Construction Traffic Management Plan
|
|
- Randolf Hines
- 8 years ago
- Views:
Transcription
1 Construction Traffic Management Plan Proposed Additional Accommodation for SWDPLS Shinners Bridge Dartington Produced for and on behalf of Built Environments Team Devon County Council NPS South West Ltd Venture House One Capital Court Sowton Industrial Estate Exeter EX2 7FW
2 Construction Traffic Management Plan, The Bridge Centre Dartington The construction site must be organised so that vehicles and pedestrians using site routes are segregated and can move around safely. The routes need to be suitable for the persons or vehicles using them, in suitable positions and sufficient in number and size, this is so that incidents can be prevented by the effective management of transport operations throughout the construction process. Pedestrians and vehicles can be kept apart by management of the following: Entrances and exits - provide separate entry and exit gateways for pedestrians and vehicles; Walkways - provide firm, level, well-drained pedestrian walkways that take a direct route where possible; Crossings - where walkways cross roadways, provide a clearly signed and lit crossing point where drivers and pedestrians can see each other clearly; Visibility - make sure drivers driving out onto public roads can see both ways along the footway before they move on to it; the existing entrance has a visibility splay to enable this Obstructions do not block walkways so that pedestrians have to step onto the vehicle route; and Barriers - think about installing a barrier between the roadway and walkway. Vehicle movement will need to be minimised on site due to the restricted areas in which the contractor will have to work. This can be minimised by management of the following: provide car and van parking for the workforce and visitors away from the work area; control entry to the work area; and Plan storage areas so that delivery vehicles do not have to cross the site. People who direct vehicle movements (banksmen) must be trained and authorised to do so. Make sure that all drivers and pedestrians know and understand the routes and traffic rules on site. Use standard road signs where appropriate Provide induction training for drivers, workers and visitors and send instructions out to visitors before their visit. This management will be greatly assisted by utilising the following: Banksmen - who can be appointed to control manoeuvres and who are trained in the task; Clothing - pedestrians on site should wear high-visibility clothing. Gatekeeper- to direct/summon banksmen Speed limits- restrict speed to 5 mph 1
3 Route for deliveries Construction traffic will be able to access the site from one of two directions. The A384 fronts the site from a north to south direction. Depending upon the route, the traffic will come from the A38 and along the A384, this road does have some restrictions although is regularly used by larger vehicles coming into Dartington. From the southerly direction the A384 is joined to the A385 in a east and west direction which will allow traffic form the Torbay areas and an alternative route from Plymouth. Map showing main routes to the site 2
4 Loading and unloading of plant and materials A designated area within the site will be identified in order for the vehicles to safely access from the A384 main entrance and allow safe and easy egress without disrupting the flow of traffic on this road. Times and deliveries will be restricted to be outside of the times of pick up and drop off for the adjacent schools of Bidwell Brook and Dartington Primary School. The delivery times should not be between 8.30 and 9.30 am, and 3 to 4 pm Storage of plant and materials The storage of plant and materials will be within easy access of the point of unloading to minimise movement through the site for vehicles and plant. It should be close to the contractor s compound but located to be free of obstruction. This will be further determined upon the appointment of a main contractor for this scheme. Suggested contractor compound areas, subject to appointment of main contractor 3
5 Programme of works, traffic management measures An overall programme of work has been provisionally included, although this is subject to detailed scrutiny by the main contractor appointed at a later date. The contractor programme will have a detailed breakdown of all site activities and will be subject to the approval of the project manager/contract administrator. Provision of boundary fencing/hoarding There will be Herras fencing secured to a minimum height of 2 metres alongside the construction site areas or solid panel hoarding in areas with high/low viewing panels to help reduce unauthorised access to site. There is a pedestrian entrance point from the pavement adjacent to the A384 and the main gate entrance which will be permanently closed to non site personnel for the duration of the works. The fencing will run alongside this to prohibit any pedestrians accessing the school site from this direction to ensure complete separation from construction traffic and site works. The existing school site buildings will remain in use throughout the construction period on the lower part of the site across the Bidwell brook, and there is an existing and separate entrance on the lower side form the A385 directly into this area. All pedestrian and vehicular access for the existing school site users will be encouraged to use this as the other entrance will be blocked to non site personnel. The staff of the facility will have to park outside of the site for the duration of the works. Proposed fencing layout for the site security and safety 4
6 Parking of vehicles for site personnel, operatives and visitors A limited number of site personnel will park on site in the compound areas as identified in the site set up plan. There will be limited numbers of parking due to the scale of the development and the areas required for construction. There is a public car park to the north of the site that can be used by site personnel. Visitors to the site will be encouraged to use the public car park and keep the vehicular access on to the site to a minimum. There is a public footpath that runs from the public car park along the front of the site n order to access the site. Map highlighting car park to the north of the site 5
Construction Traffic Management Plan
Construction Traffic Management Plan Proposed Additional Classroom Accommodation for Woolacombe Primary School Produced for and on behalf of Built Environments Team Devon County Council NPS South West
More informationConstruction Traffic Management Plan
Introduction This (CTMP) has been prepared in order to discharge Condition 20 of planning permission ref 07/02879/EFUL for the enabling site works associated with the wider Bath Western Riverside development.
