Data Center Makeover: Getting the Facility You Need
|
|
|
- Shona Malone
- 9 years ago
- Views:
Transcription
1 Data Center Makeover: Getting the Facility You Need Hobart and William Smith Colleges Fred Damiano, CIO Christopher Button, Sr. Project Manager Derek Lustig, Network and Systems Infrastructure Manager Copyright Hobart and William Smith Colleges This work is the intellectual property of the author. Permission is granted for this material to be shared for non-commercial, educational purposes, provided that this copyright statement appears on the reproduced materials and notice is given that the copying is by permission of the author. To disseminate otherwise or to republish requires written permission from the author.
2 Agenda Building the Business Case High Level Project Timeline Managing the Project Facility Design, Construction, & Activation Lessons Learned
3 Hobart and William Smith Geneva, NY 1,900 Students Liberal arts 11:1 Student Faculty Ratio 170 acre campus 100+ buildings
4 Defining The Problem
5 Building The Business Case Off-Site and On-site Options Evaluated Calculated Payback Period Value of Electronic Intellectual Property Underpinning of Future Initiatives Competitive Advantage
6 High Level Timeline 2004 Apr Problem identified as critical risk May Dec On/off-site options evaluated 2005 Jan Feb Board Approves on-site facility Mar Jun Project Team Assembled May Aug Facility Design Sep Dec Facility Construction 2006 Jan Facility Activation & Go Live
7 Managing the Project Christopher Button Sr. Project Manager
8 Project Management IT Server Facilities are atypical Understand it s not a cost/benefit analysis How to Sell it: Be educated How to Design it: Be educated Leverage all available resources
9 Project Phases Planning and site visits Design Construction Commissioning Transfer to Operations
10 The Project Team SWBR Architects M/E Engineering Bruns-Pak R.L. Kistler T. Bell Construction Binder Electric Kircher Construction Postler Davis Ulmer Day Automation HWS Facilities HWS IT Services HWS Library IBM Structured Technologies All-Mode Communications Anacomp Time Warner Telecom Verizon
11 How much is enough? Size Expandability Load Redundancy Points of failure
12 Facility Design, Construction, & Activation Derek Lustig Network and Systems Infrastructure Manager
13 Data Center Reliability Ranking* HWS Before HWS Now 1-Unreliable 2-Partially Unreliable 3-Isolated Unreliable 4-Isolated Conditioned 5-Isolated Improved 6-Mostly Reliable 7-Reliable 8-Reliable Redundant 9-Ultra-Reliable 10-State of the Art * Source: Bruns-Pak
14 Factors to Consider Redundancy: ability to maintain operation during failure Fault-Tolerance: eliminating single points of failure dependent on device, route, & site Maintainability: availability of center during maintenance Growth Strategy: support expanding functions
15 Before the Makeover
16 Construction
17 The Move: Challenges Ensure that it all parts, pieces, and process came together during winter intermission Move campus core switch & fiber path Change Internet Service Providers Relocate more than 100 devices all while keeping critical systems running
18 Moving: The Script Everyone knew the game plan
19 Move Process and Teams Stage Unrack Rack
20 Move Packages Servers delivered with components tagged and packaged
21 Features of New Facility
22 Electrical System Current load (20 KVA) + growth 130 KVA UPS 10 Minute full-load run time Single PDU Dual Circuits to each rack
23 Power Generation 600 KW Diesel Generator 1-day run-time under full load
24 Cooling System
25 Integrated Fire Suppression System
26 Security Two Factor Access Unauthorized Entry Alarm & Alerts Surveillance Cameras Activity Recorded and Remotely Accessible
27 Surveillance
28 Remote Administration Remote access and control of power outlets and KVM
29 Operations & Control Systems Generous workspace for maintenance & systems controls
30 Finished Product
31 Finished Product
