate of Statutory Completion (CSC) Minor Project
Quick Guide to Application for Clearance for Drainage Works for issuance of Certificate of Statutory Completion (CSC) Minor Project DOCUMENTS TO BE SUBMITTED FOR CSC All "As-built" or "As-constructed"
SECTION 02732 CLEANING AND CLOSED CIRCUIT TELEVISION (CCTV) INSPECTION OF SEWER PIPE
SECTION 02732 CLEANING AND CLOSED CIRCUIT TELEVISION (CCTV) INSPECTION OF SEWER PIPE PART 1 - GENERAL 1.01 WORK INCLUDED A. This section covers the initial and final cleaning, and the initial and final
Beacon Hill Sewer District Standard Specifications
Beacon Hill Sewer District Standard Specifications Residential Gravity Side Sewer Including Design Criteria and Standard Construction Drawings Residential Gravity Side Sewer Design Criteria 1. Provisions
Utilities and existing services
Construction Services Building standards for mechanical and electrical installations Utilities and existing services October 2012 Directorate: Environment Construction Services - Building standards for
San Antonio Water System Standard Specifications for Construction ITEM 866 SEWER MAIN TELEVISION INSPECTION
ITEM 866 SEWER MAIN TELEVISION INSPECTION 866.1 DESCRIPTION: The Contractor shall furnish all labor, materials, equipment, and incidentals to provide the televising and a NASSCO-(PACP) standard video,
Additional Services Agreement. Part 3: Schedule of our requirements
Additional Services Agreement Part 3: Schedule of our requirements Schedule of our requirements Part A Water Services 1 All water services All connections to our water mains, including those used for construction
APPLICATION PROCEDURES FOR PLACEMENT OF UNDERGROUND WATER AND SEWER PIPELINES IN THE VICINITY OF TRANSPORTATION FACILITIES UNDER THE
APPLICATION PROCEDURES FOR PLACEMENT OF UNDERGROUND WATER AND SEWER PIPELINES IN THE VICINITY OF TRANSPORTATION FACILITIES UNDER THE JURISDICTION OF ALBERTA TRANSPORTATION 1.0 Application Procedures 2.0
Exhibit A. Rules and Regulations for House Connections and Sewer Extensions
The purpose of this application example is to provide assistance to small and medium sized rural communities in the drafting of documents necessary for the efficient operation of water, wastewater, and
Your Guide to Household Water Metering
Your Guide to Household Water Metering Introduction It s generally considered that it s fairer to pay for the amount of water you actually use, rather than by a fixed amount. After all, you pay for electricity
CLEANING, INSPECTION, AND TESTING OF SEWERS
CLEANING, INSPECTION, AND TESTING OF SEWERS PART 1 - GENERAL 1.01 SECTION INCLUDES A. Cleaning, Inspecting, and Testing Sanitary Sewers B. Cleaning, Inspecting, and Testing Storm Sewers C. Cleaning and
City of Balch Springs, Texas. Request for Proposal (RFP 2016-2-15) Pipe Bursting Sewer Line Replacement
City of Balch Springs, Texas Request for Proposal (RFP 2016-2-15) Pipe Bursting Sewer Line Replacement Balch Springs is a city in Dallas County, Texas, United States. It is a suburb of Dallas and part
Application for a new connection to the public sewer network under the provisions of sections 106 & 102 of the Water Industry Act 1991
Application for a new connection to the public sewer network under the provisions of sections 106 & 102 of the Water Industry Act 1991 Taking care of your waste water: It s part of our Blueprint for Yorkshire
East Riding of Yorkshire Council
East Riding of Yorkshire Council Lead Local Flood Authority Interim Standing Advice Revision A - April 2015 1. Introduction From April 2015 the Lead Local Flood Authority (LLFA) became a statutory consultee
SEWER CLEANING, INSPECTION AND ASSESSMENT
3.1 OVERVIEW Chapter 3 SEWER CLEANING, INSPECTION AND ASSESSMENT Preventive maintenance protects the investment of the sanitary sewer collection system infrastructure. Higher frequency cleaning of gravity
The checklist utilized by the Authority will be similar to that which is shown below. Project Name: Location: Consulting Engineering Firm:
Page 1 of 6 Section 1. PURPOSE This policy is an Engineering checklist of the Local Review Program for sanitary sewer improvement projects by the Bedford Regional Water Authority ( Authority ). Section
Essential Water. Customer Charter
Essential Water Customer Charter Who is Essential Water? Essential Water is a division of Essential Energy and provides water supply services to over 20,000 people in Broken Hill, Menindee, Sunset Strip
Adoption of sewers Section 104 of the Water Industry Act 1991
NC/DEA-V2 page 1 of 31 Adoption of sewers Section 104 of the Water Industry Act 1991 Guidance notes for developers Foreword These Guidelines are designed to be used in conjunction with the current version
We love the drains you hate! A partner you can depend on to deliver dedicated drainage maintenance services, 24 hours a day, 365 days a year
We love the drains you hate! A partner you can depend on to deliver dedicated drainage maintenance services, 24 hours a day, 365 days a year Reactive CCTV Surveys Lining & Patch Reactive London Drainage
City of Regina Standard Construction Specification SECTION 1320 SEWERMAIN TESTING
1.0 GENERAL 1.1 Scope 2.0 PRODUCTS 1.1.1 The work shall consist of testing wastewater and/or storm mains to ensure construction conforms to the proper line, grade, cross section and performance. 2.1 The
32-02.05 Precast Manhole Sections and Castings. These items shall conform to Section 31, "Storm Drain Installation," of these Standard Provisions.
