LNG A Different Approach The Teesside GasPort Project
|
|
|
- Catherine Perry
- 9 years ago
- Views:
Transcription
1 LNG A Different Approach The Teesside GasPort Project Presented to Winter Outlook Seminar by John Baldwin of Gas Strategies and James Ball On behalf of Rob Bryngelson, Executive Vice President and Chief Operating Officer Excelerate Energy 27 September 2006
2 Presentation Overview Energy Bridge Technology Genesis of the GasPort Concept Teesside GasPort Overview Exceptional and Focused Project Team Project Design Basis and Functionality Project Status Project Development Risks Next Steps 2
3 Energy Bridge Regasification Vessels Natural Gas Delivery in Three Ways Energy Bridge was primarily designed to access markets unreachable by conventional means Energy Bridge Deepwater Port Excelerate GasPort Conventional Land-Based Terminal however, its economics are competitive with a conventional, land-based LNG terminal with added flexibility benefits 3
4 Energy Bridge Regasification Vessels Natural Gas Delivery in Three Ways Conventional LNG Manifold High Pressure Gas Manifold STL Buoy 4
5 Energy Bridge Technology Dockside Vaporization High Pressure Gas Manifold Energy Bridge ships are equipped with a high pressure gas manifold Allows delivery of regasified LNG directly into a gas pipeline installed on the jetty 5
6 Teesside GasPort Project Layout 6.5 km, 24 Delivery Pipeline Seal Sands SSSI Early Pipe Lay Tees River Horizontal Directional Drill Teesport Tie-In 8 Nitrogen Pipeline PX Gas Plant Excelerate Jetty AGI NTS 6
7 Primary project drivers Be in-service by end December 2006 Respond to market price signals Accommodate wide range of LNG specifications Key characteristics Teesside GasPort Project Overview Deliver 400 million cubic feet per day (mmcfd) of natural gas (11.3 million cubic meters per day) with expansion to 600 mmcfd from 2008 Provide the ability to accommodate market needs (variable output) Minimize onshore infrastructure and time to market Design as intrinsically safe with no LNG inventory onshore, and reduced planning impact Total development and construction cost of approx. 30 million 7
8 Project Team Selection The Right Team Makes all the Difference Excelerate Energy (EE) Project sponsor and developer of GasPort technology Gas Strategies Project development support and insight throughout the process PD Teesport Limited - Port Authority for the port at Teesside Lessor of jetty lease and easements for the project Invaluable in relation to local project support px (TGPP) Limited operator of the Teesside Gas Processing Plant Provider of O&M and transportation services to EE through existing NTS access point Experienced company with strong relationships in Teesport 8
9 Project Team Selection The Right Team Makes all the Difference Murphy Pipelines Provider of pipeline and infrastructure design and construction Respected contractor with extensive experience in building to National Grid specifications MouchelParkman GEL Engineering and design contractor providing support for Murphy Pipelines Key part of the team supporting EE throughout the permit application and development process BOC Limited Provider of nitrogen supply to the project from existing facilities Capable team that developed a rapid nitrogen solution to accommodate virtually any LNG source in the world 9
10 Teesside GasPort Design Basis Component Summary Regasification Vessel Sub-Terminal South Bank Onshore offloading arm Gas blending/heating system Pressure control and associated protection systems 24 (600 mm) Pipeline Sub-Terminal North Bank NTS Entry North Bank Gas quality monitoring and NTS entry (fiscal) metering system Sub terminal pressure/flow control Existing px train 1 and train 2 10
11 The Excelerate Jetty A.K.A. The Former Shell Jetty Existing jetty structurally sound requiring refurbishment to bring it up to acceptable standards Agreements finalized with PD Teesport for jetty lease, land use, dredging, works license and conservancy dues Limited maintenance dredging required to return the ship pocket to its original state (sufficient depth) 11
