1 Cost Justification Review 2133 Whatcom Road, Abbotsford, BC Canada V3G 2K8 tel fax

2 Overview Location detail One of KubeData s large mining clients tracked the cost of building a data center at a remote mine site project. This project was a brownfield build at a mine site that had been shut down for a number of years. The client chose to build their primary onsite data center inside an existing building. This project was being managed and built by a large, well known EPCM company. While the build was remote, it was near a small town, 150 km from an airport and accessible by road. Methodology All costs were tracked and accounted for, including costs incurred by the EPCM for materials and labor, IT specific infrastructure costs as well as the client s internal management labor to complete the data center. These costs are compared in this report with the costs to build the equivalent Bulldog Mobile Data Center. Project detail The data center build was a 3 rack configuration with redundant 3 ton high precision cooling units. A 60 Kw genset with Automatic Transfer Switch and Active Tracking Filter was installed. The cost comparison included racks, cable trays, security cameras, and physical access security. The decision was made not to install fire suppression in the new build, so it was omitted from the Bulldog Mobile Data Center. The costs of UPS, structured cabling, PDU s and any IT equipment was not included in the pricing comparison as they would have been the same in either installation. Infrastructure Build Cost Categories Category breakdown and summary of items included 24% 41% Construction Total - Remove old (in-building) facilities - Re-frame and finish - Prepare room specific for installations Power Provisioning & Cabling - Cables/ conduit - Panels - Switches - Relays 9% 26% Corporate Management - Supervision - Management - Corporate overhead, accounting, review IT Systems Provisioning - Genset - HVAC - Security - Racks, cable trays Page 1

3 Cost and Benefits Costs Comparison KubeData maintains that there is always a cost savings to choose a Bulldog Mobile Data Center over a traditional build at a typical mining or oil and gas production site. Most of the expense of building a data center at a remote site is allocated across several different cost centers and in many cases the full cost of completing a project is not visible to IT. We will show the real life comparison below; Cost Summary Building Construction $127,817 Power Provisioning/ cabling $216,987 IT System Provisioning $137,553 Corporate Management $45,000 Grand Total $527,357 Cost Benefit $103, Months Bulldog MDC Grand Total $423, Weeks Benefits There is a significant cost savings when deciding to deploy a Bulldog Mobile Data Center versus a traditional in-building data center. Below are 4 additional benefits beyond the pure cost savings to consider 1. Quick Deployment A Bulldog MDC can be completed in weeks. Quicker deployment means additional cost savings. 2. Consistent Quality No surprises and you get the same quality every time. Consistency means additional cost savings. 3. Can be moved Unlike a fixed or traditional data center the Bulldog MDC can be picked up and moved. A Bulldog MDC comes a movable asset. 4. Evergreening Re-furbish your facility on the same cycle as the infrastructure equipment. Page 2

4 Continued on next page Page 3

5 Page 4

6 Continued on next page Page 5

7 Page 6

8 Page 7

Containerized Infrastructure Solutions Fast and efficient deployment, anywhere, anytime

Containerized Infrastructure Solutions Fast and efficient deployment, anywhere, anytime Containerized Infrastructure Solutions Fast and efficient deployment, anywhere, anytime Containerized Infrastructure for Business-Critical Continuity Are you deploying a remote site faster than you can

More information

Statement Of Work. Data Center Power and Cooling Assessment. Service. Professional Services. Table of Contents. 1.0 Executive Summary

Statement Of Work. Data Center Power and Cooling Assessment. Service. Professional Services. Table of Contents. 1.0 Executive Summary Statement Of Work Professional Services Data Center Power and Cooling Assessment Data Center Power and Cooling Assessment Service 1.0 Executive Summary Table of Contents 1.0 Executive Summary 2.0 Features

More information

Reduce the cost and delays associated with troubleshooting with the help of round-the-clock Service Desk Support.

Reduce the cost and delays associated with troubleshooting with the help of round-the-clock Service Desk Support. Remote Support Reduce the cost and delays associated with troubleshooting with the help of round-the-clock Service Desk Support. SERVICE DEFINITION: REMOTE SUPPORT SERVICES ITI s Remote Support Service

More information

La modularidad a nivel de Data Centers integrales. Arturo Maqueo Business Development Manager Mexico y Centro America

La modularidad a nivel de Data Centers integrales. Arturo Maqueo Business Development Manager Mexico y Centro America La modularidad a nivel de Data Centers integrales Arturo Maqueo Business Development Manager Mexico y Centro America Dashboard Our approach to simplify DC transformation A Focus for Schneider Electric

More information

Optimum Climate Control For Datacenter - Case Study. T. Prabu March 17 th 2009

Optimum Climate Control For Datacenter - Case Study. T. Prabu March 17 th 2009 Optimum Climate Control For Datacenter - Case Study T. Prabu March 17 th 2009 Agenda 2 About EDEC (Emerson) Facility Data Center Details Design Considerations & Challenges Layout Design CFD Analysis Of

More information

Statement Of Work. Data Center Thermography Assessment. Service. Professional Services. Table of Contents. 1.0 Executive Summary

