Pipeline design. concrete for life
|
|
- Jessica Webb
- 8 years ago
- Views:
Transcription
1 Pipeline design concrete for life
2 Pipeline Design
3 Pipeline design - hydraulic Graph showing relative velocity and discharge in a circular pipe for any depth of flow Proportional depth of flow PROPORTIONAL DISCHARGE PROPORTIONAL VELOCITY Proportional velocity and discharge in pipes flowing part full For calculating transitional flow, using the Colebrook-White equation, a roughness factor of Ks = 0.3mm is recommended as a realistic figure for newly installed concrete pipelines. However, research has indicated that for mature foul sewers of any material the Ks value may rise well above this figure and the Water Services Association publication Sewers for Adoption 5th Edition recommend the following: Foul and combined sewers Ks = 1.5mm (minimum velocity should be 0.75m/ see at one third design flow) Surface water sewers Ks = 0.6mm (minimum velocity should be 1m/sec at full pipe flow) Hydraulic flow charts have therefore been included for the three roughness coefficients Ks of 0.3, 0.6 and 1.5mm.
4 Pipeline design - hydraulic Example on use of flow charts Design of surface water sewer Pipeline length Difference in level between inlet and outlet Design discharge 200m 1m 4 cubic metres/sec (4,000 litres/sec) to determine the size of pipe when: a. flowing full b. the proportional depth of flow is 0.6 (i.e. 60% full) Solution Hydraulic gradient Ks for surface water sewer 1 in 200 (or 0.005) 0.6mm a. Pipe flowing full: Refer to Hydraulic Flow Chart for Ks = 0.6mm. The intersection of the horizontal discharge line of 4 cubic metres per second with the vertical hydraulic gradient line of 1 in 200 gives: Pipe diameter Average velocity 1350mm 2.8 metres/sec b. Pipe flowing 60% full: Refer to the graph showing Relative. Velocity and Discharge in a Circular pipe for any Depth of Flow. The intersection of the horizontal proportional depth line of 0.6 with the proportional discharge and velocity curves gives: Proportional discharge Proportional velocity Therefore Actual discharge Average velocity 0.67 x x cubic metres/sec 3.0 metres/sec
5 Pipeline design - hydraulic Hydraulic flow charts For Pipes Flowing Full Ks = 0.3mm (Colebrook-White) Water 15 0 C
6 Pipeline design hydraulic Hydraulic flow charts For Pipes Flowing Full Ks = 0.6mm (Colebrook-White) Water at 15 C
7 Hydraulic flow charts For Pipes Flowing Full Ks = 1.5mm (Colebrook-White) Water at 15 C
8 Pipeline design structural design Introduction This section is based on BS EN : 1998 Structural Design of Buried Pipelines Under Various Conditions of Loading. This standard gives guidance on the nationally established methods of design. For the UK this is detailed in A Guide to Design Loadings for Buried Rigid Pipes published by HMSO 1987 and Simplified Tables of External Loads on Buried Pipelines published by HMSO The charts give the maximum depth of cover for single pipelines laid in a narrow trench where there will be relief of load due to friction at the fill/trench wall interface and where the pipe is laid in wide trench conditions. Where special conditions apply, e.g. multiple pipelines in a single trench, pipelines supported on piles, trench backfilled with lean concrete and delayed removal of trench sheeting, the charts may not be applicable and advice should be sought from our Technical Department or reference made to the full publication. Whilst the normal recommendation in the UK is to have a minimum of 1.2m cover (measured from the top of the pipe barrel to the finished road surface) under roads and 0.9m elsewhere, it is sometimes necessary to lay pipes at less cover and the charts have been prepared with a minimum cover of 0.6m in Roads and Fields, etc. However, special precautions should be taken to minimise the risk of mechanical damage during future excavations and reinstatement of other services, agricultural machinery, etc. The charts are based on the loadings likely to be encountered when installation, including reinstatement, is complete and care must be taken to ensure that the concentrated load due to construction traffic does not exceed the design surcharge loads given. For a full structural analysis contact our Technical Department who can provide detailed calculations and recommendations on bedding design. Bd Bd Bd H H H min 300mm Bc Bc Bc
9 Pipeline design structural design Bedding class and factors The load-bearing capacity of a concrete pipeline is dependent both on the strength of the manufactured pipe and on the support provided by the bedding. The bedding factor (Fm) is the ratio of the strength of the laid pipe to its laboratory crushing test strength. The higher the bedding factor the greater is the load carrying capacity of a given pipeline. The methods of bedding normally used with concrete pipes are: Bc Bc Bc Y 300 DN 45 Y 180 Y Y Bedding class F B S Description 45 o granular bed 180 o granular bed 360 o granular bed Bedding factor ¼ Bc Bc+200min 1¼ Bc Bc+200min ¼Bc 120 ¼Bc ¼DN min ¼DN min Bedding class A unreinforced A reinforced Description 120 o unreinforced concrete cradle 120 o reinforced concrete cradle Bedding factor Notes 1. Concrete cradles may extend to sides of trench. 2. Transverse steel to be 0.4% min of section at x-x (Fm 3.4). 3. Minimum strength concrete of 20N/mm Allow concrete to gain sufficient strength prior to trafficking. 5. Maintain pipeline flexibility by leaving gaps at pipe joints filled with compressible material. 6. Bedding beneath and at sides of pipe to be well compacted. 7. Bedding/backfill directly above pipe to be lightly compacted. 8. Dimension Y: minimum of 1/6Bc or 100mm under barrels, and 50mm minimum under sockets whichever is greater (400mm maximum). In rock etc. use 1/4Bc and 150mm minimum under sockets. Key Granular bedding material Selected backfill material In-situ concrete Nominal size of pipe DN Pipe bedding requirement mm 225 to , 14 or 20 nominal single size or 14 to 5 graded or 20 to 5 graded 600 and above 10, 14, 20 or 40 nominal size crushed rock or 14 to 5 graded or 20 to 5 graded or 40 to 5 graded
10 Pipeline design structural design Crushing test loads Crushing test loads in kilonewtons per metre of effective length for concrete pipes. * Denotes classic size. + Not kitemarked. Nominal Size DN EN 1916 / BS :2002 Minimum crushing load (Fn) kn/m * * * * * * * * * * * Notes: Pipes of higher crushing strengths than those above can be manufactured in certain diameters. Details of required strengths should be sent to the Sales Office at Mells. CPM Group do not make all of the sizes listed above.