SECTION 32: SANITARY SEWER INSTALLATION 32-01 SCOPE. The Work shall consist of furnishing and installing sewer mains, manholes, laterals, cleanout fittings and appurtenances; and testing, flushing and
GUIDELINES FOR DESIGNERS BUILDING AND CONSTRUCTION WORKS WITHIN PROXIMITY TO CORPORATION SERVICES
CUSTOMER SERVICES DIVISION GUIDELINES FOR DESIGNERS BUILDING AND CONSTRUCTION WORKS WITHIN PROXIMITY TO CORPORATION SERVICES September 2000 FOREWORD This document provides guidelines for the structural
guidance notes Form C
guidance notes Form C These guidance notes are designed to help you complete Form C Application for new water infrastructure and plot(s) connection for industrial/commercial development(s) Important: Form
San Antonio Water System Standard Specifications for Construction ITEM NO. 1103 POINT REPAIRS AND OBSTRUCTION REMOVALS
ITEM NO. 1103 POINT REPAIRS AND OBSTRUCTION REMOVALS 1103.1 DESCRIPTION: 1. Repair of sanitary sewer lines by replacing short lengths of failed pipe with new pipe. 2. Repair of service laterals located
CCTV of Stormwater Systems. Cairns Regional Council. Commentary Guidelines #4037587
CCTV of Stormwater Systems Cairns Regional Council Commentary Guidelines Introduction Councils inherit assets through the donated asset process. In doing so, Councils immediately receive assets that are
guide for obtaining new water and waste water services
You can write to us at: Customer Connections Scottish Water 419 Balmore Road Glasgow G22 6NU Please quote this reference code when contacting us: SWP&DS/DG2 04/08 Alternative formats of this leaflet can
PART 5 : WASTEWATER DRAINAGE
Authorised by : City Waters Unit Manager Page 1 of 15 PART 5 : WASTEWATER DRAINAGE 5.1 INTRODUCTION This Manual sets out the basic design principles for drainage of wastewater. While some construction
A Property Owner s Guide
The Operation and Maintenance of Domestic and Commercial Sewers A Property Owner s Guide KILDARE LOCAL AUTHORITIES WATER SERVICES DEPARTMENT TABLE OF CONTENTS Introduction 1. Why should I care? 2. What
Guidance on applying for approval of installation of a commercial onsite wastewater system
Guidance on applying for approval of installation of a commercial onsite wastewater system This factsheet is designed to assist you to complete an Application to construct or install an apparatus for the
Section 4. Sewer Testing
Section 4 Sewer Testing 4.1 General Sewers and ancillary works shall be tested and inspected for watertightness to prevent infiltration and exfiltration and to ensure the pipes are laid correctly according
Severn Trent Water Ltd has undergone a massive investment programme in the River Tame catchment over the
Tame Urban Pollution Management Foxton Road & Sir Johns Road CSOs - collaborative working to deliver innovative solutions Severn Trent Water Ltd has undergone a massive investment programme in the River
VIDEO INSPECTION AND LASER PROFILING IN FLORIDA. AASHTO SOC Conference Larry Ritchie, FDOT August 14, 2013
VIDEO INSPECTION AND LASER PROFILING IN FLORIDA AASHTO SOC Conference Larry Ritchie, FDOT August 14, 2013 PIPE INSPECTION Over the last 5 years, the Department has spent approximately 175 million dollars
Type of Sewer Systems. Solomon Seyoum
Type of Sewer Systems Solomon Seyoum 0 Learning objectives Upon completion of this lecture, the participants will be able to differentiate between types of sewer systems and discuss different aspects of
VERIFICATION TESTING GUIDELINES FOR CONTRACTORS
Public Works Department Engineering Division VERIFICATION TESTING GUIDELINES FOR CONTRACTORS CITY OF BERKELEY PRIVATE SEWER LATERAL ORDINANCE BMC Chapter 17.24 Effective November 3, 2014 A consent decree
812-3 LIMITATIONS: b. No fire hydrant shall be obstructed or used when there is a fire in the area.