Statement Of Work. Data Center Thermography Assessment. Service. Professional Services. Table of Contents. 1.0 Executive Summary Statement Of Work Professional Services Data Center Thermography Assessment Data Center Thermography Assessment Service 1.0 Executive Summary Table of Contents 1.0 Executive Summary 2.0 Features & Benefits

More information

Data Center Cabling Design Trends

Data Center Cabling Design Trends Data Center Cabling Design Trends BICSI Regional Meeting Maurice Zetena Fiber Connect Infrastructure Trends Infrastructure Trends Any to All Trunk Cabling Trends: Data Center Infrastructure Media Choice:

More information

Data Centre Testing and Commissioning

Data Centre Testing and Commissioning Data Centre Testing and Commissioning What is Testing and Commissioning? Commissioning provides a systematic and rigorous set of tests tailored to suit the specific design. It is a process designed to

More information

About Injazat. Enterprise Cloud Services. Premier Data Center. IT Outsourcing. Learning and Development Services. Enterprise Application Services

About Injazat. Enterprise Cloud Services. Premier Data Center. IT Outsourcing. Learning and Development Services. Enterprise Application Services About Injazat Injazat Data Systems is an industry-recognized market leader in the region for Information Technology Outsourcing, Cloud and Data Center Managed Services delivered from the region s 1st Tier

More information

BU Control Technologies, Decathlon TM Product Overview. ABB in the Data Center Overview

BU Control Technologies, Decathlon TM Product Overview. ABB in the Data Center Overview BU Control Technologies, Decathlon TM Product Overview ABB in the Data Center Overview Introduction to ABB ABB is a global leader in power and automation technologies that enable utility and industrial

More information

Network Design Incorporated

Network Design Incorporated Network Design Incorporated Network Design Incorporated specializes in the design, installation and project management of Information Transport Systems (ITS) and the various technology solutions utilizing

More information

Santa Clara, CA 95054

Santa Clara, CA 95054 Leading-Edge Datacenter Facility Silicon Valley GENERAL In excess of 41,000 sq. ft. of raised floor 9 MVA of utility power into facility Purpose built Green Datacenter Sutton Roley Lic. 00793235 (408)

More information

Safeguard your critical IT assets in a highly secure, fully redundant, environmentally-conditioned and constantly monitored hosting space to receive

Safeguard your critical IT assets in a highly secure, fully redundant, environmentally-conditioned and constantly monitored hosting space to receive Co-Location Services Safeguard your critical IT assets in a highly secure, fully redundant, environmentally-conditioned and constantly monitored hosting space to receive optimum performance 24x7. SERVICE

More information

Dedicated Hosting Services

Dedicated Hosting Services Dedicated Hosting Services Protect and manage your Servers/ Routers/ Switches/ storage devices/ security devices under a highly secure hosting space and get the finest performances out of them. SERVICE

More information

LEVEL 3 DATA CENTER ASSESSMENT

LEVEL 3 DATA CENTER ASSESSMENT Nationwide Services Corporate Headquarters 410 Forest Street Marlborough, MA 01752 USA Tel: 800-342-5332 Fax: 508-303-0579 www.eecnet.com LEVEL 3 DATA CENTER ASSESSMENT Submitted by: Electronic Environments

More information

Yam Hong 施 耐 德 電 機 亞 太 日 本 區 (APJ) 三 相 關 鍵 電 源 市 場 開 發 經 理. Schneider Electric - Division - Name Date

Yam Hong 施 耐 德 電 機 亞 太 日 本 區 (APJ) 三 相 關 鍵 電 源 市 場 開 發 經 理. Schneider Electric - Division - Name Date Yam Hong 施 耐 德 電 機 亞 太 日 本 區 (APJ) 三 相 關 鍵 電 源 市 場 開 發 經 理 1 Agenda 1 2 3 相 UPS 總 覽 Introduction & Overview of 3 Phase UPS 理 解 客 戶 最 大 的 考 量 點 Understanding Top Customer Concerns 3 Galaxy VM 關 鍵 技 術 創

More information

Standard Comms Rooms Specification

Standard Comms Rooms Specification Standard Comms Rooms Specification Room Configuration Electrical General Distribution Boards Small Power Lighting Containment Fire Detection General To be defined in the project brief but should meet requirements

More information

Australian Government Data Centre Strategy 2010-2025

Australian Government Data Centre Strategy 2010-2025 Australian Government Data Centre Strategy 2010-2025 Better Practice Guide: Data Centre Structure August 2013 Contents Contents 2 1. Introduction 3 Purpose 3 Scope 3 Policy Framework 4 Related documents

More information

Technical specifications. Containerized data centre NTR CDC 40f+

Technical specifications. Containerized data centre NTR CDC 40f+ Technical specifications Containerized data centre NTR CDC 40f+ CONTENT 1 THE PURPOSE OF CDC... 3 2 BASIC PROPERTIES... 4 2.1 EXTERNAL DIMENSIONS... 4 2.2 INSTALLATION REQIREMENTS... 4 2.3 ELECTRICAL CONNECTION