32 Lessons Learned Frame data center as an institutional & operational need Explore alternatives and make solid business decisions Partner with other departments Rely on trusted vendors and engage them early Balance current & future needs with budget Be obsessive project managers Establish organizational guidelines for use
33 Service for Years to Come
34 New Feature Recently Added! Self-cleaning server facility
35 Thank You! Fred Damiano, Christopher Button, Derek Lustig,
AT&T Global Network Client for Windows Product Support Matrix January 29, 2015
AT&T Global Network Client for Windows Product Support Matrix January 29, 2015 Product Support Matrix Following is the Product Support Matrix for the AT&T Global Network Client. See the AT&T Global Network
COMPARISON OF FIXED & VARIABLE RATES (25 YEARS) CHARTERED BANK ADMINISTERED INTEREST RATES - PRIME BUSINESS*
COMPARISON OF FIXED & VARIABLE RATES (25 YEARS) 2 Fixed Rates Variable Rates FIXED RATES OF THE PAST 25 YEARS AVERAGE RESIDENTIAL MORTGAGE LENDING RATE - 5 YEAR* (Per cent) Year Jan Feb Mar Apr May Jun
COMPARISON OF FIXED & VARIABLE RATES (25 YEARS) CHARTERED BANK ADMINISTERED INTEREST RATES - PRIME BUSINESS*
COMPARISON OF FIXED & VARIABLE RATES (25 YEARS) 2 Fixed Rates Variable Rates FIXED RATES OF THE PAST 25 YEARS AVERAGE RESIDENTIAL MORTGAGE LENDING RATE - 5 YEAR* (Per cent) Year Jan Feb Mar Apr May Jun
Analysis One Code Desc. Transaction Amount. Fiscal Period
Analysis One Code Desc Transaction Amount Fiscal Period 57.63 Oct-12 12.13 Oct-12-38.90 Oct-12-773.00 Oct-12-800.00 Oct-12-187.00 Oct-12-82.00 Oct-12-82.00 Oct-12-110.00 Oct-12-1115.25 Oct-12-71.00 Oct-12-41.00
Case 2:08-cv-02463-ABC-E Document 1-4 Filed 04/15/2008 Page 1 of 138. Exhibit 8
Case 2:08-cv-02463-ABC-E Document 1-4 Filed 04/15/2008 Page 1 of 138 Exhibit 8 Case 2:08-cv-02463-ABC-E Document 1-4 Filed 04/15/2008 Page 2 of 138 Domain Name: CELLULARVERISON.COM Updated Date: 12-dec-2007
Enhanced Vessel Traffic Management System Booking Slots Available and Vessels Booked per Day From 12-JAN-2016 To 30-JUN-2017
From -JAN- To -JUN- -JAN- VIRP Page Period Period Period -JAN- 8 -JAN- 8 9 -JAN- 8 8 -JAN- -JAN- -JAN- 8-JAN- 9-JAN- -JAN- -JAN- -JAN- -JAN- -JAN- -JAN- -JAN- -JAN- 8-JAN- 9-JAN- -JAN- -JAN- -FEB- : days
Blackboard Collaborate Web Conferencing Hosted Environment Technical Infrastructure and Security
Overview Blackboard Collaborate Web Conferencing Hosted Environment Technical Infrastructure and Security Blackboard Collaborate web conferencing is available in a hosted environment and this document
The principles, processes, tools and techniques of project management
Unit 34: Plan and manage a project. 341 The principles, processes, tools and techniques of project management An industrial project, big or small, must be managed effectively to ensure the project s objectives
Computing & Telecommunications Services Monthly Report March 2015
March 215 Monthly Report Computing & Telecommunications Services Monthly Report March 215 CaTS Help Desk (937) 775-4827 1-888-775-4827 25 Library Annex [email protected] www.wright.edu/cats/ Last Modified
Managing Open Source Code Best Practices
Managing Open Source Code Best Practices September 24, 2008 Agenda Welcome and Introduction Eran Strod Open Source Best Practices Hal Hearst Questions & Answers Next Steps About Black Duck Software Accelerate
Ashley Institute of Training Schedule of VET Tuition Fees 2015
Ashley Institute of Training Schedule of VET Fees Year of Study Group ID:DECE15G1 Total Course Fees $ 12,000 29-Aug- 17-Oct- 50 14-Sep- 0.167 blended various $2,000 CHC02 Best practice 24-Oct- 12-Dec-
Every Student I Every Day I Every Possibility
For the Facilities Master Plan March 4, 2015 1 Introduction This has been prepared to describe a proposed process to be implemented in order to develop comprehensive Facility Master Plans for all schools
COMMODITIZING THE DATA CENTER MARKET
COMMODITIZING THE DATA CENTER MARKET Site Summary The building at 1360 Kifer Road has approximately 94,500 SF of server and support space and is currently divided into two independent data center areas.
