1 Joint Con Edison LIPA Offshore Wind Power Integration Project Feasibility Assessment March 20, 2009
2 Joint Con Edison LIPA Offshore Wind Power Integration Project Feasibility Assessment Table of Contents: Page Executive Summary 2 Beneficial Environmental Impact 3 Background Information 3 Scope and Objectives 4 Options Evaluated 5 Phased-In Approach Phase I 6 Phased-In Approach Phase I 7 Conclusions 9 Next Steps 9 1
3 Executive Summary: Joint Con Edison LIPA Offshore Wind Power Integration Project Feasibility Assessment This report summarizes the findings with respect to a critical aspect of a recently announced joint initiative to investigate the potential of renewable energy. Engineers from Con Edison and LIPA combined forces to determine the feasibility of their transmission systems to connect with and support a large source of new wind power to be located off the south shore of Long Island. The joint study evaluated the necessary electric transmission system requirements that would be required to obtain wind power in increments of 350 MW, an amount that is equivalent to a moderate fossil power generating facility. This initial phase of the project focused only on the necessary electric transmission required for the on-shore portion of the project. The infrastructure and costs for the anticipated offshore wind and transmission to landfall have not yet been evaluated. The study determined the following: For a wind power installation up to 350 MW, a new transmission line from an onshore receiver station to an existing station in northern Queens, combined with a connection to the LIPA transmission system in the vicinity of the Rockaways, is optimal from a simplicity and cost perspective. For a phased wind power installation greater than an initial amount of 350 MW, it would be necessary to build new transmission lines from an on-shore receiver station to a new substation in the vicinity of eastern Queens, combined with a connection to the LIPA transmission system in the vicinity of the Rockaways. In addition, existing transmission lines between LIPA and Con Edison would be reconfigured to connect at the new station, allowing each utility its full access to the wind power. This configuration provides deliverability, reliability, and synergies for future growth and expansion. 2
4 Beneficial Environmental Impact A 350 MW wind facility operating at 30% capacity factor would generate about 920,000 megawatt-hours per year, enough energy for over 250,000 homes. The New York Public Service Commission estimates that every megawatt-hour of displaced fossil power in the state is equivalent to 900 pounds of carbon dioxide or CO 2. Therefore, a wind facility of this size would displace 400,000 tons of CO 2 annually, equivalent to removing 68,000 cars from local roads. New renewable resources will help meet the New York State Renewable Portfolio Standard (RPS) and expected federal renewable energy goals and provide for added fuel diversity. Background Information An interest in reducing the use of fossil fuels for electricity production has generated interest in all types of renewable energy options. For New York City and Long Island, the potential use of offshore wind power appears to be a renewable resource that could provide a significant amount of clean energy to consumers. The practical aspects of harnessing wind and assessing the cost of putting a successful wind project into commercial service are the subject of this study. In theory, any successful wind generation project for the New York metropolitan area must be centralized and large enough to be cost effective. It must interact with the electric grid at a high-voltage transmission level, and provide power on the order of hundreds of megawatts (MW). It must also be close enough to where electricity is used, so that energy can be harnessed economically due to lower transmission costs. A New York City - Long Island area wind project warrants an offshore location due to the sheer size and number of wind turbines, coupled with the availability of strong, consistent and unobstructed wind. Wind s relative low-energy density makes it necessary to build large wind turbines in order to generate reasonable amounts of wind power. An offshore wind facility of this size has distinct advantages over inland options. Oceanbased wind power is stronger, more consistently available, and can be situated closer to New York City and Long Island in contrast to land-based wind facilities in remote regions of the state. Also, land-based wind power availability, rather than that of offshore facilities, tends to drop off during the hottest part of a summer day, which is precisely the time that Con Edison and LIPA customers use the most electricity. The higher transmission costs add to the expense of remote land-based wind power 3