11 Pipeline design structural design Safe supporting strength For a safe design the supporting strength of an installed pipeline must exceed the total external design load where the supporting strength is the product of the pipe crushing strength and the bedding factor and the total external load is the sum of the trench load, surcharge load and for pipes greater than DN600 the equivalent water load. A minimum bedding factor required can be calculated from: Fm > We x Fse Fn. Where Fm = Bedding factor We = Total external load (See BS EN ) Fse = Factor or safety taken as a minimum of 1.25 (see note below) Unreinforced pipes (DN inclusive) = 1.25 Reinforced pipes manufactured to BS EN 1916, the Fse increases to 1.5, However in order to maintain design continuity and to cater for schemes designed prior to the implementation of BS EN1916, CPM will continue to test reinforced pipes to BS proof loads permitting continued use of the current Fse = 1.25
12 Pipeline design structural design Depth of cover charts Class 120 Pipes under fields Fse = 1.25 DN Bc Bd mm mm mm Cover Depth (m) DN = Nominal diameter Bc = External diameter Bd = Trench width Class B Class S
13 Pipeline design structural design Depth of cover charts Class 120 Pipes under main roads Fse = 1.25 DN Bc Bd mm mm mm Cover Depth (m) DN = Nominal diameter Bc = External diameter Bd = Trench width Class B Class S
14 Scotland Sales and Works CPM Group Ltd, 101 Main Street, Newmains, Wishaw, Lanarkshire, ML2 9BG Tel: Fax: Pollington Works CPM Group Ltd, Pollington, Goole, East Riding of Yorkshire, DN14 0DU Tel: Fax: Leek Sales and Works CPM Group Ltd, Barnfields, Leek, Staffordshire, ST13 5QG Tel: Fax: Scotland Sales and Works Technical Offices CPM Group Ltd, CPM House, Heath Mill Road, Wombourne, Wolverhampton, West Midlands WV5 8AP Tel: Fax: Pollington Works Head Office Sales and Works CPM Group Ltd, Mells Road, Mells, Nr Frome, Somerset, BA11 3PD Tel: Fax: Technical Offices Leek Sales and Works Head Office Sales and Works
Dimensional and Structural Data for Elliptical Pipes. PD 26 rev D 21/09/05
Dimensional and Structural Data for Elliptical Pipes 21/09/05 Page 1 of 15 1. Foreword This document details a method for the structural design of Stanton Bonna Elliptical pipes for the common conditions
More informationSPECIFICATION FOR PIPE SUBSOIL DRAIN CONSTRUCTION
SPECIFICATION FOR PIPE SUBSOIL DRAIN CONSTRUCTION 1. SCOPE Pipe subsoil drains shall be constructed in accordance with this specification and in conformity with the lines, grades and cross-sections shown
More informationDRAINAGE PART 5 HA 40/01 DETERMINATION OF PIPE AND BEDDING COMBINATIONS FOR DRAINAGE WORKS SUMMARY
DESIGN MANUAL FOR ROADS AND BRIDGES VOLUME 4 SECTION 2 GEOTECHNICS AND DRAINAGE DRAINAGE PART 5 HA 40/01 DETERMINATION OF PIPE AND BEDDING COMBINATIONS FOR DRAINAGE WORKS SUMMARY This Advice Note describes
More informationState of Illinois Department Of Transportation CONSTRUCTION INSPECTOR S CHECKLIST FOR STORM SEWERS
State of Illinois Department Of Transportation CONSTRUCTION INSPECTOR S CHECKLIST FOR STORM SEWERS While its use is not required, this checklist has been prepared to provide the field inspector a summary
More information(52) In6 Publication CCM2 May 2000 ADVANCED DRAINAGE SYSTEM CATCHPITS, CHAMBERS & MANHOLES RIDGIDRAIN ENGINEERING EXCELLENCE
(52) In6 Publication CCM2 May 2000 ENGINEERING EXCELLENCE RIDGIDRAIN ADVANCED DRAINAGE SYSTEM CATCHPITS, CHAMBERS & MANHOLES AN INTRODUCTION TO POLYPIPE CIVILS LTD AN UNRIVALLED RANGE OF CATCHPITS MANHOLES
More informationSECTION 02530 STORM DRAINAGE STRUCTURES. 1. Trench excavation, backfill, and compaction; Section 02250.
