1 Australian Government Data Centre Strategy Better Practice Guide: Data Centre Power June /06/2013 4:12 PM

2 17/06/2013 4:12 PM Contents Contents 2 1. Introduction 3 Scope 3 Policy Framework 4 Related documents 4 2. Definition and Discussion 6 A Conceptual Model of a Data Centre 6 Observations about Power in Data Centres 8 3. Better practices 15 Organisation of the Better Practices 15 Implementing the Better Practices 16 Better Practices Fundamentals 16 Better Practices Power Systems 17 Better Practices Power Consumption Conclusion 22 Summary of Better Practices 22 17/06/2013 4:12 PM

3 1. Introduction The purpose of this guide is to advise Australian Government agencies on ways to improve data centre operations. Many government functions are critically dependent upon information and communication technology (ICT) systems based in data centres. Achieving and maintaining optimal data centre performance is challenging. The ICT equipment, power, cooling and other systems dynamically interact in many ways. By linking the data centre to the agency s business outcomes in an integrated approach, managers can better support business operations, control costs, and manage risks. Each better practice guide focuses on a different data centre attribute. Electricity 1 is one of the key resources for a data centre. Safe, reliable and efficient electricity use is essential to data centre performance. The aim is to assist Australian Government agencies to: Assess data centre performance relating to power. Improve practices relating to power leading to greater efficiency, reliability and safety. Meet legislative and policy requirements. The consequences of unsafe, inefficient or unreliable power use in data centres are significant. An unsafe data centre poses risks to people and surrounding buildings. An inefficient data centre can waste over 70 per cent of the electricity it uses. Unreliable data centres can disrupt the agency s business operations. This guide on power forms part of a set of better practice guides for data centres. Scope This guide applies to the data centre infrastructure supplying power to the ICT equipment and the supporting systems. This includes switchboards, switchgear, controlgear, transformers, uninterruptible power supplies (UPS), backup power generation, distribution boards, equipment racks and ICT equipment. This guide considers the power used by the ICT equipment and cooling systems in a data centre, but does not address in detail the better practices for ICT equipment efficiency or cooling a data centre 2. 1 Throughout this guide, the terms power, electricity and electrical power are equivalent, although power is preferred. 2 The Data Centre Optimisation Targets Guidance document addresses ICT equipment and cooling efficiency. Better Practice Guide: Data Centre Power 3

4 Policy Framework The guide has been developed within the context of the Australian public sector s data centre policy framework. This framework applies to agencies subject to the Financial Management and Accountability Act 1997 (FMA Act). The data centre policy framework seeks financial, technical and environmental outcomes. The Australian Government Data Centre Strategy (data centre strategy) describes actions that will avoid $1 billion in future data centre costs. Using power in data centres more efficiently will contribute significantly to the $1 billion goal. The Australian Government ICT Sustainability Plan describes actions that agencies are to take to improve environmental outcomes. The data centre strategy and the ICT sustainability plan have the same targets and objectives for data centres. The Data Centre Optimisation Targets (DCOT) policy sets minimum efficiency standards that data centres used by FMA agencies are to reach by June The DCOT policy set the power efficiency target for data centres of a Power Usage Effectiveness 3 (PUE) below The DCOT Guidance document describes methods to improve efficiency, including virtualisation, consolidation, cooling, procurement and server settings. In February 2013, the National Australian Built Environment Rating System (NABERS) for data centres was released. NABERS is an initiative led by the NSW Government and supported by the Australian Government. In the Australian public sector s data centre policy framework, PUE was chosen as an interim metric until NABERS for data centres was available. Agencies should anticipate that NABERS will replace PUE as the preferred metric over time. Related documents Information about the data centre strategy, and DCOT targets and guidance can be obtained from the Data Centre section (datacentres@finance.gov.au). The data centre better practice guides also cover: Cooling: the mechanical and electrical systems that provide conditioned air at the optimum temperature, humidity and pressure. Data Centre Infrastructure Management: the system that monitors and reports the state of the data centre. Also known as the building management system. Fire protection: the detection and suppression systems that minimise the effect of fire on people and the equipment in the data centre. Security: the physical security arrangements for the data centre. This includes access controls, surveillance and logging throughout the building, as well as perimeter protection. 3 The PUE metric is a ratio of the power used by the ICT equipment and overheads divided by the power used by the ICT equipment in a single data centre. The Green Grid developed the PUE metric and more information can be found at the website 4 A PUE of 1.9 means that for every watt powering the ICT equipment 0.9 watts is being used by overheads. Better Practice Guide: Data Centre Power 4

5 Equipment racks: this guide brings together aspects of power, cooling, cabling, monitoring, fire protection, security and structural design to achieve optimum performance for the ICT equipment. Structure: the physical building design provides for movement of people and equipment through the site, floor loading capacity, reticulation of cable, air and water. The design also complements the fire protection and security better practices. Environment: this guide examines data centre sustainability, including packaging, electric waste, water use and green house gas generation. Better Practice Guide: Data Centre Power 5

6 2. Definition and Discussion A Conceptual Model of a Data Centre A typical data centre consists of a number of different components. This complexity can be reduced to a collection of subsystems. The key data centre subsystems and power distribution networks are shown a conceptual model in Figure 1. This conceptual model describes the key functions used in a wide range of data centre designs, from computer rooms in converted office space to purpose-built, standalone data centres. While a data centre applying better practices will have these elements in their power subsystems, the physical connections and arrangements are likely to be different. The data centre industry has regional variations in the terms used to describe common set of data centre concepts. This section describes the conceptual data centre model, using terms in common use in Australia. Main switchboard UPS DB Equipment racks ICT equipment Local distribution lines to the building Backup generator Office area Fire protection system HVAC system Security system Data Centre Infrastructure Management Figure 1: Key Subsystems in a Data Centre Power enters the building site via the local distribution lines. Very high availability data centres will have multiple lines from several suppliers and substations. The main switchboard has several functions. The main switchboard connects to the various power networks in the building, and the backup generators. Each of the key subsystems usually is on its own power network. If the external power fails, static transfer switches automatically switches over to use power from the backup generator. The metering device that measures the total electricity consumption for the building is located at the point of supply between the local distribution lines and the main switchboard. The main switchboard has a residual current device, which reduces the chance of electrocution, by shutting off power if a fault is detected. Better Practice Guide: Data Centre Power 6

7 The backup generators are the source of power when the supply through the local distribution lines fails. Diesel generators are most commonly used to provide backup power, although other alternatives are becoming available. The heating, ventilation and air conditioning (HVAC) system cools and humidifies the data centre. The HVAC system is the largest overhead in a data centre. The uninterruptible power supply (UPS) ensures that there is continuity of power to the ICT equipment, regardless of disruptions to the building power supply. The length of time the UPS supplies power varies from a few seconds, long enough for the backup generator to take over, up to a few minutes, to allow the ICT equipment to shut down gracefully. The distribution board (DB) is an electrical wiring junction that connects a single power line from the UPS to multiple power lines to the equipment racks. The distribution board converts three phase power into single phase power. The equipment racks provide an enclosure for housing the ICT equipment. Inside the equipment rack the power rails provide power outlets for the ICT equipment. Modern equipment racks have a range of sensors for power and temperature. The ICT equipment consists of the servers, disk drives, storage area networks, tape drives, switches, routers and so on. The model does not show the power factor correction equipment, which is used on a case by case basis to improve the efficiency and quality of the power supply. The office area is necessary for people who must work at the data centre location. Data centres usually have several hazards for long term staff, including too much noise, uncomfortable temperatures and very low light levels. The fire protection system detects and suppresses fires or other abnormal hot spots. The security system provides the physical security arrangements. It may have video cameras, secure doors, or biometric access controls. The Data Centre Infrastructure Management (DCIM) system provides command and control functions to assist in managing a data centre. Older data centres may have a building management system that provides more limited functions, and is a predecessor to DCIM. High Voltage, Low Voltage Electrical power is distributed across Australia at very high voltages, typically 11,000 to 115,000 volts (V). The power must be converted to a lower voltage, around 240V, to be usable by most ICT equipment. However, 415V is commonly used by HVAC systems and larger ICT equipment such as mainframes. A substation with transformers converts high voltage power delivered to a data centre site to lower voltage, typically 415V. The local distribution lines take the power from the substation to the main switchboard. The substation and transformers are managed by the electricity provider, not the building owner. Common examples of power distribution voltages are shown in Figure 2. Better Practice Guide: Data Centre Power 7

