1 Opening Throttled Discharge Valves This 21-story building, constructed in 1997, is located in Oregon and contains 589,000 gross square feet of mostly office occupancy. The HVAC system includes six large air handlers, 400 variable air volume terminal units, five boilers, three chillers, and three cooling towers. The RCx investigation revealed that the discharge valves for the nine condenser water pumps were all set at approximately 50% closed. This indicated that the pumps, ranging from 10 HP to 40 HP, were oversized and could generate more pressure than the system actually requires. When the facility s condenser water system was originally tested and balanced, each pump s discharge valve was gradually throttled down until its design flow rate was achieved. This method of flow control consumes more energy than using properly sized pump impellers and open discharge valves. As part of this RCx measure, pump tests were conducted to determine the impeller size necessary for achieving design flow with the discharge valves 100% open. The impellers for all of the condenser water pumps were trimmed to the appropriate diameter, and the discharge valves were opened. Total condenser pump power was reduced by 38% as a result of reducing the pressure drop across the discharge valves. Water Pressure (Energy) Wasted energy due to oversized impeller and throttled discharge valve. System curve before impeller trim. Discharge valve is partly closed to absorb excess pressure produced by pump. Curve shifts down after impeller trim. Pump produces less pressure, no throttling required. Location in System (see diagram below) Estimated annual electric savings $7, ,053 kwh Implementation cost $6, years From Cooling Tower Pump Discharge Valve To Chiller
2 Modify VAV Box Flow Setpoints The campus consists of four buildings, totaling 805,000 square feet of offices and computer software development labs. The HVAC systems include 34 air-handling systems, hundreds of variable air volume (VAV) terminal units, two chiller plants, and two heating water boiler plants. Investigation of building occupancy trends and design assumptions revealed an actual occupancy of 1,850 people, much less than the original design s assumed continual occupancy of 6,000. This large difference in occupancy impacted the HVAC system in two ways: 1. The actual cooling load was less than design, which caused the VAV boxes to operate at their minimum flow setting for much of the time. At minimum flow, these boxes were often reheating the air just to avoid overcooling the space, causing simultaneous heating and cooling and wasting energy. 2. The actual ventilation load was less than design, leading to overventilation of the spaces, even with the VAV boxes operating at their minimum airflow setting. Design cooling load with 24/7 occupancy and operation With scheduled operation, design cooling load is greater than actual cooling load VAV box minimum flow settings can be lowered to save energy The flow settings for the VAV boxes were recalculated and adjusted based on actual observed conditions. On average, the minimum flow settings were reduced by 40%. This modification helped the facility reduce its fan energy (lower fan speeds) and heating and cooling energy (reduced simultaneous heating and cooling). Estimated annual electric savings $24, ,980 kwh Implementation cost $20, years
3 Reduce Simultaneous Heating & Cooling This 300,000 square foot silicon wafer fabrication facility in Oregon, constructed from 1997 to 1999, includes class 1, ,000 clean rooms. One of the building s main clean room make-up air handling units, a large 100% outdoor air system delivering 42,000 cfm, was adequately maintaining the clean room s tight temperature and humidity requirements (68ºF ± 1-1/2ºF, 45% RH ± 5%). Even though the system was ultimately delivering air at the proper temperature and humidity, the air handling unit s individual heating and cooling components were competing with each other by operating simultaneously. The preheat coil heated the 81ºF outdoor air to 115ºF, then the cooling coil cooled the air down to 40ºF, followed by the reheat coil heating the air to 46ºF. Since cooling the air to 40ºF also dehumidified it too much, the steam humidifier was then injecting steam into the airstream. To eliminate this simultaneous heating and cooling and unnecessary humidification, the following