Site Layout & Traffic Plan



Similar documents
Construction Traffic Management Plan

Construction Traffic Management Plan

Construction Traffic Management Plan

University Arms Hotel, Cambridge

Construction Management Statement. Introduction. Contents

CONSTRUCTION MANAGEMENT PLAN

Construction Management Statement. Residential development at Bywell House, St Mary s Hill, Ascot

CONSTRUCTION TRAFFIC MANAGEMENT PLAN (CTMP)

Logo here. TRAFFIC MANAGEMENT PLAN Ref : xxxx Dated xxxxxx. Enter details. Delivery Address: Enter details

Construction Site Set Up Requirements

Erection of replacement warehouse building and erection of two buildings in connection with builder s merchants

CONSTRUCTION TRAFFIC MANAGEMENT PLAN Issue 2, V5, 11/11/13

Construction Phase Traffic Management Plan

CORPORATE PROCUREMENT UNIT SITE & SECURITY PROCEDURES BOSTON SPA VERSION 9 SEPT12

This document must be read in conjunction with the Permit to Work and Service Interruption Notice policy.

Port Traffic Management Plan

CONSTRUCTION TRAFFIC MANAGEMENT PLAN V11, 26/09/12

LT McGuinness Site 10 Development, Wellington Waterfront. Construction Traffic Management Plan. 7 October 2014

Galloper Wind Farm Project. Traffic Management Plan May 2013 Draft v1 Document Reference GWF/TMP/ Galloper Wind Farm Limited

Repton Primary School. Traffic Management Plan

DEVELOPMENT BRIEF FOR LAND AT ALLOA ROAD, TULLIBODY

Howard Primary School Construction Management Plan

Construction Management Plan Template

Comment #1: Provide an interchange at Route 7 and Farm Market Road/White Gate Road. This was studied in the late 1990 s.

Site Traffic Management Plan

Application by National Grid Gas plc for the River Humber Gas Pipeline replacement (the application)

TRAFFIC MANAGEMENT PLAN

Demolition & Construction Management Plan

Shannon Corner Service Centre, Burlington Road, New Malden, KT3 4NP

Proposed Sports Hall at. Oldfield School. Kelston Road. Bath BA1 9AB. Construction Management Plan June 2011

Design & Access Statement : Proposed Internal Devlopment & External Plant to Data Centre Facility, 35 Imperial Way, Croydon.

APPLICATION FOR PLANNING PERMISSION FOR A SOIL TREATMENT FACILITY AT KINGS CLIFFE LANDFILL SITE, STAMFORD, NORTHAMPTONSHIRE

THIS PAGE INTENTIONALLY LEFT BLANK

17 Traffic Management Plan

INTERIM ADVICE NOTE 65/05 DESIGN OF VEHICLE RECOVERY OPERATIONS AT ROAD WORKS

PEDESTRIAN LAWS OF NORTH CAROLINA

Managing Public Use of Freeway Emergency Access Gates and Median Crossovers

Abu Dhabi EHSMS Regulatory Framework (AD EHSMS RF)

DEPARTMENT OF TRANSPORT CYCLING STRATEGY 29 February 2008

BROKEN HILL OPERATIONS Rasp Mine Project Traffic Management Plan

Designing Out Crime Assessment

Scaffold Standard (Standard to Managing and Appointing Scaffolding Contractors on University College London (UCL) Projects) Management Standard

AGENDA ITEM: 15 PROPOSED ZEBRA CROSSINGS AT VARIOUS LOCATIONS. Executive Director of Development & Environment

Household waste & recycling storage requirements

Foulford Primary School Site Traffic Management Plan. December 2012 (Review date October 2013)

Madras College Site Traffic Management Plan (South Street) August 2015

8 DELIVERING THE MOVEMENT FRAMEWORK

10.1 WILL HEY FARM WATFORD LANE NEW MILLS RETENSION OF NEW STABLE BLOCK, SAND PADDOCK AND ASSOCIATED EARTHWORKS AND LANDSCAPING (FULL - MINOR)

Development Layout Design

1 Welcome. The exhibition comprises a series of boards which provide some background information to show you our initial ideas for the site.

