Moving Ruston Forward. City of Ruston Infrastructure Maintenance and Improvements

Similar documents
in Marina Del Rey Prepared by: County of Los Angeles Department of Public Works

TOWN OF SURFSIDE UTILITY UPGRADE PROJECT Project Completion

Water and Sewer Utilities

Engineering Major Service Actual Budget Projected Request Executive Adopted

City of Auburn Summary of Capital Outlay by Fund and Department

MAIN STREET IMPROVEMENTS Water, Sewer, Stormwater and Streetscape Improvements

Home Drainage & Causes of Basement Flooding. Water

City of Santa Ana. FY 2014/2015 Capital Improvement Program. Broadway/Anahurst to 1 st Improvements. First Street Bridge Replacement

UNIT PRICE LIST January 2009

Chapter 22. Lump Sum Project Guidelines

WESTFIELD-WASHINGTON ADVISORY PLAN COMMISSION December 7, SPP-24 & 1512-ODP-24

CHAPTER 17: STORM SEWER STANDARDS Introduction Administration Standards 17.1

Kansas City s Overflow Control Program

ODOT Major Construction, Bikeways and Enhancements Report for Lucas County. (State Fiscal Years 2007 to 2010)

PROJECT COST ESTIMATE ASSUMPTIONS AND EXCLUSIONS

Roadway Cost Per Centerline Mile Revised June 2014

CHAPTER 8 CIVIL DESIGN

Proposed Program of High Capacity Transit Improvements City of Atlanta DRAFT

Koser Field. 7th St SE 2.25

FY 2011 OHIO SMALL CITIES COMMUNITY DEVELOPMENT BLOCK GRANT COMPREHENSIVE DOWNTOWN REVITALIZATION PROGRAM

PUBLIC WORKS DESIGN, SPECIFICATIONS & PROCEDURES MANUAL LINEAR INFRASTRUCTURE

APPLICATION PROCEDURES FOR PLACEMENT OF UNDERGROUND WATER AND SEWER PIPELINES IN THE VICINITY OF TRANSPORTATION FACILITIES UNDER THE

CHAPTER 4 EXISTING STORMWATER MANAGEMENT SYSTEM

Mayors Welcome Strong Surrey Votes Yes Coalition Support. Yes Vote Would Vastly Improve Transit and Transportation in Fast Growing City

AGENCY COORDINATION AND PUBLIC INVOLVEMENT

SOLD. Lot 1. 1 Mile: Population: 10,200 Median HH Income: $33, Mile: Population: 80,200 Median HH Income: $34,900

SECTION 5 DRAFTING STANDARDS

PLANNED UNIT DEVELOPMENT & SIDEWALK WAIVER REQUEST STAFF REPORT Date: November 7, 2013

SANITARY SEWER SPECIFICATIONS

City of Cape Coral, Florida FY Proposed Operating Budgets

Chapter 4 ASSET INVENTORY AND CONDITION CHAPTER 4 ASSET INVENTORY AND CONDITION PAGE 33

EPA Technical Assistance for Sustainable Communities Building Blocks

CITY OF ROANOKE AND TOWN OF VINTON, VIRGINIA. RSTP Funds Joint Application FOR

Los Angeles County Department Of Public Works. Land Development Division. Bond Calculation Sheets

DESCRIPTION OF ACCOUNTING AND FINANCIAL REPORTING SYSTEM

Bond Release Process for New Subdivision Developments in Fairfax County

Township of Enniskillen. Asset Management Plan

Storm Drainage Systems

Legacy Trail Extension Feasibility Study. Preliminary Cost Estimate

Atlanta 2015 Infrastructure Bond

APPENDIX C INLETS. The application and types of storm drainage inlets are presented in detail in this Appendix.

ENGINEERING DESIGN GUIDELINES. for SUBDIVISIONS OR COMMERCIAL DEVELOPMENTS

Pavement Management Program

REPORT TITLE: TERM OF COUNCIL PRIORITY NO. 6 - ENHANCE INTEGRITY OF WASTEWATER COLLECTION SYSTEM INCLUDING FLOOD REMEDIATION PROGRAM

SECTION INLETS INLET LOCATIONS

For more information, visit: rethinkingstreets.com

Components of a Basement Flooding Protection Plan: Sewer System Improvements. November 2000

SEMINOLE PRATT WHITNEY ROAD & NORTHLAKE BLVD. FREQUENTLY ASKED QUESTIONS

Based on the above, it is recommended that Lift Stations #1 and #3 be abandoned and their flows be diverted to the regional Lift Station #8.