5 Scope and Objectives This study evaluated the necessary transmission reinforcement required for 350 MW and 700 MW of generation. Preliminary analysis showed that more than 700 MW would require significant reinforcement in the transmission system, which would significantly increase the cost of the project. The main objectives of this study include identifying and agreeing on the best interconnection sites, identifying the transmission paths required to deliver wind power to substations of each entity s electric system, and obtaining order of magnitude cost estimates for required transmission system reinforcement. This study identifies the basic transmission system reinforcements required to deliver energy produced by a potential wind farm located off the coast of Long Island in the Atlantic Ocean with a connection to the Con Edison and LIPA electric systems. 4
6 Options Evaluated Northern Queens Con Edison Westchester Northwest Nassau Central Queens 286 MW Southwest Nassau Central Nassau South Brooklyn Rockaway South Nassau Off Shore Station The study considered six separate single points of interconnection. No one solution was considered to be best in all categories of reliability, cost-effectiveness and expandability. A two-phased approach with multiple points of interconnection was then considered. The phased approach has several advantages over the individual options: 1. Large construction costs are distributed at roughly the same level over time. No economies of scale were observed. 2. Multiple points of entry for wind power within both utilities improve flexibility and reliability. 3. The utilization of 138 kv voltage for this project allows for immediate and cost effective connectivity with the existing transmission infrastructure, and provides for a longer run of submarine cable to the wind farm, with minimal need for reactive compensation. 4. The location of the proposed Eastern Queens substation between Con Edison and LIPA provides opportunities for mutual support and sharing of resources, without taxing either utility s present infrastructure limitations. 5. The establishment of the Eastern Queens substation will support future electricity demand growth in the Con Edison service area, and could provide connectivity for potential future generation. 6. The power flows at each stage of development are within the existing transmission-system capabilities. Each phase is described below in detail. 5
7 Phased-In Approach Phase I Phase I of the interconnection assumes the establishment of the offshore wind site with a capacity of 350 MW. New transmission would connect the on-shore station to the LIPA transmission system in the vicinity of the Rockaways, and the on-shore station to the Con Edison transmission system in northern Queens. This phase can accommodate up to 350 MW of wind power, shared equally between LIPA and Con Edison, without impacting the current interchange between the utilities. Power to the Northern Queens station will be provided on a single 138 kv feeder that is routed to pass near the location of the anticipated Eastern Queens transmission station. A spare set of conduits for this line could also be built in anticipation for a second transmission path to be established in Phase II. The following diagram shows the new infrastructure that would be installed during phase 1 in red: 350 MW 175 MW The following table provides a gross order-of-magnitude estimate for the on-shore transmission Phase I infrastructure: Phase I: Wind = 350 MW Cost Description (Transmission Upgrades Only) Costs Northern Queens: 2 Bus Sections, Breakers, MODs $35 On-shore to Northern Queens (1 Transmission path+2nd conduit) $320 LIPA Work At On-Shore Station $60 Total Phase I Costs (2009 $Millions) $415 6
8 Phased-In Approach Phase II Phase II assumes the expansion of an existing 350 MW Phase I facility up to 700 MW. The transmission system will include a new substation at Eastern Queens. The first transmission path is cut at Eastern Queens, leaving one transmission path going to Northern Queens and one transmission path coming from the On-Shore station. A second transmission line is run in parallel to the Eastern Queens / On-Shore station line. Two existing transmission lines between Central Queens and LIPA are rerouted to be intercepted by the Eastern Queens substation. An electrical device called a phase angle regulator is required on the transmission line between Eastern Queens and Northern Queens to regulate power flows from Eastern Queens into the Con Edison system. Phase II can accommodate up to 700 MW of wind power, shared equally between LIPA and Con Edison. Power up to 200 MW for LIPA is tapped at the On-Shore Station as in Phase I, connected to LIPA s Rockaway substation. The remaining power for LIPA will be delivered through the Eastern Queens station by reducing the current net flow from LIPA to Con Edison by 150 MW, from 286 MW to 136 MW. Power for Con Edison can be delivered through the Eastern Queens station into the Northern and Central Queens stations. The following diagram shows the incremental infrastructure changes for phase II in red, and the previous phase I infrastructure in green: 7