812-1 SCOPE OF WORK: SECTION 812 SEWER LINE, MANHOLE AND WET WELL CLEANING a. The Contractor shall provide all labor, materials, equipment, and incidentals necessary to perform the cleaning of sewer lines,
INSTALLATION OF INSITUFORM LINER
PART 1 GENERAL 1.1 SCOPE: A. This item shall include all work and materials to install, insert a flexible polyester felt liner saturated with a thermo-setting resin into the existing sewer line for rehabilitation
CITY OF DULUTH PRIVATE SEWER SERVICE GRANT PROGRAM PROGRAM GUIDELINES
CITY OF DULUTH PRIVATE SEWER SERVICE GRANT PROGRAM PROGRAM GUIDELINES Policy and Statement of Purpose The City of Duluth has existed as a city on the shoreline of Lake Superior for more than 100 years
CITY OF PINOLE SEWER LATERAL ADMINISTRATIVE GUIDELINES
CITY OF PINOLE SEWER LATERAL ADMINISTRATIVE GUIDELINES Adopted by Resolution No. 2012-132 Dated December 18, 2012 1 TABLE OF CONTENTS PURPOSE... 3 I. WHEN INSPECTION IS REQUIRED (PMC 13.20.050, 13.20.060,
Guidance Notes: GARDEN FLOODING
Page 1 of 7 Guidance Notes: GARDEN FLOODING If you are unsure about anything within these notes then please contact the Flood Risk Management (FRM) team using the details at the end of this document. Water
ATTACHMENT 3: SPECIFICATION FOR SEWER CLEANING
ATTACHMENT 3: SPECIFICATION FOR SEWER CLEANING 1.0 General 1.1 The work covered by this section consists of providing all labor, equipment, material and supplies, insurance, accessories, tools, transportation,
Your guide to sewer flooding
Your guide to sewer flooding We re here to help 2 Severn Trent Water Your guide to sewer flooding This leaflet has been produced to give you further information on: What causes sewer flooding Who is responsible
CITY OF ST. CA THARINE S. cn- Olc.4 BY-LAW NO. WHEREAS the Council of the Corporation of the City of St. Catharines, is
~: ~,,' " CITY OF ST. CA THARINE S BY-LAW NO. cn- Olc.4 A By-law to regulate sanitary and storm drainage. WHEREAS the Council of the Corporation of the City of St. Catharines, is authorized by the provisions
SECTION 08000 STORM DRAINAGE TABLE OF CONTENTS
SECTION 08000 STORM DRAINAGE 08010 DESIGN A. Location B. Sizing TABLE OF CONTENTS 08020 MATERIALS A. Pipe Materials B. Structure Materials C. Installation D. Inlets and Outlets 08030 INSPECTIONS AND TESTING
STANDARD SPECIFICATIONS SECTION 02956 CLOSED CIRCUIT TELEVISION INSPECTION OF SEWER MAINS, MANHOLES AND LATERALS
STANDARD SPECIFICATIONS SECTION 02956 CLOSED CIRCUIT TELEVISION INSPECTION OF SEWER MAINS, MANHOLES AND LATERALS PART 1 GENERAL 1.1 DESCRIPTION A. Section includes requirements to execute internal closed
City of Bakersfield Public Works Department Sewer System Management Plan December 2014
City of Bakersfield Public Works Department Sewer System Management Plan December 2014 C:\Users\hmayberry\Desktop\SEWER SYSTEM MANAGEMENT PLAN 2014.doc 1 Sewer System Management Plan Index: Section 1 Goals
Application for the Alteration of a Gas Supply
Application for the Alteration of a Gas Supply SSE Enterprise Utilities is a trading name of SSE Utility Solutions Limited which is part of the SSE Group. The Registered Office of SSE Utility Solutions
A quick guide to our floodcare scheme
A quick guide to our floodcare scheme What to do in case of sewer flooding We re here to help We appreciate that dealing with the results of sewage flooding is always unpleasant and we know how upsetting
