FISCAL YEAR CAPITAL IMPROVEMENT PLAN WASTEWATER TREATMENT FACILITIES
|
|
|
- Britton Long
- 10 years ago
- Views:
Transcription
1 FISCAL YEAR CAPITAL IMPROVEMENT PLAN WASTEWATER TREATMENT FACILITIES 1
2 FISCAL YEAR CAPITAL IMPROVEMENT PLAN Wastewater Treatment Facilities The Wastewater Treatment System (System) collects, conveys, and processes wastewater from an estimated 3 million people, generated in a service area, which includes the City of Houston, several municipalities and unincorporated communities in the Houston metropolitan area. The system consists of approximately 6,950 miles of sanitary sewer lines, over 425,000 services connections, over 380 sanitary lift stations, 40 wastewater treatment plants (5 major and 35 satellite), and three major sludge treatment facilities. The average daily wastewater flow through the system is estimated at 185 million gallons per day (MGD) (278 MGD 12-month maximum). As reflected by state permits, the effective treatment capacity of the system is 564 MGD. The permitted capacity of plants is a part of the wastewater system treatment capacity that ranges from 0.15 MGD for the smallest plant to 200 MGD for the 69th Street Wastewater Plant. The program of improvements provides for the continued upgrade of the System. The City of Houston rehabilitates approximately 115 miles of pipe each year, or about 2% of the System. Additional funds are provided to comply with the regulations issued by the Texas Commission on Environmental Quality (TCEQ) and the U.S. Environmental Protection Agency (EPA). The five-year program includes $957 million under the Wastewater category and $59 million under Street and Traffic and Storm Drainage categories for a total of approximately $1.02 billion. It is financed by a combination of pay-asyou-go and revenue bonds. 2
3 FISCAL YEAR CAPITAL IMPROVEMENT PLAN Wastewater Treatment Facilities Highlights of the FY CIP include: Compliance with anticipated TCEQ citywide Agreed Order will continue through FY2016 construction projects Rehabilitate neighborhood sewers to improve service, remove excessive infiltration, prevent sanitary sewer overflows, and eliminate sewage backups ($70 million in FY2014). Assess, repair, and replace the city wide force main system. Upgrade, rehabilitate, or renew various wastewater treatment plants. Lift station renewal/replacement. Improve the 69th Street Wastewater Treatment Plant. Evaluate and rehabilitate large diameter sewers. 3
4 CAPITAL IMPROVEMENT PLAN ($ Thousands) CITY OF HOUSTON - WASTEWATER TREATMENT FACILITIES Planning Fiscal Year Planned Appropriations Project Allocation Total Acquisition-Land 4,936 Design 14,515 25,959 14,830 8,450 10,867 74, ,695 Construction 177, , , , , ,089 1,925,168 Equipment Acquisition 1, ,160 10,174 Salary Recovery 100 Other Total Allocation 194, , , , , ,870 2,122,072 Source of Funds PWE-W&S Syst Consolidating Constr Fd 133, , , , , ,963 1,810,165 TX Water Dev Board 60,472 69,444 60,779 62,322 58, , ,907 Total Funds 194, , , , , ,870 2,122,072 4 Form D
5 WASTEWATER TREATMENT FACILITIES - Summary of Funds CAPITAL IMPROVEMENT PLAN ($ Thousands) Fiscal Year Planned Appropriations CIP No. Project R Emergency Needs for Wastewater Utility Fiscal Year Fiscal Year Fiscal Year Fiscal Year Fiscal Year PWE-W&S Syst Consolidating Constr Fd 2,000 2,000 2,000 2,000 2,000 10,000 Project Total 2,000 2,000 2,000 2,000 2,000 10,000 R Miscellaneous Needs for Public Utility Fiscal Year Fiscal Year Fiscal Year Fiscal Year Fiscal Year PWE-W&S Syst Consolidating Constr Fd 2,070 1,026 1, ,472 Project Total 2,070 1,026 1, ,472 R Wastewater Force Main Renewal Fiscal Year Fiscal Year Fiscal Year Fiscal