Data Center Presentation
Data Center Presentation The NetSource Datacenter. Agenda General Layout of Data Center Policies and Procedures Designed to Latest Standards High Performance High Reliability High Security Design Details
Newfoundland and Labrador Hydro Electricity Rates
Newfoundland and Hydro Electricity Rates The following charts and descriptions outline: 1) residential rates by area 2) general service rates information including basic customer charges, energy charges,
Choosing a Cell Phone Plan-Verizon
Choosing a Cell Phone Plan-Verizon Investigating Linear Equations I n 2008, Verizon offered the following cell phone plans to consumers. (Source: www.verizon.com) Verizon: Nationwide Basic Monthly Anytime
CENTERPOINT ENERGY TEXARKANA SERVICE AREA GAS SUPPLY RATE (GSR) JULY 2015. Small Commercial Service (SCS-1) GSR
JULY 2015 Area (RS-1) GSR GSR (LCS-1) Texarkana Incorporated July-15 $0.50690/Ccf $0.45450/Ccf $0.00000/Ccf $2.85090/MMBtu $17.52070/MMBtu Texarkana Unincorporated July-15 $0.56370/Ccf $0.26110/Ccf $1.66900/Ccf
Stock Market Indicators: Historical Monthly & Annual Returns
Stock Market Indicators: Historical Monthly & Annual Returns July 31, 1 Dr. Edward Yardeni 51-97-73 eyardeni@ Joe Abbott 7397-53 jabbott@ Please visit our sites at blog. thinking outside the box Table
Disaster Recovery & Business Continuity Dell IT Executive Learning Series
Disaster Recovery & Business Continuity Dell IT Executive Learning Series Presented by Rich Armour, Debi Higdon & Mitchell McGovern THIS PRESENTATION SUMMARY IS FOR INFORMATIONAL PURPOSES ONLY AND MAY
Optimum Climate Control For Datacenter - Case Study. T. Prabu March 17 th 2009
Optimum Climate Control For Datacenter - Case Study T. Prabu March 17 th 2009 Agenda 2 About EDEC (Emerson) Facility Data Center Details Design Considerations & Challenges Layout Design CFD Analysis Of
U.S. Department of Energy Golden Field Office Information Technology. GOanywhere Real World Virtual Desktops in the DOE
Information Technology GOanywhere Real World Virtual Desktops in the DOE Agenda 1. Brief Intro to the 2. VDI Drivers and Architecture 3. Lessons Learned 4. Benefits of VDI 5. Follow-On Initiatives About
Basic Project Management & Planning
Basic Project Management & Planning Dr. David K. Potter Director & Don Pether Chair in Engineering and Management [email protected] 1 What is Project Management? A set of principles, methods, tools, and
Technical specifications. Containerized data centre NTR CDC 40f+
Technical specifications Containerized data centre NTR CDC 40f+ CONTENT 1 THE PURPOSE OF CDC... 3 2 BASIC PROPERTIES... 4 2.1 EXTERNAL DIMENSIONS... 4 2.2 INSTALLATION REQIREMENTS... 4 2.3 ELECTRICAL CONNECTION
AP Automation at Fossil. How Fossil implemented Opentext Vendor Invoice Management Wim Schalken
AP Automation at Fossil How Fossil implemented Opentext Vendor Invoice Management Wim Schalken Agenda INTRODUCTION LANDSCAPE PROJECT PROCESS LESSONS LEARNED Click to edit super huge text copy The Fossil
Datacentre Reading East 2 Data sheet
Datacentre Reading East 2 Data sheet Data sheet Datacentre Reading East 2 Find us With 10 datacentres, over 4,500 racks and a 10Gb resilient core network between our datacentre locations, Pulsant has the
IBM Portable Modular Data Center Overview for Critical Facilities Round Table
Brian Canney Global Services Executive, IBM GTS Site and Facilities Services April 2011 IBM Portable Modular Data Center Overview for Critical Facilities Round Table 2009 IBM Corporation Key messages Containers