More information

100 Locust Avenue, Berkeley Heights, New Jersey P R O P E R T Y O F F E R I N G

100 Locust Avenue, Berkeley Heights, New Jersey P R O P E R T Y O F F E R I N G 100 Locust Avenue, Berkeley Heights, New Jersey P R O P E R T Y O F F E R I N G The Opportunity Jones Lang LaSalle, Inc. (the Broker ) is please to offer the fee simple interest in 100 Locust Avenue (the

More information

Reducing Data Center Loads for a Large-Scale, Net Zero Office Building

Reducing Data Center Loads for a Large-Scale, Net Zero Office Building rsed Energy Efficiency & Renewable Energy FEDERAL ENERGY MANAGEMENT PROGRAM Reducing Data Center Loads for a Large-Scale, Net Zero Office Building Energy Efficiency & Renewable Energy Executive summary

More information

Automation's Modular Containerized Datacenter Solutions

Automation's Modular Containerized Datacenter Solutions SAFE Automation's Modular Containerized Datacenter Solutions Automation's SAFE (Secure, Autonomous, Flexible, Efficient) Modular Containerized Datacenter offers a fast, flexible and efficient solution

More information

Education Evolution: Scalable Server Rooms George Lantouris Client Relationship Manager (Education) May 2009

Education Evolution: Scalable Server Rooms George Lantouris Client Relationship Manager (Education) May 2009 Education Evolution: Scalable Server Rooms George Lantouris Client Relationship Manager (Education) May 2009 Agenda Overview - Network Critical Physical Infrastructure Cooling issues in the Server Room

More information

Data Center Solutions - The Containerized Evolution

Data Center Solutions - The Containerized Evolution Data Center Solutions - The Containerized Evolution Power IT Cooling 7 th Green Connected World Tsikogias Thanassis Data Centers Solutions Architect, IT Business Athens 2015 1 We are the global specialist

More information

ASX Australian Liquidity Centre. ASXCoLo

ASX Australian Liquidity Centre. ASXCoLo ASX Australian Liquidity Centre ASXCoLo Australian Liquidity Centre Location The ASX Australian Liquidity Centre is located at: Gore Hill Business Park 219-247 Pacific Highway Artarmon. NSW, 2064 The location

More information

vcloud SERVICE Virtual Tech in partnership with Equinix - vcloud Service

vcloud SERVICE Virtual Tech in partnership with Equinix - vcloud Service vcloud SERVICES vcloud SERVICE Virtual Tech offers competitive pricing on vcloud hosted services at our world class Tier 4 data centre facility fully equipped with redundant power, cooling, internet connectivity

More information

Best Practice Guide for Data Centres - a UH Perspective Steve Bowes-Phipps, Data Centres Manager University of Hertfordshire

Best Practice Guide for Data Centres - a UH Perspective Steve Bowes-Phipps, Data Centres Manager University of Hertfordshire Best Practice Guide for Data Centres - a UH Perspective Steve Bowes-Phipps, Data Centres Manager University of Hertfordshire http://rare idc.herts.ac.uk Best Practice Guide for Data Centres RARE-IDC Overview

More information

Georgia Tech Aerospace Server French building Server Room. Server Room Policy Handbook: Scope, Processes and Procedure

Georgia Tech Aerospace Server French building Server Room. Server Room Policy Handbook: Scope, Processes and Procedure Georgia Tech Aerospace Server French building Server Room Server Room Policy Handbook: Scope, Processes and Procedure Version History Version/Status Release Date Comments 1.1/Draft 1.2 1.3 1.4 1.5 1.6

More information

DATA CENTER ASSESSMENT SERVICES

DATA CENTER ASSESSMENT SERVICES DATA CENTER ASSESSMENT SERVICES ig2 Group Inc. is a Data Center Science Company which provides solutions that can help organizations automatically optimize their Data Center performance, from assets to

More information

Portable Energy Efficient Data Centre Solution

Portable Energy Efficient Data Centre Solution Portable Energy Efficient Data Centre Solution Workspace Technology Limited Technology House, PO BOX 11578, Sutton Coldfield West Midlands B72 1ZB Telephone: 0121 354 4894 Facsimile: 0121 354 6447 www.workspace-technology.com

More information

Department of Administration DATA CENTER Two Phase Approach Located at the State Defense Building

Department of Administration DATA CENTER Two Phase Approach Located at the State Defense Building DATA CENTER Two Phase Approach Located at the State Defense Building July 17, 2015 Compiled by: Office of Facilities and Property Management 800 SW Jackson, Suite 600 Topeka, Kansas 66612-1216 i I. Programming

More information

COMMODITIZING THE DATA CENTER MARKET

COMMODITIZING THE DATA CENTER MARKET COMMODITIZING THE DATA CENTER MARKET Site Summary The building at 1360 Kifer Road has approximately 94,500 SF of server and support space and is currently divided into two independent data center areas.