Year Fiscal Year PWE-W&S Syst Consolidating Constr Fd 1,904 3,128 10,415 9,610 9,668 34,725 Project Total 1,904 3,128 10,415 9,610 9,668 34,725 R Wastewater Treatment Plant Improvements Fiscal Year Fiscal Year Fiscal Year Fiscal Year Fiscal Year PWE-W&S Syst Consolidating Constr Fd 49,826 39,966 35,517 20,650 52, ,111 Project Total 49,826 39,966 35,517 20,650 52, ,111 R Neighborhood Sewer Rehabilitation Progra Fiscal Year Fiscal Year Fiscal Year Fiscal Year Fiscal Year TX Water Dev Board 38,000 55,000 53,537 54,467 52, ,684 Project Total 38,000 55,000 53,537 54,467 52, ,684 R Lift Station Renewal & Replacement Fiscal Year Fiscal Year Fiscal Year Fiscal Year Fiscal Year PWE-W&S Syst Consolidating Constr Fd 48,239 16,268 26,729 24,211 41, ,488 Project Total 48,239 16,268 26,729 24,211 41, ,488 R Citywide TCEQ Compliance Program Fiscal Year Fiscal Year Fiscal Year Fiscal Year Fiscal Year TX Water Dev Board 13,170 13,170 Project Total 13,170 13,170 R Almeda Sims Wastewater Treatment Plant Fiscal Year Fiscal Year Fiscal Year Fiscal Year Fiscal Year PWE-W&S Syst Consolidating Constr Fd 7,170 1, ,546 Project Total 7,170 1, ,546 5 Form C
6 WASTEWATER TREATMENT FACILITIES - Summary of Funds CAPITAL IMPROVEMENT PLAN ($ Thousands) CIP No. Project R Th Street Wastewater Treatment Plant Fiscal Year Fiscal Year Fiscal Year Fiscal Year Fiscal Year PWE-W&S Syst Consolidating Constr Fd 1,448 48, ,990 9,315 62,411 Project Total 1,448 48, ,990 9,315 62,411 R Sewerline Line Replacement by Other Govt Fiscal Year Fiscal Year Fiscal Year Fiscal Year Fiscal Year PWE-W&S Syst Consolidating Constr Fd 2,229 2,229 Project Total 2,229 2,229 R Wastewater Treatment Plant Consolidation Fiscal Year Fiscal Year Fiscal Year Fiscal Year Fiscal Year PWE-W&S Syst Consolidating Constr Fd 3,163 6,775 14,472 21,257 41,821 87,488 Project Total 3,163 6,775 14,472 21,257 41,821 87,488 R Collection System-SponsorParticipation Fiscal Year Fiscal Year Fiscal Year Fiscal Year Fiscal Year PWE-W&S Syst Consolidating Constr Fd ,500 Project Total ,500 R Sewer Service to Unserved Areas Fiscal Year Fiscal Year Fiscal Year Fiscal Year Fiscal Year PWE-W&S Syst Consolidating Constr Fd 4,387 2, ,830 12,991 Project Total 4,387 2, ,830 12,991 R Wastewater Treatment Plant Service Areas Fiscal Year Fiscal Year Fiscal Year Fiscal Year Fiscal Year PWE-W&S Syst Consolidating Constr Fd 1,500 1,500 Project Total 1,500 1,500 R Northside Sewer Relief Tunnel Rehab Fiscal Year Fiscal Year Fiscal Year Fiscal Year Fiscal Year PWE-W&S Syst Consolidating Constr Fd 7,515 1,602 9,117 Project Total 7,515 1,602 9,117 R Neighborhood Sewer Systems Improvements Fiscal Year Fiscal Year Fiscal Year Fiscal Year Fiscal Year PWE-W&S Syst Consolidating Constr Fd 115 5,908 2,021 15,850 12,729 36,623 Project Total 115 5,908 2,021 15,850 12,729 36,623 6 Form C
7 WASTEWATER TREATMENT FACILITIES - Summary of Funds CAPITAL IMPROVEMENT PLAN ($ Thousands) CIP No. Project R Large Diameter Sewer (LDS) Rehab Fiscal Year Fiscal Year Fiscal Year Fiscal Year Fiscal Year PWE-W&S Syst Consolidating Constr Fd 1,850 1,500 1,500 1,500 6,350 TX Water Dev Board 9,302 14,444 7,242 7,855 6,210 45,053 Project Total 9,302 16,294 8,742 9,355 7,710 51,403 R Wastewater Substitute Service Program Fiscal Year Fiscal Year Fiscal Year Fiscal Year Fiscal Year PWE-W&S Syst Consolidating Constr Fd 1,705 2,483 2,523 1,838 1,863 10,412 Project Total 1,705 2,483 2,523 1,838 1,863 10,412 Total Appropriations: 194, , , , , ,870 7 Form C
2012 2016 Capital Improvement Plan City of Houston WASTEWATER TREATMENT FACILITIES
2012 2016 Capital Improvement Plan City of Houston WASTEWATER TREATMENT FACILITIES 2012 2016 Capital Improvement Plan City of Houston WASTEWATER TREATMENT FACILITIES The Wastewater Treatment System (System)
