References ONSHORE. Weir LGE Process. Excellent Engineering Solutions ONSHORE REFERENCES

Size: px
Start display at page:

Download "References ONSHORE. Weir LGE Process. Excellent Engineering Solutions ONSHORE REFERENCES"

Transcription

1 Weir LGE Process REFERENCES

2

3 Ammonia Buffer Storage Product Storage, Export and Boil-Off Gas Facility Engro Chemical Pakistan Limited Engro Chemical Pakistan Limited Pakistan Daharki, Pakistan Project Year of Award 2008 Contract Number Weir LGE Process Scope of Work Design & Installation Supervision Facility Description Brownfield site for refrigerated ammonia storage within an existing operational facility. Product Anhydrous Ammonia Facility Specification Ammonia rundown / distribution and storage facility. 1 x 7,350m 3 fully refrigerated full containment, double wall steel tank, export pumps, boil-off gas reliquefaction and ancillary equipment, including electrical & instrumentation. Page 1

4 Ethylene Storage Terminal Product Storage, Export and Boil-Off Gas Facility Engro Vopak Terminal Limited Engro Polymer & Chemicals Limited Pakistan Port Qasim, Pakistan Project Year of Award 2007 Contract Number Weir LGE Process Scope of Work Design & Installation Supervision Facility Description Brownfield site for refrigerated ethylene storage within an existing operational facility. Product Ethylene Facility Specification Ethylene import / export and storage facility. 1 x 14,000m 3 fully refrigerated single containment, double wall steel tank, loading arms, export & re-circulation pumps, boil-off gas reliquefaction and ancillary equipment, including electrical, instrumentation & control. Page 2

5 LPG Storage Terminal Product Storage and Export Facility Oil Industries & Construction Iran Offshore Oil Company Iran Sirri Island, Iran Project Year of Award 2006 Contract Number Weir LGE Process Scope of Work Design & Installation Supervision Facility Description Greenfield site LPG storage terminal for refrigerated product. Product Liquefied Petroleum Gas 1 x m 3 fully refrigerated full containment, double wall steel inner and concrete outer tank, propane service. 1 x 22,500m 3 fully refrigerated full containment, double wall steel inner and concrete outer tank, butane service. In-tank pumps and ancillary equipment, including electrical and instrumentation. Page 3

6 LPG Storage Terminal Product Storage Facility Oil Industries & Construction Pars Oil & Gas Company Iran Assalouyeh, Iran Project Year of Award 2005 Contract Number Weir LGE Process Scope of Work Design & Installation Supervision Facility Description Greenfield site LPG storage terminal for refrigerated product. Product Liquefied Petroleum Gas Facility Specification 2 x 45,000m 3 fully refrigerated full containment, double wall steel inner and concrete outer tanks, propane service 2 x 35,000m 3 fully refrigerated full containment, double wall steel inner and concrete outer tanks, butane service. Page 4

7 LPG Storage Terminal Product Storage, Chilling and Boil-Off Gas Facility Kharg Petrochemical Company Kharg Petrochemical Company Iran Kharg Island, Iran Project Year of Award 2005 Contract Number Weir LGE Process Scope of Work Design & Installation Supervision Facility Description Brownfield site for refrigerated propane / butane product storage within an existing operational facility. Product Liquefied Petroleum Gas Facility Specification 1 x 34,000m 3 fully refrigerated full containment, double wall steel tank, propane or butane service. Product chilling system. Product reliquefaction system. Site safety system and ancillary equipment, including electrical, instrumentation & control. Page 5

8 Boil-Off Gas Package Unit Product Boil-Off Gas Facility Burckhardt Compression AG National Iranian Oil Co. Switzerland Assaluyeh, Iran Project Year of Award 2004 Contract Number Weir LGE Process Scope of Work Design & Facility Description Storage tank boil-off gas reliquefaction facility. Product Propane & Butane Facility Specification Propane skid, butane skid, cleaning in place and backflush filter. Page 6

9 Ethylene Terminal Product Storage, Export and Boil-Off Gas Facility Rotary Ltd. Vopak Ethylene Terminal Tianjin Singapore Tianjin, China Project Year of Award 2003 Contract Number Weir LGE Process Scope of Work Design & Installation Supervision Facility Description Brownfield site for refrigerated ethylene storage within an existing operational facility. Product Ethylene Facility Specification 1 x 15,000m 3 fully refrigerated single containment, double wall steel tank. Oil free loading and boil-off gas reliquefaction with a cascade plant. Ethylene vaporising unit for send out to process plant Site safety system and ancillary equipment, including electrical, instrumentation & control. Page 7

10 Propylene Storage Facility Product Storage, Chilling and Boil-Off Gas Facility Officine Maraldi SpA Hellenic Petroleum SA Italy Asproppoyrgas, Greece Project Year of Award 1998 Contract Number Weir LGE Process Scope of Work Design & Installation Supervision Facility Description Propylene storage and export facility acting as buffer storage between the propylene production units and the polypropylene plant consumers. Product Propylene (Polymer-grade) Facility Specification 2 x 4,200m 3 semi refrigerated spheres. Propylene rundown chilling plant to allow propylene storage at semi-refrigerated conditions. Pressure maintenance plant. Page 8

11 LPG Plant Product Storage and Regasification Facility Transco Transco Scotland (UK) Stornoway, Scotland (UK) Project Year of Award 1997 Contract Number L9716 Weir LGE Process Scope of Work Design & Installation Facility Description LPG Storage & vaporisation for domestic gas to consumers in the absence of a supply of natural gas from the national grid. Supply of LPG to road vehicles. Product Commercial grade propane and butane Facility Specification 2 x propane mounded tanks 1 x propane above ground tank 1 x butane above ground tank Hot water circulation for propane vaporisation Import from marine Jetty Regulated export to consumers with high on-line availability. Page 9