More information

Colocation Service Definition. SD008 v1.3 Issue Date 19 Feb 09

Colocation Service Definition. SD008 v1.3 Issue Date 19 Feb 09 Colocation Service Definition SD008 v1.3 Issue Date 19 Feb 09 Colocation Service Definition Service Overview InTechnology offers secure data centre environments for your business critical systems, applications

More information

estec ESA Request for Information concerning a new corporate datacentre at ESTEC

estec ESA Request for Information concerning a new corporate datacentre at ESTEC estec European Space Research and Technology Centre Keplerlaan 1 2201 AZ Noordwijk The Netherlands T +31 (0)71 565 6565 F +31 (0)71 565 6040 www.esa.int ESA Request for Information concerning a new corporate

More information

AisleLok Modular Containment vs. Legacy Containment: A Comparative CFD Study of IT Inlet Temperatures and Fan Energy Savings

AisleLok Modular Containment vs. Legacy Containment: A Comparative CFD Study of IT Inlet Temperatures and Fan Energy Savings WH I TE PAPE R AisleLok Modular Containment vs. : A Comparative CFD Study of IT Inlet Temperatures and Fan Energy Savings By Bruce Long, Upsite Technologies, Inc. Lars Strong, P.E., Upsite Technologies,

More information

AT&T Internet Data Center Site Specification - Phoenix Area (Mesa, AZ)

AT&T Internet Data Center Site Specification - Phoenix Area (Mesa, AZ) AT&T Internet Data Center Site Specification - Phoenix Area (Mesa, AZ) Site Biography Market Area: Phoenix, Mesa, Tempe, Chandler, Scottsdale, AZ Location: Mesa, AZ 85201 Address: 1301 University Blvd.

More information

OPERATOR - FACILITY ADDRESS - DATE

OPERATOR - FACILITY ADDRESS - DATE . Facility Criteria (RFP).0 Location Characteristics Criteria Requirements 1 Ownership and Management: Please identify the owner(s) and managers of the property and indicate if there is on-site management.

More information

Server Technology, Inc.

Server Technology, Inc. Server Technology, Inc. Power Efficiency Gains by Deploying 415 VAC Power Distribution in North American Data Centers White Paper STI-100-008 2009-April-07 Headquarters Server Technology, Inc. 1040 Sandhill

More information

SMART SHELTER CONTAINER

SMART SHELTER CONTAINER Da ta Ce nt er Total Flexibility and Security in a Modular Data Center Advantages Environmentally Friendly Short Delivery Time Smart Shelter Container (SSC) solution provides a fully functional Data Center

More information

Every business owns precious data and every business should recognise the risk of losing their data. Natural Disaster

Every business owns precious data and every business should recognise the risk of losing their data. Natural Disaster Every business owns precious data and every business should recognise the risk of losing their data Natural Disaster How do you secure your Data? A: Onsite backup & replication / inside your network B:

More information

Enterprise Data Centres

Enterprise Data Centres Enterprise Data Centres 09/12/2014 MAR0064 Cannon Data Campus s Pre-Engineered, factory built modules and systems combine to produce a high performance, efficient, Data Centre Campus. s White Space, Mechanical

More information

Our data centres have been awarded with ISO 27001:2005 standard for security management and ISO 9001:2008 standard for business quality management.

Our data centres have been awarded with ISO 27001:2005 standard for security management and ISO 9001:2008 standard for business quality management. AIMS is Malaysia and South East Asia s leading carrier neutral data centre operator and managed services provider. We provide international class data storage and ancillary services, augmented by an unrivaled

More information

The following are general terms that we have found being used by tenants, landlords, IT Staff and consultants when discussing facility space.

The following are general terms that we have found being used by tenants, landlords, IT Staff and consultants when discussing facility space. The following are general terms that we have found being used by tenants, landlords, IT Staff and consultants when discussing facility space. Terminology: Telco: Dmarc: NOC: SAN: GENSET: Switch: Blade

More information

CORPORATE SERVICES - INFORMATION SYSTEMS & TECHNOLOGY - USE OF TELECOMMUNICATIONS INFRASTRUCTURE

CORPORATE SERVICES - INFORMATION SYSTEMS & TECHNOLOGY - USE OF TELECOMMUNICATIONS INFRASTRUCTURE RENTAL OF UNLIT TELECOMMUNICATIONS FIBRE Unlit telecommunications optic fibre - Core Per Optic Fibre Network: use of an Optic Fibre Pair on the Core Pair per Ring between any two Switching Centres Subject

More information

Data Centre Services. JT First Tower Lane Data Centre Facility Product Description

Data Centre Services. JT First Tower Lane Data Centre Facility Product Description JT First Tower Lane Data Centre Facility Product Description JT s Data Centre Hosting Service provides a secure computer room enviroment with protected incoming power supplies, state-of-the-art security

More information

in other campus buildings and at remote campus locations. This outage would include Internet access at the main campus.

in other campus buildings and at remote campus locations. This outage would include Internet access at the main campus. DATA CENTER The current Campus Data Center is located within historic Founders Hall which is in a less-than ideal location for a variety of reasons, but is typical of an existing campus IT infrastructure

More information

Designing A Communications Cabling System for the Colocation Data Center Larry Smith President, ABR Consulting Group, Inc.