Kansas City s Overflow Control Program
Kansas City s Overflow Control Program Kansas City Water Services Water Wastewater Stormwater 2 Water Services Department 1000 Positions 835 Employees 3 Utilities FY 13/14 Budget = $307 million Water Wastewater
Sanitary Sewer Master Plan
, Illinois Sanitary Sewer Master Plan EXECUTIVE SUMMARY Prepared by September 9, 2010 1670 South Taylorville Road Decatur, Illinois 62521 www.bgmengineering.com Sanitary Sewer Master Plan A. SCOPE OF STUDY
BEFORE THE PHILADELPHIA WATER, SEWER AND STORMWATER RATE BOARD DIRECT TESTIMONY OF STEPHEN J. FURTEK
BEFORE THE PHILADELPHIA WATER, SEWER AND STORMWATER RATE BOARD Re Application of the Philadelphia Water Department for Increased Rates and Related Charges Fiscal Years 2017-2018 DIRECT TESTIMONY OF STEPHEN
City of Dallas Wastewater Collection System: TCEQ Sanitary Sewer Outreach Agreement City Council Briefing January 17, 2007
City of Dallas Wastewater Collection System: TCEQ Sanitary Sewer Outreach Agreement City Council Briefing January 17, 2007 1/12/2007 1 Briefing Purpose Provide update on Wastewater Collection Activities
Sanitary Sewers LINK TO THE COMPREHENSIVE PLAN
Sanitary Sewers PROGRAM DESCRIPTION Fairfax County provides sewer service to its residents through a system of nearly 3,412 miles of sewer lines, 59 sewage pumping stations, 5 storm water pumping stations,
ecmar SECTION INSTRUCTIONS: Sanitary Sewer Collection Systems
ecmar SECTION INSTRUCTIONS: Sanitary Sewer Collection Systems Please see the DEFINITIONS of terms at the end of this section. If you have any questions about these definitions, do not understand a question,
The Metropolitan St. Louis Sewer District. Sewer Overflows In Our Community
The Metropolitan St. Louis Sewer District Sewer Overflows In Our Community March 2012 About MSD Formed in 1954, the Metropolitan St. Louis Sewer District (MSD) is the governmental agency that provides
The Clean Water Project What Is The Stormwater Impact?
The Clean Water Project What Is The Stormwater Impact? Presentation To: Seminar On Water Issues Bob Weimar, PE, BCEE Chief of Program Management The Metropolitan District Sewage Overflows Have Become More
Unauthorized Discharges and Sanitary Sewer Overflows
TCEQ REGULATORY GUIDANCE Field Operations Support Division RG-395 Revised April 2011 Unauthorized Discharges and Sanitary Sewer Overflows What does this document cover? The Texas Commission on Environmental
M E M O R A N D U M. Among the standard conditions contained in the NPDES permit is also a Duty to
M E M O R A N D U M DATE: August 7, 2015 TO: FROM: SUBJECT: Metropolitan Wastewater Management Commission (MWMC) Matt Stouder, MWMC General Manager Capacity Management, Operations, and Maintenance (CMOM)
PUBLIC FACILITIES ELEMENT SANITARY SEWER SUBELEMENT. Provide an Environmentally Sound Sanitary Sewer System
PUBLIC FACILITIES ELEMENT SANITARY SEWER SUBELEMENT GOAL 1: Ensure that the City's sanitary sewer system will provide an effective, efficient and environmentally sound method of wastewater collection,
Altoona Water Authority. Infrastructure Overview
Altoona Water Authority Infrastructure Overview Mission Statement As stewards of the community s water system, our mission is to provide a clean, safe, reliable water supply and to collect and treat wastewater
Tim Schneller, P.E. GBA Engineers and Architects
Tim Schneller, P.E. GBA Engineers and Architects Portions of the presentation were taken from a presentation prepared by a member of the Water Environment Federation Collection Systems Committee CMOM Subcommittee.