Site Deliverability Statement Development at: Beech Lane, Kislingbury. Persimmon Homes Midlands March 2015

Construction Management Plan (CMP) Application

DELIVERY & SERVICING PLAN. REDWOOD PARTNERSHIP Consulting Engineers Transportation Planners

Claughton Medical Centre Travel Plan

STONEBRIDGE COMMUNITY FUNDAY

Major Improvement Schemes in Basingstoke

WELCOME PROPOSALS FOR PENTAVIA RETAIL PARK WELCOME TO OUR EXHIBITION WHICH SETS OUT OUR PLANS TO DEVELOP THE PENTAVIA RETAIL PARK SITE.

Goals & Objectives. Chapter 9. Transportation

TH 23 Access Management Study Richmond to Paynesville

Event Safety Management Plan - Template for Event Organisers

Cutwell Farm. Tetbury, Gloucestershire

GUIDELINES FOR MOVEMENT OVER SOUTH CAROLINA HIGHWAYS OF OVERSIZE AND OVERWEIGHT VEHICLES AND LOADS

Site Traffic Management Plan

Report to Planning applications committee Item Date 6 March 2014 Head of planning services

3 Tappan Zee Bridge Rehabilitation Options

Rawdon Investments Limited & Aldi Stores Limited Former Barkers Nursery, Clitheroe Servicing Management Plan

28.0 Development Permit Area #2 (Neighbourhood District)

chapter 3 basic driving skills

Workplace Health, Safety & Welfare

The Delivery Hub health, safety and environment Raising the bar 2 Traffic management entry and exit

Devonport EfW CHP Facility. CEMP Proposal for Non Destructive Testing Activities. 1. Introduction

Preventing arson in buildings

THE TOWN AND COUNTRY PLANNING ACT 1990 Grant of Planning Permission

FULL APPLICATION FOR ERECTION OF GARAGE MAINTENANCE UNIT AND PORTABLE OFFICE CABIN

TRANSPORTATION POLICY

Mount Browne (Surrey Police Head Quarters), Sandy Lane, Guildford Vision Statement. November with

Traffic Management Scheme

Event Planning Guidance Notes EVENT PLANNING GUIDANCE NOTES

SCHOOL SECURITY SURVEY

SEMINOLE PRATT WHITNEY ROAD & NORTHLAKE BLVD. FREQUENTLY ASKED QUESTIONS

Site Security and Access Policy and Procedures. Written By. Kent Walmsley Creation date Summer 2010 Adopted by Governors 7 December 2010 Reviewed By

Stone Way N Rechannelization: Before and After Study. N 34th Street to N 50th Street

Kings Road, Beith. Development Brief. Part 1: Site Specific Information

7 Temple Close Dorchester, Dorset

Perth and Kinross Council Development Control Committee 18 March 2009 Recommendation by Development Quality Manager

GUIDELINES FOR WORKING ON ROADS

Triton Knoll Offshore Wind Farm Limited Electrical System. Outline Traffic Management Plan

Transportation Management Plan Template

Cycle Safety. Some tips on safer cycling. Údarás Um Shábháilteacht Ar Bhóithre Road Safety Authority

Ipswich City Council Subordinate Local Law 5.1 (Parking) 2013

South Ash Manor Ash Lane, Ash, Sevenoaks, Kent. savills.co.uk

Transcription:

Location Site address: Norbury Manor Business Enterprise College, Kensington Avenue, Thornton Heath, Croydon CR7 8BT. The new block will be constructed on the existing hard play area. The construction site is bounded by green playing field on the north and east side which are part of the school ground, public footpath and Norbury park on the west, and existing school building on the south. The residential properties are located on the north and east of school boundary and adjacent to the site access. Site Setup and Logistic In order to meet not only our obligations in respect of CDM, Health and Safety and duties as a Considerate Constructor it will be necessary for Apollo to afford a fully functional and compliant temporary site accommodation arrangement as part of our site setup. Prior to commencement on site, the site setup will include perimeter site hoarding equipped with appropriate safety and wayfinding signage, lighting installation, and set of site gates for vehicle entrance and another set for pedestrian access to be established. Apollo will utilise the existing emergency access off Green Lane as site access and egress during the construction works. A robust segregation system will be implemented, maintained and monitored at all time. The perimeter safety segregation system, i.e Heras fencing, is to be erected and equipped with appropriate safety and way-finding signage. Clearly defined access routes will be defined both within the site and the surrounding school grounds in accordance with our management plan and with particular attention to the segregation of pedestrians, plant and vehicles. The delivery, storage and distribution of materials will form part of this plan. In addition, a safety route plan along with fire escape route plan and full site information notices will be provided in accordance with our commitment under the CCS. As the works are to be carried out in the occupied school ground of Norbury Manor Business Enterprise College within a residential area and public walk way, it is imperative that during the February 2009 Page 1 of 8 Apollo Education Part of the Apollo Group