Designing A Communications Cabling System for the Colocation Data Center Larry Smith President, ABR Consulting Group, Inc. Designing A Communications Cabling System for the Colocation Data Center Larry Smith President, ABR Consulting Group, Inc. It is often said that the communications cabling system is the conduit over which

More information

Containment Solutions

Containment Solutions Containment Solutions Improve cooling efficiency Separate hot and cold air streams Configured to meet density requirements Suitable for commercial and SCEC endorsed cabinets Available for retrofit to SRA

More information

Sovereign. The made to measure data centre

Sovereign. The made to measure data centre Sovereign D ATA C O N N E C T The made to measure data centre Prime Location Within touching distance of everything that s important. 2 Your Customer-Centric Data Centre For the vast majority of organisations

More information

SUFFOLK COUNTY CODE OF RULES GOVERNING RESTRICTED LICENSED ELECTRICIAN S

SUFFOLK COUNTY CODE OF RULES GOVERNING RESTRICTED LICENSED ELECTRICIAN S SUFFOLK COUNTY CODE OF RULES GOVERNING RESTRICTED LICENSED ELECTRICIAN S Including: 1. Heating, Ventilating and Air Conditioning (HVAC) 2. Irrigation Systems 3. Oil and Gas Burning Equipment 4. Signs and

More information

AT&T Internet Data Center Site Specification Washington-DC Area (Ashburn, VA)

AT&T Internet Data Center Site Specification Washington-DC Area (Ashburn, VA) AT&T Internet Data Center Site Specification Washington-DC Area (Ashburn, VA) Site Biography Market Area: Washington, DC Area Location: Ashburn, VA 20147-6011 Address: All deliveries should be sent to

More information

Australian Government Data Centre Strategy 2010-2025

Australian Government Data Centre Strategy 2010-2025 Australian Government Data Centre Strategy 2010-2025 Better Practice Guide: Data Centre Power June 2013 17/06/2013 4:12 PM 17/06/2013 4:12 PM Contents Contents 2 1. Introduction 3 Scope 3 Policy Framework

More information

Colocation Services. We offer a highly secure environment to deploy your computing, network, storage and IT infrastructure.

Colocation Services. We offer a highly secure environment to deploy your computing, network, storage and IT infrastructure. Colocation Services We offer a highly secure environment to deploy your computing, network, storage and IT infrastructure. v. 2015 About us Our Values McAllen Data Center s purpose is to help carriers

More information

Determining Total Cost of Ownership for Data Center and Network Room Infrastructure

Determining Total Cost of Ownership for Data Center and Network Room Infrastructure Determining Total Cost of Ownership for Data Center and Network Room Infrastructure White Paper #6 Revision 3 Executive Summary An improved method for measuring Total Cost of Ownership of data center and

More information

Future-Proof the Banking and Finance Data Center

Future-Proof the Banking and Finance Data Center Future-Proof the Banking and Finance Data Center Reinier Dungca Rey Perea Marketing Manager, Southeast Asia and North Asia Manager, Local Technical Support Emerson Network Power Emerson Network Power Philippines

More information

IBM Portable Modular Data Center Overview for Critical Facilities Round Table

IBM Portable Modular Data Center Overview for Critical Facilities Round Table Brian Canney Global Services Executive, IBM GTS Site and Facilities Services April 2011 IBM Portable Modular Data Center Overview for Critical Facilities Round Table 2009 IBM Corporation Key messages Containers

More information

Statement of Work. 3.0 Details of Service Pre Start-up. - 1 - Cooling Start-up Service. Installation Service. Table of Contents. 1.0 Executive Summary

Statement of Work. 3.0 Details of Service Pre Start-up. - 1 - Cooling Start-up Service. Installation Service. Table of Contents. 1.0 Executive Summary Installation Service Statement of Work - 1 - Cooling Start-up Service Cooling Start-up Service Service 1.0 Executive Summary Table of Contents 1.0 Executive Summary 2.0 Features & Benefits 3.0 Details

More information

Cooling a hot issue? MINKELS COLD CORRIDOR TM SOLUTION

Cooling a hot issue? MINKELS COLD CORRIDOR TM SOLUTION Cooling a hot issue? MINKELS COLD CORRIDOR TM SOLUTION The heat load in data centers is increasing rapidly, the adaptation of a cooling strategy is often necessary. Many data centers and server rooms use

More information

S c h n e i d e r E l e c t r i c BUSINESS IMPACT. Jack Hack Enterprise System Engineer 19 November 2015

S c h n e i d e r E l e c t r i c BUSINESS IMPACT. Jack Hack Enterprise System Engineer 19 November 2015 S c h n e i d e r E l e c t r i c BUSINESS IMPACT Datacenter means business - create the bridge between IT en Facilities. Jack Hack Enterprise System Engineer 19 November 2015 1 Your ability to compete