STANDARD SPECIFICATIONS SECTION 02956 CLOSED CIRCUIT TELEVISION INSPECTION OF SEWER MAINS, MANHOLES AND LATERALS
STANDARD SPECIFICATIONS SECTION 02956 CLOSED CIRCUIT TELEVISION INSPECTION OF SEWER MAINS, MANHOLES AND LATERALS PART 1 GENERAL 1.1 DESCRIPTION A. Section includes requirements to execute internal closed
Drainage. Information for those with problem drains
Drainage Information for those with problem drains Contents 1 Purpose 2 Introduction 2 Explanations: what is a drain and what is a sewer 3 Explanation of the responsibilities for public and private sewers
Section 402. STORM SEWERS
402.02 Section 402. STORM SEWERS 402.01. Description. This work consists of constructing storm sewers of the size and class required, including excavation, bedding, and backfill. 402.02. Materials. Provide
SEPTIC SYSTEM CONSTRUCTION REQUIREMENTS ST. MARY S COUNTY HEALTH DEPARTMENT
SEPTIC SYSTEM CONSTRUCTION REQUIREMENTS ST. MARY S COUNTY HEALTH DEPARTMENT The following are minimum requirements for installation of conventional trench sewage disposal systems in St. Mary s County,
SECTION 812 SEWER LINE, MANHOLE AND WET WELL CLEANING
812-1 SCOPE OF WORK: SECTION 812 SEWER LINE, MANHOLE AND WET WELL CLEANING a. The Contractor shall provide all labor, materials, equipment, and incidentals necessary to perform the cleaning of sewer lines,
Standard Specification for the Laying of Sewer Lines and Appurtenances in the Hurunui District
Standard Specification for the Laying of Sewer Lines and Appurtenances in the Hurunui District 1. SCOPE OF WORK This Specification applies to the laying of sewer pipes and all associated appurtenances
ATTACHMENT 2: SPECIFICATION FOR SEWER CCTV VIDEO INSPECTION
ATTACHMENT 2: SPECIFICATION FOR SEWER CCTV VIDEO INSPECTION 1.0 General 1.1 The work covered by this section consists of providing all labor, equipment, insurance, accessories, tools, transportation, supplies,
Practice Note 2014-62
Practice Note 2014-62 Documentation Required for Applications for Building Permits Reference to the Building Code of Australia (BCA) in this Practice Note means Volume One and Volume Two of the National
Introduction. Contents. General. Materials and workmanship. Diagrams. Other regulations. References
Introduction General This Technical Booklet has been prepared by the Department of the Environment for Northern Ireland and provides for certain methods and standards of building which, if followed, will
Geotechnical Building Works (GBW) Submission Requirements
Building Control (Amendment) Act 2012 and Regulations 2012: Geotechnical Building Works (GBW) Submission Requirements Building Engineering Group Building and Construction Authority May 2015 Content : 1.
City of Colfax ORDINANCE NO. 499 ORDINANCE REQUIRING TESTING, INSPECTION, REPAIR AND REPLACEMENT OF BUILDING SEWER LATERALS
City of Colfax ORDINANCE NO. 499 ORDINANCE REQUIRING TESTING, INSPECTION, REPAIR AND REPLACEMENT OF BUILDING SEWER LATERALS The City Council ofthe City ofcolfax does ordain as follows: Title 13, Chapter
City of Hillsboro Inflow and Infiltration Elimination Program
City of Hillsboro Inflow and Infiltration Elimination Program Because of continuing problems with overloaded sanitary sewers, the City of Hillsboro is inspecting the sewer system in your neighborhood.