12 Sub-Terminal Onshore Equipment A secure Sub-Terminal being built on land adjacent to the Excelerate Jetty, containing: Flow metering for control and nitrogen blending purposes Pressure control / reduction / heating equipment to step down from 100 bar ship delivery to NTS pressure (50 to 75 bar) Fire and gas safety systems including water deluge Site security Sub-Terminal site Old mooring anchors removed from Jetty Teesside power in background - Largest UK CCGT 12
13 px Terminal Connection to the NTS Gas quality measurement and fiscal metering to be located at px facility Access to NTS through existing px Network Entry Agreement No new System Entry Point required Around 40MCMD of capacity surplus at Teesside New works at px Ltd comprise additional: Gas metering Quality monitoring (to NTS standards) National Grid very helpful re metering Tie-in point for the 24 gas pipeline adjacent to the px plant site 13
14 Nitrogen Availability Supply from BOC BOC s largest UK Oxygen plant (with Nitrogen as a byproduct) is located around 2km from the Excelerate Jetty BOC will supply high-pressure nitrogen to the Excelerate Jetty, allowing receipt of a broader range of LNG supplies BOC will pump liquid Nitrogen to 105+ bar and then gasify it New 8 high pressure N2 pipeline being built within Murphy Pipelines scope Tie-in point for the 8 nitrogen line at the BOC facility 14
15 PD Teesport have consulted with all local stakeholders in relation to LNG vessel movements on the Tees Extensive and detailed HAZID Liaison with Isle of Grain and Milford Haven parties Ship Operations HAZID for LNG vessels 15
16 Pipeline Routing Key Issue is Securing Route New 24 pipeline will be owned and operated by px under their existing pipeline Safety Case (as applies to their pipeline to the Teesside Power Plant) Excelerate will have rights to this pipeline Easement and crossing documents developed and discussions with landowners and operators well advanced To date, all parties behaving in a reasonable manner Most agreements in place a few follow ups remain on technical issues Pipeline and associated infrastructure being built to National Grid standards 16
17 Current Status Project On Schedule for Dec Project team working to maintain the December 2006 schedule Engineer, Procure, Install, Commission contract in place with Murphy Pipeline s Ltd Design finalised, with most materials on order and approximately 18.5 million invested to date Key agreements with PD Ports and BOC for jetty use and nitrogen supply respectively have been finalized O&M and related agreements with px being finalised 17
18 Project Consents Process is Advancing Planning application including 281 page Environmental Impact Assessment submitted on 1 June 2006 for the 24 gas and 8 nitrogen pipelines to 2 authorities: Stockton (North side of Tees River) Redcar & Cleveland (South side of Tees River) Statutory Consultees: English Nature - complete section next to SPA by November HSE pipeline safety related issues Environment Agency (EA) Timetable All approvals received on August 31, 2006 In line with expectations project proceeding for a December completion with first cargoes in early January 18
19 Project Risks Key Risks Being Managed Delayed material deliveries (steel pipeline, metering, etc.) Equipment pre-ordered at risk prior to permissions provide protection Delay to completion of pipeline next to SPA (1 Nov schedule) Pre-ordered pipeline allowed installation to commence immediately following planning permission Technical difficulties with HDD under Tees HDD is ongoing and all appears well Delay to BOC works (scheduled completion 5 December) Nitrogen works are progressing on schedule, also thanks to early commitments Wet September to November period hampering construction Delay in completion and installation of gas offloading arm 19
20 Next Steps Ensure successful project implementation in accordance with permissions granted by local authorities Focus on material and equipment delivery schedules Finalize easement and crossing agreements Finalize contracts with px (TGPP) Ltd Manage project risks and maintain overall schedule Continue coordination with regulators, port authority and port tenants Ensure gas delivery by early January
Teesside GasPort. World s first dockside high pressure gas offloading facility for Energy Bridge Regasification Vessels (EBRV)
