REPORT NUMBER: 100758576MID-001 ORIGINAL ISSUE DATE: JUNE 27, 2012



Similar documents
WHI TEST REPORT # FIRE RATED DOORS

Tremco Fire Protection Systems Group Technical Bulletin

Requirements for Fire Protection of Light Weight Floor Systems **Act 1 Revisited**

Steel Door Institute. Fire Rated Doors and Frames

WHI 90-Minute Rated Veneered Door Frame Installation Instructions

Eggers meticulously-crafted door frames are rivaled only by their beauty, quality and lasting performance. Turning nature s beauty into works of art

Subject: DKS Steel Door and Frames Systems, Inc., ITS / Warnock Hersey Procedural Specification, Certification, and Inspection.

SMALL SCALE ASTM E 119/UL 263 ONE HOUR FIRE TESTING FOR MARINOWARE ON JOIST-RITE WITH ARMOROC FLOOR VTEC # TESTED: MAY 23, 2008 REVISION

INTERNATIONAL ASSOCIATION OF CLASSIFICATION SOCIETIES. Interpretations of the FTP

BASIC FIRE DOOR REQUIREMENTS TECHNICAL DATA SHEET NO. 401

A ROAD MAP FOR YOUR CODE, SMOKE BARRIER & SMOKE PARTITION REQUIREMENTS

ASTM E 1886 and ASTM E 1996 TEST REPORT. Rendered to: NORSE, INC.

Gypsum Board Systems Manual

Pyroguard Wired Glass

Basic Fire Door Requirements

SECTION SECTIONAL OVERHEAD DOORS 521 SERIES ALUMINUM SECTIONAL OVERHEAD DOORS

COMMERCIAL COOKING HOODS, VENTILATION & FIRE SUPPRESSION SYSTEM GUIDELINES AND PROCEDURES

TEST REPORT. Rendered to: TFC A DIVISION OF CENTURION INDUSTRIES, INC. Garrett, Indiana

PART 1 GENERAL 1.1 SECTION INCLUDES

SECTION COILING COUNTER DOORS. Display hidden notes to specifier. (Don't know how? Click Here)

White Paper FIRE DOOR INSPECTIONS, REPAIRS AND LABELING

Terms and Definitions In Canada

Fire Testing of Recycled Materials for Building Applications

MOCK-UP TEST REPORT. Rendered to: TUBELITE, INC. PROJECT: 200 Series Curtain Wall Mock-Up

PERFORMANCE TEST REPORT. Rendered to: GLASSCRAFT DOOR COMPANY

Lighthouse Engineering, L.L.C.

Sun Windows General Information Sun New Construction Window Installation Instructions

PERFORMANCE TEST REPORT. Rendered to: BAMCO INC. PRODUCT TYPE: ACM Wall Panel Systems

REPORT NUMBER: COQ-003 ORIGINAL ISSUE DATE: July 19, 2013

SECTION 6. Glass Storefront Doors:

Office of the State Fire Marshal. Fire Rated Doors

FIRE AND SMOKE PROTECTION FEATURES

Fire Resistance of Brick Masonry

UL 580 TEST REPORT. Rendered to: ARMSTRONG WORLD INDUSTRIES. SERIES/MODEL: MW Vector PRODUCT TYPE: Ceiling System, 3' OC

SECTION FIRE-RATED WOOD JAMBS

Fire Barriers & Fire Stopping

Code of Practice for fire resisting metal doorsets

Report Number BTC 17755F

Chapter 3 Pre-Installation, Foundations and Piers

Fiberglas, Exterior Wall Thermal Insulation

Building Code Clarifications - 7. Fire Resistance

TEST REPORT. Report No.: A Rendered to: BAMCO INC. Middlesex, New Jersey. PRODUCT TYPE: Wall Cladding System SERIES/MODEL: Dry Concept

Quality Assurance and Diagnostic Water Leakage Field Check of Installed Storefronts, Curtain Walls and Sloped Glazing Systems

Fire-resistance test on fire collars protecting a concrete slab penetrated by services

Installation Window Building In Details

INSTALLATION OF A BAY WINDOW

Classroom Door Security & Locking Hardware

PERFORMANCE TEST REPORT. Rendered to: GLASSCRAFT DOOR COMPANY

Excerpts from the Canadian National Building Code (NBC)

MIAMI-DADE COUNTY PERFORMANCE TEST REPORT. Report No.: B Rendered to: CAPTIVEAIRE, INC. Blue Bell, Pennsylvania

GYPSUM AREA SEPARATION FIREWALLS GA

Fire Barrier Duct Wrap 15A

Gas Unit Heaters Duct Furnaces Horizontal - 60 HZ Form No. LF (10/2011) LF24 Standard

Services Enclosures and Protected Shafts - Maintaining Compartmentation

Residential Decks. Planning and Development Services Department

PERFORMANCE TEST REPORT. Rendered to: FORMTECH ENTERPRISES, INC. SERIES/MODEL: Truline PRODUCT TYPE: PVC Seawall

CERTIFICATE OF APPROVAL No CF 291 SCHOTT UK LIMITED

STRUCTURES Excavation and backfill for structures should conform to the topic EXCAVATION AND BACKFILL.