minor adjustments were made to the system: The preheat coil shutoff valve was integrated with the main control system so that the valve shuts off steam to the coil when it is not needed. Temperature sensors that were out of calibration were replaced. The control sequence was revised for more stable and efficient operation. Outside Air Damper Steam Preheat Coil Chilled Water Cooling Coil Steam Reheat Coil Humidifier Supply Fan HEPA Filters 81 F Pre-RCx: 115 F Post-RCx: 81 F Pre-RCx: 40 F Post-RCx: 46 F 46 F 54 F Pre-Filters Final Filters Temperature, F Pre-RCx Estimated annual total gas and electric savings $84,000 Implementation cost $7,000 Post-RCx Hatched area represents wasted energy due to simultaneous heating and cooling Point in Air Handler 0.1 years
4 Disabled Economizer Control This 21-story building, built in 1997, contains 589,000 gross square feet of mostly office-type occupancy. Its HVAC system includes six large air handlers, 400 variable air volume terminal units, five boilers, three chillers, and three cooling towers. The outside air damper related to a 120,000 cfm air handling system was locked at 30% open to remedy return fan operational issues that occurred when the system went into economizer, or free cooling, mode. With the economizer disabled, the system was requesting chilled water at outside air temperatures as low as 45ºF. At this temperature, the system could be using 100% outside air alone to cool the facility. If the economizer system were in operation, the air handler could use a higher percentage of outside air to provide cooling, rather than relying on mechanical (chilled water) cooling. This would reduce the energy used by the HVAC system. The operational issues related to the return fan were addressed and the airside economizer system was returned to fully modulating automatic control. Mixed Air Temperature, F Performance with damper locked at 30% Hatched area represents times of additional chiller energy use due to locked outside air damper Estimated annual electric savings $5,465 74,857 kwh Implementation cost $2,800 Outside Air Damper Performance years Outside Air Temperature, F Performance as fully modulating economizer
5 Modify Heat Pump Schedules This seven-story, 125,000 square foot office building in California holds 85 different tenants. Its heat pump HVAC system includes 175 water source heat pumps, two water loop circulating pumps, and two fluid coolers. The regular HVAC operating schedules had been modified to accommodate temporary after-hours occupancy, rather than operating the system under a temporary override. As a result, the entire heat pump system was operating when the building was unoccupied, even after the temporary occupancy period had passed. This savings opportunity was identified through system trend analysis and use of data loggers that revealed the modified heat pump schedules. The schedules for the heat pumps, water loop circulating pumps, and fluid coolers were modified to reflect actual building occupancy schedules. The building operators were trained on how to accommodate temporary after-hours occupancy requests. System operation was monitored through trending of the building control system and use of data loggers to confirm that the HVAC system was operating in accordance with the new schedules. Utility interval data also confirmed a reduction in operation during weekends and other unoccupied periods. Power (kw) Fluid Cooler Spray Pumps Pre- and Post-RCx Average Daily Load Shapes Pre-RCx Post-RCx 0 0:00 1:00 2:00 3:00 4:00 5:00 6:00 7:00 8:00 9:00 10:00 11:00 12:00 13:00 14:00 15:00 16:00 17:00 18:00 19:00 20:00 21:00 22:00 23:00 Weekdays - Pre-RCx Weekdays - Post-RCx Estimated annual electric savings $17, ,460 kwh Implementation cost $240 Immediate Weekends and Holidays - Pre-RCx Weekends and Holidays - Post-RCx
Commissioning - Construction Documents (Page 1 of 6)
Commissioning - Construction Documents (Page 1 of 6) A. General Information Climate Zone: Building Type: Conditioned Area (sf): Reviewer's Name: Reviewer's Agency: Note: Design Review for each system/subsystem
KU DESIGN GUIDELINES APPENDIX XVI RECOMMENDED BAS I/O CONTROL POINTS BY EQUIPMENT / SYSTEM
KU DESIGN GUIDELINES APPENDIX XVI RECOMMENDED BAS I/O CONTROL POINTS BY EQUIPMENT / SYSTEM AIR HANDLING UNITS... 1 CHILLERS... 2 COOLING TOWERS... 2 CLOSED LOOP COOLERS... 2 MISCELLANEOUS SUPPLY FANS...