Teesside GasPort World s first dockside high pressure gas offloading facility for Energy Bridge Regasification Vessels (EBRV) Teesside GasPort Design and Construction of the world s first dockside high
Latest trends -FSRU and FSU
Latest trends -FSRU and FSU Vikas Singh 2013,Kochi 28 th November Content Types of LNG carrier & LNG tank Floating Storage Unit Floating Storage Regasification unit FSRU Design & Construction Mooring Arrangement
AN INNOVATIVE SOLUTION FOR FIXED OFFSHORE LNG REGASIFICATION TERMINALS
AN INNOVATIVE SOLUTION FOR FIXED OFFSHORE LNG REGASIFICATION TERMINALS Augusto Bulte Project Manager Foster Wheeler C/Gabriel García Márquez 2 Las Rozas 28232 Madrid (Spain) ABSTRACT Several developments
Marine Transportation of Compressed Natural Gas
Marine Transportation of Compressed Natural Gas Omid Shakeri, Aghil Barati Iranian Fuel Conservation Organization (IFCO), September 26-27, 2009, The 3rd Iran Gas Forum Introduction Natural gas is rapidly
South Hook Gas Company Ltd is a London-based liquefied natural gas (LNG) import company, which owns and manages the regasification
Energy for growth South Hook Gas Company Ltd is a London-based liquefied natural gas (LNG) import company, which owns and manages the regasification capacity and the gas supply from the South Hook LNG
MARINE TRANSPORTATION OF NATURAL GAS: LNG versus CNG. Dr. Marius Eugen OPRAN MEMBER OF THE EXECUTIVE BUREAU
MARINE TRANSPORTATION OF NATURAL GAS: LNG versus CNG Dr. Marius Eugen OPRAN MEMBER OF THE EXECUTIVE BUREAU Case Study : AZ NG FLOATING DELIVERIES via GE - to BG & to RO o ONE SUPPLIER AZ: Max. 8 Bn CM/Y
Pandora FLNG Wison Offshore & Marine
Pandora FLNG Wison Offshore & Marine Cott O&G representatives on the Caribbean FLNG vessel, Nantong. Page:1 Contents Project Background Wison Capability FLNG Solution Capital Cost Operational Expenditure
Leasing scheme information
Leasing scheme information Introduction Thank you for your interest in Genesis Housing Association leasing scheme. This information booklet sets out the stages, the requirements and the factors you will
Design and Construction of LNG Regasification Vessel
Design and Construction of LNG Regasification Vessel GASTECH 2005 March 14 17, 2005 Bilbao, Spain Hochung Kim, JungHan Lee Daewoo Shipbuilding & Marine Engineering Co. Ltd. (DSME) Gastech 2005 Design and
Single Point Mooring System (SPM) for an Offshore LNG Terminal
Single Point Mooring System (SPM) for an Offshore LNG Terminal GASTECH 2005, Session 7 - Technical Bilbao, March 15 th, 2005 Max Krekel Senior Naval Architect Bluewater Offshore Production Systems Neal
LNG terminal project in Lithuania November, 2012
LNG terminal project in Lithuania November, 2012 Areas of activities Klaipedos nafta Oil transshipment terminal LNG Terminal Klaipėdos Nafta 2 LNG Terminal Project - Background The necessity to have an
PLANNED ENHANCEMENTS, NORTHEAST NATURAL GAS PIPELINE SYSTEMS (as of 9-25-14)
PIPELINE SYSTEMS (as of 9-25-14) The Northeast Gas Association (NGA) has prepared this summary based on publicly-available information. NGA will strive to keep the information as updated as possible and
London Array Off-Shore Wind Farm
London Array Off-Shore Wind Farm 1 Jamie R Mathlin Construction Manager Off-Shore Sub-Stations Project Commissioning Manager 27 Years Experience in the Power Industry Grid Trained Electrical Engineer 10
LNG Terminal in Lithuania Security of Gas Supply
LNG Terminal in Lithuania Security of Gas Supply Tadas Matulionis Deputy Director, LNG Terminal Klaipėdos Nafta November, 2013 Gas Naturally Event, Brussels Content 1. Security of Gas Supply 2. The LNG
Carbon Capture & Storage Reliable cost effective CO 2 shipping through statistical modelling
Carbon Capture & Storage Reliable cost effective CO 2 shipping through statistical modelling The Hague November 1st, 2011 Cees van der Ben Note This document and all information contained herein are the
Class Environmental Assessment Process Guide
Class Environmental Assessment Process Guide The Environmental Assessment (EA) process is a planning tool used to identify the possible adverse effects of proposed infrastructure projects on the environment.