SECTION 6 SANITARY SEWER MAIN 6.01 SCOPE
6.01 SCOPE The work covered by this section of the specifications consists of the furnishing of all plant, labor, materials, equipment and supervision and performing all operations involved in the construction
Development enquiry request
Development enquiry request Water supply and/or drainage capacity assessment for a proposed development NOTE: Please ensure all relevant sections of the application are completed and refer to the attached
Replacing lead and common supply pipes
Replacing lead and common supply pipes How do I know if I have lead pipes? If your home was built before 1970, there s a chance that your water supply pipe is made from lead. This is the pipe that brings
www.defra.gov.uk Annex B
www.defra.gov.uk Annex B National Build Standards Design and Construction of new gravity foul sewers and lateral drains Water Industry Act 1991 Section 106B Flood and Water Management Act 2010 Section
Cowley Resident Management Organisation Ltd Cowley House, 147 Brixton Road London SW9 6LZ
Cowley Resident Management Organisation Ltd Cowley House, 147 Brixton Road London SW9 6LZ Tel: 020-7926 0690 Fax 020-7926 0692 www.cowleyrmo.org Gas Central Heating Contract for Homeowners Basic Service
Waste & Recycling. Planning Guidance on Waste & Recycling Storage and Collection. Development & Enterprise FOR INTERNAL USE ONLY.
Waste & Recycling Planning Guidance on Waste & Recycling Storage and Collection October 2011 Development & Enterprise FOR INTERNAL USE ONLY Contents 01 Introduction 3 02 General guidelines 3 03 Individual
Sewer Pipe Lining An Economic Solution for Pipe Rehabilitation By Tawana Albany Nicholas, Virgin Islands Waste Management Authority
Sewer Pipe Lining An Economic Solution for Pipe Rehabilitation By Tawana Albany Nicholas, Virgin Islands Waste Management Authority Abstract The United States Virgin Islands Waste Management Authority
SECTION 810 SEWER LINE CLEANING
SECTION 810 SEWER LINE CLEANING I. GENERAL 1.1 DESCRIPTION OF WORK The work covered by this section consists of providing all labor, equipment, material and supplies and performing all operations required
Home page Previous Next
n About DALROD n Drain Cleaning & Waste Disposal n CCTV Surveys n Sewer Renovation n Pumping Solutions n Gutter Cleaning Solutions n DALROD s Accreditations n Contact Us As one of the largest independent
CITY OF VAUGHAN SCHEDULE O LOT GRADING DESIGN FOR RESIDENTIAL DEVELOPMENT
Page 1 CITY OF VAUGHAN SCHEDULE O LOT GRADING DESIGN FOR RESIDENTIAL DEVELOPMENT CIVIC CENTRE 2141 MAJOR MACKENZIE DRIVE MAPLE ONTARIO L6A 1T1 905-832-2281 Page 2 SECTION 1 - GENERAL OBJECTIVES To provide
INDUSTRY GUIDANCE FOR INSTALLERS ON CONDENSATE DRAINAGE PIPE INSTALLATION. This guidance is endorsed by HHIC members.
1. BACKGROUND INDUSTRY GUIDANCE FOR INSTALLERS ON CONDENSATE DRAINAGE PIPE INSTALLATION This guidance is endorsed by HHIC members. During recent winters the UK has experienced prolonged spells of extremely
Guide to Conservatory Installation and Sewers
ADVICE FOR TRADE AND CONSUMERS REFERENCE NUMBER 35.2 AUGUST 2011 Guide to Conservatory Installation and Sewers www.ggf.org.uk/publications GGF guide to the members of the Conservatory Association with
BUILD OVER SEWER (BOS) ASSESSMENT MANUAL
BRISBNE CITY COUNCIL BUILD OVER SEWER (BOS) SSESSMENT MNUL To be used in conjunction with Council s Build Over Sewer Request for Consent forms: Part 1 Request for Consent Part 2 ssessment VERSION: 02/2010
Sewer Water Pipeline Replacement with CERTA LOK RESTRAINED JOINT PVC PIPE
1.0 GENERAL 1.1 DESCRIPTION This section addresses the procedures to be employed for pipe bursting existing water/sewer pipelines, as identified on the drawings, and replacing with new Restrained Joint
ARLINGTON HEIGHTS MUNICIPAL CODE CHAPTER 22 SEWERS
ARLINGTON HEIGHTS MUNICIPAL CODE CHAPTER 22 SEWERS Article I General Provisions Section 22-101 Definitions Section 22-102 Supervision of Sewer System Section 22-103 Inspections Section 22-104 Use of Public
Let Us Give Utilities the Respect that they Deserve.
Water & Sewer Utilities Miscellaneous Design and Plan Preparation Guidelines Issued by: Ray Mowla, P.E. Jefferson Parish Department of Engineering, Utilities Section The purpose of issuing these miscellaneous
Guidelines for closed circuit television (CCTV) inspection of newly constructed sewers
Guidelines for closed circuit television (CCTV) inspection of newly constructed sewers These guidelines outline inspection, reporting and acceptance requirements for newly constructed rigid and flexible