Secondary Loop Chilled Water In Super High-Rise



Similar documents
By Steven C. Severini, P.E., Member ASHRAE

COMMERCIAL HVAC CHILLER EQUIPMENT. Air-Cooled Chillers

HIGH PERFORMANCE CHILLED WATER SYSTEMS. EarthWise HVAC. EarthWise HVAC High Performance CHW Plants

ENERGY SAVING STUDY IN A HOTEL HVAC SYSTEM

Life Cycle Costing Analysis of Water-cooled Chillers. Chillventa Nuremburg, Germany

Optimization of Water - Cooled Chiller Cooling Tower Combinations

CHILLED WATER PLANT PUMPING SCHEMES. James J. Nonnenmann, PE Stanley Consultants, Inc. Muscatine, Iowa

Building HVAC Load Profiling Using EnergyPlus

CHILLER PLANT CONTROL MULTIPLE CHILLER CONTROLS

Chilled Water System Commissioning: Variable Primary Flow. John D. Villani, P.E. Associate Grumman/Butkus Associates

BEC 2012 Vs BEC Summary of Major Amendments

See any red flags? Let s take a look at the problems that occurred on the job and how to avoid making the same mistakes.

Building Performance With District Cooling

The main steam enters the building in the basement mechanical room; this is where the condensate line also leaves the building.

HVAC Systems: Overview

Data Realty Colocation Data Center Ignition Park, South Bend, IN. Owner: Data Realty Engineer: ESD Architect: BSA LifeStructures

HEAT RECOVERY FROM CHILLED WATER SYSTEMS. Applications for Heat Reclaim Chillers

Fundamentals of HVAC Control Systems

TES for Medical Center

Creating Efficient HVAC Systems

VARIABLE VOLUME / VARIABLE SPEED SYSTEMS APPLICATIONS

Tips to Reduce Chilled Water Plant Costs

Commissioning - Construction Documents (Page 1 of 6)

Second Place: Industrial Facilities or Processes, New

Federal Wage System Job Grading Standards for Air Conditioning Equipment Operating, Table of Contents

Digital Realty Data Center Solutions Digital Chicago Datacampus Franklin Park, Illinois Owner: Digital Realty Trust Engineer of Record: ESD Architect

Chapter 3.4: HVAC & Refrigeration System

2A.1 Features of Chiller Control Components A.3 Chilled-Water Supply Temperature Control A.4 Cooling-Water Supply Control...

Enclosed Football Stadium Design History and Lessons Learned

Commercial & Municipal Retrofit 2015 VFD Rebate

What are the Carrier ChillerVu Energy Dashboards?

HVACPowDen.xls An Easy-to-Use Tool for Recognizing Energy Efficient Buildings and HVAC Systems

State of the Art Energy Efficient Data Centre Air Conditioning

Case Study: Innovative Energy Efficiency Approaches in NOAA s Environmental Security Computing Center in Fairmont, West Virginia

Water Fired Chiller/Chiller-Heater. WFC-S Series: 10, 20 and 30 RT Cooling

NEBB STANDARDS SECTION-8 AIR SYSTEM TAB PROCEDURES

National Grid Your Partner in Energy Solutions

HVAC Processes. Lecture 7

2B.1 Chilled-Water Return (and Supply) Temperature B.3 Cooling-Water Supply Temperature / Flow

Pharmaceutical central utility plants

Intelligent control system with integrated electronic expansion valves in an air-conditioning system operating at a Telecom telephone exchange

District Cooling Plant : Refrigeration Plant Simulation

How To Design A Building In New Delhi

Guidelines for energy efficient heating, ventilation and air conditioning (HVAC) systems

ENERGY EFFICIENT HVAC DESIGN FOR WARM-HUMID CLIMATE CLIMATE

CURBING THE COST OF DATA CENTER COOLING. Charles B. Kensky, PE, LEED AP BD+C, CEA Executive Vice President Bala Consulting Engineers

Modeling and Simulation of HVAC Faulty Operations and Performance Degradation due to Maintenance Issues

News in Data Center Cooling

In the compression-refrigeration loop (air conditioning), which is likely to be warmer? 1. Condenser coil 2. Evaporator coil

POLK STATE COLLEGE CHILLER PLANT EVALUATION WINTER HAVEN, FLORIDA APRIL 2, C arastro & A ssociates, C&A# 5747

EHDC. Cooling system for Data Center and server cabinets.