FIRE AND SMOKE PROTECTION FEATURES

VA25014B0516 VA CINCINNATI PROJECT NO INPATIENT BED TOWER ADDITION (4 TH AND 5 TH FLOORS) SECTION GYPSUM BOARD

THERMAL BARRIERS FOR THE SPRAY POLYURETHANE FOAM INDUSTRY

Fire-Rated Glass and Glazing START

PERFORMANCE TEST REPORT. Rendered to: ARCHITECTURAL METAL SOLUTIONS, INC.

Final inspections are completed by site visit only. Access to fenced yards shall be planned.

Know the Code: Using Spray Foam Insulation In Attics and Crawl Spaces

HCD DSA OSHPD 1 2 1/AC AC SS SS/CC CALIFORNIA BUILDING CODE 199

HOOVER TREATED WOOD PRODUCTS, INC. TECHNICAL NOTE FOR ADDITIONAL INFORMATION: TEC-WOOD ( )

n Three 4 x 4 butt hinges per door - prevents wracking and assures smooth positive operation n Heavy duty 16 gauge steel frame

Introduction...COMB-2 Design Considerations and Examples...COMB-3

Installation Instructions

How To Test For An Architectural Test

Composite Panel Firewall Systems

HMMA 810 HOLLOW METAL DOORS HOLLOW METAL MANUAL -87 NAAMM STANDARD FOURTH EDITION METAL DOORS & FRAMES NAAMM 2 NAAMM 2 METAL DOORS & FRAMES

Loss Prevention Standard

TEST REPORT. Rendered to: DEXERDRY. For: Deck Weatherproofing System Installed with AZEK Deck Boards

RESIDENTIAL ROOFING & RE-ROOFING, ROOF VENTILATION AND ROOF SHEATHING REQUIREMENTS MICHIGAN RESIDENTIAL CODE 2000

(This report is endorsed) Industrivej 20, 9900 Frederikshavn, Danmark

4 Installation Requirements

FIRE-RESISTANCE-RATED CONSTRUCTION

5.1. Smoke Sealing. General: The test procedure for smoke sealed doorsets is given by reference to BS476 Section 31.1.

ASTM E 1886 / ASTM E 1996 AND ASTM E 283, ASTM E 330, ASTM E 331 TEST REPORT. Rendered to: BEKAERT SPECIALTY FILMS, LLC

PERFORMANCE TEST REPORT

Figure 22: Typical Individual Venting. Figure 21: Single Water Heater Venting

Residential Deck Safety, Construction, and Repair

TEST REPORT. Report No.: B Rendered to: CROFT, LLC. Magnolia, Mississippi. PRODUCT TYPE: Aluminum Single Hung Window SERIES/MODEL: 95

Automatic Door Selection Guide

This handout is a guide only and does not contain all of the requirements of the Minnesota State Building Code or city ordinances.

Vinyl Greenhouse Window Page 2 of 6 New Contruction Installation Instructions

2010 edition. Handbook of. Fire-Rated Glass. for schools

WINDOW AND DOOR REPLACEMENT REQUIREMENTS

NFRC THERMAL PERFORMANCE TEST REPORT. Rendered to: CR LAURENCE CO., INC. SERIES/MODEL: 7500 Concealed Vent TYPE: Projecting (Awning)

AST M F /GSA TS01 T EST R EPO R T. Rendered to: UNI T E D ST A T ES A L U M INU M

E R0 ACOUSTICAL PERFORMANCE TEST REPORT ASTM E90. Rendered to: TREX COMPANY, LLC. Series/Model: Trex Seclusion

THE DOW CHEMICAL COMPANY Issued: August 1, LARKIN CENTER 1605 JOSEPH DRIVE MIDLAND MICHIGAN (989)

Solar Panel Installations

FIRE-RESISTANCE-RATED CONSTRUCTION

ASTM E 1886 and ASTM E 1996 TEST REPORT. Rendered to: Atrium Companies, Inc. SERIES/MODEL: 50/305 HS PRODUCT TYPE: Vinyl Horizontal Slider

