1 CONSTRUCTION MANAGEMENT PLAN for CHILDRENS CENTRE, PRIMARY CLASSROOM & REPLACEMENT PRESCHOOL AT CLYST ST MARY PRIMARY SCHOOL EXETER, DEVON EX5 1BG REVISION A 7 May P a g e
2 Mansell have been appointed under the DCC Framework agreement to construct the new building. The following strategy has therefore been compiled by the contracting team who will be undertaking the project. Reference should also be made to the preferred Option 1 on page 4 of the Primary School Travel Plan (dated April 2010). This describes action to be taken by the school to safeguard pupils during the construction period. Local roads leading to and from the existing school are very narrow, making large deliveries difficult. In addition, the construction access route will need to be segregated from school pedestrian and delivery traffic. Site parking will not be permitted in the immediate vicinity of the school. The Construction Site Plan overleaf highlights the following: a. Traffic routes. b. Storage area. c. Site boundary. d. Site accommodation. Mansell will consult with the school and community before finalising the proposals. Contact details and out of hours phone numbers will be displayed during the construction period. On completion neighbours and parents will also be surveyed to seek feedback on the contractor s performance. Traffic routes in and out of the Project. All deliveries will continue on the A3052 and take the first exit by the garage towards the school. No deliveries will be made through Clyst St Mary village. Day to day operations and deliveries of smaller vehicles the routes will be the same, however a gateman will be control access and egress through the main entrance gates and into the secure site compound. This will be the case throughout the school term. Deliveries will be brought into the school under supervision and turned right once through the main gates directly past the site entrance gates adjacent to the school entrance doors and towards the grassed play area. From there the deliveries will turn right into the site compound where they will be off loaded & stored in the area marked yellow on the Site Plan. No deliveries will be allowed during the school s arrival and departure periods. All orders will note these restrictions, specify maximum vehicle size, and include our site phone number to confirm arrival before entering the access road. 2 P a g e
3 There will be some large deliveries, such as concrete, windows etc. but these will be planned in advance and outside of key school hours via the routes shown. It may be necessary to request that residents do not park in the road on specific occasions. There are two options available for the delivery of the structural timber frame to site: Option A Further to advice and consultation with the highways authority and police plan delivery by crane from the roundabout over the boundary into the site; either on a Sunday or at night. (Refer to purple hatched area on Site Plan). Option B Design the frame in smaller panels sections that can be offloaded at the front entrance and carried around to the site within the defined contractor s compound area. Again this will be timed to fall outside of key school hours. Site accommodation will comprise of 1 x office unit, 1 x welfare with drying facilities, 1 x wc unit & 2 x lockable storage units. Temporary utilities will be taken from the existing School supplies. The site boundary (shown red) will be fully secured by hoarding or haras panels. The Construction Learning Experience The construction of Clyst St Mary Primary School creates the opportunity for Mansell to work with the pupils and staff of the school in order to take full advantage of the practical learning environment a construction site creates. Of prime importance to this relationship is the introduction of the contractors Health and Safety Policy to both staff and pupils. This runs in parallel with a commitment to the Considerate Contractors Scheme (CCS). Mansell have also highlighted the following: Safety sites should not endanger any person Whilst working in a live school environment ensuring The Health and Safety of students, staff and visitors at all times is our number one priority, followed by minimising disruption to the day to day function of the school. Instrumental to the success of this project is effective communication between Mansell and Clyst St Mary Primary School. Our site staff will introduce themselves to the school before commencement. They will address the high level of Health and Safety Regulations required by the industry through presentations in school assemblies and will include updates on the progress of the project. Mansell is privileged to have been involved in many education related projects and in all of these projects, our staff, supply chain and the teachers and children have lasting memories of the successful pupil involvement. 3 P a g e