Benefits of Water-Cooled Systems vs. Air-Cooled Systems for Air-Conditioning Applications

Rating Water-Source Heat Pumps Using ARI Standard 320 and ISO Standard

OPTIMIZING CONDENSER WATER FLOW RATES. W. A. Liegois, P.E. Stanley Consultants, Inc. Muscatine, Iowa

Optimizing Design & Control Of Chilled Water Plants Part 5: Optimized Control Sequences

Chilled Water Precision Air Conditioner For Critical Application

Data Center. Ultra-Efficient chilled water system optimization. White paper. File No: Date: december 03, 2015 Supersedes: new Date: new

KU DESIGN GUIDELINES APPENDIX XVI RECOMMENDED BAS I/O CONTROL POINTS BY EQUIPMENT / SYSTEM

Impacts of Static Pressure Set Level on the HVAC Energy Consumption and Indoor Conditions

*At the AHRI Standard flow rate of 3 gpm/ton, using today s efficient chillers, the ΔT is 9.3 F rather than the 10 F often assumed.

Description of cumulative (since initial certification) DOE-2.2 version 44d3 Bugfixes that Affect Title 24 Analysis:

Water cooled chiller plant (cp/vs)

Wet Bulb Temperature and Its Impact on Building Performance

Heating & Cooling Efficiency

Preliminary Final Proposal

Thermal Energy Storage Strategies for Commercial HVAC Systems

Theoretical Study on Separate Sensible and Latent Cooling Air-Conditioning System

HEATING, VENTILATION & AIR CONDITIONING

IDEA Presentation SMALL CAMPUS CHILLED WATER PLANT OPTIMIZATION.

The Piping System Model a New Life Cycle Document. Elements of the Piping System Model

A Cover HVAC ENERGY EFFICIENT

Thermal Storage System Provides Emergency Data Center Cooling

HVAC Efficiency Definitions

Code of Practice for Building Energy Audit

Heating, Ventilation & Air Conditioning Equipment

Variable Refrigerant Flow Systems

Example Retrocommissioning Measure: Opening Throttled Discharge Valves

Lawrence Berkeley National Laboratory Lawrence Berkeley National Laboratory

- White Paper - Data Centre Cooling. Best Practice

CoolTeg Plus Chilled Water (CW) version: AC-TCW

3/29/2012 INTRODUCTION HVAC BASICS

ULTRA-EFFICIENT HVAC DESIGN AND CONTROL

The Different Types of Air Conditioning Equipment for IT Environments

Presentation Outline. Common Terms / Concepts HVAC Building Blocks. Links. Plant Level Building Blocks. Air Distribution Building Blocks

Tips and Tricks for Estimating Energy Savings. Celeste Cizik, P.E. Project Manager E M C Engineers, Inc.

Centrifugal Fans and Pumps are sized to meet the maximum

How To Improve Energy Efficiency Through Raising Inlet Temperatures

Cooling Small Server Rooms Can Be. - Jim Magallanes Computer Room Uptime: Uptime Racks:

Heating, Ventilation & Air Conditioning Equipment

Combining Cold Aisle Containment with Intelligent Control to Optimize Data Center Cooling Efficiency


Heating, ventilation and air conditioning equipment. A guide to equipment eligible for Enhanced Capital Allowances

Heating, ventilation and air conditioning (HVAC) equipment. A guide to equipment eligible for Enhanced Capital Allowances

A Comparison of an R22 and an R410A Air Conditioner Operating at High Ambient Temperatures

The sample report format is applicable to many different building types and systems and the examples provided cover a variety of applications.