12 Fuel Gas Compressor Package ABB Stal AB Veba Oil Sweden Amal, Libya Project Year of Award 1995 Contract Number L9501 Product Dew Point and Compression Facility Weir LGE Process Scope of Work Design & Facility Description Gas dew point control and compression to provide fuel gas to a new gas turbine fired power generation plant. Product Hydrocarbon gas mixture Facility Specification Water and hydrocarbon dew point regulation by gas chilling. Compression of gas using compound oil injected screw compressors to provide a regulated fuel supply, responsive to turbine load changes. Page 10

13 Ammonia Import Terminal Product Vapour Recovery Facility Kemira Ince Limited Kemira Ince Limited United Kingdom Cheshire, United Kingdom Project Year of Award 1994 Contract Number L9424 Weir LGE Process Scope of Work Design & Installation Facility Description Ammonia import, and vapour recovery facility for on-site fertiliser production plant 2km overland import line from shared jetty on ship canal. Product Ammonia Facility Specification 1 x 14,650m 3 fully refrigerated double containment storage tank. Vapour recovery plant based on oil injected screw compressors. Integration into live plant without interrupting operations. Custody transfer / loss monitoring system for overland import line. Page 11

14 Propylene Terminal Fina Borealis, Fina Borealis, Antwerpen, Belgium Antwerpen, Belgium Project Year of Award 1989 Contract Number L9004 Product Storage Facility Weir LGE Process Scope of Work Design & Installation Facility Description Refrigerated Propylene Storage Terminal, receiving rundown from propylene plant and import from marine terminal, with export to polypropylene plant and marine terminal. Product Propylene Facility Specification 1 x 15,000m 3 fully refrigerated double containment tank converted from ethylene storage. Page 12

15 LPG Storage Terminal Product Storage, Import, Export and Boil-Off Gas Facility Antwerp Gas Terminal N.V., Antwerp Gas Terminal N.V., Belgium Belgium Project Year of Award 1982 Contract Number L8224 Weir LGE Process Scope of Work Design & Installation Facility Description Brownfield site LPG terminal for refrigerated and pressurised product Import / export from and to ships. Export via rail and road. Product Liquefied Petroleum Gas Facility Specification 2 x 50,000m³ LPG fully refrigerated tanks. 4 x 3,300m³ LPG pressurised spheres. 3 marine jetties for VLGC to river barges. Road truck loading stations. Railcar loading stations. Product reliquefaction and transfer systems. Site safety systems. Page 13

16 LPG Cavern Storage Product Storage, Export and Heating Facility Calor Gas Limted, Calor Gas Limted, United Kingdom Humber LPG Terminal, United Kingdom Project Year of Award 1982 Contract Number L8221 Weir LGE Process Scope of Work Design & Installation Facility Description Above ground LPG facilities, allowing receipt of fully refrigerated LPG from a marine Jetty and the transfer of the product to the underground storage. Product Liquefied Petroleum Gas Facility Specification 1 x 110,000m 3 propane fully refrigerated. 1 x 110,000m 3 butane fully refrigerated. Import pipelines from Jetty. Product pumping and heating. Control of system pressures for drop lines into caverns. Custody transfer metering. Page 14

17 Ammonia Storage Terminal Product Storage, Compression and Boil-Off Gas Facility Dutch State Mines Dutch State Mines The Netherlands Geleen, The Netherlands Project Year of Award 1981 Contract Number L8143 Weir LGE Process Scope of Work Design & Facility Description Additional ammonia storage tank and associated gas compression and reliquefaction systems, integrated into operational complex. Product Ammonia Facility Specification 1 x 25,000m 3 fully refrigerated double containment tank. Gas compressor to site pipeline system using oil-free screw compressors boil-off reliquefaction for normal use (electric motor driven) and emergency situations (diesel engine driven). Page 15

18 LPG Storage Terminal Product Storage, Import and Boil-Off Gas Facility Chinese Petroleum Corporation Chinese Petroleum Corporation Taiwan Kaohsiung, Taiwan Project Year of Award 1981 Contract Number L8142 Weir LGE Process Scope of Work Design & Installation Facility Description Refrigerated LPG storage terminal, marine jetty facilities for import and export of product. Product Liquefied Petroleum Gas Facility Specification 4 x 15,000m 3 fully refrigerated single containment storage tanks. Marine jetty including loading arms, LPG reliquefaction plant based on horizontally opposed reciprocating compressors. Page 16

www.howden.com AustCold INDUSTRIAL REFRIGERATION AND GAS COMPRESSION PLANT

www.howden.com AustCold INDUSTRIAL REFRIGERATION AND GAS COMPRESSION PLANT www.howden.com AustCold INDUSTRIAL REFRIGERATION AND GAS COMPRESSION PLANT 2 1 THE DRIVING FORCE BEHIND OUR TECHNOLOGY FOR OVER THREE DECADES, HAVE BEEN A MAJOR SUPPLIER OF LARGE INDUSTRIAL SKID-MOUNTED

More information

LNG Storage and Fuel Gas Systems. LNG: Fuel for Shipping, London 15-Feb-2011. Carriers & Offshore Units. Jürgen Harperscheidt Sales Manager

LNG Storage and Fuel Gas Systems. LNG: Fuel for Shipping, London 15-Feb-2011. Carriers & Offshore Units. Jürgen Harperscheidt Sales Manager LNG Storage and Fuel Gas Systems LNG: Fuel for Shipping, London 15-Feb-2011 Carriers & Offshore Units Jürgen Harperscheidt Sales Manager CONTENT TGE Company Profile Small LNG carriers Bunkering LNG fuel

More information

Proposed Development Phase IV at CRC Oil Terminal, Tsing Yi - Refrigerated Storage Tanks for Liquefied Gas

Proposed Development Phase IV at CRC Oil Terminal, Tsing Yi - Refrigerated Storage Tanks for Liquefied Gas in association with China Resources Petrochems (Group) Co. Ltd Proposed Development Phase IV at CRC Oil Terminal, Tsing Yi - Refrigerated Storage Tanks for Liquefied Gas Project Profile July 2005 CONTENTS