DRAFT Public Outreach Document for What s an SSMP?
DRAFT Public Outreach Document for What s an SSMP? This easy to read document is developed and provided to interested parties to assist in educating cities, agencies, their management, elected officials
REPORT ON FINANCIAL PLAN, COST OF SERVICE AND RATES WATER AND SEWER OPERATING FUND
REPORT ON FINANCIAL PLAN, COST OF SERVICE AND RATES WATER AND SEWER OPERATING FUND Harford County, Maryland APRIL 2016 Black & Veatch Holding Company 2011. All rights reserved. Harford County Report on
Monterey Regional Water Pollution Control Agency. Sewer System Management Plan
Monterey Regional Water Pollution Control Agency Sewer System Management Plan March 31, 2013 Sewer System Management Plan Introduction I. Goals II. Organization III. Legal Authority IV. Operation and Maintenance
ZIONSVILLE WASTEWATER DEPARTMENT 10-YEAR SEWER REHABILITATION REPORT 2013-2022
ZIONSVILLE WASTEWATER DEPARTMENT 10-YEAR SEWER REHABILITATION REPORT 2013-2022 Town of Zionsville, Indiana December 19, 2012 PREPARED BY BEAM, LONGEST & NEFF, LLC. 8126 Castleton Road Indianapolis, Indiana
Components of a Basement Flooding Protection Plan: Sewer System Improvements. November 2000
Components of a Basement Flooding Protection Plan: Sewer System Improvements November 2000 Components of a Basement Flooding Protection Plan: Sewer System Improvements November 2000 SEMCOG 2000 Prepared
COMBINED SEWER OVERFLOW LONG-TERM CONTROL PLAN Executive Summary
CITY OF LAKEWOOD COMBINED SEWER OVERFLOW LONG-TERM CONTROL PLAN Executive Summary MAY 2006 storage conveyance treatment performance Prepared for: City of Lakewood, Ohio Prepared by: Metcalf & Eddy of Ohio,
FY 2016 Proposed Capital Improvement Program
FY 2016 Proposed Capital Improvement Program Metropolitan St. Louis Sewer District FY 2016 Capital Improvement Program Proposed Engineering Services Rich Unverferth P.E. Director of Engineering January
Number 2014-20 September 2014 SEWER LIABILITY
Number 2014-20 September 2014. SEWER LIABILITY Sewer Backups: Most of us take the use of our wastewater and sewer systems for granted, while municipalities must be vigilant to ensure that citizens of the
TOWN OF SURFSIDE UTILITY UPGRADE PROJECT Project Completion
TOWN OF SURFSIDE UTILITY UPGRADE PROJECT Project Completion Project Overview Sanitary Sewer System 2 Town of Surfside Project Overview Potable Water System 3 Town of Surfside Project Overview Storm Water
Update on the Metro Nashville Consent Decree Program. Scott Potter Ron Taylor
Update on the Metro Nashville Consent Decree Program Scott Potter Ron Taylor 1 Why We Are Here Planned actions to meet Clean Water Act The types of projects that will be constructed The impacts of these
Work Practice: Wastewater Collection System Maintenance Plan Potential Safety Hazards
Potential Safety Hazards Required items Potential PPE None Additional References - Collection System Related Work Practices & Forms Jet Truck Cleaning Work Practice (Do not drive on peoples driveway) CDL
Bridges & Culverts Condition by Quantity
3.4.3 What condition is it in? Approximately 93% of the municipality s bridge structures are in good to excellent condition, with the remaining 7% in fair condition. As a result, the municipality received
Capital Improvement Program: Public Input and the Need for a Multi-year Plan
Attachment 1 OFFICE OF THE INDEPENDENT BUDGET ANALYST REPORT Date Issued: September 21, 2012 IBA Report Number: 12-39 Budget and Finance Committee Docket Date: September 26, 2012 Item Number: 8 OVERVIEW
PART 6 - STANDARD DESIGN AND CALCULATION FORMS 6.1 SANITARY SEWER DATA SHEET