Maintenance for Energy Efficiency

Drives and motors. A guide to using variable speed drives and motors in data centres Meeting your Carbon Reduction Commitment (CRC)

Heat Recovery In Retail Refrigeration

Dr. Michael K. West, PE 1 Dr. Richard S. Combes, PE 2 Advantek Consulting / Melbourne, Florida

Drives and motors. A guide to using variable-speed drives and motors in data centres

Transcription:

The following article was published in ASHRAE Journal, May 2008. Copyright 2008 American Society of Heating, Refrigerating and Air-Conditioning Engineers, Inc. It is presented for educational purposes only. This article may not be copied and/or distributed electronically or in paper form without permission of ASHRAE. Secondary Loop Chilled Water In Super High-Rise By Zhenjun Ma, Shengwei Wang, Ph.D., C.Eng., Member ASHRAE, and Waikeung Pau, C.Eng., Member ASHRAE This article presents the alternative design configurations for the secondary chilled water system in a super high-rise high rise com com mercial building currently being constructed in Hong Kong. The original design configuration is evaluated and compared with an alternative design configuration concerning energy performance. Both configurations are implemented in this building to test and evaluate their operational performance. Building and System Description The building is a super high-rise building of approximately 1,608 ft (490 m) height (currently the tallest building in Hong Kong) and 3,455,215 ft 2 (321 000 m 2 ) of floor area. The building has a basement of four floors, a block building of six floors and a tower building of 98 floors. The basement is used mainly for parking. The block building from the ground floor to the fth fth fth floor ser es ser es serves mainly as the commercial center including hotel ballrooms, shopping arcades, and arrival lobbies. The gross area is about 721,182 ft 2 (67 000 m 2 ). The tower building consists of 2,475,699 ft 2 (230 000 m 2 ) for commer- cial of ces and a six-star hotel on the upper floors. Figure 1 shows the central chiller and secondary chilled water system in this building. Six identical high voltage (10,000 V) centrifugal chillers located on the sixth floor with the capacity of 2,056 ton (7,230 kw) each and the nominal power consumption of 361 ton (1,270 kw) each at full load are used to supply the chiller water. The rated chilled water supply and return temperatures at the design condition are 42 F and 51 F (5.5 C and 10.5 C), respectively, while the rated condenser water inlet and outlet temperatures at the design condition are 90 F and 99 F (32 C and 37 C), respectively. The rated COP of each chiller at the design condition is 5.70. Each chiller is associated with one constant condenser water pump and one constant primary chilled water pump. The water system is divided into four zones to avoid the chilled water pipelines and terminal units from suffering extremely high pressure, i.e., the highest static pressure of more than 4000 kpa (40 bar) and the designed working pressure of About the Authors Zhenjun Ma is a doctoral candidate. Shengwei Wang, Ph.D., C.Eng., is a professor in the Department of Building Services Engineering of The Hong Kong Polytechnic University, Hong Kong. Waikeung Pau, C.Eng. is a project manager at Sun Hung Kai Properties Limited, Hong Kong. 42 ASHRAE Journal ashrae.org May 2008