ESTABLISHMENT OF A NEW BUSINESS
ESTABLISHMENT OF A NEW BUSINESS ATTENTION BUSINESS OWNERS Certificate of Occupancy Permit Requirements & Application Prior to any materials associated with your business being moved into the property that
How To Power A Bladecenter H Servers
Solutions Guide for IBM Data Center Architecture: IBM BladeCenter H Servers In today s high-demand enterprise environment, organizations need a reliable infrastructure to run compute-intensive applications
Essential NCPI Management Requirements for Next Generation Data Centers
Essential NCPI Requirements for Next Generation Data Centers By Ted Ives White Paper #14 1 Executive Summary The management of physical infrastructure in data centers can no longer be considered independently
SAMPLE. Insider Trading Chronology. Microsoft Corp (MSFT) Gates, William H. III -- 2,000,000 Shs. (0.25%)
Insider buys Price Chart Insider sells Hastings, Reed -- 77,000 Shs. (43.5%) Turner, Brian Kevin -- 234,000 Shs. (29.17%) Gates, William H. III -- 2,000,000 Shs. (0.25%) Gates, William H. III -- 2,000,000
jbpm Explained with Simple Use Cases
jbpm Explained with Simple Use Cases Tom Baeyens Founder and lead of jbpm, JBoss Sept 2nd 2009 1 Agenda Business Process Management jbpm Introduction Developer Value Business Value Train ticket system
Cost effective methods of test environment management. Prabhu Meruga Director - Solution Engineering 16 th July SCQAA Irvine, CA
Cost effective methods of test environment management Prabhu Meruga Director - Solution Engineering 16 th July SCQAA Irvine, CA 2013 Agenda Basic complexity Dynamic needs for test environments Traditional
Coordination and air quality monitoring during emergencies. Colin Powlesland Environment Agency
Coordination and air quality monitoring during emergencies Colin Powlesland Environment Agency Contents h Introduction h What do we want to achieve? h Implementation programme h Incident timeline h Proposed
Academic Calendar 2015-2018 Arkansas State University - Jonesboro
Shared Governance Proposal Any constituent (individual or group) may submit a proposal into the shared governance process. In order to be considered, each proposal must contain the following and be directed
Service Organization Control (SOC 3) Report on a Description of the Data Center Colocation System Relevant to Security and Availability
15301 Dallas Parkway, Suite 960, Addison, TX 75001 MAIN 214 545 3965 FAX 214 545 3966 www.bkmsh.com Service Organization Control (SOC 3) Report on a Description of the Data Center Colocation System Relevant
BELLE VUE MANCHESTER DATA CENTRE
www.iracknet.com 0843 557 5712 [email protected] www.iracknet.com BELLE VUE MANCHESTER DATA CENTRE 02 BELLE VUE MANCHESTER HIGHLY ADVANCED DATA CENTRE PURPOSE BUILT TO DELIVER UNRIVALLED FLEXIBILITY
Request for Proposal Colocation Hosting Services
Request for Proposal Colocation Hosting Services Proposals Due: February 29, 2016 4:00PM EST Table of Contents Table of Contents 2 Section 1 Introduction 3 Section 2 Evaluation 4 Timeline 4 Submission
LeSueur, Jeff. Marketing Automation: Practical Steps to More Effective Direct Marketing. Copyright 2007, SAS Institute Inc., Cary, North Carolina,
Preface. Overview. PART 1: Marketing Financials. Chapter 1 Profit and Loss Fundamentals. Chapter 2 Profit and Loss Component Details. Chapter 3 Managing the P&L. Chapter 4 Measuring Marketing Effectiveness.
