85 F 80 F 50% 75 F 70 F 73.0/61.8 45 F 10% Figure 1



Similar documents
By Tom Brooke PE, CEM

Dr. Michael K. West, PE 1 Dr. Richard S. Combes, PE 2 Advantek Consulting / Melbourne, Florida

Defining Quality. Building Comfort. Precision. Air Conditioning

Tom Brooke, PE, MBA, CEM

Advanced Energy Design Guide LEED Strategies for Schools. and High Performance Buildings

Data Center Design Guide featuring Water-Side Economizer Solutions. with Dynamic Economizer Cooling

Controlling Wrap-Around Heat Pipes for Systems with Strict Space Humidity Requirements. By Michael O. Davis, PE, November 2015

CRITICAL COOLING FOR DATA CENTERS

KU DESIGN GUIDELINES APPENDIX XVI RECOMMENDED BAS I/O CONTROL POINTS BY EQUIPMENT / SYSTEM

APPLICATION GUIDE. Comparison of Latent Cooling Performance of Various HVAC systems in a Classroom Application

Presentation Outline. Common Terms / Concepts HVAC Building Blocks. Links. Plant Level Building Blocks. Air Distribution Building Blocks

HVAC Systems: Overview

Optimization of Water - Cooled Chiller Cooling Tower Combinations

TODAY S PARADIGM FOR AIR TO AIR HEAT RECOVERY

How To Design A Building In New Delhi

ENERGY EFFICIENT HVAC DESIGN FOR WARM-HUMID CLIMATE CLIMATE

UNIVERSITY OF MISSOURI Heating Ventilating and Air-Conditioning (HVAC) March

Hospital Application Guide. Cost-effective climate control for hospitals


Dehumidification Frequently Asked Questions

Creating Efficient HVAC Systems

Example Retrocommissioning Measure: Opening Throttled Discharge Valves

Heating & Cooling Efficiency

Selecting the Supply Air Conditions for a Dedicated Outdoor Air System Working in Parallel with Distributed Sensible Cooling Terminal Equipment

Maximize energy savings Increase life of cooling equipment More reliable for extreme cold weather conditions There are disadvantages

Measuring The Right Thing For Humidity Control It s the Dew Point Stupid!

CURBING THE COST OF DATA CENTER COOLING. Charles B. Kensky, PE, LEED AP BD+C, CEA Executive Vice President Bala Consulting Engineers

Self-benchmarking Guide for Data Center Infrastructure: Metrics, Benchmarks, Actions Sponsored by:

Using Wet-Bulb Economizers. Data Center Cooling

APPLICATION GUIDE. Moisture Management in Waterborne Climate Systems

EnergyPro Building Energy Analysis. Assisted Living Building

How to Build a Data Centre Cooling Budget. Ian Cathcart

Commissioning - Construction Documents (Page 1 of 6)

Moisture Control. It s The Dew Point. Stupid! Its not the humidity.

Pool Dehumidification Basics

Comparing Air Cooler Ratings Part 1: Not All Rating Methods are Created Equal

Causes of High Relative Humidity Inside Air Conditioned Buildings. Roger G.Morse AIA, Paul Haas CSP, CIH Morse Zehnter Associates

ASHRAE Boston Chapter Meeting Designing AC Refrigeration Systems Lessons Learned February 11, 2014

AIR SYSTEMS ENERGY SERIES Energy Recovery Wheels

HVAC Calculations and Duct Sizing

REAL OPERATING COST SAVINGS FROM RETRO- COMMISSIONING OPPORTUNITIES FOR SAVINGS IN ACADEMIC MEDICAL CENTERS

Digital Realty Data Center Solutions Digital Chicago Datacampus Franklin Park, Illinois Owner: Digital Realty Trust Engineer of Record: ESD Architect

Innovent LASER Packaged Fresh Air Conditioning Units

ENHANCED LABORATORY HVAC SYSTEM

Engineering White Paper UTILIZING ECONOMIZERS EFFECTIVELY IN THE DATA CENTER

Tips and Tricks for Estimating Energy Savings. Celeste Cizik, P.E. Project Manager E M C Engineers, Inc.