APPLICATION PROCEDURES FOR PLACEMENT OF UNDERGROUND WATER AND SEWER PIPELINES IN THE VICINITY OF TRANSPORTATION FACILITIES UNDER THE
APPLICATION PROCEDURES FOR PLACEMENT OF UNDERGROUND WATER AND SEWER PIPELINES IN THE VICINITY OF TRANSPORTATION FACILITIES UNDER THE JURISDICTION OF ALBERTA TRANSPORTATION 1.0 Application Procedures 2.0
The Pipelines Regulations, 2000
PIPELINES, 2000 P-12.1 REG 1 1 The Pipelines Regulations, 2000 being Chapter P-12.1 Reg 1 (effective April 1, 2000) as amended by the Statutes of Saskatchewan, 2014, c.21. NOTE: This consolidation is not
TECHNICAL INFORMATION
Page: 1/6 This checklist recognizes the major accident hazards found by experience of previous HAZID studies. It is not intended to be totally exhaustive and feedback from users should be incorporated
Asset Management Conformity Assessment Fitness for Service QHSE. Oil & Gas Services and Tools. For the benefit of business and people
Asset Management Conformity Assessment Fitness for Service QHSE Oil & Gas Services and Tools For the benefit of business and people Services along the whole life of Facilities Bureau Veritas services can
SC KLAIPĖDOS NAFTA 9 MONTHS 2014 RESULTS. 9 months 2014 results 1
SC KLAIPĖDOS NAFTA 9 MONTHS 2014 RESULTS 9 months 2014 results 1 Main activities Klaipedos nafta Subačius fuel storage (SFS) Oil transshipment terminal Liquefied Natural Gas Terminal (LNG) 9 months 2014
Loading Master Training 2015
Loading Master Training 2015 HSE, knowledge, insight, awareness, skill, control, efficiency, time to name just a few are the necessary foundations for tank terminal and marine operations. This has led
26.3.3 The Ship/Shore Safety Check-List
International Safety Guide for Oil Tankers and Terminal Fifth Edition 2006-12-05 26.3.3 The Ship/Shore Safety Check-List Ship's Name Berth Date of Arrival Port Time of Arrival Part `A' - Bulk Liquid General
Announcement on Providing Guarantee for the Subsidiary Company - Offshore Oil Engineering (Qingdao) Co., Ltd. by Offshore Oil Engineering Co., Ltd.
Announcement on Providing Guarantee for the Subsidiary Company - Offshore Oil Engineering (Qingdao) Co., Ltd. by Offshore Oil Engineering Co., Ltd. Important Notes The board of directors and all the directors
Frequently Asked Questions About. Japan s Feed-in- Tariff System
Frequently Asked Questions About Japan s Feed-in- Tariff System Spring 2013 JAPAN S FEED-IN-TARIFF SYSTEM SPRING 2013 Naoki Watanabe 1. What are the Key Steps in the Process of Getting FIT Approval of
THE DELTON GROUP MANPOWER TRAINING CONSULTANCY SHORT COURSE PROGRAMME TOPICS LISTING
THE DELTON GROUP MANPOWER TRAINING CONSULTANCY SHORT COURSE PROGRAMME TOPICS LISTING Delton Short Course Programmes English Language Technical English Language English Language for the Oil Industry Oil
Watco Companies, L.L.C. NUTC Oil Panel Discussion Terminal Perspective Evanston, IL June 11, 2014 Stefan Loeb SVP Marketing & Strategic Development
Watco Companies, L.L.C. NUTC Oil Panel Discussion Terminal Perspective Evanston, IL June 11, 2014 Stefan Loeb SVP Marketing & Strategic Development Terminal Perspective: Watco Shale Opportunities CASE
Comanche Trail Pipeline Project. September 2015
Comanche Trail Pipeline Project September 2015 2 Comanche Trail Pipeline Project The Comanche Trail Pipeline is a Texas intrastate pipeline (1) designed to transport 1.1 billion cubic feet per day of clean-burning
Triton Knoll Offshore Wind Farm Limited Electrical System. Outline Traffic Management Plan
Triton Knoll Offshore Wind Farm Limited Electrical System Outline Traffic Management Plan October 2014 RWE Innogy UK Triton Knoll TMP Copyright 2014 RWE Innogy UK Ltd All pre-existing rights reserved.
BONATTI: COMPANY OVERVIEW
BONATTI: COMPANY OVERVIEW Bonatti is an International General Contractor which provides Engineering, Procurement, Construction and Operation & Maintenance Services to the Oil & Gas and Power Industry.
