Leaky Homes Financial Assistance Package (FAP) Repair plan example



Similar documents
Residential Inspection Guidelines

The compliance of a roof to part of a new house at 28D Rata Street, Oxford, Waimakariri

Linea Weatherboard DIRECT FIX CONCRETE SLAB AND SOFFIT FIGURE 1

March 14, Installation of Bay, Bow and Garden Windows

NRG 75 CRF NRG GREENBOARD WALL SYSTEM

EXTERNAL WATERPROOFING MEMBRANES BEST PRACTICE GUIDELINES

FLAT ROOF CARPORT RECOMMENDED INSTRUCTION MANUAL

CLIENT. Inspection Report. 271 Front St. Alert Bay, B.C. Island Building Inspections V ANCOUVER I SLAND B. C.

Document type: Practice Note Title: External and internal membranes Document number: AC2234 Version: Purpose

PETERSONS WATERFRONT CONDOMINIUMS

DESIGNERS GUIDE TO DOMESTIC CONSERVATORIES

October 5, 2015 Dear Client,

How To Build A Gambrel Roof And A Gable End Roof

Instruction Manual 19/9/01. Flat Roof Carport

Comment Form on Proposed Gut Rehabilitation Alternatives

Free 12 x 8 Shed Plan With Illustrations, Blueprints & Step By Step Details

Melbourne balcony Assessments

A0 SHEET 1 OF LOCUST STREET FRANKFORT, KANSAS FRANKFORT, KANSAS ROOF REPAIR OF THE 400 LOCUST STREET

PRE-PURCHASE INSPECTION REPORT

Best Barns USA Assembly Book

Clad Direct Glaze Window Installation Instructions

Waterproofing of exterior walls at 7 Anderson Place, Queenstown

Weathertightness: Guide to Remediation Design

FLASHMAN WINDOW AND DOOR FLASHING SYSTEM. Product. Scope. Appraisal No. 573 [2013]

Exterior Elevated Elements Inspection Guidelines

How To Prevent Water Damage To A Home

WorkSafe Guidance Document FALL PROTECTION IN RESIDENTIAL CONSTRUCTION

How To Repair A Boat Landing Deck With A Boat Bed

The WANZ Guide to Window Installation

FLAT ROOF BOX SPAN CARPORTS

Date of inspection 10/04/2014. Auckland Pre purchase - Condition report. Agent Present: Buyer Present: Weather at time of Inspection

CLAIM NO: 626. UNDER The Weathertight Homes Resolution Services Act IN THE MATTER of an adjudication

SUPER SHED. Indoor shelter for your outdoor tools.

Sample Drawing Package for One and Two Family Dwelling Applications

SG Series 65mm Frame Windows (Fixed Lite Window Illustrated)

TIMBER FRAME STANDARD DETAILS SEPTEMBER 09

SPPI: Specialist Inspections NZS4306 Compliant Residential Property Inspection Specialist

RDH Building Sciences Inc.

SECTION 3 ONM & J STRUCTURAL ANALYSIS

!!!!!! !!! Decra Plus DPSW010 DPSTW011 DPSW012 DPSW013 DPSW014 DPSW015 DPSW016 DPSW020 DPSW021 DPSW024 DPSW030 DPSW031 DPSW035 DPSW030 DPSW031 DPSW035

COMMONLY USED RESIDENTIAL BUILDING CODES

Vision Home Inspection

Lighthouse Engineering, L.L.C.

Residential Deck Safety, Construction, and Repair

Page & Turnbull imagining change in historic environments through design, research, and technology

CITY OF WHITE BEAR LAKE BUILDING INSPECTION DEPARTMENT 4701 Highway 61 White Bear Lake, MN Fax: Re-Roofing: Asphalt Shingles

School Construction Authority Architecture & Engineering

etter buildings Lessons learned: Restoring the Quayside Village leaky condo CASE STUDY NUMBER 50 Introduction

ELIGIBLE REPAIR PROJECT PARAMETERS

Extension. for. Pretend Customer 123 A Road HA7 9BP. at: 123 A Road HA7 9BP

INSTALLATION OF A BAY WINDOW

BELL ASSOCIATES ARCHITECTURE PLANNING

A Guide To The New Termite Standards (revised 09/02/2001)

KAHU RESIDENTIAL ROOFING RRKA DETAIL LIST

Residential Foundations and Basements

Superform Products Ltd.