TOPOGRAPHICAL SURVEY REPORT - PART OF L.R No. 7413/11 Done on February 2015 at International Union for Conservation of Nature (IUCN) Eastern African

Infrastructure assets are distinguished from other capital assets because they normally:

Rocky View County. Background Report

EXHIBIT A Accessible Truck Routes Map

PUBLIC WORKS DEPARTMENT STRATEGIC PLAN

CITY OF VISTA STANDARD DRAWINGS (PRELIMINARY, FOR REVIEW)

SECTION 6A STORM DRAIN DESIGN Mar S E C T I O N 6A STORM DRAIN - DESIGN

EFFECTIVE FEBRUARY note: drainage permit required to call for a dampproof inspection

Town of Medway Capital Improvements Planning Committee

FIBER-OPTIC CABLE PLAN CHECK

City of Hilshire Village Pine Creek Ln Reconstruction

Table 4.9 Storm Drain Inlet Protetion Applicable for

Narrative Response/Attachment 1 (WisDOT TAP- Second Round Application ID-SWBP22)

Mandatory Weeping Tile Disconnection to Reduce the Impact of Basement Flooding

The Bond Release Process for New Subdivision Developments: An Overview for Homeowners Associations DRAFT Revised

DESCRIPTION OF WORK:

FISCAL YEAR CAPITAL IMPROVEMENT PLAN WASTEWATER TREATMENT FACILITIES

2014 CONSTRUCTION PLAN

Using GIS to Track and Prioritize Your Assets

Upper Polo Field Turf Project Information Session

Road Rehabilitation and Reconstruction Using AutoCAD Civil 3D

Bridges & Culverts Condition by Quantity

CITY OF HIGHLAND PARK, ILLINOIS Stormwater Management Fact Sheet

Downspout Disconnection Program FAQs

VDOT Project Advertisements from 4/1/13-6/30/14 (by advertisement)

EXPENDITURES SUMMARY INCREASE BUDGET BUDGET (DECREASE) Over 2015 $ $ $

CHAPTER 4 STORM DRAINAGE SYSTEMS

NATIONAL INSTITUTE OF GOVERNMENT PURCHASING (NIGP) DESIGN AND CONSTRUCTION CODES

Extreme Wet Weather in Brookfield. How to Keep Your Basement Dry During Heavy Rains and Floods

Doing a little can accomplish a lot. Proposed Change of Municipal Class Environmental Assessment from Schedule from B to A+

CD i -STREETS- Detail #

How To Improve Safety

Transcription:

Moving Ruston Forward City of Ruston Infrastructure Maintenance and Improvements

MLK Extension Project will be done in conjunction with proposed water and sewer improvements Connect Martin Luther King Drive to Hwy 167 Increase accessibility to the area from Hwy 167 Provide heavy commercial traffic with alternate route around Ruston s Core Districts to industrial areas Total Estimated Costs: $2,000,000

Kentucky: Hwy 167-Hwy 33 Expand the existing road surface to three lanes with curb and gutter, install bike lanes, and add sidewalks Project will include the replacement of the Colvin Creek Bridge Relocation and upgrade of existing utilities Will promote the inclusive community feel with multi-modal transportation and sidewalks Estimated Cost of $15,000,000

Monroe St.: Line Ave to Service Rd Expand the existing road surface to accommodate bike lanes with curb and gutter and sidewalks Project may include extensive drainage work Possible relocation and upgrade of existing utilities Estimated Cost of $4,000,000

Bonner St.: Mills to Maryland Expand the existing road surface to accommodate bike lanes with curb/ gutter and add sidewalks Possible relocation and upgrade of existing utilities Estimated Cost of $3,000,000

Monroe and Line St. Intersection Rebuild intersection for better traffic flow Create a safer driving environment Create 4 way stop for Monroe St., Jones St., and Line Ave Angle the end of Monroe St. towards Jones St. Model the intersection after Farmerville St. and E. Mississippi Ave. intersection. Total estimated Cost: $800,000

Shepard Creek Improvements Increase flow capacity of the creek and road crossings Rebuild all road crossings and water flow conduits Will help reduce current flooding from West Alabama to the city limits This will help the sewer system in the area by reducing water infiltration into the sewer system. Total Estimated Cost: $6,500,000

Street Overlays: 35 miles Currently working with engineering firm to develop plan, evaluate, and grade all road surfaces in the city The information generated by the street survey will determine the scope and schedule of work per street block 120 miles of road ways inside the city limits Funding would cover resurfacing 35 miles of road Total distance may vary if more substantial road improvements are necessary Total Estimated Cost $5,000,000 or $135,000/mile of overlay