9 The following table provides a gross order-of-magnitude estimate for the Phase II expansion of transmission infrastructure as well as the total cost of both phases: Phase II: Wind = 700 MW Cost Description (Transmission Upgrades Only) Costs Eastern Queens 138 kv Station (8 Breakers) $200 Transmission Costs (2nd Trans Path + Reroute) $100 PAR for Eastern Queens to Northern Queens Tie $30 Redirect Con Ed - LIPA Ties thru Eastern Queens $76 LIPA Expansion at On-shore Station N/A Total Phase II Costs (2009 $Millions) $406 Cumulative Costs (Phase I and II) $821 8
10 Conclusions The connection of a large offshore wind power facility is feasible within the context of the current transmission infrastructure of the Con Edison and LIPA utilities. For a wind power installation with capacity up to 350 MW, utilization of the existing station in Northern Queens combined with a connection to the LIPA transmission system in the Rockaways is optimal for simplicity and cost. For an expansion to a larger installation (up to 700 MW) the establishment of a new station in the vicinity of Eastern Queens provides additional capability to supply Con Edison and LIPA with their full share of the expanded wind facility. This solution is optimal for flexibility, reliability improvement, and synergies with future transmission opportunities. Next Steps Con Edison and LIPA are in the process of developing a plan to move the wind project evaluation forward. This would involve a more detailed assessment of the potential options, refinement of interconnection costs and construction plans and conducting an evaluation of the impact that a wind farm would have on grid operations. In order to gather the more detailed information that will be required to perform this assessment, Con Edison and LIPA plan to issue a Request for Information so that equipment manufacturers, wind developers and other interested parties can provide the necessary input. In addition, Con Edison and LIPA plan to initiate the process for installing wind monitoring equipment in the Atlantic Ocean to collect wind data and characteristics to support the assessment of the wind potential off of Long Island and Queens. 9
Overview of Long Island Electric Service Territory
Overview of Long Island Electric Service Territory Long Island Electric Service Territory» Long Island s electric service customers are located in Nassau County and Suffolk County (except for the villages
Product brochure Multi Functional Switchgear PASS M00 72.5 kv Flexible and compact switchgear solutions for windfarms
Product brochure Multi Functional Switchgear PASS M00 72.5 kv Flexible and compact switchgear solutions for windfarms The future of Wind Farms As offshore wind farms move towards deploying higher capacity
Offshore Renewable Energy in Virginia
Offshore Renewable Energy in Virginia Presented to the Renewable Natural Resources Foundation December, 8 2009 Neil Rondorf Vice President, Maritime Operations Science Applications International Corporation
HVDC Technology for Large Scale Offshore Wind Connections
HVDC Technology for Large Scale Offshore Wind Connections Nandan Mahimkar, Gunnar Persson,Claes Westerlind, ABB AB, SE-771 80, Ludvika, Sweden, [email protected], [email protected],[email protected],
Fact Sheet: Siemens Energy in the US
Fact Sheet: Siemens Energy in the US Energy infrastructure overview The U.S. electricity market is the world s largest and accounts for one-fifth both of global power demand and generation capacity. The
New York s Transmission Challenges and Opportunities: An Overview
New York s Transmission Challenges and Opportunities: An Overview By: Dr. Matthew Cordaro 2012 is shaping up to be the year of the grid. Governor Cuomo has proposed an energy highway aimed at finding ways
Developing Ocean Energy in Ireland. Belmullet Wave Energy Test Site
Developing Ocean Energy in Ireland Belmullet Wave Energy Test Site Where does our energy come from? Most of the energy we use in Ireland comes from fossil fuels such as oil, coal, peat and gas. We burn
POWER TRANSMISSION FROM OFFSHORE WIND FARMS
POWER TRNSMISSION FROM OFFSHORE WIND FRMS Thorsten Völker University of pplied Sciences Bremerhaven Germany BSTRCT The future for wind power generation in Germany is offshore wind energy. The preferred
CLEAN LINE ENERGY PARTNERS:
CLEAN LINE ENERGY PARTNERS: Building Transmission To Facilitate Large-Scale Renewable Energy Development Overview: Clean Line Energy Partners is developing four large transmission projects to connect areas
Generation Interconnection Feasibility Study Report-Web Version. PJM Generation Interconnection Request Queue Position Z1-055
Generation Interconnection Feasibility Study Report-Web Version For PJM Generation Interconnection Request Queue Position Z1-055 South Bend Generation Project March 2014 PJM Interconnection 2014. All rights
16 West Coast Regional Plan
16 West Coast Regional Plan 16.1 Regional overview 16.2 West Coast transmission system 16.3 West Coast demand 16.4 West Coast generation 16.5 West Coast significant maintenance work 16.6 Future West Coast
Case Study 5 Use of Wind Turbine Technology
Case Study 5 Use of Wind Turbine Technology 1. Context Hong Kong relies on an adequate and reliable electricity supply for its economic development. Our electricity needs are met by the two electricity
Wind and Energy Markets: A Case Study of Texas.