More information

South Hook Gas Company Ltd is a London-based liquefied natural gas (LNG) import company, which owns and manages the regasification

South Hook Gas Company Ltd is a London-based liquefied natural gas (LNG) import company, which owns and manages the regasification Energy for growth South Hook Gas Company Ltd is a London-based liquefied natural gas (LNG) import company, which owns and manages the regasification capacity and the gas supply from the South Hook LNG

More information

Industrial Gas Turbines

Industrial Gas Turbines Industrial Power Industrial Gas Turbines The comprehensive product range from 5 to 50 megawatts Scan the QR code with the QR code reader in your mobile! siemens.com / energy / gasturbines Meeting your

More information

LNG Fuel Gas Infrastructure from terminal to onboard system The Motorship Gas-fuelled Ships 12 to 14-Sep-2012, Bergen

LNG Fuel Gas Infrastructure from terminal to onboard system The Motorship Gas-fuelled Ships 12 to 14-Sep-2012, Bergen LNG Fuel Gas Infrastructure from terminal to onboard system The Motorship Gas-fuelled Ships 12 to 14-Sep-2012, Bergen Content Short Company Introduction Small LNGC and LNG tanks Terminals and distribution

More information

Main areas of services are:

Main areas of services are: Pakistan Foundation for the Advancement of Engineering & Technology provides superior solutions to Oil & Gas Companies/ industry upstream, production, transportation, refining and related industries. Upstream

More information

LNG BUNKERING LNG AS A SHIP S FUEL GREEN SHIP TECHNOLOGY, OSLO 23-MAR-2011. Carriers & Offshore Units. Jürgen Harperscheidt Sales Manager

LNG BUNKERING LNG AS A SHIP S FUEL GREEN SHIP TECHNOLOGY, OSLO 23-MAR-2011. Carriers & Offshore Units. Jürgen Harperscheidt Sales Manager LNG BUNKERING LNG AS A SHIP S FUEL GREEN SHIP TECHNOLOGY, OSLO 23-MAR-2011 Carriers & Offshore Units Jürgen Harperscheidt Sales Manager CONTENT TGE Company Profile Small LNG carriers as part of a bunkering

More information

For the transfer of : Oil Solvents Liquid Chemicals Acids Cryogenic Products Vapour

For the transfer of : Oil Solvents Liquid Chemicals Acids Cryogenic Products Vapour Eteha bv Flextraco Manufacturer of s Flextraco Manufacturer of s For the transfer of : Oil Solvents Liquid Chemicals Acids Cryogenic Products Vapour Flextraco Composite Hoses - 20 Company Information Flextraco

More information

Open Cycle Refrigeration System

Open Cycle Refrigeration System Chapter 9 Open Cycle Refrigeration System Copy Right By: Thomas T.S. Wan 温 到 祥 著 Sept. 3, 2008 All rights reserved An open cycle refrigeration system is that the system is without a traditional evaporator.

More information

Synfuels GASRICH Transport Light Gas Technology

Synfuels GASRICH Transport Light Gas Technology Synfuels GASRICH Transport Light Gas Technology Storage and Transport of Light Gas and LNG Blends Abstract The Liquefied Natural Gas (LNG) industry is well established and growing. Recently depressed Natural

More information

OUR CONVERSATION TODAY

OUR CONVERSATION TODAY OUR CONVERSATION TODAY Our goal is to raise the level of awareness around the natural gas supply chain among key stakeholders in order to facilitate positive working relationships and more informed decision

More information

Facts about gas physical properties

Facts about gas physical properties Facts about gas physical properties Gas as fuel for propulsion of ships status and perspectives Ingeniørhuset, 3. March 2008 By Asger Myken, DONG Energy DONG Energy 2 Agenda Basic information on gas types

More information

Natural Gas Information Contents

Natural Gas Information Contents Natural Gas Information Contents What is natural gas Natural Gas Components Physical Properties of Natural Gas Different Forms of Natural Gas The Use of Natural Gas Co-generation System Natural Gas and

More information

SMALL SCALE LIQUEFACTION & DISTRIBUTION

SMALL SCALE LIQUEFACTION & DISTRIBUTION SMALL SCALE LIQUEFACTION & DISTRIBUTION - Biomethane and Natural Gas CLEAN ENERGY SMALL SCALE LIQUEFACTION & DISTRIBUTION Biomethane and Natural Gas 1 The Cryostar Group Specialising in equipment and expertise

More information

Nonrenewable Natural Gas. Natural Gas Basics. How Was Natural Gas Formed?

Nonrenewable Natural Gas. Natural Gas Basics. How Was Natural Gas Formed? Did You Know? Because natural gas is colorless, odorless, and tasteless, mercaptan (a chemical that smells like sulfur) is added before distribution, to give it a distinct unpleasant odor (it smells like

More information

Recent evolutions in the tank storage sector in the Port of Antwerp. Rose-Marie Pype March 19th, 2013

Recent evolutions in the tank storage sector in the Port of Antwerp. Rose-Marie Pype March 19th, 2013 Recent evolutions in the tank storage sector in the Port of Antwerp Rose-Marie Pype March 19th, 2013 The Port of Antwerp The Antwerp Tank Storage Scene Sustainable growing Conclusion Location Organisation

More information

Gas Detection for Refining. HA University

Gas Detection for Refining. HA University Gas Detection for Refining HA University Refinery Process and Detection Needs Refining i Crude Oil Final Products Coke Asphalt Waxes, Lubricating Oils and Greases Kerosene, Jet Fuel, Diesel Fuel, Home

More information

Industrial Gas Turbines utilization with Associated Gases

Industrial Gas Turbines utilization with Associated Gases Industrial Gas Turbines utilization with Associated Gases Géraldine ROY Lead Market Analyst - Business Development Siemens Industrial Turbomachinery Ltd Siemens PG I satisfies customer needs from a single