02530-1 of 5 SECTION 02530 STORM DRAINAGE STRUCTURES 02530.01 GENERAL A. Description Storm drainage structure construction shall include, but not necessarily be limited to, furnishing and installing or
More informationIntroduction. Contents. General. Materials and workmanship. Diagrams. Other regulations. References
Introduction General This Technical Booklet has been prepared by the Department of the Environment for Northern Ireland and provides for certain methods and standards of building which, if followed, will
More informationSECTION 08000 STORM DRAINAGE TABLE OF CONTENTS
SECTION 08000 STORM DRAINAGE 08010 DESIGN A. Location B. Sizing TABLE OF CONTENTS 08020 MATERIALS A. Pipe Materials B. Structure Materials C. Installation D. Inlets and Outlets 08030 INSPECTIONS AND TESTING
More informationExperiment (13): Flow channel
Introduction: An open channel is a duct in which the liquid flows with a free surface exposed to atmospheric pressure. Along the length of the duct, the pressure at the surface is therefore constant and
More informationPUBLIC WORKS DESIGN, SPECIFICATIONS & PROCEDURES MANUAL LINEAR INFRASTRUCTURE
REGION OF PEEL PUBLIC WORKS DESIGN, SPECIFICATIONS & PROCEDURES MANUAL LINEAR INFRASTRUCTURE Sanitary Sewer Design Criteria REVISED July 2009 PUBLIC WORKS SANITARY SEWER DESIGN CRITERIA TABLE OF CONTENTS
More informationC. Section 014510 TESTING LABORATORY SERVICE.
SECTION 014500 QUALITY CONTROL PART 1 GENERAL 1.01 RELATED REQUIREMENTS A. Drawings and General Provisions of Contract, including General and Special Conditions and other Division 1 Specification Sections,
More informationSection 402. STORM SEWERS
402.02 Section 402. STORM SEWERS 402.01. Description. This work consists of constructing storm sewers of the size and class required, including excavation, bedding, and backfill. 402.02. Materials. Provide
More informationPipes and Fittings for Gravity Sewer Mains. SewerMAX
SewerMAX High resistance to tree root intrusion and groundwater infiltration lightweight for ease of installation low embodied energy for environmental benefits long service life Excellent chemical resistance
More informationSECTION 33 41 13 PUBLIC STORM UTILITY DRAINAGE PIPING
SECTION 33 41 13 PUBLIC STORM PART 1 - GENERAL 1.01 SECTION INCLUDES A. Storm drainage piping, fittings, and accessories at proposed station areas and locations other than under and immediately adjacent
More informationSECTION 55 PIPE FOR STORM DRAINS AND CULVERTS (FAA D-701)
SECTION 55 PIPE FOR STORM DRAINS AND CULVERTS (FAA D-701) 55-1 GENERAL The Contractor shall perform all work required by the plans for construction of pipe for storm drains, precast polymer trench drains
More informationGreater Dublin Strategic Drainage Study Regional Drainage Policies - Volume 2 New Development
7 SPECIFICATIONS There is currently no Irish specification for construction of drainage works, or water supply works. There are several publications that give guidance on drainage works, such as the Building
More informationSection 2 Specification 2.18 Concrete and/or Corrugated Steel Storm Sewer TABLE OF CONTENTS
TABLE OF CONTENTS 2.18 CONCRETE AND/OR CORRUGATED STEEL STORM SEWER... 1 2.18.1 GENERAL... 1 2.18.2 MATERIALS... 1 2.18.2.1 Storm Sewer Pipe... 1 2.18.2.2 Cement Mortar... 1 2.18.2.3 Granular Materials...
More informationSECTION 7- STORM SEWER
SECTION 7- STORM SEWER 7.1. STORM SEWERS.... 7-1 7.2. SUMP DRAINS... 7-3 7.3. CATCH BASINS... 7-3 7.4. MANHOLES... 7-4 7.5. STORM SEWER CALCULATIONS... 7-4 7.6. CULVERTS AND BRIDGES... 7-5 7.7. OPEN CHANNELS...