A A Secondary Water Circuit for Zone 1 C From Office Floors (79-98) To Office Floors (79-98) B Secondary Water Circuit for Zone 2 SCHWP-78-01 to 03 From Podium and Basement To Podium and Basement SCHWP-06-10 to 12 C Secondary Water Circuit for Zones 3 & 4 D Primary Water Circuit E Chiller Circuit F Cooling Water Circuit PCHWP-78-01 PCHWP-78-02 PCHWP-78-03 SCHWP-42-04 to 06 From Office Floors (43-77) To Office Floors (43-77) SCHWP-42-01 to 03 HX-06 HX-06 SCHWP-06-01 to 02 B From Office Floors (7-41) To Office Floors (7-41) SCHWP-06-03 to 05 PCHWP-42-01 PCHWP-42-02 PCHWP-42-03 PCHWP-42-04 PCHWP-42-05 PCHWP-42-06 PCHWP-42-07 HX-42 HX-42 HX-42 HX-42 HX-42 HX-42 HX-42 SCHWP-06-06 to 09 D PCHWP-06-01 PCHWP-06-02 PCHWP-06-03 PCHWP-06-04 PCHWP-06-05 PCHWP-06-06 E Evaporator Evaporator Evaporator Evaporator Evaporator WCC-06a-01 WCC-06a-02 WCC-06a-03 WCC-06a-04 WCC-06a-05 Condenser Condenser Condenser Condenser Condenser Evaporator WCC-06a-06 Condenser F CDWP-06-01 CDWP-06-02 CDWP-06-03 CDWP-06-04 CDWP-06-05 CDWP-06-06 From Cooling Towers To Cooling Towers Figure 1: Schematics of the chiller and secondary chilled water systems. nearly 6000 kpa (60 bar). The actual designed water working pressure for Zone 1 is 1600 kpa (16 bar), while the designed water working pressures for the other three zones are 2000 kpa (20 bar), respectively. Zone 2 (seventh through the 41 st floor), indicated as B in Figure 1, is supplied with the secondary chilled water directly. For the other three zones, the heat exchangers are used to transfer the cooling energy from low zones to high zones to avoid the high water static pressure. Zone 1 (all floors below the sixth floor) indicated as A in Figure 1, is supplied with the secondary chilled water through the heat exchangers located on the sixth floor, while the chilled water from chillers serves as the cooling source of the heat exchangers. Zone 3 (43 rd through 77 th floor) and Zone 4 (79 th through 98 th floor), indicated as C in Figure 1, are supplied with the secondary chilled water through the rst stage heat exchangers (HX-42 in Figure 1) located on the 42 nd floor. Some of the chilled water after the rst stage heat exchangers is delivered to Zone 3 by the secondary chilled water pumps (SCHWP-42-01 to 03) located on the 42 nd floor. Some water is delivered to the second stage heat exchangers ( in Figure 1) located on the 78 th floor by the secondary chilled water pumps (SCHWP-42-04 to 06) located on the 42 nd floor. The water system after the second stage heat exchangers is the conventional primary-secondary chilled water system. Zones 3 and 4 represent about 51% of the total cooling load of this building. All primary chilled water pumps in Zones 3 and 4 are constant speed pumps, while all secondary chilled water pumps are variable speed pumps. The major speci cation of all pumps in Zones 3 and 4 at the design condition is summarized in Table 1. The total design power load of all pumps in Zones 3 and 4 is 389 ton (1369.4 kw), while the total design power load of all constant speed pumps in Zones 3 and 4 is 120 ton (421.2 kw). The constant primary pumps makeup 30.76% of the total pump power in Zones 3 and 4 at the design condition. The Original Design Configuration In the original design, the con guration of water systems after the rst and second stage heat exchangers in Zones 3 and 4 is the primary-secondary pumping paradigm. Each primary chilled water pump is dedicated to each heat exchanger to provide a relatively constant water flow rate, while the water flow rate in the secondary chilled water system varies to meet the indoor cooling load requirements. Under part load, especially May 2008 ASHRAE Journal 43

