1 Packet page 30 of 191 Capital Maintenance Projects

2 A sound facilities maintenance plan helps to ensure that school facilities are, and will be, cared for appropriately. Negligent facilities maintenance planning can result in real problems. Large capital investments can be squandered when buildings and equipment deteriorate or warranties are invalidated. Failure to maintain school facilities adequately also discourages future investment in public education system. School House in the Red, American Association of School Administrators Packet page 31 of 191

3 Building and Grounds Maintenance Policy Maintenance and operation of the entire District plant composed of all the land and buildings used for District purposes. Packet page 32 of 191

4 Packet page 33 of 191 Types of Maintenance Normal and Routine Maintenance which includes Infrastructure and Preventative Maintenance that is performed by the District s Maintenance, Grounds and Custodial Staff Non-Major Improvements/Remodeling which includes Educational Maintenance that is funded as a part of the district operational budget or individual school budgets. Usually performed by District Maintenance staff or outside contractors. Capital Maintenance which includes projects related to the replacement of the major building components such as roofs, parking lots, carpet, etc. Deferred Maintenance projects are Capital Maintenance project that have been delayed due to funding inadequacies. Cleaning Maintenance is an activity performed by the Custodial Staff related to keeping the building clean and sanitary.

5 Capital Maintenance Projects Background and Criteria Capital maintenance projects Considered substantive maintenance or facilities/operations related equipment updates or replacements Generally consist of system, component or replacement or upgrade versus repair Typically have a minimum estimated project cost of $2,500 (smaller projects are funded through the Facilities Services operational budget) Packet page 34 of 191

6 Capital Maintenance Projects Background and Criteria Capital maintenance projects have been funded through a combination of sources that include: Annual capital maintenance budget in the General Fund Capital Projects (41) Fund (established at the 1993 Annual Meeting) tax levy and fund balance Lease/purchase financing Long-term debt (i.e. Park Elementary HVAC project or included as part of a building project) Packet page 35 of 191

7 Capital Maintenance Projects Background and Criteria Capital maintenance projects are classified into six different categories: Mechanical Systems (i.e. boilers, plumbing) Structural Systems (i.e. roofs, bldg envelope) Architectural / Interior (i.e. flooring, cabinetry) Safety and Security (i.e. assess control) Site Improvements (i.e. asphalt replacement) Operations and Grounds (i.e. field restoration) Other (i.e. large equipment or vehicle replacement) Packet page 36 of 191

8 Capital Maintenance Projects Background and Criteria Capital maintenance projects are prioritized taking into account factors such as: Age and condition of system/component Safety Criticalness of system/component State/Federal requirements (such as ADA) Necessity to accommodate program or enrollment Potential energy savings or operational cost avoidance Available funding Packet page 37 of 191

9 Building DATA Building Name Year Built Additions/ Square Feet of Acres per site Age Major Renovations Building space Elm Lawn Elementary Northside Elementary years years 1988, ,766 SF 10.4 Acres 2001, 2006, ,038 SF 12.4 Acres Park , ,021 SF 17.7 Acres Elementary 47 years 1978, 2003 Sauk Trail , ,846 SF 10.8 Acres Elementary 59 years 1969, 1990, 2006 Sunset Ridge ,600 SF 22 Acres Elementary 16 years West Middleton , 1978, 1990, 61,435 SF 15 Acres Elementary 45 years 2006 Packet page 38 of 191

10 Building DATA Building Name Year Built Additions/ Square Feet of Acres per site AGE Major Renovations Building space Glacier Creek ,000 SF 27 Acres Middle School 16 years Kromrey , ,000 SF 13 Acres Middle School 50 years 1990 Middleton , 1967, ,975 SF 48 Acres High School 63 years 1990, 1995, 2003 Middleton Indoor Pool years 2006 Included in MHS MASH years DAC years 17,000 SF 5 Acres 1951, 1988, ,000 SF 2 Acres Packet page 39 of 191

11 Building DATA Building Name Year Built Additions/ Square Feet of Acres per site AGE Major Renovations Building space DOC years ,000 SF 1 Acre Transportation ,543 SF 9.5 Acres Center 3 years Bus storage building not included DISTRICT TOTALS: 13 Buildings 1,114,224 Square Feet 195 Acres Packet page 40 of 191

12 Completed Capital Maintenance Projects Packet page 41 of 191

13 Packet page 42 of 191 Sauk Trail Elementary Water Heater Replacement

14 Packet page 43 of 191 Middleton High Chimney renovation with partial removal

15 Park/Sauk Trail Elementary Cabinet, countertop, sink and floor replacement Packet page 44 of 191

16 Packet page 45 of 191 Park and Northside Elementary Asphalt replacement / Drop off addition

17 Proposed Capital Maintenance Projects Packet page 46 of 191

18 Proposed Capital Maintenance Projects for Location Estimated Cost MECHANICAL Digital Control upgrade for the heating, ventilation, cooling system. Allowance MHS $200,000 Honeywell Digital Controller upgrade EL,ST $7,000 Generator Emissions compliance upgrade MHS $50,000 Air conditioning systems addition for Elementary computer labs EL,NS,P,WM $36,000 Re-Heat coil addition in room 324 and 333 currently no heating coil EL $9,500 Water heater replacement to a tank-less type DAC $4000 STRUCTURAL Metal Fascia Panel replacement and repair. Allowance MHS $50,000 Roof design services for Northside roofing project NS $10,000 Packet page 47 of 191

19 Proposed Capital Maintenance Projects for Continued Location Estimated Cost ARCHITECTURAL Carpet replacement Library WM $17,000 Flooring and countertop/sink replacement north classrooms ST $48,000 Replacement of exterior doors #3,#4,#9 DAC $21,000 Replacement of exterior doors #4, #5 SR $17,000 Window replacement materials DAC $38,000 Gym floor repair WM $7,500 Multi-station sink replacement art room EL $5,500 Flooring replacement DAC $40,000 Room signage replacement EL/P $4,500 Flooring replacement SR $25,000 Flooring removal and replacement room 1013 MHS $6,000 Packet page 48 of 191

