BUDGET ( MANAGEMENT CONTROL 1 IGI POSEIDON IGI POSEIDON PROVISION OF FEASIBILITY STUDY SERVICES FOR THE EASTERN MEDITERRANEAN NATURAL GAS PIPELINE (EAST- MED (in Consortium 2015 2016 2 TRANSADRIATIC PIPELINE AG E.ON TECHNOLOGIES PROVISION OF PERMIT ENGINEERING SERVICES FOR THE TAP IN AND ALBANIA (in Consortium 2014 2016 3 TRANSADRIATIC PIPELINE AG E.ON NEW BUILD & TECHNOLOGY GmbH PROVISION OF LOCAL PIPELINE ENGINEERING SERVICES FOR THE TRANSADRIATIC PIPELINE (TAP - WEST SECTION 2012 2014-4 TRANSADRIATIC PIPELINE AG ROYAL HASKONING DHV PROVISION OF LAND EASEMENT & ACQUISION SERVICES FOR THE TRANSADRIATIC PIPELINE (TAP - 2012 2014-5 DETAILED ENGINEERING, PROCUREMENT AND CONSTRUCTION OF THE 3 rd LNG TANK OF 95.000 m 3 STORAGE CAPACITY ON REVITHOUSSA ISLAND LNG TERMINAL (Partnering in Joint Venture: 25% 2013 2016 100,000,000 6 J&P - AVAX S.A. DETAILED ENGINEERING SERVICES FOR THE " HIGH PRESSURE NATURAL GAS PIPELINE FROM AG. THEODORI TO PPC/MEGALOPOLIS" 2012 2013 110,000,000 7 TERNA S.A. DETAILED ENGINEERING, PROCUREMENT AND CONSTRUCTION OF 4th GROUP OF M STATIONS FOR THE NATURAL GAS 2013 2014 5,400,000
8 ICGB AD (BULGARIAN ENERGY HOLDING EAD 50% - DEPA S.A. 25% - EDISON Spa 25% ICGB AD (BULGARIAN ENERGY HOLDING EAD 50% - DEPA S.A. 25% - EDISON Spa 25% P R O J E C T S L I S T FRONT END ENGINEERING (FEED AND ENVIRONMENTAL IMPACT ASSESSMENT (EIA, ARRANGEMENT OF APPROVALS, PREPARATION OF DOCUMENTATION FOR PROCUREMENT PROCEDURES REGARDING THE NATURAL GAS INTERCONNECTOR -BULGARIA (IGB (Partnering in Consortium: 35,38% BUDGET ( MANAGEMENT CONTROL 2011 2012 160,000,000 9 BASIC ENGINEERING DESIGN FOR THE ONSHORE PART OF THE NATURAL GAS INTERCONNECTION ITALY (IGI (Partnering in Consortium: 45% 2010 2011 1,100,000,000 10 (DEPA S.A. (DEPA S.A. PRE-FEASIBILITY STUDY FOR PELOPONNESUS & WEST N.G. FACILITIES (OFFSHORE N.G. PIPELINE LANDFALLS / ONSHORE PIPELINE ROUTING & COMPRESSORS STATIONS FOR EAST MED PIPELINE 2012 2012-11 (DEPA S.A. (DEPA S.A. PRE-FEASIBILITY STUDY FOR EAST CRETE N.G. FACILITIES (OFFSHORE N.G. PIPELINE LANDFALL AND COMPRESSORS STATION OF EAST MED PIPELINE 2012 2012-12 GHIZZONI S.p.A. GREEK BRANCH DETAILED ENGINEERING, PROCUREMENT OF MATERIALS & CONSTRUCTION OF THE ONSHORE PART OF THE STEFANI- ALIVERI NATURAL GAS HIGH PRESSURE PIPELINE - ND 20" - KM 58,5 2010 2011 72,000,000 13 GHIZZONI S.p.A. GREEK BRANCH DETAILED ENGINEERING OF THE NATURAL GAS H.P. PIPELINE MAVROMATI-DOMVRENA-THISVI VIPE - ND 20 KM. 26,3 2009 2010 20,000,000 14 BASIC ENGINEERING DESIGN FOR THE HIGH PRESSURE N.G. PIPELINE FROM AG. THEODORI TO P.P.C./MEGALOPOLIS - ND 30"/24" - KM 158 2009 2010 110,000,000