Pumps Number * Flow (L/s) Head (m) under light load, these primary chilled water pumps contribute a large portion of the total energy used in Zones 3 and 4. In the conventional primary-secondary chilled water systems, the primary chilled water pumps are piped and dedicated to each chiller to provide a constant water flow rate in the evaporators, achieving more reliable control and avoiding the freezing and rupturing of tubes in the evaporators. For the heat exchangers in Zones 3 and 4, the major function of these primary chilled water pumps is to provide the circulation force to chilled water to overcome the pressure drops. Since both sides of heat exchangers are chilled water and the water temperatures are normally higher than 41 F (5 C) for this project, there is no problem of freezing and rupturing occurring in the heat exchanger tubes. To reduce the installation cost and space requirements as well as to enhance the system energy ef ciency, these primary chilled water pumps can be eliminated from the original design and the variable primary water system can be designed for Zones 3 and 4. The Alternative Design Configuration Although variable primary chilled water systems have been addressed and promoted in a number of studies, 1,2,5,7 9 primary-secondary chilled water systems are still used in many projects. These systems are simple, and personnel are familiar and experienced with them. 3 Also, there is a concern that the controls intended to prevent freezing and rupturing from occurring in chiller e aporators evaporators may cause nuisance shutdowns of chillers as a result of too-rapid decreases in chilled water flow. In the alternative design, the con guration of the Efficiency (%) Pow (kw) Pow tot (kw) SCHWP-06-06 to 09 3 (1) 345 30.3 84.2 122 366 PCHWP-42-01 to 07 7 (1) 149 26.0 84.9 44.7 312.9 SCHWP-42-01 to 03 2 (1) 294 36.5 87.8 120 240 SCHWP-42-04 to 06 2 (1) 227 26.2 84.3 69.1 138.2 PCHWP-78-01 to 03 3 (1) 151 20.6 84.3 36.1 108.3 SCHWP-78-01 to 03 2 (1) 227 39.2 85.8 102 204 Total design power of all pumps in Zone 3 and Zone 4 1369.4 (kw) Total design power of primary pumps in Zone 3 and Zone 4 421.2 (kw) (30.76%) * Value in parentheses indicates number of standby pumps. Pow tot in each row does not include the power of standby pumps. Table 1: Major specifications of all pumps in Zones 3 and 4. HX-42 SCHWP-78-01 to 03 SCHWP-42-04 to 06 From Zones 3 & 4 From Office Floors (79-98) To Office Floors (79-98) HX-42 HX-42 HX-42 HX-42 HX-42 HX-42 SCHWP-06-06 to 09 From Office Floors (43-77) To Office Floors (43-77) Figure 2: Water systems in Zones 3 and 4 using the alternative design configuration. primary-secondary chilled water system associated with the chillers keeps them unchanged, while the con gurations of the water systems after the rst and second stage heat exchangers in Zones 3 and 4 are designed as the variable primary chilled water systems. Figure 2 shows the water systems in Zones 3 and 4 using the alternative design. In this design, the primary chilled water pumps after the rst and second stage heat exchangers and their associated ttings in the original design are elimi- nated, and the secondary chilled water pumps in the original design are functioned as the variable primary pumps. The bypass line between the primary water loop and the second- 44 ASHRAE Journal ashrae.org May 2008 To Zone 3 & Zone 4 Pressure Limiting Valve SCHWP-42-01 to 03

Advertisement formerly in this space.

ary water loop in the original design is eliminated as well. In the alternative design, a bypass line is located near the pumps, as shown in Figure 2, to limit the maximum pressure head on the water distribution system. A pressure limiting valve is installed on each bypass line. When the pressure difference between the two points is more than a predetermined pressure difference, the pressure limiting valve will be activated. Otherwise, the valve is closed. Compared to the original design, this alternative design From Coils To Coils Temperature Setpoint has several distinct advantages. The installation cost and space requirements are reduced signi cantly due to the elimination of the primary water pumps after the rst and second stage heat exchangers and their associated ttings. The system energy performance is improved since the parasitic power of these primary constant chilled water pumps is eliminated. The energy T Temperature Controller Water Flow Setpoint Figure 3: The speed control logic for pumps of SCHWP-42-04 to 06. Water Flow Controller From Cooling Source To Cooling Source performance associated with this alternative design is evaluated and compared with the original design in the next section. Energy Performance Evaluation Since the building is still at the construction stage, the hourly based annual building cooling load pro les of this building M Advertisement formerly in this space. Advertisement formerly in this space. 46 ASHRAE Journal May 2008

Advertisement formerly in this space.

Advertisement formerly in this space.