Wind and Energy Markets: A Case Study of Texas. Ross Baldick Department of Electrical and Computer Engineering [email protected] The University of Texas at Austin May 21, 2010 1 Abstract Many jurisdictions
Optimization of the coupled grid connection of offshore wind farms
Optimization of the coupled grid connection of offshore wind farms Dirk Schoenmakers Graduation project at Evelop Netherlands BV Technical University of Eindhoven September 2008 Supervisors: TU Eindhoven
ERCOT Analysis of the Impacts of the Clean Power Plan Final Rule Update
ERCOT Analysis of the Impacts of the Clean Power Plan Final Rule Update ERCOT Public October 16, 2015 ERCOT Analysis of the Impacts of the Clean Power Plan Final Rule Update In August 2015, the U.S. Environmental
Millennium Pipeline Company, LLC Response to New York State Energy Highway RFI
Millennium Pipeline Company, LLC Response to New York State Energy Highway RFI www.millenniumpipeline.com One Blue Hill Plaza, 7th Floor Post Office Box 1565 Pearl River, N Y 10965 845.620.1300 Voice 845.620.1320
SOUTHERN MARYLAND ELECTRIC COOPERATIVE, INC. HUGHESVILLE, MD
SOUTHERN MARYLAND ELECTRIC COOPERATIVE, INC. HUGHESVILLE, MD HOLLAND CLIFF HEWITT ROAD 230 KV TRANSMISSION LINE PROJECT ELECTRIC ALTERNATIVE EVALUATION STUDY BLACK & VEATCH CORPORATION B&V Project 146026(G)
Austin Energy Resource, Generation and Climate Protection Plan to 2025: An Update of the 2020 Plan
Austin Energy Resource, Generation and Climate Protection Plan to 2025: An Update of the 2020 Plan INTRODUCTION The Austin City Council adopted the Austin Climate Protection Plan (ACPP) in 2007 to build
Grid connection of near shore wind farms
Grid connection of near shore wind farms methods, preconditions and results Rene Starup 5. Marts 2015 1 Topics Methods Preconditions Technical and socio-economic analysis 5. Marts 2015 2 60, 150 and 400
Brochure Introducing HVDC
Brochure Introducing HVDC ABB and HVDC The world s first commercial high-voltage direct current (HVDC) link, situated between the Swedish mainland and the island Gotland, was delivered by ABB already in
Cross-Tie Transmission Line. Ravikanth Varanasi Principal Transmission Planner
Cross-Tie Transmission Line Ravikanth Varanasi Principal Transmission Planner Overview ~213 mile 500-kV transmission line between PacifiCorp s proposed Clover 500 kv substation with NV Energy s Robinson
Power System review W I L L I A M V. T O R R E A P R I L 1 0, 2 0 1 3
Power System review W I L L I A M V. T O R R E A P R I L 1 0, 2 0 1 3 Basics of Power systems Network topology Transmission and Distribution Load and Resource Balance Economic Dispatch Steady State System
New York s Upstate Nuclear Power Plants Contribution to the State Economy
New York s Upstate Nuclear Power Plants Contribution to the State Economy PREPARED FOR New York State IBEW Utility Labor Council Rochester Building and Construction Trades Council Central and Northern
Estimation of electrical losses in Network Rail Electrification Systems
Estimation of electrical losses in Network Rail Electrification Systems Page 1 of 16 Contents 1. BACKGROUND...3 2. PURPOSE...3 3. SCOPE...3 4. DEFINITIONS & ABBREVIATIONS...4 5. NETWORK RAIL INFRASTRUCTURE
Impact of Distributed Generation on Voltage Profile in Deregulated Distribution System
Impact of Distributed Generation on Voltage Profile in Deregulated Distribution System W. EL-KHATTAM M. M. A. SALAMA Electrical & Computer Engineering, Waterloo University, Ontario, Canada Abstract: Due
Loviisa 3 unique possibility for large scale CHP generation and CO 2 reductions. Nici Bergroth, Fortum Oyj FORS-seminar 26.11.
Loviisa 3 unique possibility for large scale CHP generation and CO 2 reductions Nici Bergroth, Fortum Oyj FORS-seminar 26.11.2009, Otaniemi Loviisa 3 CHP Basis for the Loviisa 3 CHP alternative Replacement
Federal Wage System Job Grading Standards for Electric Power Controlling, 5407. Table of Contents
Federal Wage System Job Grading Standards for Electric Power Controlling, 5407 Table of Contents WORK COVERED... 2 WORK NOT COVERED...2 TITLES... 2 GRADE LEVELS... 2 SPECIAL ADDITIONAL RESPONSIBILITIES...