4 Our Education Liaison Officer, Fiona Gush, who has a wealth of experience within the construction industry and education, will establish an early relationship with key staff members and develop construction projects related to the curriculum and designed to suit the age group of the pupils. Below is an example of some of the projects which can be presented to the schools. Construct an offsite viewing platform where pupils can have safe access to view the work being carried out on the construction site. Presentation on the building process, this activity is broken down into three phases, and where possible includes a site visit. A presentation to the pupils would take place prior to the site visits. This will give the pupils a clear understanding of the build process, the variety of trades involved and the technical and professional qualifications required to complete the project. Weekly photographs taken from the same point on site for the duration of the project. These photographs can be shown as a slideshow which will clearly demonstrate the build process. Pupils might like to interview the site staff and from this compile a newsletter for their parents. Presentation on materials. This would involve collecting a range of materials from the demolition of the existing building, comparing them to the materials used in the new build and discussing the benefits and drawbacks of the materials. We would also look at sustainability and recycling. The use of straw bale technology, we hope the children will be able to participate in the straw bale construction. They can learn about the other different insulation products how double glazing and expanded foam work. Design and technology project investigating how different parts of the building are joined together, what methods are used and what materials are involve and the importance of measurement. A day in the life of presentations in assembly carried out by our subcontractors or site staff where they will describe their role and follow this up with a practical demonstration of how various tools are used for their particular trade. A timecapsule buried beside the new building, its position indicated by a plaque. The pupils will have the opportunity to choose what they would like included in the capsule. Mansell will provide drawings and photographs and there is an opportunity for the Education Authority and the Board of Governors to be involved in this project. The pupils could have the opportunity to paint the hoarding or design the hoarding which we could get graphically printed. 4 P a g e
5 CONSTRUCTION SITE PLAN 5 P a g e
Construction Traffic Management Plan
Construction Traffic Management Plan Proposed Additional Accommodation for SWDPLS Shinners Bridge Dartington Produced for and on behalf of Built Environments Team Devon County Council NPS South West Ltd
Construction Management Statement. Residential development at Bywell House, St Mary s Hill, Ascot
Construction Management Statement Residential development at Bywell House, St Mary s Hill, Ascot Parking of Vehicles of Site Personnel, Operatives and Visitors Site staff, visitors to the development and
Construction Traffic Management Plan
Construction Traffic Management Plan Proposed Additional Classroom Accommodation for Woolacombe Primary School Produced for and on behalf of Built Environments Team Devon County Council NPS South West
Site Layout & Traffic Plan
Location Site address: Norbury Manor Business Enterprise College, Kensington Avenue, Thornton Heath, Croydon CR7 8BT. The new block will be constructed on the existing hard play area. The construction
Construction Traffic Management Plan
Introduction This (CTMP) has been prepared in order to discharge Condition 20 of planning permission ref 07/02879/EFUL for the enabling site works associated with the wider Bath Western Riverside development.
University Arms Hotel, Cambridge
Traffic Management Plan For University Arms Hotel, Cambridge Prepared By: James Batterbee Number: M1342 / Rev B Date: 29 th August 2014 CONTENTS: (1) INTRODUCTION (2) VEHICLE ACCESS & EGRESS AND PEDESTRIAN
Construction Phase Traffic Management Plan
Construction Phase Traffic Management Plan The Construction Phase Traffic Management Plan is in connection with the application for the development of a single Wind Turbine and Ancillary Works on land