8 Local Distribution Lines Main switch board Backup Generator UPS DB Equipment racks ICT equipment 11 kva 415 V 3 phase 240 V single phase 11 kva 415 V 3 phase 240 V single phase 415 V 240 V single phase Figure 2: Voltage Conversion Examples Observations about Power in Data Centres Fit for Purpose - Design and Operations The design of a data centre sets the limits of the operational achievements. Excellence in data centre operations will not overcome limits in the design. Conversely, poor operations performance will degrade any design, causing agencies to get less value for money than expected. The core design criteria for power in a data centre are safety, reliability, efficiency, flexibility and scalability. The core responsibilities for data centre operations are safety, reliability and efficiency. An agency will periodically evaluate the fitness for purpose of the data centre and the ICT equipment for the agency s outcomes. Broadly, either the data centre will (or with justifiable investment) meet business expectations, or the data centre cannot meet expectations and an alternative must be found. Many older data centres have been neglected, and so are less reliable and efficient. Minor capital improvements to design or operational capability are likely to be value for money. Examples are mining unused cables and selling them for scrap, removing idle ICT equipment providing little business value, or using power monitoring to find and replace equipment with high power costs. Major data centre upgrades are generally very expensive and disruptive to business operations. In most cases, moving to a more modern data centre will be a better option than refurbishing an existing data centre. Examples of major upgrades are installing a backup generator, doubling the power supplied to the data centre or installing redundant power supply to equipment racks with essential ICT systems. Better Practice Guide: Data Centre Power 8

9 Safety The Work Health and Safety Act 2011 imposes mandatory obligations and roles on all people working in a data centre. Power in a data centre poses risks including electrocution, fire and explosion. These hazards can cause injury or death. The legal obligations include: That all incidents are recorded, assessed and treated. The safety management plan is maintained. People to know how to behave safely in and around the data centre. In addition to the legal obligations, agencies should understand that a likely consequence of a serious safety incident is a significant disruption to normal agency operations. The process of investigating, repairing and confirming that the data centre is safe may prevent business as usual operations for days or weeks. Agency business continuity planning should include the partial or total loss of the data centre for safety reasons. Several better practices provide risk controls that could improve safety and agencies should review these for applicability. These controls include: Ensuring that Australian Standards and applicable building regulations are satisfied. Employing suitably licensed and accredited people to work on power systems. Verifying that the capacity of the power system is not exceeded by ICT equipment changes. Routine inspection of the power and temperature throughout the power system, including thermal images of switchboard, UPS and PDUs. Analysing the monitoring logs for trends and accounting for all variations. This advice in the better practice guide does not affect the obligations of staff or agencies to maintain a safe workplace. Power Uses in Data Centres The power consumed in a data centre should be considered as having either productive or overhead (unproductive) uses. The productive power is used by the data centre ICT equipment. The overhead power is used by the supporting systems, which consume power to maintain the ICT equipment. Achieving and sustaining better data centre power practices requires regular monitoring, analysis and reporting of both productive and overhead power. Ideally automated, monitoring records the rate of consumption, fluctuations, failures, and the efficiency of all power subsystems. This baseline will allow managers to improve efficiency and reliability. Electricity Billing The other measurement device available in all data centres is the usage meter, which is used to calculate the electricity bill. This is positioned on the local distribution line before the main switchboard. The usage meter records two, equally Better Practice Guide: Data Centre Power 9

10 correct perspectives of data centre power, which are demand and consumption. The demand, measured in kilovolt amperes (kva), is the amount of power that the data centre requires to be delivered by the generators and transmission network. The consumption, measured in kilowatt hours (kwh), is the amount of power used by the equipment inside the data centre. The typical data centre electricity bill is about 80 percent consumption, 20 per cent demand and a small fee for the regulatory agencies to run the energy markets. The most effective way of reducing the bill is to reduce consumption, which is the power used by the ICT equipment and overheads systems. Measuring Power Use When planning the data collection, thought should be given to how much data will be collected and how often it will be collected. Setting the time interval for data collection measurements is a matter of judgment. A one minute interval is often used for systems that are essential to maintaining reliability, such as the UPS, and five or ten minutes for other systems. Small data centres may only generate kilobytes of data, easily analysed by a standard spreadsheet tool. Very large data centres can generate gigabytes of data, requiring a specialised software package. A baseline should be maintained of the power consumed by each device in the data centre. Analysis of the baseline can provide significant insights into the state of the data centre. High and low power consumption thresholds should be identified for all equipment, in particular the HVAC and ICT equipment. Examples of using this analysis are: ICT servers that remain under the low usage threshold will have low or zero utilisation. These are candidates for being reallocated or removed. Computer Room Air Conditioning (CRAC) units in close proximity that exceed the high usage threshold may have conflicting settings, resulting in one CRAC unit working to reach a particular temperature or humidity, and the other CRAC unit working to reach a different state. The correct settings CRAC units in this circumstance will save power and reduce costs. Metric PUE or NABERS The PUE metric 5 is widely used in the data centre industry. Good Better Best 6 >1.9 >1.7 >1.5 The advantage of PUE as a metric is that it provides a simple, meaningful metric of power efficiency that addresses productive and overhead uses of power. Agencies should note that in October 2012 The Green Grid clarified how PUE is to be measured and reported. This may require changes in existing reports The values are taken from the Uptime Institute survey. Better Practice Guide: Data Centre Power 10

11 NABERS for data centres measures greenhouse gas emissions across a period of time. NABERS collects information on the power used by the data centre systems, and the utilisation of the ICT equipment in the data centre including the servers, storage and networks. NABERS has a star rating: 3 stars Average, 4 stars Good, 5 stars Excellent and 6 stars Market Leading. Agencies should pick only one metric when beginning to monitor and improve data centre efficiency. There is no equivalence between the two metrics. The data centre strategy and DCOT used PUE as it was available and recognised, with the expectation of switching NABERS once it became available. As an Australian standard, NABERS for data centres is better aligned with the local data centre industry. ICT Efficiency Reducing the power needed by the ICT equipment (the productive use) is often the most effective way to maximise power efficiency. Reducing the ICT equipment s power load means smaller overhead power is needed, as for example, less heat is generated so less cooling is needed. Actions that reduce the power needed by ICT equipment include: Virtualisation moving workloads from dedicated ICT equipment (including servers, storage and networks) to shared ICT equipment can reduce the amount of power required by 10% to 40%. Decommissioning disused ICT equipment can be left powered on rather than decommissioned and removed. Modernising the latest models of ICT hardware are using much less power for equivalent performance. Gartner advises that server power requirements have dropped by two thirds over the past two generations. Consolidation Physical and logical consolidation projects can rationalise the data centre ICT equipment. Cooling Efficiency The cooling systems are usually the major source of overhead power consumption, and so there is usually value in making cooling more efficient. There is a wide range of data centre cooling technology, which provides agencies with great flexibility about investing in an optimum solution. Common techniques to minimise power use include: Free air cooling brings the cooler air outside the data centre into the data centre through dust and particle filters. In most Australian cities free air cooling can be used over 50 per cent of the time, and in Canberra over 80 per cent of the time. Hot or cold aisle containment is a technique that aligns all the ICT equipment in the racks so that all of the cold air arrives on side of the rack and leaves on the other side of the rack. This means that the chilled air produced by the cooling system is delivered to the ICT equipment without mixing with the warmer exhaust air. Better Practice Guide: Data Centre Power 11