PART 6 - STANDARD DESIGN AND CALCULATION FORMS 6.1 SANITARY SEWER DATA SHEET Name of Municipality or Sewer District Name of Project Original Township and Lot Number Name of Engineer of Firm Preparing Plans
High-Rate Retention Treatment Facility for CSO Control in Windsor Riverfront East
High-Rate Retention Treatment Facility for CSO Control in Windsor Riverfront East Jian Li, Ph.D., P.Eng., PE Senior Environmental Engineer Stantec Consulting Ltd. Water & Wastewater Treatment BMP Forum
City of Chula Vista. Fiscal Year 2016 2017. Proposed Budget Overview. May 9 and 18, 2016
City of Chula Vista Fiscal Year 2016 2017 Proposed Budget Overview May 9 and 18, 2016 Agenda Fiscal Year 2016 17 Proposed Budget All Funds Summary General Fund Summary Long Term Financial Plan Fiscal Year
Executive Summary Consent Decree
OVERFLOW ABATEMENT PROGRAM Executive Summary Consent Decree The sewer system in Nashville dates back to the late 1800s and originally consisted of a combined sewer system, later transitioning to separate
City of Mill Valley Sewer Capital Improvement Plan 2012 2016
City of Mill Valley Sewer Capital Improvement Plan 2012 2016 I. BACKGROUND Between December 2004 and February 2008, the ed States Environmental Protection Agency (EPA) conducted inspections of the SASM
DEPARTMENT OF ENVIRONMENTAL QUALITY
PROJECT IDENTIFICATION DEPARTMENT OF ENVIRONMENTAL QUALITY City of Burton Sanitary Sewer Collection System Improvements State Revolving Fund (SRF) Environmental Assessment April 2015 Applicant: Authorized
Understanding Your An Introduction to the Chicago Area s Combined Sewer Systems
Understanding Your An Introduction to the Chicago Area s Combined Sewer Systems Metropolitan Water Reclamation District of Greater Chicago What is a combined sewer? In a combined sewer system, sanitary
Combined Sewer Overflows in the Milwaukee Metropolitan Sewerage District Conveyance and Treatment System
Combined Sewer Overflows in the Milwaukee Metropolitan Sewerage District Conveyance and Treatment System Eric Loucks 1, David Watkins 2, Theresa Culver 3 Background Many older cities across the United
Agenda Cover Memorandum
Agenda Cover Memorandum Meeting Date: June 11, 2012 Item Title: Action Requested: Approval For discussion Feedback requested For your information Staff Contact: Allison Stutts Phone Number: 847-318-5216
Implementing Green Infrastructure in Atlanta
City of Atlanta Mayor Kasim Reed Department of Watershed Management Implementing Green Infrastructure in Atlanta SESWA Southeast Regional Stormwater Seminar April 9, 2014 Jo Ann J. Macrina, P.E. Commissioner
BOARD OF COUNTY COMMISSIONERS OKALOOSA COUNTY, FLORIDA DEPARTMENT/PROGRAM: WATER & SEWER ENTERPRISE FUND/WATER OPERATIONS
WATER AND SEWER BOARD OF COUNTY COMMISSIONERS OKALOOSA COUNTY, FLORIDA SERVICE AREA: PHYSICAL ENVIRONMENT DEPARTMENT/PROGRAM: WATER & SEWER ENTERPRISE FUND/WATER OPERATIONS PROGRAM DESCRIPTION: This program
Source Water Protection Practices Bulletin Managing Sanitary Sewer Overflows and Combined Sewer Overflows to Prevent Contamination of Drinking Water
United States Office of Water EPA 916-F-01-032 Environmental Protection (4606) July 2001 Agency Source Water Protection Practices Bulletin Managing Sanitary Sewer Overflows and Combined Sewer Overflows
Dry Weather Flow from Footing Drains and Service Connections
Wastewater Master Plan DWSD Project No. CS-1314 Dry Weather Flow from Footing Drains and Service Connections Technical Memorandum Original Date: May 2, 2002 Revision Date: September 2003 Author: CDM Table
Dan Ott Managing Engineer Collection System Johnson County Wastewater, KS and Rick Nelson CH2M HILL