AIR COOLED CHILLER CHILLED WATER PUMP CONTROL: The chilled water pump with the lowest runtime will automatically start when the outside air temperature rises above the system enable setpoint. When the
UNIVERSITY OF MISSOURI 23 0000 - Heating Ventilating and Air-Conditioning (HVAC) March 2015.01
GENERAL: This section provides general standards for overall sizing and design of Heating, Ventilating, and Air Conditioning (HVAC) systems. Other sections contain specific standards for each system per
Energy Efficiency in Industrial HVAC Systems
Energy Efficiency in Industrial HVAC Systems Heating, ventilation and air conditioning (HVAC) constitutes up to 35 percent of energy used in manufacturing facilities. This fact sheet is geared towards
Presentation Outline. Common Terms / Concepts HVAC Building Blocks. Links. Plant Level Building Blocks. Air Distribution Building Blocks
Presentation Outline Common Terms / Concepts HVAC Building Blocks Plant Level Building Blocks Description / Application Data Green opportunities Selection Criteria Air Distribution Building Blocks same
for Plans Examiners and Building Inspectors
Building Technologies Program HVAC Controls Guide for Plans Examiners and Building Inspectors September 2011 Authors: Eric Makela, PNNL James Russell, PECI Sarah Fujita, PECI Cindy Strecker, PECI Prepared
Data Center Design Guide featuring Water-Side Economizer Solutions. with Dynamic Economizer Cooling
Data Center Design Guide featuring Water-Side Economizer Solutions with Dynamic Economizer Cooling Presenter: Jason Koo, P.Eng Sr. Field Applications Engineer STULZ Air Technology Systems jkoo@stulz ats.com
HVAC Checklist - Long Form
HVAC Checklist - Long Form Page 1 of 14 Appendix B discusses HVAC system components in relation to indoor air quality. utside Air Intake Location pen during occupied hours? Unobstructed? Standing water,
REAL OPERATING COST SAVINGS FROM RETRO- COMMISSIONING OPPORTUNITIES FOR SAVINGS IN ACADEMIC MEDICAL CENTERS
REAL OPERATING COST SAVINGS FROM RETRO- COMMISSIONING OPPORTUNITIES FOR SAVINGS IN ACADEMIC MEDICAL CENTERS Ken L. Hansen P.E. University of Nebraska Medical Center [email protected] 402-559- 5301 402-630-
CHAPTER 8 HVAC (Heating, Ventilation, and Air-Conditioning)
CHAPTER 8 HVAC (Heating, Ventilation, and Air-Conditioning) Objectives Survey current HVAC system(s), operating procedures, and maintenance schedule. Analyze results of energy audit for HVAC system(s)
3/29/2012 INTRODUCTION HVAC BASICS
INTRODUCTION HVAC BASICS AND HVAC SYSTEM EFFICIENCY IMPROVEMENT SECTION O HVAC systems or Heating, Ventilating and Air-Conditioning systems control the environment for people and equipment in our facilities.
Defining Quality. Building Comfort. Precision. Air Conditioning
Defining Quality. Building Comfort. Precision Air Conditioning Today s technology rooms require precise, stable environments in order for sensitive electronics to operate optimally. Standard comfort air
HVAC Processes. Lecture 7
HVAC Processes Lecture 7 Targets of Lecture General understanding about HVAC systems: Typical HVAC processes Air handling units, fan coil units, exhaust fans Typical plumbing systems Transfer pumps, sump
Scope of Work. See www.sei.ie for resources available
HVAC SWG Summary Background Pool energy-efficiency knowledge Increase cost-competitiveness Develop resources aimed at assisting in reducing HVAC energy consumption Address barriers to energy-saving HVAC
ENHANCED LABORATORY HVAC SYSTEM
ENHANCED LABORATORY HVAC SYSTEM INTRODUCTION Since the early 1980's the attention to more energy efficient laboratory designs has been on the rise due to the increase in energy cost and the emergence of
Printing and Publishing Energy Savings Guide
Printing and Publishing Energy Savings Guide Oregon printing and publishing plants face challenges of rising operating costs, environmental and other regulations, outdated equipment and customer demand
The main steam enters the building in the basement mechanical room; this is where the condensate line also leaves the building.