12 Raising the data centre temperature exploits the capability of modern ICT equipment to operate reliably at higher temperatures. Data centres can now operate at between 23 and 28 degrees Celsius, rather than the 18 to 21 degrees Celsius. Operating at higher temperatures means much less power is needed for cooling, and free air cooling becomes even more effective. The American Society of Heating Refrigeration and Air-conditioning Engineers (ASHRAE) publish guidance on maintaining optimum air temperatures in data centres. Agencies should also evaluate the environmental impact of cooling solutions. The environmental impact of cooling systems is typically excessive water use, however some cooling systems use hazardous chemicals. The investment case for cooling systems is quite different to ICT equipment. The asset life is usually 7 to 15 years. During the life of the cooling systems, the ICT equipment can be expected to change between two and five times. The amount of cooling required will vary significantly as the ICT equipment changes. This variability means that agencies should seek cooling solutions that can adjust as the demand for cooling rises and falls. Losses in Power Systems and Cables Converting power from high voltage into usable voltages and then distributing this power throughout the data centre results in inefficiencies, or losses. Losses occur in the power equipment, such as the transformer, distribution board, and UPS, and in the wiring (copper loss) that distributes the power throughout the data centre. The power factor is a measure of how efficiently power is distributed through the data centre. Efficient data centres have a power factor between 0.90 and 0.99, while inefficient data centres have a power factor below Minimising power losses generally requires capital investment in new subsystems or auxiliary conditioning equipment. Power can be distributed efficiently over long distances as 3 phase power. The common alternative is to distribute the power as single phase power. In nearly all circumstances, single phase power will have higher losses than 3 phase power. However, these losses are proportional to the length and cross section of the copper cable. The difference between single and 3 phase power is negligible for distances of less than 100 metres. Generally, purpose built commercial data centres will use 3 phase power to reach the equipment racks. If 3 phase power is used to distribute power throughout the data centre, then the When the phases are balanced, three phase power is distributed with very small losses throughout the data centre. Ensuring that the 3 phase power circuits are balanced should be a routine task. Continuity of Power and Reliability The reliability of the power supplied by the data centre to the ICT equipment is a major factor in the overall reliability of the ICT system. It is common to mitigate the effects of failures by duplicating key components. This imposes higher capital costs, and generally the power systems are less efficient. Typically, the business continuity planning process produces an analysis of business goals that can be mapped simply to reliability targets for the data centre. Better Practice Guide: Data Centre Power 12

13 In general terms, requirements for power continuity will fall into one of three categories: Essential that there are no outages. The ICT systems should be operational at all times. Important that there are no unplanned outages. The ICT systems are useful to normal operations. These systems can be turned off with prior planning. Of little or no importance. The ICT systems can be allowed to turn off in the event of a loss of power. These systems are not essential to normal operations, or there are other controls in place, such as an alternate system that will take over in another location. Organisations that maintain high efficiency metrics and high reliability for their data centres are increasingly relying on virtualisation and cloud technology. In this model, the data centre is highly reliable, the ICT hardware is based on identical, inexpensive components that are not redundant, and the virtualised operating environment protects the applications and business processes against individual hardware component failures. This also works to mitigate eth effect of partial failures in the power supply in the data centre. Trade-off between Efficiency and Reliability There is a trade-off between efficiency and reliability of power distribution. The various components (transformers, UPS, PDUs) operate most efficiently at high utilisation rates, typically above 90%. However, highly reliable power distribution designs typically provide two paths to the ICT equipment. In normal operations, each path carries less than half the power to the ICT equipment. If a failure occurs in one path, then the other path is capable of carrying the full power load to the equipment. This means that in normal operations the components are operating at less than 50% capacity. Most power systems are less efficient in this range. Newer equipment typically loses 2% to 4%, while older equipment can lose as much as 50%. Inspection and Maintenance Every component in a power system is subject to wear and tear. Regular inspection and maintenance is essential. Inspections can be aided by analysing the data collected for efficiency reporting. Variations, especially power losses, usually indicate a potential failure. A thermal imaging camera can detect hot spots, which are also signs of an incipient failure. Early detection and remediation is less disruptive and costly. Maintenance work is essential. All components, including cables, should be maintained according to the manufacturer s schedules. There is an increased risk to business operations when that the maintenance work is carried out. This business risk should be assessed and controlled by business, ICT and data centre staff. Some data centres are designed so that maintenance work requires the ICT equipment to be shut down while the work is being done. Provided this shut down is planned and agreed with the business, and the length of the shutdown is within the reliability target, the better practice is being followed. Better Practice Guide: Data Centre Power 13

14 Other data centre design allow for maintenance work to be carried out while the ICT equipment continues normal operation. The maintenance work still elevates the level of risk, as the level of protection provided by the data centre design has been lowered. It remains better practice to review this risk with the business prior to the maintenance work. Conclusion Keeping a data centre performing optimally is challenging, due to the multiple interacting systems. It is essential that power use is monitored, and that there are clear expectations of the reliability of the power supply in a data centre. Agencies must decide how much to invest in their data centres to obtain value for money and to support achieving the agency outcomes. The better practices will assist agencies to reach these objectives. The DCOT policy describes the minimum performance measures for APS data centres and ICT equipment. If an agency decides that the data centre performance is inadequate, the first point to review is the data centre operations. If the operations are satisfactory (that is, delivering the full capability of the design), then the data centre design must change. Generally, changing the data centre design means moving to a different data centre. As part of the data centre strategy two whole of government panels have been established. The Data Centre Migration Services panel allows agencies to obtain any mix of data centre project services, from design services to establish requirements and assess existing data centres, through commissioning and moving to another data centre, to cleaning and decommissioning the old data centre. The Data Centre Facility panel provides access to quality commercial data centre facilities. Better Practice Guide: Data Centre Power 14

15 3. Better practices Data centres are very diverse in size and operational purposes. The guide focuses on key principles and processes, enabling agencies to gauge the operational practices in a data centre. Applying the better practices will require pragmatic judgements by agencies. Organisation of the Better Practices The better practices have been grouped into related topics: Fundamental: the most important practices are safety, targets and monitoring. If these practices are not being followed, the other practices will deliver limited benefits or unnecessary costs. Power System: practices relating to the subsystems that transform, condition, protect and distribute power throughout the data centre. Also includes continuity of supply of power to the ICT equipment, electricity billing and environmental considerations. Power Consumption: practices relating to the power used by other data centre subsystems, in particular the ICT equipment and HVAC. Main switchboard UPS DB Equipment racks ICT equipment Local distribution lines to the building Backup generator HVAC Power System Power Consumption Figure 3: Separation of the Better Practices for Power Systems and Power Consumption Better Practice Guide: Data Centre Power 15

16 Implementing the Better Practices The successful application of the better practices will require planning, analysis and integration with existing capabilities. Agencies should expect to: Plan a phased implementation. Analyse how each better practice can be applied to their data centre. Create a standard operating procedure and supporting training material. Integrate the standard operating procedures into the existing ICT and data centre operations. Extend existing processes, such as capacity management, configuration control and availability monitoring, to include the power better practices. Monitor the first uses of the procedures, and adjust the procedures and training as needed. Better Practices Fundamentals Business Alignment Metrics and Reporting The data centre performance must be linked to the agency s goals by clear metrics. Reliability and efficiency are the two key metrics of data centre power. The targets must be endorsed by the agency s senior responsible officer. The reliability target should be based on the agency s business continuity and disaster recovery planning. The reliability metric is commonly expressed in terms of continuity of the power supply to ICT systems. For example, critical systems must always have power, and useful systems must shut down gracefully and be able to be restarted within 2 hours of power being restored. The efficiency target can be measured and reported in one of two ways, Power Usage Effectiveness (PUE) and NABERS for data centres. The better practice standard for existing data centres is either a PUE less than 1.7 7, or a NABERS rating of 4 Stars 8 or better. Monitoring, Analysis and Reporting Improving and sustaining the data centre performance requires regular monitoring and reporting. The monitoring system should record the state of all data centre 7 The Uptime Institute s 2012 Data Centre Survey reports the average PUE as between 1.8 and Conducted in March and April 2012, over 1,100 organisations responded from around the world. The 21st Century Data Center: An overview, ZDNet, (confirmed 16 April 2013). 8 NABERS website 4 stars is a rating of Good Performance. tm&side=factsheets.htm Better Practice Guide: Data Centre Power 16