A macro-economic viewpoint. What is the real cost of offshore wind? siemens.com / wind
A macro-economic viewpoint What is the real cost of offshore wind? siemens.com / wind in the cost debate A broader view of the value of renewables. Globally, installed power generation capacity currently
ACCELERATING GREEN ENERGY TOWARDS 2020. The Danish Energy Agreement of March 2012
ACCELERATING GREEN ENERGY TOWARDS The Danish Energy Agreement of March 2012 The most ambitious energy plan of the world In March 2012 a historic new Energy Agreement was reached in Denmark. The Agreement
Photovoltaic in Mexico Recent Developments and Future
Photovoltaic in Mexico Recent Developments and Future Rodolfo Martínez Strevel Berlin, Germany May 23th, 2013 Bufete de Tecnología Solar, S.A. (BUTECSA) Production of Primary Energy in Mexico, 2011 % 7,0
Introduction to The Trans Bay Cable Project
Introduction to The Trans Bay Cable Project We ve come a long way 1 But thanks to the advances of two men and 2 The Battle of Currents 3 Utilities are able to choose the most effective and efficient means
Alternative RE Approach Technical Support Document
Alternative RE Approach Technical Support Document 1.1. Introduction Renewable energy (RE) is a cost-effective approach for reducing carbon dioxide (CO 2) emissions from fossil fuel-fired electric generating
INTRODUCTION TO HARMONIC ASSESSMENT IN POWER SYSTEMS
INTRODUCTION TO HARMONIC ASSESSMENT IN POWER SYSTEMS LIST OF CONTENT 1. INTRODUCTION... 1 2. HARMONIC VOLTAGE ASSESSMENT REQUIREMENT IN THE UK... 2 3. THE ASSESSMENT... 2 3.1. SYSTEM MODELLING...3 3.2.
Renewable Energy on Regional Power Grids Can Help States Meet Federal Carbon Standards
FACT SHEET Renewable Energy on Regional Power Grids Can Help States Meet Federal Carbon Standards In June 2014, the U.S. Environmental Protection Agency (EPA) used its authority under Section 111(d) of
Scope of Restoration Plan
RWG Area Restoration Review Worksheet (10/28/09) EOP-006-02 Directory 8 EOP-005 NYSRG Rule G Text Restoration Plan Requirement R1.Each Reliability Coordinator shall have a Reliability Coordinator Area
4.1.1 Generator Owner 4.1.2 Transmission Owner that owns synchronous condenser(s)
A. Introduction 1. Title: Verification and Data Reporting of Generator Real and Reactive Power Capability and Synchronous Condenser Reactive Power Capability 2. Number: MOD-025-2 3. Purpose: To ensure
About T&D Europe : The association
G. onizza Electra: Doing Business with Energy G. onizza Electra: Doing Business with Energy Electra Doing Business with Energy Efficiency Thursday 15. October 2009, Ljubljana (SI) Electra conclusions in
ITP Evaluation Process Plan Cross-Tie Transmission Line
ITP Evaluation Process Plan Cross-Tie Transmission Line The goal of the coordinated Interregional Transmission Project (ITP) evaluation process is to achieve consistent planning assumptions and technical
FRCC Standards Handbook. FRCC Automatic Underfrequency Load Shedding Program. Revision Date: July 2003
F R C C FRCC Standards Handbook FRCC Automatic Underfrequency Load Shedding Program Revision Date: July 2003 FRCC Underfrequency Load Shedding Program Modification and Approval Process Requests to modify
Who is National Grid?
Who is National Grid? National Grid is a leading international energy infrastructure business In the UK, our business includes electricity and gas transmission networks and gas distribution networks. We
The Leader in Wind Energy
The Leader in Wind Energy About the Cover: The 102-megawatt Red Mesa Wind Energy Center in New Mexico is capable of generating enough electricity to power more than 30,000 homes. NextEra Energy Resources
Magnus Callavik, ABB Power Systems, HVDC, 721 64 Västerås, Sweden Phone: +46(0)21323226. e-mail: [email protected]
HVDC GRIDS FOR OFFSHORE AND ONSHORE TRANSMISSION Magnus Callavik, ABB Power Systems, HVDC, 721 64 Västerås, Sweden Phone: +46(0)21323226. e-mail: [email protected] SUMMARY The objective with this
Passion for Offshore. Wind Power & Renewables Division Market Unit Offshore
Wind Power & Renewables Division Market Unit Offshore Passion for Offshore - Frank Zimmermann, Head of Sales - 5 th British Chamber Conference on Renewable Energy, Hamburg, siemens.com/answers Siemens
LIPA. The. Long Island Power Authority links to the PJM Interconnection with an undersea/underground HVDC link. 20 www.tdworld.com.