More information

Rack & Stack 123 TM. Enterprise Education Government Telecommunications Service Providers Tel: 408-586-8800

Rack & Stack 123 TM. Enterprise Education Government Telecommunications Service Providers Tel: 408-586-8800 Rack & Stack 123 TM Enterprise Education Government Telecommunications Service Providers Tel: 408-586-8800 Rack & Stack 123 TM Introduction Simplicity Scope of Work Rack & Stack 123 TM Benefits 2 toll-free:

More information

Fire Alarm System Monitoring - CAN/ULC-S561-03

Fire Alarm System Monitoring - CAN/ULC-S561-03 Fire Alarm System Monitoring - CAN/ULC-S561-03 Brian McBain ULC Regulatory Services May 4, 2011 Copyright 1995-2007 Underwriters' Laboratories of Canada. All rights reserved. No portion of this material

More information

POD S in Data Centres. The Frame Group Pty Ltd

POD S in Data Centres. The Frame Group Pty Ltd Presented by: Greg Goode The Frame Group Pty Ltd DATA Centres? POD SOLUTIONS REFERRED TO AS: Cells Modular Rooms High Density Zones Portable Modular Data Centres (Containers) Multiple Interpretations Varied

More information

Facilities Planning and Management Services

Facilities Planning and Management Services Page 1 of 5 Services Page 2 of 5 TABLE OF CONTENTS Revision History... 2 Abbreviations and Acronyms... 2 Terminology... 2 1.0 Service Description and Services... 3 Baseline Services... 3 1.2 Additional

More information

Data Center Management

Data Center Management Data Center Management How Cisco IT Operates, Manages, and Protects Its Data Center A Cisco on Cisco Case Study: Inside Cisco IT 1 Overview The Cisco IT Operations Data Center on the San Jose, California

More information

Meeting the FCC Backup Power Mandate From Site Audit to Total Site Solutions. DC Power, Outside Plant & Services for Business-Critical Continuity

Meeting the FCC Backup Power Mandate From Site Audit to Total Site Solutions. DC Power, Outside Plant & Services for Business-Critical Continuity Meeting the FCC Backup Power Mandate From Site Audit to Total Site Solutions DC Power, Outside Plant & Services for Business-Critical Continuity Integrated Backup Power Solutions to increase your network

More information

Data Centre Solutions... energy efficient by design. APC by Schneider Electric Elite Data Centre Partner. APC s leading Elite Data Centre Solutions

Data Centre Solutions... energy efficient by design. APC by Schneider Electric Elite Data Centre Partner. APC s leading Elite Data Centre Solutions Data Centre Solutions... energy efficient by design APC by Schneider Electric Elite Data Centre Partner APC s leading Elite Data Centre Solutions Partner providing customers with expert advice, integration

More information

Extending Ethernet over 2-wire Copper Networks

Extending Ethernet over 2-wire Copper Networks Extending Ethernet over 2-wire Copper Networks Executive Summary To improve the efficiency of industrial automation systems, many operators are considering the possibility of IP upgrades to provide centralised

More information

Data Center Makeover: Getting the Facility You Need

Data Center Makeover: Getting the Facility You Need Data Center Makeover: Getting the Facility You Need Hobart and William Smith Colleges Fred Damiano, CIO Christopher Button, Sr. Project Manager Derek Lustig, Network and Systems Infrastructure Manager

More information

Cooling Capacity Factor (CCF) Reveals Stranded Capacity and Data Center Cost Savings

Cooling Capacity Factor (CCF) Reveals Stranded Capacity and Data Center Cost Savings WHITE PAPER Cooling Capacity Factor (CCF) Reveals Stranded Capacity and Data Center Cost Savings By Lars Strong, P.E., Upsite Technologies, Inc. Kenneth G. Brill, Upsite Technologies, Inc. 505.798.0200

More information

The formula for finding CFM is: CFM = BTUH OUTPUT_ Temp Rise (ACF)* *Altitude correction factor below 1000ft = 1.08

The formula for finding CFM is: CFM = BTUH OUTPUT_ Temp Rise (ACF)* *Altitude correction factor below 1000ft = 1.08 Air Volume Requirement Air conditioning systems are engineered with a specific amount of indoor air passing across the surface of the evaporator coil. The amount of air is measured in cubic feet per minute.

More information

Federal Data Center Consolidation Initiative (FDCCI) FAQs May 2012

Federal Data Center Consolidation Initiative (FDCCI) FAQs May 2012 Federal Data Center Consolidation Initiative (FDCCI) FAQs May 2012 1. What is the Federal Data Center Consolidation Initiative (FDCCI)? The Federal CIO Vivek Kundra established the FDCCI in a memo dated

More information

Data Centers: How Does It Affect My Building s Energy Use and What Can I Do?

