TENNESSEE GAS PIPELINE COMPANY, L.L.C.
|
|
|
- Silvester Johnston
- 9 years ago
- Views:
Transcription
1 TENNESSEE GAS PIPELINE COMPANY, L.L.C. SILT FENCE DESIGN CRITERIA AND METHODOLOGY FOR THE ACCESS ROADWAYS CONNECTICUT PIPELINE EXPANSION PROJECT CONNECTICUT LOOP Submitted by: Tennessee Gas Pipeline Company, L.L.C Louisiana St, Suite 1000 Houston, TX JULY 2014
2 INTRODUCTION The following description of silt fence design criteria and methodology was performed as part of a comprehensive erosion and sedimentation control design of the Connecticut Expansion Pipeline (Project) within Connecticut. Tennessee Gas Pipeline Company ( Tennessee ) is filing an application for a certificate of public convenience and necessity with the Federal Energy Regulatory Commission ( Commission or FERC ) for the Project in Albany County, New York, Berkshire and Hampden Counties, Massachusetts and Hartford County, Connecticut. The proposed Project involves the construction of two sections of new 36-inch pipeline looping totaling 1.4 miles in New York and 3.8 miles in Massachusetts, and one section of new 24-inch pipeline looping totaling 8.1 miles in Massachusetts and Connecticut. To the extent that it is practicable, feasible, and in compliance with existing law, Tennessee proposes to locate the pipeline loops within or adjacent to the right-of-way ( ROW ) associated with its existing pipelines designated as the 200 and 300 Lines. Tennessee proposes to begin construction of the Project facilities in 2015 and to place the facilities in-service by November DESIGN CRITERIA AND METHODOLOGY In order to reduce runoff velocity and effect deposition of transported sediment load, both standard and reinforced silt fencing has been specified for use in the Connecticut portion of the Tennessee Pipeline Construction areas. As per the Connecticut Guidelines for Soil and Sediment Control (2002, section ), silt fencing placement is applicable where small disturbed areas where the contributing drainage area is less than 1 acre. The maximum slope length for 20 reinforced silt fence is: Slope Steepness Slope Steepness (%) Maximum Slope Length (ft) 2:1 to 3:1 50 to :1 to 5:1 33 to :1 or flatter 20 or less 100
3 As there are no Connecticut State standards for silt fence specification where either maximum slope steepness or slope length is exceeded (as in noted in the above table), Tennessee specifies the use of reinforced silt fence and super silt fence with the following maximum allowable slope length (see standard environmental details at the end of this document): Maximum Slope Length (ft) Above Fence [1] Slope Steepness Slope Percent Super Silt Fence (%) 2: : : : : : [1]This table is based on the table 4.4 Maximum Slope Length for Silt Fence of the PA DEP Erosion and Sediment Pollution Control Manual, 2012, page 76. Locations where reinforced silt barrier slope steepness or slope length are exceeded (as noted in the above table), Tennessee will be utilizing a swale to intercept runoff up gradient of the construction areas, sized appropriately to either transfer flow to a nearby waterbody, if appropriate or directed via storm drainage pipe through the construction area and outletting in a preferred down gradient location. Finally, Silt fence materials will be according to specifications as noted in the Best Management Practices (BMPs) for Construction Activities in Connecticut.