More information

2002 Date CHARLES TAYLOR PLC Risk Engineering Consultant. 1991-2000 JOHNSON & HIGGINS (LATER MARSH) Vice President

2002 Date CHARLES TAYLOR PLC Risk Engineering Consultant. 1991-2000 JOHNSON & HIGGINS (LATER MARSH) Vice President Eur Ing Doug S. Scott BTech, CEng CSci, FIChemE, MEI CHARTERED ENGINEER/SCIENTIST RISK ENGINEERING CONSULTANT Office Tel No: +44 20 7015 2059 Office Fax No: +44 20 7623 1817 Mobile No: +44 7760 173 819

More information

COMMERCIAL REPORT / STOCK CONDITION SURVEY. Sydenham Hill Estate Sydenham Hill London SE 23

COMMERCIAL REPORT / STOCK CONDITION SURVEY. Sydenham Hill Estate Sydenham Hill London SE 23 COMMERCIAL REPORT / STOCK CONDITION SURVEY For Sydenham Hill Estate Sydenham Hill London SE 23 Submission Prepared by Gas Advisory Services Limited Date: 4 th June 2013 Gas Advisory Services Limited Phoenix

More information

ARP Food Industry, Portugal

ARP Food Industry, Portugal Food Industry, Portugal In a Portuguese food company colibri will install a twostage ammonia-water-absorption refrigeration system. The 1st refrigeration stage provides the customer with liquid ammonia

More information

Supply, storage and handling of LNG as ship s fuel Björn Munko LNG 17, Houston

Supply, storage and handling of LNG as ship s fuel Björn Munko LNG 17, Houston Supply, storage and handling of LNG as ship s fuel Björn Munko LNG 17, Houston Content Short Company Introduction Small LNGC and LNG tanks Bunker supply chain LNG fuel gas systems Conclusions LNG 17 -

More information

Natural gas liquids recovery from gas turbine fuel

Natural gas liquids recovery from gas turbine fuel Natural gas liquids recovery from gas turbine fuel By Simone Amidei, Francesca Monti, Riccardo Valorosi / GE Oil & Gas GE imagination at work Natural gas liquids recovery from gas turbine fuel By Simone

More information

INDIAN STANDARDS FOR NATURAL GAS PIPELINE SYSTEM

INDIAN STANDARDS FOR NATURAL GAS PIPELINE SYSTEM INDIAN STANDARDS FOR NATURAL GAS PIPELINE SYSTEM 1. IS 15663(Part 1):2006 This code covers requirements and recommendations for the design, materials, construction and testing of pipelines made of steel

More information

GEOil&Gas. Liquefied Natural Gas. Reliable innovation for the entire LNG value chain

GEOil&Gas. Liquefied Natural Gas. Reliable innovation for the entire LNG value chain GEOil&Gas Liquefied Natural Gas Reliable innovation for the entire LNG value chain Pushing technological boundaries When GE Oil & Gas introduced its Frame 5 gas turbine driver to LNG liquefaction in 1989,

More information

Carefully to Carry. The carriage of liquefied gases. Ethylene carriers LNG

Carefully to Carry. The carriage of liquefied gases. Ethylene carriers LNG Carefully to Carry The carriage of liquefied gases Introduction The renewed interest in gas, which started in the 1990s due to its excellent environmental credentials, has seen an increase in the order

More information

Aviva Insurance Limited

Aviva Insurance Limited One Park Place, Hatch Street, Dublin 2 Registration number: 9002 is accredited by the Irish National Board (INAB) to undertake inspection as detailed in the Schedule bearing the above registration number,

More information

LNG terminal project in Lithuania November, 2012

LNG terminal project in Lithuania November, 2012 LNG terminal project in Lithuania November, 2012 Areas of activities Klaipedos nafta Oil transshipment terminal LNG Terminal Klaipėdos Nafta 2 LNG Terminal Project - Background The necessity to have an

More information

Alberta Research Council (ARC) Enhanced Coalbed Methane (ECBM) Recovery Project in Alberta, Canada

Alberta Research Council (ARC) Enhanced Coalbed Methane (ECBM) Recovery Project in Alberta, Canada Alberta Research Council (ARC) Enhanced Coalbed Methane (ECBM) Recovery Project in Alberta, Canada Bill Gunter Alberta Research Council (ARC) Inc. Edmonton, Alberta, Canada CBM Resources of Western Canada

More information

Putting a chill on global warming

Putting a chill on global warming Carbon capture and storage Putting a chill on global warming SABINE SULZER SULZER PUMPS MARKUS DUSS SULZER CHEMTECH Whenever fuel is burned, carbon dioxide (CO ) is emitted into the atmosphere. The subsequent

More information

IBP 2778_10 HIGH EFFICIENCY ON CO2 REMOVAL IN NATURAL GAS WITH UCARSOL SOLVENTS Thiago V. Alonso 1. Abstract. 1. Introduction

IBP 2778_10 HIGH EFFICIENCY ON CO2 REMOVAL IN NATURAL GAS WITH UCARSOL SOLVENTS Thiago V. Alonso 1. Abstract. 1. Introduction IBP 2778_10 HIGH EFFICIENCY ON CO2 REMOVAL IN NATURAL GAS WITH UCARSOL SOLVENTS Thiago V. Alonso 1 Copyright 2010, Brazilian Petroleum, Gas and Biofuels Institute - IBP This Technical Paper was prepared

More information

TOBOLSK-POLYMER propane dehydrogenation and polypropylene production complex

TOBOLSK-POLYMER propane dehydrogenation and polypropylene production complex TOBOLSK-POLYMER propane dehydrogenation and polypropylene production complex LOCATION OF THE TOBOLSK-POLYMER COMPLEX WEST SIBERIAN PETROCHEMICAL CLUSTER THE COMPLEX IS ADVANTEGOUSLY LOCATED AT THE HUB

More information

Challenges and Opportunities for Small Businesses Engaged in Energy Development and Energy Intensive Manufacturing