Construction Management Statement. Introduction. Contents
Construction Management Statement Project Name Dee Point Primary School Introduction On all Morgan Sindall projects, the safety and welfare of all is of paramount importance. This document concentrates
Construction Management Plan (CMP) Application
About this form Principal Contractor (Applicant) Applicant Details (Person lodging application and main contact for CMP) DA and Site Details Development Consent for Works you are carrying out Construction
Construction Site Set Up Requirements
Process Code Number Revision COP A 035 B Document Title Construction Site Set Up Requirements B 1/11/10 SRC SAT DH Final A 1/10/10 SRC MI Draft comment Rev. Date Prepared Reviewed Approved Detail/Comment
Repton Primary School. Traffic Management Plan
Repton Primary School Traffic Management Plan Headteacher: Mrs H Wallis Signature: H Wallis Date: 26 th June 2015 Chair of Governors: Mrs L Eaton Signature: L Eaton Date: 26 th June 2015 8 th June 2015
CONSTRUCTION TRAFFIC MANAGEMENT PLAN Issue 2, V5, 11/11/13
Note: Please refer to the end of this document for guidance notes about completing this form Q1. What is the full postal address of the site? Your response Q2. Planning reference and revision number (if
CONSTRUCTION TRAFFIC MANAGEMENT PLAN (CTMP)
CONSTRUCTION TRAFFIC MANAGEMENT PLAN (CTMP) [Colston Budd Hunt & Kafes Pty Ltd AS AMENDED BY City of Sydney] 23 March 2010 1. PREAMBLE 1.1 This document constitutes the Demolition and Traffic Management
Foulford Primary School Site Traffic Management Plan. December 2012 (Review date October 2013)
Foulford Primary School Leuchatsbeath Drive Cowdenbeath Fife KY4 9SN Foulford Primary School Site Traffic Management Plan December 2012 (Review date October 2013) Site Traffic Management Plan Foulford
Site Security and Access Policy and Procedures. Written By. Kent Walmsley Creation date Summer 2010 Adopted by Governors 7 December 2010 Reviewed By
Site Security and Access Policy and Procedures Written By Kent Walmsley Creation date Summer 2010 Adopted by Governors 7 December 2010 Reviewed By David Neild Last Reviewed date Autumn 2014 (VERSION 4)
CONSTRUCTION TRAFFIC MANAGEMENT PLAN V11, 26/09/12
If the project you are constructing was subject to planning permission and a condition requiring a Construction Traffic Management Plan (CTMP) was applied to the planning consent, this condition will need
CITY OF VINCENT CONSTRUCTION MANAGEMENT PLAN GUIDELINES
CITY OF VINCENT CONSTRUCTION MANAGEMENT PLAN GUIDELINES INTRODUCTION What is a Construction Management Plan? The City of Vincent requires careful management of construction involving excavation and retention
Proposed Sports Hall at. Oldfield School. Kelston Road. Bath BA1 9AB. Construction Management Plan June 2011
Proposed Sports Hall at Oldfield School Kelston Road Bath BA1 9AB Construction Management Plan June 2011 CONTENTS 1.0 Introduction 2.0 Site Location 3.0 Proposed Development 4.0 Construction Management
Galloper Wind Farm Project. Traffic Management Plan May 2013 Draft v1 Document Reference GWF/TMP/100513. Galloper Wind Farm Limited
Galloper Wind Farm Project Traffic Management Plan May 2013 Draft v1 Document Reference GWF/TMP/100513 Galloper Wind Farm Limited Document title Galloper Wind Farm Project Traffic Management Plan Status
Howard Primary School Construction Management Plan
2.1 Introduction Howard Primary School Construction Management Plan The Howard Primary school project covers the construction of a new three storey block next to a live school and includes alterations
GUIDE NOTES FOR SCHOOLS, ACADEMIES AND COLLEGES
CONTINGENCY PLANNING GUIDE NOTES FOR SCHOOLS, ACADEMIES AND COLLEGES We have received a number of requests from schools for assistance in the preparation of a disaster recovery plan. Attached are some
Madras College Site Traffic Management Plan (South Street) August 2015
Madras College Site Traffic Management Plan (South Street) August 2015 South Street, St. Andrews, KY16 9EJ Kilrymont Road, St. Andrews, KY16 8DE Telephone (01334) 659402 Telephone (01334) 659401 Email
Site Traffic Management Plan
Pathhead Primary School Cairns Street West Kirkcaldy Fife KY1 2JA Telephone: 01592 583450 Email: [email protected] Headteacher Julie M Anderson Site Traffic Management Plan December 2012
Health & Safety Policy For Locations Hosting Film Production Companies
Health & Safety Policy For Locations Hosting Film Production Companies Throughout this document, the location will be referred to as The Venue and the film production company as The Contractor. The following