17 power subsystems, and the power consumed by the ICT equipment and overhead systems. Agencies should set up an automated monitoring and data collection process as early as possible. Reporting should begin once the monitoring is in place and collecting data. The following conditions should be reported: Voltage: Transients, Interruptions, Sag / Undervoltage, Swell / Overvoltage, Waveform distortion, Voltage fluctuations, Frequency variations. Current: Over-current, Under-current, Idle equipment. Unexplained variations to the baseline are usually either failing components or unplanned configuration changes. Early detection of, and response to these variations assists in maintaining reliability and containing costs. Electricity Billing Information from the power bill should be combined with other reporting to report the consumption patterns of all equipment in the data centre, including the power cost for each ICT system. The analysis of the billing information, power consumption and demand should be available to all teams involved in the data centre. When reducing the power bill, data centre and ICT managers should focus on reducing the consumption, as this has proven the most effective. Better Practices Power Systems This set of better practices focus on the subsystems that distribute the power through the data centre. Just enough power Using just enough power throughout a data centre can markedly improve efficiency. Any excess power usually becomes excess heat, which uses yet more power to remove it. Efficient data centres have a power factor between 0.95 and Better practice is to monitor the power factor, and take value for money decisions to raise the power factor. If 3 phase power is used to distribute power then the circuits should be balanced. Confirming this and taking corrective action should be a routine operation. The optimum level of power for the power supply units (PSU) in the ICT equipment will be determined. It is likely to be 230V for servers. If practical, the power supply will be adjusted to reduce the excess power and so remove excess heat. Inspection Normal fluctuations in power cause expansion and contraction, particularly at connections in switchboards, PDUs and equipment racks. Over time this can lead to components failing, disrupting the power supply. Better Practice Guide: Data Centre Power 17

18 The better practice is to conduct regular inspections using a thermal imaging camera. Maintenance Maintenance is essential to keep the data centre operating. The data centre equipment must be maintained according to the manufacturer s specifications. However, maintenance activities increase risks to business operations during the time the maintenance is being done. The increased risk to business during maintenance activity should be assessed and controlled by business, ICT and data centre staff. Efficiency and Economy Modes Modern data centre equipment offers flexible operating modes that reduce power consumption. For example, HVAC systems have economisers that draw in cooler outside air, variable speed fans and more controlled responses to changes in conditions. The better practice is to ensure that the economy modes are being used to deliver optimum efficiency without compromising reliability. Power failure mitigation and continuity provisioning The better practice for power failure mitigation and continuity provisioning is that the agency s declared business needs determine the level of protection for each ICT system. This then determines the investment in protecting each ICT system against power failure. The procedures and systems to ensure continuity of power should be practiced regularly. Sustainable Water Use Agencies optimising sustainability should estimate, report and optimise water use 9 of the data centre. This includes on-site and off-site water use. Major on-site uses of water are cooling and humidifying. The key off-site use of water is electricity generation. 10 Better Practices Power Consumption This set of better practices focus on the subsystems that are the major consumers of power. Data Halls A data hall is a room with dedicated PDUs and CRAC units within a data centre. Data halls should be in one of three states: 9 10 The Green Grid, WP#35-Water Usage Effectiveness (WUE ): A Green Grid Data Center Sustainability Metric, Better Practice Guide: Data Centre Power 18

19 Full: should be operating at peak efficiency. Changing: all ICT moves, adds and changes should be in this data hall. Empty. Should be powered off, and may not have power or cooling systems installed. The air temperature should be raised, consistent with ASHRAE recommendations and ICT equipment tolerances. Data centre staff must plan the power capacity provided to racks and areas of the data centre floor. As equipment is installed and removed, it is necessary to consider the impact on the power demand and make suitable adjustments. Better practice also requires power cables are fit for purpose, catalogued and arranged in conduits or trays. The power cables must not obstruct airflow, or create hazards for staff. There must be no domestic power boards or extension cords in the data hall. Equipment Racks The power load to be carried by the circuits, and the circuit breakers, will be confirmed during the installation planning step for new ICT equipment. If intelligent power rails are installed, then power is turned on to each outlet only once change control is approved. The racks and equipment are earthed according to the electrical design for the data centre. ICT Equipment The DCOT targets are to be met by June Facilities and ICT staff should identify and agree what to do with: Idle ICT equipment that may be able to be powered off. Obsolete and powered down equipment that may be able to be removed from the data centre. Power costs should be attributed to ICT equipment. Power losses should be attributed to ICT equipment. When power is being restored to the data centre following a partial or complete power down, the ICT equipment is restarted in stages. This is to protect the power systems and shorten the ICT system restoration. The start up phase of most ICT equipment draws more power than normal operations. This peak demand may cause circuit breakers to trip unnecessarily, resulting in extended outages. Modern ICT systems in data centres are complex, preferring activation in particular sequences. Restarting the ICT equipment out of sequence can cause avoidable problems. Power should be restored to the ICT equipment in a staged manner, allowing enough time for software to load and configure itself, and become available for other systems. Better Practice Guide: Data Centre Power 19

20 Fundamentals The safety plan has the goal of no injuries due to data centre power. The procedures and training for staff and visitors support this goal. The safety incident log is actively used to identify, develop and apply preventive actions to improve the effectiveness of the safety program. The reliability targets and associated metrics are defined, based on the agency s business continuity plan or equivalent. The reliability targets and metrics are signed off by the senior responsible officer. The efficiency targets and associated metrics are defined, based on the agency s business requirements. The efficiency targets and metrics are signed off by the senior responsible officer. The measure is either PUE < 1.7 or NABERS rating of 4 stars or better. Power systems are being automatically monitored. Regular reports on safety, reliability and efficiency are provided to senior responsible officer, ICT and facility managers. Power Systems Data centre equipment is maintained according manufacturers schedules. Regular inspections conducted using thermal imaging camera of all switchboards, switchgear and controlgear. Efficiency and economy modes have been evaluated and used appropriately. Three phase power circuits have balanced phases. Power factor is as high as value for money will permit. Power cables are in marked single purpose trays or conduits, are not hazards, and do not block airflow. Domestic grade electrical equipment, including double adapters, extension cords and power strips, are not used in the equipment racks, data halls or data centre. Domestic grade equipment may be used in the office area only. The contingency procedures established to meet the reliability targets and manage risks are practiced regularly. Risk management plan is current, jointly developed and agreed with business owners. Operations check the contingency plan and systems monthly for readiness and completeness. Better Practice Guide: Data Centre Power 20

Australian Government Data Centre Strategy 2010-2025

Australian Government Data Centre Strategy 2010-2025 Australian Government Data Centre Strategy 2010-2025 Better Practice Guide: Data Centre Cooling November 2013 22/11/2013 2:58 PM 22/11/2013 2:58 PM Contents Contents 2 1. Introduction 3 Purpose 3 Scope

More information

Australian Government Data Centre Strategy 2010-2025

Australian Government Data Centre Strategy 2010-2025 Australian Government Data Centre Strategy 2010-2025 Better Practice Guide: Data Centre Structure August 2013 Contents Contents 2 1. Introduction 3 Purpose 3 Scope 3 Policy Framework 4 Related documents

More information

Office of the Government Chief Information Officer. Green Data Centre Practices

Office of the Government Chief Information Officer. Green Data Centre Practices Office of the Government Chief Information Officer Green Data Centre Practices Version : 2.0 April 2013 The Government of the Hong Kong Special Administrative Region The contents of this document remain

More information

Measuring Power in your Data Center: The Roadmap to your PUE and Carbon Footprint

Measuring Power in your Data Center: The Roadmap to your PUE and Carbon Footprint Measuring Power in your Data Center: The Roadmap to your PUE and Carbon Footprint Energy usage in the data center Electricity Transformer/ UPS Air 10% Movement 12% Cooling 25% Lighting, etc. 3% IT Equipment

More information

Energy Efficiency Best Practice Guide Data Centre and IT Facilities

Energy Efficiency Best Practice Guide Data Centre and IT Facilities 2 Energy Efficiency Best Practice Guide Data Centre and IT Facilities Best Practice Guide Pumping Systems Contents Medium-sized data centres energy efficiency 3 1 Introduction 4 2 The business benefits

More information

Data Centre Testing and Commissioning

Data Centre Testing and Commissioning Data Centre Testing and Commissioning What is Testing and Commissioning? Commissioning provides a systematic and rigorous set of tests tailored to suit the specific design. It is a process designed to

More information

AEGIS DATA CENTER SERVICES POWER AND COOLING ANALYSIS SERVICE SUMMARY

AEGIS DATA CENTER SERVICES POWER AND COOLING ANALYSIS SERVICE SUMMARY AEGIS DATA CENTER SERVICES POWER AND COOLING ANALYSIS SERVICE SUMMARY The Aegis Services Power and Assessment Service provides an assessment and analysis of your data center facility and critical physical

More information

Can you afford to ignore energy costs of IT infrastructure? A practical guide to more efficient data operations. Powering IT

Can you afford to ignore energy costs of IT infrastructure? A practical guide to more efficient data operations. Powering IT Can you afford to ignore energy costs of IT infrastructure? A practical guide to more efficient data operations. Powering IT Executive Summary Energy costs are expected to double over the next 10 years.