More informationOAR52 A-1 (September, 1981)
APPENDIX A SEWER PIPELINES (1) MINIMUM REQUIREMENTS FOR SEWER - PIPELINES (a) Capacity: Sewers shall be of such diameter as to pass without overflow, bypass, or back flow onto damageable property of a
More informationPUBLIC WORKS DESIGN, SPECIFICATIONS & PROCEDURES MANUAL LINEAR INFRASTRUCTURE
REGION OF PEEL PUBLIC WORKS DESIGN, SPECIFICATIONS & PROCEDURES MANUAL LINEAR INFRASTRUCTURE Storm Sewer Design Criteria REVISED July 2009 PUBLIC WORKS STORM SEWER DESIGN CRITERIA TABLE OF CONTENTS 1.0
More informationPART 6 HA 113/05 DRAINAGE
DESIGN MANUAL FOR ROADS AND BRIDGES VOLUME 4 SECTION 2 GEOTECHNICS AND DRAINAGE DRAINAGE PART 6 HA 113/5 COMBINED CHANNEL AND PIPE SYSTEM FOR SURFACE WATER DRAINAGE SUMMARY This Advice Note gives guidance
More informationCHAPTER 3 STORM DRAINAGE SYSTEMS
CHAPTER 3 STORM DRAINAGE SYSTEMS 3.7 Storm Drains 3.7.1 Introduction After the tentative locations of inlets, drain pipes, and outfalls with tail-waters have been determined and the inlets sized, the next
More informationL4. Pipes Materials and Loads
The Islamic University of Gaza- Civil Engineering Department SanitaryEngineering- ECIV 4325 L4. Pipes Materials an Loas Base on Dr. Fahi Rabah lecture notes Pipes Materials an loas Materials use for pipes:
More informationThe Manitoba Water Services Board SECTION 022180 Standard Construction Specifications PIPE EXCAVATION, BEDDING AND BACKFILL Page 1 of 11
Page 1 of 11 Part 1 General 1.1 DESCRIPTION OF WORK.1 The work described herein shall consist of the excavation of trenches (or excavation of tunnels); the supply and placing of bedding and backfill materials;
More informationUniclass L7315 + L2123 EPIC J3413. CI/SfB (52.5) Heavy duty channel drainage system ACO S Range
Uniclass L7315 + L2123 EPIC J3413 CI/SfB (52.5) Heavy duty channel drainage system ACO S Range ACO S Range CHANNEL DRAINS Load Class BS EN 1433:2002 Optimum solution The ACO S Range is an interconnecting
More informationWhat is the most obvious difference between pipe flow and open channel flow????????????? (in terms of flow conditions and energy situation)
OPEN CHANNEL FLOW 1 3 Question What is the most obvious difference between pipe flow and open channel flow????????????? (in terms of flow conditions and energy situation) Typical open channel shapes Figure
More informationModule 7: Hydraulic Design of Sewers and Storm Water Drains. Lecture 7 : Hydraulic Design of Sewers and Storm Water Drains
1 P age Module 7: Hydraulic Design of Sewers and Storm Water Drains Lecture 7 : Hydraulic Design of Sewers and Storm Water Drains 2 P age 7.1 General Consideration Generally, sewers are laid at steeper
More informationPrepare a drainage system layout and specification notes for a low- rise building.
STUDENT MATERIALS Prepare a drainage system layout and specification notes for a low- Outcome 1 - rise building. In this outcome you will study the technology of below and above ground drainage systems.
More informationOpen channel flow Basic principle
Open channel flow Basic principle INTRODUCTION Flow in rivers, irrigation canals, drainage ditches and aqueducts are some examples for open channel flow. These flows occur with a free surface and the pressure
More informationSPECIFICATION FOR DYNAMIC CONSOLIDATION / DYNAMIC REPLACEMENT
SPECIFICATION FOR DYNAMIC CONSOLIDATION / DYNAMIC REPLACEMENT 1.0 SOIL IMPROVEMENT 1.1 General Soil Investigation Information are provided in Part B1 annex as a guide to the Contractor for his consideration
More informationSECTION 5: SANITARY SEWER SYSTEM DESIGN
SECTION 5: SANITARY SEWER SYSTEM DESIGN 5.01 GENERAL Sanitary sewer improvements shall be designed to serve the ultimate level of City development as defined in the General Plan and the Wastewater Facilities
More informationThe work of this Section includes furnishing and installing Reinforced Concrete Pressure Pipe as shown on the Drawings and as specified.
Section 33 0200- Page 1 of 4 PART 1 - GENERAL 1.1 DESCRIPTION OF WORK The work of this Section includes furnishing and installing Reinforced Concrete Pressure Pipe as shown on the Drawings and as specified.
More informationDesign and Construction of Cantilevered Reinforced Concrete Structures
Buildings Department Practice Note for Authorized Persons, Registered Structural Engineers and Registered Geotechnical Engineers APP-68 Design and Construction of Cantilevered Reinforced Concrete Structures
More informationM6a: Open Channel Flow (Manning s Equation, Partially Flowing Pipes, and Specific Energy)
M6a: Open Channel Flow (, Partially Flowing Pipes, and Specific Energy) Steady Non-Uniform Flow in an Open Channel Robert Pitt University of Alabama and Shirley Clark Penn State - Harrisburg Continuity
More informationWelded Mesh Gabions and Mattresses River Protection Design Guide HY-TEN GABION SOLUTIONS Dunstall Hill Trading Estate, Gorsebrook Road,
