Konti Skan Replacement of Cable 1



Similar documents
HV Submarine Cable Systems Design, Testing and Installation

Feasibility Study of Deep Water Power Cable Systems. Enrico Colombo CESI S.p.A

An Introduction to High Voltage Direct Current (HVDC) Underground Cables

HVDC Light Cables. Submarine and land power cables

E-Highway2050 WP3 workshop April 15 th, 2014 Brussels

CIEMADeS 4th INTERNATIONAL CONFERENCE

CONFLEX ELECTRIC CABLE

State, trends and evolutions of HV/EHV power cables systems and contributions of SC B1 to their ongoing progress

Submarine Power Cables. State-of-the-art production facility, more than 100 years of experience and reference installations around the world.

8 Strait of Belle Isle Marine Cable Crossing

Optimization of the coupled grid connection of offshore wind farms

Overview of the 500MW EirGrid East-West Interconnector, considering System Design and Execution-Phase Issues

Cable Consulting International

Undergrounding high voltage electricity transmission. The technical issues

Offshore Wind China 2010 Bergen, 15th March Olivier Angoulevant Nexans Norway AS

Q: PLEASE STATE YOUR NAME AND BUSINESS ADDRESS. A: Gerry Sheerin. Sheerin Technical, 25 Eastville Avenue, Toronto, Ontario Canada

Viking Link Interconnector

Offshore Work Packages

environment briefing02

METAL-CLAD AND METAL-ENCLOSED SWITCHGEAR 3.6KV~40.5KV. tgood.com. Energy. Fast.

A Deeper Insight into Fault Location on Long Submarine Power Cables

EuroAsia Interconnector Project Submarine power cable

XLPE Land Cable Systems User s Guide. Rev 5

Introduction to The Trans Bay Cable Project

UGVCL/SP/591/11KV HT AB CABLE

SUITABILITY OF DIFFERENT TEST VOLTAGES FOR ON-SITE TESTING OF XLPE CABLE SYSTEMS

LIPA. The. Long Island Power Authority links to the PJM Interconnection with an undersea/underground HVDC link. 20

Hendrix Spacer Cable

MEDIUM VOLTAGE CE-BF SWITCHBOARDS. UP TO 40.5 kv. CE - BF - C - en - REV

Svenska Kraftnät s requirements for documentation in cable projects

Gulf Cable & Electrical Ind. Co.

factsheet High Voltage Direct Current electricity technical information

The new 525 kv extruded HVDC cable system

Curriculum Vitae Fredrik Rüter 1 December 2014

Underground vs. Overhead Transmission and Distribution

Developing Ocean Energy in Ireland. Belmullet Wave Energy Test Site

Fault location on power cables. Fault location on power cables

High Voltage Systems. Today. The history of cables

Brochure Introducing HVDC

Summary of Electric Transmission Assessment Report

Cable Laying and Repair - Cable Ship Operations

DEK-REL- 24/1/SEN. Extract from the online catalog. Order No.:

Permanent Reservoir Monitoring (PRM) System Installation: The Installers Perspective

FLEXIBLE INDUSTRIAL CABLES H07RN-F TENAFLEX SR

VDE Information. Degree of Pollution, Clearances and Creepage Distances and Insulating Materials

MV CABLE TYPE C

Cable System Planning and Permitting: Business and Stakeholder Considerations

Oahu Wind Integration and Transmission Study (OWITS) Hawaiian Islands Transmission Interconnection Project

SOUTHERN MARYLAND ELECTRIC COOPERATIVE, INC. HUGHESVILLE, MD

SUPERCONDUCTING CABLE SYSTEMS

RoHS APPROVAL SHEET. ituner 12V/6.6A SERIES NO. (E17) EA10953A. ( ) Edac Power Electronics (Suzhou) Co., Ltd. 59 No.59, Chang Sheng Road, Sheng Pu,

Arctic Fibre Submarine Cable System

Network Standard Advice No. 1420C 9/6/2011

For business. Wiring your business for broadband. What happens when copper is required?

factsheet High Voltage Direct Current Electricity technical information

Electrical Considerations for HVDC Transmission Lines. Joe Mooney, PE

Cables, Cable Laying & Accessories Manual

VIPERFLEX ELECTRIC CABLE

AORC Technical meeting 2014

Pipelines and seabed intervention

Max. Length of HTS Cables in the Future

Unified requirements for systems with voltages above 1 kv up to 15 kv

Submarine Cables: Critical Infrastructure Supplier Perspective

Positive-guided relay outputs: 3 safety contacts (N/O), instantaneous. 1 auxiliary contact (N/C), instantaneous

pole, 8 A Safety relay. Screw terminal. 35 mm rail (EN 60715) mounting. 2 CO (DPDT) 8/15 250/400 2, /0.65/0.

6 ELECTRICAL PARAMETERS

NATUS NES / NES-H Draw-out Type Medium Voltage Switchgear Systems. Safe energy distribution that meets the highest industrial requirements

Ampacity simulation of a high voltage cable to connecting off shore wind farms

Grid connection of near shore wind farms

SECTION FIRE AND SMOKE ALARM SYSTEM. City of San Diego, CWP Guidelines

High Voltage Cable Systems

Recent Siemens HVDC Activities Yuriy Kazachkov Siemens PTI

4 IX D N E P P A Installation methods Current-carrying capacity and voltage drop for cables Reference method IET Wiring Matters

NSW Submarine Power. Cables for the future, delivered today.