Gas Marketplace Work? July 9-13, 2007
What Makes a Natural Gas Marketplace Work? July 9-13, 2007 Accra TOPIC I: Resource & Infrastructure Investment for Delivery Key value chain components Physical Infrastructure Gathering Removal of basic
Ultrasonic Gas Leak Detection
Ultrasonic Gas Leak Detection What is it and How Does it Work? Because every life has a purpose... Ultrasonic Gas Leak Detection Introduction Ultrasonic gas leak detection (UGLD) is a comparatively recent
Electric heat tracing
PIPELINE DESIGN Figure 1. Shorter, more complex piping at a process plant. Electric heat tracing Neil Malone, Heat Trace, UK, discusses electric heat tracing of long pipelines. In considering electric
Propane-Fueled Microturbine: Case Study
Propane-Fueled Microturbine: Case Study Potential of Propane as a Microturbine Fuel Microturbine generators are small turbine generators targeted for the distributed generation marketplace and located
TransGas General Overview
TransGas General Overview TransGas General Overview TransGas Facilities Many Islands Pipe Lines (Canada) Limited TransGas and Adjacent Systems Primary Business Overview The Saskatchewan Market TransGas
MLD: Domestic Maritime Transport Project
Environmental Monitoring Report Project Number: 37265 December 2010 MLD: Prepared by Japan Port Consultants Co., Ltd. Malé, Maldives For Ministry of Finance and Treasury Ministry of Transport and Communication
SMALL GAS OPERATOR OPERATION AND MAINTENANCE PLAN
SMALL GAS OPERATOR OPERATION AND MAINTENANCE PLAN Facility Name: Address: QUALIFIED PERSONNEL All tasks shall be completed by a person that is qualified to that task (see operators qualification of individuals
Integrated Risk Management Solutions
Integrated Risk Management Solutions Our services 2 RPS Integrated Risk Management Solutions provides specialist HSE & Risk Management consultancy services to the energy industry and other major hazard
Marsh is a leading broker and risk adviser for FSRU projects. Marsh Insights:
DECEMBER 2012 Marsh Insights: lng FSRUs A guide to risk and insurance The energy industry is evolving. As the costs of traditional energy sources increase, so too will the demand for alternative sources.
DONG Energy offshore wind experience
DONG Energy offshore wind experience Future Tendering Process for Offshore Wind Energy February 10th 2011 Per Hjelmsted Pedersen Head of Project Development DONG Energy Renewables DONG Energy Renewables
New England Pipeline Safety Seminar October 22, 2014
New England Pipeline Safety Seminar October 22, 2014 Chris Christopoulos, Jr. Lebanon Fire Department Portable-Pipelines.com Slide - 1 Portable Pipeline Sometimes called a Virtual Pipeline, is method for
Norsk Olje og gass Selbusjøen 21.5.2014. www.eninorge.com
Norsk Olje og gass Selbusjøen 21.5.2014 www.eninorge.com Innholdet i presentasjonen Goliat værdata Goliat innretningen valg av løsninger Risikostyring i arktiske strøk Lysarkene er hovedsakelig skrevet
Committees: Dates: Item no. Community and Children's Services Committee Projects Sub 10/07/2015 21/07/2015. Gateway 3/4 Options Appraisal.