Prysmian cable-laying ship Giulio Verne. The LIPA By Christopher Hocker, Neptune Regional Transmission System; Richard M. Kessel, Long Island Power Authority; and John Duschang, Henningson, Durham & Richardson
Electric Power Systems An Overview. Y. Baghzouz Professor of Electrical Engineering University of Nevada, Las Vegas
Electric Power Systems An Overview Y. Baghzouz Professor of Electrical Engineering University of Nevada, Las Vegas Overview Power Generation Conventional power generation Power generation from renewables
Offshore Wind Farm Layout Design A Systems Engineering Approach. B. J. Gribben, N. Williams, D. Ranford Frazer-Nash Consultancy
Offshore Wind Farm Layout Design A Systems Engineering Approach B. J. Gribben, N. Williams, D. Ranford Frazer-Nash Consultancy 0 Paper presented at Ocean Power Fluid Machinery, October 2010 Offshore Wind
Memorandum. This memorandum requires Board action. Executive Summary
California Independent System Operator Corporation Memorandum To: ISO Board of Governors From: Keith Casey, Vice President, Market & Infrastructure Development Date: July 8, 2014 Re: Decision on the Delaney-Colorado
System Protection Schemes in Eastern Denmark
System Protection Schemes in Eastern Denmark Joana Rasmussen COWI A/S, Energy Department System Protection Schemes in Eastern Denmark 1.Advanced system protection schemes are investigated and perspectives
Resource Planning Opportunities
Resource Planning Opportunities A Manitoba Hydro Perspective for the Planning Advisory Committee April 27, 2011 Dan Prowse Manitoba Hydro April 27, 2011 Coordinating Sector 1 It s Time to Model Flexible
Cost Benefit Methodology for Optimal Design of Offshore Transmission Systems
Centre for Sustainable Electricity and Distributed Generation Cost Benefit Methodology for Optimal Design of Offshore Transmission Systems Predrag Djapic and Goran Strbac July 2008 FUNDED BY BERR URN 08/1144
Preparatory Paper on Focal Areas to Support a Sustainable Energy System in the Electricity Sector
Preparatory Paper on Focal Areas to Support a Sustainable Energy System in the Electricity Sector C. Agert, Th. Vogt EWE Research Centre NEXT ENERGY, Oldenburg, Germany corresponding author: [email protected]
Design and Operation of Power Systems with Large Amounts of Wind Power, first results of IEA collaboration
Design and Operation of Power Systems with Large Amounts of Wind Power, first results of IEA collaboration H. Holttinen, P. Meibom, A. Orths, F. Van Hulle, C. Ensslin, L. Hofmann, J. McCann, J. Pierik,
Energy Storage Systems. New solutions for a new energy environment
Energy Storage Systems New solutions for a new energy environment Facilitating the integration of renewable energy The increase in the quantity of electricity produced by renewable sources is creating
Natural Gas & Energy Efficiency: Keys to Reducing GHG Emissions
Natural Gas & Energy Efficiency: Keys to Reducing GHG Emissions Janet Gail Besser, Vice President, Regulatory Strategy NARUC 120 th Annual Convention November 17, 2008 New Orleans, Louisiana Overview 1.
Generation and Transmission Interconnection Process
PJM Manual 14A Generation and Transmission Interconnection Process Revision: 18 Effective Date: January 28, 2016 Prepared by Planning Division Generation Interconnection Department PJM 2016 Table of Contents
Dominion. Dan Weekley Vice President, Corporate Affairs. Dan Stoddard Senior Vice President, Nuclear Operations. March 24, 2016
Dominion Dan Weekley Vice President, Corporate Affairs Dan Stoddard Senior Vice President, Nuclear Operations March 24, 2016 Dominion Profile Power and Natural Gas Infrastructure Overview Leading provider
AMI and DA Convergence: Enabling Energy Savings through Voltage Conservation
AMI and DA Convergence: Enabling Energy Savings through Voltage Conservation September 2010 Prepared for: By Sierra Energy Group The Research & Analysis Division of Energy Central Table of Contents Executive
Viking Link Interconnector
Viking Link Interconnector Public information event for Bicker Parish Why we re here today We re here today to introduce the Viking Link project, to explain what we want to build and to answer any questions
Generation Interconnection System Impact Study Report. For. PJM Generation Interconnection Request Queue Position X1-114.