Welded Mesh Gabions and Mattresses River Protection Design Guide HY-TEN GABION SOLUTIONS Dunstall Hill Trading Estate, Gorsebrook Road, Wolverhampton, WV6 0PJ Tel 01902 712200 Fax 01902 714096 e-mail sales@hy-tengabions.com
More informationCONCRETE PIPE AND PORTAL CULVERT HANDBOOK P.I.P.E.S
CONCRETE PIPE AND PORTAL CULVERT HANDBOOK P.I.P.E.S Pipes, Infrastructural Products and Engineering Solutions Division PREFACE Concrete pipes and portal culverts are the most frequently used and accepted
More informationHOTCHKISS AIR SUPPLY Heating, Ventilating & Air Movement Equipment
HOTCHKISS AIR SUPPLY Heating, Ventilating & Air Movement Equipment F l a t O v a l T u b e a n d F i t t i n g s Introduction Hotchkiss Flat Oval ductwork offers all the advantages of rectangular ducts
More informationAPPLICATION PROCEDURES FOR PLACEMENT OF UNDERGROUND WATER AND SEWER PIPELINES IN THE VICINITY OF TRANSPORTATION FACILITIES UNDER THE
APPLICATION PROCEDURES FOR PLACEMENT OF UNDERGROUND WATER AND SEWER PIPELINES IN THE VICINITY OF TRANSPORTATION FACILITIES UNDER THE JURISDICTION OF ALBERTA TRANSPORTATION 1.0 Application Procedures 2.0
More informationLecture 22 Example Culvert Design Much of the following is based on the USBR technical publication Design of Small Canal Structures (1978)
Lecture 22 Example Culvert Design Much of the following is based on the USBR technical publication Design of Small Canal Structures (1978) I. An Example Culvert Design Design a concrete culvert using the
More information9.00 THE USE OF HUNTER LAND DRAINAGE PERFORATED PIPES. Hunter Underground Systems
9.00 THE USE OF HUNTER LAND DRAINAGE PERFORATED PIPES Hunter Underground Systems 9.01 General 9.02 Surface water Drainage 9.03 Groundwater Drainage 9.04 Dispersal of Septic Tank Effluent 9.01 The use of
More informationCHAPTER 2 HYDRAULICS OF SEWERS
CHAPTER 2 HYDRAULICS OF SEWERS SANITARY SEWERS The hydraulic design procedure for sewers requires: 1. Determination of Sewer System Type 2. Determination of Design Flow 3. Selection of Pipe Size 4. Determination
More informationSIENA STONE GRAVITY RETAINING WALL INSTALLATION SPECIFICATIONS. Prepared by Risi Stone Systems Used by permission.
SIENA STONE GRAVITY RETAINING WALL INSTALLATION SPECIFICATIONS Prepared by Risi Stone Systems Used by permission. 1-800-UNILOCK www.unilock.com FOREWORD This outline specification has been prepared for
More informationGuide to working on Public Sewers
Guide to working on Public Sewers affected by Building Works Introduction Severn Trent Water Ltd requires the work to be done in order to protect the public sewer and minimise the risk of us having to
More informationDESIGN OF SLABS. 3) Based on support or boundary condition: Simply supported, Cantilever slab,
DESIGN OF SLABS Dr. G. P. Chandradhara Professor of Civil Engineering S. J. College of Engineering Mysore 1. GENERAL A slab is a flat two dimensional planar structural element having thickness small compared
More informationSECTION 02150 REMOVAL OR ABANDONMENT OF EXISTING UTILITIES AND UNDERGROUND STRUCTURES. 1. Trench excavation, backfill, and compaction; Section 02250.
02150-1 of 6 SECTION 02150 REMOVAL OR ABANDONMENT OF EXISTING 02150.01 GENERAL A. Description Removal or abandonment of existing utilities and underground structures shall include, but not necessarily
More informationPART 5 : WASTEWATER DRAINAGE
Authorised by : City Waters Unit Manager Page 1 of 15 PART 5 : WASTEWATER DRAINAGE 5.1 INTRODUCTION This Manual sets out the basic design principles for drainage of wastewater. While some construction
More informationDIVISION 2 - SEWERAGE AND DRAINAGE SECTION 02720 - STORM DRAIN SYSTEMS PART 1 - GENERAL
DIVISION 2 - SEWERAGE AND DRAINAGE SECTION 02720 - STORM DRAIN SYSTEMS PART 1 - GENERAL 1.01 DESCRIPTION A. Furnish and install all storm drains, including manholes, inlets, service lines and other appurtenant
More informationSECTION 3 SANITARY SEWER DESIGN
SECTION 3 SANITARY SEWER DESIGN 3.1 GENERAL DESIGN CRITERIA 3.1.1 Requirement for Sanitary Sewer 3.1.2 Design Approval 3.1.3 IEPA Permit Required 3.1.4 Differentiation Between Public and Private Sanitary
More informationSECTION 33 05 16.13 PRECAST CONCRETE UTILITY STRUCTURES
SECTION 33 05 16.13 PRECAST CONCRETE PART 1 - GENERAL 1.01 SECTION INCLUDES A. This item shall consist of the construction of both sanitary and storm sewer precast concrete manholes in accordance with
More informationLecture 24 Flumes & Channel Transitions. I. General Characteristics of Flumes. Flumes are often used:
Lecture 24 Flumes & Channel Transitions I. General Characteristics of Flumes Flumes are often used: 1. Along contours of steep slopes where minimal excavation is desired 2. On flat terrain where it is
More informationChapter 9. Steady Flow in Open channels
Chapter 9 Steady Flow in Open channels Objectives Be able to define uniform open channel flow Solve uniform open channel flow using the Manning Equation 9.1 Uniform Flow in Open Channel Open-channel flows
More informationIS THAT LINER THICK ENOUGH?
