Austin Utility Location & Coordination Committee Agenda Meeting scheduled for Thursday June 30, 2016 One Texas Center, 505 Barton Springs Road, 10th floor Conference Room Time: 2:00 p.m. to 4:00 p.m. Project Contacts: The projects will be reviewed in the order listed after any announcements are made. Allowing for announcements, there should be ample time for discussion of each project; however, the discussion of each could take as little as 5 minutes or as long as 15 minutes to complete. If you have no representative present when your project comes up, the project will be rotated to the end of the agenda. Please sidebar lengthy discussions with the reviewers, if necessary, until the end of the meeting. The AULCC meeting is scheduled for 2 hours; however, the conference room is reserved until 4:30. Project Reviewers: Please keep your side discussions and noise level limited so that the meeting can proceed efficiently. Please make yourself available after the meeting for additional discussions, if requested, with the project managers or consultants. 1 PAR-Dove Springs Recreation Center Expansion UCC-160630-01-01 The City of Austin (COA) desires to expand the existing Dove Springs District Park Recreation Center building at 5801 Ainez Drive, in Southeast Austin. The recreation center was constructed under COA approved Site Plan No. SPC-94-0444C. This expansion will include a new building and a shaded open area which connects the new building to the existing building. An extended fire lane and a fire hydrant is also proposed to meet Fire Code. The existing sidewalk from Ainez Drive to the building will be reconstructed to be ADA compliant. Chan & Partners Engineering (CPE) is responsible for site civil design. The domestic water line will be rerouted to provide water for the new building. A new wastewater line serving the Project Contact (Primary): Zhipeng Xing, E.I.T. 512-480-8155, ext. 25 Project Manager (Owner's): Kevin Johnson, 512-974-9506 Project Engineer: John R. King, P.E. 512-480-8155, ext. 12 zhipengx@chanpartners.com Est. Construction Dates: January 1, 2017 Plan Dist. Date: May 11, 2016 Designer: Chan & Partners Engineering, LLC. (site civil) Design Stage: Preliminary Design
2 SP-Studio East Tower Crane UCC-160630-02-01 Tower Crane installation at 1648 E. 6th Street for a mixed-use multi-family project, Studio East. Project Contact (Primary): Gregory Cole 512-450-8066 gcole@mpconstruct.com Project Manager (Owner's): Gregory Cole 512-450-8066 gcole@mpconstruct.com Project Engineer: Ellis Petersen 512-439-0400 gcole@mpconstruct.com Est. Construction Dates: 7/15/16-11/15/17 Plan Dist. Date: June 6, 2016 Designer: Wilder Belshaw Architects Design Stage: 100%
3 SP-Residence Hall 5 Student Housing UCC-160630-03-01 St Edwards University is planning to construct a new residence hall on the southern portion of the campus adjacent to Woodward Street and Theater Pass. As part of this construction, additional utilties will be installed both within the campus, and in the adjacent Woodward Street right-ofway. As shown on the Utility Plan we are proposing to install several underground duct banks, pull boxes, and manholes for power/telecommunications. Note: the depicted linework is from the final design by Austin Energy. Additionally, an 8" WW line will be installed across Woodward Street to tie to an existing WW manhole. There are several existing utilities within Woodward Street as shown (cable, overhead power, public water, storm sewer, wastewater, gas.) Note that the design engineer has already coordinated with the utility companies as depicted on the Utility Plan. Project Contact (Primary): Russell Tomer, Doucet & Associates, Inc. 512-538-2640 Project Manager (Owner's): Micheal Peterson 512-448-8788 Project Engineer: Russell Tomer, Doucet & Associates, Inc. 512-538-2640 rtomer@doucetengineers.com Est. Construction Dates: 07/01/16 to 07/31/16 Plan Dist. Date: June 7, 2016 Designer: Doucet & Associates, Inc. Design Stage: 100%