More information

Server room guide helps energy managers reduce server consumption

Server room guide helps energy managers reduce server consumption Server room guide helps energy managers reduce server consumption Jan Viegand Viegand Maagøe Nr. Farimagsgade 37 1364 Copenhagen K Denmark jv@viegandmaagoe.dk Keywords servers, guidelines, server rooms,

More information

Statement Of Work. Data Center Power and Cooling Assessment. Service. Professional Services. Table of Contents. 1.0 Executive Summary

Statement Of Work. Data Center Power and Cooling Assessment. Service. Professional Services. Table of Contents. 1.0 Executive Summary Statement Of Work Professional Services Data Center Power and Cooling Assessment Data Center Power and Cooling Assessment Service 1.0 Executive Summary Table of Contents 1.0 Executive Summary 2.0 Features

More information

AIR-SITE GROUP. White Paper. Green Equipment Room Practices

AIR-SITE GROUP. White Paper. Green Equipment Room Practices AIR-SITE GROUP White Paper Green Equipment Room Practices www.air-site.com Common practices to build a green equipment room 1 Introduction Air-Site (www.air-site.com) is a leading international provider

More information

Reducing Data Center Loads for a Large-Scale, Net Zero Office Building

Reducing Data Center Loads for a Large-Scale, Net Zero Office Building rsed Energy Efficiency & Renewable Energy FEDERAL ENERGY MANAGEMENT PROGRAM Reducing Data Center Loads for a Large-Scale, Net Zero Office Building Energy Efficiency & Renewable Energy Executive summary

More information

Reducing Data Center Energy Consumption

Reducing Data Center Energy Consumption Reducing Data Center Energy Consumption By John Judge, Member ASHRAE; Jack Pouchet, Anand Ekbote, and Sachin Dixit Rising data center energy consumption and increasing energy costs have combined to elevate

More information

Server Room Thermal Assessment

Server Room Thermal Assessment PREPARED FOR CUSTOMER Server Room Thermal Assessment Analysis of Server Room COMMERCIAL IN CONFIDENCE MAY 2011 Contents 1 Document Information... 3 2 Executive Summary... 4 2.1 Recommendation Summary...

More information

Managing Data Centre Heat Issues

Managing Data Centre Heat Issues Managing Data Centre Heat Issues Victor Banuelos Field Applications Engineer Chatsworth Products, Inc. 2010 Managing Data Centre Heat Issues Thermal trends in the data centre Hot Aisle / Cold Aisle design

More information

Energy Efficiency and Availability Management in Consolidated Data Centers

Energy Efficiency and Availability Management in Consolidated Data Centers Energy Efficiency and Availability Management in Consolidated Data Centers Abstract The Federal Data Center Consolidation Initiative (FDCCI) was driven by the recognition that growth in the number of Federal

More information

Managing Power Usage with Energy Efficiency Metrics: The Available Me...

Managing Power Usage with Energy Efficiency Metrics: The Available Me... 1 of 5 9/1/2011 1:19 PM AUG 2011 Managing Power Usage with Energy Efficiency Metrics: The Available Metrics and How to Use Them Rate this item (1 Vote) font size Data centers consume an enormous amount

More information

TIA-942 Data Centre Standards Overview WHITE PAPER

TIA-942 Data Centre Standards Overview WHITE PAPER TIA-942 Data Centre Standards Overview WHITE PAPER TIA-942 Data Centre Standards Overview For the past 20 years, cabling standards have been the cornerstone of ensuring proper design, installation, and

More information

RVH/BCH Data Centres Proposals for Surge Protection and Ventilation

RVH/BCH Data Centres Proposals for Surge Protection and Ventilation REPORT Proposals for Surge Protection and Ventilation BELFAST HEALTH AND SOCIAL CARE TRUST ROYAL GROUP OF HOSPITALS GROSVENOR ROAD BELFAST BT12 6BA Rev. 01 6th September 2013 Table of Contents 1.0 Ventilation

More information

Case study: End-to-end data centre infrastructure management

Case study: End-to-end data centre infrastructure management Case study: End-to-end data centre infrastructure management Situation: A leading public sector organisation suspected that their air conditioning units were not cooling the data centre efficiently. Consequently,

More information

DATA CENTER ASSESSMENT SERVICES

DATA CENTER ASSESSMENT SERVICES DATA CENTER ASSESSMENT SERVICES ig2 Group Inc. is a Data Center Science Company which provides solutions that can help organizations automatically optimize their Data Center performance, from assets to

More information

Data Centre Outsourcing a Buyer s Guide

Data Centre Outsourcing a Buyer s Guide Data Centre Outsourcing a Buyer s Guide The inside guide to deciding whether to outsource your data centre facility and operations and how to select an appropriate partner. This Guide will help you Determine

More information

Best Practices. for the EU Code of Conduct on Data Centres. Version 1.0.0 First Release Release Public

Best Practices. for the EU Code of Conduct on Data Centres. Version 1.0.0 First Release Release Public Best Practices for the EU Code of Conduct on Data Centres Version 1.0.0 First Release Release Public 1 Introduction This document is a companion to the EU Code of Conduct on Data Centres v0.9. This document

More information

2014 Best Practices. The EU Code of Conduct on Data Centres

2014 Best Practices. The EU Code of Conduct on Data Centres 2014 Best Practices The EU Code of Conduct on Data Centres 1 Document Information 1.1 Version History Version 1 Description Version Updates Date 5.0.1 2014 Review draft Comments from 2013 stakeholders

More information

AIA Provider: Colorado Green Building Guild Provider Number: 50111120. Speaker: Geoff Overland

AIA Provider: Colorado Green Building Guild Provider Number: 50111120. Speaker: Geoff Overland AIA Provider: Colorado Green Building Guild Provider Number: 50111120 Office Efficiency: Get Plugged In AIA Course Number: EW10.15.14 Speaker: Geoff Overland Credit(s) earned on completion of this course

More information

PMCS. Integrated Energy Management Solution. Unlock the Full Potential of Power Networks Through Integration. Complete Solution. Informed Decisions

PMCS. Integrated Energy Management Solution. Unlock the Full Potential of Power Networks Through Integration. Complete Solution. Informed Decisions PMCS Integrated Energy Management Solution Unlock the Full Potential of Power Networks Through Integration Power Management Control System (PMCS) is a highly customizable, fully integrated end-to-end Energy

More information

Data center upgrade proposal. (phase one)

Data center upgrade proposal. (phase one) Data center upgrade proposal (phase one) Executive Summary Great Lakes began a recent dialogue with a customer regarding current operations and the potential for performance improvement within the The

More information

BCA-IDA Green Mark for Existing Data Centres Version EDC/1.0

BCA-IDA Green Mark for Existing Data Centres Version EDC/1.0 BCA-IDA Green Mark for Existing Data Centres Version EDC/1.0 To achieve GREEN MARK Award Pre-requisite Requirement All relevant pre-requisite requirements for the specific Green Mark Rating are to be complied

More information

Data Centers: Definitions, Concepts and Concerns

Data Centers: Definitions, Concepts and Concerns Data Centers: Definitions, Concepts and Concerns Arash Mousavi DCC September 2013 Agenda 1. Introduction 2. Issues in Modern Data Centers: Siemens Integrated Data Center Solutions 3. Issues in Modern Data

More information

Capgemini UK Infrastructure Outsourcing

Capgemini UK Infrastructure Outsourcing Together. Free your energies Capgemini UK Infrastructure Outsourcing Project Arthur Improved Data Centre Efficiency Paul Feeney Capgemini Tony Mills Spie Matthew Hall Project Arthur The Toltec data centre,

More information

GUIDE TO ICT SERVER ROOM ENERGY EFFICIENCY. Public Sector ICT Special Working Group

GUIDE TO ICT SERVER ROOM ENERGY EFFICIENCY. Public Sector ICT Special Working Group GUIDE TO ICT SERVER ROOM ENERGY EFFICIENCY Public Sector ICT Special Working Group SERVER ROOM ENERGY EFFICIENCY This guide is one of a suite of documents that aims to provide guidance on ICT energy efficiency.