Challenges and Opportunities for Small Businesses Engaged in Energy Development and Energy Intensive Manufacturing Statement of Toby Mack, EEIA President, Before the U.S Senate Committee on Small Business and Entrepreneurship July 14, 2015 Challenges and Opportunities for Small Businesses Engaged in Energy Development

More information

Gas Marketplace Work? July 9-13, 2007

Gas Marketplace Work? July 9-13, 2007 What Makes a Natural Gas Marketplace Work? July 9-13, 2007 Accra TOPIC I: Resource & Infrastructure Investment for Delivery Key value chain components Physical Infrastructure Gathering Removal of basic

More information

Biomethane in Vehicles. October 2008

Biomethane in Vehicles. October 2008 Biomethane in Vehicles October 2008 1 Gas vehicles A gas vehicles is a vehicle fuelled buy a gaseous fuel not liquid fuel. Seems simple, but not all gasses are the same, and storage methods vary 2 Definitions

More information

The World Pump Market 2011-2016

The World Pump Market 2011-2016 The World Pump Market 2011-2016 Volume I 20 October 2011 support is by e-mail only to: [email protected] European Industrial Forecasting Ltd 2011 Contents - Volume I - Page 1 I INTRODUCTION II GLOBAL

More information

Arkansas Natural Gas Severance Marketing Costs

Arkansas Natural Gas Severance Marketing Costs Arkansas Natural Gas Severance Marketing Costs The following lists present various costs by category as "Allowable" or "Disallowed" as marketing costs. While listing many items, this list may not be all

More information

Ethanol Vehicle and Infrastructure Codes and Standards Citations

Ethanol Vehicle and Infrastructure Codes and Standards Citations Ethanol Vehicle and Infrastructure Codes and Standards Citations This document lists codes and standards typically used for U.S. ethanol vehicle and infrastructure projects. To determine which codes and

More information

Pumping Fuel & Fuel Oil

Pumping Fuel & Fuel Oil Pumping Fuel & Fuel Oil Fuels & Rotary Pumps Though the handling of fuel oil is not necessarily "challenging," the reliable handling of fuel oils is critical for heating and transportation systems. Rotary

More information

Propulsion Trends in LNG Carriers

Propulsion Trends in LNG Carriers This Is a Headline This is a subheadline Propulsion Trends in LNG Carriers Two-stroke Engines Contents Introduction...5 Market Development...6 Definition and types of liquefied gas...6 Types of LNG carriers

More information

Overview of pipelines in Europe advantages and disadvantages

Overview of pipelines in Europe advantages and disadvantages Overview of pipelines in Europe advantages and disadvantages Dr. Georgios A. Papadakis Industrial Risk Management Technical University of Crete,, Greece tel: : +30-28210 28210-37316 e-mail: [email protected]

More information

INVESTMENT OPPORTUNITIES IN THE PETROLEUM SECTOR

INVESTMENT OPPORTUNITIES IN THE PETROLEUM SECTOR INVESTMENT OPPORTUNITIES IN THE PETROLEUM SECTOR PROJECT 1 Introduction The Jubilee Filed oil is of light quality and has high gas content. For every 1,000 barrels of oil that is produced, there is an

More information

How To Fuel A Natural Gas Vehicle

How To Fuel A Natural Gas Vehicle Natural Gas Vehicle Fueling A Readers Digest Brief: LNG, CNG and your Fleet February 28, 2014 Overview Why Choose Natural Gas? Difference Between These Natural Gas-based Fuels Choosing Wisely: LNG or CNG?

More information

SUPERSONIC GAS CONDITIONING - COMMERCIALISATION OF TWISTER TECHNOLOGY

SUPERSONIC GAS CONDITIONING - COMMERCIALISATION OF TWISTER TECHNOLOGY 87th Annual Convention Grapevine, Texas, USA March 2-5, 2008 SUPERSONIC GAS CONDITIONING - COMMERCIALISATION OF TWISTER TECHNOLOGY Peter Schinkelshoek MSc Eng Twister BV Principal Process Engineer [email protected]

More information

Liquefied Natural Gas (LNG)

Liquefied Natural Gas (LNG) Graduate Diploma in Petroleum Studies Major in Liquefied Natural Gas (LNG) INDUCTION Launching ceremony Week 39, 2012 Administration / Plant visit / Fundamentals of LNG and LNG main risks awareness Module

More information

Crowley LNG. Puget Sound Harbor Safety Committee June 3 rd, 2015. Matthew Sievert Director Business Development LNG

Crowley LNG. Puget Sound Harbor Safety Committee June 3 rd, 2015. Matthew Sievert Director Business Development LNG Crowley LNG Puget Sound Harbor Safety Committee June 3 rd, 2015 Matthew Sievert Director Business Development LNG Company Profile Crowley was founded in 1892. Largest US Jones Act Co. Focusing on Marine

More information

DESCRIPTION OF THE CHAIRMAN S MARK OF A PROPOSAL TO CONVERT THE TAX ON LIQUEFIED NATURAL GAS AND LIQUEFIED PETROLEUM GAS TO AN ENERGY EQUIVALENT BASIS

DESCRIPTION OF THE CHAIRMAN S MARK OF A PROPOSAL TO CONVERT THE TAX ON LIQUEFIED NATURAL GAS AND LIQUEFIED PETROLEUM GAS TO AN ENERGY EQUIVALENT BASIS DESCRIPTION OF THE CHAIRMAN S MARK OF A PROPOSAL TO CONVERT THE TAX ON LIQUEFIED NATURAL GAS AND LIQUEFIED PETROLEUM GAS TO AN ENERGY EQUIVALENT BASIS Scheduled for Markup by the SENATE COMMITTEE ON FINANCE

More information

PLUTO LNG PLANT START-UP

PLUTO LNG PLANT START-UP PLUTO LNG PLANT START-UP Gerard Ransom Woodside Energy Ltd. ABSTRACT The Pluto gas field was discovered in early 2005 in the North West Shelf area, approximately 180 km from the Burrup Peninsula and 100