MSV: Square Footage: 24,844 No. of Floors: 1 Year Built: 1963 Type of Use: Lounge and dining area open all night for snacks Steam Water-cooled condenser, 50-Ton York unit with a 6 cylinder-reciprocating
HVAC Simplified Approach Option
HVAC Simplified Approach Option Part I Project Address: City: HVAC System Designer of Record: Date: Zip: Qualification The building is 2 stories or less in height and has a gross floor area is less than
Modeling and Simulation of HVAC Faulty Operations and Performance Degradation due to Maintenance Issues
LBNL-6129E ERNEST ORLANDO LAWRENCE BERKELEY NATIONAL LABORATORY Modeling and Simulation of HVAC Faulty Operations and Performance Degradation due to Maintenance Issues Liping Wang, Tianzhen Hong Environmental
Data Center Energy Profiler Questions Checklist
Data Center Energy Profiler Questions Checklist Step 1 Case Name Date Center Company State/Region County Floor Area Data Center Space Floor Area Non Data Center Space Floor Area Data Center Support Space
5.6 Technical Specification: Premium Efficiency Electric Air Conditioning Equipment
5.6 Technical Specification: Premium Efficiency Electric Conditioning Equipment Small Premium Project Type: For Premium Conditioning Retrofit Projects: Projects that voluntarily replace existing unitary
DATA CENTER COOLING INNOVATIVE COOLING TECHNOLOGIES FOR YOUR DATA CENTER
DATA CENTER COOLING INNOVATIVE COOLING TECHNOLOGIES FOR YOUR DATA CENTER DATA CENTERS 2009 IT Emissions = Aviation Industry Emissions Nations Largest Commercial Consumers of Electric Power Greenpeace estimates
Advanced Energy Design Guide LEED Strategies for Schools. and High Performance Buildings
Advanced Energy Design Guide LEED Strategies for Schools and High Performance Buildings Today s Presenters Stephen Koontz, LEED AP Energy Services Leader Tampa Bay Trane Allen Irvine General Sales Manager
Design Guide. Retrofitting Options For HVAC Systems In Live Performance Venues
Design Guide Retrofitting Options For HVAC Systems In Live Performance Venues Heating, ventilation and air conditioning (HVAC) systems are major energy consumers in live performance venues. For this reason,
Mechanical Systems Proposal revised
Mechanical Systems Proposal revised Prepared for: Dr. William Bahnfleth, Professor The Pennsylvania State University, Department of Architectural Engineering Prepared by: Chris Nicolais Mechanical Option
Data Realty Colocation Data Center Ignition Park, South Bend, IN. Owner: Data Realty Engineer: ESD Architect: BSA LifeStructures
Data Realty Colocation Data Center Ignition Park, South Bend, IN Owner: Data Realty Engineer: ESD Architect: BSA LifeStructures Project Overview Data Realty is a data center service provider for middle
UNIFIED FACILITIES GUIDE SPECIFICATIONS
USACE / NAVFAC / AFCEC / NASA UFGS-23 09 93 (November 2015) ----------------------------- Preparing Activity: USACE Superseding UFGS-23 09 23 (May 2011) UNIFIED FACILITIES GUIDE SPECIFICATIONS References
HEAT RECOVERY FROM CHILLED WATER SYSTEMS. Applications for Heat Reclaim Chillers
HEAT RECOVERY FROM CHILLED WATER SYSTEMS Applications for Heat Reclaim Chillers April 2008 TABLE OF CONTENTS INTRODUCTION... 3 WASTE HEAT SOURCES... 3,4 Capturing Sufficient Heat for Useful Purposes...
Ener.co & Viridian Energy & Env. Using Data Loggers to Improve Chilled Water Plant Efficiency. Randy Mead, C.E.M, CMVP
Ener.co & Viridian Energy & Env. Using Data Loggers to Improve Chilled Water Plant Efficiency Randy Mead, C.E.M, CMVP Introduction Chilled water plant efficiency refers to the total electrical energy it
Flexibility, Efficiency In San Antonio Arena
2005, American Society of Heating, Refrigerating and Air-Conditioning Engineers, Inc. (www.ashrae.org). Reprinted by permission from ASHRAE Journal, (Vol. 47, No. 9, September 2005). This article may not
SUCCESS STORY ENERGY TO CARE UF HEALTH SHANDS VISTA REHAB & UF HEALTH SHANDS CANCER HOSPITAL (SOUTH TOWER)
ENERGY TO CARE SUCCESS STORY UF HEALTH SHANDS VISTA REHAB & UF HEALTH SHANDS CANCER HOSPITAL (SOUTH TOWER) UF Shands uses commissioning and automation to save more than $5 million in less than five years
HVAC Systems: Overview
HVAC Systems: Overview Michael J. Brandemuehl, Ph.D, P.E. University of Colorado Boulder, CO, USA Overview System Description Secondary HVAC Systems Air distribution Room diffusers and air terminals Duct
Product Data Bulletin
Product Data Bulletin Adjustable Frequency Drives and HVAC Systems An Application Guide September, 1994 Raleigh, NC, U.S.A. INTRODUCTION All buildings pose the same problem: how to heat or cool the air
Xcel Business Customers: Program and Rebate Summary
Xcel Business Customers: Program and Rebate Summary Rebates for New Energy-Efficient Equipment Xcel offers prescriptive rebates to its business customers. What s a prescriptive rebate? It simply means
Using Time-of-Day Scheduling To Save Energy
The following article was published in ASHRAE Journal, May 29. Copyright 29 American Society of Heating, Refrigerating and Air-Conditioning Engineers, Inc. It is presented for educational purposes only.