More informationRepton Primary School. Traffic Management Plan
Repton Primary School Traffic Management Plan Headteacher: Mrs H Wallis Signature: H Wallis Date: 26 th June 2015 Chair of Governors: Mrs L Eaton Signature: L Eaton Date: 26 th June 2015 8 th June 2015
More informationHousehold waste & recycling storage requirements
South Gloucestershire Council Guidance for Developers on Household waste & recycling storage requirements INTRODUCTION As part of the Council s aim to improve the quality of life for residents as well
More informationGENERAL GUIDE FOR WORKPLACE TRAFFIC MANAGEMENT
1 This General Guide provides information on how to manage traffic risks at a workplace. It is supported by specific guidance material on traffic management for shopping centres, construction workplaces,
More informationCONSTRUCTION TRAFFIC MANAGEMENT PLAN Issue 2, V5, 11/11/13
Note: Please refer to the end of this document for guidance notes about completing this form Q1. What is the full postal address of the site? Your response Q2. Planning reference and revision number (if
More informationUniversity Arms Hotel, Cambridge
Traffic Management Plan For University Arms Hotel, Cambridge Prepared By: James Batterbee Number: M1342 / Rev B Date: 29 th August 2014 CONTENTS: (1) INTRODUCTION (2) VEHICLE ACCESS & EGRESS AND PEDESTRIAN
More informationAbu Dhabi EHSMS Regulatory Framework (AD EHSMS RF)
Abu Dhabi EHSMS Regulatory Framework (AD EHSMS RF) EHS Regulatory Instrument Code of Practice EHS RI CoP 44.0 Traffic Management and Logistics Version 2.0 February 2012 ACKNOWLEDGEMENTS With gratitude
More informationTraffic Management Plan - Depot Procedure
Traffic Management Plan - Depot Procedure Date: 1/8/13 Version: TMPDPGWT001 Status: Approved 1. Purpose This procedure outlines the traffic management plan which must be followed for the Depots. 2. Scope
More informationLogo here. TRAFFIC MANAGEMENT PLAN Ref : xxxx Dated xxxxxx. Enter details. Delivery Address: Enter details
Logo here Ref : xxxx Dated xxxxxx Mandatory H&S 905 Rev 1: xxxxx Page 1 of 1 Project: Project No: Date: Prepared by: Enter details Enter details Enter details Enter details Delivery Address: Enter details
More informationSite Layout & Traffic Plan
Location Site address: Norbury Manor Business Enterprise College, Kensington Avenue, Thornton Heath, Croydon CR7 8BT. The new block will be constructed on the existing hard play area. The construction
More informationCONSTRUCTION MANAGEMENT PLAN
CONSTRUCTION MANAGEMENT PLAN for CHILDRENS CENTRE, PRIMARY CLASSROOM & REPLACEMENT PRESCHOOL AT CLYST ST MARY PRIMARY SCHOOL EXETER, DEVON EX5 1BG REVISION A 7 May 2010 1 P a g e Mansell have been appointed
More informationTHIS PAGE INTENTIONALLY LEFT BLANK
THIS PAGE INTENTIONALLY LEFT BLANK Construction Traffic Management Plan 2 Contents 1. Introduction... 4 1.1 Conditions of Consent... 4 2. Goals of the CTMP... 6 2.1 Objectives... 6 2.2 Predicted Construction
More informationSite Traffic Management Plan
Masterton Primary School Aberdour Road Dunfermline Fife KY11 8HY Telephone: 01383 602455 Email: masterton.enquiries@fife.gov.uk Head Teacher: Mr Stephen Humphries Site Traffic Management Plan Date December
More informationRockhampton Office Brisbane Office Tarong Site. Barron Gorge Hydro PS Kareeya Hydro PS Mica Creek PS
Business Procedure Traffic Management Document Number OHS-PROC-130 This document applies to the following sites: All Sites Rockhampton Office Brisbane Office Tarong Site Barron Gorge Hydro PS Kareeya Hydro
More informationMadras College Site Traffic Management Plan (South Street) August 2015
Madras College Site Traffic Management Plan (South Street) August 2015 South Street, St. Andrews, KY16 9EJ Kilrymont Road, St. Andrews, KY16 8DE Telephone (01334) 659402 Telephone (01334) 659401 Email