IS THAT LINER THICK ENOUGH? Philip McFarlane, Opus International Consultants Ltd ABSTRACT The amount of pipeline rehabilitation being undertaken in New Zealand is increasing each year. Larger diameter
More informationTS 813 GROUNDING AND BONDING TTD 813.001 TRAFFIC SIGNAL INSTALLATION AND CONTROLLER CABINET GROUNDING SYSTEM TTD 813.005 CONTROLLER CABINET GROUNDING
TORONTO TRANSPORTATION January 2012 TS 813 GROUNDING AND BONDING TABLE OF CONTENTS 1. DRAWINGS TTD 813.001 TRAFFIC SIGNAL INSTALLATION AND CONTROLLER CABINET GROUNDING SYSTEM TTD 813.005 CONTROLLER CABINET
More informationEXHIBIT "A. Technical Specifications for Water and Sewer Service Lines
EXHIBIT "A Technical Specifications for Water and Sewer Service Lines Water and Sewer Line Bedding and Backfill: Drawings show cross-section of trench, pipe laid on top of 6" min. bedding material, bedding
More informationBUILDING OVER OR NEAR WATER & SEWER MAINS POLICY
MURRAY SHIRE COUNCIL BUILDING OVER OR NEAR WATER & SEWER MAINS POLICY ADOPTED: 1 May 2012 1 BUILDING OVER OR NEAR WATER AND SEWER MAINS POLICY CONTENTS 1. Objective... 2 2. Requirements for Building Near
More informationInstallation Guidelines for Segmental Block Wall. Contents 1. INTRODUCTION... 2 2. MATERIALS... 2
Johannesburg +27 (0)11 922 3300 Pinetown +27 (0)31 717 2300 Cape Town +27 (0)21 531 8110 East London +27 (0)43 727 1055 www.kaytech.co.za Installation Guidelines for Segmental Block Wall Contents 1. INTRODUCTION...
More informationNAYLOR. Metro Duct. The Complete Duct and Access System M E T R O D R A I N. The MANUFACTURING EXCELLENCE Awards Winner - Best SME
NAYLOR M E T R O D R A I N Metro Duct The Complete Duct and Access System e m a i l : s a l e s @ n a y l o r. c o. u k w e b : w w w. n a y l o r. c o. u k Winners Growing Business The MANUFACTURING EXCELLENCE
More informationExperiment 3 Pipe Friction
EML 316L Experiment 3 Pipe Friction Laboratory Manual Mechanical and Materials Engineering Department College of Engineering FLORIDA INTERNATIONAL UNIVERSITY Nomenclature Symbol Description Unit A cross-sectional
More informationEmergency Spillways (Sediment basins)
Emergency Spillways (Sediment basins) DRAINAGE CONTROL TECHNIQUE Low Gradient Velocity Control Short-Term Steep Gradient Channel Lining Medium-Long Term Outlet Control Soil Treatment Permanent [1] [1]
More informationSTORM DRAINS CHAPTER 7
CHAPTER 7 Chapter 7 - Storm Drains A storm drain is a drainage system that conveys water or stormwater, consisting of two or more pipes in a series connected by one or more structures. Storm drains collect
More informationwww.defra.gov.uk Annex B
www.defra.gov.uk Annex B National Build Standards Design and Construction of new gravity foul sewers and lateral drains Water Industry Act 1991 Section 106B Flood and Water Management Act 2010 Section
More informationSTANDARD SPECIFICATIONS SECTION 02701 INSTALLATION OF GRAVITY SEWER PIPELINES. 1. Trenching, Backfilling and Compacting: 02223
STANDARD SPECIFICATIONS SECTION 02701 INSTALLATION OF GRAVITY SEWER PIPELINES PART 1 - GENERAL A. Description This section describes the installation of gravity sewer pipelines fabricated of vitrified
More informationCITY UTILITIES DESIGN STANDARDS MANUAL
CITY UTILITIES DESIGN STANDARDS MANUAL Book 2 (SW) SW9 June 2015 SW9.01 Purpose This Chapter provides information for the design of open channels for the conveyance of stormwater in the City of Fort Wayne.
More informationGEOTECHNICAL DESIGN MANUAL
GEOTECHNICAL DESIGN MANUAL CHAPTER 21 GEOTECHNICAL ASPECTS OF PIPE DESIGN AND INSTALLATION NYSDOT Geotechnical Page 21-1 July 18, 2013 (Intentionally left blank) NYSDOT Geotechnical Page 21-2 July 18,
More informationSECTION 724 PIPE CULVERTS
SECTION 724 PIPE CULVERTS 724.1 Description. This work shall consist of providing pipe or pipe arch of the diameter or shape designated, laid upon a firm bed and backfilled as specified. Where appropriate
More informationSTRUCTURES. 1.1. Excavation and backfill for structures should conform to the topic EXCAVATION AND BACKFILL.