20 Proposed Capital Maintenance Projects for Continued Location Estimated Cost SAFETY AND SECURITY Camera and Access Controls allowance District $200,000 Site safety measures secure 2 nd office exit, classroom lock replacement District $27,500 SITE IMPROVEMENT Asphalt path to evacuation site WM $15,000 Concrete replacement as needed allowance District $15,000 Playground surfacing replacement per plan allowance District $11,500 Asphalt replacement design services for MHS-PAC asphalt project MHS $10,000 TOTAL $875,000 Packet page 49 of 191

21 Packet page 50 of 191 MHS Direct Digital Controls HVAC

22 Packet page 51 of 191 MHS Generator Emissions Compliance Upgrade

23 Packet page 52 of 191 MHS Metal Fascia Panel Replacement

24 Packet page 53 of 191 West Middleton Carpet Replacement

25 Packet page 54 of 191 Sauk Trail Carpet and Countertop/Sink Replacement

26 Packet page 55 of 191 Sunset Ridge/DAC Exterior Door Replacement

27 Packet page 56 of 191 West Middleton Gym Floor Repair

28 Packet page 57 of 191 DAC Flooring Replacement

29 Packet page 58 of 191 Sunset Ridge Flooring Replacement

30 Packet page 59 of 191 West Middleton Path to evacuation site

31 Packet page 60 of 191 District Playground surfacing/concrete replacement

32 Capital Maintenance Projects Proposed Funding Plan Capital Projects (Fund 41) Levy 1 $875,000 TOTAL $875,000 1 $25,000 increase from (plan is to increase the Capital Maintenance Budget annually by $25,000 to $50,000 to a target budget of $1.2 to $1.3 million) Packet page 61 of 191

PLUMMER ELEMENTARY SCHOOL

PLUMMER ELEMENTARY SCHOOL INITIAL YEAR BUILT 1959 BUILDING AREA 69,400 SF CURRENT PROGRAM CAPACITY 481 ENROLLMENT 2008 228 WARD 7 PROPOSED PROGRAM CAPACITY 325 Site Plan PLUMMER - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION

More information

DRAPER ELEMENTARY SCHOOL

DRAPER ELEMENTARY SCHOOL INITIAL YEAR BUILT 1953 BUILDING AREA 54,000 SF CURRENT PROGRAM CAPACITY 250 ENROLLMENT 2008 84 WARD 8 PROPOSED PROGRAM CAPACITY 325 Site Plan DRAPER - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION PK-5

More information

Lindsay Thurber Comprehensive High School Red Deer School District No. 104 School Facilities Evaluation Project Page 1

Lindsay Thurber Comprehensive High School Red Deer School District No. 104 School Facilities Evaluation Project Page 1 School Facilities Evaluation Project Page 1 Executive Summary In November 1999, Alberta Infrastructure, School Facilities Branch engaged Stephens Kozak Carr and Brown Architects to conduct evaluations

More information

MURCH ELEMENTARY SCHOOL

MURCH ELEMENTARY SCHOOL INITIAL YEAR BUILT 1929 BUILDING AREA 47,700 SF CURRENT PROGRAM CAPACITY 479 ENROLLMENT 2008 491 WARD 3 PROPOSED PROGRAM CAPACITY 500 Site Plan MURCH - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION PK-5

More information

CALLOWAY COUNTY SCHOOLS DISTRICT FACILITIES PLAN

CALLOWAY COUNTY SCHOOLS DISTRICT FACILITIES PLAN DISTRICT "SHELL" SUBMISSION DATE: 4/17/13 (delete following Hearing) KDE "SHELL" RESUBMISSION DATE: 4/19/13 (delete following Hearing) KBE APPROVAL DATE: JUNE 2013 CALLOWAY COUNTY SCHOOLS DISTRICT FACILITIES

More information

Mequon - Thiensville School District Long Range Facilities Plan Monthly Project Schedule

Mequon - Thiensville School District Long Range Facilities Plan Monthly Project Schedule Mequon - Thiensville School District Long Range Facilities Plan Monthly Project Schedule Homestead HS Sept.'15 Oct'15 Nov'15 Dec'15 Jan'16 Feb'16 Repair Asphalt @ Main Garage Replace Exterior Hollow Metal

More information

Estimated Cost of Repair

Estimated Cost of Repair 1 Applicant: Property: Home: Business: Assessor: Applicant Number: Type of Loss: Hurricane Date Contacted: 1/18/2014 Date of Loss: 10/29/2012 Date Received: 1/14/2014 Date Inspected: 2/4/2014 Date Entered:

More information

Hamilton-Wentworth Catholic District School Board Event Listing By Ascending Event Year

Hamilton-Wentworth Catholic District School Board Event Listing By Ascending Event Year Hamilton-Wentworth Catholic District School Board Event Listing By Ascending Event Year Printed On: 2003/04/03 St Patrick CES, 7932 Study [03.3-050 Plumbing Piping Systems] Study condition, remaining service

More information

ORANGE UNIFIED SCHOOL DISTRICT SCHOOL FACILITIES MASTER PLAN NEEDS ASSESSMENT

ORANGE UNIFIED SCHOOL DISTRICT SCHOOL FACILITIES MASTER PLAN NEEDS ASSESSMENT 1. SAFETY, HEALTH, CODE 1.1 Structural Requirements, Seismic Stability 1.1.1 Primary Structure 1.1.2 Ceilings 1.1.3 Cabinets, Equipment 1.1.4 Portables 1.2 Fire / Life Safety 1.2.1 Corridor, Separation

More information

Project Management Division

Project Management Division CAPITAL PROJECTS DEPARTMENT MONTHLY ACTIVITY REPORT February 2015 Project Management Division BELOW: Collins Construction crews complete recent exterior work and await delivery of exterior siding. Collins

More information

Print Shop/Mail Room

Print Shop/Mail Room Chapter XVIII Print Shop/Mail Room Page 110 CHAPTER XVIII Print Shop/Mail Room ARCHITECTURAL/STRUCTURAL A. BUILDING EXTERIOR 1.0 EXTERIOR WALLS The exterior walls are comprised of stone veneer. There were