Building an Effective Roadmap
Building an Effective Roadmap Jason Tanner Senior Consultant, Enthiosys Motivated from Within Thank you to our sponsors 2 Agenda What is an effective roadmap? What are roadmap benefits? Why do roadmaps
Cloud. Pure and simple.
IBM Competitive Project Office Cloud. Pure and simple. Summary and Action We showed you how PureApplication is the solid cloud application platform of choice It has Patterns of Expertise for easy topology
Data Centre Infrastructure Assessment
Data Centre Infrastructure Assessment Prepared for: ACME INC SAMPLE REPORT Attention: Mr DC Manager This report represents a generic sample data centre audit for a generic customer by Focus Group Technologies.
Georgia Tech Aerospace Server French building Server Room. Server Room Policy Handbook: Scope, Processes and Procedure
Georgia Tech Aerospace Server French building Server Room Server Room Policy Handbook: Scope, Processes and Procedure Version History Version/Status Release Date Comments 1.1/Draft 1.2 1.3 1.4 1.5 1.6
14-Dec-15. Number Amount Number Amount Number Amount Number Amount Number Amount
14-Dec-15 and Number of Qualifying Children, 2013 Returns with no Returns with one Returns with two Returns with three or Size of AGI qualifying children qualifying child qualifying children more qualifying
Employers Compliance with the Health Insurance Act Annual Report 2015
Employers Compliance with the Health Insurance Act Annual Report 2015 ea Health Council Health Council: Employers Compliance with the Health Insurance Act 1970 Annual Report 2015 Contact us: If you would
SYSTRUST CERTIFICATION REPORT FOR COLLOCATION AND DATA CENTER HOSTING SERVICES FOR THE PERIOD FROM JANUARY 1, 2013 TO DECEMBER 31, 2013
SYSTRUST CERTIFICATION REPORT FOR COLLOCATION AND DATA CENTER HOSTING SERVICES FOR THE PERIOD FROM JANUARY 1, 2013 TO DECEMBER 31, 2013 TABLE OF CONTENTS SECTION I: INDEPENDENT PRACTITIONERS TRUST SERVICES
Data Center Build vs. Buy
2014 Data Center Build vs. Buy More information available on our website: /page/whitepapers Data Center Build vs. Buy 2014 When considering colocating your data center, first you must understand your technical
City & County of San Francisco Permit & Project Tracking System
City & County of San Francisco Permit & Project Tracking System PPTS Sneak Preview March 20, 2013 Welcome & Opening Statements AGENDA 1. Opening Statements Department Directors 2. Project Background 3.