4 Sediment Barrier Backup Calculations Construction in Connecticut ACCESS ROAD TYPE AND NAME SEDIEMNT BARRIER LOCATION (STA. TO STA.) Length of Barrier (FT) SEDIMENT BARRIER TYPE SEDIMENT BARRIER TYPE AND LOCATION - CONNECTICUT ACCESS ROADS ACTUAL SLOPE PERCENT ABOVE ACTUAL SLOPE LENGTH ABOVE ALLOWABLE SLOPE LENGTH ABOVE REMAINING SLOPE LENGTH PERCENTAGE OF SLOPE LENGTH BARRIER (%) BARRIER (FT) BARRIER (FT) (FT) REMAINING CT INCH SILT FENCE % OK CT INCH SILT FENCE % OK CT INCH SILT FENCE % OK CT INCH SILT FENCE % OK SUPER SILT FENCE % OK INCH SILT FENCE % OK CT-4a INCH SILT FENCE % OK SUPER SILT FENCE % OK CT INCH SILT FENCE % OK SUPER SILT FENCE % OK INCH SILT FENCE % OK SUPER SILT FENCE % OK CT-5a INCH SILT FENCE % OK CT INCH SILT FENCE % OK CT INCH SILT FENCE % OK INCH SILT FENCE % OK INCH SILT FENCE % OK INCH SILT FENCE % OK CT-7a INCH SILT FENCE % OK INCH SILT FENCE % OK CT INCH SILT FENCE % OK CT-8A INCH SILT FENCE % OK AT ENTRANCE TO EXIST PAVED LOT RESULT Comments Pipe Yard 1 NE to SE 0' - 475' 475 SUPER SILT FENCE % OK 475' ' INCH SILT FENCE % OK 1035' INCH SILT FENCE % OK SW to NW 0'-1540' 1540 SUPER SILT FENCE % OK 1540' ' 608 SUPER SILT FENCE % OK N edge 268 SUPER SILT FENCE % OK SUPER SILT FENCE 0 0 0% - Pipe Yard 2 SUPER SILT FENCE 0 0 0% - SW to NW 0' - 637' 637 SUPER SILT FENCE % OK N edge 482 SUPER SILT FENCE % OK NE to SE 0' - 460' 857 SUPER SILT FENCE % OK E&S_CALCS_14C4781CT_Sediment Barrier Calculations.xlsx
5
6
TENNESSEE GAS PIPELINE COMPANY, L.L.C.
TENNESSEE GAS PIPELINE COMPANY, L.L.C. HYDROLOGIC & HYDRAULIC CALCULATIONS FOR WATERBODIES CROSSED BY CONNECTICUT PIPELINE EXPANSION PROJECT CONNECTICUT LOOP Submitted by: Tennessee Gas Pipeline Company,
CONSTRUCTION STORMWATER POLLUTION PREVENTION PLAN TEMPLATE
CONSTRUCTION STORMWATER POLLUTION PREVENTION PLAN TEMPLATE The following template may be used as a general guide for development of a Stormwater Pollution Prevention Plan (SWPPP) for construction activities.
SE-10 STORM DRAIN INLET PROTECTION. Objectives
STORM DRAIN INLET PROTECTION SE-10 Objectives Erosion Control - EC Sediment Control - SE Tracking Control - TC Wind Erosion Control - WE Non-Storm Water Management - NS Waste and Materials Management -
Outlet stabilization structure
Overview of Sedimentation and Erosion Control Practices Practice no. 6.41 Outlet stabilization structure Erosion at the outlet of channels, culverts, and other structures is common, and can cause structural
Storm Drain Inlet Protection - IP
Storm Drain Inlet Protection - IP DEFINITION A temporary protective device formed around a storm drain drop inlet to trap sediment. PURPOSE To prevent sediment from entering storm drainage systems, prior
SITE-SPECIFIC BEST MANAGEMENT PRACTICES (BMP) PLAN REVIEW CHECKLIST
This checklist may be used by applicants for encroachment permits, and contractors in development of Site- Specific BMP Plans for projects. plan reviewers will use this checklist to review the Site-Specific
Storm Drain Inlet Protection
Source: Caltrans Construction Site Best Management Practices Manual, 2003. Description Applications Installation and Implementation Requirements Devices installed at storm drain inlets to detain and/or
3.4 DRAINAGE PLAN. 3.4.1 Characteristics of Existing Drainages. 3.4.2 Master Drainage System. Section 3: Development Plan BUTTERFIELD SPECIFIC PLAN
3.4 DRAINAGE PLAN This section describes the existing onsite drainage characteristics and improvements proposed within this Specific Plan. Following this description, drainage plan development standards
City of Shelbyville Site Inspection Checklist
City of Shelbyville Site Inspection Checklist General Information Project Name: KYR10 Permit Number: Date: Project Location: Contractor: Conractor Representative: Inspector's Name: Title: Signature : Weather
STANDARD AND SPECIFICATIONS FOR STORM DRAIN INLET PROTECTION
STANDARD AND SPECIFICATIONS FOR STORM DRAIN INLET PROTECTION Design Criteria Drainage Area The drainage area for storm drain inlets shall not exceed one acre. The crest elevations of these practices shall
Minimizes sediment and debris from entering storm drains that lead to waterways and watercourses.