Benefits of Water-Cooled Systems vs. Air-Cooled Systems for Air-Conditioning Applications

L ABORATORIES FOR THE 21ST C ENTURY: ENERGY ANALYSIS. U.S. Department of Energy Energy Efficiency and Renewable Energy

POLK STATE COLLEGE CHILLER PLANT EVALUATION WINTER HAVEN, FLORIDA APRIL 2, C arastro & A ssociates, C&A# 5747

DATA CENTER COOLING INNOVATIVE COOLING TECHNOLOGIES FOR YOUR DATA CENTER

Alternate Cooling Solutions for Mission Critical Facilities Stuart Lawrence National Account Sales Engineer Munters Air Treatment

Data Realty Colocation Data Center Ignition Park, South Bend, IN. Owner: Data Realty Engineer: ESD Architect: BSA LifeStructures

White Paper. Data Center Containment Cooling Strategies. Abstract WHITE PAPER EC9001. Geist Updated August 2010

Preliminary Final Proposal

newsletter engineers energy-saving strategies for Water-Source Heat Pump Systems volume 36 2 providing insights for today s hvac system designer

FACILITY A BUILDING 3

Legacy Data Centres Upgrading the cooling capabilities What are the options?

Chapter 3.4: HVAC & Refrigeration System

Building Performance With District Cooling

3/29/2012 INTRODUCTION HVAC BASICS

Data Center. Ultra-Efficient chilled water system optimization. White paper. File No: Date: december 03, 2015 Supersedes: new Date: new

1. What percent of a commercial business s energy usage comes from their HVAC system? A. 13% B. 23% C. 33% D. 43% E. 53%

How To Design A Refrigeration System

Data Center Heat Rejection

The main steam enters the building in the basement mechanical room; this is where the condensate line also leaves the building.

Building Energy Systems. - HVAC: Heating, Distribution -

DOAS UNITS. MAKEUP AND VENTILATION AIR 100% OUTSIDE AIR. Kitchens Hotel Corridors Laboratories. Paint Booths. Capacities Tons MBH

Flexibility, Efficiency In San Antonio Arena

Air Conditioning Clinic

Design Guide. Retrofitting Options For HVAC Systems In Live Performance Venues

HVAC and REFRIGERATION

Role of Economizers in Dedicated Outdoor Air Systems

Energy Savings in High-Rise Buildings Using High-Reflective Coatings

Energy Efficiency in Industrial HVAC Systems

THE PSYCHROMETRIC CHART AND ITS USE

HVAC Basic Science - System Capacity

Dedicated Outdoor Air-Dual Wheel System Control Requirements

Presented By: WALTER E. JOHNSTON, PE CEM, CEA, CLEP, CDSM, CPE

HVAC Processes. Lecture 7

COMMERCIAL HVAC EQUIPMENT. Condensers and Cooling Towers

Design Options for HVAC Distribution Systems

By Donald Fisher, P.Eng., Associate Member ASHRAE

Evaporative Cooling System for Aquacultural Production 1

Lower Energy Costs with Rooftop Air-Conditioning Package Units

Free Cooling in Data Centers. John Speck, RCDD, DCDC JFC Solutions

Enclosed Football Stadium Design History and Lessons Learned

Chilled Water HVAC Systems

HVACPowDen.xls An Easy-to-Use Tool for Recognizing Energy Efficient Buildings and HVAC Systems

HVAC Checklist - Long Form

THE PSYCHROMETRIC CHART: Theory and Application. Perry Peralta NC State University

Data Center Energy Profiler Questions Checklist

Wet Bulb Temperature and Its Impact on Building Performance

HVAC Technologies for Building Energy Efficiency Improvements 2013 National Symposium on Market Transformation. Richard Lord Carrier Fellow