More information

LNG bunkering market perspectives, challenges and trends

LNG bunkering market perspectives, challenges and trends LNG bunkering market perspectives, challenges and trends Moscow 31 March 2015 Sergiu Maznic Full-picture perspective Sund Energy helps navigate into the energy future Energy Economics Environment Learning

More information

Intelligent Terminal Automation System

Intelligent Terminal Automation System Intelligent Terminal Automation System. Rockwell Automation intelligent Terminal Automation Systems provide a complete automation solution for tank terminals beyond your expectations The Rockwell Automation

More information

FUEL OIL Crude Condensate Naphtha Ethane Reformate

FUEL OIL Crude Condensate Naphtha Ethane Reformate FUEL OIL Crude The Crude Overview gives a summary of the daily price movements of the benchmark WTI (West Texas Intermediate) and Brent futures contracts on the NYMEX and IPE exchanges, detailing any significant

More information

OPTIONS FOR COMMERCIAL GAS DEVELOPMENT OF MARGINAL FIELDS

OPTIONS FOR COMMERCIAL GAS DEVELOPMENT OF MARGINAL FIELDS OPTIONS FOR COMMERCIAL GAS DEVELOPMENT OF MARGINAL FIELDS Gabriel N. Bujulu Principal Petroleum Engineer TANZANIA PETROLEUM DEVELOPMENT CORPORATION PRESENTATION OUTLINE! Introduction! Origin of Natural

More information

Ground-breaking conversion of critical Data Room WaterChiller from R22 to R422D / MO29

Ground-breaking conversion of critical Data Room WaterChiller from R22 to R422D / MO29 Ground-breaking conversion of critical Data Room WaterChiller from R22 to R422D / MO29 A refrigerant retrofit project, involving the conversion of a large Data Room cooling system from R22 to R422D (DuPont

More information

LNG benefit Terminals for Data Center Cooling and Power

LNG benefit Terminals for Data Center Cooling and Power By Recovering co-locating Cryogenic cryogenic industries Refrigeration for mutual Energy From LNG benefit Terminals for Data Center Cooling and Power Technology Presentation Datacentres Europe 2014 May

More information

Freeport LNG Liquefaction Project

Freeport LNG Liquefaction Project Freeport LNG Liquefaction Project GE Oil & Gas The 2015 Gas/Electric Partnership Conference XXIII Houston, February 17-19, 2015 GE Oil & Gas General Electric Company, 2015. GE Proprietary Information -

More information

High-performance steam boiler and hot water boiler plants for industry

High-performance steam boiler and hot water boiler plants for industry High-performance steam boiler and hot water boiler plants for industry Information 2/3 HKB leading manufacturer of industrial boiler plants in Europe and Asia Steam boilers with outputs up to 120 t/h and

More information

Oxygen generation. By Vacuum Pressure Swing Adsorption.

Oxygen generation. By Vacuum Pressure Swing Adsorption. Oxygen generation. By Vacuum Pressure Swing Adsorption. 02 Introduction Advantages 03 Introduction. Advantages. Balancing performance needs with cost constraints. Fast, cost-effective oxygen on demand

More information

TRADING UPDATE YTD Q3 2015 RESULTS ROYAL VOPAK 6 NOVEMBER 2015 ANALYST PRESENTATION

TRADING UPDATE YTD Q3 2015 RESULTS ROYAL VOPAK 6 NOVEMBER 2015 ANALYST PRESENTATION TRADING UPDATE YTD Q3 RESULTS ROYAL VOPAK 6 NOVEMBER ANALYST PRESENTATION FORWARD-LOOKING STATEMENTS This presentation contains forward-looking statements, based on currently available plans and forecasts.

More information

Chapter 4 Natural gas

Chapter 4 Natural gas NATURAL GAS Chapter 4 Natural gas Key points UK natural gas production in 2014 was up 0.2 per cent on 2013 to 425 TWh. Although small the increase contrasts with the long term decline in UK natural gas

More information

ASimple Guide to Oil Refining

ASimple Guide to Oil Refining ASimple Guide to Oil Refining We all know that motor oil and gasoline come from crude oil. What many people do not realize is that crude oil is also the starting point for many diverse products such as

More information

INSTALLATION AND START UP REPORT CERTIFYING THE CORRECT FUNCTIONALITY OF THE AD HOC REFUELLING STATION LIFE+ MHYBUS LIFE 07-ENV/IT/000434

INSTALLATION AND START UP REPORT CERTIFYING THE CORRECT FUNCTIONALITY OF THE AD HOC REFUELLING STATION LIFE+ MHYBUS LIFE 07-ENV/IT/000434 Feb. 15, 212 Sheet: 1 of 27 INSTALLATION AND START UP REPORT CERTIFYING THE CORRECT FUNCTIONALITY OF THE AD HOC REFUELLING STATION Ref. Number: LIFE+ MHYBUS LIFE 7-ENV/IT/434 Project Acronym: MHYBUS Project

More information

TOTAL FDI Inflow to KSA (Millions of dollars) FDI by Source :

TOTAL FDI Inflow to KSA (Millions of dollars) FDI by Source : Actual Inflows & Stocks of Foreign Direct Investments (Millions of dollars) in KSA by Country & Sector FDI Inflows Total Stock ( Millions of dollars ) TOTAL FDI Inflow to KSA (Millions of dollars) 8 8,,,,88

More information

Design of a Fuel Oil Storage Facility

Design of a Fuel Oil Storage Facility Design of a Fuel Oil Storage Facility Background The goal of this project is to design a new, state-of-the-art fuel oil storage facility for the Kanawha Valley Facility, such as the one illustrated in

More information

Passing the Baton Cleanly

Passing the Baton Cleanly GASTECH 2000 Passing the Baton Cleanly F.W. Richardson Bechtel Commissioning/Start-Up Manager P. Hunter Bechtel Deputy Commissioning/Start-Up Manager T. Diocee Atlantic LNG Commissioning/Start-Up Manager