Hartsfield-Jackson Atlanta International Airport s

LAYING BLOCK AND BRICK

Mark Cramer Inspection Services, Inc.

Basement & Foundation Damage

STEEL BUILDINGS RECOMMENDED INSTALLATION GUIDE

Rehab Inspection Report Page 1

MULTI-FAMILY, COMMERCIAL, INDUSTRIAL, AS GOVERNED BY THE BC BUILDING CODE PART 3

Internal Dry Area Finishes for Major Defects & Significant Items

Building Condition Assessment: North Howard Street Baltimore, Maryland

Custom 30 x 20-8 Garage Plan Plan #g233 By SDS-CAD Specialized Design Systems

Fig. 2 WALL-TO-WALL PANEL CONNECTIONS CORNER WALL CONNECTION

EXAMPLE BILL OF MATERIALS

HomeSpec REPORT SUMMARY

Wet Area Construction. Carpentry - Residential Construction. Product Code: 5603

Block Lofts Condominiums

BUILDING SAFETY UNIT

RODENT PROOFING CHECKLIST

H:\forms\handouts\bldg049 1 of 11 Revised Mar 2/15/dh

Inspection Item COMMENTS

How-To-build guide timber windows

Walls. Add Strength and Water Resistance When Repairing Your. Replace damaged framing members when walls are open

RESPONSIBILITY FOR REPAIRS AND MAINTENANCE FAIR FUNDING: April 2002

Issue of the Guidelines on Prevention of Water Seepage in New Buildings

ROOF CONSTRUCTION Roof Styles Gable Roof Hip Roof Gambrel Roof

PDmB, Inc. Definitions

Scope of works. Name Job# TBA -1. Project: Bathroom Renovation

WINDOW INSTALLATION GUIDE FOR NEW CONSTRUCTION - WOOD FRAMING

The better way to build TM. Installation Manual. FOUNDATION SIPs & FROST WALLS SIPs



From the Office of: MAHLUM ARCHITECTS 71 Columbia Street Floor 4 Seattle, WA 98104

Burns Home Services SUMMARY REPORT. 7/18/2006 Start: 9:00 am End: 12:30 pm

The WANZ Guide to Window Installation

Historic Preservation Certification Application Part Main Street West South Haven, Vermont NPS Project No

PELHAM MEMORIAL HIGH SCHOOL STONE FAÇADE REPORT. November 2007

STRUCTURAL CONCEPT FOR LIGHT GAUGE STEEL FRAME SYSTEM

Patio Covers / Carports

PLEASE REFER TO YOUR INDIVIDUAL QUOTE

Water Management & Damage Prevention:

TULSA PRESERVATION COMMISSION

Structure Survey Findings:

Building Condition Assessment: West Lexington Street Baltimore, Maryland

METHOD STATEMENT 006 TORCH APPLIED MEMBRANE TO BASEMENT WALLS

Transcription:

LEAKY HOMES FINANCIAL ASSISTANCE PACKAGE FACT SHEET Repair Plan Example - June 2014 Page 1 Leaky Homes Financial Assistance Package (FAP) Repair plan example Introduction This repair plan example is intended to provide guidance to designers prior to preparing a repair plan for approval under the Financial Assistance Package (FAP) on behalf of eligible homeowners. Homeowners and project managers may also find the example useful for briefing and discussing the work required of designers, and for understanding the Ministry of Business, Innovation & Employment s (Ministry s) requirements at this stage of the process. The diagram below is a stage of the homeowner journey, which is an overview of the full FAP process. Commissioning a repair plan fits in the following step in the homeowner journey: The Ministry does not have a requirement for the format of the information required, and designers are free to copy the format adopted in the example, or present the same type of information in another format. 3 INITIAL REVIEW OF SCOPE & FINALISE DESIGN Commission repair plan to developed design stage Council and Ministry review repair plan Finalise design Obtain building consent KEY MINISTRY ACTIONS HOMEOWNER ACTIONS To see the homeowner journey in its entirety visit www.dbh.govt.nz/weathertight-services The example uses a fictitious building to demonstrate the type of information which the Ministry requires in a repair plan. MB12572.1.35