4.5-p DRAIN INLET PROTECTION Alternative Names: DI protection, Drop Inlet Protection DESCRIPTION Storm drain inlet (DI) protection slows and ponds stormwater, and filters sediment and debris before it
STATEMENT OF ACKNOWLEDGMENT
General Permit for the Discharge of Stormwater and Dewatering Wastewaters from Construction Activities, issued 8/21/13, effective 10/1/13 Stormwater Monitoring Report SITE INFORMATION Permittee: BNE Energy
SECTION 104 PREVENTION, CONTROL, AND ABATEMENT OF EROSION AND WATER POLLUTION
SECTION 104 PREVENTION, CONTROL, AND ABATEMENT OF EROSION AND WATER POLLUTION 104-1 Description. Provide erosion control measures on the project and in areas outside the right-of-way where work is accomplished
CITY UTILITIES DESIGN STANDARDS MANUAL
CITY UTILITIES DESIGN STANDARDS MANUAL Book 2 (SW) SW9 June 2015 SW9.01 Purpose This Chapter provides information for the design of open channels for the conveyance of stormwater in the City of Fort Wayne.
Construction Site Inspection Checklist for OHC000004 By making use of some simple Best Management Practices (BMPs) a construction site operator can
Construction Site Inspection Checklist for OHC000004 By making use of some simple Best Management Practices (BMPs) a construction site operator can do his or her share to protect Ohio's water resources
Storm Drain Inlet Protection
Categories EC Erosion Control SE Sediment Control TC Tracking Control WE Wind Erosion Control Non-Stormwater NS Management Control Waste Management and WM Materials Pollution Control Legend: Primary Category
Basic Elements of Reading Plans
Center for Land Use Education and Research at the University of Connecticut Basic Elements of Reading Plans University of Connecticut. The University of Connecticut supports all state and federal laws
CLACKAMAS COUNTY ZONING AND DEVELOPMENT ORDINANCE
1008 STORM DRAINAGE (3/24/05) 1008.01 PURPOSE To minimize the amount of stormwater runoff resulting from development utilizing nonstructural controls where possible, maintain and improve water quality,
Land Disturbance, Erosion Control and Stormwater Management Checklist. Walworth County Land Conservation Department
Land Disturbance, Erosion Control and Stormwater Management Checklist Walworth County Land Conservation Department The following checklist is designed to assist the applicant in complying with the Walworth
Table 4.9 Storm Drain Inlet Protetion Applicable for
BMP C220: Storm Drain Inlet Protection Purpose To prevent coarse sediment from entering drainage systems prior to permanent stabilization of the disturbed area. Conditions of Use Type of Inlet Protection
Chapter 3 CULVERTS. Description. Importance to Maintenance & Water Quality. Culvert Profile
Chapter 3 CULVERTS Description A culvert is a closed conduit used to convey water from one area to another, usually from one side of a road to the other side. Importance to Maintenance & Water Quality
SAMPLE COPY. Stormwater Pollution Prevention Plan. A site map must be developed and must contain, at a minimum, the following information:
Stormwater Pollution Prevention Plan "I certify under penalty of law that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure
Storm Drain Inlet Protection
Objectives EC Erosion Control SE Sediment Control TR Tracking Control WE Wind Erosion Control Non-Stormwater NS Management Control Waste Management and WM Materials Pollution Control Legend: Primary Objective
SITE-SPECIFIC BEST MANAGEMENT PRACTICES (SSBMP) PLAN/STORM WATER POLLUTION PREVENTION PLAN (SWPPP) REVIEW CHECKLIST
This checklist may be used by applicants for encroachment permits, and contractors in development of Site Specific Best Management Practice (SSBMP) Plans or Storm Water Pollution Prevention Plans (SWPPP)
Index. protection. excavated drop inlet protection (Temporary) 6.50.1 6.51.1. Block and gravel inlet Protection (Temporary) 6.52.1
6 Index inlet protection excavated drop inlet protection (Temporary) 6.50.1 HARDWARE CLOTH AND GRAVEL INLET PROTECTION Block and gravel inlet Protection (Temporary) sod drop inlet protection ROCK DOUGHNUT
CHAPTER 2 CONSTRUCTION STORMWATER POLLUTION PREVENTION
CHAPTER 2 CONSTRUCTION STORMWATER POLLUTION PREVENTION CONTENTS 2.0 INTRODUCTION 2-1 2.1 MIMINUM REQUIREMENT #2 SWPP 2-1 ELEMENT 1: MARK CLEARING LIMITS 2-1 ELEMENT 2: ESTABLISH CONSTRUCTION ACCESS 2-2
Vehicle Tracking Pad
Stormwater Quality Best Management Practices Construction Sites s When to use: Where construction vehicles leave active construction areas onto surfaces where runoff is not checked by sediment controls
BMP-7. A sediment filter or an excavated impounding area around a storm drain drop inlet or curb inlet.