Corrugated Metal Pipe Replacement Replace all existing Corrugated metal pipe culverts, drains and bridges system wide Corrugated metal piping is known to hold water which causes the pipe to rust and ultimately the structure will fail Most of the corrugated pipe will be replaced with a smooth PVC pipe that has a much longer life span. Approximately 107 corrugated metal pipe culverts that cross roadways Total Estimated Cost: $700,000

Reynolds Dr.: Hwy 167 to Goodwin Rd. Need to address multiple issues along the roadway Establish sidewalks down the roadway Address drainage issues along the right of way Reevaluate any parking that backs into the street and speed limits along the right of way Evaluate the road surface and determine if any improvements are necessary Estimated total Costs: $2,000,000

AMI Meter Change Out Program Will increase the city s water meter reading and billing efficiency. Projected two year time line Total Project cost of $2,100,000

Water Well Rehab Rehab and bring online existing Well 8 Well 8 is currently not in use Estimated cost $300,000 Project may be done in the 2016 budget year Drill new water well Drill new well in the North East quarter of the city Estimated cost- $1,000,000 Rehab other existing online wells Estimated $40,000 each Estimated Total cost: $3,000,000

Kirkland St. Currently no water main on Kirkland St. Improve water quality on existing services Added fire protection in area Installation of 6 water main 1,100 down Kirkland St. from Arizona Ave to E. Line Ave. Estimated Total Costs: $400,000

Arizona to Trenton Main Rehab Replace 1700 of 4 water main with 6 water main Tie into existing 6 water line on Dan Reneau Dr. Increase capacity of water lines Increase fire protection Estimated cost $1,000,000

MLK, Jonesboro and Vernon St. Tie Install new 12 main down Jonesboro St to MLK Dr. Abandon existing 2 line and install 8 line at the eastern end of MLK Dr., down Cornell Ave., and south along Dark St. Connect existing 6 lines on Vernon St. to 6 lines on MLK Dr. 12 main 2590 8 main 3031 6 main 1052 Estimated cost: $800,000

North Plant Rehabilitation North Treatment Plants necessary 5 year enhancement costs $4,000,000 Main issues that need to be addressed Filtration system Clarifier system ph Diversion system This will increase the capacity and effectiveness of the waste water treatment plant

MLK Dr. Sewer Extension This project will be done in conjunction with the road and water line extension Tie existing gravity sewer line from Famerville St. to Mills St. Install approximately 1000 of sewer line Estimated total cost: $500,000

Hundred Oaks Lift Station Rebuild the Hundred Oaks Lift station Estimated Cost: $600,000 Rebuild portions of the gravity sewer line and reduce inflow and infiltration $140/ft Total Estimated Cost: $1,000,000

Street Overlay Prep Project will be done in conjunction with the road overlay project Any section of road surface that is chosen to be rebuilt will have the existing sewer line evaluated and replaced as needed Will help decrease inflow and infiltration and decrease the amount of storm water relocated by lift stations and treated at the treatment plant This initiative will further decrease any future cost if the sewer is replaced while the road is actively under construction Estimated Total Cost: $5,000,000

South Plant Lift Station Need to rehab the south plant lift station Top priority project, could be done in conjunction with the South Plant flow basin rehabilitation Will improve the sewer main issues in the area Projected cost $1,000,000

South Plant Flow Basin Replace gravity sewer lines that feed the South Plant lift station Replacement of lines will improve efficiency of South Plant lift station by reducing amount of storm water that enters into our waste water system Approximate distance 16,430 Estimated Cost: $2,000,000

Force Main Rehab Need to rebuild the existing force main from Lift Station 39 to Gains St. Need to rebuild the existing force main from Honeysuckle Ln. to the Treatment plant Total approximate distance: 13,000 Estimated Total Cost: $3,000,000

Bike and Running Trails Developing bike and running trails throughout the city Estimated cost: $1,000,000

New Animal Control Facility New facility will include New Kennel Facility New Office Building New Exam, Surgery, Lab, and Isolation rooms Large Animal Facilities Fencing New Location Dog Park Estimated total cost for all improvements: $1,200,000

New Sports Complex 6 Adult softball fields 8 Dixie fields 8 Girls softball fields 3 T-ball fields 1 Buddy ball field 6 Soccer areas 3 Football areas Walking track Estimated Total Cost: $15,000,000

Moving Ruston Forward Available Funds ¾ cent Tax at today s levels: $4,200,000 (annually) Bondable Amount 20 years: $40,000,000 Excess Tax Above Payments ($1.2 Million per year): $24,000,000 Savings on Capital Projects ($2 Million per year): $40,000,000 Grants and State Capital Outlay: $15,000,000 Total: $119,000,000