Dan Ott Managing Engineer Collection System Johnson County Wastewater, KS and Rick Nelson CH2M HILL What is JCW s strategy for meeting wet weather performance targets? SSO s Basement Back-ups Serving Johnson
City of Bakersfield Public Works Department Sewer System Management Plan December 2014
City of Bakersfield Public Works Department Sewer System Management Plan December 2014 C:\Users\hmayberry\Desktop\SEWER SYSTEM MANAGEMENT PLAN 2014.doc 1 Sewer System Management Plan Index: Section 1 Goals
DeSoto County is not a water service provider and does not operate any
Water and Sewer DeSoto County is not a water service provider and does not operate any water delivery systems. There are 14 certificated, non-municipal water associations operating in the county that are
2015-2019 CAPITAL IMPROVEMENT PLAN ($ Thousands) CITY OF HOUSTON - STORM DRAINAGE SYSTEM
CITY OF HOUSTON - STORM DRAINAGE SYSTEM Planning Fiscal Year Planned Appropriations Project Allocation 2015-2019 Acquisition-Land 451 451 Design 12,354 19,796 6,666 7,062 7,474 53,352 Construction 69,540
COMBINED SEWER OVERFLOW OPERATIONAL AND MAINTENANCE PLAN SUMMARY
COMBINED SEWER OVERFLOW OPERATIONAL AND MAINTENANCE PLAN SUMMARY Revised: April 2014 Village of Wilmette, Illinois NPDES CSO Permit No. ILM580012 Chapter 1 Introduction This Operational and Maintenance
SAWS SSO Reduction Program
SAWS SSO Reduction Program Jeff Haby, P.E. Director Sewer System Improvements February 20, 2014 TMDL Implementation Plan Technical Committee Overview Sanitary Sewer Overflows Consent Decree Overview Major
A Systematic Approach to Reduce Infiltration and Inflow (I&I) and Sanitary Sewer Overflows (SSO) PETE GORHAM, P.E. MIKE LYNN FEBRUARY 19, 2015
A Systematic Approach to Reduce Infiltration and Inflow (I&I) and Sanitary Sewer Overflows (SSO) PETE GORHAM, P.E. MIKE LYNN FEBRUARY 19, 2015 Infiltration/Inflow (I/I) I & I Reduction: Three-Prong Attack
REQUEST FOR PROPOSALS SANITARY SEWER MAINTENANCE SERVICES FOR THE TOWN CENTER SEWER ASSESSMENT DISTRICT WITHIN THE TOWN OF WOODSIDE
REQUEST FOR PROPOSALS SANITARY SEWER MAINTENANCE SERVICES FOR THE TOWN CENTER SEWER ASSESSMENT DISTRICT WITHIN THE TOWN OF WOODSIDE Submit Proposals to: Town of Woodside Public Works Department 2955 Woodside
APPROVED CONSOLIDATION AGREEMENT BETWEEN THE TOWN OF AMHERST SANITARY SEWER DISTRICTS 1 and 16 REGARDING THEIR CONSOLIDATION INTO A SINGLE DISTRICT
REGARDING THEIR CONSOLIDATION INTO A SINGLE DISTRICT This Agreement ("the Agreement ) is entered into this day of, 2011, between the Town of Amherst Sanitary Sewer District 1 (hereinafter SSD 1 ) and Town
A Comprehensive Approach to Storm Water Asset Management Planning. City of Virginia Beach Public Works Operations
A Comprehensive Approach to Storm Water Asset Management Planning City of Virginia Beach Public Works Operations Steve McLaughlin, PE April 2016 Agenda City of Virginia Beach, VA Population: 450,000 250
Ann Arbor Wastewater Treatment Plant Facilities Renovations Project September 2015
Ann Arbor Wastewater Treatment Plant Facilities Renovations Project September 2015 The Facilities Master Plan was completed in 2004 and identified the need for improvements to the City of Ann Arbor s Wastewater
City of Sacramento, California Department of Utilities. March 2011
Department of Utilities Utility Rate Study March 2011 March, 2011 page i TABLE OF CONTENTS EXECUTIVE SUMMARY... 3 SECTION I: INTRODUCTION... 13 SECTION II: FINANCIAL POLICIES... 15 A. Defining Revenue
ANALYSIS OF RAINFALL AND ITS INFLOW INTO MOBILE, ALABAMA S, ESLAVA SEWER SHED SYSTEM
ANALYSIS OF RAINFALL AND ITS INFLOW INTO MOBILE, ALABAMA S, ESLAVA SEWER SHED SYSTEM Jerrod Frederking, Department of Earth Sciences, University of South Alabama, Mobile, AL 36688. E-mail: [email protected].