More information

DAVIESS COUNTY SCHOOLS DISTRICT FACILITIES PLAN

DAVIESS COUNTY SCHOOLS DISTRICT FACILITIES PLAN DISTRICT "SHELL" SUBMISSION DATE: 11/13/12 questions 11/26/12 (delete following Hearing) KDE "SHELL" RESUBMISSION DATE: 11/19/12 revised 11/26/12 (delete following Hearing) KBE APPROVAL DATE: FEBRUARY

More information

BUNKER HILL ELEMENTARY SCHOOL

BUNKER HILL ELEMENTARY SCHOOL INITIAL YEAR BUILT 1970 BUILDING AREA 98,200 SF CURRENT PROGRAM CAPACITY 332 ENROLLMENT 2008 387 WARD 5 PROPOSED PROGRAM CAPACITY 750 Site Plan BUNKER HILL - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION

More information

Cherokee Trail High School 25901 East Arapahoe Road Aurora, Colorado 80016

Cherokee Trail High School 25901 East Arapahoe Road Aurora, Colorado 80016 Cherokee Trail High School 25901 East Arapahoe Road Aurora, Colorado 80016 Year Opened 2003 Current Square Footage 391,000 Site Acreage 86.22 cherokeetrail.cherrycreekschools.org $279,200 Asphalt and concrete

More information

1. Maintenance. Mechanical, Electrical & Plumbing Improve ligh>ng control an sensoring $230,239

1. Maintenance. Mechanical, Electrical & Plumbing Improve ligh>ng control an sensoring $230,239 1. Maintenance Building Component Detail Est. Cost. Alkali Building Envelope Replace windows $40,425 Replace worn and rippling carpet $81,335 Improve ligh>ng control an sensoring $230,239 Repair and replace

More information

PROPERTY INSPECTION OR ASSESSMENT OF DAMAGES

PROPERTY INSPECTION OR ASSESSMENT OF DAMAGES PROPERTY INSPECTION OR ASSESSMENT OF DAMAGES ADDRESS: 123 MAIN ST MIAMI, FL CLIENT: BUYER ID No: 2014193 DATE: 5/13/2014 INSPECTION OR ASSESSMENT BY: GAIA CONSTRUCTION INC. CGC 1516136 FLORIDA HI-2792

More information

SODA SPRINGS JOINT SCHOOL DISTRICT NO. 150 RECOMMENDED REPAIRS, REPLACEMENT, AND ADDITIONS OPINIONS OF PROBABLE COST

SODA SPRINGS JOINT SCHOOL DISTRICT NO. 150 RECOMMENDED REPAIRS, REPLACEMENT, AND ADDITIONS OPINIONS OF PROBABLE COST SODA SPRINGS JOINT SCHOOL DISTRICT NO. 150 RECOMMENDED REPAIRS, REPLACEMENT, AND ADDITIONS OPINIONS OF PROBABLE COST SODA SPRINGS HIGH SCHOOL REPAIRS AND UPGRADES SITE Construction Estimate = $100,000

More information

17,280 square feet Overview:

17,280 square feet Overview: CENTRAL OFFICE Located at 167 Boston Post Road, East Lyme, Connecticut, the Central Office was built in 1916 as the original Flanders Elementary School and remains connected to the current school. The

More information

Five-Year Capital Plan Request FY 2015-16 through FY 2019-20

Five-Year Capital Plan Request FY 2015-16 through FY 2019-20 Section Contents Five-Year Capital Plan Request FY 2015-16 through FY 2019-20 Project Funding Type Total ($ 000s) Critical Maintenance for Community Colleges bonded $417,500 Health and Safety bonded $91,088

More information

LONG RANGE CAPITAL REPLACEMENT SCHEDULE ANNUAL CAPITAL EXPENDITURES

LONG RANGE CAPITAL REPLACEMENT SCHEDULE ANNUAL CAPITAL EXPENDITURES 7 LONG RANGE CAPITAL REPLACEMENT SCHEDULE ANNUAL CAPITAL EXPENDITURES T he Park District has certain assets that require ongoing and yearly repairs and improvements. These items are essential to the recreational

More information

Springfield Township Board of Education March 10, 2015 Referendum Questions and Answers (updated 2/19/2015)

Springfield Township Board of Education March 10, 2015 Referendum Questions and Answers (updated 2/19/2015) Springfield Township Board of Education March 10, 2015 Referendum Questions and Answers (updated 2/19/2015) What is a referendum? New Jersey school districts hold public referendum votes to seek approval

More information

FACILITIES PLANT OPERATIONS SERVICES

FACILITIES PLANT OPERATIONS SERVICES FACILITIES PLANT OPERATIONS SERVICES Plant Operations consists of five areas of responsibility: Grounds, Utilities, Building Services, Trades and Automotive each managed by an Assistant Director, except

More information

Repair Project for April 7, 2009

Repair Project for April 7, 2009 Repair Project for April 7, 2009 Scope of the Project HVAC Upgrades Roof Replacement Window Replacement/Exterior Openings Science Lab Renovations New Fire Alarm/Electrical AAB (accessibility) Upgrades

More information

November 3, 2015 Bond and District Additional Assistance Election Information

November 3, 2015 Bond and District Additional Assistance Election Information November 3, 2015 Bond and District Additional Assistance Election Information Proposition 432 - $22 million General Obligation Bond 150+ facility projects across all schools Building renovations and improvements

More information

E X I S T I N G F A C I L I T I E S

E X I S T I N G F A C I L I T I E S Los Angeles Unified School District Facilities Services Division E X I S T I N G F A C I L I T I E S 68 TH STREET ELEMENTARY SCHOOL FOOD FACILITIES BUILDING Monthly Program Status Report August 2011 Prepared

More information

School Board Proposed Capital Improvements Program. Fiscal Years 2014-2023

School Board Proposed Capital Improvements Program. Fiscal Years 2014-2023 School Board Proposed Capital Improvements Program Fiscal Years 2014-2023 TABLE OF CONTENTS Summary Page 1 Capital Projects Pages 2-6 Capital Projects Description Pages 7-14 SCHOOL BOARD PROPOSED CAPITAL