More informationCONSTRUCTION TRAFFIC MANAGEMENT PLAN V11, 26/09/12
If the project you are constructing was subject to planning permission and a condition requiring a Construction Traffic Management Plan (CTMP) was applied to the planning consent, this condition will need
More informationThis document must be read in conjunction with the Permit to Work and Service Interruption Notice policy.
UNIVERSITY OF HERTFORDSHIRE HIGHER EDUCATION CORPORATION SITE RULES FOR CONTRACTORS The University s Site Rules for Contractors are issued on the authority of the Director of Estates, Hospitality and Contract
More informationConstruction Management Statement. Residential development at Bywell House, St Mary s Hill, Ascot
Construction Management Statement Residential development at Bywell House, St Mary s Hill, Ascot Parking of Vehicles of Site Personnel, Operatives and Visitors Site staff, visitors to the development and
More informationDevelopment Layout Design
Development Layout Design General Design Considerations for Adoptable Highways Version 1 June 2012 Transportation, Waste and Environment Service Issue and Revisions Record Revision Date Originator Purpose
More informationConstruction Phase Traffic Management Plan
Construction Phase Traffic Management Plan The Construction Phase Traffic Management Plan is in connection with the application for the development of a single Wind Turbine and Ancillary Works on land
More informationDELIVERY & SERVICING PLAN. REDWOOD PARTNERSHIP Consulting Engineers Transportation Planners
Redwood Partnership Transportation Limited Maritime House Basin Road North Portslade Brighton BN41 1WR T: 01273 414515 F: 01273 376824 E: consult@redwoodpartnership.co.uk www.redwoodpartnership.co.uk REDWOOD
More informationInformation Sheet. What is a Workplace Transport Risk Assessment?
Workplace Transport Safety Risk Assessment Information Sheet This information sheet provides basic information on conducting a workplace transport risk assessment. The information is aimed at employers,
More informationCONSTRUCTION TRAFFIC MANAGEMENT PLAN (CTMP)
CONSTRUCTION TRAFFIC MANAGEMENT PLAN (CTMP) [Colston Budd Hunt & Kafes Pty Ltd AS AMENDED BY City of Sydney] 23 March 2010 1. PREAMBLE 1.1 This document constitutes the Demolition and Traffic Management
More informationSafe Driver. Information Sheet
Workplace Transport Safety Safe Driver Information Sheet To effectively control workplace transport risks, the vehicle, the driver and the working environment must be appropriately managed. This information
More informationFoulford Primary School Site Traffic Management Plan. December 2012 (Review date October 2013)
Foulford Primary School Leuchatsbeath Drive Cowdenbeath Fife KY4 9SN Foulford Primary School Site Traffic Management Plan December 2012 (Review date October 2013) Site Traffic Management Plan Foulford
More informationConstruction Management Statement. Introduction. Contents
Construction Management Statement Project Name Dee Point Primary School Introduction On all Morgan Sindall projects, the safety and welfare of all is of paramount importance. This document concentrates
More informationSite Traffic Management Plan
Pathhead Primary School Cairns Street West Kirkcaldy Fife KY1 2JA Telephone: 01592 583450 Email: pathheadps.enquiries@fife.gov.uk Headteacher Julie M Anderson Site Traffic Management Plan December 2012
More informationTRAFFIC MANAGEMENT IN WORKPLACES
TRAFFIC MANAGEMENT IN WORKPLACES Code of Practice TABLE OF CONTENTS FOREWORD... 3 SCOPE AND APPLICATION... 3 1. INTRODUCTION... 4 1.1 The meaning of key terms... 4 1.2 Who has health and safety duties
More informationParking Regulations. Why?