More information

CarbonDecisions. The green data centre. Why becoming a green data centre makes good business sense

CarbonDecisions. The green data centre. Why becoming a green data centre makes good business sense CarbonDecisions The green data centre Why becoming a green data centre makes good business sense Contents What is a green data centre? Why being a green data centre makes good business sense 5 steps to

More information

2010 Best Practices. for the EU Code of Conduct on Data Centres. Version 2.0.0 Release Public Review Public

2010 Best Practices. for the EU Code of Conduct on Data Centres. Version 2.0.0 Release Public Review Public 2010 Best Practices for the EU Code of Conduct on Data Centres Version 2.0.0 Release Public Review Public 1 Document Information 1.1 Version History Version 1 Description Version Updates Date 2.0.0 2010

More information

EUROPEAN COMMISSION DIRECTORATE-GENERAL JOINT RESEARCH CENTRE Institute for Energy and Transport Renewable Energy Unit. 2013 Best Practices

EUROPEAN COMMISSION DIRECTORATE-GENERAL JOINT RESEARCH CENTRE Institute for Energy and Transport Renewable Energy Unit. 2013 Best Practices EUROPEAN COMMISSION DIRECTORATE-GENERAL JOINT RESEARCH CENTRE Institute for Energy and Transport Renewable Energy Unit 201 Best Practices for the EU Code of Conduct on Data Centres Version 4.0.5 1 Document

More information

Security+ Guide to Network Security Fundamentals, Fourth Edition. Chapter 13 Business Continuity

Security+ Guide to Network Security Fundamentals, Fourth Edition. Chapter 13 Business Continuity Security+ Guide to Network Security Fundamentals, Fourth Edition Chapter 13 Business Continuity Objectives Define environmental controls Describe the components of redundancy planning List disaster recovery

More information

Power Distribution in Data Centers: STARLINE Track Busway, PX ipdus and Power IQ

Power Distribution in Data Centers: STARLINE Track Busway, PX ipdus and Power IQ Power Distribution in Data Centers: STARLINE Track Busway, PX ipdus and Power IQ 2011 Raritan Inc. Overview Data center managers are faced with increasingly challenging demands: supplying additional computing

More information

Energy Management Services

Energy Management Services February, 2012 Energy Management Services Data centers & IT environments are often critical to today s businesses, directly affecting operations and profitability. General & Mechanical Services has the

More information

Guideline for Water and Energy Considerations During Federal Data Center Consolidations

Guideline for Water and Energy Considerations During Federal Data Center Consolidations Guideline for Water and Energy Considerations During Federal Data Center Consolidations Prepared for the U.S. Department of Energy Federal Energy Management Program By Lawrence Berkeley National Laboratory

More information

2014 Best Practices. for the EU Code of Conduct on Data Centres

2014 Best Practices. for the EU Code of Conduct on Data Centres EUROPEAN COMMISSION DIRECTORATE-GENERAL JRC JOINT RESEARCH CENTRE Institute for Energy and Transport Renewable Energies Unit 2014 Best Practices for the EU Code of Conduct on Data Centres 1 Document Information

More information

Fundamentals of Power

Fundamentals of Power Fundamentals of Power Fundamentals of Power 2008 American Power Conversion Corporation. All rights reserved. All trademarks provided are the property of their respective owners. Learning Objectives At

More information

Considerations for a Highly Available Intelligent Rack Power Distribution Unit. A White Paper on Availability

Considerations for a Highly Available Intelligent Rack Power Distribution Unit. A White Paper on Availability Considerations for a Highly Available Intelligent Rack Power Distribution Unit A White Paper on Availability Introduction Data centers are currently undergoing a period of great change. Data center managers

More information

Document Details. 247Time Backup & Disaster Recovery Plan. Author: Document Tracking. Page 1 of 12

Document Details. 247Time Backup & Disaster Recovery Plan. Author: Document Tracking. Page 1 of 12 Document Details Title: Author: 247Time Backup & Disaster Recovery Plan Document Tracking Page 1 of 12 TABLE OF CONTENTS 1 INTRODUCTION... 3 1.1 OVERVIEW... 3 1.2 DEFINED REQUIREMENT... 3 2 DISASTER OVERVIEW...

More information

Our data centres have been awarded with ISO 27001:2005 standard for security management and ISO 9001:2008 standard for business quality management.

Our data centres have been awarded with ISO 27001:2005 standard for security management and ISO 9001:2008 standard for business quality management. AIMS is Malaysia and South East Asia s leading carrier neutral data centre operator and managed services provider. We provide international class data storage and ancillary services, augmented by an unrivaled

More information

DataCenter 2020: first results for energy-optimization at existing data centers

DataCenter 2020: first results for energy-optimization at existing data centers DataCenter : first results for energy-optimization at existing data centers July Powered by WHITE PAPER: DataCenter DataCenter : first results for energy-optimization at existing data centers Introduction

More information

Re Engineering to a "Green" Data Center, with Measurable ROI

Re Engineering to a Green Data Center, with Measurable ROI Re Engineering to a "Green" Data Center, with Measurable ROI Alan Mamane CEO and Founder Agenda Data Center Energy Trends Benchmarking Efficiency Systematic Approach to Improve Energy Efficiency Best Practices

More information

SmartOnline Expandable Rack / Tower UPS System Online, double-conversion protection for mission critical applications

SmartOnline Expandable Rack / Tower UPS System Online, double-conversion protection for mission critical applications SmartOnline Expandable Rack / Tower UPS System Online, double-conversion protection for mission critical applications Model #: SU3000RTXL3U 3000VA online 3U rack / tower UPS Enhanced serial communications

More information

Introducing UNSW s R1 Data Centre

Introducing UNSW s R1 Data Centre Introducing UNSW s R1 Data Centre R1-DC Our New High Density Data Centre Right here Right now - Welcome to our newest UNSW Data Centre R1-DC R1 Location on UNSW Randwick campus. Keeping it in the family

More information

Data Centre Infrastructure Assessment

Data Centre Infrastructure Assessment Data Centre Infrastructure Assessment Prepared for: ACME INC SAMPLE REPORT Attention: Mr DC Manager This report represents a generic sample data centre audit for a generic customer by Focus Group Technologies.

More information

Title: Design of a Shared Tier III+ Data Center: A Case Study with Design Alternatives and Selection Criteria

Title: Design of a Shared Tier III+ Data Center: A Case Study with Design Alternatives and Selection Criteria Tier 3+ 1 Title: Design of a Shared Tier III+ Data Center: A Case Study with Design Alternatives and Selection Criteria Abstract: Schoolcraft College is constructing a High Availability (HA) Data Center

More information

Green Computing: Datacentres

Green Computing: Datacentres Green Computing: Datacentres Simin Nadjm-Tehrani Department of Computer and Information Science (IDA) Linköping University Sweden Many thanks to Jordi Cucurull For earlier versions of this course material

More information

IT Service Management

IT Service Management IT Service Management Service Continuity Methods (Disaster Recovery Planning) White Paper Prepared by: Rick Leopoldi May 25, 2002 Copyright 2001. All rights reserved. Duplication of this document or extraction

More information

Case Study: Innovative Energy Efficiency Approaches in NOAA s Environmental Security Computing Center in Fairmont, West Virginia

Case Study: Innovative Energy Efficiency Approaches in NOAA s Environmental Security Computing Center in Fairmont, West Virginia Case Study: Innovative Energy Efficiency Approaches in NOAA s Environmental Security Computing Center in Fairmont, West Virginia Prepared for the U.S. Department of Energy s Federal Energy Management Program

More information

How High Temperature Data Centers & Intel Technologies save Energy, Money, Water and Greenhouse Gas Emissions

How High Temperature Data Centers & Intel Technologies save Energy, Money, Water and Greenhouse Gas Emissions Intel Intelligent Power Management Intel How High Temperature Data Centers & Intel Technologies save Energy, Money, Water and Greenhouse Gas Emissions Power savings through the use of Intel s intelligent

More information

Overview of Green Energy Strategies and Techniques for Modern Data Centers

Overview of Green Energy Strategies and Techniques for Modern Data Centers Overview of Green Energy Strategies and Techniques for Modern Data Centers Introduction Data centers ensure the operation of critical business IT equipment including servers, networking and storage devices.