Generation Interconnection System Impact Study Report For PJM Generation Interconnection Request Queue Position X1-114 Sandyston January 2012 Preface The intent of the System Impact Study is to determine
Modular Systems wind portfolio overview Power Collection and Grid Connection products
Modular Systems wind portfolio overview Power Collection and Grid Connection products Slide 1 Modular Systems wind portfolio Wind power - definition A wind turbine is a device that converts kinetic energy
Summary of Electric Transmission Assessment Report
Summary of Electric Transmission Assessment Report January 2010 Assessment and Analysis of the State-Of-the-Art High-Voltage Electric Transmission Systems with Specific Focus on High-Voltage Direct Current
-1- PSEG-LI Update of LIPA SGIP Full Docw-NYISO reqmts above 10 MW 10-27-14
PSEG-Long Island Smart Grid Small Generator Interconnection Procedures for New Distributed Resources 20 MW or Less Connected in Parallel with LIPA s Radial Distribution Systems -1- PSEG-LI Update of LIPA
ESBI Company Profile. ESB International. Bringing Energy Innovation to the World...
ESBI Company Profile ESB International Bringing Energy Innovation to the World... ESB International ESBI is one of Europe s most progressive and commercially focused electricity consultancy firms with
2012 San Francisco Colloquium
2012 San Francisco Colloquium http : //www.cigre.org Advances in voltage source converter (VSC) technologies B4-6 500 kv VSC Transmission System for lines and cables B. JACOBSON, B. WESTMAN, M. P. BAHRMAN*
Voltage Source HVDC Overview Mike Barnes Tony Beddard
Voltage Source HVDC Overview Mike Barnes Tony Beddard Note: This is a version with images removed which have copyrighted other than from the University of Manchester, for web publication. Should a conference
FIXED CHARGE: This is a cost that goes towards making the service available, including
ELECTRICITY BILL COMPONENTS FIXED CHARGE: This is a cost that goes towards making the service available, including installation and maintenance of poles, power lines and equipment, and 24-hour customer
A Green Sector Overview
A Green Sector Overview Micro Hydro Electric Power Ontario's Waterpower Resources: Past and Present The first hydroelectric generator in Canada was installed near Ottawa, which was the first city in North
About Southern California Edison
About Southern California Edison One of the nations largest investorowned utilities with 125 years of service. Service Area 50,000 square miles Over 430 cities and communities Population Served Nearly
Michigan Nuclear Power Plants Contribution to the State Economy
Michigan Nuclear Power Plants Contribution to the State Economy PREPARED FOR PREPARED BY Mark Berkman, Ph.D. Dean Murphy, Ph.D. September 2015 This report was prepared for Nuclear Matters. All results
Electricity Costs White Paper
Electricity Costs White Paper ISO New England Inc. June 1, 2006 Table of Contents Executive Summary...1 Highlights of the Analysis...1 Components of Electricity Rates...2 Action Plan for Managing Electricity
FACT SHEET. BSES, Delhi - Distribution Network. Power Systems Consultancy from ABB
BSES, Delhi - Distribution Network improve power quality System design for optimal techno-economic distribution network based on current and future load forecast Analysis of existing sub-transmission and
Oahu Wind Integration and Transmission Study (OWITS) Hawaiian Islands Transmission Interconnection Project
Oahu Wind Integration and Transmission Study (OWITS) Hawaiian Islands Transmission Interconnection Project Dennis Woodford Electranix Corporation Winnipeg, Manitoba Canada NREL is a national laboratory
Offshore Wind. IEEE Boston PES - November 16, 2010
Offshore Wind IEEE Boston PES - November 16, 2010 Offshore Wind A high-level overview of offshore wind project development identifying current technologies, challenges, risks and costs. Presented by: Brook
Study to Determine the Limit of Integrating Intermittent Renewable (wind and solar) Resources onto Pakistan's National Grid
Pakistan Study to Determine the Limit of Integrating Intermittent Renewable (wind and solar) Resources onto Pakistan's National Grid Final Report: Executive Summary - November 2015 for USAID Energy Policy
Northport - Norwalk Harbor Cable (NNC) Tie line
September 9, 008 Northport - Norwalk Harbor Cable (NNC) Tie line Technical Assessment of Operating up to NNC Inter Tie STE Ratings Executive Summary Three (3) 38kV submarine cable circuits (Lines 60, 60,