Parking Regulations Why? The aim is to make the Campus a safer place. Despite there being empty parking spaces available for use most days we still have a minority who regularly park inconsiderately and
More informationINTERIM ADVICE NOTE 65/05 DESIGN OF VEHICLE RECOVERY OPERATIONS AT ROAD WORKS
INTERIM ADVICE NOTE 65/05 DESIGN OF VEHICLE RECOVERY OPERATIONS AT ROAD WORKS The Purpose of this document is to provide the Project Sponsor / Designer with comprehensive guidance on the range of issues
More informationWorkplace Transport Safety Reversing Vehicles Information Sheet What are the dangers associated with reversing vehicles? Why is reversing a problem?
Workplace Transport Safety Reversing Vehicles Information Sheet This information sheet aims to raise awareness of the dangers caused by reversing vehicles in the workplace. It provides basic information,
More informationConstruction Site Set Up Requirements
Process Code Number Revision COP A 035 B Document Title Construction Site Set Up Requirements B 1/11/10 SRC SAT DH Final A 1/10/10 SRC MI Draft comment Rev. Date Prepared Reviewed Approved Detail/Comment
More informationWorkplace transport safety A brief guide
Workplace transport safety A brief guide Introduction Every year, there are over 5000 accidents involving transport in the workplace. About 50 of these result in people being killed (www.hse.gov.uk/statistics).
More informationPhysical Security Assessment Form
Physical Security Assessment Form Security Self-Assessment T Wake 10 February 2012 Security Assessment Contents Facility / Site Security Assessment Form... 3 Identification Details... 3 Facility Details...
More informationConstruction Management Plan (CMP) Application
About this form Principal Contractor (Applicant) Applicant Details (Person lodging application and main contact for CMP) DA and Site Details Development Consent for Works you are carrying out Construction
More informationLT McGuinness Site 10 Development, Wellington Waterfront. Construction Traffic Management Plan. 7 October 2014
LT McGuinness Site 10 Development, Wellington Waterfront Construction Traffic Management Plan 7 October 2014 TDG Ref: 12950 141007 ltm ctmp final report.docx LT McGuinness Site 10 Development, Wellington
More informationSite inspection: Workplace transport checklist
Site inspection: Workplace transport checklist The following checklist is a guide to what employers should consider when assessing the risk from vehicles in the workplace. It may not be comprehensive for
More informationDesign & Access Statement : Proposed Internal Devlopment & External Plant to Data Centre Facility, 35 Imperial Way, Croydon.
Design & Access Statement : Proposed Internal Devlopment & External Plant to Data Centre Facility, ARC-RP-A-002 Prepared by ARCMC Ltd July 2012: Issue A Contents 1. Introduction 2. Application Proposal
More informationTraffic Management Issue 1.0 Revision: v2 October 2014
Disclaimer IMPORTANT: The information in this guide is of a general nature, and should not be relied upon as individual professional advice. If necessary, legal advice should be obtained from a legal practitioner
More informationTRAFFIC MANAGEMENT PLAN FOR THE PORT AND INDUSTRIAL ESTATE OF POINT LISAS
POINT LISAS INDUSTRIAL PORT DEVELOPMENT CORPORATION LIMITED TRAFFIC MANAGEMENT PLAN FOR THE PORT AND INDUSTRIAL ESTATE OF POINT LISAS Page 1 Document Distribution Page COPY # LOCATION HOLDER DATE 1 2 3
More informationThe Delivery Hub health, safety and environment Raising the bar 2 Traffic management entry and exit
Safe roads, reliable journeys, informed travellers The Delivery Hub health, safety and environment Raising the bar 2 Traffic management entry and exit Version I - July 2012 An executive agency for the