Ocean Class AGOR Program Acquisition Status. Prepared by PEO Ships, PMS325Q For UNOLS Annual meeting 13 October 2009
Program Acquisition Status Prepared by PEO Ships, PMS325Q For UNOLS Annual meeting 13 October 2009 Agenda History/Status of Acquisition Efforts History of Specification Development Acquisition Schedule
DATA CENTRE DATA CENTRE MAY 2015
DATA CENTRE DATA CENTRE MAY 2015 CONCERTHOUSE MUSIC Concerthouse Music Data Centre services are located in the Equinix Internet Business Exchange (IBX ) Centre at Mascot. This IBX offers the highest level
ENERGY STAR for Data Centers
ENERGY STAR for Data Centers Alexandra Sullivan US EPA, ENERGY STAR February 4, 2010 Agenda ENERGY STAR Buildings Overview Energy Performance Ratings Portfolio Manager Data Center Initiative Objective
CITY UNIVERSITY OF HONG KONG Physical Access Security Standard
CITY UNIVERSITY OF HONG KONG (Approved by the Information Strategy and Governance Committee in December 2013) PUBLIC Date of Issue: 2013-12-24 Document Control Document Owner Classification Publication
Data Center Relocation Proposal
Data Center Relocation Proposal Mike Salmans United Telephone Association, Inc. 1107 McArtor Road Dodge City, KS 67801 February 16, 2006 Who we are The Computer Cure consists of four individuals: Jason
Release of the Draft Cybersecurity Procurement Language for Energy Delivery Systems
Release of the Draft Cybersecurity Procurement Language for Energy Delivery Systems Energy Sector Control Systems Working Group Supporting the Electricity Sector Coordinating Council, Oil & Natural Gas
Accident & Emergency Department Clinical Quality Indicators
Overview This dashboard presents our performance in the new A&E clinical quality indicators. These 8 indicators will allow you to see the quality of care being delivered by our A&E department, and reflect
How to Modernize Your School s Bells, Overhead Paging, and Mass Notification in Times of Austerity. August 25, 2011
How to Modernize Your School s Bells, Overhead Paging, and Mass Notification in Times of Austerity August 25, 2011 How to Modernize Your School s Bells, Overhead Paging, and Mass Notification in Times
DISASTER RECOVERY AND BUSINESS CONTINUITY
DISASTER RECOVERY AND BUSINESS CONTINUITY ISO 9001/27001 PARTNER ONLY NODE4 LIMITED 03/01/2014 DISASTER RECOVERY PLAN This plan will be held at Node4 s premises located at Pride Park in Derby and also
** PROPRIETARY ** SAMPLE COUNTY DATA CENTER PROJECT BUDGET ** PROPRIETARY **
1.0 SECTION I - DESIGN AND ENGINEERING FEES 1.0.1 Project Management and Administration Costs $25,000 1.0.2 Architectural and Space Planning 1.0.2.1 Design Development 1.0.2.1.1 Lead Architect 500 $130.0
Datacentre South Gyle 1 Data sheet
Datacentre South Gyle 1 Data sheet Data sheet Datacentre South Gyle 1 Find us South Gyle Datacentre With 10 datacentres, over 4,500 racks and a 10Gb resilient core network between our datacentre locations,
RESTRICTION ON DISCLOSURE AND USE OF DATA
RESTRICTION ON DISCLOSURE AND USE OF DATA This document includes data that shall not be disclosed outside the Government and shall not be duplicated, used, or disclosed in whole or in part for any purpose
Datacenter Assessment
The Netmagic team has compiled this Checklist to help you evaluate, compare and select datacenter facilities to meet your hosting, business continuity and disaster recovery needs. Based on industry best
Top 12 Questions to Consider When Choosing UPS Systems for Network/Server Applications
W H I T E P A P E R Top 12 Questions to Consider When Choosing UPS Systems for Network/Server Applications Executive Summary One of the fundamental decisions in the design of data centers, server rooms
Bb Upgrade Timeline. Oct Nov Dec Jan 2011 Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan 2012. PDFmyURL.com
Bb Upgrade Timeline Oct Nov Dec Jan 2011 Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan 2012 Technology Create a training plan for Bb early adopters and mentors Conduct Transitioning to Bb 9.1 training
Datacentre South London Data sheet
Datacentre South London Data sheet Data sheet Datacentre South London Find us With 10 datacentres, over 4,500 racks and a 10Gb resilient core network between our datacentre locations, Pulsant has the infrastructure
LEVEL 3 DATA CENTER ASSESSMENT
Nationwide Services Corporate Headquarters 410 Forest Street Marlborough, MA 01752 USA Tel: 800-342-5332 Fax: 508-303-0579 www.eecnet.com LEVEL 3 DATA CENTER ASSESSMENT Submitted by: Electronic Environments
Menu Case Study 3: Medication Administration Record
Menu Case Study 3: Medication Administration Record Applicant Organization: Ontario Shores Centre for Mental Health Sciences Organization s Address: 700 Gordon Street, Whitby, Ontario, Canada, L1N5S9 Submitter
RBC Insurance Fetes Online Auto/Home Insurance Growth
Case Studies, K. Harris Research Note 29 October 2002 RBC Insurance Fetes Online Auto/Home Insurance Growth RBC Insurance's e-business successes are generating greater than $3 million in premiums per month.