BUDGET ( MANAGEMENT CONTROL 15 ROUTING VERIFICATION / OPTIMIZATION ENVIRONMENTAL IMPACT STUDY FOR THE HIGH PRESSURE N.G. PIPELINE FROM AG. THEODORI TO P.P.C MEGALOPOLIS - ND 30"/24" - KM 158 2009 2010 110,000,000 16 STUDY OF CORRELATION OF ACTIVE SEISMIC FAULTS WITH THE PIPELINE ROUTING AND MAPS IN SCALE 1:5000 AND GEOLOGICAL LONGITUDINAL SECTIONS IN SCALE 1:5000(PLAN / 1:2000(ELEVATION ALONG THE HIGH PRESSURE N.G. PIPELINE FROM AG. THEODORI TO P.P.C. MEGALOPOLIS 2009 2010 110,000,000 17 TERNA S.A. DETAILED ENGINEERING, PROCUREMENT, CONSTRUCTION FOR THE NEW M-STATION HERON B' U-6030 AND MODIFICATION OF THE EXISTING M-STATION HERON A' U-6020 2009 2010 2,490,000 18 TERNA S.A. TERNA S.A. LNG TERMINAL ΙΝ MADOUDI (FEASIBILITY STUDY 2009 2009-19 - - MANAGEMENT SERVICES FOR A NUMBER OF C.S.F. III ONGOING NATURAL GAS S (CONCERNS 48 NATURAL GAS S INCLUDING HIGH PRESSURE PIPELINES, MEDIUM AND LOW PRESSURE PIPELINES, BORDER METERING STATION, M & M/R STATIONS AND UPGRADE OF TECHNOLOGY & OTHER REMOTE CONTROL AND COMMUNICATION (RCC WORKS (Partnering in Consortium: 45% 2006 2009 190,000,000 20 PENSPEN L.T.D. MANAGEMENT SERVICES FOR FIVE NATURAL GAS S (GAS COMPRESSOR STATION, H.P.N.G. PIPELINES, M/R STATIONS (DEPA'S Nominated Subcontractor - Participation : 45% 2006 2009 107,330,000 21 REVITHOUSSA LNG TERMINAL EXPANSION (Partnering in Joint Venture: 50% 2004 2008 45,000,000
22 23 (DEPA S.A. (DEPA S.A. PENSPEN L.T.D. TECHNICAL UNION S.A. (Member of the Consortium SOFREGAZ S.N. TECHNIGAZ TECHNICAL UNION S.A. P R O J E C T S L I S T MANAGEMENT SERVICES FOR C.S.F. III NATURAL GAS S (CONCERNS NATURAL GAS S INCLUDING HIGH PRESSURE PIPELINES, MEDIUM AND LOW PRESSURE PIPELINES, BORDER METERING STATION, M & M/R STATIONS AND UPGRADE OF TECHNOLOGY & OTHER REMOTE CONTROL AND COMMUNICATION (RCC WORKS (DEPA'S Nominated Subcontractor - Participation : 45% CRYOGENIC INSTALLATIONS AND UTILITY SYSTEMS FOR THE REVITHOUSSA ISLAND LNG TERMINAL BUDGET ( MANAGEMENT CONTROL 2002 2006 163,000,000 1995 2000 176,000,000 24 SERVICES FOR S RELEVANT TO THE CONSTRUCTION OF NATURAL GAS DISTRIBUTION NETWORKS AND GAS SERVICE LINES IN SOUTH AND CENTRAL AREA OF ATTICA (Partnering in Consortium:80% 2007 2011 29,791,156 25 PENSPEN L.T.D. NATURAL GAS BORDER METERING STATION AT THE GREEK / TURKISH BORDER 2003 2003 11,000,000 26 AND BATHYMETRIC STUDY FOR CROSSING OF THE GAS PIPELINE WITH EVROS / MERIC RIVER AT KIPI AREA (GREEK/TURKISH BORDER 2004 2004 2,800,000 27 AKTOR S.A. NATURAL GAS - U-3430 M-STATION AT LAVRIO 1999 2003 1,500,000 28 DESIGN AND CONSTRUCTION REVIEW OF 20,000 INTERNAL NATURAL GAS INSTALLATIONS OF DOMESTIC AND COMMERCIAL CONSUMERS IN ATTICA 2004 2008 -
BUDGET ( MANAGEMENT CONTROL 29 AND INSPECTION (T.P.I. SERVICES FOR PERIOD CONTRACT 2002-2005 S IN CENTRAL AREA OF ATHENS 2003 2007 25,000,000 30 (DEPA S.A. NATURAL GAS - OPERATION AND MAINTENANCE BUILDINGS AT VISTONIDA, XANTHI 1998 2000 3,200,000 31 HELLENIC TECHNODOMIKI S.A. NATURAL GAS - OPERATION AND MAINTENANCE BUILDINGS AT ELEFSINA, FARSALA AND N.MESSIMVRIA ΤΗΕSSALONIKI 1993 1995 12,300,000 32 Consortium PESPEN HELLENIC DYNAMICS S.A. LATOKA ENGINEERING NATURAL GAS BORDER METERING STATION, DEHYDRATION FACILITIES AND BUILDING INSTALLATIONS, AT STRYMONOCHORI 1995 1996 13,200,000 33 CNG REFUELING STATION AT ANO LIOSIA, ATTICA 1999 2000 4,000,000 34 CNG REFUELING STATION AT ANTHOUSA, ATTICA 2003 2004 5,000,000 35 NATURAL GAS MEDIUM PRESSURE (19 BAR - ATTICA BRANCH SOUTH "A" 1997 2000 5,900,000