10.1 WILL HEY FARM WATFORD LANE NEW MILLS RETENSION OF NEW STABLE BLOCK, SAND PADDOCK AND ASSOCIATED EARTHWORKS AND LANDSCAPING (FULL - MINOR)
HPK/2012/0207 03/04/2012 WILL HEY FARM WATFORD LANE NEW MILLS MR & MRS M WILSON KIRSTY WILSON EQUINE AND WILL HEY FARM BED & BREAKFAST RETENSION OF NEW STABLE BLOCK, SAND PADDOCK AND ASSOCIATED EARTHWORKS
Site Traffic Management Plan
Masterton Primary School Aberdour Road Dunfermline Fife KY11 8HY Telephone: 01383 602455 Email: [email protected] Head Teacher: Mr Stephen Humphries Site Traffic Management Plan Date December
THIS PAGE INTENTIONALLY LEFT BLANK
THIS PAGE INTENTIONALLY LEFT BLANK Construction Traffic Management Plan 2 Contents 1. Introduction... 4 1.1 Conditions of Consent... 4 2. Goals of the CTMP... 6 2.1 Objectives... 6 2.2 Predicted Construction
INTERIM ADVICE NOTE 65/05 DESIGN OF VEHICLE RECOVERY OPERATIONS AT ROAD WORKS
INTERIM ADVICE NOTE 65/05 DESIGN OF VEHICLE RECOVERY OPERATIONS AT ROAD WORKS The Purpose of this document is to provide the Project Sponsor / Designer with comprehensive guidance on the range of issues
Event Planning Guidance Notes EVENT PLANNING GUIDANCE NOTES
EVENT PLANNING GUIDANCE NOTES 1 Event Planning Guidance Notes Important issues This documentation is not a full and authoritative statement of the law, statutory guidance or best practice in planning,
AVOIDANCE OF ELECTRICAL HAZARDS WHEN WORKING NEAR OVERHEAD ELECTRIC LINES
overhead 23/11/04 2:28 PM Page 1 AVOIDANCE OF ELECTRICAL HAZARDS WHEN WORKING NEAR OVERHEAD ELECTRIC LINES ESB Code 9803203 overhead 23/11/04 2:28 PM Page 2 overhead 23/11/04 2:28 PM Page 3 Page 1 of 20
LT McGuinness Site 10 Development, Wellington Waterfront. Construction Traffic Management Plan. 7 October 2014
LT McGuinness Site 10 Development, Wellington Waterfront Construction Traffic Management Plan 7 October 2014 TDG Ref: 12950 141007 ltm ctmp final report.docx LT McGuinness Site 10 Development, Wellington
Scaffold Standard (Standard to Managing and Appointing Scaffolding Contractors on University College London (UCL) Projects) Management Standard
Scaffold Standard (Standard to Managing and Appointing Scaffolding Contractors on University College London (UCL) Projects) Management Standard UNIVERSITY COLLEGE LONDON Engineering, Maintenance & Infrastructure
APPLICATION FOR PLANNING PERMISSION FOR A SOIL TREATMENT FACILITY AT KINGS CLIFFE LANDFILL SITE, STAMFORD, NORTHAMPTONSHIRE
APPLICATION FOR PLANNING PERMISSION FOR A SOIL TREATMENT FACILITY AT KINGS CLIFFE LANDFILL SITE, STAMFORD, NORTHAMPTONSHIRE DESIGN AND ACCESS STATEMENT Report Reference: AU/KC/SPH/1449/01/D&A/FIN Baddesley
PROOF ONLY. Police and Fire Service Home Security & Fire Safety Checklist. Student Accommodation Security Checklist
Police and Fire Service Home Security & Fire Safety Checklist Student Accommodation Security Checklist A Self Assessment Guide for Landlords This checklist contains all the standards needed to make sure
Whistler Village Construction Management Strategy
Whistler Village Construction Management Strategy Purpose: To mitigate the impacts of construction activity on the Whistler Village resort experience and on Village businesses and property owners. Objectives:
17 Traffic Management Plan
17 Traffic Management Plan Introduction The Traffic Management Plan has prepared for Glastonbury Festival Ltd by the Off Site Manager following a process of consultation and on going dialogue with the
Demolition & Construction Management Plan
Demolition & Construction Management Plan 72 76 Cadogan lane SW1 Demolition & Construction Management Plan Issue Date: March 2013 Contents: 1.0 Introduction 1.1 Objectives of the Plan 1.2 Project Overview
Household waste & recycling storage requirements
South Gloucestershire Council Guidance for Developers on Household waste & recycling storage requirements INTRODUCTION As part of the Council s aim to improve the quality of life for residents as well
RAEBURN GARAGE, 118 RAEBURN AVENUE, SURBITON
RAEBURN GARAGE, 118 RAEBURN AVENUE, SURBITON DELIVERY AND SERVICING PLAN August 2015 Introduction This Delivery and Servicing Plan (DSP) has been prepared in relation to the proposed redevelopment of Raeburn
Physical Security Assessment Form
Physical Security Assessment Form Security Self-Assessment T Wake 10 February 2012 Security Assessment Contents Facility / Site Security Assessment Form... 3 Identification Details... 3 Facility Details...
Risk Assessment for visits by schools and other groups including children.