Data Centers: How Does It Affect My Building s Energy Use and What Can I Do? Data Centers: How Does It Affect My Building s Energy Use and What Can I Do? 1 Thank you for attending today s session! Please let us know your name and/or location when you sign in We ask everyone to

More information

Power Management Strategies for High-Density IT Facilities and Systems. A White Paper from the Experts in Business-Critical Continuity TM

Power Management Strategies for High-Density IT Facilities and Systems. A White Paper from the Experts in Business-Critical Continuity TM Power Management Strategies for High-Density IT Facilities and Systems A White Paper from the Experts in Business-Critical Continuity TM Executive Summary Increases in data center density and diversity

More information

Server Monitoring & Management Services

Server Monitoring & Management Services Server Monitoring & Management Services Monitor and manage your applications and servers under enterprise-class monitoring solutions, and protect your business from planned and unplanned downtime. ITI

More information

Data Centre Services. JT Rue Des Pres Data Centre Facility Product Description

Data Centre Services. JT Rue Des Pres Data Centre Facility Product Description JT Rue Des Pres Data Centre Facility Product Description JT s Data Centre Hosting Service provides a secure computer room environment with protected and backup power, security and bandwidth. Data Centre

More information

Introducing Computational Fluid Dynamics Virtual Facility 6SigmaDC

Introducing Computational Fluid Dynamics Virtual Facility 6SigmaDC IT Infrastructure Services Ltd Holborn Gate, 330 High Holborn, London, WC1V 7QT Telephone: +44 (0)20 7849 6848 Fax: +44 (0)20 7203 6701 Email: info@itisltd.co.uk www.itisltd.com Introducing Computational

More information

Data Center Presentation

Data Center Presentation Data Center Presentation The NetSource Datacenter. Agenda General Layout of Data Center Policies and Procedures Designed to Latest Standards High Performance High Reliability High Security Design Details

More information

Data Centre Best Practices Summary

Data Centre Best Practices Summary Data Centre Best Practices Summary Delivering Successful Technology Rooms 1 END2END s Data Centre Best Practices END2END design Data Centres/Computer Rooms based on 7 major principles: Understanding the

More information

Built to last, designed to perform

Built to last, designed to perform Built to last, designed to perform Scalping and precision screening Easy service and maintenance access Screen box 4200 x 1500 mm Electric version available Fuel Saving by load sense hydraulic system Advanced

More information

Whitepaper Modular Integration of Process Equipment Packages for Oil and Gas Facilities

Whitepaper Modular Integration of Process Equipment Packages for Oil and Gas Facilities Whitepaper Modular Integration of Process Equipment Packages for Oil and Gas Facilities Author: Allan Bozek P.Eng, MBA, EngWorks Inc, Calgary, Canada Abstract An integrated design approach to a modular

More information

POWERING A CONNECTED ASIA. Pacnet Hong Kong CloudSpace1 Technical Specifications. Asia s Pioneering Facility with Direct Subsea Cable Access

POWERING A CONNECTED ASIA. Pacnet Hong Kong CloudSpace1 Technical Specifications. Asia s Pioneering Facility with Direct Subsea Cable Access POWERING A CONNECTED ASIA Pacnet Hong Kong CloudSpace1 Technical Specifications Asia s Pioneering Facility with Direct Subsea Cable Access Our purpose-built, 300 m 2 Pacnet Hong Kong CloudSpace1 (HKCS1)

More information

Hortonville School District Door Control System Phase I Request for Proposal July 5th, 2013

Hortonville School District Door Control System Phase I Request for Proposal July 5th, 2013 Hortonville School District Door Control System Phase I Request for Proposal July 5th, 2013 1 Overall Scope Hortonville School District is interested in deploying door locks, cameras, intercoms, and control

More information

THE OPTIMAL SOLUTION FOR SMALL AND MEDIUM DATA CENTER

THE OPTIMAL SOLUTION FOR SMALL AND MEDIUM DATA CENTER Your Complete Turnkey Server Room Air Condition UPS THE OPTIMAL SOLUTION FOR SMALL AND MEDIUM DATA CENTER AVAILABLE IN WATER AND GAS SYSTEM MODEL AIR-CONDITIONED CABINET EXCELLENT TEMPERATURE CONTROL FOR

More information

415V DISTRIBUTION FOR GREEN DATA CENTERS

415V DISTRIBUTION FOR GREEN DATA CENTERS White Paper: HMRP-WP001-A1 October 1, 2010 415V DISTRIBUTION FOR GREEN DATA CENTERS Prepared by: Anthony (Tony) Hoevenaars, P. Eng President and CEO Mirus International Inc. Copyright 2005 Mirus International

More information

Our data centres have been awarded with ISO 27001:2005 standard for security management and ISO 9001:2008 standard for business quality management.