Committees: Dates: Item no. Community and Children's Services Committee Projects Sub 10/07/2015 21/07/2015 Subject: Heating and hot water equipment replacement - Golden Lane Estate. Report of: Director
Bondholders Report. Six months ended 30 September 2010
Six months ended 30 September 2010 Bondholders Report We would like to thank you for your investment in our business. We d also like for you to get to know us a bit better. This short report summarises
Operational Review and Outlook
TD Newcrest Oil Sands Conference Calgary July 2009 Operational Review and Outlook Paul M. Boechler Chief Financial Officer Trading Information Strategy Flint s Markets and Geographic Footprint Business
Planning Act 2008: Guidance on Changes to Development Consent Orders. December 2015 Department for Communities and Local Government
Planning Act 2008: Guidance on Changes to Development Consent Orders December 2015 Department for Communities and Local Government Crown copyright, 2015 Copyright in the typographical arrangement rests
lng FSRUs A guide to risk and insurance
Marsh Insights: lng FSRUs A guide to risk and insurance The energy industry is evolving. As the costs of traditional energy sources increase, so too will the demand for alternative sources. Many nations
LNG Poised to Significantly Increase its Share of Global Gas Market David Wood February 2004 Petroleum Review p.38-39
LNG Poised to Significantly Increase its Share of Global Gas Market David Wood February 2004 Petroleum Review p.38-39 For the past few years LNG has experienced high levels of activity and investment in
PIPELINE ROUTING PERMIT. For A NATURAL GAS PIPELINE DAKOTA AND RAMSEY COUNTIES ISSUED TO NORTHERN STATES POWER COMPANY D/B/A XCEL ENERGY
PIPELINE ROUTING PERMIT For A NATURAL GAS PIPELINE IN DAKOTA AND RAMSEY COUNTIES ISSUED TO NORTHERN STATES POWER COMPANY D/B/A XCEL ENERGY PUC DOCKET No. G002/GP-05-1706 In accordance with the requirements
LOGISTICS SOLUTION FOR NUSTAR ENERGY
LOGISTICS SOLUTION FOR NUSTAR ENERGY We look forward to a continued working relationship with Energy Solutions. Energy Solutions has shown us a commitment to our partnership backed by a sound technology
OFFSHORE WIND PROCUREMENT
OFFSHORE WIND PROCUREMENT Raymond Cravitz Procurement Manager 17 09 2015 Irish Sea DONG Energy is a leading energy group in Northern Europe Overview #1 in Danish energy markets Global leader in offshore
OFFSHORE OIL & GAS SECTOR STRATEGY 2014 TO 2017
STRATEGIC CONTEXT OFFSHORE OIL & GAS SECTOR STRATEGY 2014 TO 2017 1 This strategy sets out how HSE s Energy Division will regulate health and safety of the offshore oil and gas industry operating on the
Table 5 Core Port and Transport Logistic Measures: Definitions, priorities, and sources of data
Table 5 Core Port and Transport Logistic Measures: Definitions, priorities, and sources of data (Work in progress, latest revision 24 February, 2004 - PeteR)) Core Measure Unit Priority Definition of Term
Mercator Limited. Driven by growth Sustained by values
Mercator Limited Group Driven by growth Sustained by values 1 Mercator at a Glance History Incorporated in 1983. Listed on both NSE and BSE Capacity Expansion by more than 1200% since 31 st March 2003
References ONSHORE. Weir LGE Process. Excellent Engineering Solutions ONSHORE REFERENCES
Weir LGE Process REFERENCES Ammonia Buffer Storage Product Storage, Export and Boil-Off Gas Facility Engro Chemical Pakistan Limited Engro Chemical Pakistan Limited Pakistan Daharki, Pakistan Project
OUR CONVERSATION TODAY
OUR CONVERSATION TODAY Our goal is to raise the level of awareness around the natural gas supply chain among key stakeholders in order to facilitate positive working relationships and more informed decision
CMPDI. An ISO 9001Company. R.K.Chopra Director (Tech/RD&T), CMPDI, Ranchi, INDIA
Development of CBM in India: An Overview Flare of Methane at Moonidih R.K.Chopra S R Pump at Moonidih Director (Tech/RD&T),, Ranchi, INDIA Presentation outline India s energy scenario Coal: Reliable source
OPTIONS FOR COMMERCIAL GAS DEVELOPMENT OF MARGINAL FIELDS
OPTIONS FOR COMMERCIAL GAS DEVELOPMENT OF MARGINAL FIELDS Gabriel N. Bujulu Principal Petroleum Engineer TANZANIA PETROLEUM DEVELOPMENT CORPORATION PRESENTATION OUTLINE! Introduction! Origin of Natural
Natural Gas Storage in Alaska