Air Conditioning Clinic
Air Conditioning Clinic Introduction to HVAC Systems One of the Systems Series February 2012 TRG-TRC018-EN Introduction to HVAC Systems One of the Systems Series A publication of Trane Preface Introduction
How To Design A Building In New Delhi
ENERGY EFFICIENT HVAC DESIGN FOR COMPOSITE CLIMATE Overview of Design Conditions: Air conditioning system consumes most of the energy that a building needs in its operation. In order to reduce energy consumption
Variable Air Volume - VAV
Mode Enable Sensor Options Variable Air Volume - VAV The temperature of this sensor will determine if the unit is in heating, cooling or vent mode during occupied operation. The following options are available:
State of the Art Energy Efficient Data Centre Air Conditioning
- White Paper - State of the Art Energy Efficient Data Centre Air Conditioning - Dynamic Free Cooling - Release 2, April 2008 Contents ABSTRACT... 3 1. WHY DO I NEED AN ENERGY EFFICIENT COOLING SYSTEM...
ENERGY EFFICIENT HVAC DESIGN FOR WARM-HUMID CLIMATE CLIMATE
ENERGY EFFICIENT HVAC DESIGN FOR WARM-HUMID CLIMATE CLIMATE Overview of Design Conditions: Air conditioning system consumes most of the energy that a building needs in its operation. In order to reduce
HEATING, VENTILATION & AIR CONDITIONING
HEATING, VENTILATION & AIR CONDITIONING as part of the Energy Efficiency Information Grants Program Heating and cooling can account for approximately 23 % of energy use in pubs and hotels 1. Reducing heating
newsletter engineers energy-saving strategies for Water-Source Heat Pump Systems volume 36 2 providing insights for today s hvac system designer
engineers volume 36 2 newsletter providing insights for today s hvac system designer energy-saving strategies for Water-Source Heat Pump Systems from the editor... Water-source heat pump (WSHP) systems
Central Plant Air Systems: Keeping the Heart and. Title Style. Better Buildings Summit May 2016
Central Plant Air Systems: Keeping the Heart and Click Lungs To Healthy Edit Master Title Style Better Buildings Summit May 2016 Introductions Michael Deru National Renewable Energy Laboratory New Resources
Sample - Existing Building Commissioning Plan
Sample - Existing Building Commissioning Plan Version: Draft for Review Final Approved: Owner Site Address: Primary Site Contact Name and Telephone Number: Date Building Description The site consists of
Chilled Water HVAC Systems
Chilled Water HVAC Systems By Ron Prager, Brinco Mechanical Services, Inc. Types of water based systems: There are three types of HVAC systems that utilize water as a heat transfer medium. The first system,
Rev. No. 0 January 5, 2009
ENERGY & ENVIRONMENTAL ENERGY ISSUES COMMITTEE 415 Main Building Telephone (574) 631-6666 Notre Dame, Indiana Facsimile (574) 631-5883 46556 USA Energy Conservation Plan For HVAC Systems Rev. No. 0 January
Presented By: WALTER E. JOHNSTON, PE CEM, CEA, CLEP, CDSM, CPE <[email protected]
Presented By: WALTER E. JOHNSTON, PE CEM, CEA, CLEP, CDSM, CPE
APPLICATION GUIDE. Comparison of Latent Cooling Performance of Various HVAC systems in a Classroom Application
APPLICATION GUIDE Comparison of Latent Cooling Performance of Various HVAC systems in a Classroom Application Section Comparison of Latent Cooling Performance of Introduction Most commercial HVAC systems
Design Options for HVAC Distribution Systems
Design Options for HVAC Distribution Systems Course No: M06-017 Credit: 6 PDH A. Bhatia Continuing Education and Development, Inc. 9 Greyridge Farm Court Stony Point, NY 10980 P: (877) 322-5800 F: (877)
NetApp Data Center Design
NetApp Data Center Design Presentation for SVLG Data Center Efficiency Summit November 5, 2014 Mark Skiff, PE, CEM, CFM Director, IT Data Center Solutions Data Center Design Evolution Capacity Build Cost
Data Centers WHAT S ONTHEHORIZON FOR NR HVAC IN TITLE 24 2013? SLIDE 1
WHAT S ONTHEHORIZON FOR NR HVAC IN TITLE 24 2013? SLIDE 1 Data Center CASE Scope Existing Title 24 2008 Scope Current scope ( 100 T24-2008) exempts process space from many of the requirements, however
Federal Wage System Job Grading Standards for Air Conditioning Equipment Operating, 5415. Table of Contents
Federal Wage System Job Grading Standards for Air Conditioning Equipment Operating, 5415 Table of Contents WORK COVERED... 2 WORK NOT COVERED...2 TITLES... 2 GRADE LEVELS... 2 HELPER AND INTERMEDIATE JOBS...