BMP-7 BMP: STORM DRAIN INLET PROTECTION Definition A sediment filter or an excavated impounding area around a storm drain drop inlet or curb inlet. To prevent sediment from entering storm drainage systems
1. It would create hazardous effects of storm water run-off. 3. It would increase hazardous driving conditions on the public road.
SECTION 6: REQUIREMENTS FOR A DRIVEWAY CONNECTION A. Required information. The application shall be accompanied by a sketch of the proposed driveway which at a minimum shall indicate: 1. Geometric information
7.2 CONDITIONAL APPROVAL
SECTION 7.0 GUARANTEE OF PERFORMANCE 7.1 GENERAL REQUIREMENTS In lieu of requiring the completion of all improvements previous to the final approval of a subdivision plan, the Commission may accept a bond
Architectural Processing and Inspections for Home Mortgage Insurance
Page 1 of 5 [Text Only] Architectural Processing and Inspections for Home Mortgage Insurance Directive Number: 4145.1 SITE GRADING AND DRAINAGE GUIDELINES Construction complaints and structural defect
HIGHWAY DEPARTMENT ACCESS AND RIGHT OF WAY WIDTH GUIDELINES
Approved 6/26/01 HIGHWAY DEPARTMENT ACCESS AND RIGHT OF WAY WIDTH GUIDELINES All new, modified and/or changed use access(es) onto county roads shall be subject to the access and corridor protection guidelines
SECTION 5. Sediment Control Measures
SECTION 5 Sediment Control Measures 60. STORM DRAIN INLET PROTECTION When Runoff from earth change activities will discharge to a catch basin or storm drain inlet. A newly constructed catch basin or storm
A. Describe the existing drainage patterns on-site as shown on Map I, including any potential flooding and erosion problems.
19. STORMWATER MANAGEMENT A. Describe the existing drainage patterns on-site as shown on Map I, including any potential flooding and erosion problems. The majority of the approximately ±500 acre Property
Compost-Based Stormwater Best Management Practices Using Compost to Improve Stormwater Management and Erosion Control On Roadsides
Compost-Based Stormwater Best Management Practices Using Compost to Improve Stormwater Management and Erosion Control On Roadsides Chris Newman US EPA Region 5 Chicago, IL Compost-Based BMPs Compost-based
Guidelines for Control of Water Runoff on Small Lots. Revised 6/09
Guidelines for Control of Water Runoff on Small Lots Revised 6/09 Table of Contents Introduction and Purpose 3 Administrative Procedures 3 Plan Submittal Requirements 3 General Design Criteria 4 Dry Wells
Frequently Asked Transmission Pipeline Questions
Frequently Asked Transmission Pipeline Questions Who is PennEast, LLC? PennEast was formed by the partnership of AGL Resources, NJR Pipeline Company, South Jersey Industries and UGI Energy Services (UGIES).
WESTFIELD-WASHINGTON ADVISORY PLAN COMMISSION December 7, 2015 1512-SPP-24 & 1512-ODP-24
Petition Number: Subject Site Address: Petitioner: Request: East side of Oak Road, north of 151 st Street Langston Development Co. Primary Plat and Overall Development Plan amendment review for Mapleridge
Beseck Switching Station Inspection
Page 1 of 5 Docket No. 272 Development and Management Plan Inspection The Connecticut Light and Power Company Certificate of Environmental Compatibility and Public Need for the construction of a new 345-kV
ADS Water Quality Units
ADS Water Quality Units Engineered structures for storm water pollutant removal Water Quality Units Standards for storm water quality will necessarily vary by location and land use. The most targeted sources
Definition of Tower from the Bradley County Zoning Resolution
Definition of Tower from the Bradley County Zoning Resolution 43. TOWER. Any outdoor structure designed and constructed to support one (1) or more transmitting or receiving devices for telephone, radio
RIPRAP From Massachusetts Erosion and Sediment Control Guidelines for Urban and Suburban Areas http://www.mass.gov/dep/water/laws/policies.