STRUCTURES 1. General. Critical structures may impact the integrity of a flood control project in several manners such as the excavation for construction of the structure, the type of foundation, backfill
More informationCHAPTER 5. Storm Sewer
CHAPTER 5 Storm Sewer A. Introduction All proposed developments shall have a properly designed and constructed storm water conveyance system. This chapter deals only with the conveyance system. Storm water
More informationChapter 3 CULVERTS. Description. Importance to Maintenance & Water Quality. Culvert Profile
Chapter 3 CULVERTS Description A culvert is a closed conduit used to convey water from one area to another, usually from one side of a road to the other side. Importance to Maintenance & Water Quality
More informationConcrete pipe reference manual Issue 1
Strength. Performance. Passion. Concrete pipe reference manual Issue 1 Contents 1. Introduction 3 Manufacturing 3 Joint types 3 Durability 4 Hydraulics 4 Size class (DN) 4 Load class 5 6. Pipes for pressure
More informationCable usage designation. Number of ducts required Number of spare ducts to be provided < 3 4-10 > 11
EXTERNAL SERVICE DUCTS AND CABLE TROUGHING SECTION 190 Service ducts routes generally DUCTS 1 Except where shown otherwise on the Contract Drawings, the number, type and size of ducts shall be determined
More informationSECTION 36 - CAST-IN-PLACE CONCRETE PIPE (CIPCP) TABLE OF CONTENTS
SECTION 36 - CAST-IN-PLACE CONCRETE PIPE (CIPCP) TABLE OF CONTENTS Section Page 36-1 GENERAL... 36.1 36-2 PIPEMAKING EQUIPMENT... 36.1 36-3 TRENCH EXCAVATION... 36.1 36-4 SPECIAL FOUNDATION TREATMENT...
More informationSimplifying design and construction. Alan Tovey, Director The Basement Information Centre
Simplifying design and construction Alan Tovey, Director The Basement Information Centre Simplifying design and construction Grades of construction Construction options Design and waterproofing issues
More informationSection 2100-Trenching and Tunneling
SECTION 5200 - STORM SEWER PART 1 - GENERAL 1.01 SCOPE: This Section covers installation of storm sewer mains and culverts. Topics include permits and fees, trench widths, pipe laying, bedding, initial
More informationSECTION 02720 SANITARY SEWER AND STORM DRAIN SYSTEMS
SECTION 02720 SANITARY SEWER AND STORM DRAIN SYSTEMS PART 1 GENERAL 1.01 SECTION INCLUDES A. The requirements for pipe material and installation in sewer and drainage collection systems. All materials
More informationEngineering Specifications February, 2004 Schedule H to Bylaw 7452, Subdivision Bylaw Page 18
Schedule H to Bylaw 7452, Subdivision Bylaw Page 18 3.4 Sanitary Sewers 3.4.1 Materials 3.4.1.1 The class and type of pipe and fittings, together with required class of bedding and trench widths, shall
More information3. Contractor shall ensure that all permits are obtained prior to any construction. Contractor shall be responsible for all utility fees.
The following shall serve as the minimum requirements for contractors performing work in relation to the Authority s potable water and sanitary sewer system(s), appurtenances and service connections. General:
More informationSECTION 33 31 00.11 GRAVITY SANITARY SEWERS
SECTION 33 31 00.11 GRAVITY SANITARY SEWERS PART 1: GENERAL 1.01 SCOPE A. Gravity sanitary sewers and appurtenances. 1.02 SUBMITTALS A. Conform to requirements of Section 01 33 00 Submittals. B. Submit
More informationLECTURE 1: Review of pipe flow: Darcy-Weisbach, Manning, Hazen-Williams equations, Moody diagram
LECTURE 1: Review of pipe flow: Darcy-Weisbach, Manning, Hazen-Williams equations, Moody diagram 1.1. Important Definitions Pressure Pipe Flow: Refers to full water flow in closed conduits of circular
More informationSECTION 108 - INLETS 108.1 INLET LOCATIONS
Greene County Design Standards -Adopted April 5, 1999 SECTION 108 - INLETS SECTION 108 - INLETS 108.1 INLET LOCATIONS 108.2 INLET INTERCEPTION CAPACITIES 108.2.1 Clogging Factors 108.3 INTERCEPTION AND
More informationCHAPTER 5 OPEN CHANNEL HYDROLOGY
5.4 Uniform Flow Calculations 5.4.1 Design Charts CHAPTER 5 OPEN CHANNEL HYDROLOGY Following is a discussion of the equations that can be used for the design and analysis of open channel flow. The Federal
More informationRidgistorm-XL - the latest innovative
Ridgistorm-XL - the latest innovative solution to SUDS and stormwater management Combined with the technical expertise, knowledge and support of Polypipe, Ridgistorm-XL is designed as a bespoke application
More informationSettlement of Precast Culverts Under High Fills; The Influence of Construction Sequence and Structural Effects of Longitudinal Strains
Settlement of Precast Culverts Under High Fills; The Influence of Construction Sequence and Structural Effects of Longitudinal Strains Doug Jenkins 1, Chris Lawson 2 1 Interactive Design Services, 2 Reinforced
More informationGulf Cable & Electrical Ind. Co.