Director of Utilities. Manager. Regulatory Compliance Supervisor. Distribution Supervisor. Utilities Analyst. Account Clerk. Water
DEPARTMENT ORGANIZATIONAL CHART WATER RESOURCES Director of Utilities Secretary Resources Manager Business Services Manager Utilities Engineer Resources Supervisor Distribution Supervisor Utilities Project
Sewer System Management Plan University of California Kearney Agricultural Research & Extension Center 9240 S. Riverbend Ave.
Sewer System Management Plan University of California Kearney Agricultural Research & Extension Center 9240 S. Riverbend Ave. Parlier, CA 93648 Wastewater ID # 5SSO11453 1 Goals 1.1 Regulatory Requirements
CITY OF HIGHLAND PARK, ILLINOIS Stormwater Management Fact Sheet
CITY OF HIGHLAND PARK, ILLINOIS Stormwater Management Fact Sheet WHAT IS STORMWATER MANAGEMENT? Stormwater management is the method for channeling rainfall through pipes and sewers away from property to
ORDINANCE NO. 15 BE IT ORDAINED BY THE COUNCIL OF KANSAS CITY:
ORDINANCE NO. 15 Amending Chapter 60 of the Code of Ordinances of Kansas City, Missouri, entitled Sewers and Sewage Disposal by adding Sections 60-349 through 60-360; and establishing an effective date.
SECTION 3 SANITARY SEWER DESIGN
SECTION 3 SANITARY SEWER DESIGN 3.1 GENERAL DESIGN CRITERIA 3.1.1 Requirement for Sanitary Sewer 3.1.2 Design Approval 3.1.3 IEPA Permit Required 3.1.4 Differentiation Between Public and Private Sanitary
SANITARY SEWER BACKUP. Causes & Prevention
SANITARY SEWER BACKUP Causes & Prevention A. PURPOSE The purpose of this publication is twofold: 1. It provides homeowners with basic information on the causes of sanitary sewer backups. 2. It provides
City Budget - A Glossary of Useful Terms
26 SECTION 26 Glossary 273 Glossary Account - The primary accounting field in the budget used to describe the type of the financial transaction. Actual - Actual level of expenditures/fte positions approved
Bulletin. Gerard D. Perry, Director of Accounts. DATE: August 2014. Sewer Rate Relief Fund FY2015
Massachusetts Department of Revenue Division of Local Services Amy A. Pitter, Commissioner Robert G. Nunes, Deputy Commissioner & Director of Municipal Affairs Bulletin TO: Mayors, City Managers, Selectmen,
John J. Cronley Marketing Communications Manager Mission Communications 678-969-0021, x1008 [email protected]
1 Supervisory Control and Data Acquisition (SCADA) Utilization For Capacity, Management, Operations, and Maintenance (CMOM) Program Compliance in Wastewater Collection Systems John J. Cronley Marketing
Chapter 6 INFRASTRUCTURE ELEMENT 6.1 INTRODUCTION 6.2 AUTHORITY FOR THE ELEMENT 6.3 KEY THEMES AND VISION FOR GENERAL PLAN
Chapter 6 INFRASTRUCTURE ELEMENT 6.1 INTRODUCTION Public infrastructure is an important support network for the City. Well-designed and maintained infrastructure systems are critical to the community s
CRS Report for Congress
Order Code RS22285 Updated March 22, 2006 CRS Report for Congress Received through the CRS Web Hurricane-Damaged Drinking Water and Wastewater Facilities: Impacts, Needs, and Response Summary Claudia Copeland
Based on the above, it is recommended that Lift Stations #1 and #3 be abandoned and their flows be diverted to the regional Lift Station #8.