More information

Facilities Operations Customer Service Standards WORK ORDER PRIORITIES

Facilities Operations Customer Service Standards WORK ORDER PRIORITIES Facilities Operations Customer Service Standards WORK ORDER PRIORITIES In order to provide fair and consistent maintenance service to all University faculty, staff and students, a work priority system

More information

HAMILTON SCHOOL. 1401 Brentwood Parkway, N.E., Washington, DC INITIAL YEAR BUILT 1968 BUILDING AREA

HAMILTON SCHOOL. 1401 Brentwood Parkway, N.E., Washington, DC INITIAL YEAR BUILT 1968 BUILDING AREA INITIAL YEAR BUILT 1968 BUILDING AREA 187,700 SF CURRENT PROGRAM CAPACITY N/A ENROLLMENT 2008 129 WARD 5 PROPOSED PROGRAM CAPACITY N/A Site Plan HAMILTON - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION

More information

The University of Akron Main Campus Biennium 1 July 2016- June 2018. Priority Project Budget Description 1 Electrical Infrastructure Loop

The University of Akron Main Campus Biennium 1 July 2016- June 2018. Priority Project Budget Description 1 Electrical Infrastructure Loop The University of Akron Main Campus Biennium 1 July 2016- June 2018 1 Electrical Infrastructure Loop $2,400,000 Scope: Replace center campus deteriorated 4,160 volt cable and duct bank with 23,000 volt

More information

HOUSTON ELEMENTARY SCHOOL

HOUSTON ELEMENTARY SCHOOL INITIAL YEAR BUILT 1962 BUILDING AREA 59,900 SF CURRENT PROGRAM CAPACITY 507 ENROLLMENT 2008 291 WARD 7 PROPOSED PROGRAM CAPACITY 325 Site Plan HOUSTON - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION

More information

MEASURE G-2010 EXHIBIT B FULL TEXT BALLOT PROPOSITION OF THE SAN JOSE EVERGREEN COMMUNITY COLLEGE DISTRICT BOND MEASURE ELECTION NOVEMBER 2, 2010

MEASURE G-2010 EXHIBIT B FULL TEXT BALLOT PROPOSITION OF THE SAN JOSE EVERGREEN COMMUNITY COLLEGE DISTRICT BOND MEASURE ELECTION NOVEMBER 2, 2010 MEASURE G-2010 EXHIBIT B FULL TEXT BALLOT PROPOSITION OF THE SAN JOSE EVERGREEN COMMUNITY COLLEGE DISTRICT BOND MEASURE ELECTION NOVEMBER 2, 2010 To better prepare San Jose City College/ Evergreen Valley

More information

School Facilities Referendum Recommendations

School Facilities Referendum Recommendations Haddonfield Public School District LONG RANGE PLANNING COMMITTEE School Facilities Referendum Recommendations NOVEMBER 19, 2015 School Facilities Referendum Recommendations Tonight s goals Presentation

More information

CAPITAL EXPENDITURES

CAPITAL EXPENDITURES CAPITAL EXPENDITURES 1 CAPITAL EXPENDITURES CAPITAL EXPENDITURES PLANNING On March 1, 2010 the AmherstPelham Regional School committee adopted a policy for developing a formal capital needs planning process.

More information

Number Northern Arizona University Facility Services Section Page. Effective April 1, 2011

Number Northern Arizona University Facility Services Section Page. Effective April 1, 2011 Facility Services Section Page Recharge Services, Maintenance and Construction PURPOSE 1 of 6 The purpose of this policy is to set forth standards for chargeable services for maintenance and construction

More information

APPENDIX E: CAPITAL NEEDS SUMMARY

APPENDIX E: CAPITAL NEEDS SUMMARY APPENDIX E: CAPITAL NEEDS SUMMARY Building A Foundation Hall Building to be replaced ARCHITECTURAL Roof Repair North Structural Wall Repair Flooring Repairs Ceiling Repairs Lighting Repairs Lighting Repairs

More information

PATTERSON ELEMENTARY SCHOOL

PATTERSON ELEMENTARY SCHOOL INITIAL YEAR BUILT 1945 BUILDING AREA 78,300 SF CURRENT PROGRAM CAPACITY 368 ENROLLMENT 2008 463 WARD 8 PROPOSED PROGRAM CAPACITY 500 Site Plan PATTERSON - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION

More information

Cherry Creek School District Update - 2012 Bond Projects

Cherry Creek School District Update - 2012 Bond Projects Cherry Creek School District Update - 2012 Bond Projects Summer Projects, 2013 September 9, 2013 School Locations Where Projects Have Been Completed Summer, 2013 Elementary Schools: Cimarron Creekside

More information

Items in red were complete 2-22-10. Items in green were complete on 8-2-11. Lined out items are Life Safety Codes.

Items in red were complete 2-22-10. Items in green were complete on 8-2-11. Lined out items are Life Safety Codes. Office of Safe and Orderly Schools Facility Safety Assessment Dennis Meador, School Facilities Supervisor Mark Hobson, School Facilities Supervisor Division of School Building September 18 19, 2007 Items

More information

Bond Referendum Presentation. Dr. Ralph P. Ferrie, Superintendent of Schools May 12, 2014

Bond Referendum Presentation. Dr. Ralph P. Ferrie, Superintendent of Schools May 12, 2014 Bond Referendum Presentation Dr. Ralph P. Ferrie, Superintendent of Schools May 12, 2014 Mr. David Fowler President Floral Park- Bellerose Mr. David Del Santo Vice-President New Hyde Park Garden City Park

More information

COMPREHENSIVE PROPERTY INSPECTIONS

COMPREHENSIVE PROPERTY INSPECTIONS COMPREHENSIVE PROPERTY INSPECTIONS Thank you for selecting CPI for your Deficiency Observation. A full home inspection was not performed on this property at the buyers request. This inspection is a limited