CONTENTS INTRODUCTION PRODUCT RANGE I PRODUCT DATA TABLES XLPE INSULATED 600/1000V CABLES Two Core Cables CU/XLPE/PVC/LC/PVC/SWA/PVC 1 Three Core Cables CU/XLPE/PVC/LC/PVC/SWA/PVC 2 Four Core Cables CU/XLPE/PVC/LC/PVC/SWA/PVC
More informationENGINEERING STANDARDS MANUAL SECTION 5 WASTEWATER DRAINAGE
CODE OF PRACTICE FOR CITY INFRASTRUCTURE & LAND DEVELOPMENT ENGINEERING STANDARDS MANUAL SECTION 5 WASTEWATER DRAINAGE Issue 4.6 Sept 2008 Section 5 Page 1 SECTION 5.0 WASTEWATER DRAINAGE Note: The adoption
More informationSEWERS FOR ADOPTION 6 PIPE MATERIALS TABLE AND CONDITIONS OF USE VERSION 4 March 09
SEWERS FOR ADOPTION 6 PIPE MATERIALS TABLE AND CONDITIONS OF USE VERSION 4 March 09 Foul and Storm Lateral Drains (100 & 150 mm Diameters) Pumped Storage General Exceptions General Exceptions General Exceptions
More informationROAD OPENING LICENCE APPLICATION FORM PLEASE READ ALL PARTS AND SECTIONS OF THIS FORM IN ADVANCE OF COMPLETING THE APPLICATION
ROAD OPENING LICENCE APPLICATION FORM PLEASE READ ALL PARTS AND SECTIONS OF THIS FORM IN ADVANCE OF COMPLETING THE APPLICATION N.B. WORK MUST NOT COMMENCE UNTIL LICENCE IS ISSUED June 2014 Roads Section
More informationCHAPTER 17: STORM SEWER STANDARDS. 17.00 Introduction. 17.01 Administration. 17.02 Standards 17.1
CHAPTER 17: STORM SEWER STANDARDS 17.00 Introduction 17.01 Administration 17.02 Standards 17.1 17.00 INTRODUCTION The purpose of this chapter is to provide guidance for the design and construction of storm
More informationUtilities and existing services
Construction Services Building standards for mechanical and electrical installations Utilities and existing services October 2012 Directorate: Environment Construction Services - Building standards for
More informationGUIDELINE FOR HAND HELD SHEAR VANE TEST
GUIDELINE FOR HAND HELD SHEAR VANE TEST NZ GEOTECHNICAL SOCIETY INC August 2001 CONTENTS Page 1.0 Introduction 2 2.0 Background 2 3.0 Recommended Practice 3 4.0 Undrained Shear Strength 3 5.0 Particular
More informationEARTHWORKS COMPLETION REPORT ELLEN STIRLING PARADE, ELLENBROOK. Ellenbrook, W.A. Georgiou Group Pty Ltd
EARTHWORKS COMPLETION REPORT ELLEN STIRLING PARADE, ELLENBROOK Ellenbrook, W.A. Georgiou Group Pty Ltd GEOTPERT08050AZ-AH 27 March 2013 EARTHWORKS COMPLETION REPORT ELLEN STIRLING PARADE, ELLENBROOK Ellenbrook,
More informationBEST PRACTICE GUIDELINES FOR CULVERT LINER SELECTION
BEST PRACTICE GUIDELINES FOR CULVERT LINER SELECTION GENERAL Rehabilitation of culverts with pipe liners is one of several methods available for extending the life of an existing culvert. It is often cost
More informationWavinsewer Systems PIONEERS IN PLASTIC WAVINSEWER CONTENTS WAVIN IRELAND LIMITED
PIONEERS IN PLASTIC Wavin is Europe s largest manufacturer of industrial plastic products, and one of the largest producers of plastic pipe and fittings in the world. Owned equally by the Overijssel Water
More informationAPPENDIX C INLETS. The application and types of storm drainage inlets are presented in detail in this Appendix.
Storm Drainage 13-C-1 APPENDIX C INLETS 1.0 Introduction The application and types of storm drainage inlets are presented in detail in this Appendix. 2.0 Inlet Locations Inlets are required at locations
More informationSHAFT CONSTRUCTION IN TORONTO USING SLURRY WALLS
SHAFT CONSTRUCTION IN TORONTO USING SLURRY WALLS Vince Luongo Petrifond Foundation Co., Ltd. PROJECT DESCRIPTION The York Durham Sanitary System (YDSS) Interceptor in the Town of Richmond Hill located
More informationSUPPLEMENTAL TECHNICAL SPECIFICATIONS BI-DIRECTIONAL STATIC LOAD TESTING OF DRILLED SHAFTS
July 14, 2015 1.0 GENERAL BI-DIRECTIONAL STATIC LOAD TESTING OF DRILLED SHAFTS This work shall consist of furnishing all materials, equipment, labor, and incidentals necessary for conducting bi-directional
More informationDesign Manual to BS8110
Design Manual to BS8110 February 2010 195 195 195 280 280 195 195 195 195 195 195 280 280 195 195 195 The specialist team at LinkStudPSR Limited have created this comprehensive Design Manual, to assist
More informationModule 9: Basics of Pumps and Hydraulics Instructor Guide
Module 9: Basics of Pumps and Hydraulics Instructor Guide Activities for Unit 1 Basic Hydraulics Activity 1.1: Convert 45 psi to feet of head. 45 psis x 1 ft. = 103.8 ft 0.433 psi Activity 1.2: Determine
More informationCONTENTS. Yale University Design Standards. Underground Electrical Duct Bank. A. Summary. B. System Design and Performance Requirements
16600 Underground Electrical Duct Bank This document provides design standards only, and is not intended for use, in whole or in part, as a specification. Do not copy this information verbatim in specifications
More informationAGENDA. Pipe Materials / Trends The Reason for Change Design / Standards Pipe Selection Installation Examples Conclusion
AGENDA Pipe Materials / Trends The Reason for Change Design / Standards Pipe Selection Installation Examples Conclusion Water & Sewerage Pipe Materials Flexible Pipes Replacing Rigid Pipes Old Days Vitrified
More information