AAMA Standard Practice for Installation of Windows with a Mounting Flange in Open Stud Frame Construction for Low Wind/Water Exposure

MAJOR 2015 MN RESIDENTIAL CODE CHANGES Effective Date: January 24 th, 2015

Fire-Rated Doors and Hardware. A Guide to Field Inspection

Transcription:

TEST REPORT REPORT NUMBER: 100758576MID-001 ORIGINAL ISSUE DATE: JUNE 27, 2012 EVALUATION CENTER Intertek Testing Services NA Inc. 8431 Murphy Drive Middleton, WI 53562 RENDERED TO Fire Door Caulk LLC. Dothan, AL 36301 CONTACT: Contact@FireDoorSolutions.com PRODUCT EVALUATED: 3'0" x 3 6" Single Swing Flush Door with Through Penetrations Filled with Fire Door Caulk. EVALUATION PROPERTY: 90 Minute Positive Pressure Fire Endurance Report of Testing Fire Door Caulk s non-combustible intumescent caulk filling multiple through penetrations in a 3 0 x 3 6 mineral core door for compliance with the applicable requirements of the following criteria: UL 10C (2009) Positive Pressure Fire Tests of Door Assemblies, NFPA 252 (2012), and CAN4 S104 (1985). This report is for the exclusive use of Intertek's Client and is provided pursuant to the agreement between Intertek and its Client. Intertek's responsibility and liability are limited to the terms and conditions of the agreement. Intertek assumes no liability to any party, other than to the Client in accordance with the agreement, for any loss, expense or damage occasioned by the use of this report. Only the Client is authorized to copy or distribute this report and then only in its entirety. Any use of the Intertek name or one of its marks for the sale or advertisement of the tested material, product or service must first be approved in writing by Intertek. The observations and test results in this report are relevant only to the sample tested. This report by itself does not imply that the material, product, or service is or has ever been under an Intertek certification program. Page 1 of 13

Page 2 of 13 Table of Contents Table of Contents... 2 1 Introduction... 3 2 Test Samples And Assembly Description... 3 3 Test Installation and Procedures... 4 4 Testing and Evaluation of Results... 5 4.1. Observations, June 27, 2012... 5 4.2. Door Deflection... 5 4.3. Flaming and Penetration... 5 4.4. Hose-Stream Test Observations and Results... 5 5 Conclusion... 6

Page 3 of 13 1 Introduction The Middleton, Wisconsin fire testing laboratory of Intertek Testing Services NA (Intertek)/Warnock Hersey conducted a Vertical Fire Test for Fire Door Caulk LLC. The test sample(s) were received at the laboratory on June 13, 2012 in good condition. This report gives the results of the evaluation of the fire resistance property of Fire Door Caulk s impact on a listed fire door with multiple through penetrations. The test was conducted at positive pressure in accordance with and UL 10C (2009) Fire Tests of Door Assemblies, NFPA 252 (2012), and CAN4 S104 (1985) 2 Test Samples And Assembly Description The door was selected by Intertek. The caulk was selected and submitted by the client. The caulk was sampled at the Middleton Lab by Intertek. Construction details are in the project file. Assembly 1 Door Size/Configuration Nominal 3'0" wide x 3'6" high x 1-3/4" single swing flush door. Door Skin Door skin: Birch Veneer Stiles Composite. Door Top Rail Composite. Door Bottom Rail Composite. Door Core MDS non-combustible core. Frame Size/Configuration 3'0" wide x 3'6" high listed steel frame. Material 16ga. Wall Type 8 CMU Hardware Lockset Simulated Hinges Simulated Edge seal 1 strip of Lorient 1.5 intumescent applied to jambs. Through Penetrations All penetrations were filled with Fire Door Caulk. Core: <t¾, <t ½, <t ¼. Stile & Rail: <t ½, <t ¼. ***See Figure 3 for a map of these through penetrations. ***No voids in the caulk or penetrations were allowed.