contract period, Apollo will maintain good communication with all parties by having a weekly logistic meeting to discuss and determine the logistic plan, future deliveries, future works and safety and fire escape routes around the site. Operating such a measure will mitigate any impact over the entire length of the scheme that site vehicle and plant movement will have on the existing environment, allowing the security of the site to be maintained at all times. Site Accommodation Having reviewed the tender documentation and carried out a site visit, Apollo will propose to establish the site accommodation and site compound on the existing parking bay at emergency access route by protected trees. As a minimum, the site accommodation will comprise of a site office with meeting room, drying / changing room, W.C and canteen / dining area and store. Temporary utilities are to be established prior to the erection of the site accommodation. For temporary utilities, Apollo will establish a temporary service run and connect to the existing whenever feasible. If the connection to the existing is not feasible, Apollo will provide a new temporary service run from the proposed site compound area and make a connection to the main services. Typical view of Canteen areas Typical Temporary Site Accommodation February 2009 Page 2 of 8 Apollo Education Part of the Apollo Group

The Governors Site access / egress point Security point 1 Public pedestrian crossing point Security point 2 Wheel wash area One way traffic system Trees to be protected Muster Point New Build Waste management area Existing School Building Site Accommodation and Logistic Plan Strategy Note / Legend Site traffic route, area will be kept clear at all time for emergency vehicles access Site pedestrian route, pedestrian barriers will be erected Public pedestrian route, pedestrian barriers will be erected Emergency access route, area will be kept clear at all times Perimeter site boundary Existing school boundary Propose location for site accommodation and security point February 2009 Page 3 of 8 Apollo Education Part of the Apollo Group

The Governors Norbury Park Public Park One Way Traffic System Public playground Wheel wash area Trees to be protected Existing School Boundary Spare Spare Pedestrian crossing point Site Office Meeting Room WC & Shower Room Site Lockable Store Canteen & Dining Drying Room New Build Site Accommodation Plan Note / Legend Site traffic route, area will be kept clear for emergency vehicles access Site pedestrian route Trees protection boundary Emergency access route, area will be kept clear at all times Perimeter site boundary Site pedestrian barrier Propose location for site accommodation and security point All fire fighting equipment and first aid kit will be located in each cabin. February 2009 Page 4 of 8 Apollo Education Part of the Apollo Group

The Governors Lockable emergency access barrier No construction traffic allowed to utilise road adjacent to 191 Green Lane Security point 1 All delivery vehicles must be accompanied by a banksman on this road Public Pedestrian crossing point Security point 2 Site Pedestrian crossing point Lockable site access gates Road Access Strategy Note / Legend Site traffic route, area will be kept clear at all time for emergency vehicles access Site pedestrian route Public pedestrian route, a temporary zebra crossing will be established at crossing point Perimeter site boundary The security person on security point 2 will closely monitor and control the pedestrian crossing point. Fire fighting equipment and first aid kit will be located in the security cabin. February 2009 Page 5 of 8 Apollo Education Part of the Apollo Group