Our data centres have been awarded with ISO 27001:2005 standard for security management and ISO 9001:2008 standard for business quality management. AIMS is Malaysia and South East Asia s leading carrier neutral data centre operator and managed services provider. We provide international class data storage and ancillary services, augmented by an unrivaled

More information

Convergence of Complexity

Convergence of Complexity Convergence of Complexity Optimize Existing Data Center Space Measure And Allocate Energy Cost Plan for new data centers or additional capacity How to make your Data Center Last Longer, Gartner, December

More information

Whitepaper. Modular Substation Cable Termination Design. Author: Allan Bozek P.Eng, MBA, EngWorks Inc, Calgary, Canada

Whitepaper. Modular Substation Cable Termination Design. Author: Allan Bozek P.Eng, MBA, EngWorks Inc, Calgary, Canada Whitepaper Modular Substation Cable Termination Design Author: Allan Bozek P.Eng, MBA, EngWorks Inc, Calgary, Canada Abstract The methods for cable penetrations into modular industrial substations are

More information

Datacentre Reading East 2 Data sheet

Datacentre Reading East 2 Data sheet Datacentre Reading East 2 Data sheet Data sheet Datacentre Reading East 2 Find us With 10 datacentres, over 4,500 racks and a 10Gb resilient core network between our datacentre locations, Pulsant has the

More information

ITCS Data Center Co Location Study

ITCS Data Center Co Location Study ITCS Data Center Co Location Study November 19, 2007 Introduction Northwestern Information Technology (NUIT) has started investigating the possibility of using a co-location facility to house university

More information

* * * AGENDA TRANSMITTAL FORM * * *

* * * AGENDA TRANSMITTAL FORM * * * MONTEREY REGIONAL WATER POLLUTION CONTROL AGENCY * * * AGENDA TRANSMITTAL FORM * * * MEETING DATE: SEPTEMBER 28, 2015 AGENDA ITEM: AGENDA TITLE: 6 H APPROVE CONTRACT FOR RTP NETWORK CENTER CONSOLIDATION

More information

Statement Of Work Professional Services

Statement Of Work Professional Services Statement Of Work Professional Services Data Center Cooling Analysis using CFD Data Center Cooling Analysis Using Computational Fluid Dynamics Service 1.0 Executive Summary Table of Contents 1.0 Executive

More information

Data Centre Basiglio, Milan Flexible, advanced and efficient by design.

Data Centre Basiglio, Milan Flexible, advanced and efficient by design. Data Centre Basiglio, Milan Flexible, advanced and efficient by design. TelecityGroup Via Francesco Sforza 13 Milano 3 City 20080 Basiglio MI Italy Tel: +39 02 36679500 it.info@telecity.com www.telecitygroup.it

More information

Huawei IDS1000 Container Data Center Solution

Huawei IDS1000 Container Data Center Solution CloudPower Huawei IDS1000 Container Data Center Solution HUAWEI TECHNOLOGIES CO., LTD. Traditional data centers suffer from long construction periods, high energy consumption and high initial investment,

More information

Modular Data Centre. Flexible, scalable high performance modular data centre solutions. Data Centre Solutions...energy efficient by design

Modular Data Centre. Flexible, scalable high performance modular data centre solutions. Data Centre Solutions...energy efficient by design Data Centre Solutions...energy efficient by design Modular Data Centre Flexible, scalable high performance modular data centre solutions Creating an effective workspace environment The Modular Data Centre

More information

DATA CENTRE DATA CENTRE MAY 2015

DATA CENTRE DATA CENTRE MAY 2015 DATA CENTRE DATA CENTRE MAY 2015 CONCERTHOUSE MUSIC Concerthouse Music Data Centre services are located in the Equinix Internet Business Exchange (IBX ) Centre at Mascot. This IBX offers the highest level

More information

Biznet Technovillage Data Center

Biznet Technovillage Data Center Biznet Technovillage Data Center Biznet Technovillage Jl. Biznet Technovillage No 1 Cimanggis, West Java 16965 - Indonesia Tel +62-21-57998888 Facility Overview Biznet Technovillage is an integrated high

More information

Tour of new eircom Data Centre Blanchardstown by Dervan Engineering Consultants 11 th March 2015

Tour of new eircom Data Centre Blanchardstown by Dervan Engineering Consultants 11 th March 2015 Tour of new eircom Data Centre Blanchardstown by Dervan Engineering Consultants 11 th March 2015 Presentation Outline Mechanical Overview Chillers and Pumps Pipework and Ancillaries In Row Cooling Units

More information

Our data centres have been awarded with ISO 27001:2005 standard for security management and ISO 9001:2008 standard for business quality management.

Our data centres have been awarded with ISO 27001:2005 standard for security management and ISO 9001:2008 standard for business quality management. AIMS is Malaysia and South East Asia s leading carrier neutral data centre operator and managed services provider. We provide international class data storage and ancillary services, augmented by an unrivaled

More information

DESIGNING DATA CENTERS & SERVER ROOMS

DESIGNING DATA CENTERS & SERVER ROOMS DESIGNING DATA CENTERS & SERVER ROOMS Compton s Designing Data Center Services are an enterprise-wide, consultative approach to help you manage mission critical environments. The services encompass the

More information

Specialty Environment Design Mission Critical Facilities

Specialty Environment Design Mission Critical Facilities Brian M. Medina PE Associate Brett M. Griffin PE, LEED AP Vice President Environmental Systems Design, Inc. Mission Critical Facilities Specialty Environment Design Mission Critical Facilities March 25,

More information