Page 4 of 13 3 Test Installation and Procedures The test assembly was installed per the installation instructions of the door and frame manufacturers in a fire rated wall constructed in a furnace frame. The Fire Door Caulk was applied by Intertek in the fashion the manufacturer requested. The average door clearances to the frame were measured and recorded within the allowable limit as follows (unit: inches): Assembly 1 Top Hinge stile Latch stile Bottom 0.050 0.105 0.100 0.375 After positioning the assembly frame over the furnace opening, the burners were ignited and a timer started. Temperatures within the furnace were monitored using thermocouples and the data recorded. The burners were controlled to keep the furnace temperatures within the allowable limits specified in the test standards. These temperature data are included in this report. Periodic observations were made of the exposed and unexposed surfaces of the test assembly during the fire endurance test. These observations are included in this report. A pressure tap was installed through the furnace wall adjacent to the test assembly at one height (top of door) to measure furnace pressure. The pressure plane at the top of the door within the furnace was maintained at 0.04 inches of water column to simulate testing the top portion of a door. The pressure data is included in this report. Immediately after the Fire Endurance Test, the assembly frame was moved into position for a Hose Stream Test. The exposed surface of the test assembly was subjected to the impact, erosion, and cooling effects of a hose stream described in the test standards. The following test equipment was used to collect and monitor test conditions. Test Equipment Inventory Number Measurement Uncertainty Calibration Date Omega Data Acquisition System 1163 ±2 F at 95% C. L. 5/16/12 Pressure Transducer 1156 ±0.005 w.c. at 95% C.L. 9/16/11 Magnehelic differential pressure gauge 633 ±0.005 w.c. at 95% C.L. 1/19/12 Water pressure gauge 1186 Grade C 4/16/12 Accusplit Timer 611 ±0.001% (over 3hr. period) 7/29/11

Page 5 of 13 4 Testing and Evaluation of Results 4.1. Observations, June 27, 2012 Assembly 1 TIME EXPOSED FACE 00:00 Burners ignited. 00:48 Flash over of veneer skin. 02:28 Flash over complete. 90:00 Test stop. TIME UNEXPOSED FACE 00:00 Assembly tight to frame. 01:23 Smoke from around perimeter of door. 02:28 Smoke ceases. 04:19 Light smoke from head of door. 07:15 Discoloration of hinge side and top hinge corner. 09:10 Discoloration of latch side and top latch corner. 30:00 No significant change. 45:00 No significant change. 47:40 Glow at top hinge corner. 60:00 Glow and char at bottom hinge corner of door. 71:09 Top hinge corner is deteriorating. 75:00 No change at filled holes. 90:00 Test stop. 4.2. Door Deflection Door deflection relative to the frame, where applicable, was monitored throughout the test. The door s deflection did not exceed the allowable limit, 1 times the door thickness, and thus met the requirements of the test standards for deflection. 4.3. Flaming and Penetration During the fire exposure period there was no flaming of the unexposed face of the assembly in excess of that allowed by the standard. The assembly met the criteria of the test standards for flaming. 4.4. Hose-Stream Test Observations and Results A Hose-Stream Test was conducted for 18.3 seconds based on a total assembly area of 12.22 square feet and a required duration of 1.5 seconds per square foot of assembly area at 30 psi. At the conclusion of the Hose-Stream test, all of the through penetrations being evaluated remained filled with the intumescent caulk. The top corners of the door were removed from the opening during the Hose-Stream test, this failure of the door occurred away from the evaluated areas and was not caused by the through penetrations or application of the Fire Door Caulk.

Page 6 of 13 5 Conclusion Assembly 1: The Fire Door Caulk intumescent applied to through openings ranging from ¼ to ¾ in diameter in a 3 0 by 3 6 single swing door, as described herein, complied with UL 10C (2009) Positive Pressure Fire Tests of Door Assemblies, NFPA 252 (2012), and CAN4 S104 (1985) for a 90 minute rating. This report does not automatically imply product certification. Products must bear the Warnock Hersey registered certification mark to demonstrate compliance. INTERTEK TESTING SERVICES NA Reported by: Gregory Allen Associate Engineer, Fire Resistance Building Products Group Intertek Reviewed by: Kent Kelsey Project Manager, Fire Resistance Building Products Group Intertek

Page 7 of 13 APPENDIX A Test Data, Technical Drawing and Photographs

Page 8 of 13 FIGURE 1 TIME-TEMPERATURE PHOTOGRAPHS, ASSEMBLY CURVE, 1 ASSEMBLY 1 2000 1800 1600 Furnace Temperature Stnd. Ave Furn. Pressure (in w.c.) Temperature( o F) 1400 1200 1000 800 600 400 200 0 0.10 0.08 0.06 0.04 0.02 0.00-0.02-0.04-0.06-0.08-0.10 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 Time FIGURE 2 FURNACE PRESSURES, ASSEMBLY 1 Furnace Pressures 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 Time Pres. Top

Page 9 of 13 FIGURE PHOTOGRAPHS, 3 HOLE LOCATION ASSEMBLY MAP 1

Page 10 of 13 Before

Page 11 of 13 Fire Endurance

Page 12 of 13 Hose Stream

REVISION SUMMARY Page 13 of 13 DATE June 27, 2012 SUMMARY Original Issue Date