Perrygrove Railway Risk Assessment for visits by schools and other groups including children. Page 1 Risk Assessment for visits by schools and other groups including children. Introduction Perrygrove Railway
Logo here. TRAFFIC MANAGEMENT PLAN Ref : xxxx Dated xxxxxx. Enter details. Delivery Address: Enter details
Logo here Ref : xxxx Dated xxxxxx Mandatory H&S 905 Rev 1: xxxxx Page 1 of 1 Project: Project No: Date: Prepared by: Enter details Enter details Enter details Enter details Delivery Address: Enter details
Triton Knoll Offshore Wind Farm Limited Electrical System. Outline Traffic Management Plan
Triton Knoll Offshore Wind Farm Limited Electrical System Outline Traffic Management Plan October 2014 RWE Innogy UK Triton Knoll TMP Copyright 2014 RWE Innogy UK Ltd All pre-existing rights reserved.
Traffic Management Plan
Traffic Management Plan Contract: [insert the contract title, section, chainage, length, contract ID No] Contractor: [Full name of the contractor, Address, City, Country] Supervision Consultant: [Full
Bedford Girls School Job Description. Director of Music
Bedford Girls School The School is committed to safeguarding and promoting the welfare of children and young people and expects all staff and volunteers to share this commitment. Bedford Girls School will
Appendix J3 - Outline Fuel Spill Contingency Response Plan. Control room receives call on fuel spill from staff or public
Appendix J3 - Outline Fuel Spill Contingency Response Plan Control room receives call on fuel spill from staff or public Initial Actions to be taken after Fuel Spill reported Identification of the source
RINGSHALL SCHOOL COMMUNICATIONS POLICY
INTRODUCTION Schools have many lines of communication to maintain: with parents and carers, with other schools, with the community, with outside agencies, and within the school. Good communication between
CORPORATE PROCUREMENT UNIT SITE & SECURITY PROCEDURES BOSTON SPA VERSION 9 SEPT12
SITE PROCEDURES BSPA VERSION 9 PAGE 1 OF 9 CONTENTS PAGE 1. GENERAL INFORMATION 3 2. ACCESS 3 3. SECURITY 3 4. VEHICLE PARKING 4 5. PERMITS TO WORK 4 6. DELIVERY, UNLOADING AND STORAGE 4 7. HOURS OF WORK
Welcome Welcome to the public exhibition for development at Bowman Field. This exhibition provides an overview of the proposals for the site.
Welcome Welcome to the public exhibition for development at Bowman Field. This exhibition provides an overview of the proposals for the site. Background & Planning Context The Site The site is an area
1.0 APPOINTMENTS 2.0 FIRE RISK ASSESSMENTS
Fire Risk assessment 1.0 APPOINTMENTS 1.1 Responsible Person. In compliance with the Regulatory Reform (Fire Safety) Order 2005 (FSO) the School s Head, Mrs J M Miles is appointed as the Responsible Person
THE ROYAL BOROUGH OF KENSINGTON AND CHELSEA PLANNING APPLICATIONS COMMITTEE 16/06/2015
THE ROYAL BOROUGH OF KENSINGTON AND CHELSEA PLANNING APPLICATIONS COMMITTEE 16/06/2015 REPORT BY THE EXECUTIVE DIRECTOR, PLANNING AND BOROUGH DEVELOPMENT Application: /PP/15/02000 Agenda Item: N34 Address:
Abu Dhabi EHSMS Regulatory Framework (AD EHSMS RF)
Abu Dhabi EHSMS Regulatory Framework (AD EHSMS RF) EHS Regulatory Instrument Code of Practice EHS RI CoP 44.0 Traffic Management and Logistics Version 2.0 February 2012 ACKNOWLEDGEMENTS With gratitude
This Policy applies to all pupils including EYFS
Policy for Photographs and Photography This Policy applies to all pupils including EYFS Introduction Photography in schools is subject to the Data Protection Act 1998 regarding the rights of individuals