More information

Data Center Infrastructure & Managed Services Outline

Data Center Infrastructure & Managed Services Outline Data Center Infrastructure & Managed Services Outline The 360 Technology Center Solutions Data Center is located in Lombard, IL, USA. We are 20 minutes outside of downtown Chicago. The 360TCS staff consists

More information

Environmental Data Center Management and Monitoring

Environmental Data Center Management and Monitoring 2013 Raritan Inc. Table of Contents Introduction Page 3 Sensor Design Considerations Page 3 Temperature and Humidity Sensors Page 4 Airflow Sensor Page 6 Differential Air Pressure Sensor Page 6 Water Sensor

More information

Data Centers That Deliver Better Results. Bring Your Building Together

Data Centers That Deliver Better Results. Bring Your Building Together Data Centers That Deliver Better Results Bring Your Building Together 1 Meeting the high demands of your data center Meeting the increasing heat loads associated with growing computational needs requires

More information

Data Center Power Distribution and Capacity Planning:

Data Center Power Distribution and Capacity Planning: Data Center Power Distribution and Capacity Planning: Understanding what you know and don t know about power usage in your data center 2009, Raritan Inc. About This Series Raritan, a leading provider of

More information

ICT and the Green Data Centre

ICT and the Green Data Centre ICT and the Green Data Centre Scott McConnell Sales Manager c/o Tanya Duncan MD Interxion Ireland Green Data Centres Our Responsibility Data centre greenhouse gas emissions are projected to quadruple by

More information

Data Center Technology: Physical Infrastructure

Data Center Technology: Physical Infrastructure Data Center Technology: Physical Infrastructure IT Trends Affecting New Technologies and Energy Efficiency Imperatives in the Data Center Hisham Elzahhar Regional Enterprise & System Manager, Schneider

More information

How To Improve Energy Efficiency In A Data Center

How To Improve Energy Efficiency In A Data Center Google s Green Data Centers: Network POP Case Study Table of Contents Introduction... 2 Best practices: Measuring. performance, optimizing air flow,. and turning up the thermostat... 2...Best Practice

More information

THE KEY TO DATA CENTRE INFRASTRUCTURE

THE KEY TO DATA CENTRE INFRASTRUCTURE ENCLOSURES, RACKS & CABINETS THE KEY TO DATA CENTRE INFRASTRUCTURE PAGE 52 www.insidenetworksme.com JULY 15 Jonathan Duncan, Data Centre and Integrated Solutions Director, Schneider Electric, outlines

More information

Best Practices, Benefits and Economics of Load Testing IEEE PES Fort Worth, TX Chapter July 16, 2013

Best Practices, Benefits and Economics of Load Testing IEEE PES Fort Worth, TX Chapter July 16, 2013 Best Practices, Benefits and Economics of Load Testing IEEE PES Fort Worth, TX Chapter July 16, 2013 Mark Siira ComRent International 1 8/1/2013 Agenda Introduction Overview of Load Bank Testing Benefits

More information

Green Data Centre Design

Green Data Centre Design Green Data Centre Design A Holistic Approach Stantec Consulting Ltd. Aleks Milojkovic, P.Eng., RCDD, LEED AP Tommy Chiu, EIT, RCDD, LEED AP STANDARDS ENERGY EQUIPMENT MATERIALS EXAMPLES CONCLUSION STANDARDS

More information

in other campus buildings and at remote campus locations. This outage would include Internet access at the main campus.

in other campus buildings and at remote campus locations. This outage would include Internet access at the main campus. DATA CENTER The current Campus Data Center is located within historic Founders Hall which is in a less-than ideal location for a variety of reasons, but is typical of an existing campus IT infrastructure

More information

Thursday, April 26, 2012 Sydney New South Wales TECHNICAL ARTICLE FOR IMMEDIATE RELEASE

Thursday, April 26, 2012 Sydney New South Wales TECHNICAL ARTICLE FOR IMMEDIATE RELEASE RITTAL Pty Ltd 130-140 Parraweena Road Miranda NSW 2228 ABN 79 000 439 976 Thursday, April 26, 2012 Sydney New South Wales TECHNICAL ARTICLE FOR IMMEDIATE RELEASE RITTAL Pty Ltd HEAD OFFICE 130-140 Parraweena

More information

Calculating Total Power Requirements for Data Centers

Calculating Total Power Requirements for Data Centers Calculating Total Power Requirements for Data Centers By Richard Sawyer White Paper #3 Executive Summary Part of data center planning and design is to align the power and cooling requirements of the IT

More information

Analysis of data centre cooling energy efficiency

Analysis of data centre cooling energy efficiency Analysis of data centre cooling energy efficiency An analysis of the distribution of energy overheads in the data centre and the relationship between economiser hours and chiller efficiency Liam Newcombe

More information

Understanding Sage CRM Cloud

Understanding Sage CRM Cloud Understanding Sage CRM Cloud Data centre and platform security whitepaper Document version 2016 Table of Contents 1.0 Introduction 3 2.0 Sage CRM Cloud Data centre Infrastructure 4 2.1 Site location 4

More information

The following are general terms that we have found being used by tenants, landlords, IT Staff and consultants when discussing facility space.

The following are general terms that we have found being used by tenants, landlords, IT Staff and consultants when discussing facility space. The following are general terms that we have found being used by tenants, landlords, IT Staff and consultants when discussing facility space. Terminology: Telco: Dmarc: NOC: SAN: GENSET: Switch: Blade

More information

Scalable. Affordable. Flexible. Fast.

Scalable. Affordable. Flexible. Fast. Modular Data Center Solutions Scalable. Affordable. Flexible. Fast. Build the data center you need today with the flexibility to meet tomorrow s challenges The only constant in business is change. Fluctuations

More information

7 Best Practices for Increasing Efficiency, Availability and Capacity. XXXX XXXXXXXX Liebert North America

7 Best Practices for Increasing Efficiency, Availability and Capacity. XXXX XXXXXXXX Liebert North America 7 Best Practices for Increasing Efficiency, Availability and Capacity XXXX XXXXXXXX Liebert North America Emerson Network Power: The global leader in enabling Business-Critical Continuity Automatic Transfer

More information

How SafePlug Smart Receptacles Can Save Money in Commercial Buildings

How SafePlug Smart Receptacles Can Save Money in Commercial Buildings How SafePlug Smart Receptacles Can Save Money in Commercial Buildings by Steve Montgomery, P.E. 2D2C, Inc. SafePlug smart receptacle system add the ability to accurately identify exactly what appliance

More information

Green Computing: Datacentres

Green Computing: Datacentres Green Computing: Datacentres Simin Nadjm-Tehrani Department of Computer and Information Science (IDA) Linköping University Sweden Many thanks to Jordi Cucurull For earlier versions of this course material

More information

Datacentre Studley. Dedicated managed environment for mission critical services. Six Degrees Group www.6dg.co.uk

Datacentre Studley. Dedicated managed environment for mission critical services. Six Degrees Group www.6dg.co.uk Dedicated managed environment for mission critical services www.6dg.co.uk Our datacentres are the core of our business. At we own and manage 30,000 square feet of highly available, geographically diverse

More information

About Injazat. Enterprise Cloud Services. Premier Data Center. IT Outsourcing. Learning and Development Services. Enterprise Application Services

About Injazat. Enterprise Cloud Services. Premier Data Center. IT Outsourcing. Learning and Development Services. Enterprise Application Services About Injazat Injazat Data Systems is an industry-recognized market leader in the region for Information Technology Outsourcing, Cloud and Data Center Managed Services delivered from the region s 1st Tier

More information

Energy Efficiency Opportunities in Federal High Performance Computing Data Centers

Energy Efficiency Opportunities in Federal High Performance Computing Data Centers Energy Efficiency Opportunities in Federal High Performance Computing Data Centers Prepared for the U.S. Department of Energy Federal Energy Management Program By Lawrence Berkeley National Laboratory