More informationWorkplace Health, Safety & Welfare
Relevant Legislation Workplace (Health, Safety and Welfare) Regulations 1992 Construction (Design & Management) Regulations 2015 Provision & Use of Work Equipment Regulations 1998 (PUWER) Lifting Operations
More informationWaste Collection Operations
Occupational Road Risk & Fleet Management System Management of vehicles Fit & proper person to The and manage the are trained and hold a Certificate of Professional Competence in National Road Haulage
More informationBEHANS LAND RESTORATION LIMITED RESTORATION OF FORMER QUARRY BLACKHALL, CO. KILDARE OUTLINE CONTINGENCY PLAN MAY 2008
BEHANS LAND RESTORATION LIMITED RESTORATION OF FORMER QUARRY BLACKHALL, CO. KILDARE OUTLINE CONTINGENCY PLAN MAY 2008 JBA Prepared by : John Barnett and Associates / SLR Consulting 7 Dundrum Business Park
More informationSTONEBRIDGE COMMUNITY FUNDAY
STONEBRIDGE COMMUNITY FUNDAY General Assessment Activity assessed: Planning and Delivery of the Stonebridge Community Funday Location: Name of assessor: A Smith Date of assessment: 21 May 2014 Version
More informationRAEBURN GARAGE, 118 RAEBURN AVENUE, SURBITON
RAEBURN GARAGE, 118 RAEBURN AVENUE, SURBITON DELIVERY AND SERVICING PLAN August 2015 Introduction This Delivery and Servicing Plan (DSP) has been prepared in relation to the proposed redevelopment of Raeburn
More informationGUIDELINES FOR THE DESIGN OF OFF-STREET CAR PARKING FACILITIES
GUIDELINES FOR THE DESIGN OF OFF-STREET CAR PARKING FACILITIES SECTION 1 SCOPE AND GENERAL 1.1 SCOPE These Guidelines set out the minimum requirements for the design and layout of off-street parking facilities,
More informationCORPORATE PROCUREMENT UNIT SITE & SECURITY PROCEDURES BOSTON SPA VERSION 9 SEPT12
SITE PROCEDURES BSPA VERSION 9 PAGE 1 OF 9 CONTENTS PAGE 1. GENERAL INFORMATION 3 2. ACCESS 3 3. SECURITY 3 4. VEHICLE PARKING 4 5. PERMITS TO WORK 4 6. DELIVERY, UNLOADING AND STORAGE 4 7. HOURS OF WORK
More informationArdessie Hydro Electric Project
Ardessie Hydro Electric Project Appendix T - Traffic Management Plan 13 th December 2014 V1.0 Jacinta MacDermot DHG Hydro Ltd 7 St James s Gardens London W11 4RB Jacinta.macdermot@dhghydro.com 077 888
More information17 Traffic Management Plan
17 Traffic Management Plan Introduction The Traffic Management Plan has prepared for Glastonbury Festival Ltd by the Off Site Manager following a process of consultation and on going dialogue with the
More informationWelcome Welcome to the public exhibition for development at Bowman Field. This exhibition provides an overview of the proposals for the site.
Welcome Welcome to the public exhibition for development at Bowman Field. This exhibition provides an overview of the proposals for the site. Background & Planning Context The Site The site is an area
More informationNow Therefore, The Corporation of the City of Peterborough by the Council thereof hereby enacts as follows:
The Corporation of the City of Peterborough By-Law Number 14-096 Being a By-law to Regulate Bicycles, Skateboards, Inline Skates, Roller Skates, E- bikes, Segways and other conveyances drawn, propelled
More informationCITY OF VINCENT CONSTRUCTION MANAGEMENT PLAN GUIDELINES
CITY OF VINCENT CONSTRUCTION MANAGEMENT PLAN GUIDELINES INTRODUCTION What is a Construction Management Plan? The City of Vincent requires careful management of construction involving excavation and retention
More informationNorth Camden Town Neighbourhood Forum. 1. The meeting was organised as a drop-in session to accommodate all attendees on different schedules.