Lakeside; Clairmont Heights; Portion of Clairmont currently serviced to Pump Station #2; Crossroads North and Crossroads South portion of flows that are diverted to Lakeside Trunk. It is understood that
NEVADA CITY WASTEWATER TREATMENT INQUIRY
NEVADA CITY WASTEWATER TREATMENT INQUIRY REASON FOR INVESTIGATION The 2003-2004 Grand Jury investigated the status of wastewater treatment in unincorporated Nevada County. This year, the Grand Jury investigated
MARYLAND AVENUE BACKUPS DURING AUGUST 31, 2014 STORM EVENT COMMUNITY OUTREACH
MARYLAND AVENUE BACKUPS DURING AUGUST 31, 2014 STORM EVENT COMMUNITY OUTREACH MARYLAND AVENUE BACKUPS COMMUNITY OUTREACH MEETING AGENDA Introductions History of PWSA Actions August 31 Storm Impacts Short
Oakland Macomb Interceptor Drain Rehabilitation State Revolving Fund Project Plan Overview. Public Meeting June 10, 2009
State Revolving Fund Project Plan Overview Public Meeting June 10, 2009 What is the OMI? The OMI is the Oakland Macomb Interceptor Sewer. The OMI transports much of the sanitary sewage from Oakland and
Sanitary Sewer Overflow(SSO)/Bypass Notification Form Instructions
Bureau of Resource Protection Wastewater Management Progr Sanitary Sewer Overflow(SSO)/Bypass Who must notify DEP about an overflow or bypass, and when? Any owner or operator of the following facilities:
City of Minot CDBG Disaster Recovery Action Plan Amendment #3
City of Minot CDBG Disaster Recovery Action Plan Amendment #3 Table 2: Method of Distribution for Program Activities. Project delivery costs are in green [AMENDMENT #2 ADDED PROJECT DELIVERY TO EACH ACTIVITY]
DEPARTMENT OF WATERSHED MANAGEMENT AN ENTERPRISE FUND OF THE CITY OF ATLANTA, GEORGIA
CITY OF ATLANTA, GEORGIA DEPARTMENT OF WATERSHED MANAGEMENT AN ENTERPRISE FUND OF THE CITY OF ATLANTA, GEORGIA COMPREHENSIVE ANNUAL FINANCIAL REPORT FOR THE YEARS ENDED JUNE 30, 2012 AND 2011 Department
SANITARY SEWER SYSTEM ASSESSMENT
SANITARY SEWER SYSTEM ASSESSMENT What is this tool? The Sanitary Sewer System Assessment is a form that helps your utility identify and document all of the components in your utility s sanitary sewer system.
Sewer System Management Plan (SSMP) 2009. Eastern Municipal Water District
Sewer System Management Plan (SSMP) 2009 Eastern Municipal Water District Table of Contents 1.0 SSMP Goals... 3 Goal 1A:... 3 Goal 1B:... 3 2.0 Organizational Structure... 3 3.0 Legal Authority... 4 4.0
Description of Fund Types and Funds
Financial activities for local government fall into three broad categories, governmental, proprietary, and fiduciary fund categories. Governmental funds are used to account for activities primarily supported
Asset Management Overview. Wastewater Utility Operation and Management for Small Communities
Asset Management Overview Wastewater Utility Operation and Management for Small Communities Asset Management Overview What is an Asset? What is Asset Management? What are the Benefits of Implementing Asset
SANITARY SEWER MASTER PLAN
SANITARY SEWER MASTER PLAN PREPARED FOR: VILLAGE OF GALENA, OHIO PREPARED BY: POGGEMEYER DESIGN GROUP, INC. 1168 NORTH MAIN STREET BOWLING GREEN, OHIO 43402 JOB NO. 3550-030 MARCH, 2006 TABLE OF CONTENTS
City of Los Altos Sewer System Management Plan
City of Los Altos Sewer System Management Plan February 2015 This page intentionally left blank. LIST OF REVISIONS Revision No. 2 3 4 Description of Revision Revision of telephone numbers and text issues,
SPU - DRAINAGE AND WASTEWATER
SPU - DRAINAGE AND WASTEWATER Overview SPU Seattle Public Utilities (SPU) is responsible for maintaining the network of sewer and drainage systems throughout the City of Seattle. These systems include