Alexandria Overview. Sept 4, 2015
Alexandria Overview Sept 4, 2015 Alexandria 1U System Block Diagram SAS Interface Board Zoneboard Zoneboard I2C UART SAS to SATA I2C 12V AC Power Supply Power 60w Supply Seagate Confidential Alexandria
Case study; A sustainable Green Data Centre, fact or fiction?
Case study; A sustainable Green Data Centre, fact or fiction? Brian O Hora, BSc MBA MPM Networks & Infrastructure Manager Information Systems Services, Trinity College Dublin 200 Pearse Street Single UPS,
DATA CENTRE DATA CENTRE
DATA CENTRE DATA CENTRE v. OCT 2014 DJ CENTRAL DJ Central Data Centre services are located in the Equinix Internet Business Exchange (IBX ) Centre at Mascot. This IBX offers the highest level of service
QuickSpecs. HP Modular Power Distribution Units (Zero-U/1U Modular PDUs) Overview
Overview HP Modular PDUs have a unique modular architecture designed specifically for data center customers who want to maximize power distribution and space efficiencies in the rack. Modular PDUs consist
san francisco//usa data center specifications tel: +61 2 9948 8888 fax: +61 2 9948 1111 internet + intellectual property + intelligence
internet + intellectual property + intelligence We thank you for the opportunity to work with you regarding your colocation needs in San Francisco, USA. We can colocate standard rack-mountable servers
415V DISTRIBUTION FOR GREEN DATA CENTERS
White Paper: HMRP-WP001-A1 October 1, 2010 415V DISTRIBUTION FOR GREEN DATA CENTERS Prepared by: Anthony (Tony) Hoevenaars, P. Eng President and CEO Mirus International Inc. Copyright 2005 Mirus International
CEI Document Management in S/4 Initial Call
CEI Document Management in S/4 Initial Call, SAP Labs India Dec 2015 Disclaimer The information in this document is confidential and proprietary to SAP and may not be disclosed without the permission of
Detailed guidance for employers
April 2015 3 Detailed guidance for employers Appendix A: Pay reference periods This document accompanies: Detailed guidance no. 3 Assessing the workforce Pay reference period calendars where the definition
HKEx Hosting Services Information Briefing Session
HKEx Hosting Services Information Briefing Session Jonathan Leung Vice President and Head of Hosting Services Andy Lee Senior Manager, Hosting Services Market Development Division March/April 2012 1 HKEx
7 Best Practices for Increasing Efficiency, Availability and Capacity. XXXX XXXXXXXX Liebert North America
7 Best Practices for Increasing Efficiency, Availability and Capacity XXXX XXXXXXXX Liebert North America Emerson Network Power: The global leader in enabling Business-Critical Continuity Automatic Transfer
Oxfam GB Digital Case Study - email
Oxfam GB Digital Case Study - email Friday 19 th July Lizzie Williams Email Marketing Manager Holly Bolter Senior Analyst Mark Lumby Selections & Analysis Manager Emergencies Get Together Campaigns Regular