LEAKY HOMES FINANCIAL ASSISTANCE PACKAGE FACT SHEET Repair Plan Example - June 2014 Page 2 Repair plan content The repair plan must: describe the scope and type of works that will be incorporated in building and resource consent applications resolve all weathertightness issues, i.e. stop current leaks, fix the damage caused by the penetration of water and protect the home against future water penetration address the scope of the repair proposal identified in the Ministry s assessor s report be on A3 size paper or larger. The repair plan should not contain as much detail as building consent applications, in case it needs to be amended following the Ministry s review; developed design drawings only are highly recommended. You must apply for repair plan approval to the council and Ministry before proceeding with (and paying for) any more than the minimum level of documentation needed to clearly define the scope of all architectural elements. The developed design documents should show what work is proposed, but not have the level of detail as to how this work will be constructed The repair plan review will take between two and three months. It is strongly recommended that you do not apply for building consent until after the repair plan review is complete and you have been notified that it is approved. Developed design includes: floor plans (dimensioned) both existing and proposed plans should be provided elevations (confirmed floor-to-floor heights) both existing and proposed layouts should be provided sections, where necessary to show the layout of existing and proposed building elements annotations to describe the scope and type of repairs and annotations or a schedule to list internal and external materials and finishes affected by the work. Steps to obtaining an approved repair plan 1. Review the scope of the repair proposal in the Ministry s assessor s report. 2. Contact designer to commission drawings to developed design stage. 3. Complete the repair plan application. 4. Submit repair plan application, designer statement form and developed drawings to the council for approval. 5. Council reviews the repair plan then forwards it to the Ministry for their review. 6. Ministry confirms in writing to the claimant as to the outcome of the review. 7. Once your repair plan has been approved you may prepare your plans and documentation for building consent. Further information is available in the design and contract management fact sheet. Contact Us If you have any questions about the Repair Plan process or other aspects of the FAP please call us to discuss on 0800 324 477. Further information is also available on our website at www.dbh.govt.nz.