Presentation to the South Central Alaska Energy Forum Brian E. Havelock Alaska Department of Natural Resources Division of Oil & Gas September 20, 2006 Presentation Outline 1. Introduction to Underground
Natural Gas Utilization in Ghana. West African Gas Pipeline Project History and Technical Description
atural Gas Utilization in Ghana West African Gas Pipeline Project History and Technical Description West African Gas Pipeline Company Ltd. Workshop on atural Gas - Abuja February 5-9, 2007 Welcome to this
ENVIRONMENTAL & SOCIAL IMPACT ASSESSMENT (ESIA) FOR PRINOS OFFSHORE DEVELOPMENT PROJECT ANNEX 15: TRAFFIC MANAGEMENT PLAN
: Pioneer in integrated consulting services March 2016 PRINOS OFFSHORE DEVELOPMENT PROJECT THIS PAGE IS LEFT INTENTIONALLY BLANK Page ii Environmental Consultant: LDK Engineering Consultants SA Date: 04/03/2016
DAWEI Sea PROJECT Port Project DAWEI AND THE REGION
February 2012 DAWEI Sea PROJECT Port Project DAWEI AND THE REGION PROJECT LOCATION Kunming India Middle East / Europe Dawei Africa Asia Regional Hub DAWEI Sea PROJECT Port Project DAWEI PROJECT OVERVIEW
Synfuels GASRICH Transport Light Gas Technology
Synfuels GASRICH Transport Light Gas Technology Storage and Transport of Light Gas and LNG Blends Abstract The Liquefied Natural Gas (LNG) industry is well established and growing. Recently depressed Natural
Boskalis: at home in the Middle East
Boskalis: at home in the Middle East Boskalis Westminster Middle East Ltd ( Boskalis ) has been active in all countries of the Middle East since the Oil States emerged in the early seventies. Dredging
Suzanne Minter. Manager, Oil and Gas Consulting BENTEK Energy. Natural Gas Outlook
Suzanne Minter Manager, Oil and Gas Consulting BENTEK Energy Natural Gas Outlook North American Natural Gas The Fertilizer Institute November, 2014 2013 Platts, McGraw Hill Financial. All rights reserved.
TECHNIP AT A GLANCE 2014
TECHNIP AT A GLANCE 2014 Unique range of activities A world leader in project management, engineering and construction for the energy industry S U B S E A OFFSHORE Subsea infrastructures, from deep to
Completion of Acquisition: New England - New York Cross Sound Cable
28 February 2006 ASX Announcement Completion of Acquisition: New England - New York Cross Sound Cable Babcock & Brown Infrastructure (ASX: BBI) today announced the completion of the acquisition of the
Petrol Storage Information Note
Petrol Storage Information Note The storage of petrol is governed by specific legislation. These regulations are entitled; Dangerous Substances (Retail and Private Petroleum Stores) Regulations, S.I. 311
Det norske oljeselskap - Our first diving operation. Annual Conference The Norwegian Oil and Gas Association Stavanger, Norway 13.03.
Det norske oljeselskap - Our first diving operation Annual Conference The Norwegian Oil and Gas Association Stavanger, Norway 13.03.13 Diving Operations our starting point Det norske started out with a
Liberty Utilitiec. Samson. Local Plant, Domestic Supply. 4~NORTHSTAR ~i~~~industriesllc ENERGY. ~LH~PJi~C~ La~ Exhibit F~LE
Liberty Utilitiec ENERGY 4~NORTHSTAR ~i~~~industriesllc ~LH~PJi~C~ La~ Exhibit F~LE Local Plant, Domestic Supply NECA Fuel Conference Sept 18, 2014 Who we are Liberty tjtiiiti~ ~ W?\TER~ ~Z?~S ELECtREC
FREMANTLE PORTS. A Guide to Our Business
FREMANTLE PORTS A Guide to Our Business Our Vision, Mission and Values VISION To be valued by our customers and the community for our leadership and excellence. MISSION To facilitate trade in a sustainable
CRITICAL SUCCESS FACTORS FOR ELECTRICITY GENERATION PROJECTS
17 th INTERNATIONAL CONFERENCE & EXHIBITION ON LIQUEFIED NATURAL GAS ( 17) 17 th INTERNATIONAL CONFERENCE & EXHIBITION ON LIQUEFIED NATURAL GAS ( 17) CRITICAL SUCCESS FACTORS FOR ELECTRICITY GENERATION
Subsea Technology. Alain Marion, Senior VP Assets & Subsea Technology. Investor Day in Brazil, October 4, 2011
Subsea Technology Alain Marion, Senior VP Assets & Subsea Technology Investor Day in Brazil, October 4, 2011 Subsea Technology Technip s Commitment to Subsea R&D Technip Leadership Position Emerging Technologies
LIQUEFIED NATURAL GAS (LNG) Terminal BUSINESS PLAN. 2013 February
LIQUEFIED NATURAL GAS (LNG) Terminal BUSINESS PLAN 2013 February 1 CONTENT Summary... 3 LNG terminal project... 9 LNG terminal technology and infrastructure... 10 LNG terminal and marketing business model...