Glossary of Heating, Ventilation and Air Conditioning Terms
Glossary of Heating, Ventilation and Air Conditioning Terms Air Change: Unlike re-circulated air, this is the total air required to completely replace the air in a room or building. Air Conditioner: Equipment
A. The Commissioning Authority (CxA) has been contracted or will be contracted directly with the Owner for this project.
DIVISION 23 HEATING, VENTILATING, AND AIR CONDITIONING (HVAC) SECTION 23 08 02 PART 1 GENERAL 1.01 AUTHORITY (CxA) A. The Commissioning Authority (CxA) has been contracted or will be contracted directly
ENERGY AUDITS AND RETRO- COMMISSIONING Local Law 87
ENERGY AUDITS AND RETRO- COMMISSIONING Local Law 87 Overview Although energy-efficiency retrofits generally result in major cost and energy savings, many buildings are not participating in the audits that
Data Center. Ultra-Efficient chilled water system optimization. White paper. File No: 9.236 Date: december 03, 2015 Supersedes: new Date: new
Data Center Ultra-Efficient chilled water system optimization White paper File No: 9.236 Date: december 03, 2015 Supersedes: new Date: new Data Center - Ultra-Efficient white paper 3 abstract The primary
ENERGY SAVING STUDY IN A HOTEL HVAC SYSTEM
ENERGY SAVING STUDY IN A HOTEL HVAC SYSTEM J.S. Hu, Philip C.W. Kwong, and Christopher Y.H. Chao Department of Mechanical Engineering, The Hong Kong University of Science and Technology Clear Water Bay,
Dedicated Outdoor Air-Dual Wheel System Control Requirements
4428 Dedicated Outdoor Air-Dual Wheel System Control Requirements Stanley A. Mumma, Ph.D., P.E. Fellow ASHRAE ABSTRACT The central thrust of this paper is to develop a clear understanding of the performance
White Paper. Data Center Containment Cooling Strategies. Abstract WHITE PAPER EC9001. Geist Updated August 2010
White Paper Data Center Containment Cooling Strategies WHITE PAPER EC9001 Geist Updated August 2010 Abstract Deployment of high density IT equipment into data center infrastructure is now a common occurrence
APPLICATION GUIDE. Moisture Management in Waterborne Climate Systems
APPLICATION GUIDE Moisture Management in Waterborne Climate Systems Contents Introduction 3 WBCS Concept 3 Condensation 4 Moisture Sources in the Space 4 Impact of a High Moisture Load 5 Designing to Manage
Creating Efficient HVAC Systems
Creating Efficient HVAC Systems Heating and Cooling Fundamentals for Commercial Buildings Heating, ventilating, and air conditioning (HVAC) systems account for nearly half of the energy used in a typical
B.C. Buildings Corporation. Mandatory Preventive Maintenance Standard. To Meet Section 4.78 of the WCB OH & S Regulation
B.C. Buildings Corporation Mandatory Preventive To Meet Section 4.78 of the WCB OH & S Regulation Prepared by: BCBC WCB-IAQ Steering Committee Mandatory Preventive TABLE OF CONTENTS Page no. INTRODUCTION...1
ALBUQUERQUE PUBLIC SCHOOLS Facility Design & Construction / Maintenance & Operations
ALBUQUERQUE PUBLIC SCHOOLS Facility Design & Construction / Maintenance & Operations MECHANICAL SYSTEMS DESIGN STANDARDS Appendix A RECOMMENDED HVAC SYSTEMS BY TYPE OF SPACE Matt Higgins Valentin Lucero
Engineering White Paper UTILIZING ECONOMIZERS EFFECTIVELY IN THE DATA CENTER
Engineering White Paper UTILIZING ECONOMIZERS EFFECTIVELY IN THE DATA CENTER SUMMARY A proper balance of temperature and humidity control is essential for efficient data center operation, and integral
RFI Response RFP: HSCG88-16-R-PQQ015 Replace HVAC Bldg A & C San Diego, CA.