Camden Road Construction Liaison Meeting Tuesday 12 th May 2015, 5pm - 7pm The Irish Centre, Camden Square Attendees: Local representatives (LR) Anne Holt (AH) Polly Holt (PH) Gill Scott (GS) James Demos
More informationProposed Sports Hall at. Oldfield School. Kelston Road. Bath BA1 9AB. Construction Management Plan June 2011
Proposed Sports Hall at Oldfield School Kelston Road Bath BA1 9AB Construction Management Plan June 2011 CONTENTS 1.0 Introduction 2.0 Site Location 3.0 Proposed Development 4.0 Construction Management
More informationErection of replacement warehouse building and erection of two buildings in connection with builder s merchants
Plan: O 02/00708/FUL Thames Ward (A) Address: Development: Applicant: London Works, Ripple Road, Barking Erection of replacement warehouse building and erection of two buildings in connection with builder
More informationTRAFFIC MANAGEMENT PLAN
CLIENT: LONDON UNDERGROUND LIMITED CONTRACT REF: TLL 7917 NORTHERN LINE EXTENSION MAIN WORKS CONTRACT TRAFFIC MANAGEMENT PLAN Issue and Revision Control Distribution and revision control is managed through
More informationHow To Prevent Accidents At Work
2 Preventing vehicle accidents Construction work is considered to be one of the most hazardous industrial activities in the EU. The rate of injury in the construction industry is higher than in other industries.
More informationFramework Pinhoe Area Access Strategy
Framework Pinhoe Area Access Strategy January 2011 Devon County Council County Hall Topsham Road Exeter Devon EX2 4QD 1 PREPARED BY Name: Matt Collins Position: Assistant Transportation Planning Officer
More informationTriton Knoll Offshore Wind Farm Limited Electrical System. Outline Traffic Management Plan
Triton Knoll Offshore Wind Farm Limited Electrical System Outline Traffic Management Plan October 2014 RWE Innogy UK Triton Knoll TMP Copyright 2014 RWE Innogy UK Ltd All pre-existing rights reserved.
More informationTemporary Traffic Management
Temporary Traffic Management Tom Kiddle 4 th July 2012 Temporary Traffic Management Auckland Transport TTM Operation Requirements AT TTM Audits Qualified Persons on site Pedestrian Management 1 AT Temporary
More informationRisk Assessment for visits by schools and other groups including children.
Perrygrove Railway Risk Assessment for visits by schools and other groups including children. Page 1 Risk Assessment for visits by schools and other groups including children. Introduction Perrygrove Railway
More informationAppendix G. Security management plan
Appendix G Security management plan Security Management Plan Prepared by: Kann Finch Group Project Energy Australia Belmore Park Zone 1- Sub-station component General Design Requirements The perimeter
More informationParking On-street parking Front garden parking Off-street parking
Nae place mair braw A guide to placemaking in Perth and Kinross Whan I haik't up to Craigie Hill And lookit east and west; "In a' the world," said I to mysel', "My ain shire is the best." Parking On-street
More information5.1 Parking Policy 1. INTRODUCTION
5.1 Parking Policy 1. INTRODUCTION This policy consolidates the City s parking requirements and outlines its approach to the provision of off-street parking facilities for non-residential and residential
More informationFLEET ROAD RISK POLICY
FLEET ROAD RISK POLICY SGPilliner U:\PolicieandProcedures\FleetRoadRiskPolicy\FleetRoadRiskPolicy040903 1 Fleet Road Risk Policy. 1.0 Introduction. Carmarthenshire County Council is committed to manage
More informationProposed Sports Hall at. Oldfield School. Kelston Road. Bath BA1 9AB. Construction Management Plan June 2011 Rev A
Proposed Sports Hall at Oldfield School Kelston Road Bath BA1 9AB Construction Management Plan June 2011 Rev A CONTENTS 1.0 Introduction 2.0 Site Location 3.0 Proposed Development 4.0 Construction Management
More informationGalloper Wind Farm Project. Traffic Management Plan May 2013 Draft v1 Document Reference GWF/TMP/100513. Galloper Wind Farm Limited
Galloper Wind Farm Project Traffic Management Plan May 2013 Draft v1 Document Reference GWF/TMP/100513 Galloper Wind Farm Limited Document title Galloper Wind Farm Project Traffic Management Plan Status
More informationGUIDELINES FOR WORKING ON ROADS
GUIDELINES FOR WORKING ON ROADS Guide to the Safety, Health and Welfare at Work (Construction)(Amendment)(No. 2) Regulations 2008 (S.I. No. 423 of 2008) 7 CONTENTS Page Introduction.....................................................