A1.04 Schedule - Remedial Work and Betterment

Summary of Assessor s Remediation Scope Set up site, provide temporary weather protection, protect finishes, remove all exterior fixtures and fittings and reinstate on completion. Reclad all walls, including solid balustrade, using texture-coated fibre-cement to match existing, on a cavity over flexible building wrap. Replace all framing timber damaged by moisture entry with H1.2 treated framing, extending 1.0 m beyond all signs of decay. Site treat all remaining framing timber exposed during the work, including drilling and injecting treatment into doubled/multiple members. Add concrete nib under bottom plate of wall (approx 7.4 m length), in south-west corner of house, where ground level affects the base of cladding include temporary propping. Replace deck membrane, ply substrate, add firring strips to deck joists to increase falls, pack sill of door to deck to increase threshold height, and add a scupper overflow outlet through the solid balustrade. Provide new cap flashing to solid balustrade, with saddle flashings each end at junction with main walls of house Modify pipe handrail to deck to include brackets allowing fixing through the side face of the solid balustrade Pack stringer supporting pergola off wall cladding face, and install pergola posts using specific design structural steel brackets which allow fixing through the side face of the solid balustrade Modify structure of timber deck to ensure all members are packed 12mm off cladding face and all fixing bolts have sealing washers. Provide new specific design flashings around ends of exposed rafters. Remove all exterior joinery, reseal all mitres and replace all gaskets, replace jamb liners with deeper reveals to suit proposed cavity, and reinstall with new flashings, sill supports etc. Specific design of a new flashing system to round window, which prevents moisture entry from water running down the sides of the flashing. Reinstate interior lining, all finishes and fixings etc where affected by the work. Add a diagonal brace under the deck to prevent flexing of the structure which has caused failure of the deck cladding. Differences between Proposed Repairs and Assessor s Remediation Scope Differences between Proposed Repairs and Assessor s Remediation Scope Proposed Work Equivalent Assessed Work Explanation Proposed Work Equivalent Assessed Work Explanation 1 Reclad all exterior walls and the deck balustrade using a weatherboard cladding system, installed on a cavity Reclad all exterior walls in a texture coated fibre-cement cladding system (i.e. a like-for-like material) installed on a cavity The owners have expressed a preference 7 2 Remove the round window, enlarge the wall opening, and install a new large rectangular window 3 New wall bracing adjacent to the large rectangular window which replaces the original round window 4 Remove paving to the south-west corner of the house, excavate to reduce ground level, and reinstate paving to be 150mm below interior floor level 5 Remove all roofing, add outriggers to extend roof framing to form 600mm eaves around the house, and install new long run roofing to suit increased roof area, with new soffits, fascias, barge boards and guttering 6 Use of a 2-layer torch-on type waterproof membrane to the deck, as part of deck repairs which otherwise follow the assessor s likefor-like proposal Re-install the original round window (after re-sealing work) in its original location, using a new specific design flashing system No change to wall bracing, other than like-for-like replacement of any bracing elements affected by moisture damage Construct a concrete nib under bottom plate of wall (approx 7.4 m length), in south-west corner of house No change to original roofing, soffits, fascias, barge boards and guttering Use of a liquid-applied membrane in repairs to the deck, being a like-for-like repair solution for a weatherboard cladding system over fibre-cement, because this will improve the value of the property removes future risks, and may require less future maintenance. The owners acknowledge that the cost difference is betterment. The owners have expressed a preference for the large rectangular window, both to improve natural lighting and because this removes future risk. The owners acknowledge that the cost difference is betterment. The bracing change is required as a direct result of enlarging the window, and is also betterment The owners prefer to resolve this deficiency by lowering ground levels rather than by constructing a concrete nib, because they perceive this option as carrying less future risk, and it will be easier to integrate into future landscaping work. The owners acknowledge that the cost difference is betterment. The owners wish to replace the roofing because this is overdue for maintenance work. To reduce future risk, a 600 mm eaves will be added. The owners acknowledge that this work is betterment. The owners wish to use a 2-layer torch-on membrane in lieu of a like-for-like repair using a liquid applied membrane, because this will require less future maintenance. They acknowledge that the cost difference is betterment. Removal of the original solid balustrade to the deck, construction of a revised deck fascia, and installation of a new proprietary glass balustrade, with provision for overflow drainage to occur under the glass 8 Cut off and discard ends of exposed rafters at the wall framing line, and continue new wall cladding uninterrupted by rafter ends 9 Complete removal of the pergola 10 Remove exterior slab at laundry to keep clear of cladding, and rebuild at lower level 11 Repair of the plumbing leak, and replacement of moisture damaged flooring and joists, including removal and reinstatement of bathroom fittings and finishes. Repair of the solid balustrade (including repair of framing damage, recladding both faces, new cap and saddle flashings, and modifying pipe handrail to include brackets allowing fixing through the side face of the solid balustrade), and incorporating a new scupper overflow outlet, all carried out in conjunction with deck repairs Install new specific design flashings to each individual exposed rafter in the course of recladding work. Pack stringer supporting pergola off wall cladding face, and install pergola posts using specific design structural steel brackets which allow fixing through the side face of the solid balustrade No work to this exterior slab is described in the assessor s report The plumbing leak is not a weathertightness deficiency, so no repairs were included in the assessor s repair scope, and this work will not receive financial contributions. The owners prefer the glass balustrade for aesthetic reasons and to reduce future risk. They acknowledge that the cost difference between the proposed work and the assessed work is betterment. The owners do not wish to keep the exposed rafter ends, both for aesthetic reasons and to reduce future risk. The proposed repair solution will clearly cost less than the assessed repair, therefore there is no betterment in this item. The owners do not wish to keep the pergola, both for aesthetic reasons and to reduce future risk. The proposed repair solution will clearly cost less than the assessed repair, therefore there is no betterment in this item. The assessor appears to have overlooked the fact that the exterior slab is only 70mm below the interior floor level, and dampness from the slab has damaged the base of the wall cladding. A photo of this damage is appended as evidence of this additional deficiency. Rebuilding the slab at a lower level is necessary to prevent the same issue affecting the replacement cladding. Accordingly, we do not believe that it constitutes betterment. The owner acknowledges that the repair plan cannot be approved unless this work is undertaken, because it is necessary to ensure the future integrity of the house structure. It will be carried out at the owner s expense.