TRAFFIC MANAGEMENT PLAN
CLIENT: LONDON UNDERGROUND LIMITED CONTRACT REF: TLL 7917 NORTHERN LINE EXTENSION MAIN WORKS CONTRACT TRAFFIC MANAGEMENT PLAN Issue and Revision Control Distribution and revision control is managed through
Health and Safety Policy
Health and Safety Policy 1. GENERAL STATEMENT OF INTENT The Headteacher and Governors of Castle Hill St. Philip s C.E. Primary School recognise they have overall responsibility for the organisation and
19-27 Young Street Development Kensington
19-27 Young Street Development Kensington Construction Management Plan Resident Update Draft 2nd October 2013 υ Introduction An initial construction management meeting took place on Tuesday 10 th September
Perton Middle School Business Continuity Plan
Perton Middle School Business Continuity Plan IN AN EMERGENCY 1 IF APPROPRIATE, CALL THE EMERGENCY SERVICES ON 999 (OR 112) 2 CONTACT THE EXECUTIVE HEAD TEACHER ON Mrs M E Tunnicliffe - 01902 434200 or
Health and safety guidance for research undertaken in the community
Health and safety guidance for research undertaken in the community Document control information Published document name: research-comm-gn.pdf Date issued: September 2012 Version: 3.0 Previous review dates:
SCHOOL SECURITY SURVEY
School Name: Survey Date: Address: Postcode: Telephone: Fax: e-mail: Contact Name: Role: Survey Compiled By: School Type: Pupil Numbers: PAN: Approx No. of Pupils: Community Use / Out of hour use: Regular
CATERING CONTRACTORS General Code of Safety Practice
Residential & Business Services Director s Office CATERING CONTRACTORS General Code of Safety Practice CONTENTS 1 Introduction 2 2 Commencement of Work 3 3 Vehicles 3 4 Temperature control 3 5 Food hygiene
LONDON ROAD SEVENOAKS
WELCOME TO THE BERKELEY HOMES EXHIBITION Train Station Gr anv i ll e Dar tford Road Lo ad Ro nd on ad Ro Eard SITE Th ed riv e ley R oad on R oad A 224 Gord Pem b rok e Roa d Site Location Since the submission
RAVENSCOTE JUNIOR SCHOOL. Security POLICY. Headteacher
RAVENSCOTE JUNIOR SCHOOL Security POLICY 2015 Date of Approval Date of Review Signed Mr D Harris Signed Mrs J. Brill Headteacher Chair of Governors Ravenscote Junior School Security Policy At Ravenscote
Communications Policy
Communications Policy Approved by Trustees May 2015 Approved by Staff November 2015 Date for Review November 2017 1 Rationale 1.1 Schools have many lines of communication to maintain good relationships
Approved Document Q: Security
Approved Document Q: Security Requirement Q1 Unauthorised access Consultation draft September 2014 1 The approved documents What is an approved document? The Secretary of State has approved a series of
Our repairs and maintenance service
Your repairs Being a GHA tenant gives you special rights when it comes to getting things fixed. This is called your Right to Repair. Here you ll find all you need to know about that, and much more. If
Caravan Parks and Camping Sites. Flood Evacuation Plan Guidance for owners and operators of sites in Kent
Caravan Parks and Camping Sites Flood Evacuation Plan Guidance for owners and operators of sites in Kent Prepared by the Kent Resilience Team Telephone: 01622 212409 E-mail@ [email protected] Version
SCHOOL SECURITY POLICY & PROCEDURES
ORWELL PARK SCHOOL Nacton, Ipswich IP10 0ER SCHOOL SECURITY POLICY & PROCEDURES Date: January 2013 Status: Approved Review Date: January 2014 1 ORWELL PARK SCHOOL SECURITY POLICY AND PROCEDURES 1. PURPOSE
Parking Regulations. Why?