Construction Phase Traffic Management Plan Address; Apollo Site Office Green Lane (Opposite Norbury Hill) Thornton Heath Croydon CR7 8BL 1. Existing Emergency access routes will be maintained to permit emergency vehicles to attend the surrounding properties, local park, and school premises at all times. 2. Prior to any works commencing a dual conditions survey will be undertaken with the local authority and Apollo Property services group recording and photographing existing surrounds. 3. Only one of the two existing roadways from Green Lane can be used that being the access way directly adjacent to 189 Green Lane. 4. The type and frequency of vehicle movement throughout the construction period is provided in the anticipated schedule below (refer to item 20). 5. Clear access will be provided and maintained for residents to gain entry / exit to the rear of properties of Green Lane at all times. The existing tarmacadam road to the rear of the Green Lane properties will be provided with a temporary Heras fence / barrier at the junction of the construction access / egress road to mitigate the potential foot passage of residents and risk of injury. The barrier will be removable to permit both foot and vehicle passage of the residents and will be removed upon completion of each working day, and re erected the following working day. 6. It is proposed to erect a line of Heras fencing on the construction access / egress road, parallel to the adjacent boundary of 189 Green Lane to mitigate the risk of damage to the boundary wall / fence. 7. A further Heras fencing erection will be placed directly opposite this to provide segregation of the public from vehicle movement at all times. 8. Apollo to clearly establish a Track route for vehicles entering the neighbourhood whereby entry to the site will be via the A23 Road to Green Lane with vehicles turning into the site against oncoming traffic and vehicles leaving site turning left onto Green Lane towards the A23 exiting with the traffic. 9. Procedures as follows :---- 10. Additional segregation between existing adjacent properties, clear way finding signage for the public footpath on the highway and access directions for public to the greenbelt land from Green Lane will be prominently positioned and maintained at all times. 11. Pedestrians will have right of way on the public footpaths at all times. 12. At the Junction of the Fire Gates and Green Lane a dedicated person employed by Apollo is to be stationed in addition to the Gate s person located at the point of entry onto site (existing school gates) with radio controlled communications to ensure that no vehicles are parked up or held on the public highway or held within the access road i.e. vehicles straight through into the site confines. 13. Delivery times for heavy vehicle traffic to be restricted to the hours of 09:00 to 17:00hrs Monday to Friday. 14. All vehicles will enter the site access when passage is clear and safe to move. February 2009 Page 6 of 8 Apollo Education Part of the Apollo Group

15. All vehicles to approach from the A23 in Norbury via Green Lane turning right into the construction site access / egress road across the line of oncoming traffic. 16. All delivery drivers will report at the site traffic entrance gate and adhere to the instructions provided by Apollo s traffic manager who will escort the vehicle to the site security gate for access into the site compound. 17. A restricted speed limit of 5MPH will be in operation at all times. 18. All drivers will be instructed to deliver / off load, turn and return to the site security gate and await instruction to be escorted from the site compound traffic exit onto the access / egress road by the site traffic manager. 19. All vehicles to leave the site access road turning left onto Green Lane heading towards Norbury. 20. Anticipated vehicle numbers and size on a monthly basis; Type August September October November December Low loader 8No 6No 12No 8 Wheeler 30No 40No 30No 10No 5No Muck away 40ft Flatbed 11No 6No 6No 15No 15No Curtain Sided 10No 10No 10No 10No 10No Luton Van 5No 2No 5No 5No 5No Concrete 25No 25No 25No 25No 15No Type January February March April May Low loader 4No 8 Wheeler 12No 6No Muck away 40ft Flatbed 30No 20No 25No 25No 25No Curtain Sided 12No 10No 10No 10No 10No Luton Van 5No 5No 5No 5No 5No Concrete February 2009 Page 7 of 8 Apollo Education Part of the Apollo Group

Type June July August September Low loader 2No 2No 6No 8 Wheeler 5No 2No Muck away 40ft Flatbed 10No 10No 10No 10No Curtain Sided 8No 9No 6No 1No Luton Van 5No 5No 5No 5No Concrete Emergency Contact In case of emergency the contact numbers for local emergency services are: 1. Police: South Norwood Police Station Address: 11 Oliver Grove, London SE25 2. Fire Brigade: Croydon Fire Station Address: 90 Old Town, Croydon, Surrey CR0 1AR (4 miles) Phone: 020 85551200 ext 37630 3. A & E Hospital and Ambulance Services: Mayday University Hospital Address: 530 London Road, Thornton Heath, Surrey CR7 7YE Phone: 020 84013000 Apollo will contact the emergency authorities for consultation and liaison prior to the provision of method statements relating to traffic control, access / egress from site and emergency vehicle access and regress to site and the adjoining property. February 2009 Page 8 of 8 Apollo Education Part of the Apollo Group