Comparative study for cables and busbars

ELEKTROTEHNI KO PODJETJE Leskoπkova cesta 12, 1000 Ljubljana, SLOVENIA

SURGE PROTECTIVE DEVICES

NSW Submarine Power. Cables for the future, delivered today

Transformer Bushings for GIS

HIGH-CAPACITY HIGH TEMPERATURE SUPERCONDUCTING POWER CABLES

Installation Instructions for Contractors. Connection Sets. Solar Twin Tube. Inox 1/2" Inox 3/4" (2011/02) US/CA

48 SERIES Relay interface modules 10 A

Power supply 142. Couplers 143. Data interfaces 144. Accessories 145

ESB Networks Response. ERGEG Consultation. Voltage Quality Regulation in Europe

THE PATHWAY TO POWER HIGH-VOLTAGE CABLES

CHAPTER VIII LINE PLANT SYSTEM COMMUNICATION THROUGH RE CABLE

HERZ-Thermal Actuators

PB POWER ISLAND OF IRELAND CAVAN-TYRONE AND MEATH-CAVAN 400KV PROJECTS PRELIMINARY BRIEFING NOTE OVERHEAD AND UNDERGROUND ENERGY TRANSMISSION OPTIONS

POWER TRANSMISSION FROM OFFSHORE WIND FARMS

49 Series - Relay interface modules A. Features

Lightning Arresters P KVA P KVA. Description & Installation

Cable action plan kv grids March 2009

Current valve. for AC 24 V pulse/pause control of electrical loads up to 30 kw

THE NEPTUNE REGIONAL TRANSMISSION SYSTEM 500 kv HVDC PROJECT

QUESTIONS and ANSWERS RFB , Metal Clad Switchgear and Power Control Room

Why Submarine Cables?

Overview of Submarine Cable Route Planning & Cable Route Survey Activities. Graham Evans Director EGS Survey Group

SingleNet Single Cable Control System

CATALOGUE SURGE PROTECTION LOW VOLTAGE

Transcription:

Konti Skan Replacement of Cable 1 Presentation of the project 1

Agenda Background for the project Scope of Work for the cable delivery Eletrical Requirements Type Test Route description Time Schedule 2

Background The Konti Skan connection consists of a combination of HVDC overhead line,-land cable and submarine cable. The three cables between Jutland and Laesoe is configured such a way that cable 2 together with one conductor from cable 1 is used for the KS1 converter and cable 3 with one conductor from cable 1 is used for the KS2 converter. The new cable is to be used for the KS1 converter, and the existing cables 2 and 3 are to be connected in parallel for use in KS2 converter. 3

Scope of work # 1 Submarine Cable Cable type Cable Length : MIND (Mass Impregnated Non Draining) : 25 km (including 1,5 km spare cable) Accessories End terminations : 3 pcs (incl. one spare) Submarine repair joints : 4 pcs Other Installation of end terminations Basket for spare cable according to ENDK specifications 4

Scope of work # 2 Option for Transport and Laying of Submarine Cable The Cable manufacturer is obliged to give a price on the option for Transport and Laying of the submarine Cable Options for surveys and guard vessels Project Management Project meetings (at factory, in Denmark (both at site and at Energinet.dk) Monthly progress reports Etc. 5

Electrical Requirements Cable Voltage Rated DC Cable Voltage Max continuous DC Cable Voltage Lightning Impulse withstand Voltage Switching Surge withstand Voltage Rated current : 282 kv : 285 kv : 850 kv : 685 kv : 1347,5 A Under the following pretenses Thermal resistivity : 1 K*m/W Temperature of the surrounding soil : 20 C Burial depth: 1 m (sea); 1,3 m (land) Maximal fault current Conductor type Cross Section : 20 ka for 0.3 sec. : Profile/Keystone : 1200 mm² Cu 6

Type Test If no valid type test is present, the manufacturer needs to perform an accepted type test the year before delivery. E.g. if the cable is to be delivered in 2014, an accepted type test is to be performed before the end of 2013. A valid type test is a test that is not too old and has a similar design with a equal to or higher than the voltage level than for the project specified 285 kv DC. 7

Route #1 The new route is the blue route Length is approx. 23,5 km Max depth is around 30 m Landings Jutland: 400 m horizontal directional drilling + 150 m open trench to the station. Laesoe: 800 m horizontal directional drilling + 800 m open trench to the station 8

Route #2 9

Route #3 Conditions of the seabed A survey of the planned cable route will not be performed prior to or within the tender period. However Energinet.dk has in 2012 completed a seabed survey approximately 1.0 1.5 nautical miles north of the planned cable route. The results from this survey will be submitted to the tenderers. A survey of the trace will be performed as a part of environmental investigations in the spring/summer of 2013. Approx 100 % sandy sea floor, with some minor obstacles (chalk mushrooms, made through bubbles of natural gas from the sea floor). From previous projects in the past we know that the sea floor is jettable, and that the submarine can be directly laid on the seafloor and that no pre-dredging is not needed. Landings will be done using HDD s at both ends (HDD s are not to be part of this tender) 10

Route #4 11

Time Schedule for the Project See the Time Schedule on the homepage 12

Time Schedule for the Project #1 13