6 MECHANICAL HVAC SYSTEMS

TODAY S PARADIGM FOR HEAT RECOVERY - PART 2

Alerts and Delta T Diagnostics with the Prestige 2.0 IAQ Thermostat

Glossary of Heating, Ventilation and Air Conditioning Terms

Cooling Capacity Factor (CCF) Reveals Stranded Capacity and Data Center Cost Savings

School HVAC. Design Manual. Application Guide AG Air Cooled Chiller. Chilled Water Pumps. Expansion Tank CHWR CHWS. Make up Water Line Boiler

Active Chilled Beam System Design & Layout

Transcription:

Feb. 07 INTRODUCTION: Wrap around heat pipes are air-to-air heat exchangers that are installed in the airstream upstream and downstream of a cooling coil to deliberately reduce the Sensible Heat Ratio (SHR) below a standard air conditioning system s.75. Depending on the application, they re also used to replace all or part of the necessary reheat in a system to minimize energy usage. The energy ramifications are especially powerful because the energy savings occur not just on the reheating side but also the cooling side, unlike in the other very common usage of air-to-air heat exchangers as used to transfer energy between exhaust air and outside air. Given then that some form of reheat is needed, this analysis examines the effect on energy savings of changing the different parameters of the air conditioning system design. 50 90%.0 60 85 F 80%.0 PRECOOL 80 F 70% 60%.0.0 55 50% 75 F ACTIVE 78.5/73.7 COOLING 95.0/78.0 70 F %.0.018.016 50 REHEAT 60 F 65 F %.014.012 50 F 55 F 55.0/95 %RH 73.0/61.8 %.010.008 15 F F F 10%.006.004 F 10 50 55 60 65 15 70 75 Figure 1 Figure 1 shows the psychrometrics of the wrap around heat pipe installed in an air conditioning system. The upstream heat pipes sensibly precool the air to 78.5DB/73.7WB which then enters the cooling coil. The cooling coil cools and dehumidifies the air to 56.5DB/95%RH/55.0DP. The downstream heat pipe then sensibly reheats the air the same amount to 73DB/61.8WB. The heat pipes then replace 16.5ºF of reheat energy and 16.5ºF of cooling energy. 80 85 90 95 100 105 110 115.002 1 As an alternative to a system with a lower SHR with reheat is considered, it is helpful for the HVAC system designer to have some general rules of thumb on not only the performance of the heat pipes, but more importantly their payback. In this analysis, the payback is compared to using the very common hot water reheat and it looks at the sensitivity of the payback to different variables used in the system design compared to a base case. Some variables are under the control of the designer, but many are not. While the results of changing multiple variables at the same time should generally not be considered additive, two cases are examined to determine if the model can be used for changing up to six variables at a time. 43 N.E. 49 th Ave., Gainesville, Fl 309 Phone: (2) 367-0999 Email: heatpipe@heatpipe.com www.heatpipe.com 1

Feb. 07 BASE CASE: The base case is for heat pipes installed in a new HVAC system located in St. Louis, MO, roughly in the geographical center of the US. It is a % OA system supplying,000 CFM of 59DB/54DP air (moderate 5ºF of reheat) at a 0 fpm coil face velocity. RA is 78/50%, and ASHRAE design 1% OA DB/MCWB conditions are used and BIN data. System characteristics are a.75 kw/ton central plant efficiency, a.75 central heating plant efficiency,.92 motor and.70 fan efficiencies respectively, $.07/kwh blended electrical cost and $.80/therm natural gas cost. R is used as the heat transfer fluid. All pricing is as of Feb, 07. Higher or lower CFM amounts should have comparable results overall. Motor reheat is downstream of the reheat heat pipe and thus not included (although it is a part of the final calculations of supply air conditions). The payback for this base case is.1 months. LOCATION: As expected, the geographical location has a major influence on the payback. Since the design OA dry bulb is relatively consistent, and the heat pipe is a sensible heat transfer device that reacts only to dry bulb temperature, the same heat pipe selection is actually used for all locations. The southerly locations do have more hours when cooling is required and the heat pipes can become operative. Note that the payback is surprisingly low at and months even as far north as St. Louis and Boston respectively, decreasing to 12 months in Puerto Rico. While the location is not a variable for a given project site, this does provide organizations with multiple sites a way to prioritize their interest. FLOWRATE (CFM) As seen in Figure 3, there is a slight adjustment if the total project CFM is more or less than the baseline case of,000 CFM. This is because of nothing more than the project volume, which translates into pricing breaks. Although each heat pipe is individually engineered and built, larger projects inherently cost less on a per CFM basis. 18 16 14 12 10 Boston Newark St Louis Atlanta Tampa Puerto Rico Figure 2 0 10,000,000,000,000 Total CFM Figure 3 43 N.E. 49 th Ave., Gainesville, Fl 309 Phone: (2) 367-0999 Email: heatpipe@heatpipe.com www.heatpipe.com 2