STV. ENDURING. DRIVEN. VISIONARY. ENERGY SERVICES
STV. ENDURING. DRIVEN. VISIONARY. ENERGY SERVICES STV has served the energy industry for more than 25 years, providing services for projects that transport crude oil, refined petroleum products, natural
AORC Technical meeting 2014
http : //www.cigre.org B4-1076 AORC Technical meeting 2014 Construction the North-East Asian Supergrid for Co-prosperity and Peace Kyu-won Jeong, Kwang-hee Hong, Sung-yun Hong, Kab-ho Park, Hong-gyun Kim,
The evolving world of power Opportunities and challenges
The evolving world of power Opportunities and challenges Balancing the need for power with minimum environmental impact Global demand for energy is rising fast, and demand for electricity is rising even
Relion. Power system protection and automation reference Fast substation busbar protection with IEC 61850 and GOOSE
Relion Power system protection and automation reference Fast substation busbar protection with IEC 61850 and GOOSE Fast substation busbar protection with IEC 61850 and GOOSE Falu Elnät AB applies new power
Comparison of Renewable Portfolio Standards (RPS) Programs in PJM States
Regulation or Legislation Geographic Eligibility Reporting Period Banking Credit Multipliers Technology - Specific (set asides) NJ MD DC PA DE HB 1308 / SB 869 (2004) Bill 15-747 (4/12/2005) SB 1030/Act
Renewable Fuels. 2008 24 minutes
2008 24 minutes Teacher Notes: Jodie Ashby B.Sc.B.Ed. Program Synopsis This program begins by looking at why we cannot sustain our current use of non-renewable resources and their environmental effects.
CLASS. Customer Load Active System Services
CLASS Customer Load Active System Services 1 Customer Load Active System Services Offer new services and choice for the future Maximise use of existing assets Delivering value to customers Innovative solutions
Eldorado-Ivanpah Transmission Project WELCOME To Southern California Edison Company s Eldorado-Ivanpah Transmission Project OPEN HOUSE
WELCOME To Southern California Edison Company s Eldorado-Ivanpah Transmission Project OPEN HOUSE 1 1 Welcome to The Eldorado-Ivanpah Transmission Project Open House How is the open house organized? This
Maryland Nuclear Power Plant s Contribution to the State Economy
Maryland Nuclear Power Plant s Contribution to the State Economy PREPARED FOR PREPARED BY Mark Berkman, Ph.D. Dean Murphy, Ph.D. September 2015 This report was prepared for Nuclear Matters. All results
G8 - Contracts for Difference Metering
PUBLIC G8 - Contracts for Difference Metering EMRS Guidance EMR Settlement Limited Version 1.0 12 October 2015 CONTENTS Change Amendment Record...4 1. Introduction...5 2. Purpose...5 3. What is the Electrical
Network Interconnection of Offshore Wind
Network Interconnection of Offshore Wind Prepared for REOLTEC Carlos Aguirre Madrid, December 3rd Experience you can trust. Introducing KEMA A trusted independent partner providing advise throughout the
Medium voltage products. Technical guide Smart grids
Medium voltage products Technical guide Smart grids Contents 2 1. Introduction 8 2 The different components and functions of a smart grid 8 2.1 Integration of distributed renewable energy sources 9 2.2
www.orient-cables.com
AC subsea power cables(ac SPC) 35 kv and below Submarine Optical Composite Power Cable 110kV Submarine Power Cable Composite with FO 220kV Submarine Power Cable Composite with FO 500kV Submarine Power
HVDC-VSC: transmission technology of the future
A bi-pole ± 285 kv HVDC line sandwiched between 3-phase 400 kv HVAC lines. HVDC-VSC: transmission technology of the future A new hybrid HVDC circuit technology using voltage source converters is only half
Levelized Cost of New Electricity Generating Technologies
Levelized Cost of New Electricity Generating Technologies The Energy Information Administration (EIA) produces forecasts of energy supply and demand for the next 20 years using the National Energy Modeling
Preliminary Information Memorandum. Thanet Offshore Transmission Assets. July 2009
Preliminary Information Memorandum Thanet Offshore Transmission Assets July 2009 SUMMARY In April 2009 Ofgem distributed a teaser document, UK Offshore Transmission Investment Opportunity, to investors
MAINTAINING SYSTEM BLACKSTART IN COMPETITIVE BULK-POWER MARKETS
MAINTAINING SYSTEM BLACKSTART IN COMPETITIVE BULK-POWER MARKETS BRENDAN KIRBY and ERIC HIRST Consulting in Electric-Industry Restructuring Oak Ridge, Tennessee Restructuring the electric-power industry