Undergrounding high voltage electricity transmission. The technical issues
Undergrounding high voltage electricity transmission The technical issues This is an interactive PDF document with clickable links from the contents to all sections and back and also to URL and email links.
Facts about gas physical properties
Facts about gas physical properties Gas as fuel for propulsion of ships status and perspectives Ingeniørhuset, 3. March 2008 By Asger Myken, DONG Energy DONG Energy 2 Agenda Basic information on gas types
Case Study: Sand Removal from 3 Phase Production Separators and Vessels
Case Study: Sand Removal from 3 Phase Production Separators and Vessels Online De-sanding Syphonvac Sand removed whilst vessel in full production no loss of production Reduces deferral costs Reduces critical
NOVEMBER 2015 UPDATE
NOVEMBER 2015 UPDATE 1 Started Sept 2010, fourth Storm since Nov 1998 history of per share growth in prod n & asset value 119.3 MM shares + 6.0 MM options, TSX-V symbol SRX management, Board ownership
Development of a Scottish Government Policy Approach to Repowering. Debbie Harper Arup Glasgow
Development of a Scottish Government Policy Approach to Repowering Debbie Harper Arup Glasgow Overview 1. Overview of Scottish Government s emerging Energy Strategy 2. Summary of Existing Planning Policy
Economics and Financing of Integrated Gulf LNG Project
Economics and Financing of Integrated Gulf LNG Project Collin Visaggio Chief Financial Officer September 2012 Page 2 Cautionary & Forward-Looking Statements Papua New Guinea Poised to Join the Ranks of
Rainwater Harvesting
Rainwater Harvesting With climate change now a reality rather than a speculated possibility, the demand on water resources has gone up, whilst the amount of water available for supply has gone down. Forth
Growing in challenging markets
Growing in challenging markets SABIC site visit Wilton and North Tees 26 November 2015 Copyright Cape Group 2015, All rights reserved. Cape is a registered trade mark of the Cape Group of companies. 1
Regional Gas Market Update
April 22, 2015 Milford, MA Regional Gas Market Update Presentation to: ISO-NE Planning Advisory Committee Tom Kiley Northeast Gas Association Objective NGA S ANTITRUST COMPLIANCE PROCEDURES Adopted by
Why Insurance Cost are Rising for Biogas Power Generation Plants
Why Insurance Cost are Rising for Biogas Power Generation Plants The United Kingdom has approximately 7,000 dairy farmers producing over 90 million tonnes of slurry per year. Traditionally this slurry
HYDROSTATIC TEST PUMPS
HYDROSTATIC TEST PUMPS MANUAL HYDROSTATIC TEST PUMPS Ideal for testing residential water lines. Also for pressure testing small pressure tanks, sprinkler, boiler and solar systems. Lightweight and easy
FINANCIAL AND OPERATING HIGHLIGHTS
Orca Exploration Group Inc. PO Box 3152 Road Town Tortola British Virgin Islands FOR IMMEDIATE RELEASE 30 April 2007 Orca Exploration (formerly EastCoast Energy Corporation) announces its results for the
Rules for Classification and Construction Additional Rules and Guidelines 3 Machinery Installations
VI Rules for Classification and Construction Additional Rules and Guidelines 3 Machinery Installations 5 Guidelines for Design, Equipment and Testing of Gas Welding Installations on Seagoing Ships Edition
The role of technology and knowhow in the sector
The role of technology and knowhow in the sector Japan-Norway Maritime Offshore Technology Seminar Henrik O. Madsen Numerous drivers for new and improved technology in the Maritime Offshore sector Developments