RIPRAP From Massachusetts Erosion and Sediment Control Guidelines for Urban and Suburban Areas http://www.mass.gov/dep/water/laws/policies.htm#storm Definition: A permanent, erosion-resistant ground cover
Emergency Spillways (Sediment basins)
Emergency Spillways (Sediment basins) DRAINAGE CONTROL TECHNIQUE Low Gradient Velocity Control Short-Term Steep Gradient Channel Lining Medium-Long Term Outlet Control Soil Treatment Permanent [1] [1]
DRAINAGE :: DRAINAGE CONCERN FREQUENTLY ASKED QUESTIONS
DRAINAGE :: DRAINAGE CONCERN FREQUENTLY ASKED QUESTIONS The City of DeSoto s Department of Development Services is the point of contact for storm drainage related issues. The following are some frequently
SECTION ELEVEN: ACTIVITIES REQUIRING A CERTIFIED EROSION AND SEDIMENT CONTROL PLAN 1
SECTION ELEVEN: ACTIVITIES REQUIRING A CERTIFIED EROSION AND SEDIMENT CONTROL PLAN 1 An application for approval of a soil erosion and sediment control plan in accordance with these regulations shall be
COLORADO DEPARTMENT OF TRANSPORTATION STORMWATER FIELD INSPECTION REPORT - ACTIVE CONSTRUCTION
COLORADO DEPARTMENT OF TRANSPORTATION STORMWATER FIELD INSPECTION REPORT - ACTIVE CONSTRUCTION (1) Project Name: (2) Project Contractor: (3) Erosion Control Supervisor/SWMP Administrator: (4) CDOT Project
City of Paso Robles Community Development Department Construction Site Storm Water Quality Requirements
City of Paso Robles Community Development Department Construction Site Storm Water Quality Requirements Overview of the City s Construction Storm Water Program The City of Paso Robles is committed to protecting
Block and Gravel Inlet Protection (BIP)
Block and Gravel Inlet Protection (BIP) Practice Description Block and gravel inlet protection is a sediment control barrier formed around a storm drain inlet by the use of standard concrete block and
PLANNED UNIT DEVELOPMENT & SIDEWALK WAIVER REQUEST STAFF REPORT Date: November 7, 2013
PLANNED UNIT DEVELOPMENT & SIDEWALK WAIVER REQUEST STAFF REPORT Date: November 7, 2013 NAME LOCATION Audubon Properties, LLC. 4700 & 4960 Dauphin Island Parkway West side of Dauphin Island Parkway, 580
Riprap-lined Swale (RS)
Riprap-lined Swale (RS) Practice Description A riprap-lined swale is a natural or constructed channel with an erosion-resistant rock lining designed to carry concentrated runoff to a stable outlet. This
Activity Yes No N/A Notes
CE 2020 (Rev. 12/11) Page 1 of 5 PROJECT NAME AND SITE ADDRESS: CONTRACT NUMBER: ORACLE NUMBER: WDID NUMBER: CONTRACTOR NAME AND ADDRESS: PROJECT SITE RISK LEVEL: Risk Level 1 Risk Level 2 Risk Level 3
City of Colleyville Community Development Department. Site/Landscape Plan Application Packet
City of Colleyville Community Development Department Site/Landscape Plan Application Packet Development Application Fees City of Colleyville 100 Main Street Colleyville TX 76034 817.503.1050 Zoning Zoning
Small Dam Hazard Assessment Inventory
Small Dam Hazard Assessment Inventory What would happen if your dam were to fail? This is a question that most dam owners hope they will never have to answer. However it is a question you, as a responsible
Chapter 5.0. Stormwater Credits for Innovative Site Planning
Chapter 5.0 Stormwater Credits for Innovative Site Planning Chapter 5. Stormwater Credits...Introduction 5.0 Stormwater Credits In Maryland, there are many programs at both the State and local level that
CONSTRUCTION PERMIT SUBMITTAL CHECKLIST
LAS VEGAS VALLEY STORMWATER QUALITY MANAGEMENT PROGRAM CONSTRUCTION PERMIT SUBMITTAL CHECKLIST (Applies to all Grading Site Development Building and Encroachment Permits and plans including Final Parcel