Feb. 07 PLANT EFFICIENCIES AND UTILITIES COST Figures 4 and 5 affect the heat pipe cooling savings, and Figures 6 and 7 affect the heat pipe heating savings. The cooling system kw/ton includes the tower and AHU fan motors and pumps. The system kw/ton range covers typical centrifugal chiller central plants, but local complete air cooled chiller systems, especially if older, may have a kw/ton above this range. The electrical cost is for a blended total cost, i.e., including the demand charges in the base rate. No cost escalation is built into the electrical rates. The heating efficiency is the overall efficiency to convert natural gas into a hot water heating system. The electrical cost does also effect the heating payback since electrical energy is used for the fan motor seeing air side pressure drop losses, but while included, it s relatively minor. 29 27 23 21 0.5 0.7 0.9 1.1 1.3 1.5 System kw/ton 19 0.04 0.06 0.08 0.1 0.12 0.14 0.16 Elec Cost Blended $/kwh Figure 4 Figure 5 34 18 0.5 0.7 0.9 1.1 1.3 Gas Cost $/therm 0.50 0.60 0.70 0.80 0.90 Heating Plant Efficiency Figure 6 Figure 7 3 43 N.E. 49 th Ave., Gainesville, Fl 309 Phone: (2) 367-0999 Email: heatpipe@heatpipe.com www.heatpipe.com

Feb. 07 FACE VELOCITY 34 Figure 8 is perhaps one of the more surprising results. While lower face velocities are used to minimize the chance of water blow off and to decrease the airside pressure drop, at least for the heat pipes, a higher velocity provides a shorter payback. The reader is reminded that the face velocity also typically applies to the cooling coil, and that even month paybacks are acceptable for most projects PER CENT OUTSIDE AIR Figure 9 shows that 100% Outside Air applications actually increase the payback compared to mixed air applications with typical 78ºFDB return air, so it s another surprising result because the wrap around heat pipes are sometimes only thought to be for 100% OA applications. While the wrap around heat pipes do provide the most BTU transfer at design conditions, the nature of OA is that there are more operating hours in the range of 55 75ºF DB, which brings down the average entering dry bulb temperature below typical mixed air conditions. For example, Figure 10 shows the distribution of the cooling BIN annual hours in St. Louis above 55 ºFDB. Annual Hours 32 0 0 0 0 0 500 550 Face Velocity (fpm) Figure 8 0 60 80 100 % Outside Air 1000 800 600 0 0 0 Figure 9 St. Louis 57 62 67 72 77 82 87 92 97 102 107 BIN Dry Bulb Figure 10 43 N.E. 49 th Ave., Gainesville, Fl 309 Phone: (2) 367-0999 Email: heatpipe@heatpipe.com www.heatpipe.com 4