More information

Chicago Public Schools

Chicago Public Schools Ames Middle School 1920 N Hamlin Ave 1997 Completed The scope of this project is to construct a new school $16,913,379 2014 Construction The intent of this project is to expand existing Ames middle school

More information

AGENDA. BUILDING AND GROUNDS COMMITTEE MEETING April 21, 2015 6:30 PM School Board Room

AGENDA. BUILDING AND GROUNDS COMMITTEE MEETING April 21, 2015 6:30 PM School Board Room AGENDA BUILDING AND GROUNDS COMMITTEE MEETING April 21, 2015 6:30 PM School Board Room 1. Call to order at 6:30 p.m. 2. Review of Three Year Life Safety Recommendations from EGM Architects 3. Review of

More information

Presentation to Senate Select Committee on Government Facilities: Deferred Maintenance for State Supported Living Centers and State Hospitals

Presentation to Senate Select Committee on Government Facilities: Deferred Maintenance for State Supported Living Centers and State Hospitals Presentation to Senate Select Committee on Government Facilities: Deferred Maintenance for State Supported Living Centers and State Hospitals Les Butler Associate Commissioner for Business and Regional

More information

Seattle Public Schools Building Excellence IV Projects Under Construction

Seattle Public Schools Building Excellence IV Projects Under Construction Seattle Public Schools Building Excellence IV Projects Under Construction Project Slide Number Arbor Heights Elementary School 2 Cascadia Elementary School & Robert Eagle Staff Middle School 13 Genesee

More information

Article 11. Window Replacement Project Norman E. Day & Col. John Robinson Elementary Schools

Article 11. Window Replacement Project Norman E. Day & Col. John Robinson Elementary Schools Article 11 Window Replacement Project Norman E. Day & Col. John Robinson Elementary Schools MSBA Accelerated Repair Program Program targets replacement of roofs, windows, doors, and boilers Goal is to

More information

Colorado School Finance Project 1200 Grant Street, Denver, Colorado 80203 303-860-9136 - Fax: 303-832-1086 - @COSFP - cosfp.org

Colorado School Finance Project 1200 Grant Street, Denver, Colorado 80203 303-860-9136 - Fax: 303-832-1086 - @COSFP - cosfp.org Student Count Colorado School Finance Project Override, Sales Tax Dollars Purpose Comments BOND ELECTIONS: Alamosa 2,098 Bond $4,990,000 Constructing, equipping and furnishing an athletic complex on the

More information

Schematic Design Presentation S. Dallas Dance, Superintendent October 22, 2013 OVERLEA HIGH SCHOOL

Schematic Design Presentation S. Dallas Dance, Superintendent October 22, 2013 OVERLEA HIGH SCHOOL Schematic Design Presentation S. Dallas Dance, Superintendent October 22, 2013 0 Overlea High School - Facility Summary Facility Opened: Auditorium Addition: Activity Room Addition: School Rated Capacity

More information

PROPERTY INSPECTION OR ASSESSMENT OF DAMAGES

PROPERTY INSPECTION OR ASSESSMENT OF DAMAGES PROPERTY INSPECTION OR ASSESSMENT OF DAMAGES ADDRESS: Somewhere, FL CLIENT: GAIA GC ID No: 2015000 DATE: 12/31/2015 INSPECTION OR ASSESSMENT BY: GAIA CONSTRUCTION INC. CGC 1516136 FLORIDA HI-2792 FLORIDA

More information

31289 ADOPTED BOARD OF TRUSTEES COMMUNITY COLLEGE DISTRICT NO. 508 JANUARY, 5.00 12, 2012

31289 ADOPTED BOARD OF TRUSTEES COMMUNITY COLLEGE DISTRICT NO. 508 JANUARY, 5.00 12, 2012 31289 ADOPTED BOARD OF TRUSTEES COMMUNITY COLLEGE DISTRICT NO. 508 JANUARY, 5.00 12, 2012 BOARD OF TRUSTEES OF COMMUNITY COLLEGE DISTRICT NO. 508 COUNTY OF COOK AND STATE OF ILLINOIS JOB ORDER CONTRACT

More information

Project Management Division

Project Management Division CAPITAL PROJECTS DEPARTMENT MONTHLY ACTIVITY REPORT August 2015 Project Management Division New Joe Redington Sr. JR/SR High School ($65M): On August 20th, a very impressive and upbeat ribbon-cutting ceremony

More information

Board Seminar Facilities. School Year 2012-2013. Submitted by Joseph L. Lisa-Director of Facilities

Board Seminar Facilities. School Year 2012-2013. Submitted by Joseph L. Lisa-Director of Facilities Board Seminar Facilities School Year 2012-2013 Submitted by Joseph L. Lisa-Director of Facilities High School Installed new fence for Pre-K activities by weight room. Installed new rails and side walks

More information

Newtown and Holland Middle Schools Construction Project Bid Review

Newtown and Holland Middle Schools Construction Project Bid Review Newtown and Holland Middle Schools Construction Project Bid Review *Includes clarifications requested at 30MAR16 FACCOM Meeting (italicized) Facilities Committee Meeting March 30, 2016 (Updated March 31,

More information

Colorado School Finance Project 1200 Grant Street, Denver, Colorado 80203 303-860-9136 - Fax: 303-832-1086 - @COSFP - cosfp.org

Colorado School Finance Project 1200 Grant Street, Denver, Colorado 80203 303-860-9136 - Fax: 303-832-1086 - @COSFP - cosfp.org BOND ELECTIONS: Alamosa Bond $4,990,000 Constructing, equipping and furnishing an athletic complex on the high school site, including locker rooms, an athletic storage building, a team building, track

More information

Western Avenue South Small Business Based on Small Business Improvement Fund (SBIF) Grant Agreements

Western Avenue South Small Business Based on Small Business Improvement Fund (SBIF) Grant Agreements Company Address TIF ID TIF District Herbert Brusso 4131 N Western Western Ave South Ken Sakamoto DDS PC 3939 N Lincoln Western Ave South P Jerome Jakubco 2224 W Irving Park Western Ave South B&G Painting