Parking Regulations Why? The aim is to make the Campus a safer place. Despite there being empty parking spaces available for use most days we still have a minority who regularly park inconsiderately and
Signed by Ann Slater, Chair of Governors of: Harris Primary Academy Chafford Hundred and Harris Primary Academy Mayflower
Educational Visits Policy Harris Primary Academy Chafford Hundred and Harris Primary Academy Mayflower Signed by Ann Slater, Chair of Governors of: Harris Primary Academy Chafford Hundred and Harris Primary
NORWICH CITY COUNCIL. Report for Resolution
NORWICH CITY COUNCIL Report for Resolution Report To Report of Subject Norwich Highways Agency Committee 11 November 2004 Director of Development Lakenham TAP Responses to the advertisement of waiting
New Scheme Teacher Accreditation Policy
New Scheme Teacher Accreditation Policy This policy addresses issues in relation to: Staff Teaching Staff Responsible for Delivering the Curriculum 3.2.1 Safe and Supportive Environment Student Welfare
THE BRITISH INTERNATIONAL SCHOOL OF STAVANGER EDUCATIONAL VISITS POLICY & PROCEDURES. References
THE BRITISH INTERNATIONAL SCHOOL OF STAVANGER EDUCATIONAL VISITS POLICY & PROCEDURES References This policy draws on the guidance set out in DfES Guidance Health and Safety of Pupils on Educational Visits
CONSTRUCTION SEQUENCE & PROGRAMME
CONSTRUCTION SEQUENCE & PROGRAMME 2 CONTENTS 1.0 Introduction 7 2.0 Key activities 8 2.1 Airport related activities 2.2 Construction of new roads and accesses 2.3 Earthworks zone a 2.4 Earthworks zone
Development Layout Design
Development Layout Design General Design Considerations for Adoptable Highways Version 1 June 2012 Transportation, Waste and Environment Service Issue and Revisions Record Revision Date Originator Purpose
EMERGENCY PLANS FACT SHEET
EMERGENCY PLANS FACT SHEET Overview This fact sheet provides general guidance for persons conducting a business or undertaking (PCBUs) and workers on preparing and maintaining general emergency plans for
Design and Build of Passenger Terminal Building North Extension At Macau International Airport (RFQ-198) Section 6 Bill of Quantities
At Macau International Airport (RFQ-198) Section 6 Bill of Quantities Bill Nr. 1 Preliminaries Bill Nr. 1 PRELIMINARIES NOTES : (1) The work shall be done during day time and night time according to CAM/ADA
Introduction. Welcome. 358-364 London Road, Mitcham
Introduction View from the southern junction of London Road and Cricket Green Welcome Thank you for attending our public exhibition and viewing the latest proposals for 358-364 London Road. As you may
Contra Costa Community College District Business Procedure 20.01 PARKING AND TRAFFIC REGULATIONS
Contra Costa Community College District Business Procedure 20.01 PARKING AND TRAFFIC REGULATIONS The District provides facilities for vehicles for the sole purpose of conducting college business. The District
Waste Management. GUIDANCE NOTES FOR DEVELOPERS AND LANDLORDS ON THE STORAGE & COLLECTION OF DOMESTIC REFUSE AND RECYCLING (December 2012)
Waste Management GUIDANCE NOTES FOR DEVELOPERS AND LANDLORDS ON THE STORAGE & COLLECTION OF DOMESTIC REFUSE AND RECYCLING (December 2012) 1. Introduction The aim of this guide is to inform developers of
Modern Methods of Construction (MMC)
Improving resource efficiency in construction product manufacture BeAware Supply Chain Resource Efficiency Sector Report Modern Methods of Construction (MMC) BeAware is a TSB 1 and industry funded project
Measuring your capabilities in Fleet Safety Management ACC Fleet Saver
Measuring your capabilities in Fleet Safety Management ACC Fleet Saver Audit Standard 29 May 2014 Table of Contents Page 2 1. Getting Started...3 2. Critical element 1: Registered Owner Commitment to Safety
TRAFFIC MANAGEMENT PLAN
TRAFFIC MANAGEMENT PLAN For: The construction and operation of a Photovoltaic (PV) Facility in Dabenoris, South Africa Prepared for: Alternative Energy Solutions (Pty) Ltd PO Box 4939 Tygervalley, South
Safety Systems Review Facilities Management Guidance and specification Version 1 2014
Safety Systems Review Facilities Management Guidance and specification Version 1 2014 Membership Training Qualifications Audit and Consultancy Policy and Opinion Awards Contents Page Safety Systems Review
The Construction (Design and Management) Regulations 2007
STATUTORY INSTRUMENTS 2007 No. 320 HEALTH AND SAFETY The Construction (Design and Management) Regulations 2007 Made - - - - - 7th February 2007 Laid before Parliament 15th February 2007 Coming into force
BRITISH SCHOOL OF GENEVA HEALTH AND SAFETY POLICY
BRITISH SCHOOL OF GENEVA HEALTH AND SAFETY POLICY The Health and Safety Policy of the British School of Geneva aims to safeguard the health and safety of all its pupils and employees as well as visitors
Design and Access Statement. 141-145 Earls Court Road London SW5 9RH
J U L I A N A R E N D T A S S O C I A T E S 1 7 a P i n d o c k M e w s L i t t l e V e n i c e L o n d o n W 9 2 P Y F + 4 4 2 0 7 2 8 6 9 9 0 1 Design and Access Statement T + 4 4 2 0 7 2 8 6 9 9 9 1