More information

Residential Heating Oil Prices: What Consumers Should know

Residential Heating Oil Prices: What Consumers Should know Residential Heating Oil Prices: What Consumers Should know Introduction Heating oil is a petroleum product used by many Americans to heat their homes. Historically, heating oil prices have fluctuated from

More information

Backup Fuel Oil System Decommissioning & Restoration Plan

Backup Fuel Oil System Decommissioning & Restoration Plan Backup Fuel Oil System Page 1 of 19 Overview of Physical Fuel Oil System and Decommissioning Steps The fuel oil system at Milford Power consists of a number of subsystems. These include the following:

More information

Chart 1: Zambia's Major Trading Partners (Exports + Imports) Q4 2008 - Q4 2009. Switzernd RSA Congo DR China UAE Kuwait UK Zimbabwe India Egypt Other

Chart 1: Zambia's Major Trading Partners (Exports + Imports) Q4 2008 - Q4 2009. Switzernd RSA Congo DR China UAE Kuwait UK Zimbabwe India Egypt Other Bank of Zambia us $ Million 1. INTRODUCTION This report shows Zambia s direction of merchandise trade for the fourth quarter of 2009 compared with the corresponding quarter in 2008. Revised 1 statistics,

More information

The Port of Antwerp. July 1 st 2015 A case of success for the management of chemical maritime logistics

The Port of Antwerp. July 1 st 2015 A case of success for the management of chemical maritime logistics The Port of Antwerp July 1 st 2015 A case of success for the management of chemical maritime logistics 2 DEEP INLAND LOCATION IN THE HEART OF EUROPE Combining the advantages of an inland port CUTTING COSTS

More information

Natural Gas. Shale Gas Impacts. Natural Gas Liquids (NGLs) Dan Brockett Penn State Extension

Natural Gas. Shale Gas Impacts. Natural Gas Liquids (NGLs) Dan Brockett Penn State Extension Natural Gas Shale Gas Impacts Natural Gas Liquids (NGLs) Dan Brockett Penn State Extension Natural Gas Liquids Natural Gas Liquids (NGLs) are found in wet gas or rich gas areas of shale gas producing regions.

More information

Reliability Modeling Software Defined

Reliability Modeling Software Defined Reliability Modeling Software Defined Using Titan Reliability Modeling Software May 30, 2014 Prepared by: The Fidelis Group 122 West Way, Suite 300 Lake Jackson, TX 77566 Fidelis Group, LLC All Rights

More information

Expanding the Twin Ports Energy Cluster to include LNG and CNG Production and Distribution. Dr. Richard Stewart, Co-Director-GLMRI May 21, 2014

Expanding the Twin Ports Energy Cluster to include LNG and CNG Production and Distribution. Dr. Richard Stewart, Co-Director-GLMRI May 21, 2014 Expanding the Twin Ports Energy Cluster to include LNG and CNG Production and Distribution Dr. Richard Stewart, Co-Director-GLMRI May 21, 2014 Natural Gas (NG) Study Overview The U.S. Maritime Administration

More information

Practical Guidelines for Electrical Area Classification in Combustion Turbine-Generator Power Plants

Practical Guidelines for Electrical Area Classification in Combustion Turbine-Generator Power Plants Practical Guidelines for Electrical Area Classification in Combustion Turbine-Generator Power Plants Ram K. Saini, P.E. Principal Engineer, Chuck Emma, P.E. Principal Engineer, Burns and Roe Enterprises,

More information

U.S. Energy Outlook. Oil and Gas Strategies Summit May 21, 2014 New York, NY. By Adam Sieminski, EIA Administrator

U.S. Energy Outlook. Oil and Gas Strategies Summit May 21, 2014 New York, NY. By Adam Sieminski, EIA Administrator U.S. Energy Outlook May 21, 214 New York, NY By Adam Sieminski, EIA Administrator U.S. Energy Information Administration Independent Statistics & Analysis www.eia.gov The U.S. has experienced a rapid increase

More information

ENTERPRISE RISK MANAGEMENT An ISO 31000 based approach

ENTERPRISE RISK MANAGEMENT An ISO 31000 based approach ENTERPRISE RISK MANAGEMENT An ISO 31000 based approach Fabrizio Bosia Tecnimont Vice President QHSE Frédéric Veny Sofregaz Joint Managing Director ECRI SPONSORS MEETING 6 7 June 2012, Paris AGENDA 1. Maire

More information

MIDSTREAM GROWTH PROGRAM

MIDSTREAM GROWTH PROGRAM MIDSTREAM GROWTH PROGRAM PROPERTY TAX VALUE LIMITATION (CHAPTER 313) MAPS January, 015 PROJECT OVERVIEW 1 Sweeny Refinery Columbia-Brazoria Independent School District Stratton Ridge Clemens Terminal 3

More information

THE DELTON GROUP MANPOWER TRAINING CONSULTANCY SHORT COURSE PROGRAMME TOPICS LISTING

THE DELTON GROUP MANPOWER TRAINING CONSULTANCY SHORT COURSE PROGRAMME TOPICS LISTING THE DELTON GROUP MANPOWER TRAINING CONSULTANCY SHORT COURSE PROGRAMME TOPICS LISTING Delton Short Course Programmes English Language Technical English Language English Language for the Oil Industry Oil

More information

Liquefied Petroleum Gas Volume 1 : Large Bulk Pressure Storage & Refrigerated LPG

Liquefied Petroleum Gas Volume 1 : Large Bulk Pressure Storage & Refrigerated LPG IP THE INSTITUTE OF PETROLEUM Liquefied Petroleum Gas Volume 1 : Large Bulk Pressure Storage & Refrigerated LPG MODEL CODE OF SAFE PRACTICE PART 9 ISBN 0 471 91612 9 First'printed 1987 Reprinted October