More information

SECTION XI OPINION OF PROBABLE COST

SECTION XI OPINION OF PROBABLE COST SECTION XI OPINION OF PROBABLE COST OPINION OF PROPABLE COSTS HARBOR ISLAND THE PAVILION 1) Provide a sprinkler system for the entire building. 8000 SF X $15/SF $120,000 2) Remove and replace existing

More information

Policy on Repair and Renovation Funding

Policy on Repair and Renovation Funding Policy on Repair and Renovation Funding I. POLICY STATEMENT Auburn University s (the University s) Policy on Repair and Renovation Funding provides guidance and direction regarding the use of Repair and

More information

Facilities Maintenance Standards rev 9-1-2015

Facilities Maintenance Standards rev 9-1-2015 Facilities Maintenance Standards rev 9-1-2015 Purpose The purpose of these standards is to outline the minimum requirements for maintaining state owned facilities and infrastructures in a manner that will

More information

Saint Cloud Business Center

Saint Cloud Business Center Saint Cloud Business Center 14 7th Avenue North Saint Cloud, MN 56303 For Sale Located on 7th Avenue in the heart of downtown across from the Court House Square. A large professional reception area with

More information

Chignecto-Central Regional School Board. Highland Consolidated Middle School. Indoor Air Quality Issues Mechanical Systems

Chignecto-Central Regional School Board. Highland Consolidated Middle School. Indoor Air Quality Issues Mechanical Systems Chignecto-Central Regional School Board Highland Consolidated Middle School Mechanical Systems Prepared by: Neil Van Rossum, P.Eng. CJ MacLellan & Associates Antigonish, Nova Scotia November 2012 CJM File:

More information

Preventative Maintenance

Preventative Maintenance Preventative Maintenance Safety Committee To have a preventative maintenance plan, you should have a Safety Committee. Designate persons involved with day to day operations and grounds control. Use your

More information

WYTHEVILLE COMMUNITY COLLEGE

WYTHEVILLE COMMUNITY COLLEGE WYTHEVILLE COMMUNITY COLLEGE Director of Facility Planning and Maintenance Position Description: The Director of Facility Maintenance directs, manages, and supervises all aspects of facility planning,

More information

WOODLAND HOMES BUILDING PROCESS A STEP BY STEP CONSTRUCTION GUIDE TO YOUR NEW HOME

WOODLAND HOMES BUILDING PROCESS A STEP BY STEP CONSTRUCTION GUIDE TO YOUR NEW HOME WOODLAND HOMES BUILDING PROCESS A STEP BY STEP CONSTRUCTION GUIDE TO YOUR NEW HOME 1 THE BUILDING PROCESS The focus of Woodland Homes building department is Quality, Service and Predictability. Through

More information

Portland s Financial District. Overview FOR SALE RETAIL/OFFICE BUILDING 6-8 CITY CENTER, PORTLAND, MAINE

Portland s Financial District. Overview FOR SALE RETAIL/OFFICE BUILDING 6-8 CITY CENTER, PORTLAND, MAINE FOR SALE RETAIL/OFFICE BUILDING Portland s Financial District Overview 6-8 City Center is a well know 4-story retail and office building with a mix of granite and brick architecture and interesting interior

More information

WILLIAM LYON HOMES - ARIZONA 3-YEAR WARRANTY & SERVICE PROGRAM

WILLIAM LYON HOMES - ARIZONA 3-YEAR WARRANTY & SERVICE PROGRAM WILLIAM LYON HOMES - ARIZONA 3-YEAR WARRANTY & SERVICE PROGRAM WARRANTY yr SERVICE PEACE OF MIND UNCOMPROMISING SERVICE DEPENDABILITY DOING OUR PART 30-DAY CARE VISIT A month after your closing date we

More information

STATE BOARD OF COMMUNITY COLLEGES Construction and Property June 23, 2016

STATE BOARD OF COMMUNITY COLLEGES Construction and Property June 23, 2016 STATE BOARD OF COMMUNITY COLLEGES Construction and Property June 23, 2016 1. Project Approval New A. Guilford Technical Community College Project No. 2187 Underpass and Connector Roads Life Safety Main

More information

Services outsourced in 2013 to a third-party firm (not including parts, equipment purchased). Type of Service

Services outsourced in 2013 to a third-party firm (not including parts, equipment purchased). Type of Service Outsourcing Services outsourced in 2013 to a third-party firm (not including parts, equipment purchased). Type of Service Abandoned Vehicle Auction Auctioneer Accounts Payable Services Actuarial Services

More information

How to Analyze and Communicate Preventive Maintenance Address Now or Pay Later

How to Analyze and Communicate Preventive Maintenance Address Now or Pay Later How to ANALYZE AND COMMUNICATE PREVENTIVE MAINTENANCE - ADDRESS NOW - OR PAY LATER Tuesday, February 22, 2012, 10:15 a.m. 11:30 a.m. John Poytress Moderator Clovis USD Doug Halverson Presented by Clovis

More information

THIS ADDENDUM MUST BE ACKNOWLEDGED. THIS ADDENDUM SHALL BECOME A PART OF THIS SOLICITATION. Amend Invitation to Bid 14-MC-2194 as follows:

THIS ADDENDUM MUST BE ACKNOWLEDGED. THIS ADDENDUM SHALL BECOME A PART OF THIS SOLICITATION. Amend Invitation to Bid 14-MC-2194 as follows: Denver Public Schools Purchasing Department 1617 S. Acoma St. Denver, Colorado 80223 INVITATION TO BID 14-MC-2194 ADDENDUM NUMBER ONE January 24, 2014 THIS ADDENDUM MUST BE ACKNOWLEDGED. THIS ADDENDUM

More information

ORANGE UNIFIED SCHOOL DISTRICT SCHOOL FACILITIES MASTER PLAN NEEDS ASSESSMENT

ORANGE UNIFIED SCHOOL DISTRICT SCHOOL FACILITIES MASTER PLAN NEEDS ASSESSMENT 1. SAFETY, HEALTH, CODE 1.1 Structural Requirements, Seismic Stability 1.1.1 Primary Structure 1.1.2 Ceilings 1.1.2 Water damage in many classrooms. Replace tiles. 1.1.3 Cabinets, Equipment 1.1.4 Portables