Feb. 07 There are 165 hours at the 92ºFDB BIN and 764 hours at the 67ºFDB BIN. However, the average temperature (as shown by the vertical bar where there are equal hours above and below that temperature) is 72ºFDB. So clearly, decreasing the proportion of outside air entering the precool heat pipe increases the mixed air temperature and thus the heat pipe BTU transfer and energy savings, so wrap around heat pipes are well suited for applications with only 5-% outside air. While the above is true for most of North America, there are particular situations for which the results would be different. For example, the average cooling BIN in Puerto Rico is 77.8ºFDB. Therefore, any applications in Puerto Rico with the return air condition below 77.8ºFDB will have a decreasing payback with increasing outside air percentages. LEAVING DEWPOINT AND REHEAT AMOUNT These are not something under the control of the HVAC system designer, who is trying to produce specific psychrometric results to maintain a space condition specified by the owner. A given reheat amount is needed, and it ll be either produced by utility fueled reheat or heat pipe reheat. Figure 11 establishes that the heat pipe payback is largely unaffected by the leaving dewpoint itself, given a specific reheat amount. However, a lower dewpoint needed for space humidity reasons increases the likelihood that additional reheat will be needed to provide for comfort conditions. Figure 12 establishes that a lower payback results after an initial dramatic improvement. 27 50 52 54 56 Leaving Dewpoint 15 2 4 6 8 10 12 ºF Reheat Figure 11 Figure 12 43 N.E. 49 th Ave., Gainesville, Fl 309 Phone: (2) 367-0999 Email: heatpipe@heatpipe.com www.heatpipe.com 5

Feb. 07 EXAMPLES: Of course, there ll never be an application where an actual selection is exactly at the base case conditions with only one variable changed. Let s examine two cases with multiple variables changed and compare the results to the models. Ideally, the results will be additive when multiple variables are changed. Case 1,000 CFM at 500 fpm of 10% OA in Newark. Plant efficiencies at.75 kw/ton cooling and.75 heating, utility costs at $.10/kwh and $1.00/therm and standard motor efficiencies. Leaving air at 57ºFDB and 50ºFDP(7ºF reheat), and return air at 78/65. Running the actual computer BIN program establishes a 12.5 month payback or a 52% payback reduction from the base case. Variables for which we d expect a quicker payback than the base case are a 500 fpm face velocity (21% quicker payback), 10% outside air (5% quicker payback) 7 ºF of reheat (3% quicker payback), $.10/kwh (10% quicker payback), and $1.00/therm (15% quicker payback). Totaling the model payback improvements (multiplying their reciprocals) indicates a total payback reduction of %. The model is slightly conservative for case 1. Case 2 10,000 CFM at 0 fpm of 100% OA in Atlanta. Plant efficiencies at 1.4kw/ton (an older air cooled chiller) and.75 heating, utility costs at $.09/kwh and $.90/therm and standard motor efficiencies. Leaving air at 60ºFDB and 50ºFDP (10ºF reheat). Running the actual computer BIN program establishes a 17.5 month payback or a 33% payback reduction from the base case. Variables for which we d expect a different payback than the base case are 10,000 CFM (3% longer payback), 100% outside air (61% longer payback), 1.4 cooling kw/ton (% shorter payback), $.09/kwh (7% shorter payback), $.90/therm (8% shorter payback), and 10ºF reheat (17% shorter payback). Totaling the model payback changes (multiplying their reciprocals) indicates a total payback reduction of 6%. The model again is a little conservative for case 2. SUMMARY Wrap around heat pipes are popular because of their benefits. In addition to their economic benefits as we ve seen above, there are no moving parts and multiple circuits for extreme reliability and redundancy, they require the smallest physical volume compared to other technologies that produce the same psychrometric results, and they can be added to any manufacturer s equipment. Wrap around heat pipes are a powerful tool that an HVAC designer has at his disposal. While software for heat pipe product selections is available, the effect on cost is not as easily obtainable. Therefore, this analysis determines results as measured by simple payback as different engineering and costing parameters are adjusted. It is recognized that not all the variables are under the control of the designer. Some further points can be noted: 1. If reheat is needed, numbers should show good payback for ALL selections, just shorter for some 2. For marginal cases, use face and bypass dampers to bypass air when cooling not needed (winter) 3. Controllable heat pipes are also available that modulate refrigerant or airflow 43 N.E. 49 th Ave., Gainesville, Fl 309 Phone: (2) 367-0999 Email: heatpipe@heatpipe.com www.heatpipe.com 6