PLAN VIEW FOR LAKE OR MARSH FRONT VIEW FOR FLOTATION SILT CURTAIN
OF WATERWAY PERIMETER CONTROL LESS THAN / THE STREAM/RIVER STEEL FENCE POST ANCHOR TO LAND (TYP.) / DEPTH OF WATER PLOTTED/REVISED:-OCT-0 WIDTH STREAM BANK TEMPORARY ROCK BERM BRIDGE ABUTMENT, CULVERT
Standard Site Drainage and Erosion Control Details (August 15, 2006)
City of St. Petersburg Construction Services and Permitting Standard Site Drainage and Erosion Control Details (August 15, 2006) Attached are the City Engineer s approved City standards dated September
TREE # 3 CRITICAL ROOT ZONE = 4,536 SF AREA IMPACTED = 50 SF % IMPACTED = 1 % 87.2 80.5 35' BL VALVE IN BOX POP-UP EMITTER 74.7 CLEAN OUT BACKWATER
NOTES: 1. THE INSTALLATION OF EROSION AND SEDIMENTATION CONTROL MEASURES AND PRACTICES SHALL OCCUR PRIOR TO OR CONCURRENT WITH LAND-DISTURBING ACTIVITIES. 2. EROSION AND SEDIMENTATION CONTROL MEASURES
Rational Method Hydrologic Calculations with Excel. Rational Method Hydrologic Calculations with Excel, Course #508. Presented by:
Rational Method Hydrologic Calculations with Excel, Course #508 Presented by: PDH Enterprises, LLC PO Box 942 Morrisville, NC 27560 www.pdhsite.com Calculation of peak storm water runoff rate from a drainage
A perforated conduit such as pipe, tubing or tile installed beneath the ground to intercept and convey ground water. or structures.
BMP: SUBSURFACE DRAIN Definition A perforated conduit such as pipe, tubing or tile installed beneath the ground to intercept and convey ground water. PurRoses 1. To prevent sloping soils from becoming
Storm Water Runoff. Managing. A Self-Assessment Guide for Wisconsin Businesses. Storm water runoff is coming. This guide provides businesses
Managing Storm Water Runoff A Self-Assessment Guide for Wisconsin Businesses Storm water runoff is coming under increasing scrutiny as both a source of pollutants to our lakes and streams, and as a cause
COMMONWEALTH OF KENTUCKY CITY OF LONDON ORDINANCE NO. 2006-19 AN ORDINANCE ESTABLISHING EROSION AND STORM WATER CONTROL
COMMONWEALTH OF KENTUCKY CITY OF LONDON ORDINANCE NO. 2006-19 AN ORDINANCE ESTABLISHING EROSION AND STORM WATER CONTROL For health, safety and welfare reasons, particularly due to problems experienced
Chapter 3 SENSITIVE AREAS AND VEGETATED CORRIDORS
Chapter 3 3.01 General Provisions 3.01.1 Introduction 3.01.2 Application and Interpretation of Chapter 3.01.3 Unbuildable Lots 3.01.4 Other Permits 3.01.5 Prohibited Activities 3.02 Service Provider Letter
Topic 8: Open Channel Flow
3.1 Course Number: CE 365K Course Title: Hydraulic Engineering Design Course Instructor: R.J. Charbeneau Subject: Open Channel Hydraulics Topics Covered: 8. Open Channel Flow and Manning Equation 9. Energy,
STANDARD INSPECTION FORM GENERAL PERMIT FOR STORMWATER ASSOCIATED WITH CONSTRUCTION ACTIVITY
STANDARD INSPECTION FORM GENERAL PERMIT FOR STORMWATER ASSOCIATED WITH CONSTRUCTION ACTIVITY Project Name Permittee NOI # Start Time Inspector s Name(s) Green Card Certification # Inspector s Contact Information
Storm Drain Inlet Protection for Construction Sites (1060)
Storm Drain Inlet Protection for Construction Sites (1060) Wisconsin Department of Natural Resources Conservation Practice Standard I. Definition A temporary device installed in or around a storm drain
Chesapeake Bay Preservation Ordinance Waiver and Exception Process Guidance for Activities in the Resource Protection Area (RPA)
Chesapeake Bay Preservation Ordinance Waiver and Exception Process Guidance for Activities in the Resource Protection Area (RPA) Property owners interested in working in the Resource Protection Area (RPA)
Stormwater Best Management Practice (BMP) Selection and Implementation