More information

Asbestos Procedures. Asbestos Products

Asbestos Procedures. Asbestos Products Asbestos Procedures Asbestos Products Where is asbestos known to be located on The Evergreen State College? Please see Appendix A for a list of known asbestos containing materials located on the Olympia

More information

Your Warranty Guide. ...bringing community to life

Your Warranty Guide. ...bringing community to life Your Warranty Guide...bringing community to life Contents Warranty Coverage...4 Pre-Delivery Inspection...6 30 Day Warranty Request...6 Year-End Warranty Service Request...6 Requesting Emergency Service...6

More information

CONDITION OF QUALITY ITEMS

CONDITION OF QUALITY ITEMS CONDITION OF QUALITY ITEMS FOUNDATION Always look for moisture problems and any bulges or irregularities in the walls. Lines on the walls or floors may indicate water problems. Have these been cured? If

More information

Lincoln Public Schools. 15 Attachments (separately bound) Schematic Design. 15.1 Schematic Design Project Manual

Lincoln Public Schools. 15 Attachments (separately bound) Schematic Design. 15.1 Schematic Design Project Manual 15 Attachments (separately bound) 15.1 Project Manual - Table of Contents - Outline Specifi cations 15.2 Drawings (half size) - Drawing List Section 15.3 15.1 Project Manual Separately bound and being

More information

Building Condition Assessment Report

Building Condition Assessment Report Building Condition Assessment Report Asset C3c - Oak Terrace Cottage 121 Address Riverview Lands, 2601 Lougheed Highway, Coquitlam, BC. V5C 4J2 Construction Year Size (Gross Floor Area) 1920. 2,553 Sq.Ft.

More information

HVAC 95% + Energy Efficient Furnace KC Heating and Air. Derald Smith Plumbing. Mountain Vista Homes Customer Care Department

HVAC 95% + Energy Efficient Furnace KC Heating and Air. Derald Smith Plumbing. Mountain Vista Homes Customer Care Department MANUFACTURER WARRANTY LIST Before contacting a manufacturer, please consult the following list to ensure the item(s) in question correspond(s) with the appropriate manufacturer(s). Once you have determined

More information

FACILITIES MANAGEMENT - MAINTENANCE, REPAIR, AND RENOVATION

FACILITIES MANAGEMENT - MAINTENANCE, REPAIR, AND RENOVATION Page 1 Policy: XIII.B.1 Issued: February 9, 1994 Owner: Chief Facilities Officer Latest Revision: FACILITIES MANAGEMENT - MAINTENANCE, REPAIR, AND RENOVATION 1.0 Purpose 2.0 Policy 2.1 Facilities Maintenance

More information

BUILDING ASSESSMENT QUESTIONNAIRE. B. TENANTS Is there more than one tenant in the building? YES

BUILDING ASSESSMENT QUESTIONNAIRE. B. TENANTS Is there more than one tenant in the building? YES Department of Health and Human Services, Division of Public Health Occupational and Environmental Epidemiology Branch 1912 Mail Service Center, Raleigh, North Carolina 27699-1912 BUILDING ASSESSMENT QUESTIONNAIRE

More information

Town of Sandwich Facilities Department Summary of Building Repairs from Prior 5 7 Years List Updated August 7, 2015

Town of Sandwich Facilities Department Summary of Building Repairs from Prior 5 7 Years List Updated August 7, 2015 Town of Sandwich Facilities Department Summary of Building Repairs from Prior 5 7 Years List Updated August 7, 2015 Town Hall Complete building restoration (state historic preservation award) High efficiency

More information

Table C33. Total fuel oil consumption and expenditures, 2012

Table C33. Total fuel oil consumption and expenditures, 2012 Release date: May 2016 Table C33. fuel oil consumption and, 2012 ) gallons) dollars) Building ( 1,001 to 5,000 204 604 3.0 21 151 522 5,001 to 10,000 74 559 7.6 10 74 253 10,001 to 25,000 67 1,123 16.7

More information

1. Background. 2. Why this is Relevant to the 2014 Bond. 3. Attachments

1. Background. 2. Why this is Relevant to the 2014 Bond. 3. Attachments Issue Paper # 8: Modernization Renovation Projects 1. Background BSD s student population has grown since the last capital bond in 2006 and facilities have experienced normal wear and aging leading to

More information

BUILDING DEPARTMENT 8748 W. 82 nd Place - Justice, IL 60458 Phone: (708) 458-2130 Fax: (708) 458-3207

BUILDING DEPARTMENT 8748 W. 82 nd Place - Justice, IL 60458 Phone: (708) 458-2130 Fax: (708) 458-3207 BUILDING DEPARTMENT 8748 W. 82 nd Place - Justice, IL 60458 Phone: (708) 458-2130 Fax: (708) 458-3207 SELF EVALUATION CHECKLIST FOR RESIDENTIAL AND MULTI-FAMILY DWELLING INSPECTIONS The attached checklist

More information

ALBUQUERQUE PUBLIC SCHOOLS Facility Design & Construction / Maintenance & Operations

ALBUQUERQUE PUBLIC SCHOOLS Facility Design & Construction / Maintenance & Operations ALBUQUERQUE PUBLIC SCHOOLS Facility Design & Construction / Maintenance & Operations MECHANICAL SYSTEMS DESIGN STANDARDS Appendix A RECOMMENDED HVAC SYSTEMS BY TYPE OF SPACE Matt Higgins Valentin Lucero

More information

Designing Schools To Reduce On-Going And Future Maintenance and Repair Costs

Designing Schools To Reduce On-Going And Future Maintenance and Repair Costs Designing Schools To Reduce On-Going And Future Maintenance and Repair Costs Charles H. Johnson, Consultant School Facilities Planning Division California Department of Education March 7, 2001 1 Designing

More information

The Southwest Florida Water Management District (District) does not discriminate on the basis of disability. This nondiscrimination policy involves

The Southwest Florida Water Management District (District) does not discriminate on the basis of disability. This nondiscrimination policy involves Southwest Florida Water Management District Fiscal Year 2011 2012 through Fiscal Year 2015 2016 Five-Year Capital Improvements Plan (As required by Section 373.536(6)(a)3, Florida Statutes) n e td m e

More information

Inspecting to a higher standard.