More information

How High Temperature Data Centers & Intel Technologies save Energy, Money, Water and Greenhouse Gas Emissions

How High Temperature Data Centers & Intel Technologies save Energy, Money, Water and Greenhouse Gas Emissions Intel Intelligent Power Management Intel How High Temperature Data Centers & Intel Technologies save Energy, Money, Water and Greenhouse Gas Emissions Power and cooling savings through the use of Intel

More information

Measuring Energy Efficiency in a Data Center

Measuring Energy Efficiency in a Data Center The goals of the greening of the Data Center are to minimize energy consumption and reduce the emission of green house gases (carbon footprint) while maximizing IT performance. Energy efficiency metrics

More information

Energy Efficiency and Green Data Centers. Overview of Recommendations ITU-T L.1300 and ITU-T L.1310

Energy Efficiency and Green Data Centers. Overview of Recommendations ITU-T L.1300 and ITU-T L.1310 Energy Efficiency and Green Data Centers Overview of Recommendations ITU-T L.1300 and ITU-T L.1310 Paolo Gemma Chairman of Working Party 3 of ITU-T Study Group 5 International Telecommunication Union Agenda

More information

Power Distribution Units (PDUs): Power monitoring and environmental monitoring to improve uptime and capacity planning

Power Distribution Units (PDUs): Power monitoring and environmental monitoring to improve uptime and capacity planning Power Distribution Units (PDUs): Power monitoring and environmental monitoring to improve uptime and capacity planning 2009, Raritan Inc. Overview Corporate America is more dependent than ever on computing

More information

Colocation Service Definition. SD008 v1.3 Issue Date 19 Feb 09

Colocation Service Definition. SD008 v1.3 Issue Date 19 Feb 09 Colocation Service Definition SD008 v1.3 Issue Date 19 Feb 09 Colocation Service Definition Service Overview InTechnology offers secure data centre environments for your business critical systems, applications

More information

19 Site Location, Design and Attributes. Site Location, Design and Attributes

19 Site Location, Design and Attributes. Site Location, Design and Attributes 1 Site Location, Design and Attributes The Primary Data Center shall be physically located on Oahu, Hawaii. 2 Site Location, Design and Attributes The Primary Data Center shall be located at least 1 mile

More information

Measuring Power in your Data Center

Measuring Power in your Data Center RESEARCH UNDERWRITER WHITE PAPER LEAN, CLEAN & GREEN Raritan Measuring Power in your Data Center Herman Chan, Director, Power Solutions Business Unit, and Greg More, Senior Product Marketing Manager There

More information

Colocation Selection Guide. Workspace Technology Ltd

Colocation Selection Guide. Workspace Technology Ltd Colocation Selection Guide Workspace Technology Ltd Technology House 5 Emmanuel Court Reddicroft Sutton Coldfield West Midlands B72 1TJ Tel 0121 354 4894 Fax 0121 354 6447 www.workspace-technology.com

More information

Metering and Managing University of Sheffield Data Centres. Chris Cartledge Independent Consultant C.Cartledge@sheffield.ac.uk

Metering and Managing University of Sheffield Data Centres. Chris Cartledge Independent Consultant C.Cartledge@sheffield.ac.uk Metering and Managing University of Sheffield Data Centres Chris Cartledge Independent Consultant C.Cartledge@sheffield.ac.uk Summary ICT Electricity Use Footprint Data Centre Electricity Use European

More information

The 5th Greater Pearl River Delta Conference - Smart Management System in Building Facilities for Sustainability of Low Carbon Environment

The 5th Greater Pearl River Delta Conference - Smart Management System in Building Facilities for Sustainability of Low Carbon Environment The 5th Greater Pearl River Delta Conference - Smart Management System in Building Facilities for Sustainability of Low Carbon Environment Deployment of Advanced Technologies for Carbon Efficiency in Process

More information

Common Power Problems & Power Protection Solutions

Common Power Problems & Power Protection Solutions W H I T E P A P E R Common Power Problems & Power Protection Solutions Executive Summary All systems, from home theaters and office desktops to enterprise IT equipment in data centers, are prone to downtime,

More information

Engineering & Support Services

Engineering & Support Services Engineering & Support Services Expert Project, Engineering & Customer Support Services Providing a range of Engineering and Support Services for:- Mission Critical Environments Data Centres & Server Room

More information

Interested in conducting your own webinar? Email webinars@bnpmedia.com

Interested in conducting your own webinar? Email webinars@bnpmedia.com Interested in conducting your own webinar? Email webinars@bnpmedia.com Improving Efficiencies by Integrating Data Center Systems August 30 th, 2012 Audio Abstract Presenter Info Slides Handouts Group Chat

More information

Frankfurt Data Centre Overview

Frankfurt Data Centre Overview Technical Services Briefing Document Frankfurt Data Centre Overview Version 2.1 Contents Introduction... 3 TelecityGroup Data Centre in Frankfurt... 4 Data Centre Characteristics... 4 Technologies in Use

More information

Our data centres have been awarded with ISO 27001:2005 standard for security management and ISO 9001:2008 standard for business quality management.

Our data centres have been awarded with ISO 27001:2005 standard for security management and ISO 9001:2008 standard for business quality management. AIMS is Malaysia and South East Asia s leading carrier neutral data centre operator and managed services provider. We provide international class data storage and ancillary services, augmented by an unrivaled

More information

This 5 days training Course focuses on Best Practice Data Centre Design, Operation and Management leading to BICSI credits.

This 5 days training Course focuses on Best Practice Data Centre Design, Operation and Management leading to BICSI credits. This 5 days training Course focuses on Best Practice Data Centre Design, Operation and Management leading to BICSI credits. DCD, DCOM, DCE DESIGN IMPLEMENTATION BEST PRACTICE OPERATION & MANAGEMENT DATA

More information

Manchester City Council Report for Information. Report to: Resource and Governance Overview and Scrutiny Committee - 15 December 2011

Manchester City Council Report for Information. Report to: Resource and Governance Overview and Scrutiny Committee - 15 December 2011 Manchester City Council Report for Information Report to: Resource and Governance Overview and Scrutiny Committee - 15 December 2011 Subject: Report of: Data Centre Provisioning Project City Treasurer

More information

IBM Portable Modular Data Center Overview for Critical Facilities Round Table

IBM Portable Modular Data Center Overview for Critical Facilities Round Table Brian Canney Global Services Executive, IBM GTS Site and Facilities Services April 2011 IBM Portable Modular Data Center Overview for Critical Facilities Round Table 2009 IBM Corporation Key messages Containers

More information

IT Cost Savings Audit. Information Technology Report. Prepared for XYZ Inc. November 2009

IT Cost Savings Audit. Information Technology Report. Prepared for XYZ Inc. November 2009 IT Cost Savings Audit Information Technology Report Prepared for XYZ Inc. November 2009 Executive Summary This information technology report presents the technology audit resulting from the activities

More information

Convergence of Complexity

Convergence of Complexity Convergence of Complexity Optimize Existing Data Center Space Measure And Allocate Energy Cost Plan for new data centers or additional capacity How to make your Data Center Last Longer, Gartner, December

More information

Availability and Disaster Recovery: Basic Principles

Availability and Disaster Recovery: Basic Principles Availability and Disaster Recovery: Basic Principles by Chuck Petch, WVS Senior Technical Writer At first glance availability and recovery may seem like opposites. Availability involves designing computer

More information

GHG Protocol Product Life Cycle Accounting and Reporting Standard ICT Sector Guidance. Chapter 8: 8 Guide for assessing GHG emissions of Data Centers

GHG Protocol Product Life Cycle Accounting and Reporting Standard ICT Sector Guidance. Chapter 8: 8 Guide for assessing GHG emissions of Data Centers GHG Protocol Product Life Cycle Accounting and Reporting Standard ICT Sector Guidance Chapter : Guide for assessing GHG emissions of Data Centers DRAFT March 0 Table of Contents GHG Protocol ICT Sector

More information

Data Center Facility Basics

Data Center Facility Basics Data Center Facility Basics Ofer Lior, Spring 2015 Challenges in Modern Data Centers Management, Spring 2015 1 Information provided in these slides is for educational purposes only Challenges in Modern

More information