BUDGET ( MANAGEMENT CONTROL 36 NATURAL GAS MEDIUM PRESSURE (19 BAR - ATTICA BRANCH NORTH "Α" (Partnering in Consortium: 50% 1998 1999 5,900,000 37 NATURAL GAS MEDIUM PRESSURE (19 BAR - XANTHI 1999 2000 1,000,000 38 NATURAL GAS MEDIUM PRESSURE (19 BAR - B' INDUSTRIAL AREA, VOLOS 1998 1999 1,121,000 39 EPA THESSALONIKI S.A. EPA THESSALONIKI S.A. EXPANSION OF THESSALONIKI M.P.T.S. 19 BAR FROM AMYLUM FACTORY UP TO MACEDONIA AIRPORT 2001 2002 735,000 40 UNILEVER HELLAS S.A. UNILEVER HELLAS S.A. INTERNAL NATURAL GAS INSTALLATIONS FOR GAS TURBINE SUPPLY OF UNILEVER HELLAS S.A. INDUSTRY 2006 2006-41 NETWORK, SECTORS 04, 42, 46 AND 68 IN ATTICA 2005 2006-42 NETWORK, SECTOR 71 - ACTIVATION OF SECTORS 10, 12, 18 ΚΑΙ 37 IN ATTICA 2005 2005 4,724,916
BUDGET ( MANAGEMENT CONTROL 43 MARKET RESEARCH SERVICES, DATABASE DEVELOPMENT, TECHNICAL EVALUATION AND DESIGN OF GAS SERVICE LINES TO FEED BIG CUSTOMERS FROM MEDIUM (19 bar AND LOW PRESSURE (4 bar NATURAL GAS DISTRIBUTION NETWORKS IN ATTICA 2003 2004-44 DESIGN OF THE NATURAL GAS INTERNAL INSTALLATIONS OF 189 EDUCATION FACILITIES BUILDING COMPLEXES 2004 2005-45 G.I.S. MAPING SYSTEM FOR NATURAL GAS MEDIUM AND LOW PRESSURE DISTRIBITION NETWORKS IN ATTICA 2004 2005-46 NETWORK EXPANSION TO FEED INDUSTRIAL AREAS ACHARNAI AND MANDRA (SECTORS 94 AND 95 IN ATTICA 2004 2004 2,880,516 47 NETWORKS, SECTORS 30, 71, 92 IN ATTICA 2004 2004 8,854,506 48 NETWORKS EXPANSION FROM THE AIRPORT CITY GATE TO THE TWO INDUSTRIAL ZONES OF KOROPI, SECTOR 97 IN ATTICA 2004 2004 4,278,515 49 PLANNING, SCHEDULING & CONTROL SERVICES FOR THE PERIOD CONTRACT 2002-2005 S 2003 2004 -
BUDGET ( MANAGEMENT CONTROL 50 TECHNICAL EVALUATION OF Β2C CONSUMERS 2003 2004-51 NETWORKS, SECTORS 02, 03, 05, 07, 16, 25, 32, 48, 50, 51, 62, 64, 65, 83, 101 IN ATTICA 2003 2004 52,568,679 52 NETWORK EXPANSION TO FEED SECTOR 50 CONSISTING OF THE OLYMPIC STADIUM ATHLETIC INSTALLATIONS AND THE MEDIA VILLAGE AT AMYGDALEZA 2003 2003 2,109,523 53 NATURAL GAS LOW PRESSURE DISTRIBUTION NETWORK EXRANSION TO FEED THE GALATSI AND NIKAIA OLYMPICS GYMS 2002 2003 66 54 GENERAL SECRETARIAT OF SPORTS NATURAL GAS MEDIUM (19 bar AND LOW PRESSURE (4 bar DISTRIBUTION NETWORK EXPANSION TO FEED MEDIA VILLAGE AT PALLINI 2003 2003 320,000 55 PREPARATION OF TENDER DOCUMENTS FOR VARIOUS S 2002 2002 1,290,000 56 PARTIALLY RELOCATION OF NATURAL GAS MEDIUM PRESSURE DISTRIBUTION NETWORK AT SARANTAPOROU STREET 2002 2002 312,500
BUDGET ( MANAGEMENT CONTROL 57 BIOMAR HELLENIC S.A. BIOMAR HELLENIC S.A. INTERNAL NATURAL GAS INSTALLATIONS 2001 2001-58 NATURAL GAS MEDIUM PRESSURE 19 BAR PIPING STRESS ANALYSIS OF BRANCHLINES AT LARISSA AND INOFITA 1996 1997-59 FILKERAM JOHNSON S.A. FILKERAM JOHNSON S.A. REPLACEMENT OF FUEL GAS (PROPANE SUPPLY SYSTEM TO NATURAL GAS 1996 1997 29 60 ATHINAIKI TECHNIKI S.A. NATURAL GAS MEDIUM PRESSURE 19 BAR - BRANCH TO PIREAUS 1996 1996 2,934,703