were calculated using EnergyPlus 4 based on the design data and hourly based weather data of the typical year in Hong Kong. To predict the power consumption of variable speed pumps under various operating conditions, proper pump models are required. The pump models used in this study were comprised of polynomials representing head versus flow and speed, ef ciency versus flow and speed, motor ef ciency versus the fraction of the nameplate brake horsepower, and VSD (variable speed driver) ef ciency versus the fraction of the nominal speed. The head and ef ciency characteristics are based on the manufacturers data at full speed operation and extended to variable speed operation using pump af nity laws. 5 To evaluate energy performance of the original design and alternative design, a set of control strategies are required to control the operation of these pumps. In this article, simple control strategies are used and are presented briefly. The speed of the pumps distributing water to cooling coils (i.e., pumps of SCHWP-42-01 to 03 in Zone 3 and pumps of SCHWP-78-01 to 03 in Zone 4) is controlled to maintain the differential pressure at a remote location in the system at a setpoint determined to be suf cient to deliver the required chilled water flowing through all cooing coils. The speed of the pumps distributing water to heat exchangers, i.e., pumps of SCHWP-42-04 to 06, is controlled using a cascade controller, as shown in Figure 3. This cascade controller uses the outlet water temperature at the secondary side of heat exchangers to determine the required water flow rate with respect to the temperature setpoint and the required water flow rate is then compared with the measured water flow rate to carry out the pump speed control. In this controller, a predetermined function is embedded to set the setpoints of the outlet water temperature at the secondary side and the water temperature at the primary side of heat exchangers with proper difference, allowing the water flow rates at both sides to remain roughly the same as needed for proper control of the system. The same control logic also is used for the pumps of SCHWP-06-06 to 09 for the same purpose. The heat exchangers and pumps are sequenced based on the water flow limits for each. Another heat exchanger is put into operation when the water flow rate of each operating heat exchanger exceeds its design water flow rate. One of the operating heat exchangers will be switched off when the water flow rate in the system is less than the total design water flow rate of (N-1) heat exchangers (the current operating number of heat exchangers is N). Another pump is put into operation when the water flow rate of each operating pump exceeds its design value. One of the operating pumps will be shut down when the water flow rate in the system is less than the total design water flow rate of (N-1) pumps (the current operating number of pumps is N). A dead band is used in the sequence controllers of the heat exchangers and pumps for staging and destaging a heat exchanger and a pump to avoid their frequent cycling on and off. In the original design, the operation of each primary chilled water pump in Zones 3 and 4 is dedicated to the operation of the associated heat exchanger that it serves. Since the setpoint, Advertisement formerly in this space. May 2008 ASHRAE Journal 49

Pump Power Original Design (kwh) Alternative Design (kwh) Savings (kwh) Savings (%) Annual 2,760,758.4 1,726,163.5 1,034,594.9 37.48 Spring day 8,587.7 5,392.7 3,195.0 37.20 Mild-Summer Day 10,505.8 6,490.4 4,015.4 38.22 Sunny-Summer Day 12,894.5 8,212.8 4,681.7 36.31 Table 2: Comparison of annual and daily power consumption of all pumps in Zones 3 and 4 under different design configurations. including the differential pressure setpoint and the temperature setpoint, of each local controller signi cantly affects the system energy consumption, the same setpoints were used during the evaluation of energy performance of both design con gurations. Most of the control and operation strategies used in this study are conventional and not the optimal strategies to be used in practice. Based on the previous pump models and control strategies, the energy performance of both design con gurations was evaluated on the virtual building system, including the cool- ing plant and air-conditioning systems that were constructed, particularly for the super high-rise building. 6 Using the simulated hourly based annual building cooling loads and the hourly based weather data of the typical year in Hong Kong, the annual power consumptions of the pumps in Zones 3 and 4 under two different design con gurations were evaluated. Table 2 gives the results. The annual power consumptions of pumps in Zones 3 and 4 using the original design con guration and the alternative design con guration were 2,760,758.4 kwh and 1,726,163.5 kwh, respectively. Compared to the original design con guration, the annual energy savings using this alternative design con guration was about 1,034,595 kwh, which contributes about 2% in savings of the annual total energy consumption of the overall air-conditioning system (including all pumps, chillers, cooling tower fans, AHU fans, and PAU fans) of this building. Three typical days, which represent the typical operation conditions of the air-conditioning system in the spring, mild-summer, and sunny-summer, respectively, were selected to demonstrate more details of energy-saving potentials using the alternative design con guration. The building cooling loads are varied from 796 ton to 7,535 ton (2,800 kw to 26,500 kw), from 1,308 ton Advertisement formerly in this space. Advertisement formerly in this space. 50 ASHRAE Journal May 2008

Advertisement formerly in this space.