4 SP-Springwood Self Storage at 9206 Anderson Mill Road UCC-160630-04-01 The proposed 0.915-acre site is currently developed with two one-story storage unit buildings and associated paving. The proposed development is for one three-story storage unit building and associated infrastructure. The site is located at 9206 Anderson Mill Rd., the Williamson County Parcel No. is R055054. The site is located within the Lake Creek Suburban Watershed. The existing 6-inch waterline (COA #74-0121) runs north and south in the Harmony Hill St. R.O.W. and will be used to serve the site with domestic water and fire protection. Wastewater flows from the site will tie into the existing wastewater manhole (COA #135187) located west of the southwest corner of the property. The proposed stormwater pipe will tie into the existing curb inlet along Anderson Mill Rd. just south of the southwest corner of the property. Work within the ROW to make connections to existing water and stormewater facilities will take place on the following streets: Address Range Street Cross Street 1 Cross Street 2 Project Contact (Primary): Erik Allore 512-441-9493 Project Manager (Owner's): Gemsong N. Ryan, PE Project Engineer: Gemsong N. Ryan, PE eallore@jonescarter.com Est. Construction Dates: 3/1/2017-6/1/2017 Plan Dist. Date: May 18, 2016 Designer: Jones Carter Design Stage: 50%
5 Tower Crane for Kline Hotel at 1109 E 6th St =No5!MUCC-160630-05-01 Tower Crane for Kline Hotel at 1109 E 6th St Project Contact (Primary): MWhite@lottbrothers.com Project Manager (Owner's): Colby Wallis (512) 718-3358 Project Engineer: Ricky Decamps (512) 669-5560 colby@walliscs.com MWhite@lottbrothers.com Est. Construction Dates: 7/15/16 to 10/1/17 Plan Dist. Date: May 17, 2016 Designer: Big Red Dog Engineering Design Stage: 100% Red Stamps
6 SP-Cottages at Lantana (5610 & 5804 Wier Hills Road) UCC-160630-06-01 The site is located within the Williamson Creek Suburban Watershed and Barton Springs Zone. The existing 16-inch waterline (COA W-2002-0527) runs west to east on the north side of the site and then turns and parallels Wier Hills Road towards Rialto Blvd. This line will be used to serve the site with domestic water and fire protection. Wastewater flows from the site will tie into the existing wastewater main (COA 2001-0810) utilizing a proposed manhole located just west of the property. The proposed stormwater system will treat all onsite water and discharge into the existing waterway located in the middle of the site. All offsite water will be collected and diverted to multiple locations of the existing waterway. Work within the ROW to make connections to existing water and stormewater facilities will take place on the following streets: Address Range Street Cross Street 1 Cross Street 2 Project Contact (Primary): Joshua W. Miksch, P.E. (512) 441-9493 Project Manager (Owner's): John Swanson Project Engineer: Joshua W. Miksch, P.E. jmiksch@jonescarter.com Est. Construction Dates: 10/1/2016-4/1/2017 Plan Dist. Date: May 24, 2016 Designer: Jones Carter Design Stage: 90%
7 WPD-Harris Branch Stirling Bridge Wetpond Repair (R01155) UCC-160630-07-01 The Stirling Bridge Subdivision Wetpond has suffered damage at both the inlet and outlet structures due to heavy rains in early 2015. The project will involve widening and armoring both the inlet and outlet structures to prevent further damage. Construction duration is about 2 months. Address Range Street Cross Street 1 Cross Street 2 11840-11948 Gaelic Dr. Culloden Dr. Gaelic Ct. Project Contact (Primary): Sean Thompson 512-974-3387 Project Manager (Owner's): Tom Franke 512-974-1882 Project Engineer: Tom Franke 512-974-1882 sean.thompson@austintexas.gov tom.franke@austintexas.org Est. Construction Dates: 9/1/2016 to 11/1/2016 Plan Dist. Date: May 27, 2016 Designer: Sean Thompson Design Stage: 30%