More informationchapter 3 basic driving skills
chapter 3 basic driving skills When curving to the left, keep the front wheels close to the right edge of the lane to keep your driver s side rear wheels out of the next lane of traffic. Curve ahead slow
More informationManaging Public Use of Freeway Emergency Access Gates and Median Crossovers
Managing Public Use of Freeway Emergency Access Gates and Median Crossovers Operational Instruction Transport Services Division TRAFFIC MANAGEMENT Operational Instructions Managing Public Use of Freeway
More informationLevel 1 Award in Health and Safety in a Construction Environment
Level 1 Award in Health and Safety in a Construction Environment Student notes (sample) www.britsafe.org Membership Training Qualifications Audit and Consultancy Audit and Policy Consultancy and Opinion
More informationThe Northumberland Estates Proposed Residential Development, Prudhoe Town Centre D/I/D/63558/603. Framework Residential Travel Plan
The Northumberland Estates Proposed Residential Development, Prudhoe Town Centre D/I/D/63558/603 Framework Residential Travel Plan September 2013 CONTROL SHEET CLIENT: PROJECT TITLE: REPORT TITLE: THE
More informationDraft CODE OF PRACTICE MANAGING RISKS IN STEVEDORING
Draft CODE OF PRACTICE MANAGING RISKS IN STEVEDORING Draft for Public Comment This draft model Code of Practice for Managing Risks in Stevedoring supports the model Work Health and Safety (WHS) Act and
More informationDevonport EfW CHP Facility. CEMP Proposal for Non Destructive Testing Activities. 1. Introduction
Devonport EfW CHP Facility CEMP Proposal for Non Destructive Testing Activities. 1. Introduction This application is issued in compliance with the principles of the approved Construction Environmental
More informationAmex Site Residential Development, Tarneit
Amex Site Residential Development, Tarneit Local Area Traffic Management Report Client: Amex Corporation Project No. 114430 Draft Report 13/12/13 Suite 1, 1 st Floor 132 Upper Heidelberg Road Ivanhoe Vic
More information23 February 2015. Enfield Intermodal Logistics Centre
Enfield Intermodal Logistics Centre Overarching Operational Traffic Management Plan February 2015 Table of Contents 1. Introduction... 2 2. Purpose of the Plan... 2 3. Objective of the Plan... 3 4. Road
More informationThe Mersey Gateway Project
The Mersey Gateway Project The Mersey Gateway Project is a major scheme to build a new six-lane toll bridge over the River Mersey in the north west of England. It will link the towns of Runcorn and Widnes
More informationSlips, Trips and Falls Health & Safety Advice
Slips, Trips and Falls Health & Safety Advice One of the targets the Health and Safety Executive have set this year is to reduce accidents caused by slips, trips and falls, one of the most common causes
More informationROAD SAFETY ASSESSMENTS AND ROAD SAFETY AUDITS ON THE EXISTING ABU DHABI INTERNAL ROAD NETWORK
ROAD SAFETY ASSESSMENTS AND ROAD SAFETY AUDITS ON THE EXISTING ABU DHABI INTERNAL ROAD NETWORK Siegfried GROSSKOPF, Tawab KAZEMI*, John HUGHES* & Sami ALMUSAWI Bani Hashim # Parsons International Limited,
More informationFREMANTLE PORTS 2015 T R A F F I C M A N A G E M E N T P L A N F A C T S H E E T
FREMANTLE PORTS 2015 T R A F F I C M A N A G E M E N T P L A N F A C T S H E E T PLANNING BRANCH Introduction The management of traffic is important to the operation of the port as a whole to allow for
More informationProspectus. A Specialist Further Education College for young people with learning disabilities
Prospectus A Specialist Further Education College for young people with learning disabilities A Specialist Further Education College for young people with young people with learning disabilities A Specialist
More informationEvent Safety Management Plan - Template for Event Organisers
Event Safety Management Plan - Template for Event Organisers The following information has been put together to help you plan your event. It follows the structure of an Event Safety Management Plan so
More informationLONDON ROAD SEVENOAKS
WELCOME TO THE BERKELEY HOMES EXHIBITION Train Station Gr anv i ll e Dar tford Road Lo ad Ro nd on ad Ro Eard SITE Th ed riv e ley R oad on R oad A 224 Gord Pem b rok e Roa d Site Location Since the submission