to 8,985 ton (4,600 kw to 31,600 kw), 1400 and from 1,507 ton to 10,805 ton (5,300 kw to 38,000 kw) in the selected typical 1200 spring day, mild-summer day, and sunnysummer day, respectively. Compared to 1000 the original design, the alternative design can save about 3,195.0 kwh (37.20%), 800 4,015.4 kwh (38.22%) and 4,681.7 kwh (36.31%) in the typical spring day, 600 mild-summer day and sunny-summer day, respectively. The hourly based pump 400 power consumptions under two different design configurations in the typical 200 sunny-summer day are also showed in Figure 4. At part load, the contribution of the parasitic power of the primary pumps in the original design to the total power consumption of the pumps in Zones 3 and 4 would be more signi cant. The hourly based pump power consumption of the original design is always signi cantly higher than that of the alternative design. These preliminary results illustrate that this alternative design can provide sig- ni cant energy savings in this building as compared to the original design. The power consumptions presented throughout this article includes the power consumptions of all pumps in Zones 3 and 4 only. The practical installation of the chilled water pumping systems can operate under these two design con gurations because the alternative design was proposed at the construction stage. One standby primary chilled water pump at each primary set is eliminated and the associated pipeline is replaced by a bypass line, allowing the chilled water system to operate without using the constant primary pumps. When the manual valves installed on these bypass lines are shut off, the chilled water system can operate according to the original design con guration. The secondary chilled water pumps in the original design can provide suf cient pump head to handle the pressure losses previously handled by the primary pumps since the secondary chilled water pumps in the original design are oversized. Conclusions An alternative design con guration for the secondary chilled water system of a super high-rise building is presented in this article and implemented in the building to achieve more energy savings. The preliminary energy performance evaluation results show that a signi cant amount of pump energy can be saved when using this alternative design. Compared to the original primary-secondary design con guration, the annual energy savings using this alternative design con guration for this building is about 1,034,594 kwh. Both alternative design con gurations are implemented in the super high-rise building. Their operational performance, implementation issues, and control issues, as well as their comparisons in practical application, will be reported in the near future. Pump Power (kw) Original Design Alternative Design 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Time (h) Figure 4: Comparison of hourly based pump power consumptions between two design configurations in the typical sunny-summer day. Acknowledgments The work presented in this article is nancially supported by a grant (5283/05E) of the Research Grant Council (RGC) of the Hong Kong SAR and the support of Sun Hung Kai Properties Limited. References 1. Kirsner, W. 1996. Demise Demise of the primary-secondary pumping paradigm for chilled water plant design. HPAC Engineering 68(11):73 78. 2. Hartman, T.B. 1996. Design issues of variable chilled-water flow through chillers. ASHRAE Transactions 102(2):679 83. 3. Severini, S.C. 2004. Making them work: Primary-secondary chilled water systems. ASHRAE Journal 46(7):27 33. 4. EnergyPlus. 2005. www.eere.energy.gov/buildings/energyplus/. 5. Bahnfleth, W., and E. Peyer. 2001. Comparative analysis of variable and constant primary-flow chilled-water-plant performance. HPAC Engineering 73(4):41 50. 6. Wang, S.W., X.H. Xu, and Z.J. Ma. 2006. Report on the energy performance evaluation of International Commerce Center (ICC) A study sponsored by Sun Hung Kai (SHK). Department of Building Services Engineering, The Hong Kong Polytechnic University. 7. Bahnfleth, W. and E. Peyer. 2006. Energy use and economic comparison of chilled water pumping alternatives. ASHRAE Transactions 112(2):198 208. 8. Bahnfleth, W. and E. Peyer. 2004. Varying views on variable flow chilled water systems. HPAC Engineering 76(3):S5 S9. 9. Bahnfleth, W. and E. Peyer. 2004. Variable primary flow chilled water systems: Potential bene ts and application issues. ARTI-21CR/611-20070-01. Final report (two volumes) to Air- Conditioning and Refrigeration Technology Institute. http:// tinyurl.com/33dgk8 (or http://www.arti-research.org/research/ completed/ nalreports/20070- nal1.pdf). http://tinyurl.com/2r44ce (or http://www.arti-research.org/research/completed/ nalreports/ 20070- nal2.pdf). 52 ASHRAE Journal ashrae.org May 2008