Stormwater Best Management Practice (BMP) Selection and Implementation January, 2003 Midwest Research Institute Funding for this program was made possible through a Section 319 Nonpoint Source Management
DESCRIPTION OF STORMWATER STRUCTURAL CONTROLS IN MS4 PERMITS
DESCRIPTION OF STORMWATER STRUCTURAL CONTROLS IN MS4 PERMITS Phase I MS4 permits require continuous updating of the stormwater system inventory owned and operated by the MS4. They also include inspection
Town of Beaumont. Lot Grading Guidelines
Town of Beaumont Lot Grading Guidelines LOT GRADING APPROVAL PROCESS Lot Grading Guidelines... 3 Introduction... 3 Purpose... 3 Definitions... 3 Lot Grading... 3 Lot Grading Plan... 3 Lot Grading Certificate...
The Most Advanced Name in Drainage Systems. Geotextile Products
The Most Advanced Name in Drainage Systems Geotextile Products ADS MEETs YOUR Geotextile NEEDS Advanced Drainage Systems, Inc. (ADS) single wall and N12 dual wall pipe have become the industry standard
Temporary Erosion-Control Measures
A Guide to Temporary Erosion-Control Measures for Contractors, Designers and Inspectors June 2001 North Dakota Department of Health Division of Water Quality A Guide to Temporary Erosion-Control Measures
Post-Wildfire Clean-Up and Response in Houston Toad Habitat Best Management Practices
Post-Wildfire Clean-Up and Response in Houston Toad Habitat Best Management Practices Purpose The purpose of this document is to provide guidance and recommendations for minimizing potential impacts to
Operations and Maintenance Plan The Residences at Johnson Farm 189 Landham Road Sudbury, Massachusetts. Submitted to: Town of Sudbury
Operations and Maintenance Plan The Residences at Johnson Farm 189 Landham Road Sudbury, Massachusetts Submitted to: Town of Sudbury December 2011 Table of Contents 1.0 Introduction... 1 1.1 Responsibility...
SeCTion 656 - TemPoRARy Soil erosion and WaTer pollution ConTrol sewpcp requirements
Appendix C SECTION 656 - TEMPORARY SOIL EROSION AND WATER POLLUTION CONTROL 656.1 Responsibility of the Contractor-Prepare and Follow Plan. The Contractor shall provide continuous and effective temporary
PROJECT COST ESTIMATE ASSUMPTIONS AND EXCLUSIONS
C PROJECT ESTIMATE ASSUMPTIONS AND EXCLUSIONS In support of the alternatives development process, preliminary cost estimates were prepared for each of the three Candidate Build Alternatives. The cost estimates
SUSTAINABLE URBAN DRAINAGE SYSTEMS
overflow can lead into a permeable conveyance system to increase further the benefit and reduce the need for pipe systems. Pollutant removal rates have been shown to be high, with some pollutants being
Bond Release Process for New Subdivision Developments in Fairfax County
Bond Release Process for New Subdivision Developments in Fairfax County An Overview for Homeowners Associations A Fairfax County, Va., publication April 2009 For more information or to request this document
Comments on: Middlesex School East Fields Athletics Drainage Calculations Samiotes Consultants, Inc., 16 November 2004
Comments on: Middlesex School East Fields Athletics Drainage Calculations Samiotes Consultants, Inc., 16 November 2004 submitted to Massachusetts Department of Environmental Protection by William W. Walker,
TCEQ TPDES CGP EPA NPDES GCP Inspection of Controls Report
TCEQ TPDES CGP EPA NPDES GCP Inspection of Controls Report Complete this form every seven days and after every rain event of 0.5" or greater and retain in your SWP3. General Information Name of Project:
CONSTRUCTION MANAGER S WEEKLY PROGRESS REPORT
Volkert Field Office 80 M Street SE, Suite 725 Washington, DC 20003 RIVERSMART WASHINGTON - CONSTRUCTION RIVERSMART MACFARLAND, RIVERSMART LAFAYETTE AND GREEN ALLEYS CHEVY CHASE D.C. Contract No.: DCKA-2013-C-0160