More information

Prepared and Submitted by

Prepared and Submitted by Technical Feasibility Study Report of Proposed Sulfuric Acid and Phosphoric Acid Unloading Facilities, Acid Storage Tanks at the existing Wharf and Acid Transfer Pipeline Falling within the CRZ area &

More information

WHY NOW? GAS? The Design. Nopetro

WHY NOW? GAS? The Design. Nopetro Nopetro The Energy Solution About Us Founded in 2008 Design, finance, build, operate, maintain and supply Compressed Natural Gas (CNG) and Liquefied Natural Gas (LNG) Fueling Stations Focus on Medium and

More information

INVESTMENT OPPORTUNITIES

INVESTMENT OPPORTUNITIES NIOC In the Name of God National Iranian Oil Company Public Relations Title: Investment Opportunities Written and Edited by: Corporate planning directorate - Deputy of Investment and Development Publisher:

More information

Methodological tool Upstream leakage emissions associated with fossil fuel use

Methodological tool Upstream leakage emissions associated with fossil fuel use CLEAN DEVELOPMENT MECHANISM TOOL15 Methodological tool Upstream leakage s associated with fossil fuel use Methodological tool: Upstream leakage s associated with fossil fuel use TABLE OF CONTENTS Page

More information

Fiscal Measurement Natural Gas

Fiscal Measurement Natural Gas White Paper FSG-WP-0012 February 2014 Fiscal Measurement Natural Gas Fiscal Measurement How much? Fiscal Measurement must not be confused with Custody Transfer; in fact, fiscal measurement is a more general

More information

Measurement Services Inspectorate America Corporation

Measurement Services Inspectorate America Corporation Measurement Services Inspectorate America Corporation Expert Testing & Inspection Services for the Oil, Gas & Petrochemicals Industry Measurement Services Inspectorate America Corporation applies a client-focused

More information

1st Session 114 27 LNG AND LPG EXCISE TAX EQUALIZATION ACT OF 2015. Mr. HATCH, from the Committee on Finance, submitted the following R E P O R T

1st Session 114 27 LNG AND LPG EXCISE TAX EQUALIZATION ACT OF 2015. Mr. HATCH, from the Committee on Finance, submitted the following R E P O R T 114TH CONGRESS Calendar No. 50 REPORT " SENATE! 1st Session 114 27 LNG AND LPG EXCISE TAX EQUALIZATION ACT OF 2015 APRIL 14, 2015. Ordered to be printed Mr. HATCH, from the Committee on Finance, submitted

More information

MEDICAL AIR STATIONS FOR MEDICAL GAS PIPING SYSTEM. Key features: NOVAIR quality and service: www.novairmedical.com

MEDICAL AIR STATIONS FOR MEDICAL GAS PIPING SYSTEM. Key features: NOVAIR quality and service: www.novairmedical.com MEDICAL AIR STATIONS FOR MEDICAL GAS PIPING SYSTEM Designed for centralized medical air production in hospitals and clinics, NOVAIR medical air stations ensure the continuous supply of the medical gas

More information

UTILITIES DEPARTMENT NORTH CAMPUS DISASTER RECOVERY PLAN

UTILITIES DEPARTMENT NORTH CAMPUS DISASTER RECOVERY PLAN Page 1 of 27 UTILITIES DEPARTMENT NORTH CAMPUS DISASTER RECOVERY PLAN Page 2 of 27 Table of Contents 1. OBJECTIVE... 4 2. SCOPE... 4 3. COMMUNICATION... 4 4. LOSS OF NATURAL GAS SUPPLY... 5 5. LOSS OF

More information

Energy Conservation Measures due to Industrial Gas Supply Business Model Innovation

Energy Conservation Measures due to Industrial Gas Supply Business Model Innovation 2008 Prize of Director General of Agency for Natural Resources and Energy Energy Conservation Measures due to Industrial Gas Supply Business Model Innovation Air Water Inc. Industry Business Division Industry

More information

LOGISTICS SOLUTION FOR NUSTAR ENERGY

LOGISTICS SOLUTION FOR NUSTAR ENERGY LOGISTICS SOLUTION FOR NUSTAR ENERGY We look forward to a continued working relationship with Energy Solutions. Energy Solutions has shown us a commitment to our partnership backed by a sound technology

More information

Imtech Industry International

Imtech Industry International Imtech Industry International Driving Technology Who we are Imtech Industry International Coevorden The Netherlands We are Imtech Industry International N 52 39.791, E 6 43.203 Imtech Industry International

More information

Fossil Energy Study Guide: Oil

Fossil Energy Study Guide: Oil Petroleum or crude oil is a fossil fuel that is found in large quantities beneath the Earth s surface and is often used as a fuel or raw material in the chemical industry. It is a smelly, yellow-to-black

More information

Energy Audit Data Collection Form

Energy Audit Data Collection Form SAVING ENERGY IN COMMERCIAL BUILDINGS Energy Audit Data Collection Form Site Data Building Name Address Building Square Footage (ft 2 ) Age of Building (years) Date of Last Major Renovation Purpose of

More information

Advantages and Disadvantages of the Preferred Alternative Fuels

Advantages and Disadvantages of the Preferred Alternative Fuels Page 1 of 5 University of Texas at Austin Vehicle Fleet Alternative Fuels Policy Background In 1991 the Texas Legislature enacted laws requiring state agencies to purchase and operate vehicles powered

More information

NATURAL GAS EXPERIENCE

NATURAL GAS EXPERIENCE 02 NATURAL GAS EXPERIENCE Linde Process Plants, Inc. (LPP) has constructed NGL Plants since 1969 using traditional processes as well as the more advanced CRYO-PLUS technology. CRYO-PLUS TM Proprietary

More information

Marine Transportation of Compressed Natural Gas

Marine Transportation of Compressed Natural Gas Marine Transportation of Compressed Natural Gas Omid Shakeri, Aghil Barati Iranian Fuel Conservation Organization (IFCO), September 26-27, 2009, The 3rd Iran Gas Forum Introduction Natural gas is rapidly

More information