More informationSite Security and Access Policy and Procedures. Written By. Kent Walmsley Creation date Summer 2010 Adopted by Governors 7 December 2010 Reviewed By
Site Security and Access Policy and Procedures Written By Kent Walmsley Creation date Summer 2010 Adopted by Governors 7 December 2010 Reviewed By David Neild Last Reviewed date Autumn 2014 (VERSION 4)
More informationSafety Systems Review Facilities Management Guidance and specification Version 1 2014
Safety Systems Review Facilities Management Guidance and specification Version 1 2014 Membership Training Qualifications Audit and Consultancy Policy and Opinion Awards Contents Page Safety Systems Review
More informationTRAFFIC MANAGEMENT POLICY
Covent Garden Market Authority TRAFFIC MANAGEMENT POLICY CONTENTS Part 1 Policy Statement Part 2 Roles and Responsibilities 1 Introduction 2 Role of Authority Part 3 Operation 1 Working Areas 2 Parking
More informationBROKEN HILL OPERATIONS Rasp Mine Project Traffic Management Plan
BROKEN HILL OPERATIONS Document History and Status Revision Date issued Reviewed by Approved by Date approved Revision type A 31-Mar-11 SKK TC 31-Mar-11 Issued for information B 18-July-11 SW GT 18-July-11
More informationTRAFFIC MANAGEMENT PLAN
TRAFFIC MANAGEMENT PLAN For: The construction and operation of a Photovoltaic (PV) Facility in Dabenoris, South Africa Prepared for: Alternative Energy Solutions (Pty) Ltd PO Box 4939 Tygervalley, South
More informationFootpath Seating for Restaurants
Waverley Development Control Plan 2010 E3 Footpath Seating for Restaurants Contents 1.0 Introduction............................................. 2 1.1 Designated Areas for Footpath Restaurants................
More informationCorrections Management (Maintenance and Capital Upgrades) Policy 2014
Australian Capital Territory Corrections Management (Maintenance and Capital Upgrades) Policy 2014 Notifiable instrument made under the Corrections Management Act 2007, section 14(1) (Corrections policies
More informationHIGHWAY DESIGN GUIDE. 1.1 Foreword
HIGHWAY DESIGN GUIDE Part 1 INTRODUCTION 1.1 Foreword Coventry City Council wants Coventry to be a growing, accessible city where people choose to live, work and be educated, and where businesses choose
More informationRawdon Investments Limited & Aldi Stores Limited Former Barkers Nursery, Clitheroe Servicing Management Plan
Rawdon Investments Limited & Aldi Stores Limited Former Barkers Nursery, Clitheroe Servicing Management Plan Technical Note No. 6 Project: Former Barkers Nursery, Clitheroe Planning Application 3/2014/0890
More informationWalking Route the assigned or authorized route a pupil walks to arrive at school or at the designated bus stop.
BUSINESS NON-INSTRUCTION OPERATION 3541 TRANSPORTATION I. GENERAL It is the goal of the Board of Education to establish for the public schools an appropriate transportation system one which will enable
More informationYOUR GUIDE TO INTRA-TOWN CYCLING
YOUR GUIDE TO INTRA-TOWN CYCLING Content 04 Introduction 05 Attire Before you set off 06 Safety Checklist for Bicycle 07 Maintenance 08 Preventing Bicycle Theft What to look out for on the way 10 Signs
More informationBest Practice Guide for Managing Litter and Illegal Dumping at Clothing Bins
Best Practice Guide for Managing Litter and Illegal Dumping at Clothing Bins 2013 Acknowledgements: The research for this guide was completed by Equilibrium OMG Pty Ltd (trading as Equilibrium) for Sustainability
More informationAPPLICATION FOR PLANNING PERMISSION FOR A SOIL TREATMENT FACILITY AT KINGS CLIFFE LANDFILL SITE, STAMFORD, NORTHAMPTONSHIRE
APPLICATION FOR PLANNING PERMISSION FOR A SOIL TREATMENT FACILITY AT KINGS CLIFFE LANDFILL SITE, STAMFORD, NORTHAMPTONSHIRE DESIGN AND ACCESS STATEMENT Report Reference: AU/KC/SPH/1449/01/D&A/FIN Baddesley
More informationTraffic Management During Construction
Traffic Management During Construction The construction of Dublin Port Tunnel couldn t begin until a traffic management plan had been developed and agreed to facilitate construction of the Tunnel and to
More information