Homeowner s Guide to Drainage
Homeowner s Guide to Drainage a scottsdale homeowner s guide to drainage produced by the city of scottsdale s stormwater management division Transportation Department TABLE OF CONTENTS Introduction 2 Drainage
Storm Drainage Systems 11.9-1
Storm Drainage Systems 11.9-1 11.9 Gutter Flow Calculations 11.9.1 Introduction Gutter flow calculations are necessary in order to relate the quantity of flow (Q) in the curbed channel to the spread of
Environmental Case Study Decatur, Georgia, DeKalb County A Suburban Creek Resists Channelization
Introduction A visual examination of Doolittle Creek in a highly developed suburban county in Georgia yielded telltale signs of a creek whose original streambed had been altered. Examination of official
Natural Gas Summit 11/14/12
Natural Gas Summit 11/14/12 1 Natural Gas Summit 11/14/12 Maureen Ball Joined Central New York Oil and Gas (Inergy) in 1999. Participated in the development and construction of various storage, compression,
Prattsville Berm Removal Project. 1.0 Project Location
Prattsville Berm Removal Project 1.0 Project Location The project site is located between the New York State Route 23 Bridge over the Schoharie Creek and the Schoharie Reservoir. The restoration plan encompassed
STORM DRAINS CHAPTER 7
CHAPTER 7 Chapter 7 - Storm Drains A storm drain is a drainage system that conveys water or stormwater, consisting of two or more pipes in a series connected by one or more structures. Storm drains collect
Storm Drain Inlet Protection for Construction Sites (1060)
Storm Drain Inlet Protection for Construction Sites (1060) Wisconsin Department of Natural Resources Conservation Practice Standard I. Definition A temporary device installed in or around a storm drain
Operations and Maintenance
Seattle Public Utilities Green Stormwater Infrastructure: O&M Program Operations and Maintenance O&M Maintenance Took Kit 1. Landscape Maintenance Manual 2. GSI/LID Maintenance Manual for ROW 3. Identifiable
PLANNED ENHANCEMENTS, NORTHEAST NATURAL GAS PIPELINE SYSTEMS (as of 9-25-14)
PIPELINE SYSTEMS (as of 9-25-14) The Northeast Gas Association (NGA) has prepared this summary based on publicly-available information. NGA will strive to keep the information as updated as possible and
Floodplain Development Land Use Review
COMMUNITY DEVELOPMENT DEPARTMENT Planning Division P.O. Box 490 333 Broadalbin Street SW Albany, OR 97321 Phone 541-917-7550 Fax 541-791-0150 www.cityofalbany.net Floodplain Development Land Use Review
STORM WATER MANAGEMENT HANDBOOK FOR CONSTRUCTION ACTIVITIES
STORM WATER MANAGEMENT HANDBOOK FOR CONSTRUCTION ACTIVITIES Prepared by City of Houston Harris County Harris County Flood Control District 2006 Edition NOTICE TO USERS The Storm Water Management Handbook
Travel Time. Computation of travel time and time of concentration. Factors affecting time of concentration. Surface roughness
3 Chapter 3 of Concentration and Travel Time Time of Concentration and Travel Time Travel time ( T t ) is the time it takes water to travel from one location to another in a watershed. T t is a component
Burnsville Stormwater Retrofit Study
Burnsville Stormwater Retrofit Study Prepared for City of Burnsville June 2006 4700 West 77 th Street Minneapolis, MN 55435-4803 Phone: (952) 832-2600 Fax: (952) 832-2601 Burnsville Stormwater Retrofit
Low Impact Development Checklist
New Jersey Stormwater Best Management Practices Manual February 2004 A P P E N D I X A Low Impact Development Checklist A checklist for identifying nonstructural stormwater management strategies incorporated