1. There is verbiage in the hazardous material report referring to a state licensed abatement contractor. Within the recommendations part of the report (page 64 of 111 of the specification pdf) is the
NEBB STANDARDS SECTION-8 AIR SYSTEM TAB PROCEDURES
NEBB STANDARDS SECTION-8 AIR SYSTEM TAB PROCEDURES 8.1 INTRODUCTION Testing, adjusting, and balancing of HVAC systems can best be accomplished by following a series of systematic procedures. The NEBB TAB
Collaborative Laboratory Commissioning and Sustaining the Optimal Building. By E. Lon Brightbill, P.E Facility Dynamics
Collaborative Laboratory Commissioning and Sustaining the Optimal Building By E. Lon Brightbill, P.E Facility Dynamics Overview DefineCommissioning (Cx) Put the Cx process in the Context of a State of
Causes of High Relative Humidity Inside Air Conditioned Buildings. Roger G.Morse AIA, Paul Haas CSP, CIH Morse Zehnter Associates
Causes of High Relative Humidity Inside Air Conditioned Buildings Roger G.Morse AIA, Paul Haas CSP, CIH Morse Zehnter Associates S. FLORIDA AVE. AMBIENT 91 F db / 78 F wb 16,000 HOURS ANNUALLY THAT wb
Building Energy Systems. - HVAC: Heating, Distribution -
* Some of the images used in these slides are taken from the internet for instructional purposes only Building Energy Systems - HVAC: Heating, Distribution - Bryan Eisenhower Associate Director Center
Design Options For HVAC Distribution System
PDHonline Course M147 (4 PDH) Design Options For HVAC Distribution System Instructor: A. Bhatia, B.E. 2012 PDH Online PDH Center 5272 Meadow Estates Drive Fairfax, VA 22030-6658 Phone & Fax: 703-988-0088
85 F 80 F 50% 75 F 70 F 73.0/61.8 45 F 10% Figure 1
Feb. 07 INTRODUCTION: Wrap around heat pipes are air-to-air heat exchangers that are installed in the airstream upstream and downstream of a cooling coil to deliberately reduce the Sensible Heat Ratio
Dr. Michael K. West, PE 1 Dr. Richard S. Combes, PE 2 Advantek Consulting / Melbourne, Florida
Optimizing 100% Outside Air Systems with Heat Pipes Dr. Michael K. West, PE 1 Dr. Richard S. Combes, PE 2 Advantek Consulting / Melbourne, Florida Introduction To meet increasingly rigorous building codes
2 STEPS TO CONDUCTING YOUR HVAC ASSESSMENT
Presentation Synopsis Heating, Ventilating and Air Conditioning Building Condition Assessment Vancouver, B.C. Prepared for: EPIC Prepared by: Douglas Spratt, P.Eng Douglas Spratt & Associates Ltd. www.dspratt-associates.com
SECTION 23 05 93 TESTING, ADJUSTING, AND BALANCING FOR HVAC INTRODUCTORY INFORMATION
SECTION 23 05 93 TESTING, ADJUSTING, AND BALANCING FOR HVAC INTRODUCTORY INFORMATION The purpose of this guide specification is to assist the specifier in correctly specifying Mechanical System Testing
HVAC Applications. VFD considerations for HVAC systems...
HVAC Applications VFD considerations for HVAC systems... 1 COMMON TERMINOLOGY VFD (VARIABLE FREQUENCY DRIVES) AFC (ADJUSTABLE FREQ. CONTOLLER) ASD (ADJUSTABLE SPEED DRIVES) VSD (VARIABLE SPEED DRIVES)
Case Study: Innovative Energy Efficiency Approaches in NOAA s Environmental Security Computing Center in Fairmont, West Virginia
Case Study: Innovative Energy Efficiency Approaches in NOAA s Environmental Security Computing Center in Fairmont, West Virginia Prepared for the U.S. Department of Energy s Federal Energy Management Program
SAM HOUSTON STATE UNIVERSITY
PART 1: GENERAL 1.01 General Requirements A. This standard is intended to provide useful information to the Professional Service Provider (PSP) to establish a basis of design. The responsibility of the
for K-12 School Buildings
Advanced Energy Design Guide for K-12 School Buildings HVAC Section John Murphy Applications Engineer, LEED AP Trane La Crosse, Wisconsin [email protected] www.trane.com AEDG-K12 HVAC Subcommittee John
Digital Realty Data Center Solutions Digital Chicago Datacampus Franklin Park, Illinois Owner: Digital Realty Trust Engineer of Record: ESD Architect
Digital Realty Data Center Solutions Digital Chicago Datacampus Franklin Park, Illinois Owner: Digital Realty Trust Engineer of Record: ESD Architect of Record: SPARCH Project Overview The project is
Case Study. Crown Melbourne & BUENO Systems: Energy and Operational Savings Across a Multi-Use Entertainment Complex.