Inspecting to a higher standard. Inspecting to a higher standard. Rob Hopkin Silver Spring, MD 20902 Monday, June 2, 2014 ProTec Inspection Services Inc. 19736 Selby Ave Poolesville, MD 20837 301-972-8531 www.protec-inspections.com rob@protec-inspections.com

More information

2015 Every Building Conference & Expo

2015 Every Building Conference & Expo Beauty vs. the Beast Presented by LuAnn Stiles Hill, RPA,Leed AP Senior Property Manager Liberty Property Trust Beauty vs. the Beast Position your asset to be Best in Class to meet the needs of future

More information

The Uniform Building Inspection Report Condensed

The Uniform Building Inspection Report Condensed The Uniform Building Inspection Report Condensed Single Family Residence:, Scottsdale, AZ Condensed Report Version Prepared for: John Doe Inspection Date: 9/19/2005, 1:00:00 AM Report Number: 091805s Inspection

More information

Building Condition Assessment Report

Building Condition Assessment Report C2 - Nurses Resident (aka Administration) Building Condition Assessment Report Asset Address Address Construction Year Size (Gross Floor Area) Asset Type Floors Above Ground Inspection Date C2 - Nurses

More information

How school administrators and board members are improving learning and saving money

How school administrators and board members are improving learning and saving money Energy-Smart Building Choices How school administrators and board members are improving learning and saving money School Districts Are Challenged to Provide More with Less Most school administrators and

More information

Every Student I Every Day I Every Possibility

Every Student I Every Day I Every Possibility For the Facilities Master Plan March 4, 2015 1 Introduction This has been prepared to describe a proposed process to be implemented in order to develop comprehensive Facility Master Plans for all schools

More information

Energy Action Plan 2015

Energy Action Plan 2015 Energy Action Plan 2015 Purpose: In support of the Texas A&M University Vision 2020: Creating a Culture of Excellence and Action 2015: Education First Strategic Plan, the Energy Action Plan (EAP) 2015

More information

MANUFACTURER WARRANTY LIST

MANUFACTURER WARRANTY LIST MANUFACTURER WARRANTY LIST Before contacting a manufacturer, please consult the following list to ensure the item(s) in question correspond(s) with the appropriate manufacturer(s). Once you have determined

More information

HOWARD UNIVERSITY. I. Policy Statement. II. Rationale. III. Entities Affected by the Policy. IV. Definitions. Policy Number: 300-004

HOWARD UNIVERSITY. I. Policy Statement. II. Rationale. III. Entities Affected by the Policy. IV. Definitions. Policy Number: 300-004 HOWARD UNIVERSITY Policy Number: 300-004 Policy Title: ASSET CAPITALIZATION Responsible Officer: Chief Financial Officer Responsible Offices: Office of the Controller, Departments of Strategic Sourcing

More information

#1) BEFORE Purchasing Land Here Is A Checklist Of Things You Should Check

#1) BEFORE Purchasing Land Here Is A Checklist Of Things You Should Check #1) BEFORE Purchasing Land Here Is A Checklist Of Things You Should Check Zoning laws Deed restrictions on home size, foundation style, roof pitch, etc. Suitability (slope, wetland issues, etc.) Accessibility

More information

DEARBORN HEIGHTS SCHOOL DISTRICT NO. 7 Sinking Fund Projects 10 Year Plan Proposal (2016 2025)

DEARBORN HEIGHTS SCHOOL DISTRICT NO. 7 Sinking Fund Projects 10 Year Plan Proposal (2016 2025) DEARBORN HEIGHTS SCHOOL DISTRICT NO. 7 Sinking Fund Projects 10 Year Plan Proposal (2016 2025) Year One $995,000.00 Polk electronic marquee Annapolis roof needs half of building replaced Phase One District

More information

MID-TOWN RE-DEVELOPMENT

MID-TOWN RE-DEVELOPMENT FOR SALE MID-TOWN RE-DEVELOPMENT 293 MACPHERSON AVENUE, TORONTO, ON Property Description > 21,135 square feet > 153.25 feet frontage, 89.63 feet depth > Site area: 13,735 SF > Zoning: ID2.5 Legal Description

More information

A Self-Audit of Your Current Campus Security Systems

A Self-Audit of Your Current Campus Security Systems A Self-Audit of Your Current Campus Security Systems Security Solutions for Education, Business & Public Safety Free Consultations on ID Card Systems, Access Control, Call Recording, Video Surveillance,

More information

COST OF WORK FORM. Abbreviations: ea = each, LF = linear feet, SF = square feet, HSF = square feet of living area (including garage conversion space)

COST OF WORK FORM. Abbreviations: ea = each, LF = linear feet, SF = square feet, HSF = square feet of living area (including garage conversion space) COST OF WORK FORM All costs shown are estimates using base grade materials, taxes, and labor. For houses where a higher quality is indicated, the costs should be increased for work requiring upgraded materials.

More information

Home Inspection Report

Home Inspection Report 4949 Brownsboro Rd Suite 293 Louisville, KY 40223 (502) 414-1440 tripleainspections@gmail.com Inspected By: William Carter, HI-1956 Home Inspection Report Prepared For: Edward Cullen Property Address:

More information

Presented by The Facilities Management Group TFMG / TFMG Architecture, PC. in conjunction with EMTEC Engineers, LLC

Presented by The Facilities Management Group TFMG / TFMG Architecture, PC. in conjunction with EMTEC Engineers, LLC Presented by The Facilities Management Group TFMG / TFMG Architecture, PC in conjunction with EMTEC Engineers, LLC Why are we here today? To solicit public comments to help us create the Comprehensive

More information