Case Study Crown Melbourne & BUENO Systems: Energy and Operational Savings Across a Multi-Use Entertainment Complex Version 1.0 June 2015 Find What Matters Crown Melbourne Analytics-Driven Energy and Operational
The Business Case Annual fuel cost savings of 26% worth more than 28,000 Annual fuel savings of 1.3million kwh Annual CO2 savings of over 245 tonnes
North Lanarkshire Council The Business Case Annual fuel cost savings of 26% worth more than 28,000 The Sir Matt Busby Sports Complex is an important local facility for the people of Bellshill, North Lanarkshire.
6 MECHANICAL HVAC SYSTEMS
Conventional Facilities Chapter 6: HVAC Systems 6-1 6 MECHANICAL HVAC SYSTEMS 6.1 Design Criteria 6.1.1 Codes and Standards The latest edition of the codes, standards, orders, and guides referred to in
Section 2: Estimating Energy Savings and Incentives
Section 2: Estimating Energy Savings and Incentives 2.1 Estimating Energy Savings and Incentives... 2 2.2 Customized Measures - Estimation Software... 2 2.2.1 AC&R I - High Efficiency Chiller... 3 2.2.2
The Data Center Dilemma - A Case Study
Second Place: Industrial Facilities or Processes, Existing The TCS data center makes use of white cabinets and reflective surfaces as one method to reduce power for its lights and cooling. Data Center
Water cooled chiller plant (cp/vs)
Data Center Water cooled chiller plant (cp/vs) Design Envelope File No: 9.573 Date: december 16, 2014 Supersedes: 9.573 Date: november 14, 2014 design envelope s performance improvements are among the
CONTROL STRATEGIES FOR HVAC SYSTEMS
CONROL SRAEGIES FOR HVAC SYSEMS ZBIGNIEW POPIOLEK Department of Heating, Ventilation and Dust Removal echnology Silesian University of echnology, Poland 1 Definition of control: to apply a regulating influence
Guidelines for energy efficient heating, ventilation and air conditioning (HVAC) systems
Guidelines for energy efficient heating, ventilation and air conditioning (HVAC) systems If you're a designer or a BCA, this guidance on the energy efficiency of HVAC systems in commercial buildings may
Engineers Newsletter. Understanding Single-Zone VAV Systems. providing insights for today s hvac system designer. volume 42 2
providing insights for today s hvac system designer Engineers Newsletter volume 42 2 Understanding Single-Zone VAV Systems Single-zone variable-air-volume (VAV) is not a new concept, but due to new energy
Centrifugal Fans and Pumps are sized to meet the maximum
Fans and Pumps are sized to meet the maximum flow rate required by the system. System conditions frequently require reducing the flow rate. Throttling and bypass devices dampers and valves are installed
How To Control Humidity With A Humidifier
Control of ventilation and air conditioning plants Building Technologies s Contents.Temperature control in air treatment systems 2. Humidity controls 3. Recirculated air mixing. Internal heat sources 6.2
EnergyPro Building Energy Analysis. Assisted Living Building
EnergyPro Building Energy Analysis Assisted Living Building EnergyPro Building Energy Analysis for an assisted living building Project Scope The purpose of the EnergyPro energy model was to evaluate the
ULTRA-EFFICIENT HVAC DESIGN AND CONTROL
CASE STUDY ULTRA-EFFICIENT HVAC DESIGN AND CONTROL MAJOR HEATING, VENTILATING AND AIR- CONDITIONING REPLACEMENT AT THE COUNTY OF SAN DIEGO CRIME LAB December 30, 2005 8520 Tech Way, Suite 110 San Diego,
SPECIAL ISSUE: NATIONAL SCIENCE FOUNDATION WORKSHOP
research journal 2013 / VOL 05.01 www.perkinswill.com SPECIAL ISSUE: NATIONAL SCIENCE FOUNDATION WORKSHOP ARCHITECTURE AND ENGINEERING OF SUSTAINABLE BUILDINGS Current Trends in Low-Energy HVAC Design
CyberFortress Data Center at Innovation Park Infrastructure and Topology Guide. Innovation Park Charlotte. NC 28262. DRAFT V0.
Innovation Park Charlotte. NC 28262 DRAFT V0.1 Page 2 CyberFortress Data Center at Innovation Park BECO South purchased Innovation Park in March 2010 and immediately launched a dramatic top-to-bottom $30M